CN105064356B - Prestress compound bar and cable anchoring device for supporting soft and loose soil mass - Google Patents

Prestress compound bar and cable anchoring device for supporting soft and loose soil mass Download PDF

Info

Publication number
CN105064356B
CN105064356B CN201510478142.3A CN201510478142A CN105064356B CN 105064356 B CN105064356 B CN 105064356B CN 201510478142 A CN201510478142 A CN 201510478142A CN 105064356 B CN105064356 B CN 105064356B
Authority
CN
China
Prior art keywords
anchor cable
hollow drill
bar
anchor
drill
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510478142.3A
Other languages
Chinese (zh)
Other versions
CN105064356A (en
Inventor
张鹏
王旭春
朱珍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao University of Technology
Original Assignee
Qingdao University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao University of Technology filed Critical Qingdao University of Technology
Priority to CN201510478142.3A priority Critical patent/CN105064356B/en
Publication of CN105064356A publication Critical patent/CN105064356A/en
Application granted granted Critical
Publication of CN105064356B publication Critical patent/CN105064356B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The invention belongs to the technical field of geotechnical engineering supporting, and particularly relates to a prestress compound bar and cable anchoring device for supporting a soft and loose soil mass. An anchor cable positioning guide ring is arranged on the outer wall of a hollow drill bar. Anchor cable guide holes are evenly distributed in the anchor cable positioning guide ring. A protective casing is welded to the anchor cable positioning guide ring. An anchor cable is inserted into the protective casing in a penetrating manner. A bar and cable connecting sleeve is arranged on the inner side of the anchor cable positioning guide ring. A separation rolling bearing is arranged on the bar and cable connecting sleeve. The bar and cable connecting sleeve is mechanically fixed to the hollow drill bar. An anchor cable fixing plate is arranged at the front end of the hollow drill bar. An anchor cable is anchored to the anchor cable fixing plate. A thread is arranged at the tail end of the hollow drill bar. The front end of the hollow drill bar is connected with a drill bit through a connecting rod, and a grouting hole is formed in the side wall of the front end of the hollow drill bar. The prestress compound bar and cable anchoring device is simple in structure, safe and convenient to use, strong in anchoring force and suitable for loose and soft geological conditions with hole collapse easily occurring, and can resist the shear slip effect of surrounding rock-soil masses.

