CN206189914U - Bathroom room - Google Patents

Bathroom room Download PDF

Info

Publication number
CN206189914U
CN206189914U CN201621092853.3U CN201621092853U CN206189914U CN 206189914 U CN206189914 U CN 206189914U CN 201621092853 U CN201621092853 U CN 201621092853U CN 206189914 U CN206189914 U CN 206189914U
Authority
CN
China
Prior art keywords
bathing room
grid layer
wall
fixed plate
base plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621092853.3U
Other languages
Chinese (zh)
Inventor
俞大有
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhuyou Zhizao Technology Investment Co., Ltd
Original Assignee
China Mingsheng Drawin Technology Investment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Mingsheng Drawin Technology Investment Co Ltd filed Critical China Mingsheng Drawin Technology Investment Co Ltd
Priority to CN201621092853.3U priority Critical patent/CN206189914U/en
Application granted granted Critical
Publication of CN206189914U publication Critical patent/CN206189914U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Finishing Walls (AREA)
  • Floor Finish (AREA)

Abstract

The utility model provides a bathroom room, including bottom plate and wallboard, its characterized in that, the bottom plate includes bottom surface and side, bottom surface and side are mainly by concrete or the disposable whole machine -shaping of fibre concrete, the whole basin type that is of bottom plate, the wall decoration board on the wall body is fixed including the installation to the wallboard, wall decoration board includes panel and check gate layer, thus, check gate layer passes through the connecting piece and is connected with wall fixing, the panel is fixed on check gate layer. Like this, bathroom room's bottom plate can seamlessly be pour, can play rigid water -proofing's effect, can produce the prefabrication in the mill, and water -proof effects is good, and intensity is high, and the wallboard site operation is efficient.

