CN108661682A CN201810409903.3A CN201810409903A CN108661682A CN 108661682 A CN108661682 A CN 108661682A CN 201810409903 A CN201810409903 A CN 201810409903A CN 108661682 A CN108661682 A CN 108661682A
Authority
CN
China
Prior art keywords
anchor cable
top plate
water
anchor
slip casting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810409903.3A
Other languages
Chinese (zh)
Other versions
CN108661682B (en
Inventor
杨晓成
马忠跃
王海凤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yangquan Coal Industry Group Co Ltd
Original Assignee
Yangquan Coal Industry Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yangquan Coal Industry Group Co Ltd filed Critical Yangquan Coal Industry Group Co Ltd
Priority to CN201810409903.3A priority Critical patent/CN108661682B/en
Publication of CN108661682A publication Critical patent/CN108661682A/en
Application granted granted Critical
Publication of CN108661682B publication Critical patent/CN108661682B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/02Setting anchoring-bolts with provisions for grouting
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/02Setting anchoring-bolts with provisions for grouting
    • E21D20/028Devices or accesories for injecting a grouting liquid in a bore-hole

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

A kind of weak cementing rich water top plate anchor cable hole grouting water blocking method, it is therefore an objective to solve weak cementing rich water top plate anchor cable hole water drenching support issues and anti-anchor cable gets rusty;The method of the present invention is the comprehensive length and diameter for determining required solid cable body during endoscope probe insertion has drilled;Gunite concrete enclosing tunnel immediately after tunnel excavates, beats and carries out secondary injection concrete after anchor pole linked network again;Anchor cable drilling is carried out in back surface direction in back using anchor cable rig;Solid cable body is packed into the anchor cable hole accomplished fluently, and is fully anchored with hard surrounding rock by the anchoring cartridge of anchor cable end;Rigid circular pipe is installed successively, meets slurry expansion type stop grouting plug, slip casting pallet and lockset, seals aperture;Tensioner is pre-tightened mounted in solid cable body revealed section tensioning;Slip casting is carried out to the anchor cable hole slip casting section between anchoring section and stop grouting plug, prevents the water in top plate water-bearing layer from infiltrating into top plate coal petrography by anchor cable hole, to play the role of waterproof water blockoff.

