CN107869792A - A kind of air purifier and its control method - Google Patents
A kind of air purifier and its control method Download PDFInfo
- Publication number
- CN107869792A CN107869792A CN201610846441.2A CN201610846441A CN107869792A CN 107869792 A CN107869792 A CN 107869792A CN 201610846441 A CN201610846441 A CN 201610846441A CN 107869792 A CN107869792 A CN 107869792A
- Authority
- CN
- China
- Prior art keywords
- air
- room
- air channel
- purification
- outside atmosphere
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F1/00—Room units for air-conditioning, e.g. separate or self-contained units or units receiving primary air from a central station
- F24F1/02—Self-contained room units for air-conditioning, i.e. with all apparatus for treatment installed in a common casing
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F13/00—Details common to, or for air-conditioning, air-humidification, ventilation or use of air currents for screening
- F24F13/28—Arrangement or mounting of filters
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F8/00—Treatment, e.g. purification, of air supplied to human living or working spaces otherwise than by heating, cooling, humidifying or drying
- F24F8/10—Treatment, e.g. purification, of air supplied to human living or working spaces otherwise than by heating, cooling, humidifying or drying by separation, e.g. by filtering
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F8/00—Treatment, e.g. purification, of air supplied to human living or working spaces otherwise than by heating, cooling, humidifying or drying
- F24F8/10—Treatment, e.g. purification, of air supplied to human living or working spaces otherwise than by heating, cooling, humidifying or drying by separation, e.g. by filtering
- F24F8/108—Treatment, e.g. purification, of air supplied to human living or working spaces otherwise than by heating, cooling, humidifying or drying by separation, e.g. by filtering using dry filter elements
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F8/00—Treatment, e.g. purification, of air supplied to human living or working spaces otherwise than by heating, cooling, humidifying or drying
- F24F8/10—Treatment, e.g. purification, of air supplied to human living or working spaces otherwise than by heating, cooling, humidifying or drying by separation, e.g. by filtering
- F24F8/15—Treatment, e.g. purification, of air supplied to human living or working spaces otherwise than by heating, cooling, humidifying or drying by separation, e.g. by filtering by chemical means
- F24F8/158—Treatment, e.g. purification, of air supplied to human living or working spaces otherwise than by heating, cooling, humidifying or drying by separation, e.g. by filtering by chemical means using active carbon
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F2221/00—Details or features not otherwise provided for
- F24F2221/17—Details or features not otherwise provided for mounted in a wall
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F2221/00—Details or features not otherwise provided for
- F24F2221/34—Heater, e.g. gas burner, electric air heater
Abstract
The invention discloses a kind of air purifier and its control method, the clarifier, which is divided on the closed cabin of left and right thermal regeneration room and air purifying room, to be provided with:Relief valve is placed on the bulkhead of thermal regeneration room and communicated by mode through walls with outdoor;Air purifying room lower wall is provided with air channel that is through walls and being communicated by Air Valve Control ON/OFF with outdoor;Indoor and outdoor is respectively equipped with survey air-temperature sensor.Methods described is, into when being desorbed, if outside air temperature is more than indoor air temperature, and less than or equal to 65 DEG C, outdoor air is entered in cabin, makes outside air temperature as initial temperature when being desorbed or directly as desorption temperature;Using timing plus temp measuring method control of sewage disposal duration, it is ensured that blowdown terminates temperature in rear deck and is adapted with indoor temperature;Blower fan rotating is controlled to realize dedusting during blowdown.Using when carrying out the desorption decontamination time needed for the accumulative clarification time close to setting when standby, then timing wake-up is desorbed blowdown automatically.
Description
Technical field
The invention belongs to the wall-mounted air purifier structure in Techniques for Indoor Air Purification field, more particularly to hot recycling
Design and its control method.
Background technology
With the high speed development of Chinese Urbanization, the annual newly-built enormous amount of building, increasing Novel decoration material
And chemical products are applied to interior decoration dress and drilled.It is organic that these new indoor finishing materials often discharge a large amount of volatility
The pollutant such as thing (VOCs) and formaldehyde, causes serious indoor pollution.According to statistics, after finishing, formaldehyde and VOCs in newly constructed house
Content is largely exceeded.
Volatile organic matter (VOCs) and formaldehyde significantly affect comfortable, the healthy and operating efficiency of people.Volatility is organic
Thing causes stimulus to the sense organ to human body, dries human body sensory, stimulates eye mucous membrane, schneiderian membrance, respiratory tract and skin etc.;Make one to produce
The discomfort such as headache, weak, drowsy.The pollutants such as alcohol, aromatic hydrocarbon and aldehydes can produce thorn to mucous membrane and the upper respiratory tract
Swash;Many VOC such as benzene, tetrachloro-ethylene, trichloroethanes, trichloro ethylenes etc. may be related to cancer.
In addition, formaldehyde is typical pollutant in China room.Oneself confirmation formaldehyde of the World Health Organization is carcinogenic and teratogenesis
Material, for one of potential strong mutagen.Long Term Contact low dosage formaldehyde can cause chronic respiratory disease, trigger nasopharynx
Cancer, colon cancer, paramenia etc..Especially, formaldehyde is bigger for children, pregnant woman's harm, can cause the pregnancy syndrome of pregnant woman,
Cause neonatal chromosome disorder, leukaemia so that teenager's memory and intelligence decline etc..
The time life more than 80% in life of people is indoors.Therefore, the pollutants such as indoor VOCs and formaldehyde are carried out
Purify particularly necessary.For this reason, it may be necessary to suitable air purifier is chosen to eliminate harm of these indoor pollutants to human body.
Current indoor purification techniques mainly includes ventilation, absorption, photochemical catalytic oxidation and plasma technology etc..Wherein adsorption material
Material the advantage such as no harmful side product, is most widely used due to relatively low with cost in the market.However, due to sorbing material
Adsorption capacity is limited, and sorbing material will often be taken out by, which needing, is desorbed, and otherwise will be had a strong impact on clean-up effect, and be made adsorption air
The life cycle of clarifier is shorter, and frequently changes sorbing material trouble.When this make it that adsorption cleaning device is difficult to realize longer
Between application.Therefore, this key issue of solution adsorbent saturation in technique is needed badly.
