CN109372555A - A kind of fault disruption zone area tunnel 3 D stereo grouting support method - Google Patents

A kind of fault disruption zone area tunnel 3 D stereo grouting support method Download PDF

Info

Publication number
CN109372555A
CN109372555A CN201811597985.5A CN201811597985A CN109372555A CN 109372555 A CN109372555 A CN 109372555A CN 201811597985 A CN201811597985 A CN 201811597985A CN 109372555 A CN109372555 A CN 109372555A
Authority
CN
China
Prior art keywords
grouting
anchor
slip casting
tunnel
cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811597985.5A
Other languages
Chinese (zh)
Inventor
王连国
王凯
陆银龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN201811597985.5A priority Critical patent/CN109372555A/en
Publication of CN109372555A publication Critical patent/CN109372555A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/18Arch members ; Network made of arch members ; Ring elements; Polygon elements; Polygon elements inside arches
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/02Setting anchoring-bolts with provisions for grouting

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Civil Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The present invention relates to one kind to be suitable for fault disruption zone area tunnel 3 D stereo grouting support method, comprising the following steps: carries out whitewashing to heading end and closes country rock of meeting head on, carries out superficial part slip casting by grouted anchor bar, form wall for grouting mortar leakage prevention;Multiple pre-grouting injected holes are evenly arranged in the position apart from vault 300mm along wall for grouting contour line, carry out pre-grouting;It can continue to excavate tunnel after slurry consolidation, shed shoring is carried out to tunnel using U-shaped steel bracket immediately after roadway excavation, surrouding rock deformation is limited and prevents tunnel from collapsing;It is sequentially completed the installation of roadway surrounding rock superficial part Full-face pouring anchor pole and the installation of deep grouting cable anchor;Gunite layer is formed to roadway surrounding rock gunite concrete;Grouted anchor bar slip casting is first carried out, forms superficial part grouting reinforced region in roadway surrounding rock superficial part;Then slip casting is successively carried out to grouting cable anchor, forms roadway surrounding rock deep grouting reinforced region;With concrete backfill bottom plate to design section, the smooth concrete backfill layer on roadway floor is formed.