Description

A kind of weak cementing rich water top plate anchor cable hole grouting water blocking method
Technical field
The present invention relates to coal mine down-hole tunnel surrounding rock supporting technical field, specially a kind of weak cementing rich water top plate anchor cable hole Grouting water blocking method.
Background technology
The stabilization of roadway surrounding rock is that country rock and prop are coefficient as a result, country rock inherently supporting construction or supporting The indivisible important component of structure.The supporting of coal mine roadway experienced log hut supporting, build and condemn supporting, shaped steel supporting to anchor Bar(Rope)The lengthy procedure of supporting.With small aperture anchor support technology and the maturation of supporting technology, resin anchoring agent anchor cable branch The application protected in mine working, tunnel, underground chamber and other underground structures is more and more extensive.Using resin anchoring agent Small aperture anchor supporting has the advantages that construction equipment is easy, speed of application is fast, anchoring effect is good low with labor intensity etc..With Being continuously increased for roadway excavation depth, the case where roadway surrounding rock is in water-bearing layer more and more, weak cementing rich water roadway in the roof There are following characteristics, and Seam Roof And Floor first is mostly the weak cementing soft rock such as charcoal mudrock, packsand, mud stone, silty, this Class soft rock forms unique physico-mechanical properties, more complete under native state, has certain green strength, but easily disturb Dynamic, easy-weathering meets the easy argillization of water and disintegration, and for most of rock mostly based on argillaceous agglutination, lithology is poor;Secondly when anchor cable hole is long Between a large amount of water drenchings, be easy to make Anchor Cable Anchorage and the body of rod that corrosion and corrosion occurs, lead to intermediate plate locking failure, cause anchorage, pallet It glides, hidden trouble is brought to mine safety;In addition, roof water infiltrates into top plate coal petrography by anchor cable hole, top plate is met after water easily Softening, disintegration cause roadway support difficult.The method used at present to solve this problem mainly has top plate grouting for water blocking and adopts Anchor cable is anchored with slip casting.Since the general distribution in top plate water-bearing layer is wider, and saturation state changes greatly, using top plate slip casting Method it is of high cost, effect is poor and influences normal tunnelling again.Anchor cable is anchored using slip casting, anchor cable body is hollow structure, anchor Tenacity is relatively low, and operational procedure is complicated, and when anchor cable hole water drenching is larger, and slip casting effect is not easy to control, is subsequent exploitation Safety has buried hidden danger.
Invention content
The invention aims to overcome the shortcomings of above-mentioned prior art, weak cementing rich water top plate anchor can be solved by providing one kind Rope hole water drenching support issues, anti-anchor cable get rusty and realize the weak cementing rich water top plate of one kind of anchor cable high intensity overall length pretightning force anchoring Anchor cable hole grouting water blocking method.
The method of the present invention is as follows:
(1)Drilling is pried through:Endoscope probe is inserted into having drilled and is gradually goed deep into, by detecting bore inner damage and structure Situation, and shown, recorded and stored by image, so that it is determined that the developmental state of the position in top plate water-bearing layer and crack, After considering the parameters such as stress state and mechanical property, anchor cable laying mode residing for drift section size, country rock again, then determine The length and diameter of solid cable body.
(2)Whitewashing enclosing tunnel surface:Tunnel carries out the gunite concrete enclosing tunnel of first time immediately after excavating, just first Thickness 45-55mm is sprayed, beats and carries out second of gunite concrete after anchor pole linked network again, spray 45-55mm again, gunite concrete is total twice Thickness is 100mm.
(3)Play anchor cable drilling:It is drilled in back construction anchor cable using MFC-1392/3657 anchor cable rigs, anchor cable bores Hole is perpendicular to back surface.The parameter of drilling is determined according to the specification of the length of anchor cable, diameter and drilling machine.
(4)Anchor anchor cable:Solid cable body is packed into the anchor cable hole accomplished fluently, and by the anchoring cartridge of anchor cable end with it is hard Country rock fully anchors;Anchorage cable anchoring section(Refer to anchoring cartridge by the region of anchor cable and country rock anchoring)It should be on water-bearing layer top;It is solid Cable body protruded length is 150mm-200mm.
(5)Water blockoff structure is installed:Rigid circular pipe is installed successively in anchor cable drilling, meets slurry expansion type stop grouting plug, slip casting support Disk and lockset, seal aperture.
(6)Stretch-draw anchor:MQ18-200/63 tensioners are mounted on solid cable body revealed section, by lockset to solid Cable body carries out tensioning preload.
(7)Slip casting:Slip casting is carried out to the slip casting section of anchor cable hole by the injected hole and rigid circular pipe of slip casting pallet, prevents top The water in plate water-bearing layer infiltrates into top plate coal petrography by anchor cable hole, to play the role of waterproof water blockoff.Slip casting section is located at anchoring section Between stop grouting plug.Injection slurry uses the ratio of mud(Mass ratio)1-1.1:1 cement mortar and density 1.50g/cm3Waterglass with 1:The mass ratio of 0.5-0.8 is formulated, and is advisable with filling hole and solidifying.