It is well-known:It is the method that skilled person generally uses that heating desorption is used to sorbing material, in order to overcome
The defects of adsorption cleaning device needs frequently to change sorbing material, and the method being desorbed is heated according to sorbing material, currently there are public affairs
Open document and record the new-type adsorption cleaning device integrated with thermal desorption function, as number of patent application is:
201510898501.0 a kind of wall-mounted air purification device and its purification method based on hot recycling, user selects as needed
To indoor purifying or force ventilation, when selection is to indoor purifying function, blowdown after thermal desorption will be carried out in the course of work, will be elected to
Select a good opportunity tool ventilation function when, outdoor fresh air is introduced it is indoor, but the wall-mounted air purification device and its purification method exist it is as follows
Defect:(1) because only that when heating is desorbed (hot recycling mode period), close that to be possible to pressure in closed cabin excessive, and by
In anti-device damage with relief valve be arranged on clarifier closed cabin air purifying room to interior wall on, once therefore relief valve
Pressure release is opened, just the high air of Cabin contamination thing concentration is let out to interior, makes indoor composition secondary pollution, and work as purification of air
Air valve between room and thermal regeneration room is closed and the air valve of outdoor is led in closing shape in thermal regeneration room
When state, i.e. clarifier are in purification pattern, to the electrical heating wire heating control circuit generation high temperature out of control in thermal regeneration room, and
Temperature sensor in thermal regeneration room damages again, in the thermal regeneration room now closed caused pressure be possible to it is excessive and
Device is damaged, because being arranged on air purifying room this moment can not possibly work to relief valve on the wall of interior;(2) because using nothing
Have by indoor/outdoor temperature-difference much, air initial temperature is indoor air temperature in cabin when proceeding by thermal desorption, so working as room
When outer temperature is more than indoor temperature, it is impossible to using outside air temperature as air is initially warm in cabin when proceeding by thermal desorption
Degree, that is, the air of outdoor high temperature can not be introduced when proceeding by thermal desorption in cabin, make air initial temperature and outdoor in cabin high
The air themperature of temperature is consistent, therefore when outdoor temperature is more than indoor temperature, now using at the beginning of air in cabin when proceeding by thermal desorption
Beginning temperature is the method for indoor air temperature, makes not save during desorption;(3) because that is opened under blowdown pattern is provided in air
Air valve at the top of clean room, and the air valve for being provided in air purifying room bottom is closed, therefore be desorbed in purification of air room
Air containing pollutant can not possibly be completely exhausted out, it is also possible to arranged to interior, formed secondary pollution;(4) because opening under fresh air pattern
The air valve of air purifying room bottom is provided in, and closes the air valve being provided at the top of air purifying room, thus it is outdoor new
Wind can not possibly introduce interior after filtering module purification in duct main, but purify straight-through interior without filtering module;Because
Using pure timing blowdown, timing there may be it is long or too short, as winter there may exist the overlong time of timing, summer
The heat that time of timing pass in nacelle is there may exist not dissipate;(6) do not have and other removed to adsorbing dust on low efficient filter
Dirt function;Because thermal desorption need one or two hour, and use air purifier to during indoor air purification set when pair
Indoor air purification institute's cumulative time reaches when needing desorption time of setting, and pause is adopted to indoor air purification, is desorbed
Blowdown, it is well known that:It typically someone will exist in room when purifying room air, therefore can be influenceed during desorption blowdown is carried out
Indoor people cannot breathe cleaned air.And it is well-known, only in purification of air or ventilation, air purifier just can work for interior
Make under corresponding pattern, otherwise, air purifier is in holding state, waits user to open corresponding modes, i.e. purification of air
Device selects purification pattern to open, then into the purification pattern course of work, used in holding state, wait corresponding modes operation, user
Family selection fresh air pattern is opened, then into the fresh air pattern course of work;When user closes purification pattern and fresh air pattern, air is net
Change device and enter holding state.
It is well-known:Indoor air temperature is typically below 40 DEG C, and otherwise people normally can not live indoors.
The content of the invention
The purpose of the present invention is to overcome oneself to have the weak point of technology, proposes a kind of air purifier and its controlling party
Method, have 1. pressure release when will not be to indoor formation secondary pollution;2. enter the desorption stage moment, if outside air temperature is more than room
Interior air themperature, and less than or equal to 65 DEG C, set in cabin and enter outdoor air, using outside air temperature as at the beginning of when being desorbed
Beginning temperature or directly as desorption temperature;3. using timing plus temp measuring method control of sewage disposal time length;4. in purification pattern
Not only there is desorption decontamination function, also have in purification pattern and fresh air pattern has dedusting work(to dust on filter automatically
Energy;5. when standby when carrying out the desorption decontamination time needed for the accumulative clarification time close to setting, then timing wake-up takes off automatically
Attached blowdown, if desorption needed for clarification time not close setting decontaminates the time, but the clarification time added up connects with ventilation time sum
During the required carry out dedusting time closely set, then timing wake-up automatic dust removing.
In order to realize above-mentioned purpose, the technical scheme is that:
A kind of air purifier, including:Closed cabin, blower fan, the first automatically controlled air valve were imitated to the 6th automatically controlled air valve, slightly
Filter, efficiently renewable VOCs and methyl aldehyde adsorption material, heater, VOCs sensors, first to three-temperature sensor, control
Processor unit, relief valve;Described first is defeated with control processor unit respectively to three-temperature sensor, VOCs sensors
Enter end to be connected;The blower fan, heater, the first automatically controlled air valve to the 6th automatically controlled air valve respectively with control processor unit
Output end be connected;The closed cabin with the left and right thermal regeneration room for being set to be isolated with thermal insulation board and air purifying room, every
Air channel is respectively equipped with from the thermal insulation board upper and lower end between thermal regeneration room and air purifying room, isolates thermal regeneration room and air
Clean room is communicated by air channel set by thermal insulation board upper and lower end;It is respectively equipped with the upper and lower wall of air purifying room to the wind of interior
It is logical;In the position corresponding with thermal insulation board lower end air channel provided with big with outdoor in a manner of through walls on the bulkhead of the thermal regeneration room
The logical air channel of gas phase;The first automatically controlled air valve is placed in the set wind to interior on purification of air chamber upper wall and led to, the second electricity
Control air valve is placed in the set wind to interior on air purifying room lower wall and led to, and the 3rd automatically controlled air valve is placed in isolation thermal regeneration
The air channel that thermal insulation board upper end between room and air purifying room is set, the 4th automatically controlled air valve are placed in isolation thermal regeneration room and sky
The air channel that thermal insulation board lower end between gas clean room is set, the 5th automatically controlled air valve be placed on the bulkhead of thermal regeneration room with it is heat-insulated
The air channel communicated in a manner of through walls with outside atmosphere that the corresponding position in plate lower end air channel is set;The heater and the first temperature
Degree sensor is from top to bottom sequentially arranged in thermal regeneration room;The low efficient filter, efficiently renewable VOCs and formaldehyde inhale
Enclosure material, blower fan, VOCs sensors are sequentially arranged in purification of air room from the bottom to top, and low efficient filter is arranged on isolation and added
Air channel space above between hot recycling room and air purifying room set by thermal insulation board lower end, assembling is in isolation thermal regeneration room
Space below air channel between air purifying room set by thermal insulation board upper end;Described relief valve is installed on the cabin of thermal regeneration room
On wall, communicated by mode through walls with outside atmosphere;Described second temperature sensor is installed on interior;The 3rd described temperature
Sensor is installed on outdoor;The air channel communicated in a manner of through walls with outside atmosphere is additionally provided with described air purifying room lower wall,
6th automatically controlled air valve is placed on air purifying room lower wall the air channel communicated in a manner of through walls with outside atmosphere set.
Above-described three-temperature sensor is installed on outdoor, refers to that three-temperature sensor is installed on air purifying room
On lower wall in the set air channel communicated in a manner of through walls with outside atmosphere, and closely directly contacted with outdoor air.
Above-described first automatically controlled air valve and the second automatically controlled air valve are single automatically controlled open type electromagnetic air valve, the 3rd
Automatically controlled air valve to the 6th automatically controlled air valve is single automatically controlled closed type electromagnetic air valve.
Above-described heater selects PTC heaters, it is ensured that adstante febre will not naked light.
Above-described blower fan is Bidirectional axial flow fan, and during Positive work, purification of air indoor air flow flows from the bottom to top,
Inversely during (reverse) operating, purification of air indoor air flow from top to bottom flows.
Above-described low efficient filter and efficiently renewable VOCs and methyl aldehyde adsorption material form air-purifying module;Slightly
Imitate conventional products of the filter from convenient installation, such as there is the screen pack of fire resistance fibre, be mainly used in particulate matter, i.e., it is main
It is used to adsorb dust, filters out the dust in air;Efficient renewable VOCs and methyl aldehyde adsorption material are for convenience of the routine installed
A shaped activated carbon be filling adsorption material, for volatile organic matter (VOCs) and formaldehyde absorbing.