Description

A kind of fault disruption zone area tunnel 3 D stereo grouting support method
Technical field
The present invention relates to a kind of coal mine roadway slip casting Support Methods, and in particular to one kind is suitable for fault disruption zone area lane Road 3 D stereo grouting support method, belongs to roadway support field.
Background technique
In the construction project of mine, this bad geological phenomenon in fault disruption zone area exists as the unstable section of roadway surrounding rock It is relatively common in digging process.Since fault disruption zone area roadway surrounding rock intensity is low, with pick with emitting and be easy to happen big change Shape, so such as roof fall, gushing water geological disaster often occurs when tunnel is dug to fault disruption zone area, this to be in tomography Roadway support difficulty in fracture area is very big, and is likely to occur large deformation in the use process in tunnel so as to cause branch The unstable failure of protection structure.Therefore, fault disruption zone area improving stability of surrounding rocks in roadway control all the time and supporting be all its emphasis with And difficult point.
It there is the following in existing fault disruption zone area Roadway Support Technology:
1, for fault disruption zone area tunnel, since fault disruption zone area roadway surrounding rock degree of consolidation is low, in roadway excavation Self-stable ability is poor afterwards, causes empty top short from the steady time and with pick with emitting, easily generation safety accident.And existing method for protecting support In, fault belt substep Dynamic Coupling method for protecting support is worn for tunnel as disclosed in Chinese patent CN104533453A, is passed through " anchor mesh belt rope note " support pattern carries out dynamic shoring to fault disruption zone area tunnel and distribution is reinforced, to reach better supporting Effect.This method for protecting support is only applicable to the tunnel that top plate has certain self-stable ability, and broken with the tomography emitted with pick for top plate Broken area tunnel is simultaneously not suitable for.
2, for the control of fault disruption zone area roadway surrounding rock, since fault disruption zone area roadway surrounding rock is extremely broken, country rock is split Slip easily occurs in breaking surrounding rock, supporting is caused to be failed for gap development, conventional bolting and rope support.And existing method for protecting support In, a kind of complicated fault crushed zone large section roadway dynamic superposition coupling supporting side as disclosed in Chinese patent CN103850688A Method carries out fault belt roadway surrounding rock by per-fore pouring liquid with small pipe plus anchor rete cord spray filling slurry combining anchor method for protecting support Effectively control.But this method for protecting support is since grouting pipe is short, grouting pressure is small, so that grout mixing is limited, the lane Jin Dui Road country rock superficial part has certain supporting effect, lacks effective control to deep crack country rock, for fault disruption zone area tunnel Speech, it cannot be guaranteed that tunnel is steady in a long-term.And since per-fore pouring liquid with small pipe is apart from short, advance support is limited in scope, and slurries are solidifying Knot improves Surrounding Rock Strength and needs the regular hour, this allows for tunnelling speed and is severely impacted.
Therefore, for fault disruption zone area tunnel, need one kind that can effectively prevent breaking roof with pick with emitting and can have The method for protecting support of effect control incompact fractured surrounding rock deformation, realizes the fast and safe construction in coal mine fault disruption zone area tunnel.
Summary of the invention
In order to solve the problems, such as exist, the present invention proposes a kind of fault disruption zone area tunnel three-dimensional grouting support method, with solution The problem of phantom fracture area roadway surrounding rock soft broken, supporting difficulty.
Technical solution is that the present invention provides a kind of fault disruption zone area tunnel three-dimensional grouting support method, the specific steps are as follows:
Step 1: before tunnelling to fault belt, whitewashing is carried out to heading end and closes country rock of meeting head on, is led to after whitewashing It crosses grouted anchor bar and carries out superficial part slip casting, grouting and reinforcing carries out pre-grouting, mortar leakage prevention after forming wall for grouting again;
Step 2: equal in the position apart from vault 300mm along wall for grouting contour line by geological drilling rig after wall for grouting is formed It is even to arrange multiple pre-grouting injected holes, pre-grouting floral tube is arranged in injected hole after pore-forming, in grouting tube and hole muzzle Pre-grouting is carried out after using cementing between pipe;
Step 3: advanced grouting support terminates, and can continue to excavate tunnel after slurry consolidation, use immediately after roadway excavation U-shaped steel bracket carries out shed shoring to tunnel, limits surrouding rock deformation and prevents tunnel from collapsing;
Step 4: after U-shaped steel bracket is set up, plate and two of first being pinched using jumbolter helps grouted anchor bar to drill, after pore-forming It carries out top plate and two and helps the installation of grouted anchor bar.Top plate and two help grouted anchor bar to be installed after, utilize jumbolter bottoming plate Grouted anchor bar drills, and mounting base grouted anchor bar after pore-forming completes the installation of roadway surrounding rock superficial part Full-face pouring anchor pole;
Step 5: after grouted anchor bar is installed, being drilled using anchor cable rig topping plate and side portion's grouting cable anchor, at Top plate and side portion's grouting cable anchor are installed behind hole, complete the installation of roadway surrounding rock deep grouting cable anchor;
Step 6: it after grouted anchor bar and grouting cable anchor are installed, is formed and is whitewashed to roadway surrounding rock gunite concrete Layer, when anchor being avoided to infuse spillage and can prevent roadway surrounding rock weathering deliquesce;
Step 7: after whitewashing, grouted anchor bar slip casting is first carried out, successively roadway floor, two are helped and top plate slip casting anchor Bar slip casting forms superficial part grouting reinforced region in roadway surrounding rock superficial part;