Description

A kind of bathing room
Technical field
The utility model belongs to building field, specially a kind of bathing room.
Background technology
The base plate of traditional bathing room is constructed using concrete cast-in-situ, and waterproofing process is mainly by brush water-repellent paint, paving Protective layer reaches the effect of impervious waterproof.In order to the waterproof effect that has reached it is general firstly the need of ensure the ground of bathing room compared with For steady, but if necessary to change the floor tile of bathing room, after original floor tile chisel is gone, must first will with cement mortar Floor leveling, then does water-proofing treatment, complex process again.In addition, in order to prevent water percolation of wall, also to be done about on general metope 30 centimetres of water-repellent paints high, the metope in case ponding is spread and sunk in.It follows that existing bathing room waterproof slab workload is larger, apply Work efficiency rate is low, construction cost hardly results in control.And the metope of traditional bathing room decorates way using patch block, it is mainly logical Cross following steps completion, snap the line, labeling on schedule, select brick, row's brick, leaching brick (Imitation Rock Porcelain Tiles or high-grade brick do not allow immersion), edge patch logical Seam, jointing or the wiping seam effect attractive in appearance to reach wall decoration.It follows that existing wall tile decoration way efficiency of construction Low, construction cost hardly results in control.
The content of the invention
The technical problems to be solved in the utility model is:There is provided a kind of bathing room, the base plate of the bathing room can be with factory Production is prefabricated, and good water-proof effect, intensity is high, wallboard site operation efficiency high.
What solution of the present utility model was realized in:A kind of bathing room, including base plate and wallboard, wherein, it is described Base plate includes bottom surface and side, and the bottom surface and side are main by the disposable overall machine-shaping of concrete or fiber concrete, The base plate is in integrally basin type;The wallboard includes the wall decorating veneer being fixed on wall, the wall decorating veneer bag Panel and grid layer are included, the grid layer is arranged between wall and panel, and the grid layer is fixed by connector with wall Connection, the panel is fixed on grid layer.So, the base plate of bathing room is disposably overall using concrete or fiber concrete Machine-shaping, and overall is in basin type, whole base plate is seamless to be poured, and can play a part of rigid waterproofing, and it is stainless to save installation The techniques such as steel water-proof strip side, not only good water-proof effect, and also efficiency of construction is high.Particularly, according to ultra-high performance concrete The ultra-high performance concrete of (Ultra-High Performance Concrete) or mixing of steel fiber fabricates bathing room Base plate, high intensity, high tenacity, the strong high-durability of the superelevation of low porosity of ultra-high performance concrete can be made full use of, carry The cracking strength of bathing room base plate high and fatigue life, strengthen the durability and rigidity of bathing room base plate.In addition, the bottom surface and Side overall processing shaping, can use and instead beat casting craft so that the use face of the base plate of bathing room is located at the lower section of mould, So that it is guaranteed that using face smoother, flatness is good, saves levelling construction, can directly be decorated with paving PVC floor, ceramic tile etc. Layer, so as to further improve efficiency of construction.Further, built-in fitting hole can be set on the base plate of bathing room as needed Or built-in fitting is set, and it is easy to production line balance, the manufacture of bottom surface and side engineering can be simultaneously carried out, further reduce follow-up adding Work technique, improves efficiency of construction.In addition, wall decorating veneer includes panel and grid layer, the grid layer is arranged on wall and face Between plate, the grid layer is fixedly connected by connector with wall, and the panel is fixed on grid layer.So, by Grid layer is set between wall and panel, panel can be positioned with locator card, and be laid on platform mould, at the back side of panel Brushing adhesive glue, then by grid layer concora crush on the panel of tiling, in factory with regard to prefabricated wall decorating veneer, until scene is used With matrix wall or lightgage steel joist wall be connected wall decorating veneer by the connectors such as bolt.Connector one end is fixed with grid layer, The other end is anchored in wall.Multiple connectors can be set according to the size and weight of wall decorating veneer, multiple connectors can To be evenly distributed on surrounding or the middle part of wall decorating veneer.The processing of the wall decorating veneer can use pipelining, from And the workload of site operation can be greatly reduced, it is to avoid and situ wet operation, efficiency of construction is improved, facilitate in-site installation.Certainly, Shackle member or suspension member can also be behind set in panel, panel is fixed on grid layer by shackle member or suspension member.Or Glue line is set at panel back, diaphragm is set outside glue line, when panel is installed, diaphragm is torn, then by face Plate is directly pasted and fixed on grid layer, it is also possible to greatly reduce the workload of site operation, it is to avoid situ wet operation, raising is applied Work efficiency rate.
Another technical scheme of the present utility model is that the bottom surface is provided with dry area and wet area on above-mentioned basis, The dry area and wet area are separated by projection, the projection overall machine-shaping disposable with bottom surface.So, area and wet area are done by convex Block separates, projection overall machine-shaping disposable with bottom surface, not only projection and bottom surface good forming effect, good appearance, Er Qiejia Work is easily manufactured, and efficiency of construction is high.