Above control processor unit is used to control the first automatically controlled air valve to the 6th automatically controlled air valve ON/OFF, controls wind
The forward direction of machine and antikinesis and stopping, controlling the ON/OFF and temperature adjustment of heater, and pass through the first temperature sensor pair
Temperature is detected in cabin, and indoor air temperature is detected by second temperature sensor, and outside air temperature is examined by three-temperature sensor
Survey, by VOCs sensors in cabin in upper wall outlet air VOCs Concentration Testings;Control processor unit includes MCU (micro-controls
Unit processed) unit, data storage, real-time clock, display, the keyboard for including purification pattern and fresh air mode selecting key,
And various input/output interfaces being connected with peripheral hardware etc., the accumulative timing list of purification operation is additionally provided with control processor unit
Member and the accumulative timing unit of ventilation operation and the timing unit for being desorbed, decontaminating, control processor unit purify according to selection
Pattern or fresh air pattern carry out corresponding running status control to automatically controlled air valve, blower fan, heater, and according to the temperature of measurement and
Timing situation is accordingly controlled, and send display to show cabin inner outlet air V OCs Concentration Testings by VOCs sensors.
And be set by the temperature that the first temperature sensor measures and be set to T1, the temperature measured by second temperature sensor is set to T2,
The temperature measured by three-temperature sensor is set to T3.
In order to realize above-mentioned purpose, another technical scheme of the invention is:
A kind of control method of air purifier, comprises the following steps:
1) temperature for setting control processor unit to be measured by the first temperature sensor is set as T1, passes through second temperature
The temperature that sensor measures is set as T2, and the temperature measured by three-temperature sensor is set as T3, and provided with purification operation
Accumulative timing unit and the accumulative timing unit of ventilation operation, working method are provided with purification pattern and fresh air pattern, selection purification mould
Air purifier is set during formula, and circulation work is set in purification, desorption, blowdown three phases process, selection fresh air pattern successively
Air purifier successively circulation work ventilation, two phase process of dedusting;
2) when air purifier is in holding state, setting is standby to reach 30min, reads the accumulative timing of purification operation
Control is identified in the time that unit adds up:
When recognize the time that the accumulative timing unit of purification operation add up be more than or equal to set needed for be desorbed
When decontaminating the 80% of time, automatically wake up air purifier and carry out desorption decontamination, and remove the accumulative timing unit institute of purification operation
The accumulative time,
When recognize the time that the accumulative timing unit of purification operation add up be less than set needed for carry out desorption decontamination
Time 80% when, retain the time that the accumulative timing unit of purification operation add up, the purification operation of reading added up into timing list
The time that the time that member adds up adds up with the accumulative timing unit of ventilation operation read is added, if sum is more than or equal to
The 80% of the required carry out dedusting time of setting, automatically wake up air purifier and carry out dedusting, and remove the accumulative meter of ventilation operation
The time that Shi Danyuan adds up, otherwise, keep standby, and retain the time that the accumulative timing unit of ventilation operation adds up,
(3) removed during the air purifier automatically waken up carries out desorption decontamination with the air purifier automatically waken up
During dirt, there is the operation of purification pattern or fresh air pattern, the control process after the corresponding running automatically waken up terminates is set
Device unit responds corresponding modes, otherwise, after the corresponding running automatically waken up terminates, immediately enters holding state;
3) air purifier carries out purification pattern or the operation of fresh air pattern, wakes up enter accordingly immediately in holding state
Pattern.
Air purifier is set during above-described selection purification pattern, and circulation work is being purified, is being desorbed, blowdown three successively
Individual phase process, there are following steps:
(1) cleansing phase running
Control processor unit outputs control signals to the first automatically controlled air valve to the 6th automatically controlled air valve and blower fan, opens
The air channel communicated on the upper and lower wall of air purifying room with interior, it is upper and lower to close thermal insulation board between thermal regeneration room and air purifying room
Air channel set by end, and close on the bulkhead of thermal regeneration room the air channel communicated with outside atmosphere and close and be located at purification of air
The air channel that room lower wall communicates with outside atmosphere, blower fan Positive work is controlled, purification of air indoor air flow flows from the bottom to top, indoor
Air is got in through filtering after being flowed into by air purifying room lower wall to the air channel of interior with after adsorption treatment from upper wall air channel, and
Accumulative timing unit is run to purification and carries out accumulative timing, when until reach will purification operation accumulative timing unit institute's cumulative time
When carrying out desorption processing set time, the accumulative timing unit of pause purification operation add up that timing and removing adds up when
Between, into purification pattern step (2) desorption stage running;
(2) desorption stage running
Control processor unit outputs control signals to the first automatically controlled air valve to the 6th automatically controlled air valve, heater and wind
Machine, the air channel communicated on the upper and lower wall of air purifying room with interior is closed, open the spaced heat of thermal regeneration room and air purifying room
Air channel set by plate upper end, blower fan Positive work is kept, kept between thermal regeneration room and air purifying room set by thermal insulation board lower end
Air channel is closed, and keeps the air channel that is communicated with outside atmosphere on the bulkhead of thermal regeneration room and located at air purifying room lower wall
The air channel communicated with outside atmosphere is closed, and keeps heater to close, and is examined by second temperature sensor and three-temperature sensor
Survey indoor and outdoor air temperature and keep in the indoor air temperature of detection, and temporary indoor air temperature is set to T2 ', and will
The outside air temperature T3 that the indoor air temperature T2 that second temperature sensor measures measures with three-temperature sensor is compared
Compared with:
1. T3-T2 is worked as in setting<At 2 DEG C or when T3-T2 >=2 DEG C, and during 65 DEG C of T3 >, holding is located at thermal regeneration room bulkhead
Go up the air channel communicated with outside atmosphere and closed located at the air channel that air purifying room lower wall communicates with outside atmosphere, and be desorbed
Start timing, into the step of desorption stage 5.,
2. T3-T2 >=2 DEG C are worked as in setting, and during 55 DEG C≤T3≤65 DEG C, are opened and be located on the bulkhead of thermal regeneration room and outdoor
The air channel and be desorbed located at the air channel that air purifying room lower wall communicates with outside atmosphere, setting after 10 seconds that air communicates
Start timing, and air themperature in cabin is continued to monitor and by three-temperature sensor pair by the first temperature sensor
Outside air temperature is continued to monitor in real time:
Set the T3 to be monitored measured to three-temperature sensor continue 5 seconds be less than 55 DEG C or continue 5 seconds be more than 65 DEG C when,
Into the step of desorption stage 4., otherwise, wait be desorbed timing time reach complete desorption processing needed for setting time when, enter
Purification pattern step (3) blowdown stage running process,
3. T3-T2 >=2 DEG C, and T3 are worked as in setting<At 55 DEG C, open and communicated on the bulkhead of thermal regeneration room with outside atmosphere