Description

A kind of prestressing force coupled pole rope anchor for weak loose earth supporting
Technical field:
The invention belongs to Geotechnical Engineering support technology field, more particularly, to a kind of weak for tunnel, side slope, base pit engineering The prestressing force coupled pole rope anchor of loose earth supporting.
Background technology:
With the continuous development of Geotechnical Engineering support technology, prestressed anchor, cable bolting technology are widely used to ground In the engineering constructions such as lower engineering surrounding rock supporting, slope retaining, pattern foundation pit supporting structure.At present, commonly used prestressed anchor or anchor cable Support technology is single support form, less using being provided simultaneously with the compound of prestressed anchor and prestressed cable anchorage feature Anchorage technology, in the form of its construction method is generally using first boring, grouting behind shaft or drift lining, but for weak soil or broken Rock And Soil, due to one-tenth Easily there is collapse hole phenomenon behind hole, cause slip casting process cannot be normally carried out, or have a strong impact on supporting effect, engineering safety is made Become to threaten.Simultaneously for single prestressed anchor, because its body of rod area of section is larger, when applying prestressing force, the body of rod produces Deflection less, the anchor effect of drawing that far-end is stablized with Rock And Soil is nothing like anchor cable, and around anchor cable itself can not resist The shear action of Rock And Soil.
Content of the invention:
It is an object of the invention to the shortcoming overcoming prior art to exist, provide a kind of for weak loose earth supporting Prestressing force coupled pole rope anchor, gives full play to the anchoring property of anchor cable, provides huge anchor force, and anchor force is reliable Be transferred on the stable Rock And Soil that far-end is anchored, strengthen with far-end stablize Rock And Soil draw anchor effect, enable anchor simultaneously The shearing slip effect of Rock And Soil around bar opposing, and can preferably be applied to the easy loose weak geological conditions that collapse hole occurs.
To achieve these goals, the agent structure of the present invention include drill bit, connecting rod, anchor cable fixed plate, hollow drill, Protection sleeve pipe, bar rope adapter sleeve, anchor cable positioning and guiding ring, anchor cable pilot hole, separation rolling bearing, anchor cable and injected hole;Hollow Equipped with the anchor cable positioning and guiding ring of fixing protection sleeve pipe on the outer wall of drilling rod, anchor cable positioning and guiding ring along the circumferential direction uniformly divides It is laid with anchor cable pilot hole, the quantity of anchor cable pilot hole determines according to the actual demand quantity of anchor cable;Protection sleeve pipe is led from anchor cable Xiang Kongzhong passes through and is welded on anchor cable positioning and guiding ring, is interspersed with anchor cable, the length of protection sleeve pipe is anchor cable in protection sleeve pipe Total length deducts anchorage cable anchoring segment length, it is to avoid protection sleeve pipe occurs freely rotatable;Anchor cable positioning and guiding is around hollow drill certainly By rotating, when hollow drill rotates into stratum under rig twisting force, the anchor cable being distributed in around hollow drill is not sent out Raw rotation, enables anchor cable smoothly to enter inside Rock And Soil with hollow drill;The inner side of anchor cable positioning and guiding ring is provided with bar rope and connects Set, bar rope adapter sleeve is provided with and separates rolling bearing, and bar rope adapter sleeve is mechanically anchored on hollow drill, before hollow drill End is provided with anchor cable fixed plate, and anchor cable fixed plate lengthens along hollow drill axial width to 2 times of hollow drill diameter, to support Anti- tension deformation;Anchorage cable anchoring in anchor cable fixed plate, by pulling force totally tansitive to hollow drill during anchorage cable stretching;Core drill Bar tail end is provided with screw thread, is easy to be lengthened as needed;The front end of hollow drill is connected with drill bit by connecting rod, works as sky The heart drilling rod when diameter changes according to actual needs, can adapt to the model of hollow drill by changing the size of connecting rod Change, need not make the drill bit of different model;The fin of drill bit is the decussate texture with point, in the driving effect of external rig The lower penetration power that can produce can readily penetrate through each rocks;The front end side wall of hollow drill has injected hole, makes itself to double as Drilling rod and Grouting Pipe, can carry out high-pressure slip-casting by these holes after the completion of boring, so that hollow drill is solidified with surrounding formation Integral, form steel pipe concrete column, on the one hand strengthen the rubbing action of hollow drill and formation-engaging surfaces, on the other hand strengthen empty The anti-shearing deformability of heart drilling rod.