Step 8: after grouted anchor bar, then tunnel portion of side grouting cable anchor and top plate grouting cable anchor are successively carried out Slip casting forms roadway surrounding rock deep grouting reinforced region;
Step 9: it after the completion of slip casting, with concrete backfill bottom plate to design section, is formed smooth mixed on roadway floor Solidifying earthen backfill layer.
In the step 1, screw-thread steel hollow grouting anchor is selected in wall for grouting slip casting, and anchor pole specification is Contour line along wall for grouting is evenly arranged, and ecto-entad arranges multi-turn, adjacent anchor distance between tie rods about 1600mm.
In the step 2, the spacing of pre-grouting pipe determines that specific formula is as follows according to the dilation angle of slurries:
Wherein: r1For grout spreading range;K is stratum osmotic coefficient;h1For grouting pressure head;T is the slip casting time;N is Porosity;β is the viscosity ratio of slurry viscosity and water;r0For Grouting Pipe radius.
In the step 2, pre-grouting injected hole is constructed using the drill bit of diameter 94mm, and adjacent slip casting pitch of holes is 1500mm, the elevation angle are 10 °, and to top construction of meeting head on, 25 ° of outer limb, the terminal room of adjacent injected hole is away from for 5700mm.
In the step 2, the descended Grouting Pipe specification of pre-grouting is the floral tube of diameter 73mm, and floral tube length is 10m, often Root slip casting pipe end vehicle has screw thread, and for connecting Grouting Pipe, the extravasating hole of multiple rows of diameter 8mm is vertically drilled with along tube wall, quincunx Arrangement, Gu length of tube 2m.
In the step 2, pre-grouting uses the horizontal grouting pump of BW series down-hole high pressure, has pressure high, and flow is big etc. Advantage, highest grouting pressure can reach 10MPa.Pre-grouting grouting pressure is taken as 5.0~7.0MPa.
In the step 3, U-shaped steel uses U36 shape steel bracket, and canopy is away from middle centering 600mm, lap of splice 500mm, steel back 800 × 1200 × 80mm of plate gauge lattice.
In the step 4, side grouted anchor bar in top selects screw-thread steel hollow grouting anchor, and specification isIt is broken Break power >=15t, is sequentially drilled on the body of rodInjected hole, bar tail pound it is flat, sealing of hole use quick-hardening cementroll.
In the step 4, the Grouting Pipe of portion of side bottom end tilts down arrangement, is in 30 ° of angles with horizontal direction.
In the step 4, floor grouting anchor pole selects screw-thread steel hollow grouting anchor, and specification isOften Row 3, both sides grouted anchor bar is tiltedly beaten, in vertical direction with 15 ° of angles.
In the step 5, high-strength grouting cable anchor is by 8Compressor wire composition, intermediate minimum diameter are 31.5mm, diameter is 35mm at skeleton.Anchor cable overall length arranges that 5 skeletons, hollow steel tube diameter are 13mm, and intensity rank is 1570MPa, elongation >=3.5%.
In the step 5, top plate grouting cable anchor specificationPortion of side grouting cable anchor specificationIt is made of helical ribbed steel strand, there is injected hole at anchor cable body center, and anchor cable tail portion sets the anchoring of similar Bird's Nest Section.
In the step 6, concrete material proportion used of whitewashing are as follows: cement: yellow sand: stone=1:2:2, jetting cement are strong Degree grade is C20, and concrete spraying layer is with a thickness of 120~150mm.
In the step 7, slip casting carried out to grouted anchor bar using grouting pump, the grouting pressure of grouted anchor bar is taken as 2.0~ 3.0MPa, grouted anchor bar single hole slip casting time are 250~400s, and slip casting ending standard is determined by control pump pressure and running pulp amount It is fixed, when reaching design grouting pressure or when there are a large amount of spillages, slip casting can be stopped.
In the step 8, slip casting carried out to grouting cable anchor using grouting pump, the grouting pressure of grouting cable anchor is taken as 4.0~ 6.0MPa, grouting cable anchor single hole slip casting time are 600~800s, and slip casting ending standard is determined by control pump pressure and running pulp amount It is fixed, when reaching design grouting pressure or when there are a large amount of spillages, slip casting can be stopped.
The slurries use ordinary portland cement doping, and cement uses 425# ordinary portland cement, additive Using ACZ-1 type cement additive, dosage is the 4%~6% of cement weight.The slurries ratio of mud is 0.7:1~1:1, when slip casting Thin pulp is infused after first infusing underflow.
The invention has the advantages that:
1, the present invention is based on three-dimensional effects, and organic knot of tunneling boring bolt-grouting support is coupled by front pre-grouting and the depth It closes, by the cementing formation rockmass of tunnel broken country rock in fault disruption zone area, realizes tunnel in fault disruption zone area and enclose The 3 D stereo slip casting of rock, enhances the bearing capacity of rock mass itself, by the synergistic effect of active support and passive protecting, mentions The support capacity of high entire support system.
2, by pre-grouting to tunnel broken top plate carries out pre-pouring grout reinforcing in fault disruption zone area in front of working face, to prevent Only tunnel top side collapses after excavation.It goes forward side by side horizontal high voltage slip casting to playing advance borehole in front of tunnel vault to be excavated in advance, Range of grouting is wide, and grout spreading range is big, so that the cementation that the breaking surrounding rock body in fault disruption zone area passes through slurries An entirety is formed, to enhance rock mass self-bearing ability, back is avoided after excavation with digging with emitting, improves tunnel Driving speed.
3, superficial part grouting reinforced region is formed in country rock superficial part by grouted anchor bar, so that broken the enclosing of tunnel superficial part distressed zone Rock can be cementing integral, improves the mechanical properties such as cohesive strength and the internal friction angle of rock mass.Being formed in superficial part region simultaneously has Certain thickness grouting and reinforcing arch, to increase the total bearing capacity of country rock, to control the deformation of tunnel superficial part country rock.By adopting Deep wall rock is reinforced with grouting cable anchor, so that the degree of consolidation of rock mass increases in a certain range of deep, improves rock mass Bearing capacity, to play the suspension function to superficial part grouting and reinforcing arch.Added with this by deep grouting and reinforcing and superficial part slip casting Solid coupling come control deformation of the surrounding rock in tunnel destroy.