The used slip casting pallet of the above method is the butterfly pallet with injected hole, and slip casting pallet is sleeved on solid cable body; Anchor cable hole grouting pipeline is rigid circular pipe, is installed in anchor cable drilling by injected hole.Lockset is located at slip casting pallet lower part, lockset Inner surface has the internal thread that matches with solid cable body outer surface, and slip casting pallet is fixed by lockset, and to solid cable body into Row tensioning pre-tightens.Meet the rope made of hemp or other materials plug that slurry expansion type stop grouting plug is orifice position winding.Pass through slip casting pallet Injected hole and rigid circular pipe to slip casting section slip casting.Anchorage cable anchoring section should be located at anchoring section on water-bearing layer top, slip casting section and stop Between slurry plug.
The method of the present invention can solve the problems, such as the insurmountable weak cementing rich water top plate anchor cable hole water drenching of general method for protecting support, A kind of weak cementing rich water top plate anchor cable hole grouting for water blocking structure and grouting water blocking method are provided, is suitable for top plate rich in water and more It is used for the tunnel of the weak cementing soft rock such as charcoal mudrock, packsand, mud stone, silty.Anchor cable hole may be implemented in the present invention Grouting for water blocking, make in top plate water be restored to original state, to prevent anchor cable from getting rusty, intermediate plate locking failure, realize that anchor cable is high Intensity overall length pretightning force anchors, and controlroof country rock effect is good;Anchor cable is anchored compared to top plate grouting for water blocking and slip casting, except supporting is strong Outside degree height and convenient construction, also there is simple in structure, easy to process, lower-cost advantage.
Description of the drawings
Fig. 1 is constructing structure schematic diagram of the present invention.
In figure:1, solid cable body, 2, anchorage cable anchoring section, 3, anchor rope grouting section, 4, rigid circular pipe, 5, slip casting pallet, 6, note Starch hole, 7, lockset, 8, meet slurry expansion type stop grouting plug, 9, top plate water-bearing layer.
Specific implementation mode
The big 111801 haulage gate roof and floor of South Lake mine in Hami is mostly weak cementing rock stratum, and country rock cementing properties is poor, intensity is relatively low, Surrounding Rock Strength further weakens under the influence of top plate water-bearing layer, causes roadway support difficult.Pass through roadway layout weep hole collection In it is hydrophobic can alleviate roof timbering problem, but the infiltration of roof water, which is appointed, can so corrode weak cementing rock stratum, this weak to reduce Change effect and improve Surrounding Rock Strength, by the method for the invention anchor cable hole grouting for water blocking combination anchor cable the extensible bolting, the whitewashing of tunnel surface The small-scale water conservation of back is realized in equal measures, and circulating water is become influence of the Static Water reduction to anchoring body intensity.Using Anchor cable specification is 19 strands of steel strand wires small-bore prestress anchorage cables of Φ 21.6mm × L6300mm, and every anchor cable matches one piece Specification is one piece of the dish-like slip casting anchor pallets of 300 × 300 × 16mm, and hemispherical high intensity adjusting center washer and lockset are a set of, top plate Array pitch is 1400mm × 1600mm between anchor cable, and it is 200KN that anchor cable, which applies pretightning force,.The mine is proved by type approval test:Using Back grouting cable anchor of the present invention rationally water conservation+water drenching amount is big and has control conducive to hydrophobic tunnel lower centralized arrangement weep hole The Comprehensive Control Technology that hydrophobic+high-performance high-reliability bolting and rope support is combined is good to the control effect of roadway surrounding rock. The specific steps are:
(1)Drilling is pried through:9 position of top plate water-bearing layer, roof fracture etc. are observed, 9 position of top plate water-bearing layer is closer away from back When, it is to be ensured that anchorage cable anchoring section 2 should be on 9 top of top plate water-bearing layer.
(2)Whitewashing enclosing tunnel surface:Linked network suspension roof support immediately after tunnel excavates, carries out the gunite concrete of first time Enclosing tunnel first just sprays 50mm, beats and carry out second of gunite concrete after anchor pole linked network again, spray 50mm again, spray coagulation twice Native overall thickness is 100mm.
(3)Play anchor cable drilling:It is drilled in back construction anchor cable using anchor cable rig, anchorage cable anchoring section should contain in top plate 9 top of water layer.
(4)Anchor anchor cable:Anchor cable is packed into the anchor cable hole accomplished fluently in advance, is fully anchored, 1 protruded length of solid cable body is 200mm。
(5)Water blockoff structure is installed:Grouting pipeline 4 is installed successively, meets slurry expansion type stop grouting plug 8, slip casting pallet 5 and lockset 7, Seal aperture.
(6)Stretch-draw anchor:Tensioning preload is carried out to solid cable body 1 by lockset 7 using tensioner.
Slip casting:Slip casting is carried out to anchor cable hole by rigid circular pipe 4, cement mortar and silicate ratio are 1 in slurries:0.5, note Slurry amount is advisable with filling hole and solidifying.
Slip casting pallet 5 used is the butterfly pallet with injected hole 6, and slip casting pallet 5 is sleeved on solid cable body 1;Rigidity circle Pipe 4 is anchor cable hole grouting pipeline, is installed in anchor cable drilling by injected hole 6.Lockset 7 is located at slip casting pallet lower part, in lockset 7 Surface has the internal thread to match with 1 outer surface of solid cable body, fixes slip casting pallet 5 by lockset, and to anchor cable Shu Jinhang Tensioning pre-tightens.Slurry expansion type stop grouting plug 8 is met as the rope made of hemp or other materials plug of orifice position winding.Pass through slip casting pallet 5 Injected hole 6 and rigid circular pipe 4 to 3 slip casting of slip casting section.Anchorage cable anchoring section 2 should be located at anchoring section on water-bearing layer top, slip casting section 3 Between 2 and chance slurry expansion type stop grouting plug 8.