The present invention use when, first will be connected with anchor cable positioning and guiding ring with separate rolling bearing, bar rope adapter sleeve, anchor cable solid Fixed board is fixed on hollow drill, protection sleeve pipe is passed through from the anchor cable pilot hole anchor cable positioning and guiding ring, anchor cable is divided It is not through in protection sleeve pipe, and its front end is anchored in anchor cable fixed plate;Connecting rod and drill bit are installed again, and by hollow drill with External rig connects, and drill bit is directed at Rock And Soil position hole to be drilled, starts rig, starts to creep into by default depth, was creeping into Cooling water is constantly injected to avoid drill bit to cross cause thermal damage in journey;After getting into predetermined depth, stop grouting plug is installed, and is entered by slip casting machine Horizontal high voltage slip casting, reaches after preset strength after cement mortar, carries out tensioning using prestressed stretch-draw machinery to anchor cable, after tensioning finishes Anchorage cable anchoring is on external anchorage.
Compared with prior art, its structure is simple, safe and convenient to use for the present invention, and anchor force is strong, can resist surrounding ground It is adaptable to easily there is the loose weak geological conditions of collapse hole in the shearing slip effect of body.
Brief description:
Fig. 1 is the agent structure principle schematic of the present invention.
Fig. 2 is anchor cable positioning and guiding ring of the present invention and the principle schematic diagram. separating rolling bearing.
Specific embodiment:
Below by embodiment and combine accompanying drawing the invention will be further described.
The agent structure of the present embodiment include drill bit 1, connecting rod 2, anchor cable fixed plate 3, hollow drill 4, protection sleeve pipe 5, Bar rope adapter sleeve 6, anchor cable positioning and guiding ring 7, anchor cable pilot hole 8, separation rolling bearing 9, anchor cable 10 and injected hole 11;Core drill Equipped with the anchor cable positioning and guiding ring 7 of fixing protection sleeve pipe 5 on the outer wall of bar 1, along the circumferential direction uniform on anchor cable positioning and guiding ring 7 It is distributed with anchor cable pilot hole 8, the quantity of anchor cable pilot hole 8 determines according to the actual demand quantity of anchor cable;Protection sleeve pipe 5 is from anchor Pass through in rope pilot hole 8 and be welded on anchor cable positioning and guiding ring 7, in protection sleeve pipe 5, be interspersed with anchor cable 10, protection sleeve pipe 5 Length deducts anchor cable 10 anchoring depth for anchor cable 10 total length, it is to avoid protection sleeve pipe 5 occurs freely rotatable;Anchor cable positioning and guiding Ring 7 rotates freely around hollow drill 4, when hollow drill 4 rotates into stratum under rig twisting force, is distributed in core drill Anchor cable 10 around bar 4 does not rotate, and so that anchor cable 10 is smoothly entered inside Rock And Soil with hollow drill 4;Anchor cable positioning is led It is provided with bar rope adapter sleeve 6 to the inner side of ring 7, bar rope adapter sleeve 6 is provided with and separates rolling bearing 9, bar rope adapter sleeve 6 machinery is solid It is scheduled on hollow drill 4, the tail end of hollow drill 4 is provided with anchor cable fixed plate 3, and anchor cable fixed plate 3 is along hollow drill axial width Lengthen to 2 times of hollow drill diameter, so that tension deformation can be resisted;Anchor cable 10 is anchored in anchor cable fixed plate 3, anchor cable 10 By on pulling force totally tansitive to hollow drill 4 when drawing;Hollow drill 4 tail end is provided with screw thread, is easy to be lengthened as needed; The front end of hollow drill 4 is connected with drill bit 1 by connecting rod 2, and when hollow drill 4, diameter changes according to actual needs When, the model change of hollow drill 4 can be adapted to by changing the size of connecting rod 2, the drill bit 1 of different model need not be made; The fin of drill bit 1 is the decussate texture with point, and the penetration power that can produce under the driving effect of external rig can be worn easily Each rocks thoroughly.
Described in the present embodiment, the front end side wall of hollow drill 4 has injected hole 11, makes itself to double as drilling rod and Grouting Pipe, when High-pressure slip-casting can be carried out by these holes after the completion of boring, so that hollow drill 4 and surrounding formation is solidified integral, form steel pipe Concrete column, on the one hand strengthens the rubbing action of hollow drill 4 and formation-engaging surfaces, on the other hand strengthens the shearing resistance of hollow drill 4 Shear deformation ability.
The present embodiment use when, first by be connected with anchor cable positioning and guiding ring 7 with the bar rope adapter sleeve 6 separating rolling bearing 9, Anchor cable fixed plate 3 is fixed on hollow drill 4, and protection sleeve pipe 5 is worn from the anchor cable pilot hole 8 anchor cable positioning and guiding ring 7 Cross, anchor cable 10 is through at respectively in protection sleeve pipe 5, and its front end is anchored in anchor cable fixed plate 3;Connecting rod 2 is installed again and bores 1, and hollow drill 4 is connected with external rig, drill bit 1 is directed at Rock And Soil position hole to be drilled, starts rig, by default depth Degree starts to creep into, and constantly injects cooling water to avoid drill bit 1 to cross cause thermal damage in drilling process;After getting into predetermined depth, install Stop grouting plug, and high-pressure slip-casting is carried out by slip casting machine, reach after design strength after cement mortar, using prestressed stretch-draw machinery to anchor Rope 10 carries out tensioning, and tensioning finishes rear anchor cable 10 and is anchored on external anchorage.

Claims (2)

1. a kind of prestressing force coupled pole rope anchor for weak loose earth supporting is it is characterised in that agent structure includes Drill bit, connecting rod, anchor cable fixed plate, hollow drill, protection sleeve pipe, bar rope adapter sleeve, anchor cable positioning and guiding ring, anchor cable guiding Hole, separation rolling bearing, anchor cable and injected hole;Equipped with the anchor cable positioning and guiding of fixing protection sleeve pipe on the outer wall of hollow drill Ring, anchor cable positioning and guiding ring is distributed uniformly and circumferentially and is provided with anchor cable pilot hole, the quantity of anchor cable pilot hole is according to anchor cable Actual demand quantity determine;Protection sleeve pipe passes through from anchor cable pilot hole and is welded on anchor cable positioning and guiding ring, protective case It is interspersed with anchor cable, the length of protection sleeve pipe deducts anchorage cable anchoring segment length for anchor cable total length, it is to avoid protection sleeve pipe occurs in pipe Freely rotatable;Anchor cable positioning and guiding rotates freely, when hollow drill rotates under rig twisting force around hollow drill During stratum, the anchor cable being distributed in around hollow drill does not rotate, and so that anchor cable is smoothly entered in ground body with hollow drill Portion;The inner side of anchor cable positioning and guiding ring is provided with bar rope adapter sleeve, bar rope adapter sleeve is provided with and separates rolling bearing, and bar rope connects Set is mechanically anchored on hollow drill, and the front end of hollow drill is provided with anchor cable fixed plate, and anchor cable fixed plate is along hollow drill axially Width lengthens to 2 times of hollow drill diameter, so that tension deformation can be resisted;Anchorage cable anchoring in anchor cable fixed plate, open by anchor cable By on pulling force totally tansitive to hollow drill when drawing;Hollow drill tail end is provided with screw thread, is easy to be lengthened as needed;Empty The front end of heart drilling rod is connected with drill bit by connecting rod, when diameter changes hollow drill according to actual needs, can lead to Cross the model change to adapt to hollow drill for the size changing connecting rod, the drill bit of different model need not be made;The fin of drill bit For the decussate texture with point, under the driving effect of external rig, the penetration power of generation can penetrate each rocks;Hollow drill Front end side wall on have injected hole, make itself to double as drilling rod and Grouting Pipe, when boring after the completion of horizontal high voltage is entered by injected hole Slip casting, makes hollow drill and surrounding formation solidify integral, forms steel pipe concrete column, strengthens hollow drill and formation-engaging surfaces Rubbing action and the anti-shearing deformability of hollow drill.
2. the prestressing force coupled pole rope anchor for weak loose earth supporting according to claim 1, its feature When being that this device uses, first by anchor cable positioning and guiding ring with separate rolling bearing, bar rope adapter sleeve, anchor cable fixed plate are fixed on On hollow drill, protection sleeve pipe is passed through from the anchor cable pilot hole anchor cable positioning and guiding ring, anchor cable is through at respectively protection In sleeve pipe, its front end is anchored in anchor cable fixed plate;Connecting rod and drill bit are installed again, and by hollow drill with external rig even Connect, drill bit is directed at Rock And Soil position hole to be drilled, start rig, start to creep into by default depth, constantly note in drilling process Entering cooling water avoids drill bit to cross cause thermal damage;After getting into predetermined depth, stop grouting plug is installed, and high-pressure slip-casting is carried out by slip casting machine, Reach after preset strength after cement mortar, using prestressed stretch-draw machinery tensioning is carried out to anchor cable, tensioning finish rear anchorage cable anchoring in On external anchorage.
CN201510478142.3A 2015-08-07 2015-08-07 Prestress compound bar and cable anchoring device for supporting soft and loose soil mass Expired - Fee Related CN105064356B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510478142.3A CN105064356B (en) 2015-08-07 2015-08-07 Prestress compound bar and cable anchoring device for supporting soft and loose soil mass

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510478142.3A CN105064356B (en) 2015-08-07 2015-08-07 Prestress compound bar and cable anchoring device for supporting soft and loose soil mass

Publications (2)

Publication Number Publication Date
CN105064356A CN105064356A (en) 2015-11-18
CN105064356B true CN105064356B (en) 2017-01-18

Family

ID=54493843

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510478142.3A Expired - Fee Related CN105064356B (en) 2015-08-07 2015-08-07 Prestress compound bar and cable anchoring device for supporting soft and loose soil mass

Country Status (1)

Country Link
CN (1) CN105064356B (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107190743A (en) * 2017-07-26 2017-09-22 山东省城乡建设勘察设计研究院 A kind of composite rod automatic anchor pole and its construction method
US10697490B2 (en) * 2018-07-24 2020-06-30 Ojjo, Inc. Threaded truss foundations and related systems, methods, and machines
CN109296390B (en) * 2018-09-11 2020-11-10 福建工程学院 Anchor cable supporting method for broken surrounding rock roadway
CN109441514B (en) * 2018-12-29 2020-07-03 湖南达道新能源开发有限公司 Wing type anchor rod
CN110185413A (en) * 2019-05-27 2019-08-30 太原理工大学 A method of stable slip casting channel is formed on easy collapse hole stratum
KR102187626B1 (en) * 2019-07-02 2020-12-07 주식회사 예성오션테크 Drilling apparatus
CN113006823B (en) * 2021-03-10 2023-07-07 浙江省隧道工程集团有限公司 Rapid supporting system for double-shield TBM fractured rock section and construction method thereof
CN114738023A (en) * 2022-05-13 2022-07-12 山东建筑大学 Pressure dispersion type anchoring device and method
CN115752829A (en) * 2022-11-24 2023-03-07 青岛理工大学 Anchor cable stress monitoring device and method
CN116838396B (en) * 2023-08-30 2023-11-07 北京科技大学 Grouting supporting flexible anchor cable equipment for explosion-proof and impact-proof of high-gas mine tunnel
CN116892210B (en) * 2023-09-08 2023-12-01 沈阳北方建设股份有限公司 Sleeve valve pipe grouting device and grouting method

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5067732B2 (en) * 2007-12-11 2012-11-07 和興テクノ株式会社 Branch line anchor and its drawing method
CN101649616B (en) * 2008-08-14 2011-07-20 上海强劲地基工程股份有限公司 Anchor part with controllable anchorage force
CN101629419B (en) * 2009-08-11 2011-11-09 汪小刚 Dispersed compression type internal anchoring bearing body with small aperture and large tonnage
CN203270567U (en) * 2013-05-24 2013-11-06 李宪奎 Disassembled type soil body anchor rod combined structural piece
CN104563106B (en) * 2014-12-30 2016-05-18 中国建筑第八工程局有限公司 The construction technology of a kind of churning anchor cable drill body and churning anchor cable

Also Published As

Publication number Publication date
CN105064356A (en) 2015-11-18

Similar Documents

Publication Publication Date Title
CN105064356B (en) Prestress compound bar and cable anchoring device for supporting soft and loose soil mass
US10975696B2 (en) Grouting anchor bolt and grouting anchor cable for supporting of large deformation and constant resistance and quantitative roadway supporting method
CN203756203U (en) Self-drilling type full-thread bolt grouting anchor rod
CN105626112B (en) A kind of suspension device and its application method based on built-in constant-resistance device
CN103032086B (en) Method for filling resin explosive cartridge in drilled hole of tunnel roof anchor rod
CN107740410A (en) The full-length prestress bolt-grouting support device and technique for expanding internal anchoring body can be combined
CN104895073B (en) Can being dismounted for multiple times anchor cable construction system and its construction method
CN109930609A (en) A kind of campshed composite supporting construction and its construction method for upper-soft lower-hard ground
CN105714823A (en) Recoverable quick-anchoring and body-expanding type anchor rope and construction method
CN105178979A (en) Supporting structure of tunnel in bias salt cavity environment and construction method of supporting structure
CN203717001U (en) Flexible prestressed grouting anchor rope
CN104895072A (en) A pre-stressed anchor cable and a pre-stressed anchor cable one-time forming construction method
CN108661682A (en) A kind of weak cementing rich water top plate anchor cable hole grouting water blocking method
CN207660614U (en) Roadway floor prestress anchorage cable group coordinates ruggedized construction with slip casting
CN102776881B (en) Recyclable post-tensioned prestressing anchor cable pile and construction method thereof
CN103321222A (en) Recoverable type anchor rod, pressure-bearing plate type anchor pile and anchoring method
CN201599046U (en) Tension anchor rod
CN205576907U (en) Anchor rope structure for side slope support retaining wall
CN105257326B (en) A kind of constant-resistance extends anchor cable and O-shaped hole packer cooperation method for protecting support
CN210194627U (en) Hole wall guniting device
CN208518690U (en) A kind of weak cementing rich water top plate anchor cable hole grouting for water blocking device
CN115419076B (en) High-pressure rotary spraying recyclable anchor cable supporting construction method for deep foundation pit
CN105840220A (en) Combined supporting structure
CN101768973A (en) Method and equipment for setting rotary-jet steel strand ground anchor
CN204898667U (en) A anchor rope clamping orient device that is used for prestressing force coupled pole cable anchor system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170118

Termination date: 20170807