4, it is very broken to preferably resolve fault disruption zone area roadway surrounding rock by the present invention, and for top plate with pick with emitting, deformation is serious, The problem of being difficult to supporting, the stability control for fault disruption zone area tunnel provide foundation, effectively avoid reprocessing for tunnel Work guarantees the speedy drivage in fault disruption zone area tunnel and steady in a long-term.
Detailed description of the invention
Fig. 1 is pre-grouting drilling arrangement schematic diagram
Fig. 2 is advanced grouting support expanded schematic diagram
Fig. 3 is advanced grouting support sectional view
Fig. 4 is grouted anchor bar and grouting cable anchor supporting sectional schematic diagram
Fig. 5 is grouted anchor bar and grouting cable anchor supporting crown top view
In figure, the drilling of 1. pre-groutings;2. grouted anchor bar;3.U shape steel bracket;4. top plate grouting cable anchor;5. helping portion's slip casting Anchor cable;6. concrete spraying layer;7. concrete backfill layer.
Specific embodiment
In conjunction with attached drawing, method for protecting support of the present invention is further described:
Fault disruption zone area proposed by the present invention tunnel three-dimensional grouting support method, the specific steps are as follows:
Step 1: after tunnelling, whitewashing closing is carried out to heading end and is met head on country rock, used after whitewashing specification for Grouted anchor bar 2 carry out superficial part slip casting, spacing about 1600mm then is carried out after grouting and reinforcing forms wall for grouting Pre-grouting, mortar leakage prevention;
Step 2: after wall for grouting is formed, by geological drilling rig using the drill bit of diameter 94mm in the position apart from vault 300mm Set and be evenly arranged 5 pre-grouting injected holes 1, the adjacent spacing of wells be 1500mm, 25 ° of outer limb, hole terminal room away from for 5700mm, pre-grouting grouting pressure are taken as 5.0~7.0MPa;The pre-grouting floral tube of lower diameter 73mm, floral tube are long after pore-forming Degree is 10m, and every slip casting pipe end vehicle has screw thread, and for connecting Grouting Pipe, the excessive slurry of multiple rows of diameter 8mm is vertically drilled with along tube wall Hole, quincuncial arrangement, Gu length of tube 2m;Pre-grouting is carried out after using cementing between grouting tube and orifice sleeve (as shown in Figure 1-Figure 3);
Step 3: advanced grouting support terminates, it can continue to excavate tunnel after slurry consolidation, use U36 fashioned iron after excavation Bracket 3 carries out shed shoring, and canopy is away from middle centering 600mm, and lap of splice 500mm, 800 × 1200 × 80mm of steel backing plate specification is (such as Fig. 4 shows);
Step 4: helping grouted anchor bar to drill using jumbolter topping plate and two, installation top side after U-shaped steel bracket 3 is set up Grouted anchor bar 2, top side grouted anchor bar select screw-thread steel hollow grouting anchor, and specification isFracture Force >=15t, It is sequentially drilled on the body of rodInjected hole, bar tail pound it is flat, sealing of hole use quick-hardening cementroll;The drilling of bottoming plate grouted anchor bar, peace Floor grouting anchor pole is filled, floor grouting anchor pole selects screw-thread steel hollow grouting anchor, and specification isEvery row 3, Both sides grouted anchor bar is tiltedly beaten, and in vertical direction with 15 ° of angles, array pitch is 700 × 700;Complete superficial part Full-face pouring anchor pole It installs (as shown in Figure 4);
Step 5: drilled after grouted anchor bar 2 is installed using anchor cable rig topping plate and side portion's grouting cable anchor, Top plate grouting cable anchor 4 and side portion's grouting cable anchor 5 are installed;Grouting cable anchor is by 8Compressor wire composition, it is intermediate minimum Diameter is 31.5mm, and diameter is 35mm at skeleton;Anchor cable overall length arranges that 5 skeletons, hollow steel tube diameter are 13mm.Top plate slip casting 4 specification of anchor cable isIntensity rank is 1570MPa, elongation >=3.5%;5 specification of side portion's grouting cable anchor isIntensity rank is 1570MPa, and elongation >=3.5% completes the installation of deep grouting cable anchor;Above-mentioned one to Grouted anchor bar 2 described in five steps, U-shaped steel bracket 3 and grouting cable anchor are successively spaced setting (as shown in Figure 5);
Step 6: after grouted anchor bar and grouting cable anchor are installed, to roadway surrounding rock gunite concrete raw material proportioning Are as follows: cement: yellow sand: stone=1:2:2 concrete, injection concrete strength grade are C20, concrete spraying layer 6 with a thickness of 120~ 150mm forms gunite layer 6;
Step 7: after whitewashing, to grouted anchor bar 2 carry out slip casting, helped by roadway floor, two and top plate grouted anchor bar according to Secondary slip casting, the grouting pressure of grouted anchor bar 2 are taken as 2.0~3.0MPa, and the grouted anchor bar single hole slip casting time is 250~400s, note Slurry slurries are that 425# ordinary portland cement adds ACZ-1 type cement additive, and additive amount is the 4%~6% of cement weight. The slurries ratio of mud is 0.7:1~1:1, forms superficial part grouting reinforced region in roadway surrounding rock superficial part;
Step 8: slip casting, grouting cable anchor are successively then carried out to tunnel portion of side grouting cable anchor 5 and top plate grouting cable anchor 4 Grouting pressure be taken as 4.0~6.0MPa, the grouting cable anchor single hole slip casting time is 600~800s, and grouting serous fluid is that 425# is common Portland cement adds ACZ-1 type cement additive, and additive amount is the 4%~6% of cement weight.The slurries ratio of mud is 0.7: 1~1:1 forms deep grouting reinforced region;
Step 9: after the completion of whole Cementers work, the concrete backfill bottom plate for being C20 with strength grade is disconnected to designing Face forms the smooth concrete backfill layer 7 on roadway floor.

Claims (10)

1. a kind of fault disruption zone area tunnel three-dimensional grouting support method, which is characterized in that specific step is as follows:
Step 1: before tunnelling to fault belt, whitewashing is carried out to heading end and closes country rock of meeting head on, passes through note after whitewashing It starches anchor pole and carries out superficial part slip casting, grouting and reinforcing carries out pre-grouting, mortar leakage prevention after forming wall for grouting again;
Step 2: after wall for grouting is formed, by geological drilling rig along wall for grouting contour line in the uniform cloth in position apart from vault 300mm Set multiple pre-grouting injected holes, arrange pre-grouting floral tube after pore-forming in injected hole, grouting tube and orifice sleeve it Between using after cementing carry out pre-grouting;
Step 3: advanced grouting support terminates, and can continue to excavate tunnel after slurry consolidation, use immediately after roadway excavation U-shaped Steel bracket carries out shed shoring to tunnel, limits surrouding rock deformation and prevents tunnel from collapsing;
Step 4: after U-shaped steel bracket is set up, plate and two of first being pinched using jumbolter helps grouted anchor bar to drill, and carries out after pore-forming Top plate and two help grouted anchor bar installation.Top plate and two help grouted anchor bar to be installed after, beat floor grouting using jumbolter Armature boring, mounting base grouted anchor bar after pore-forming complete the installation of roadway surrounding rock superficial part Full-face pouring anchor pole;
Step 5: it after grouted anchor bar is installed, is drilled using anchor cable rig topping plate and side portion's grouting cable anchor, after pore-forming Top plate and side portion's grouting cable anchor are installed, the installation of roadway surrounding rock deep grouting cable anchor is completed;
Step 6: after grouted anchor bar and grouting cable anchor are installed, gunite layer is formed to roadway surrounding rock gunite concrete, is kept away Exempt from spillage when anchor is infused and can prevent roadway surrounding rock weathering from deliquescing;
Step 7: after whitewashing, first carrying out grouted anchor bar slip casting, successively helps to roadway floor, two and top plate grouted anchor bar is infused Slurry forms superficial part grouting reinforced region in roadway surrounding rock superficial part;
Step 8: after grouted anchor bar, then successively carrying out slip casting to tunnel portion of side grouting cable anchor and top plate grouting cable anchor, Form roadway surrounding rock deep grouting reinforced region;
Step 9: after the completion of slip casting, with concrete backfill bottom plate to design section, the smooth concrete on roadway floor is formed Backfill layer.
2. a kind of fault disruption zone area tunnel three-dimensional grouting support method according to claim 1, which is characterized in that the step In rapid one, screw-thread steel hollow grouting anchor is selected in wall for grouting slip casting, and anchor pole specification isAlong the profile of wall for grouting Line is evenly arranged, and ecto-entad arranges multi-turn, adjacent anchor distance between tie rods about 1600mm.
3. a kind of fault disruption zone area tunnel three-dimensional grouting support method according to claim 1, which is characterized in that the step In rapid two, the spacing of pre-grouting pipe determines that specific formula is as follows according to the dilation angle of slurries:
Wherein: r1For grout spreading range;K is stratum osmotic coefficient;h1For grouting pressure head;T is the slip casting time;N is hole Degree;β is the viscosity ratio of slurry viscosity and water;r0For Grouting Pipe radius.
4. a kind of fault disruption zone area tunnel three-dimensional grouting support method according to claim 1, which is characterized in that the step In rapid two, pre-grouting injected hole is constructed using the drill bit of diameter 94mm, and adjacent slip casting pitch of holes is 1500mm, and the elevation angle is 10 °, To top construction of meeting head on, 25 ° of outer limb, the terminal room of adjacent injected hole is away from for 5700mm;The descended Grouting Pipe specification of pre-grouting For the floral tube of diameter 73mm, floral tube length is 10m, and every slip casting pipe end vehicle has screw thread, for connecting Grouting Pipe, is hung down along tube wall Directly it is drilled with the extravasating hole of multiple rows of diameter 8mm, quincuncial arrangement, Gu length of tube 2m;Pre-grouting is sleeping using BW series down-hole high pressure Formula grouting pump has many advantages, such as pressure height, and flow is big, and highest grouting pressure can reach 10MPa.Pre-grouting grouting pressure is taken as 5.0~7.0MPa.
5. a kind of fault disruption zone area tunnel three-dimensional grouting support method according to claim 1, which is characterized in that the step In rapid three, U-shaped steel uses U36 shape steel bracket, and canopy is away from middle centering 600mm, lap of splice 500mm, steel backing plate specification 800 × 1200 ×80mm。
6. a kind of fault disruption zone area tunnel three-dimensional grouting support method according to claim 1, which is characterized in that the step In rapid four, side grouted anchor bar in top selects screw-thread steel hollow grouting anchor, and specification isFracture Force >=15t, the body of rod Upper sequence is drilled withInjected hole, bar tail pound it is flat, sealing of hole use quick-hardening cementroll;The Grouting Pipe of portion of side bottom end tilts down Arrangement is in 30 ° of angles with horizontal direction;Floor grouting anchor pole selects screw-thread steel hollow grouting anchor, and specification isEvery row 3, both sides grouted anchor bar is tiltedly beaten, in vertical direction with 15 ° of angles.
7. a kind of fault disruption zone area tunnel three-dimensional grouting support method according to claim 1, which is characterized in that the step In rapid five, high-strength grouting cable anchor is by 8Compressor wire composition, intermediate minimum diameter are 31.5mm, and diameter is at skeleton 35mm.Anchor cable overall length arranges that 5 skeletons, hollow steel tube diameter are 13mm, intensity rank 1570MPa, elongation >=3.5%; Top plate grouting cable anchor specificationPortion of side grouting cable anchor specificationIt is made of helical ribbed steel strand, There is injected hole at anchor cable body center, and anchor cable tail portion sets the anchoring section of similar Bird's Nest.
8. a kind of fault disruption zone area tunnel three-dimensional grouting support method according to claim 1, which is characterized in that the step In rapid six, concrete material proportion used of whitewashing are as follows: cement: yellow sand: stone=1:2:2, injection concrete strength grade are C20, are mixed Solidifying soil gunite layer is with a thickness of 120~150mm.
9. a kind of fault disruption zone area tunnel three-dimensional grouting support method according to claim 1, which is characterized in that the step In rapid seven, slip casting is carried out to grouted anchor bar using grouting pump, the grouting pressure of grouted anchor bar is taken as 2.0~3.0MPa, slip casting anchor The bar single hole slip casting time is 250~400s, and slip casting ending standard is determined by control pump pressure and running pulp amount, designs note when reaching When slurry pressure or when there are a large amount of spillages, slip casting can be stopped.
10. a kind of fault disruption zone area tunnel three-dimensional grouting support method according to claim 1, which is characterized in that described In step 8, slip casting is carried out to grouting cable anchor using grouting pump, the grouting pressure of grouting cable anchor is taken as 4.0~6.0MPa, slip casting The anchor cable single hole slip casting time is 600~800s, and slip casting ending standard is determined by control pump pressure and running pulp amount, is designed when reaching When grouting pressure or when there are a large amount of spillages, slip casting can be stopped;The slurries use ordinary portland cement doping, water Mud use 425# ordinary portland cement, additive use ACZ-1 type cement additive, dosage be cement weight 4%~ 6%.The slurries ratio of mud is 0.7:1~1:1, when slip casting first infuse underflow after infuse thin pulp.
CN201811597985.5A 2018-12-26 2018-12-26 A kind of fault disruption zone area tunnel 3 D stereo grouting support method Pending CN109372555A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811597985.5A CN109372555A (en) 2018-12-26 2018-12-26 A kind of fault disruption zone area tunnel 3 D stereo grouting support method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811597985.5A CN109372555A (en) 2018-12-26 2018-12-26 A kind of fault disruption zone area tunnel 3 D stereo grouting support method

Publications (1)

Publication Number Publication Date
CN109372555A true CN109372555A (en) 2019-02-22

Family

ID=65371717

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811597985.5A Pending CN109372555A (en) 2018-12-26 2018-12-26 A kind of fault disruption zone area tunnel 3 D stereo grouting support method

Country Status (1)

Country Link
CN (1) CN109372555A (en)

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109763821A (en) * 2019-03-15 2019-05-17 山西潞安矿业(集团)有限责任公司 A kind of compound shield lane method of dynamic pressure exploiting field main entry
CN109914426A (en) * 2019-03-29 2019-06-21 中国水利水电第七工程局有限公司 Catalase area underground power house abutment wall construction method for supporting under a kind of large ground pressure
CN110513129A (en) * 2019-09-26 2019-11-29 黄祖军 A kind of loose thick coal layer roadway workface fore-support supporting construction and method for protecting support
CN111271077A (en) * 2019-05-03 2020-06-12 石家庄国盛矿业科技有限公司 High-ground-stress three-soft-roadway surrounding rock bolting-grouting combined reinforcement method
CN111594231A (en) * 2020-06-03 2020-08-28 贵州盘江精煤股份有限公司 Grouting reinforcement method for deep surrounding rock broken water erosion roadway
CN112174616A (en) * 2020-08-26 2021-01-05 煤科集团沈阳研究院有限公司 Underground consolidation material and method for loose coal rock mass in small kiln damage area
CN112855223A (en) * 2021-04-06 2021-05-28 中国矿业大学 Integrated grouting method for coal roadway penetrating through goaf wall rear-advance curtain space
CN112983440A (en) * 2021-02-25 2021-06-18 山东黄金矿业(莱州)有限公司焦家金矿 Efficient tunneling method for large-section tunnel of soft argillaceous sandstone zone
CN113047849A (en) * 2021-05-20 2021-06-29 宜春学院 Soft rock bias tunnel lining support construction method
CN113107523A (en) * 2021-04-06 2021-07-13 淮北市平远软岩支护工程技术有限公司 Gap-included supporting method and grouting supporting process for rock burst supporting
CN113356904A (en) * 2021-07-14 2021-09-07 宿州市金鼎安全技术股份有限公司 Three-anchor combined dynamic support method for deep well high-stress soft rock roadway
CN113605913A (en) * 2021-09-01 2021-11-05 东莞理工学院 Rock underground passage construction method
CN113605950A (en) * 2021-09-16 2021-11-05 河北交通职业技术学院 Rapid repairing device and method for local damage of high-water-pressure tunnel lining
CN113803092A (en) * 2021-09-09 2021-12-17 山东科技大学 Support device and method for broken soft rock roadway based on steel pipe concrete support
CN114320413A (en) * 2021-11-26 2022-04-12 淮北矿业股份有限公司 A high pressure resistant accurate location hole sealing device for slip casting stock
CN114414438A (en) * 2022-01-24 2022-04-29 中国矿业大学 Recognition method for detecting grouting diffusion range based on proton magnetometer
CN114439505A (en) * 2021-11-29 2022-05-06 陕西彬长孟村矿业有限公司 Three-dimensional grouting method for roadway of roadway engineering
CN114673527A (en) * 2022-04-20 2022-06-28 中国科学院武汉岩土力学研究所 Method for reinforcing broken surrounding rock of progressive roadway and tunnel
CN114837696A (en) * 2022-05-31 2022-08-02 陕西正通煤业有限责任公司 Roadway supporting method under water-rich and impact vibration conditions
CN115030746A (en) * 2022-06-17 2022-09-09 山东黄金矿业科技有限公司深井开采实验室分公司 Metal mine tunneling grouting support method
CN115045694A (en) * 2022-05-05 2022-09-13 中国矿业大学(北京) Method for grouting and tunneling discrete bodies into roadway
CN117552813A (en) * 2024-01-12 2024-02-13 中国矿业大学(北京) Surrounding rock reinforcement construction method for deep roadway