Another technical scheme of the present utility model is on above-mentioned basis, floor drain installation to be provided with the bottom surface Mouthful, it is provided with floor drain adapter at the floor drain installing port.So, the floor drain adapter can be together with the base plate of bathing room Prefabricated, during construction, floor uses laminated floor slab, floor drain adapter to be positioned on floor through the part correspondence of bathing room base plate A groove is reserved in position, and the bottom of floor drain adapter is placed in groove, then pours the overlapping layers of laminated floor slab, will defend The base plate and floor in bathroom are combined into entirety.Floor drain adapter part in a groove is connected with horizontally-arranged water pipe, and sewage is arranged Go out.The base plate of bathing room installs floor drain again after installing.Common direct-drainage floor drain can be so converted into by floor drain adapter Floor drain is arranged in side, so as to realize co-layer draining, and need not carry out drop plate treatment.It is of course also possible to floor drain is transferred with the floor drain Device set be structure as a whole, during construction, installing port is set on bathing room base plate, installed again after bathing room is installed floor drain and Floor drain adapter.
Another technical scheme of the present utility model is on above-mentioned basis, weathering to be additionally provided with the bottom surface Degree, the gradient is relatively low at the floor drain installing port.So, the sanitary wastewater of bathing room bottom surface smoothly can be caused into floor drain to install Floor drain adapter at mouthful simultaneously drains into drainage equipment module, so as to keep the drying of bathing room bottom surface.
Another technical scheme of the present utility model is that on above-mentioned basis, the junction of the bottom surface and side is set There is arc angling.So, the junction of bottom surface and side is provided with arc angling, the company of bottom surface and side can not only be reduced Meet place and the cracking risk of right-angle side is set, and be conducive to secondary decoration construction, without corner or spot as yet untouched by a clean-up campaign when using.
Another technical scheme of the present utility model is that the upper end of the side is provided with waterproof knot on above-mentioned basis Structure, the waterproof construction is sealing surface, groove or flanging.So, the upper end in side is provided with waterproof construction, bathing room Wallboard just directly can vertically be stuck in the base plate top of bathing room, then be sealed by breaking fluid sealant, simple structure, installation side Just, good water-proof effect.
Another technical scheme of the present utility model is that the side is made up of the anti-bank of staged on above-mentioned basis, The anti-bank of staged at least includes top half and the latter half.So, side is made up of the anti-bank of staged, can be formed many Level waterproof construction, improves the water resistance of base plate.
Another technical scheme of the present utility model is the top half size 50mm high, width on above-mentioned basis 40mm, the latter half size 50mm high, width 75mm.So, even if the surface water is as deep as to 50mm, also 50mm in bathing room Anti- water depth, equivalent to double waterproof measure, improve the water resistance of bathing room base plate.
Another technical scheme of the present utility model is that the bottom of the bottom surface is provided with ribs on above-mentioned basis Bar.So, the bottom of bottom surface is provided with supporting rib, the height of bottom surface can be increased, reduce processing materials.Further, The supporting rib can be fixed on the bottom of bottom surface with bottom surface one moulding by casting or by back-hand craft.
Another technical scheme of the present utility model be it is above-mentioned basis on, be provided with the base plate of the bathing room to Few two suspension centres, the suspension centre is that pre-buried hanging is followed closely or suspension ring.So, by default suspension centre, bathing room base plate can be facilitated Or movement, lifting and the transport of bathing room.Preferably, four suspension centres are respectively provided with four angles of bathing room base plate.
Another technical scheme of the present utility model is that on above-mentioned basis, the grid layer is setting the position of connector Notch is installed.So, grid layer can be connected with matrix wall or lightgage steel joist wall by connector, easy construction. And notch is provided with the position for setting connector in grid layer, and connector can be embedded in notch, keep the flat of grid layer Whole property, does not interfere with grid layer concora crush on the panel of tiling.
Another technical scheme of the present utility model is that the connector includes screw, the spiral shell on above-mentioned basis Nail afterbody is provided with U-shaped fixed plate and arc type fixed plate.So, can be by U-shaped fixed plate and arc type fixed plate by lattice Gate layer is fixedly linked, then by screw anchor on matrix wall or lightgage steel joist wall.The U-shaped fixed plate and arc type are fixed The length and size of plate, can be adjusted by the grid cell size of grid layer.In this way, the connector can well by Grid layer is fixed, and installation is also very convenient.
Another technical scheme of the present utility model is that the grid layer is fixed on U-shaped fixed plate on above-mentioned basis And arc type fixed plate between, the arc type fixed plate is arranged at the notch of grid.So, arc type fixed plate is set At the notch of grid, can be embedded in notch with arc type fixed plate, keep grid layer overall leveling, do not interfere with by Grid layer concora crush is on the panel of tiling.
Another technical scheme of the present utility model is that the connector includes reinforcing plate and some on above-mentioned basis Screw, the screw is distributed in reinforcing plate, and the screw afterbody is provided with U-shaped fixed plate.So, can be by grid layer Admittedly it is solid on matrix wall or lightgage steel joist wall by reinforcing plate and screw.Screw afterbody is provided with U-shaped fixed plate, can strengthen Connector and the lifting surface area of grid layer, improve the fixed effect of connector.