Claims (8)

1. a kind of weak cementing rich water top plate anchor cable hole grouting water blocking method, it is characterized in that:
(1)Drilling is pried through:Endoscope probe is inserted into having drilled and is gradually goed deep into, by detecting bore inner damage and structure Top plate water-bearing layer position and fractured situation are determined, with the length and diameter of solid cable body required for comprehensive determine;
(2)Whitewashing enclosing tunnel surface:Gunite concrete enclosing tunnel immediately after tunnel excavates, beats and carries out two after anchor pole linked network again Secondary gunite concrete;
(3)Play anchor cable drilling:Anchor cable drilling is carried out in back surface direction in back using anchor cable rig;
(4)Anchor anchor cable:Solid cable body is packed into the anchor cable hole accomplished fluently, and the anchoring cartridge and hard surrounding rock for passing through anchor cable end Fully anchoring;Anchoring cartridge is by anchor cable and the anchorage cable anchoring section of country rock anchoring on water-bearing layer top;
(5)Water blockoff structure is installed:Rigid circular pipe is installed successively, meets slurry expansion type stop grouting plug, slip casting pallet and lockset, seals hole Mouthful;
(6)Stretch-draw anchor:Tensioner is mounted on solid cable body revealed section, it is pre- to carry out tensioning to solid cable body by lockset Tightly;
(7)Slip casting:The anchor cable hole between anchoring section and stop grouting plug is noted by injected hole on slip casting pallet and rigid circular pipe It starches section and carries out slip casting, prevent the water in top plate water-bearing layer from infiltrating into top plate coal petrography by anchor cable hole, to play the work of waterproof water blockoff With.
2. weak cementing rich water top plate anchor cable hole grouting water blocking method as described in claim 1, it is characterized in that anchor cable hole slip casting When Duan Jinhang slip castings, slurries add waterglass to be formulated using cement mortar, and configuration proportion is advisable with filling hole and solidifying.
3. weak cementing rich water top plate anchor cable hole grouting water blocking method as claimed in claim 1 or 2, it is characterized in that being noted to anchor cable hole When starching section progress slip casting, injection slurry uses ratio of mud 1-1.1:1 cement mortar and density 1.50g/cm3Waterglass with 1:0.5- 0.8 mass ratio is formulated.
4. weak cementing rich water top plate anchor cable hole grouting water blocking method as claimed in claim 1 or 2, it is characterized in that playing anchor cable drilling When used anchor cable rig model and type be MFC-1392/3657.
5. weak cementing rich water top plate anchor cable hole grouting water blocking method as claimed in claim 1 or 2, it is characterized in that when stretch-draw anchor The model of used tensioner is MQ18-200/63.
6. weak cementing rich water top plate anchor cable hole grouting water blocking method as claimed in claim 1 or 2, it is characterized in that whitewashing closing lane When road surface, just the thickness of spray or secondary injection concrete is 45-55mm, and gunite concrete overall thickness is 90- twice 110mm。
7. weak cementing rich water top plate anchor cable hole grouting water blocking method as claimed in claim 1 or 2, it is characterized in that anchoring anchor cable When, solid cable body protruded length is 150mm-200mm.
8. weak cementing rich water top plate anchor cable hole grouting water blocking method as claimed in claim 1 or 2, it is characterized in that used slip casting Pallet is the butterfly pallet with injected hole.
CN201810409903.3A 2018-05-02 2018-05-02 Grouting water plugging method for anchor cable hole of weakly cemented water-rich roof Active CN108661682B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810409903.3A CN108661682B (en) 2018-05-02 2018-05-02 Grouting water plugging method for anchor cable hole of weakly cemented water-rich roof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810409903.3A CN108661682B (en) 2018-05-02 2018-05-02 Grouting water plugging method for anchor cable hole of weakly cemented water-rich roof