Air channel and located at the air channel that air purifying room lower wall communicates with outside atmosphere, set after 10 seconds, pass through the first TEMP
Device is continued to monitor to air themperature in cabin and outside air temperature is continued to monitor by three-temperature sensor, and
Continue to carry out in cabin temperature T1 in real time compared with outdoor temperature T3:
When setting absolute value≤0.5 DEG C to be monitored to T1 and T3 differences, carry out desorption and start timing, into desorption stage
The step of 4., otherwise, by the T3 continued to monitor compared with temporary indoor air temperature T2 ', it is to be monitored to T3 continue 5 seconds it is little
When equal to 2 DEG C of temporary indoor air temperature T2 ', or when monitoring that T3 continues 5 seconds and is more than 65 DEG C, carry out desorption and start to count
When, into the step of desorption stage 4.,
4. close on the bulkhead of thermal regeneration room the air channel communicated with outside atmosphere and located at air purifying room lower wall with
The air channel that outside atmosphere communicates, into the step of desorption stage 5.,
5. opening air channel set by thermal insulation board lower end between thermal regeneration room and air purifying room and opening heater heating, lead to
Cross the first temperature sensor to continue to monitor air themperature in cabin, air is heated by heater in cabin, air in control cabinet
Temperature maintains setting value, and the air after heating passes through sorbing material, promotes in efficiently renewable VOCs and methyl aldehyde adsorption material
The VOCs and the desorption of formaldehyde adsorbed, when desorption timing time reaches and completes to be desorbed the setting time needed for processing, entrance
Purification pattern step (3) blowdown stage running process;
(3) blowdown stage running process
Control processor unit is by control signal to the first automatically controlled air valve to the 6th automatically controlled air valve, heater and wind
Machine is controlled as follows:
1. the heater of unlatching is closed, the wind communicated on the bulkhead of thermal regeneration room with outside atmosphere of open and close
Road, the air channel for being located at air purifying room lower wall and being communicated with outside atmosphere of unlatching is closed, close thermal regeneration room and the sky of unlatching
Air channel set by thermal insulation board lower end between gas clean room, the air channel communicated on air purifying room lower wall with interior is opened, keep heating
Air channel set by thermal insulation board upper end is opened between regeneration room and air purifying room, keeps set air channel on purification of air chamber upper wall to close
Close, keep blower fan Positive work, that is, keep purification of air indoor air flow to flow from the bottom to top, dirty gas is heated in purification of air room
Air channel set by thermal insulation board upper end is set to being communicated with outside atmosphere on the bulkhead of thermal regeneration room between regeneration room and air purifying room
Air channel, arrange to outdoor, room air is by set purified to air with indoor phase ventilating duct on the lower wall of the purified room of air
Indoor supplement, set when the blowdown stage, the blower fan duration of runs reached 10min, into the step of the blowdown stage 2.,
2. thermal insulation board lower end between set air channel and thermal regeneration room and air purifying room on unlatching purification of air chamber upper wall
Set air channel, closing air purifying room lower wall, up to set by interior air channel, closes thermal regeneration room and the interval of air purifying room
Air channel set by hot plate upper end, keep communicating set air channel unlatching on the bulkhead of thermal regeneration room with outside atmosphere, holding is located at air
The air channel that clean room's lower wall communicates with outside atmosphere is closed, and changes blower fan rotation direction, that is, controls blower fan reversed operation, is changed empty
Gas purification indoor air flow flow direction, purification of air indoor air flow from top to bottom flow, the dirty heated regeneration room of gas in purification of air room
Air channel set by thermal insulation board lower end is arranged to set air channel is communicated with outside atmosphere on the bulkhead of thermal regeneration room between air purifying room
To outdoor, room air passes through air channel set by the upper wall of the purified room of air to the purified indoor supplement of air, to air through net
The dust adsorbed on low efficient filter is discharged into outside atmosphere while changing room blowdown, treats the blower fan antiport time in blowdown stage
The step of entering the blowdown stage when reaching 10min 3.,
3. control processor unit is continued to monitor by the first temperature sensor to air themperature in cabin, pass through second
Temperature sensor continues to monitor to indoor air temperature, and in the cabin that the first temperature sensor is measured air themperature T1 with
The indoor air temperature T2 that second temperature sensor measures is compared in real time:It is to be monitored to arrive T1 and absolute value≤1 of T2 differences
DEG C when return to purification pattern step (1) cleansing phase running.
It is above-described selection fresh air pattern when set air purifier successively circulation work ventilation, two stages of dedusting
Process, there is following control:
(1) divulge information running
Control processor unit is carried out by control signal to the first automatically controlled air valve to the 6th automatically controlled air valve and blower fan
Control, closing air purifying room lower wall, up to set by interior air channel, closes thermal insulation board between thermal regeneration room and air purifying room
Air channel set by upper and lower end, closes on the bulkhead of thermal regeneration room the air channel communicated with outside atmosphere, and unlatching is located at purification of air
The air channel that room lower wall communicates with outside atmosphere, set air channel on purification of air chamber upper wall is opened, blower fan Positive work is controlled, to room
Interior ventilation, and accumulative timing unit is run to ventilation and carries out accumulative timing, purification of air indoor air flow flows from the bottom to top, outdoor
Air by after being flowed into located at the air channel that air purifying room lower wall communicates with outside atmosphere through filtering and adsorption treatment after it is net from air
Change chamber upper wall upper air duct to get in, set when until the ventilation operation accumulative timing unit cumulative time reaches 300h, stop
The positive operation of blower fan, suspend to room ventilation, the accumulative timing unit of pause ventilation operation add up that timing and removing adds up when
Between, into (2) dedusting running the step of fresh air pattern;
(2) dedusting running
Control processor unit is carried out by control signal to the first automatically controlled air valve to the 6th automatically controlled air valve and blower fan
Control, the air purifying room lower wall remained turned-off air channel, the thermal regeneration room remained turned-off and purification of air up to set by interior
Air channel set by thermal insulation board upper end between room, air channel set by thermal insulation board lower end between thermal regeneration room and air purifying room is opened, is opened
The air channel communicated on the bulkhead of thermal regeneration room with outside atmosphere is opened, closing is located at air purifying room lower wall and outside atmosphere phase
Logical air channel, set air channel on the purification of air chamber upper wall kept it turned on, blower fan reversed operation is controlled, low efficient filter is removed
Dirt, room air are from top to bottom flowed through air inlet clean room in air channel set by purification of air chamber upper wall, heated regeneration room and
Air channel set by thermal insulation board lower end with outside atmosphere to communicating set air channel flow direction on the bulkhead of thermal regeneration room between air purifying room
Outdoor, so as to which the dust adsorbed on low efficient filter is discharged into outside atmosphere, setting treats that the blower fan antikinesis time reaches 10min
When, (1) the step of stopping blower fan antikinesis, returning to fresh air pattern, divulges information running.