Another technical scheme of the present utility model is that on above-mentioned basis, the screw is hexangle type spiral shell in double head belt Nail or swell fixture or countersunk self-tapping screw.So, it is easily installed fixation, it may have certain versatility, easy construction.
Another technical scheme of the present utility model be it is above-mentioned basis on, the size of the U-shaped fixed plate with it is described The grizzly bar pitch match of grid layer, the two ends of the U-shaped fixed plate are fixed in adjacent grill.So, can strengthen connecting Fitting and the lifting surface area of grid layer, improve the fixed effect of connector.
Brief description of the drawings
Fig. 1 is the sectional view of the base plate for representing the bathing room involved by a kind of implementation method of this technology;
Fig. 2 is the sectional view of the production mould of the base plate for representing the bathing room involved by a kind of implementation method of this technology;
Fig. 3 is the structure chart of the base plate for representing the bathing room involved by a kind of implementation method of this technology;
Fig. 4 is the partial section of the base plate for representing the bathing room involved by this technology another embodiment;
Fig. 5 is the floor drain discharge structure figure for representing the bathing room involved by a kind of implementation method of this technology;
Fig. 6 is the local structural graph for representing the bathing room involved by a kind of implementation method of this technology;
Fig. 7 is the installation diagram of the wall decorating veneer for representing the bathing room involved by a kind of implementation method of this technology;
Fig. 8 is the partial perspective view of the wall decorating veneer for representing the bathing room involved by a kind of implementation method of this technology;
Fig. 9 is the structure of the installation connection of the wall decorating veneer for representing the bathing room involved by a kind of implementation method of this technology Figure;
Figure 10 is the local structural graph of the wall decorating veneer for representing the bathing room involved by this technology another embodiment;
Figure 11 is that the local of wall decorating veneer for representing the bathing room involved by this technology another embodiment installs knot Composition;
Figure 12 is the structure chart for representing the bathing room involved by a kind of implementation method of this technology;
Figure 13 is to represent the partial enlarged drawing in Figure 12 at A.
In figure:
The waterproof construction of 10 production mould, 11 bottom surface, 12 side 13
The projection of 14 arc angling, 15 dry area, 16 wet area 17
The import of 18 floor drain installing port, 19 supporting rib, 50 floor drain 51
The 52 outlet T-shaped flanks of annulus of 53 reducing transfer tube 54
The top half of 55 ground leaking drainage pipe, 121 the latter half 122
The wall of 21 grid layer, 22 panel 100
The screw of 23 clearance layer, 24 notch 31
The annular lug of 32 U-shaped fixed plate, 33 arc type fixed plate 34
The reinforcing plate of 35 fixing nut 36
Specific embodiment
The utility model is described in detail below in conjunction with the accompanying drawings, the description of this part be only it is exemplary and explanatory, There should not be any restriction effect to protection domain of the present utility model.Additionally, those skilled in the art's retouching according to presents State, respective combination can be carried out to the feature in embodiment in presents and in different embodiments.
The utility model embodiment is as follows, refers to shown in Fig. 1 to 13, a kind of bathing room, including base plate and wallboard, its In, the base plate includes bottom surface 11 and side 12, the bottom surface 11 and side 12 it is main by concrete or fiber concrete once Property overall processing shaping, the base plate integrally be in basin type;The wallboard includes the wall body decoration being fixed on wall 100 Plate, the wall decorating veneer includes panel 22 and grid layer 21, and the grid layer 21 is arranged between wall 100 and panel 22, The grid layer 21 is fixedly connected by connector with wall 100, and the panel 22 is fixed on grid layer 21.So, bathroom Base plate is using concrete or fiber concrete disposable entirety machine-shaping, and overall is in basin type, and whole base plate is seamless to be poured, energy Enough play a part of rigid waterproofing, and save the techniques such as installation stainless steel water-proof strip side, not only good water-proof effect, and construction effect Rate is high.Particularly, according to ultra-high performance concrete (Ultra-High Performance Concrete) or mixing of steel fiber Ultra-high performance concrete fabricate the base plate of bathing room, high intensity, the height of ultra-high performance concrete can be made full use of Toughness, the strong high-durability of the superelevation of low porosity, improve cracking strength and the fatigue life of bathroom base plate, enhancing bathroom base plate Durability and rigidity.In addition, the bottom surface 11 and the shaping of the overall processing of side 12, as shown in Fig. 2 bathroom base plate can be using anti- Casting craft is beaten so that the use face of bathroom base plate is located at the lower section of production mould 10, so that it is guaranteed that using face smoother, putting down It is whole to spend, levelling construction is saved, directly can be with decorative layers such as paving PVC floor, ceramic tiles, so as to further improve efficiency of construction. Further, built-in fitting hole can be set on bathroom base plate as needed or built-in fitting is set, be easy to production line balance, The manufacture of bottom surface and side engineering can be simultaneously carried out, subsequent machining technology is further reduced, efficiency of construction is improved.In addition, described Wall decorating veneer includes panel 22 and grid layer 21, and the grid layer 21 is arranged between wall 100 and panel 22, the grid Layer 21 is fixedly connected by connector with wall 100, and the panel 22 is fixed on grid layer 21.So, by wall 100 Grid layer 21 is set and panel 22 between, during construction, panel 22 can be