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101864967A (en) * 2010-06-13 2010-10-20 中国矿业大学 Strengthening and reinforcing method of high-ground-pressure soft rock laneway by hierarchical grouting
CN103089276A (en) * 2013-01-28 2013-05-08 中国矿业大学 Deep-shallow hole and high-low pressure coupling grouting technology
CN103850688A (en) * 2014-03-24 2014-06-11 昆明理工大学 Method for dynamically superimposing coupling support on large-section roadway in complicated fault fracture zone
KR101482590B1 (en) * 2013-09-02 2015-01-14 한국철도기술연구원 Equipment for enlarging train tunnel for connecting boring machine and operation vehicle considering operation of train, and method for the same
CN105041325A (en) * 2015-07-13 2015-11-11 长沙理工大学 Construction method of high-tension water-rich extra-large-section weak breccia tunnel
CN106761841A (en) * 2017-03-06 2017-05-31 刘冲 Working face tailgate fractured coal grouting reinforcement method
CN106837352A (en) * 2017-01-22 2017-06-13 中南大学 Fault belt surrounding rock tunnel construction method
CN107503771A (en) * 2017-10-16 2017-12-22 山西阳城阳泰集团西冯街煤业有限公司 A kind of colliery crushes coal petrography consolidation method
CN108005685A (en) * 2017-12-12 2018-05-08 中铁十八局集团有限公司 A kind of anchor spraying concrete wall for grouting construction method
CN108005675A (en) * 2017-11-16 2018-05-08 中国电建集团昆明勘测设计研究院有限公司 The dynamic superposition coupling supporting method and supporting construction in a kind of fault belt tunnel
CN108035754A (en) * 2017-11-10 2018-05-15 张蓓 A kind of roadway bolt anchor cable combination supporting method

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101864967A (en) * 2010-06-13 2010-10-20 中国矿业大学 Strengthening and reinforcing method of high-ground-pressure soft rock laneway by hierarchical grouting
CN103089276A (en) * 2013-01-28 2013-05-08 中国矿业大学 Deep-shallow hole and high-low pressure coupling grouting technology
KR101482590B1 (en) * 2013-09-02 2015-01-14 한국철도기술연구원 Equipment for enlarging train tunnel for connecting boring machine and operation vehicle considering operation of train, and method for the same
CN103850688A (en) * 2014-03-24 2014-06-11 昆明理工大学 Method for dynamically superimposing coupling support on large-section roadway in complicated fault fracture zone
CN105041325A (en) * 2015-07-13 2015-11-11 长沙理工大学 Construction method of high-tension water-rich extra-large-section weak breccia tunnel
CN106837352A (en) * 2017-01-22 2017-06-13 中南大学 Fault belt surrounding rock tunnel construction method
CN106761841A (en) * 2017-03-06 2017-05-31 刘冲 Working face tailgate fractured coal grouting reinforcement method
CN107503771A (en) * 2017-10-16 2017-12-22 山西阳城阳泰集团西冯街煤业有限公司 A kind of colliery crushes coal petrography consolidation method
CN108035754A (en) * 2017-11-10 2018-05-15 张蓓 A kind of roadway bolt anchor cable combination supporting method
CN108005675A (en) * 2017-11-16 2018-05-08 中国电建集团昆明勘测设计研究院有限公司 The dynamic superposition coupling supporting method and supporting construction in a kind of fault belt tunnel
CN108005685A (en) * 2017-12-12 2018-05-08 中铁十八局集团有限公司 A kind of anchor spraying concrete wall for grouting construction method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
王连国等: "深部矿岩巷道深-浅耦合全断面锚注支护研究", 《中国矿业大学学报》 *
罗平平: "《岩体注浆理论与数值分析》", 30 September 2017, 黄河水力出版社 *