The above-described air purifier that automatically wakes up carries out desorption decontamination, has following steps:
1) it is desorbed
Control processor unit outputs control signals to the first automatically controlled air valve to the 6th automatically controlled air valve, heater and wind
Machine, the air channel communicated on the upper and lower wall of air purifying room with interior is closed, open the spaced heat of thermal regeneration room and air purifying room
Air channel set by plate upper end, blower fan Positive work is controlled, kept between thermal regeneration room and air purifying room set by thermal insulation board lower end
Air channel is closed, and the air channel for keeping communicating with outside atmosphere on the bulkhead of thermal regeneration room is closed and located at air purifying room
The air channel that lower wall communicates with outside atmosphere is closed, and is kept heater to close, is passed through second temperature sensor and the 3rd TEMP
Device detects indoor and outdoor air temperature and keeps in the indoor air temperature of detection, and temporary indoor air temperature is set into T2 ',
And the indoor air temperature T2 that second temperature sensor the measures outside air temperature T3 measured with three-temperature sensor are entered
Row compares:
1. T3-T2 is worked as in setting<At 2 DEG C or when T3-T2 >=2 DEG C, and during 65 DEG C of T3 >, holding is located at thermal regeneration room bulkhead
The upper air channel communicated with outside atmosphere is closed and closed located at the air channel that air purifying room lower wall communicates with outside atmosphere, and carries out
Desorption starts timing, into following steps 5.,
2. T3-T2 >=2 DEG C are worked as in setting, and during 55 DEG C≤T3≤65 DEG C, are opened and be located on the bulkhead of thermal regeneration room and outdoor
The air channel and be desorbed located at the air channel that air purifying room lower wall communicates with outside atmosphere, setting after 10 seconds that air communicates
Start timing, and air themperature in cabin is continued to monitor and by three-temperature sensor pair by the first temperature sensor
Outside air temperature is continued to monitor in real time:
Set the T3 to be monitored measured to three-temperature sensor continue 5 seconds be less than 55 DEG C or continue 5 seconds be more than 65 DEG C when,
Into following steps 4., otherwise, when desorption timing time reaches and completes to be desorbed the setting time needed for processing, into step 2)
Blowdown,
3. T3-T2 >=2 DEG C, and T3 are worked as in setting<At 55 DEG C, open and communicated on the bulkhead of thermal regeneration room with outside atmosphere
Air channel and located at the air channel that air purifying room lower wall communicates with outside atmosphere, set after 10 seconds, pass through the first TEMP
Device is continued to monitor to air themperature in cabin and outside air temperature is continued to monitor by three-temperature sensor, and
Continue to carry out in cabin temperature T1 in real time compared with outdoor temperature T3:
When setting absolute value≤0.5 DEG C to be monitored to T1 and T3 differences, carry out desorption and start timing, into following steps
4. otherwise, by the T3 continued to monitor compared with temporary indoor air temperature T2 ', it is to be monitored continue to be not more than for 5 seconds to T3 be equal to
During 2 DEG C of temporary indoor air temperature T2 ', or when monitoring that T3 continues 5 seconds and is more than 65 DEG C, carry out desorption and start timing, enter
Following steps 4.,
4. close on the bulkhead of thermal regeneration room the air channel communicated with outside atmosphere and located at air purifying room lower wall with
The air channel that outside atmosphere communicates, into following steps 5.,
5. opening air channel set by thermal insulation board lower end between thermal regeneration room and air purifying room and opening heater heating, lead to
Cross the first temperature sensor to continue to monitor air themperature in cabin, air is heated by heater in cabin, air in control cabinet
Temperature maintains setting value, and the air after heating passes through sorbing material, promotes in efficiently renewable VOCs and methyl aldehyde adsorption material
The VOCs and the desorption of formaldehyde adsorbed, when desorption timing time reaches and completes to be desorbed the setting time needed for processing, entrance
Step 2) blowdown;
2) blowdown
Control processor unit is by control signal to the first automatically controlled air valve to the 6th automatically controlled air valve, heater and wind
Machine is controlled as follows:
1. the heater of unlatching is closed, the wind communicated on the bulkhead of thermal regeneration room with outside atmosphere of open and close
Road, the air channel for being located at air purifying room lower wall and being communicated with outside atmosphere of unlatching is closed, close thermal regeneration room and the sky of unlatching
Air channel set by thermal insulation board lower end between gas clean room, the air channel communicated on air purifying room lower wall with interior is opened, keep heating
Air channel set by thermal insulation board upper end is opened between regeneration room and air purifying room, keeps set air channel on purification of air chamber upper wall to close
Close, keep blower fan Positive work, that is, keep purification of air indoor air flow to flow from the bottom to top, dirty gas is heated in purification of air room
Air channel set by thermal insulation board upper end is set to being communicated with outside atmosphere on the bulkhead of thermal regeneration room between regeneration room and air purifying room
Air channel, arrange to outdoor, room air is by set purified to air with indoor phase ventilating duct on the lower wall of the purified room of air
Indoor supplement, set when the blowdown stage, the blower fan duration of runs reached 10min, into following steps 2.,
2. thermal insulation board lower end between set air channel and thermal regeneration room and air purifying room on unlatching purification of air chamber upper wall
Set air channel, closing air purifying room lower wall, up to set by interior air channel, closes thermal regeneration room and the interval of air purifying room
Air channel set by hot plate upper end, keep communicating set air channel unlatching on the bulkhead of thermal regeneration room with outside atmosphere, holding is located at air
The air channel that clean room's lower wall communicates with outside atmosphere is closed, and changes blower fan rotation direction, that is, controls blower fan reversed operation, is changed empty
Gas purification indoor air flow flow direction, purification of air indoor air flow from top to bottom flow, the dirty heated regeneration room of gas in purification of air room
Air channel set by thermal insulation board lower end is arranged to set air channel is communicated with outside atmosphere on the bulkhead of thermal regeneration room between air purifying room
To outdoor, room air passes through air channel set by the upper wall of the purified room of air to the purified indoor supplement of air, to air through net
The dust adsorbed on low efficient filter is discharged into outside atmosphere while changing room blowdown, treats that the blower fan antiport time reaches
Enter following steps 3. during 10min,
3. control processor unit is continued to monitor by the first temperature sensor to air themperature in cabin, pass through second
Temperature sensor continues to monitor to indoor air temperature, and in the cabin that the first temperature sensor is measured air themperature T1 with
The indoor air temperature T2 that second temperature sensor measures is compared in real time:It is to be monitored to arrive T1 and absolute value≤1 of T2 differences
DEG C when enter following steps 3);
3) when during the air purifier automatically waken up is desorbed and decontaminated, having recognized purification pattern or fresh air mould
During the operation of formula, the corresponding modes to be monitored to response operation during absolute value≤1 DEG C of temperature in cabin and indoor temperature difference are no
Then, holding state is entered during absolute value≤1 DEG C to be monitored to temperature in cabin and indoor temperature difference.
The above-described air purifier that automatically wakes up carries out dedusting, has following steps:
1) dedusting
Control processor unit is carried out by control signal to the first automatically controlled air valve to the 6th automatically controlled air valve and blower fan
Control, closing air purifying room lower wall, up to set by interior air channel, keeps thermal insulation board between thermal regeneration room and air purifying room
Air channel set by upper end is closed, and opens air channel set by thermal insulation board lower end between thermal regeneration room and air purifying room, and unlatching, which is located at, to be added
The air channel communicated on the bulkhead of hot recycling room with outside atmosphere, keep located at the air channel that air purifying room lower wall communicates with outside atmosphere
Close, set air channel on the purification of air chamber upper wall kept it turned on, blower fan reversed operation is controlled, to low efficient filter dedusting, room
Interior air from top to bottom flows, heated regeneration room and air through air inlet clean room in air channel set by purification of air chamber upper wall
Air channel set by thermal insulation board lower end is outdoor to set air channel flow direction is communicated on the bulkhead of thermal regeneration room with outside atmosphere between clean room,
So as to which the dust adsorbed on low efficient filter is discharged into outside atmosphere, sets when the blower fan antikinesis time 10min is reached, stop
Only blower fan antikinesis, into following steps 2);
2) when during dedusting, recognizing the operation of purification pattern or fresh air pattern, treat that blower fan antiport is run
The corresponding modes of response operation, otherwise, enter when blower fan antiport run time reaches 10min when time reaches 10min
Holding state.
Beneficial effect:
The present invention will not be to indoor formation secondary pollution when realizing 1. pressure release;2. enter desorption, if outdoor air temperature
Degree is more than indoor air temperature, and less than or equal to 65 DEG C, outdoor air is entered in cabin, using outside air temperature as when being desorbed
Initial temperature or directly as desorption temperature, energy-conservation;3. using timing plus temp measuring method control of sewage disposal time length, it is ensured that
Blowdown terminates temperature in rear deck and is adapted with indoor temperature;4. also there is dedusting function during blowdown, and during work fresh air pattern
With dedusting function;5. using when carrying out the desorption decontamination time needed for the accumulative clarification time close to setting when standby, then
Timing wake-up is desorbed blowdown automatically, if the clarification time close to the desorption decontamination time needed for setting, but the accumulative clarification time with
Ventilation time sum close to setting the required carry out dedusting time when, then timing wake-up automatic dust removing.The present invention is simple in construction, behaviour
Facilitate, safety and stability, there is provided a kind of permanently effective mode to purify the air of a room.
Brief description of the drawings
Fig. 1 is a kind of apparatus structure schematic diagram of air purifier of the present invention;
Fig. 2 is desorption process FB(flow block) in a kind of control method of air purifier of the present invention;
In figure:1. closed cabin, 2. blower fans, 3,4,5,6,7,17. first automatically controlled air valves are thick to the 6th automatically controlled air valve, 8.
Effect filter, 9. efficient renewable VOCs and methyl aldehyde adsorption material, 10. heaters, 11.VOCs sensors, 12,16,18. first
Temperature sensor is to three-temperature sensor, 13. control processor units, 14. relief valves, 15. walls, a. thermal regenerations room,
B. air purifying room.
Embodiment
As shown in figure 1, a kind of air purifier, including:Closed cabin 1, blower fan 2, the first automatically controlled air valve 3, second are automatically controlled
Air valve 4, the 3rd automatically controlled air valve 5, the 4th automatically controlled air valve 6, the 5th automatically controlled air valve 7, the 6th automatically controlled air valve 17, thick effect
Filter 8, efficiently renewable VOCs and methyl aldehyde adsorption material 9, heater 10, VOCs sensors 11, the first temperature sensor 12,
Second temperature sensor 16, three-temperature sensor 18, control processor unit 13, relief valve 14;First TEMP
Device 12, second temperature sensor 16, three-temperature sensor 18 and VOCs sensors 11 respectively with control processor unit 13
Input is connected;The first automatically controlled air valve 3, the second automatically controlled air valve 4, the 3rd automatically controlled air valve 5, the 4th automatically controlled air
Valve 6, the 5th automatically controlled air valve 7, the 6th automatically controlled air valve 17, blower fan 2 and heater 10 respectively with control processor unit 13
Output end is connected;The closed cabin 1 with the left and right thermal regeneration room a and air purifying room b for being set to be isolated with thermal insulation board,
Thermal insulation board upper and lower end between isolation thermal regeneration room a and air purifying room b is respectively equipped with air channel, isolation thermal regeneration room a and
Air purifying room b is communicated by air channel set by thermal insulation board upper and lower end;It is respectively equipped with the upper and lower walls of air purifying room b to room
Interior wind leads to;It is provided with the bulkhead of the thermal regeneration room a in the position corresponding with thermal insulation board lower end air channel in a manner of through walls
The air channel communicated by wall 15 (external wall) with outside atmosphere;The first automatically controlled air valve 3 is placed in air purifying room b upper walls
It is upper set to lead to indoor wind, the first automatically controlled air valve 3 control it is set on air purifying room b upper walls open up to indoor wind/
Close;The second automatically controlled air valve 4 is placed in the set wind to interior on air purifying room b lower walls and led to, the second automatically controlled air valve 4
Control set to the logical ON/OFF of indoor wind on air purifying room b lower walls;The 3rd automatically controlled air valve 5 is placed in isolation heating again
The air channel that thermal insulation board upper end between raw room a and air purifying room b is set, the 3rd automatically controlled control of air valve 5 isolation thermal regeneration
Air channel ON/OFF between room a and air purifying room b set by thermal insulation board upper end;The 4th automatically controlled air valve 6 is placed in isolation heating
The air channel that thermal insulation board lower end between regeneration room a and air purifying room b is set, the 4th automatically controlled control of air valve 6 isolation heating is again
Air channel ON/OFF between raw room a and air purifying room b set by thermal insulation board lower end;The 5th automatically controlled air valve 7 is placed in heating again
The wind communicated in a manner of through walls with outside atmosphere that the position corresponding with thermal insulation board lower end air channel is set on raw room a bulkhead
Road, the 5th automatically controlled air valve 7 control that position corresponding with thermal insulation board lower end air channel on thermal regeneration room a bulkhead sets with
The air channel ON/OFF that mode through walls communicates with outside atmosphere;The temperature sensor 12 of heater 10 and first is from top to bottom successively
In a of thermal regeneration room;The low efficient filter 8, efficiently renewable VOCs and methyl aldehyde adsorption material 9, blower fan 2, VOCs
Sensor 11 is sequentially arranged in air purifying room b from the bottom to top, and low efficient filter 8 be arranged on isolation thermal regeneration room a and
Air channel space above between air purifying room b set by thermal insulation board lower end, blower fan 2 are arranged on isolation thermal regeneration room a and air
Space below air channel between clean room b set by thermal insulation board upper end;Described relief valve 14 is installed on thermal regeneration room a bulkhead
On, set air channel to be communicated with outside atmosphere by wall 15 (external wall) in a manner of through walls;Described second temperature sensor 16
Interior is installed on, for measuring indoor air temperature;Described three-temperature sensor 18 is installed on outdoor, for measuring chamber outer gas
Temperature;It is additionally provided with what is communicated in a manner of through walls by wall 15 (external wall) with outside atmosphere on described air purifying room b lower walls
Air channel, the 6th automatically controlled air valve 17 are placed on air purifying room b lower walls the wind communicated in a manner of through walls with outside atmosphere set
Road, the 6th automatically controlled air valve 17 control the air channel communicated in a manner of through walls with outside atmosphere set on air purifying room b lower walls
ON/OFF.
Above-described three-temperature sensor 18 is installed on outdoor, and it is net to refer to that three-temperature sensor 18 is installed on air
Change in the air channel communicated in a manner of through walls with outside atmosphere set on the b lower walls of room, and closely directly contacted with outdoor air,
For measuring the air channel and the outdoor outside air temperature for communicating place, that is, be used to measuring set on air purifying room b lower walls with through walls
Temperature of the air channel that mode communicates with outside atmosphere in outdoor port.
The set air channel communicated in a manner of through walls with outside atmosphere on above-described air purifying room b lower walls, with institute
Set on the thermal regeneration room a stated bulkhead in a manner of through walls in the position corresponding with thermal insulation board lower end air channel and outside atmosphere
The air channel communicated, certain distance must be kept when through wall 15 (external wall), prevent extraneous air in disengaging air purifier
When short circuit.
The relief valve 14 is automatic decompression valve, for maintaining pressure stability in cabin, that is, is used for when pressure is excessive in cabin
Releasing pressure automatically, so as to ensure that pressure is in safe range in cabin, in order to avoid the excessive damage device of pressure in cabin;Relief valve 14 is arranged on
On thermal regeneration room a bulkhead, by being connected through wall 15 with outside atmosphere, both realize that thermal runaway causes pressure mistake in cabin
When big relief valve 14 can releasing pressure automatically, it is outdoor big to ensure that the high air of the Cabin contamination thing concentration that relief valve 14 is released leads to again
Gas, i.e., will not be to indoor composition secondary pollution when relief valve 14 is released.
The first automatically controlled air valve 3, the second automatically controlled air valve 4, the 3rd automatically controlled air valve 5, the 4th automatically controlled air valve 6,
5th automatically controlled 7 and the 6th automatically controlled air valve 17 of air valve is two-way air valve, the first automatically controlled air valve 3, the second automatically controlled air valve
4th, the ON/OFF control of the 3rd automatically controlled air valve 5, the 4th automatically controlled air valve 6, the 5th automatically controlled 7 and the 6th automatically controlled air valve 17 of air valve
End processed is connected with the output end of control processor unit 13 respectively, and control processor unit 13 is according to condition to corresponding automatically controlled sky
Air valve exports corresponding control signal, realizes ON/OFF, and air valve is opened when opening, and air valve is closed during pass, so as to realize automatically controlled air
The controlled corresponding air channel of valve ON/OFF;The first automatically controlled 3 and second automatically controlled air valve 4 of air valve is from single automatically controlled normally opened in the present invention
Type electromagnetic air valve, the 3rd automatically controlled air valve 5, the 4th automatically controlled air valve 6, the 5th automatically controlled 7 and the 6th automatically controlled air valve of air valve
17 from single automatically controlled closed type electromagnetic air valve.