Publications (2)

Publication Number Publication Date
CN108661682A true CN108661682A (en) 2018-10-16
CN108661682B CN108661682B (en) 2024-05-28

Family

ID=63781653

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810409903.3A Active CN108661682B (en) 2018-05-02 2018-05-02 Grouting water plugging method for anchor cable hole of weakly cemented water-rich roof

Country Status (1)

Country Link
CN (1) CN108661682B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109252882A (en) * 2018-11-19 2019-01-22 河南理工大学 3rd area of breaking surrounding rock tunnel cooperates with coupling supporting system and its construction method
CN110821536A (en) * 2019-11-22 2020-02-21 内蒙古上海庙矿业有限责任公司 Method for improving anchoring effect of soft rock roadway floor anchor rod
CN111139853A (en) * 2019-12-24 2020-05-12 同济大学 High-flow-rate karst pipeline net hanging, stone hooking and grouting combined water plugging method
CN113153396A (en) * 2021-04-19 2021-07-23 华北科技学院 Hole sealing, grouting and water plugging reinforcing method for anchor cable holes in roadway water spraying area
CN113882883A (en) * 2021-09-30 2022-01-04 中国矿业大学 Fixed-length anchoring system and method for roadway roof in slow seepage or water spraying state

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102146673A (en) * 2011-02-27 2011-08-10 山东科技大学 Anchoring structure for liquid-injection corrosion-resistant anchor rod or anchor cable and construction method thereof
CN103321663A (en) * 2013-02-28 2013-09-25 新汶矿业集团有限责任公司 Roadway baseboard anchoring and top pouring type pre-stressed anchor cable strengthening device and construction method
CN204238956U (en) * 2014-10-15 2015-04-01 山东科技大学 A kind of pressure touch formula anchor pole
CN104653206A (en) * 2014-12-15 2015-05-27 魏兴民 Prestress full-length anchoring anchor rope construction method based on common anchor rope construction
CN105257326A (en) * 2015-11-23 2016-01-20 尤洛卡(山东)深部地压防治安全技术有限公司 Cooperated supporting method for constant-resistance lengthened anchor cable and O-shaped hole packer
CN105604593A (en) * 2016-03-17 2016-05-25 天津大学 Three-stage anchoring combined type hollow grouting anchor rod
CN208518690U (en) * 2018-05-02 2019-02-19 阳泉煤业(集团)有限责任公司 A kind of weak cementing rich water top plate anchor cable hole grouting for water blocking device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102146673A (en) * 2011-02-27 2011-08-10 山东科技大学 Anchoring structure for liquid-injection corrosion-resistant anchor rod or anchor cable and construction method thereof
CN103321663A (en) * 2013-02-28 2013-09-25 新汶矿业集团有限责任公司 Roadway baseboard anchoring and top pouring type pre-stressed anchor cable strengthening device and construction method
CN204238956U (en) * 2014-10-15 2015-04-01 山东科技大学 A kind of pressure touch formula anchor pole
CN104653206A (en) * 2014-12-15 2015-05-27 魏兴民 Prestress full-length anchoring anchor rope construction method based on common anchor rope construction
CN105257326A (en) * 2015-11-23 2016-01-20 尤洛卡(山东)深部地压防治安全技术有限公司 Cooperated supporting method for constant-resistance lengthened anchor cable and O-shaped hole packer
CN105604593A (en) * 2016-03-17 2016-05-25 天津大学 Three-stage anchoring combined type hollow grouting anchor rod
CN208518690U (en) * 2018-05-02 2019-02-19 阳泉煤业(集团)有限责任公司 A kind of weak cementing rich water top plate anchor cable hole grouting for water blocking device