Cited By (30)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109763821A (en) * 2019-03-15 2019-05-17 山西潞安矿业(集团)有限责任公司 A kind of compound shield lane method of dynamic pressure exploiting field main entry
CN109763821B (en) * 2019-03-15 2024-02-09 山西潞安矿业(集团)有限责任公司 Dynamic pressure mining area large roadway composite roadway protection method
CN109914426A (en) * 2019-03-29 2019-06-21 中国水利水电第七工程局有限公司 Catalase area underground power house abutment wall construction method for supporting under a kind of large ground pressure
CN111271077A (en) * 2019-05-03 2020-06-12 石家庄国盛矿业科技有限公司 High-ground-stress three-soft-roadway surrounding rock bolting-grouting combined reinforcement method
CN110513129A (en) * 2019-09-26 2019-11-29 黄祖军 A kind of loose thick coal layer roadway workface fore-support supporting construction and method for protecting support
CN110513129B (en) * 2019-09-26 2024-04-02 黄祖军 Advanced roof-protecting supporting structure and method for roadway of soft and thick coal seam working face
CN111594231A (en) * 2020-06-03 2020-08-28 贵州盘江精煤股份有限公司 Grouting reinforcement method for deep surrounding rock broken water erosion roadway
CN112174616A (en) * 2020-08-26 2021-01-05 煤科集团沈阳研究院有限公司 Underground consolidation material and method for loose coal rock mass in small kiln damage area
CN112983440A (en) * 2021-02-25 2021-06-18 山东黄金矿业(莱州)有限公司焦家金矿 Efficient tunneling method for large-section tunnel of soft argillaceous sandstone zone
CN112855223B (en) * 2021-04-06 2024-05-10 中国矿业大学 Coal roadway-advanced curtain space integrated grouting method after penetrating goaf wall
CN113107523A (en) * 2021-04-06 2021-07-13 淮北市平远软岩支护工程技术有限公司 Gap-included supporting method and grouting supporting process for rock burst supporting
CN112855223A (en) * 2021-04-06 2021-05-28 中国矿业大学 Integrated grouting method for coal roadway penetrating through goaf wall rear-advance curtain space
CN113047849A (en) * 2021-05-20 2021-06-29 宜春学院 Soft rock bias tunnel lining support construction method
CN113047849B (en) * 2021-05-20 2024-03-01 宜春学院 Construction method for lining support of soft rock biased tunnel
CN113356904A (en) * 2021-07-14 2021-09-07 宿州市金鼎安全技术股份有限公司 Three-anchor combined dynamic support method for deep well high-stress soft rock roadway
CN113605913A (en) * 2021-09-01 2021-11-05 东莞理工学院 Rock underground passage construction method
CN113605913B (en) * 2021-09-01 2024-05-07 东莞理工学院 Rock underground passage construction method
CN113803092B (en) * 2021-09-09 2023-07-04 山东科技大学 Supporting device and method for broken soft rock roadway based on steel pipe concrete support
CN113803092A (en) * 2021-09-09 2021-12-17 山东科技大学 Support device and method for broken soft rock roadway based on steel pipe concrete support
CN113605950A (en) * 2021-09-16 2021-11-05 河北交通职业技术学院 Rapid repairing device and method for local damage of high-water-pressure tunnel lining
CN114320413A (en) * 2021-11-26 2022-04-12 淮北矿业股份有限公司 A high pressure resistant accurate location hole sealing device for slip casting stock
CN114439505A (en) * 2021-11-29 2022-05-06 陕西彬长孟村矿业有限公司 Three-dimensional grouting method for roadway of roadway engineering
CN114414438B (en) * 2022-01-24 2024-01-26 中国矿业大学 Identification method for detecting grouting diffusion range based on proton magnetometer
CN114414438A (en) * 2022-01-24 2022-04-29 中国矿业大学 Recognition method for detecting grouting diffusion range based on proton magnetometer
CN114673527A (en) * 2022-04-20 2022-06-28 中国科学院武汉岩土力学研究所 Method for reinforcing broken surrounding rock of progressive roadway and tunnel
CN115045694A (en) * 2022-05-05 2022-09-13 中国矿业大学(北京) Method for grouting and tunneling discrete bodies into roadway
CN114837696A (en) * 2022-05-31 2022-08-02 陕西正通煤业有限责任公司 Roadway supporting method under water-rich and impact vibration conditions
CN115030746A (en) * 2022-06-17 2022-09-09 山东黄金矿业科技有限公司深井开采实验室分公司 Metal mine tunneling grouting support method
CN117552813A (en) * 2024-01-12 2024-02-13 中国矿业大学(北京) Surrounding rock reinforcement construction method for deep roadway
CN117552813B (en) * 2024-01-12 2024-03-15 中国矿业大学(北京) Surrounding rock reinforcement construction method for deep roadway

Similar Documents

Publication Publication Date Title
CN109372555A (en) A kind of fault disruption zone area tunnel 3 D stereo grouting support method
CN105041325B (en) Construction method of high-tension water-rich extra-large-section weak breccia tunnel
CN105178981B (en) The closed depth coupling of broken soft rock roadway full-fracture-surfacanchoring-rod, which allows, presses bolt-grouting support method
CN112855223B (en) Coal roadway-advanced curtain space integrated grouting method after penetrating goaf wall
CN101929340B (en) Coal mine underground flat inclined tunnel pipe shed pre-grouting advance support construction process
CN109098733B (en) Rapid grouting reinforcement method for large-section tunnel in fracture zone rock stratum
CN104389628B (en) Landslide location tunnel reinforcement device and reinforced construction method
CN104047613B (en) Baseboard of coal mine roadway anchoring process
CN111119935B (en) Multi-layer grouting reinforcement method for surrounding rock of soft and broken roadway structure
CN107143338B (en) A kind of coal mine roadway driving and method for protecting support
CN110374600A (en) A kind of ultra close distance coal seam group stope drift active workings are error-free away from formula method for arranging
CN104533453A (en) Substep dynamic coupling support method for roadway fault fracture zone
CN211258623U (en) Water-rich weak surrounding rock tunnel supporting system crossing fault fracture zone
CN108798702B (en) Supporting method for large-section soft rock large-deformation tunnel
CN101709651A (en) Grouting water blocking method for undersea tunnel
CN107965341A (en) A kind of large-section underground pipe canopy pipe network concrete support method
CN109538216A (en) Pass through mined out and subsidence area constructing tunnel technique
CN113073983B (en) Enclosure type grouting construction method for submarine tunnel to penetrate through water-rich fault fracture zone
CN108374672B (en) A method of reinforcing Deep Mine soft coal level roadway surrounding rock
CN103898916A (en) Mini-pile combined support structure and construction method thereof
CN103711507A (en) Method for controlling deformation of large broken rock zone roadway by using multi-steel stranded wire combined supporting device
CN207660614U (en) Roadway floor prestress anchorage cable group coordinates ruggedized construction with slip casting
CN102704950B (en) Support method used in passing water guide fracture structure in mine exploration
CN114483109B (en) Curtain grouting advanced large pipe shed through construction method for crossing tunnel fault fracture zone
CN110273700A (en) It is a kind of to control red shale tunnel strength bolt-grouting support structure and its construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190222