First temperature sensor 12 is used to detect temperature in closed cabin 1, and the first temperature sensor 12 is installed on heating
In regeneration room a spaces, the thermal insulation board lower end air channel isolated between thermal regeneration room a and air purifying room b is arranged on, to heating again
Pass through wall 15 (external wall) in a manner of through walls what the position corresponding with thermal insulation board lower end air channel was set on raw room a bulkhead
Between the air channel communicated with outside atmosphere.Temperature in the closed cabin 1 measured when thermal regeneration room a and air purifying room b are communicated
Represent temperature in air purifying room b;
The second temperature sensor 16 is used for the indoor temperature for detecting room, and second temperature sensor 16 is installed on should
The device interior to be purified.
First temperature sensor 12, second temperature sensor 16 and three-temperature sensor 18 pass the signal of collection respectively
It is handed to control processor unit 13 and carries out processing control.
The low efficient filter 8 and efficiently renewable VOCs and methyl aldehyde adsorption material 9 form air-purifying module;Slightly imitated
Filter 8 selects the conventional products of convenient installation, such as has the screen pack of fire resistance fibre, is mainly used in particulate matter, i.e., mainly
For adsorbing dust, the dust in air is filtered out;Efficient renewable VOCs and methyl aldehyde adsorption material 9 are conventional for convenience of what is installed
Shaped activated carbon is filling adsorption material, for volatile organic matter (VOCs) and formaldehyde absorbing.
The closed cabin 1 hangs (fixation) on wall 15 (exterior wall) inwall, and closed cabin 1 uses stainless steel environmental chamber,
Bulkhead is double-decker, and heat preserving and insulating material is filled between two layers of bulkhead;Closed cabin 1 is arranged to left and right two locellus, that is, sets
For thermal regeneration room a and air purifying room b two parts, thermal regeneration room a is used for heat and produced, and it is net that air purifying room b is used for air
Change;Isolated between thermal regeneration room a and air purifying room b two parts by the thermal insulation board filled with heat-barrier material, heated
The upper and lower end of thermal insulation board is equipped with air channel respectively between regeneration room a and air purifying room b two parts, makes thermal regeneration room a and sky
Gas clean room b is connected;Air channel ON/OFF set by thermal insulation board upper end is controlled by the 3rd automatically controlled air valve 5, wind set by thermal insulation board lower end
Road ON/OFF is controlled by the 4th automatically controlled air valve 6;It is equipped with air purifying room b upper wall and is controlled by the first automatically controlled air valve 3
The air channel communicated with room air of ON/OFF;Be equipped with air purifying room b lower wall opened by the second automatically controlled air valve 4 control/
The air channel communicated with room air closed;Also be equipped with air purifying room b lower wall opened by the 6th automatically controlled air valve 17 control/
The air channel led to outer space gas phase closed.The upper end air channel of thermal insulation board is all disposed within blower fan 2 with air purifying room b upper wall air channel
Upper part space;The lower end air channel of thermal insulation board is all disposed within the bottom of air-purifying module with air purifying room b lower wall air channel
Space.
The closed cabin 1 hung on the wall 15 of interior, sets and is provided with by the 5th on thermal regeneration room a bulkhead
The air channel communicated through wall 15 and the external world of the automatically controlled control of air valve 7 ON/OFF, and set by a bulkheads of thermal regeneration room
ON/OFF is controlled to be passed through wall 15 and the extraneous air channel position communicated by the 5th automatically controlled air valve 7, with thermal regeneration room a and sky
The air channel position that thermal insulation board lower end is laid between gas clean room b two parts is corresponding, i.e., in same level.
The heater 10 is used to provide heat energy needed for desorption during hot recycling, ON/OFF control terminal and the control of heater 10
The output end of processor unit 13 is connected, and control processor unit 13 outputs control signals to heater 10, controls heater
10 ON/OFF and temperature adjustment;Heater 10 is added from PTC heaters (ptc heater) from PTC types ceramics in the present invention
Hot device, it is ensured that adstante febre will not naked light.For making air themperature in cabin maintain 60 ± 5 DEG C in desorption.
The temperature sensor 12 of heater 10 and first is from top to bottom sequentially arranged in thermal regeneration room a space,
And heater 10 is fixed on the upper and lower end laying of thermal insulation board between thermal regeneration room a and air purifying room b two parts by support
Air channel partition on.
The blower fan 2 is Bidirectional axial flow fan, is fixed on the duct main of closed cabin 1.The control terminal of blower fan 2 and control
The output of processor unit 13 processed is connected;When control processor unit 13 exports positive control signal to the control terminal of blower fan 2
When, the Positive work of blower fan 2, i.e. wind direction flow (suction) from bottom to top;When the output multi channel of control processor unit 13 is believed
Number to blower fan 2 control terminal when, the reversed operation of blower fan 2, i.e. wind direction flow (blowout) from top to bottom;When control processor unit 13
Output closing control signal to blower fan 2 control terminal when, close blower fan 2, i.e. blower fan 2 shuts down.
The VOCs sensors 11 are installed in air purifying room b to upper wall ducting outlet, for measuring air purifying room b
The VOCs concentration of upper wall ducting outlet air, is transferred to control processor unit 13 by the signal of collection and carries out processing and show.
The low efficient filter 8, efficiently renewable VOCs and methyl aldehyde adsorption material 9, blower fan 2, VOCs sensors 11 are under
In the supreme air purifying room b for being sequentially arranged at closed cabin 1 space, and low efficient filter 8 is set to be arranged on thermal regeneration room a
The air channel position space above that thermal insulation board lower end is laid between air purifying room b two parts, makes blower fan 2 be arranged on thermal regeneration
Space below the air channel position that thermal insulation board upper end is laid between room a and air purifying room b two parts.
The control processor unit 13 is used for the ON/OFF for controlling the first automatically controlled air valve to the 6th automatically controlled air valve, control
The forward direction of blower fan 2 processed and antikinesis and stopping, controlling the ON/OFF and temperature adjustment of heater 10, and pass through the first temperature
Sensor 12 is detected to temperature in cabin, and indoor air temperature is detected by second temperature sensor 16, passes through three-temperature sensor
The detection of 18 pairs of outside air temperatures, by VOCs sensors 11 in cabin in upper wall outlet air VOCs Concentration Testings;Control processor
Unit 13 includes MCU (micro-control unit) unit, data storage, real-time clock, display, includes purification pattern and fresh air
The keyboard of mode selecting key and the various input/output interfaces that are connected with peripheral hardware etc., are additionally provided with control processor unit 13
The accumulative timing unit of purification operation and the accumulative timing unit of ventilation operation and the timing unit for being desorbed, decontaminating, control process
Device unit 13 is according to the purification pattern or fresh air pattern of selection to the first automatically controlled air valve to the 6th automatically controlled air valve, blower fan 2, hair
Hot 10 bodies carry out corresponding running status control, and are accordingly controlled according to the temperature and timing situation of measurement, are passed by VOCs
Sensor send display to show cabin inner outlet air V OCs Concentration Testings.Control processor unit 13 is installed indoors close to closed
It is easy to the place of human users in cabin 1;And be set by the temperature that the first temperature sensor measures and be set to T1, passed by second temperature
The temperature that sensor measures is set to T2, and the temperature measured by three-temperature sensor is set to T3.
Air purifier is selected to be worked under purification pattern or fresh air pattern by the upper keyboard of control processor unit 13, when
Air purifier is set during selection purification pattern, and circulation work is being purified, is being desorbed, blowdown three phases process successively;When selection is new
During wind pattern set air purifier successively circulation work ventilation, two phase process of dedusting, i.e., outdoor fresh air is introduced into room
Interior phase process.
Accumulative timing when the accumulative timing unit of purification operation is used for indoor air purification, and set whenever purification is transported
When the accumulative timing of the accumulative timing unit of row reaches 300h, desorption is carried out once to air-purifying module and is decontaminated;That is when
The accumulative timing of the accumulative timing unit of purification operation reach needed for when carrying out the desorption decontamination time, one is carried out to air-purifying module
Secondary desorption decontamination, and the desorption decontamination time is carried out needed for this and is set as 300h.