positioned with locator card, and be laid on platform mould, The back side brushing adhesive glue of panel 22, then by the concora crush of grid layer 21 on the panel 22 of tiling, wall decorating veneer is formed, until it is existing With matrix wall or lightgage steel joist wall be connected wall decorating veneer by the connectors such as field bolt, the processing of the wall decorating veneer Pipelining can be used, such that it is able to greatly reduce the workload of site operation, it is to avoid situ wet operation, construction effect is improved Rate, facilitates in-site installation.It is of course also possible to set shackle member or suspension member behind in panel 22, panel 22 can directly pass through Shackle member or suspension member are fixed on grid layer 21.Or glue line is set at the back of panel 22, in glue line peripheral hardware Put diaphragm, when panel is installed, diaphragm is torn, then directly panel 22 is pasted and fixed on grid layer 21, so also may be used To greatly reduce the workload of site operation, it is to avoid situ wet operation, efficiency of construction is improved.
On the basis of above-described embodiment, in another embodiment of the utility model, as shown in Figure 3 and Figure 4, the bottom surface can To be provided with dry area 15 and wet area 16, the dry area 15 and wet area 16 are separated by projection 17, and the projection 17 can be with bottom surface one Secondary property overall processing shaping.So, do area 15 and wet area 16 is separated by projection 17, projection 17 is disposably integrally processed into bottom surface Type, not only projection 17 and bottom surface good forming effect, good appearance, and convenient processing and manufacture, efficiency of construction is high.
On the basis of above-described embodiment, in another embodiment of the utility model, as shown in Figure 4 and Figure 5, the bottom surface 11 Floor drain installing port 18 is provided with, floor drain adapter is provided with the floor drain installing port 18.So, the floor drain adapter can be with Prefabricated together with the base plate of bathing room, during construction, floor uses laminated floor slab, floor drain adapter to pass through the part of bathing room base plate A groove is reserved in the position that correspondence is positioned on floor, and the bottom of floor drain adapter is placed in groove, then pours folded The overlapping layers of floor is closed, the base plate and floor of bathing room are combined into entirety.Floor drain adapter lower part outlet and ground leaking drainage pipe 55 are connected, and sewage is discharged.The base plate of bathing room installs floor drain 50 again after installing.Common direct-drainage floor drain can so be led to Cross floor drain adapter and be converted into side row's floor drain, so as to realize co-layer draining, and drop plate treatment need not be carried out.It is of course also possible to will Floor drain 50 sets with the floor drain adapter and is structure as a whole, and during construction, installing port is set on bathroom base plate, by bathroom base plate Floor drain and floor drain adapter are installed again after installing.Further, the floor drain adapter includes an import 51 and one outlet 52, connected by 90 ° of reducing transfer tubes 53 between the import 51 and outlet 52, the reducing transfer tube 53 is at import 51 Outer wall on be provided with the T-shaped flank 54 of annulus.So, it is provided with circle on the outer wall at import 51 in reducing transfer tube 53 The T-shaped flank 54 of ring, the T-shaped flank 54 of annulus is merged one in being well embedded in the base plate 11 of bathroom with concrete Rise, the installation sealing for later stage floor drain 50 plays a good role, and can improve floor drain 50 close with being connected for floor drain adapter Envelope effect.
On the basis of above-described embodiment, in another embodiment of the utility model, as described in Figure 4, also set on the bottom surface Drainage grade (not illustrating in figure) is equipped with, the gradient is relatively low at the floor drain installing port 18.So, can smoothly by bathing room bottom During the sanitary wastewater in face causes the floor drain adapter at floor drain installing port 18 and drains into drainage equipment module, so as to keep bathing room The drying of bottom surface.
On the basis of above-described embodiment, in another embodiment of the utility model, as shown in figure 1, the bottom surface 11 and side The junction in face 12 can be provided with arc angling 14.So, the junction of bottom surface 11 and side 12 is provided with arc angling 14, the junction that can not only reduce bottom surface 11 and side 12 sets the cracking risk of right-angle side, and is conducive to secondary decoration Construction, without corner or spot as yet untouched by a clean-up campaign when using.
On the basis of above-described embodiment, in another embodiment of the utility model, as shown in figures 1 to 6, the side 12 Upper end be provided with waterproof construction 13, the waterproof construction 13 can be sealing surface, groove or flanging.So, in side 12 Upper end be provided with waterproof construction 13, the wallboard of bathing room just directly can vertically be stuck in the base plate top of bathing room, then pass through Break fluid sealant to be sealed, simple structure is easy for installation, good water-proof effect.
On the basis of above-described embodiment, in another embodiment of the utility model, as shown in fig. 6, the side 12 is by rank The anti-bank composition of ladder type, the anti-bank of staged at least includes top half 122 and the latter half 121.So, side is by staged Anti- bank composition, can form multi-level waterproof construction 13, improve the water resistance of bathroom base plate.Preferably, the first half 122 sizes are divided to be 50mm high, width 40mm, the size of the latter half 121 is 50mm high, width 75mm.So, even if in bathing room As deep as to 50mm, the anti-water depth of also 50mm, equivalent to double waterproof measure, improves the water proofing property of bathroom base plate to the surface water Energy.