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109252882A (en) * 2018-11-19 2019-01-22 河南理工大学 3rd area of breaking surrounding rock tunnel cooperates with coupling supporting system and its construction method
CN109252882B (en) * 2018-11-19 2024-03-15 河南理工大学 Three-region cooperative coupling supporting system for broken surrounding rock roadway and construction method of three-region cooperative coupling supporting system
CN110821536A (en) * 2019-11-22 2020-02-21 内蒙古上海庙矿业有限责任公司 Method for improving anchoring effect of soft rock roadway floor anchor rod
CN111139853A (en) * 2019-12-24 2020-05-12 同济大学 High-flow-rate karst pipeline net hanging, stone hooking and grouting combined water plugging method
CN111139853B (en) * 2019-12-24 2021-03-30 同济大学 High-flow-rate karst pipeline net hanging, stone hooking and grouting combined water plugging method
CN113153396A (en) * 2021-04-19 2021-07-23 华北科技学院 Hole sealing, grouting and water plugging reinforcing method for anchor cable holes in roadway water spraying area
CN113882883A (en) * 2021-09-30 2022-01-04 中国矿业大学 Fixed-length anchoring system and method for roadway roof in slow seepage or water spraying state

Also Published As

Publication number Publication date
CN108661682B (en) 2024-05-28

Similar Documents

Publication Publication Date Title
Kang et al. Application of a combined support system to the weak floor reinforcement in deep underground coal mine
CN108661682A (en) A kind of weak cementing rich water top plate anchor cable hole grouting water blocking method
CN104481560B (en) Back water-bearing layer administering method
CN105350584B (en) A kind of construction method of anti-float anchor rod
CN112855223B (en) Coal roadway-advanced curtain space integrated grouting method after penetrating goaf wall
CN109372555A (en) A kind of fault disruption zone area tunnel 3 D stereo grouting support method
CN105064356B (en) Prestressed composite rod cable anchoring device for supporting soft loose soil body
CN105041325A (en) Construction method of high-tension water-rich extra-large-section weak breccia tunnel
CN105604593B (en) A kind of three stages anchoring Combined hollow grouted anchor bar
CN101709651A (en) Grouting water blocking method for undersea tunnel
CN104790959B (en) A kind of Shallow-buried Tunnels with Small Spacing ground method for tunnel construction
CN102146673A (en) Anchoring structure for liquid-injection corrosion-resistant anchor rod or anchor cable and construction method thereof
CN103711507B (en) A kind of many steel strand wires combination supporting device controls the method for big relaxation zone roadway deformation
CN107060774A (en) A kind of anti-tunnel portal wall damage device and construction method
CN103016034A (en) Mining hollow grouting anchor cable
CN203717001U (en) Flexible prestressed grouting anchor rope
CN103321663A (en) Roadway baseboard anchoring and top pouring type pre-stressed anchor cable strengthening device and construction method
CN113027462B (en) Reinforcing method for shaft penetrating through weak surrounding rock
CN107165661A (en) A kind of high-ground stress weak surrounding rock large deformation tunnel overlength enlarged footing anchor cable construction method
CN109736850A (en) A kind of tunnel shell arch combination strength bearing structure and its construction method
CN207660614U (en) Roadway floor prestress anchorage cable group coordinates ruggedized construction with slip casting
CN103573280B (en) Method for supporting porous ooze invasion compound roof roadway
CN208518690U (en) A kind of weak cementing rich water top plate anchor cable hole grouting for water blocking device
CN111894625B (en) Large-section weak surrounding rock high-prestress anchor rod supporting method and device
CN102286979A (en) Construction method for deep foundation pit supporting by adopting steel pipe piles-self-drilling prestressed anchor bars

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant