CN107165661A - A kind of high-ground stress weak surrounding rock large deformation tunnel overlength enlarged footing anchor cable construction method - Google Patents

A kind of high-ground stress weak surrounding rock large deformation tunnel overlength enlarged footing anchor cable construction method Download PDF

Info

Publication number
CN107165661A
CN107165661A CN201710433964.9A CN201710433964A CN107165661A CN 107165661 A CN107165661 A CN 107165661A CN 201710433964 A CN201710433964 A CN 201710433964A CN 107165661 A CN107165661 A CN 107165661A
Authority
CN
China
Prior art keywords
anchor cable
tensioning
enlarged footing
ground stress
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710433964.9A
Other languages
Chinese (zh)
Inventor
苏春生
饶胜斌
闫成军
张庆
何十美
梁朋刚
汤振亚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fifth Engineering Co Ltd of China Railway Construction Bridge Engineering Bureau Group Co Ltd
Original Assignee
Fifth Engineering Co Ltd of China Railway Construction Bridge Engineering Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fifth Engineering Co Ltd of China Railway Construction Bridge Engineering Bureau Group Co Ltd filed Critical Fifth Engineering Co Ltd of China Railway Construction Bridge Engineering Bureau Group Co Ltd
Priority to CN201710433964.9A priority Critical patent/CN107165661A/en
Publication of CN107165661A publication Critical patent/CN107165661A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/003Machines for drilling anchor holes and setting anchor bolts
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/02Setting anchoring-bolts with provisions for grouting
    • E21D20/021Grouting with inorganic components, e.g. cement
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D21/00Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
    • E21D21/0026Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection characterised by constructional features of the bolts
    • E21D21/006Anchoring-bolts made of cables or wires

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Chemical & Material Sciences (AREA)
  • Inorganic Chemistry (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a kind of high-ground stress weak surrounding rock large deformation tunnel overlength enlarged footing anchor cable construction method, under the conditions of high-ground stress weak broken wall rock, bias and large section tunnel, carry out anchor cable construction, in anchor cable construction technique, after anchor cable hole being got out using drill bit, bottom brill anchorage zone of the drill bit from anchor cable hole is replaced using enlarged footing, the cross-sectional area of described anchorage zone is more than the cross-sectional area of anchor cable hole.The beneficial effects of the invention are as follows:The constructing tunnel that the present invention is used under the conditions of high-ground stress weak broken wall rock, bias and large section tunnel, the installation strength of anchor cable can be put forward by the anchorage zone of formation, and increase the frictional force between anchoring body and rock stratum, so as to improve restraining force of the anchor cable to rock stratum, with the deformation of this only reduces rock stratum, the self-stability energy of country rock is improved.

Description

A kind of high-ground stress weak surrounding rock large deformation tunnel overlength enlarged footing anchor cable construction method
Technical field
It is a kind of high-ground stress weak surrounding rock large deformation tunnel overlength specifically the present invention relates to constructing tunnel field Enlarged footing anchor cable construction method.
Background technology
Influence of the high-ground stress to Geotechnical Engineering is significant, particularly with passing through great burying weak surrounding rock underground engineering, Such as Rail Highway tunnel, buried mining tunnel.As China railways, highway construction are continued to develop, Tunnel Engineering warp-wise Grow up, buried direction is developed.Therefore, in recent years, pass through High Ground Stress Areas and the severe weak surrounding rock of geological environment is grown up tunnel Road engineering is continued to bring out, such as Lan Yu Railway 8.5km filoplume mountain tunnel, the 9.2km tunnel of new city, 19.1km Mu Zhai ridges tunnel Road.
The country rock crimp after excavation supporting of high-ground stress weak surrounding rock large deformation tunnel is strong, can cause the just big face of branch The problems such as product destruction, gunite concrete cracking, steelframe distortion bad break, abutment wall invade limit.And high-ground stress is in Support System in Soft Rock Tunnels Release often one long-term slow engineering again, cause early stage ready-made two lining cracking constantly occurs in the later stage, it is necessary to Re-start trimming of doing over again.Therefore, rock crusher, crustal stress be larger and causes constructing tunnel deformation receipts the problems such as long deenergized period Hold back big, process conversion plan becomes frequent, construction production is discontinuous, effect is low, serious puzzlement constructing aims and construction safety.
The content of the invention
Be conducive to making rock stratum keep stable it is an object of the invention to provide one kind, avoid rock stratum from occurring compared with large deformation shadow Ring the high-ground stress weak surrounding rock large deformation tunnel overlength enlarged footing anchor cable construction method of engineering construction.
The present invention is achieved through the following technical solutions:A kind of high-ground stress weak surrounding rock large deformation tunnel overlength enlarged footing anchor Rope construction method, under the conditions of high-ground stress weak broken wall rock, bias and large section tunnel, carries out anchor cable construction, In anchor cable construction technique, after getting out anchor cable hole using drill bit, replace drill bit using enlarged footing and bored from the bottom of anchor cable hole and anchor Region, the cross-sectional area of described anchorage zone is more than the cross-sectional area of anchor cable hole.
Including following steps:
Step S1:Preparation of construction, configuration stretch-draw jack, high-pressure oil pump, rig, anchor cable, the first-class device of expansion, and carry out anchor cable The positioning measurement in hole, to be ready for boring anchor cable hole, and the hypothesis on location preliminary bracing structure designed according to anchor cable hole;
Step S2:Brill anchor cable hole is carried out using rig, drilling to anchorage zone initiating terminal takes out drilling rod and changes enlarged footing, then makes Enlarged footing drills to anchorage zone end from anchorage zone initiating terminal;
Step S3:Some steel strand wires are bundled into progress and compile beam anchor cable, after compiling beam well, anchor cable is arranged on anchor cable hole It is interior, and Grouting Pipe is entered with anchor cable in anchor cable hole, Grouting Pipe is extend into anchorage zone;
Step S4:Slip casting is carried out to anchorage zone;
Step S5:Anchor cable is carried out tensioning fixation to apply prestressing force;
Step S6:Slip casting is carried out to anchor cable hole;
Step S7:Sealing off and covering anchorage.
In described step S2, described rig uses RPD-150C tunnels ore-rock rig, and is bored using special cylindrical type Head is drilled, and drilling diameter is more than or equal to 150mm, during drilling, is followed up and drilled using D150mm steel sleeve.
In described step S3, the length of described anchor cable is more than the length sum of the length and anchor cable hole of anchorage zone.
In described step S3, described Grouting Pipe is formed using several φ 25mm fastener for connection, described slip casting Length of tube is in the range of 2 ~ 4m.
Described anchor cable when mounted, makes the diameter of anchor cable conllinear with the diameter of anchor cable hole.
Described step S4 includes following two steps:
Step S41:First time slip casting, common pressure grouting is carried out using the anti-slurry processes of bottom hole, and grouting pressure is 0.5 ~ 0.8MPa, works as anchor cable Hole aperture occur overflow slurry and the duration be more than or equal to 5 minutes after, stop slip casting;
Step S42:Second of slip casting, using high pressure split the law, after 4 ~ 5h of first time slip casting, the cement that first time slip casting is formed Consolidating strength is reached after 5MPa, carries out fracture grouting to anchoring section using M35 pure water cement mortar, grouting pressure is more than or equal to 2MPa。
In described step S5, after step S4 is completed, slurry intensity reaches 70%, recycles hydraulic jack to anchor Suo Jinhang tensioning, described tensioning includes following steps;
Step S51:Tensioning is carried out using every steel strand wires of ZEP18 types jack pair, 5% design stretching force is stretched to;
Step S52:Tensioning is carried out using YCW100-200 type jack anchor cable, it includes following steps:
Step S521:With the pre- tensioning of 10% ~ 20% design stretching force 1 ~ 2 time, make anchor cable totally straight;
Step S522:By 10% tensioning 5 minutes of design stretching force, and record the stretch value of anchor cable;
Step S523:By 20% tensioning 5 minutes of design stretching force, and record the stretch value of anchor cable;
Step S524:By 50% tensioning 5 minutes of design stretching force, and record the stretch value of anchor cable;
Step S525:By 75% tensioning 5 minutes of design stretching force, and record the stretch value of anchor cable;
Step S526:By 100% tensioning 15 minutes of design stretching force, and record the stretch value of anchor cable;
Step S527:By 110% tensioning 15 minutes of design stretching force, and record lock anchor after the stretch value of anchor cable, tensioning Rope;
Step S53:After step S527 completions, stretching force are stable, the ultra stretching power pair more than design stretching force 10% ~ 15% is utilized Anchor cable carries out tensioning, and tensioning locks anchor cable after completing.
Described design stretching force is the 70% of YCW100-200 type jack total stretching forces.
In described step S6, the process to anchor cable hole slip casting is identical to the process of anchorage zone slip casting with step S4.
The present invention compared with prior art, with advantages below and beneficial effect:
The constructing tunnel that the present invention is used under the conditions of high-ground stress weak broken wall rock, bias and large section tunnel, can The installation strength of anchor cable is put forward by the anchorage zone of formation, and increases the frictional force between anchoring body and rock stratum, so as to improve anchor Rope, with the deformation of this only reduces rock stratum, improves the self-stability energy of country rock to the restraining force of rock stratum.
Embodiment
The present invention is described in further detail with reference to embodiment, but the implementation of the present invention is not limited to this.
Embodiment 1:
In the present embodiment, a kind of high-ground stress weak surrounding rock large deformation tunnel overlength enlarged footing anchor cable construction method should on highland Under the conditions of power weak broken wall rock, bias and large section tunnel, anchor cable construction technique is used to carry out anchor cable construction to reduce The deformation of rock stratum, in anchor cable construction technique, after getting out anchor cable hole using drill bit, drill bit is replaced from anchor cable hole using enlarged footing Bottom get out anchorage zone, described anchorage zone and anchor cable hole are coaxial and cross-sectional area of anchorage zone is more than anchor cable hole Cross-sectional area.In the subsequent step of anchor cable construction technique, anchor cable is extend into anchorage zone, and to anchorage zone slip casting, Because the cross-sectional area of anchorage zone is more than the cross-sectional area of anchor cable hole, when in anchorage zone after theing cement solidifies, anchor cable and The cement of anchorage zone can not depart from, so as to increase anchor cable installation strength and increase anchor cable can provide it is pre- should Power, can just increase constraint of the anchor cable to rock stratum with this, and play a part of reducing rock deformation, displacement.The present invention is used for height Constructing tunnel under the conditions of crustal stress weak broken wall rock, bias and large section tunnel, can be by the anchorage zone of formation Domain puies forward the installation strength of anchor cable, and increases the frictional force between anchoring body and rock stratum, so that restraining force of the anchor cable to rock stratum is improved, With the deformation of this only reduces rock stratum, the self-stability energy of country rock is improved.Quickly and effectively it can be carried using enlarged footing to rock around hole For stable support force, prevent what landslide, first branch deformation intrusion tunnel boundary from causing to do over again, additionally it is possible to reduce the lining of later stage two and change Number of times, it is ensured that the safety of constructing tunnel, saves engineering cost.Because the release of high-ground stress is a slow long-term process, The anchor cable after anchor cable construction is carried out by using this programme and can play dignified continuous deformation good support and reinforce to make With, prevent country rock from occurring larger crimp, and appearance just branch extensive damage, gunite concrete are ftractureed, steelframe distortion is wrong The problems such as disconnected, abutment wall invades limit.
Embodiment 2:
On the basis of above-described embodiment, in the present embodiment, following steps are specifically included:
Step S1:Preparation of construction, configuration stretch-draw jack, high-pressure oil pump, rig, anchor cable, the first-class device of expansion, and carry out anchor cable The positioning measurement in hole, to be ready for boring anchor cable hole, and the position designed according to anchor cable hole sets up preliminary bracing structure.
Step S2:Brill anchor cable hole is carried out using rig, described rig is used, RPD-150C tunnels ore-rock rig, drilling Shi Caiyong D150mm steel sleeves follow-up drilling, the drilling diameter of described anchor cable hole is more than or equal to 150mm.Drill to specified depth Degree reaches anchorage zone initiating terminal, and the depth of drilling is calculated by calculating the drilling rod quantity pierced in anchor cable hole.Anchor cable hole drill After complete, take out drilling rod and change enlarged footing, then enlarged footing is drilled from anchorage zone initiating terminal to anchorage zone end.This implementation In example, described enlarged footing is prior art, and skilled artisan knows its concrete structure and application method, this programme The improvement also no longer structure of enlarged footing in itself, therefore its concrete structure is not repeated.After drilling is completed, high-pressure blast is used Landwaste complete liquidation in hole is clean.
Step S3:Some steel strand wires are bundled into progress and compile beam anchor cable.Due to anchor cable body length and again, to linearity It is required that higher, it is necessary to using hand haulage, so the volume beam Active workings of anchor cable should be close proximity to erecting bed, to reduce transport Difficulty.
Compile before beam, it should be ensured that the arrangement of each steel strand wires is uniform, straight, does not turn round and does not pitch, mechanical damage and corrosion are serious It should reject, be derusted the need for slightly getting rusty.
Compile beam when, several are set to medium-height trestle, by steel strand wires colligation on to medium-height trestle, it is two neighboring to medium-height trestle it Between steel strand wires bundled, described primarily served to medium-height trestle makes steel strand wires keeping parallelism degree and make anchor cable from each other Keep the effect of linearity.In the present embodiment, the length of described anchor cable is more than the length of the length and anchor cable hole of anchorage zone Sum, its specific length reference anchoring depth, tensioning length, outer anchor head length with staying length sum to be calculated outside.Its Middle anchoring depth is the length for extending into anchorage zone, and tensioning length is carries out tensioning to anchor cable in anchor cable technique, anchor cable is real Now extend to provide the effective length of pretightning force, outer anchor head length with staying length to be to be reserved in the length outside anchor cable hole outside.
After compiling beam well, anchor cable is arranged in anchor cable hole.Before installation, one layer of butter is smeared in anchor cable free end, and close is wrapped up in Plastic cloth, sleeving plastic flexible pipe is simultaneously fastened.Grouting Pipe and anchor cable are bundled, and entered with anchor cable in anchor cable hole, makes Grouting Pipe It extend into anchorage zone, the outlet of Grouting Pipe is apart from 50 ~ 100mm of anchorage zone bottom.During installation, make anchor cable same with anchor cable hole Axle, and keep coaxial after installing.Described Grouting Pipe is formed using several φ 25mm fastener for connection, described Slip casting length of tube is in the range of 2 ~ 4m, the general Grouting Pipe from 3m length.
Step S4:Slip casting is carried out to anchorage zone, it specifically includes following two steps:
Step S41:First time slip casting, common pressure grouting is carried out using the anti-slurry processes of bottom hole, and grouting pressure is 0.5 ~ 0.8MPa, works as anchor cable Hole aperture occur overflow slurry and the duration be more than or equal to 5 minutes after, stop slip casting, mortar require it is full closely knit, it is complete in slip casting After finishing, mortar solidification shrinkage is waited, benefit slurry is carried out to eating dishes without rice or wine;
Step S42:Second of slip casting, using high pressure split the law, after 4 ~ 5h of first time slip casting, the cement that first time slip casting is formed Consolidating strength is reached after 5MPa, carries out fracture grouting to anchoring section using M35 pure water cement mortar, grouting pressure is more than or equal to 2MPa。
Step S5:Tensioning fixation is carried out to anchor cable to apply prestressing force, after step S4 is completed, slurry intensity reaches 70%, recycle hydraulic jack to carry out tensioning to anchor cable, described tensioning includes following steps:
Step S51:Tensioning is carried out using every steel strand wires of ZEP18 types jack pair, 5% design stretching force is stretched to, it is described It is the 70% of YCW100-200 type jack total stretching forces to design stretching force;
Step S52:Tensioning is carried out using YCW100-200 type jack anchor cable, it includes following steps:
Step S521:With the pre- tensioning of 10% ~ 20% design stretching force 1 ~ 2 time, make anchor cable totally straight;
Step S522:By 10% tensioning 5 minutes of design stretching force, and record the stretch value of anchor cable;
Step S523:By 20% tensioning 5 minutes of design stretching force, and record the stretch value of anchor cable;
Step S524:By 50% tensioning 5 minutes of design stretching force, and record the stretch value of anchor cable;
Step S525:By 75% tensioning 5 minutes of design stretching force, and record the stretch value of anchor cable;
Step S526:By 100% tensioning 15 minutes of design stretching force, and record the stretch value of anchor cable;
Step S527:By 110% tensioning 15 minutes of design stretching force, and record lock anchor after the stretch value of anchor cable, tensioning Rope;
Step S53:After step S527 completions, stretching force are stable, the ultra stretching power pair more than design stretching force 10% ~ 15% is utilized Anchor cable carries out tensioning, and tensioning locks anchor cable after completing.
Step S6:Slip casting, the anchorage grouting port slip casting used from anchor cable technique, from anchor cable technique are carried out to anchor cable hole Use blast pipe exhaust, until blast pipe outflow can be sealed with injection end concentration identical slurries, its specific step and The step of in step S4 to anchorage zone slip casting, is identical.
Step S7:Sealing off and covering anchorage, steel strand wires are cut off with abrasive wheel cutting machine at outer anchor head 5cm, with anchor outside C25 grades of concrete enclosings Head.Described outer anchor head is the free end of anchor cable.In the present embodiment, other parts not described and the content phase of above-described embodiment Together, therefore do not repeat.
Embodiment 3:
In described step S4, when anchor cable is installed, in piece wire of afterbody system of anchoring section anchor cable, and make wire with insulating tape Insulation is separated with steel strand wires, wire stretches out anchor cable hole and external universal meter positive pole with anchor cable, and steel strand wires are connected to universal meter negative pole, ten thousand Ohms range is adjusted to table, after in mortar note to anchoring section, wire can pass through mortar formation loop, universal meter with steel strand wires Mortar is filled in indicators turn and proof anchoring section.In the present embodiment, other parts not described and the content of above-described embodiment It is identical, therefore do not repeat.
It is described above, be only presently preferred embodiments of the present invention, any formal limitation not done to the present invention, it is every according to According to the present invention technical spirit above example is made any simple modification, equivalent variations, each fall within the present invention protection Within the scope of.

Claims (10)

1. a kind of high-ground stress weak surrounding rock large deformation tunnel overlength enlarged footing anchor cable construction method, in high-ground stress weak broken Under the conditions of country rock, bias and large section tunnel, anchor cable construction is carried out, it is characterised in that:In anchor cable construction technique, utilize Drill bit is got out after anchor cable hole, and bottom brill anchorage zone of the drill bit from anchor cable hole, described anchorage zone are replaced using enlarged footing Cross-sectional area be more than anchor cable hole cross-sectional area.
2. a kind of high-ground stress weak surrounding rock large deformation tunnel overlength enlarged footing anchor cable construction side according to claim 1 Method, it is characterised in that:Including following steps:
Step S1:Preparation of construction, configuration stretch-draw jack, high-pressure oil pump, rig, anchor cable, the first-class device of expansion, and carry out anchor cable The positioning measurement in hole, to be ready for boring anchor cable hole, and the hypothesis on location preliminary bracing structure designed according to anchor cable hole;
Step S2:Brill anchor cable hole is carried out using rig, drilling to anchorage zone initiating terminal takes out drilling rod and changes enlarged footing, then makes Enlarged footing drills to anchorage zone end from anchorage zone initiating terminal;
Step S3:Some steel strand wires are bundled into progress and compile beam anchor cable, after compiling beam well, anchor cable is arranged on anchor cable hole It is interior, and Grouting Pipe is entered with anchor cable in anchor cable hole, Grouting Pipe is extend into anchorage zone;
Step S4:Slip casting is carried out to anchorage zone;
Step S5:Anchor cable is carried out tensioning fixation to apply prestressing force;
Step S6:Slip casting is carried out to anchor cable hole;
Step S7:Sealing off and covering anchorage.
3. a kind of high-ground stress weak surrounding rock large deformation tunnel overlength enlarged footing anchor cable construction side according to claim 2 Method, it is characterised in that:In described step S2, described rig uses RPD-150C tunnels ore-rock rig, and uses special circle Column type drill bit is drilled, and drilling diameter is more than or equal to 150mm, during drilling, is followed up and drilled using D150mm steel sleeve.
4. a kind of high-ground stress weak surrounding rock large deformation tunnel overlength enlarged footing anchor cable construction side according to claim 2 Method, it is characterised in that:In described step S3, the length of described anchor cable is more than the length of the length and anchor cable hole of anchorage zone Sum.
5. a kind of high-ground stress weak surrounding rock large deformation tunnel overlength enlarged footing anchor cable construction side according to claim 2 Method, it is characterised in that:In described step S3, described Grouting Pipe is formed using several φ 25mm fastener for connection, described Slip casting length of tube in the range of 2 ~ 4m.
6. a kind of high-ground stress weak surrounding rock large deformation tunnel overlength enlarged footing according to any one of claim 2,4,5 Anchor cable construction method, it is characterised in that:Described anchor cable when mounted, makes the diameter of anchor cable conllinear with the diameter of anchor cable hole.
7. a kind of high-ground stress weak surrounding rock large deformation tunnel overlength enlarged footing anchor cable construction side according to claim 2 Method, it is characterised in that:Described step S4 includes following two steps:
Step S41:First time slip casting, common pressure grouting is carried out using the anti-slurry processes of bottom hole, and grouting pressure is 0.5 ~ 0.8MPa, works as anchor cable Hole aperture occur overflow slurry and the duration be more than or equal to 5 minutes after, stop slip casting;
Step S42:Second of slip casting, using high pressure split the law, after 4 ~ 5h of first time slip casting, the cement that first time slip casting is formed Consolidating strength is reached after 5MPa, carries out fracture grouting to anchoring section using M35 pure water cement mortar, grouting pressure is more than or equal to 2MPa。
8. a kind of high-ground stress weak surrounding rock large deformation tunnel overlength enlarged footing anchor cable construction side according to claim 2 Method, it is characterised in that:In described step S5, after step S4 is completed, slurry intensity reaches 70%, recycles hydraulic jack Top carries out tensioning to anchor cable, and described tensioning includes following steps;
Step S51:Tensioning is carried out using every steel strand wires of ZEP18 types jack pair, 5% design stretching force is stretched to;
Step S52:Tensioning is carried out using YCW100-200 type jack anchor cable, it includes following steps:
Step S521:With the pre- tensioning of 10% ~ 20% design stretching force 1 ~ 2 time, make anchor cable totally straight;
Step S522:By 10% tensioning 5 minutes of design stretching force, and record the stretch value of anchor cable;
Step S523:By 20% tensioning 5 minutes of design stretching force, and record the stretch value of anchor cable;
Step S524:By 50% tensioning 5 minutes of design stretching force, and record the stretch value of anchor cable;
Step S525:By 75% tensioning 5 minutes of design stretching force, and record the stretch value of anchor cable;
Step S526:By 100% tensioning 15 minutes of design stretching force, and record the stretch value of anchor cable;
Step S527:By 110% tensioning 15 minutes of design stretching force, and record lock anchor after the stretch value of anchor cable, tensioning Rope;
Step S53:After step S527 completions, stretching force are stable, the ultra stretching power pair more than design stretching force 10% ~ 15% is utilized Anchor cable carries out tensioning, and tensioning locks anchor cable after completing.
9. a kind of high-ground stress weak surrounding rock large deformation tunnel overlength enlarged footing anchor cable construction side according to claim 8 Method, it is characterised in that:Described design stretching force is the 70% of YCW100-200 type jack total stretching forces.
10. a kind of high-ground stress weak surrounding rock large deformation tunnel overlength enlarged footing anchor cable construction side according to claim 2 Method, it is characterised in that:In described step S6, to the process of anchor cable hole slip casting with step S4 to the process of anchorage zone slip casting It is identical.
CN201710433964.9A 2017-06-09 2017-06-09 A kind of high-ground stress weak surrounding rock large deformation tunnel overlength enlarged footing anchor cable construction method Pending CN107165661A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710433964.9A CN107165661A (en) 2017-06-09 2017-06-09 A kind of high-ground stress weak surrounding rock large deformation tunnel overlength enlarged footing anchor cable construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710433964.9A CN107165661A (en) 2017-06-09 2017-06-09 A kind of high-ground stress weak surrounding rock large deformation tunnel overlength enlarged footing anchor cable construction method

Publications (1)

Publication Number Publication Date
CN107165661A true CN107165661A (en) 2017-09-15

Family

ID=59825146

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710433964.9A Pending CN107165661A (en) 2017-06-09 2017-06-09 A kind of high-ground stress weak surrounding rock large deformation tunnel overlength enlarged footing anchor cable construction method

Country Status (1)

Country Link
CN (1) CN107165661A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109252517A (en) * 2018-10-31 2019-01-22 五冶集团上海有限公司 A kind of anchorage pile anchorage and its application method
CN109339838A (en) * 2018-08-15 2019-02-15 福建陆海工程勘察设计有限公司 A kind of reinforcement means of prestressed anchor
CN109538265A (en) * 2017-09-22 2019-03-29 吴占瑞 Tunnel overlength enlarged footing anchor cable and its method for protecting support
CN109555548A (en) * 2017-09-27 2019-04-02 吴占瑞 A kind of supporting construction that high-ground stress Support System in Soft Rock Tunnels is formed using overlength enlarged footing anchor cable
CN109555545A (en) * 2017-09-27 2019-04-02 吴占瑞 High-ground stress weak surrounding rock large deformation tunnel overlength enlarged footing anchor cable construction method
CN111894635A (en) * 2020-08-13 2020-11-06 高军 Method for reinforcing broken surrounding rock tunnel through high-pressure splitting grouting modification
CN114233350A (en) * 2021-12-20 2022-03-25 西南交通大学 Mechanical rapid construction method of prestressed anchoring system in soft rock tunnel

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1523197A (en) * 2003-05-09 2004-08-25 陆观宏 Drill expanding aiguille of anchor shaft, anchor cable, stake and drill expanding technology
CN101538856A (en) * 2009-04-15 2009-09-23 曾庆义 Construction method of anchor rod with expanded head
CN102002947A (en) * 2010-12-06 2011-04-06 武汉大学 Explosion expanded internal anchor head prestressed anchor cable for strengthening weak rock and anchoring method thereof
CN103088819A (en) * 2013-02-22 2013-05-08 北京市公路桥梁建设集团有限公司 Pre-stressed anchor cable construction method
CN106592588A (en) * 2016-11-22 2017-04-26 成都四海岩土工程有限公司 Bit-expanded anchor rope construction method by using mechanical hole expansion

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1523197A (en) * 2003-05-09 2004-08-25 陆观宏 Drill expanding aiguille of anchor shaft, anchor cable, stake and drill expanding technology
CN101538856A (en) * 2009-04-15 2009-09-23 曾庆义 Construction method of anchor rod with expanded head
CN102002947A (en) * 2010-12-06 2011-04-06 武汉大学 Explosion expanded internal anchor head prestressed anchor cable for strengthening weak rock and anchoring method thereof
CN103088819A (en) * 2013-02-22 2013-05-08 北京市公路桥梁建设集团有限公司 Pre-stressed anchor cable construction method
CN106592588A (en) * 2016-11-22 2017-04-26 成都四海岩土工程有限公司 Bit-expanded anchor rope construction method by using mechanical hole expansion

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
邹思源: "扩大头锚索在深基坑支护工程中的应用", 《建筑施工》 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109538265A (en) * 2017-09-22 2019-03-29 吴占瑞 Tunnel overlength enlarged footing anchor cable and its method for protecting support
CN109555548A (en) * 2017-09-27 2019-04-02 吴占瑞 A kind of supporting construction that high-ground stress Support System in Soft Rock Tunnels is formed using overlength enlarged footing anchor cable
CN109555545A (en) * 2017-09-27 2019-04-02 吴占瑞 High-ground stress weak surrounding rock large deformation tunnel overlength enlarged footing anchor cable construction method
CN109339838A (en) * 2018-08-15 2019-02-15 福建陆海工程勘察设计有限公司 A kind of reinforcement means of prestressed anchor
CN109252517A (en) * 2018-10-31 2019-01-22 五冶集团上海有限公司 A kind of anchorage pile anchorage and its application method
CN111894635A (en) * 2020-08-13 2020-11-06 高军 Method for reinforcing broken surrounding rock tunnel through high-pressure splitting grouting modification
CN114233350A (en) * 2021-12-20 2022-03-25 西南交通大学 Mechanical rapid construction method of prestressed anchoring system in soft rock tunnel
CN114233350B (en) * 2021-12-20 2022-07-19 西南交通大学 Mechanical rapid construction method of prestressed anchoring system in soft rock tunnel

Similar Documents

Publication Publication Date Title
CN107165661A (en) A kind of high-ground stress weak surrounding rock large deformation tunnel overlength enlarged footing anchor cable construction method
CN102121395B (en) Method for integrated comprehensive management of gas in low-permeability single coal bed
CN103306687B (en) Soft rock tunnel long cantilever horizontal jet grouting Deformation control construction method
CN103061785B (en) Grouting process for borehole casing pressure-proof seepage sealing grouting device for drilling roadway breaking water burst surrounding rock
CN101603431B (en) Method for reinforcing outburst-prone coal seam cross-cut coal uncovering
CN102002956B (en) Multi-level fully-closed reinforcement technology of exposed fault zone of excavated side slope
CN103089276B (en) Deep-shallow hole and high-low pressure coupling grouting technology
CN106337686A (en) Rock stratum underground excavation three-story subway station umbrella cover structure and construction method thereof
CN110056369A (en) A kind of construction method at tunnel's entrance and exit hole
CN101709651A (en) Grouting water blocking method for undersea tunnel
WO2022122052A1 (en) Comprehensive construction method for shallow buried section of tunnel using urban railway mine tunneling method
CN107605498A (en) Rich water sand-pebble layer shield tunnel termination horizontal grouting ruggedized construction construction method
CN104790959B (en) A kind of Shallow-buried Tunnels with Small Spacing ground method for tunnel construction
CN110409461A (en) A kind of base pit stand construction based on assembled large-diameter tubular pile
CN105351001B (en) A kind of method based on gob side entry retaining region reinforcement gas pumping
CN108005660A (en) A kind of Optimization of Expressway Tunnel Construction method
CN109681210A (en) A kind of two side-wall pilot tunnel of section bored tunnel construction
CN105332710A (en) Construction method suitable for up-down overlapped tunnel with small clear space and long distance under weak geological condition
CN106014424A (en) Blasting excavation method for shallowly-overburdened and shallowly-buried bored tunnel
CN104612696A (en) Construction method for underground excavated large-section subway station to pass through viaduct in fine sand layer based on pioneer heading-column method
CN109555548A (en) A kind of supporting construction that high-ground stress Support System in Soft Rock Tunnels is formed using overlength enlarged footing anchor cable
CN101793154A (en) Method for grouting for stopping up water by using geological parameters of tunnel surrounding rocks and setting relief holes
CN107237638A (en) Both wired concealed tunneling structure and its construction method are worn under a kind of
CN108915702B (en) Shield receiving method in circular small-section tunnel
CN207406345U (en) Rich water sand-pebble layer shield tunnel end horizontal grouting ruggedized construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170915