On the basis of above-described embodiment, in another embodiment of the utility model, as shown in figure 5, the bottom of the bottom surface 11 Portion is also provided with supporting rib 19.So, the bottom in bottom surface 11 is provided with supporting rib 19, can increase bottom surface 11 Highly, processing materials are reduced.Further, the supporting rib 19 can be with the one moulding by casting of bottom surface 11 or by anti-manual labour Skill is fixed on the bottom of bottom surface 11.
On the basis of above-described embodiment, in another embodiment of the utility model, it is provided with least on the bathroom base plate Two suspension centres, the suspension centre is that pre-buried hanging is followed closely or suspension ring (not indicated in figure).So, by default suspension centre, can be conveniently Movement, lifting and the transport of the base plate or bathing room of bathing room.Preferably, set respectively on four angles of bathing room base plate Put four suspension centres.
On the basis of above-described embodiment, in another embodiment of the utility model, as shown in Figure 8 and Figure 11, grid layer 21 Notch 24 is provided with the position for setting connector.So, can be by connector by grid layer 21 and matrix wall or lightgage steel joist Wall is connected, easy construction.And notch 24 is provided with the position for setting connector in grid layer 21, connector can be embedded in In notch 24, the planarization of grid layer is kept, do not interfered with the concora crush of grid layer 21 on the panel 22 of tiling.
On the basis of above-described embodiment, in another embodiment of the utility model, as shown in figures 7 and 12, the grid Clearance layer 23 is provided between layer 21 and wall 100.So, clearance layer 23, wall body decoration are set between grid layer and wall Plate is applied to bathing room or kitchen, even if water or vapor are immersed in wall decorating veneer by panel, also can be by gap Layer is down drained, therefore clearance layer can play certain waterproof action, it is also possible to pass through clearance layer row line and pipeline Arrangement, facilitates the installation or maintenance of electrical equipment.
On the basis of above-described embodiment, in another embodiment of the utility model, as shown in figure 9, the connector can be with Including screw 31, the afterbody of the screw 31 is provided with U-shaped fixed plate 32 and arc type fixed plate 33.So, can be by U-shaped solid Be fixedly linked for grid layer 21 by fixed board 32 and arc type fixed plate 33, is then anchored at matrix wall or lightgage steel joist by screw 31 On wall.The length and size of the U-shaped fixed plate 32 and arc type fixed plate 33, can be big by the grid cell of grid layer 21 It is small to adjust.In this way, the connector well can fix grid layer, installation is also very convenient.
On the basis of above-described embodiment, in another embodiment of the utility model, as shown in figure 9, the head of the screw 31 Portion and afterbody are provided with screw thread, and the middle part of the screw 31 is provided with annular lug 34.So, the head and afterbody in screw set Screw thread is equipped with, is easy to for screw 31 fixation to be installed, and the middle part of screw 31 is provided with annular lug 34, this aspect can be propped up The U-shaped fixed plate 32 of support fixation, is easy to the fixation of grid 21, on the other hand, when grid is fixed by connector and is anchored at matrix When on wall or lightgage steel joist wall, due to being provided with annular lug 34 in the middle part of screw, in grid and matrix wall or lightgage steel joist wall On can form certain gap, so, when grid is applied to bathing room or kitchen, gap can be formed between grid and wall Layer, can play certain waterproof action, it is also possible to enter the arrangement of row line and pipeline by clearance layer, facilitate electrical equipment Install or safeguard.
On the basis of above-described embodiment, in another embodiment of the utility model, the screw afterbody is additionally provided with fixation Nut 35, the fixing nut 35 is arranged on the outside of arc type fixed plate 33.So, word can will be bent by fixing nut 35 Type fixed plate 33 is fixed, and then grid is placed between U-shaped fixed plate 32 and arc type fixed plate 33.
On the basis of above-described embodiment, in another embodiment of the utility model, as shown in figure 8, the grid layer 21 is solid It is scheduled between U-shaped fixed plate 32 and arc type fixed plate 33, the arc type fixed plate 33 is arranged at the notch 24 of grid.This Sample, arc type fixed plate 33 is arranged at the notch 24 of grid, can be embedded in notch 24 with arc type fixed plate 33, is kept The overall leveling of grid layer, does not interfere with the concora crush of grid layer 21 on the panel 22 of tiling.
On the basis of above-described embodiment, in another embodiment of the utility model, as shown in Figure 10 and Figure 11, the connection Part can also include reinforcing plate 36 and some screws 31, and the screw 31 is distributed in reinforcing plate 36, the tail of the screw 31 Portion is provided with U-shaped fixed plate 32.So, can be solid in matrix wall or light steel admittedly by reinforcing plate 36 and screw 31 by grid layer 21 On keel wall.The afterbody of screw 31 is provided with U-shaped fixed plate 32, the lifting surface area of connector and grid layer 21 can be strengthened, carry The fixed effect of connector high.
On the basis of above-described embodiment, in another embodiment of the utility model, the screw 31 can be in double head belt Hexangle type screw or swell fixture or countersunk self-tapping screw.So, it is easily installed fixation, it may have certain versatility, constructs It is convenient.
On the basis of above-described embodiment, in another embodiment of the utility model, the size of the U-shaped fixed plate 32 and institute The grizzly bar pitch match of grid layer 21 is stated, the two ends of the U-shaped fixed plate are fixed in adjacent grill.So, Ke Yijia Strong ties part and the lifting surface area of grid layer, improve the fixed effect of connector.
The above is only preferred embodiment of the present utility model, it is noted that for the common skill of the art For art personnel, on the premise of the utility model principle is not departed from, some improvements and modifications can also be made, these improve and Retouching also should be regarded as protection domain of the present utility model.

Claims (10)

1. a kind of bathing room, including base plate and wallboard, it is characterised in that the base plate include bottom surface and side, the bottom surface and Side is main by the disposable overall machine-shaping of concrete or fiber concrete, and the base plate is in integrally basin type;The wallboard bag The wall decorating veneer being fixed on wall is included, the wall decorating veneer includes panel and grid layer, and the grid layer is set Between wall and panel, the grid layer is fixedly connected by connector with wall, and the panel is fixed on grid layer.
2. bathing room according to claim 1, it is characterised in that the bottom surface is provided with dry area and wet area, the dry area Separated by projection with wet area, the projection overall machine-shaping disposable with bottom surface.
3. bathing room according to claim 1, it is characterised in that the bottom surface is provided with floor drain installing port, the floor drain Floor drain adapter is provided with installing port.
4. bathing room according to claim 3, it is characterised in that drainage grade is additionally provided with the bottom surface, describedly The gradient is relatively low at leakage installing port.
5. bathing room according to claim 1, it is characterised in that the junction of the bottom surface and side is provided with arc and falls Angle.
6. bathing room according to claim 1, it is characterised in that the upper end of the side is provided with waterproof construction, described Waterproof construction is sealing surface, groove or flanging.
7. bathing room according to claim 1, it is characterised in that the side is made up of the anti-bank of staged, the ladder The anti-bank of formula at least includes top half and the latter half;Or, the top half size 50mm high, width 40mm, the lower half Portion size 50mm high, width 75mm.
8. bathing room according to any one of claim 1 to 7, it is characterised in that set on the base plate of the bathing room There are at least two suspension centres, the suspension centre is that pre-buried hanging is followed closely or suspension ring.
9. bathing room according to any one of claim 1 to 7, it is characterised in that the connector includes screw, described Screw afterbody is provided with U-shaped fixed plate and arc type fixed plate;The grid layer is fixed on U-shaped fixed plate and arc type fixed plate Between, the grid layer is provided with notch with the bearing of connector, and the arc type fixed plate is arranged at the notch of grid.
10. bathing room according to any one of claim 1 to 7, it is characterised in that the connector include reinforcing plate and Some screws, the screw is distributed in reinforcing plate, and the screw afterbody is provided with U-shaped fixed plate, the U-shaped fixed plate Size and the grid layer grizzly bar pitch match, the two ends of the U-shaped fixed plate are fixed in adjacent grill.
CN201621092853.3U 2016-09-29 2016-09-29 Bathroom room Active CN206189914U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621092853.3U CN206189914U (en) 2016-09-29 2016-09-29 Bathroom room

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621092853.3U CN206189914U (en) 2016-09-29 2016-09-29 Bathroom room

Publications (1)

Publication Number Publication Date
CN206189914U true CN206189914U (en) 2017-05-24

Family

ID=58730436

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621092853.3U Active CN206189914U (en) 2016-09-29 2016-09-29 Bathroom room

Country Status (1)

Country Link
CN (1) CN206189914U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107313615A (en) * 2017-07-27 2017-11-03 华科住宅工业(东莞)有限公司 A kind of agent structure of integral bathroom

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107313615A (en) * 2017-07-27 2017-11-03 华科住宅工业(东莞)有限公司 A kind of agent structure of integral bathroom

Similar Documents

Publication Publication Date Title
CN106958358A (en) The industrialization commercial residential buildings of energy-conserving and environment-protective
CN206189906U (en) Bathroom room
CN203394108U (en) Fabricated bathroom
CN208777468U (en) A kind of kitchen and bath's water-proofing anticracking structure
CN206189914U (en) Bathroom room
CN206189912U (en) Bathroom bottom plate
CN206189909U (en) Bathroom room
CN206616888U (en) A kind of bathing room
CN206189916U (en) Bathroom room
CN208996333U (en) A kind of inverted roof balcony node waterproof structure
CN206189908U (en) Bathroom room
CN207499071U (en) toilet
CN109797988A (en) A kind of co-layer draining hard-cover precast block toilet of outer wall provided pipe line groove hole
CN206942232U (en) A kind of agent structure of integral bathroom
CN206530009U (en) A kind of bathroom bottom plate
CN206530084U (en) A kind of bathroom bottom plate
CN206385828U (en) A kind of bathing room
CN206329067U (en) A kind of bathing room
CN209585309U (en) Subsided rest room waterproof construction
CN104790472B (en) Same floor drainage structure of toilet
CN106320749A (en) Bathroom
CN206189911U (en) Bathroom room
CN206189907U (en) Bathroom room
CN208981671U (en) A kind of French building eave structure
CN206189905U (en) Bathroom room

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: China Civil Architecture Friends Technology (Jiaozhou) Co., Ltd.

Assignor: CHINA MINGSHENG DRAWIN TECHNOLOGY INVESTMENT CO., LTD.

Contract record no.: 2018430000023

Denomination of utility model: Bathroom

Granted publication date: 20170524

License type: Common License

Record date: 20190102

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Nanning Zhongmin zhuyou Intelligent Manufacturing Technology Co., Ltd

Assignor: CHINA MINGSHENG DRAWIN TECHNOLOGY INVESTMENT CO., LTD.

Contract record no.: X2019430000004

Denomination of utility model: Bathroom

Granted publication date: 20170524

License type: Common License

Record date: 20191105

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Xiangxi Zhongmin zhuyou Technology Co., Ltd

Assignor: CHINA MINGSHENG DRAWIN TECHNOLOGY INVESTMENT CO., LTD.

Contract record no.: X2020430000002

Denomination of utility model: Bathroom

Granted publication date: 20170524

License type: Common License

Record date: 20200305

CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 5 / F, office building 2, Zhongmin zhuyou Co., Ltd., No. 10, Zhongshi Road, shaping street, Kaifu District, Changsha City, Hunan Province, 410000

Patentee after: Zhuyou Zhizao Technology Investment Co., Ltd

Address before: 410205 comprehensive building in Hunan province Changsha Kaifu District, No. 30 Xingang Road, Changsha Jinxia bonded logistics center room 3005

Patentee before: CHINA MINGSHENG DRAWIN TECHNOLOGY INVESTMENT Ltd.

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Nantong Zhongmin zhuyou Zhizao Technology Co., Ltd

Assignor: Zhuyou Zhizao Technology Investment Co., Ltd

Contract record no.: X2020980007488

Denomination of utility model: A bathroom

Granted publication date: 20170524

License type: Common License

Record date: 20201105

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Hunan Yuanfeng Construction Engineering Co.,Ltd.

Assignor: Zhuyou Zhizao Technology Investment Co., Ltd

Contract record no.: X2021980000884

Denomination of utility model: A bathroom

Granted publication date: 20170524

License type: Common License

Record date: 20210203

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Hunan Hailong Construction Engineering Co.,Ltd.

Assignor: Zhuyou Zhizao Technology Investment Co., Ltd

Contract record no.: X2021980001039

Denomination of utility model: A bathroom

Granted publication date: 20170524

License type: Common License

Record date: 20210207