Accumulative timing when the accumulative timing unit of ventilation operation is used for room ventilation, and set whenever ventilation operation is tired
When the accumulative timing of meter timing unit reaches 300h, one-time dedusting is carried out to air-purifying module;That is when ventilation is run
When the accumulative timing of accumulative timing unit reaches the required progress dedusting time, to air-purifying module progress one-time dedusting, and this
The required progress dedusting time is set as 300h.
When air purifier is desorbed, time 120min required for the completion desorption processing of setting, and set desorption
Temperature should maintain 60 ± 5 DEG C in cabin during processing.
A kind of control method of air purifier of the present invention, comprises the following steps:
1) temperature for setting control processor unit to be measured by the first temperature sensor is set as T1, passes through second temperature
The temperature that sensor measures is set as T2, and the temperature measured by three-temperature sensor is set as T3, and provided with purification operation
Accumulative timing unit and the accumulative timing unit of ventilation operation, working method are provided with purification pattern and fresh air pattern, selection purification mould
Air purifier is set during formula, and circulation work is set in purification, desorption, blowdown three phases process, selection fresh air pattern successively
Air purifier successively circulation work ventilation, two phase process of dedusting;
2) when air purifier is in holding state, setting is standby to reach 30min, reads the accumulative timing of purification operation
Control is identified in the time that unit adds up:
When recognize the time that the accumulative timing unit of purification operation add up be more than or equal to set needed for be desorbed
When decontaminating the 80% of time, automatically wake up air purifier and carry out desorption decontamination, and remove the accumulative timing unit institute of purification operation
The accumulative time,
When recognize the time that the accumulative timing unit of purification operation add up be less than set needed for carry out desorption decontamination
Time 80% when, retain the time that the accumulative timing unit of purification operation add up, the purification operation of reading added up into timing list
The time that the time that member adds up adds up with the accumulative timing unit of ventilation operation read is added, if sum is more than or equal to
The 80% of the required carry out dedusting time of setting, automatically wake up air purifier and carry out dedusting, and remove the accumulative meter of ventilation operation
The time that Shi Danyuan adds up, otherwise, keep standby, and retain the time that the accumulative timing unit of ventilation operation adds up,
(3) removed during the air purifier automatically waken up carries out desorption decontamination with the air purifier automatically waken up
During dirt, there is the operation of purification pattern or fresh air pattern, the control process after the corresponding running automatically waken up terminates is set
Device unit responds corresponding modes, otherwise, after the corresponding running automatically waken up terminates, immediately enters holding state;
3) air purifier carries out purification pattern or the operation of fresh air pattern, wakes up enter accordingly immediately in holding state
Pattern.
Air purifier is set during above-described selection purification pattern, and circulation work is being purified, is being desorbed, blowdown three successively
Individual phase process, there are following steps:
(1) cleansing phase running
Control processor unit outputs control signals to the first automatically controlled air valve to the 6th automatically controlled air valve and blower fan, opens
The air channel communicated on the upper and lower wall of air purifying room with interior, it is upper and lower to close thermal insulation board between thermal regeneration room and air purifying room
Air channel set by end, and close on the bulkhead of thermal regeneration room the air channel communicated with outside atmosphere and close and be located at purification of air
The air channel that room lower wall communicates with outside atmosphere, blower fan Positive work is controlled, purification of air indoor air flow flows from the bottom to top, indoor
Air is got in through filtering after being flowed into by air purifying room lower wall to the air channel of interior with after adsorption treatment from upper wall air channel, and
Accumulative timing unit is run to purification and carries out accumulative timing, reaches setting when purification runs accumulative timing unit institute's cumulative time
Required when carrying out the desorption decontamination time, the accumulative timing unit of pause purification operation adds up timing and simultaneously removes the time added up, enters
Enter purification pattern step (2) desorption stage running;
(2) desorption stage running
Control processor unit outputs control signals to the first automatically controlled air valve to the 6th automatically controlled air valve, heater and wind
Machine, the air channel communicated on the upper and lower wall of air purifying room with interior is closed, open the spaced heat of thermal regeneration room and air purifying room
Air channel set by plate upper end, blower fan Positive work is kept, kept between thermal regeneration room and air purifying room set by thermal insulation board lower end
Air channel is closed, and keeps the air channel that is communicated with outside atmosphere on the bulkhead of thermal regeneration room and located at air purifying room lower wall
The air channel communicated with outside atmosphere is closed, and keeps heater to close, and is examined by second temperature sensor and three-temperature sensor
Survey indoor and outdoor air temperature and keep in the indoor air temperature of detection, and temporary indoor air temperature is set to T2 ', and will
The outside air temperature T3 that the indoor air temperature T2 that second temperature sensor measures measures with three-temperature sensor is compared
Compared with:
1. T3-T2 is worked as in setting<At 2 DEG C or when T3-T2 >=2 DEG C, and during 65 DEG C of T3 >, holding is located at thermal regeneration room bulkhead
Go up the air channel communicated with outside atmosphere and closed located at the air channel that air purifying room lower wall communicates with outside atmosphere, and be desorbed
Start timing, into the step of desorption stage 5.,
2. T3-T2 >=2 DEG C are worked as in setting, and during 55 DEG C≤T3≤65 DEG C, are opened and be located on the bulkhead of thermal regeneration room and outdoor
The air channel and be desorbed located at the air channel that air purifying room lower wall communicates with outside atmosphere, setting after 10 seconds that air communicates
Start timing, and air themperature in cabin is continued to monitor and by three-temperature sensor pair by the first temperature sensor
Outside air temperature is continued to monitor in real time:
Set the T3 to be monitored measured to three-temperature sensor continue 5 seconds be less than 55 DEG C or continue 5 seconds be more than 65 DEG C when,
Into the step of desorption stage 4., otherwise, wait be desorbed timing time reach complete desorption processing needed for setting time when, enter
Purification pattern step (3) blowdown stage running process,
3. T3-T2 >=2 DEG C, and T3 are worked as in setting<At 55 DEG C, open and communicated on the bulkhead of thermal regeneration room with outside atmosphere
Air channel and located at the air channel that air purifying room lower wall communicates with outside atmosphere, set after 10 seconds, pass through the first TEMP
Device is continued to monitor to air themperature in cabin and outside air temperature is continued to monitor by three-temperature sensor, and
Continue to carry out in cabin temperature T1 in real time compared with outdoor temperature T3:
When setting absolute value≤0.5 DEG C to be monitored to T1 and T3 differences, carry out desorption and start timing, into desorption stage
The step of 4., otherwise, by the T3 continued to monitor compared with temporary indoor air temperature T2 ', it is to be monitored to T3 continue 5 seconds it is little
When equal to 2 DEG C of temporary indoor air temperature T2 ', or when monitoring that T3 continues 5 seconds and is more than 65 DEG C, carry out desorption and start to count
When, into the step of desorption stage 4.,
4. close on the bulkhead of thermal regeneration room the air channel communicated with outside atmosphere and located at air purifying room lower wall with
The air channel that outside atmosphere communicates, into the step of desorption stage 5.,
5. opening air channel set by thermal insulation board lower end between thermal regeneration room and air purifying room and opening heater heating, lead to
Cross the first temperature sensor to continue to monitor air themperature in cabin, air is heated by heater in cabin, air in control cabinet
Temperature maintains setting value, and the air after heating passes through sorbing material, promotes in efficiently renewable VOCs and methyl aldehyde adsorption material
The VOCs and the desorption of formaldehyde adsorbed, when desorption timing time reaches and completes to be desorbed the setting time needed for processing, entrance
Purification pattern step (3) blowdown stage running process;
(3) blowdown stage running process
Control processor unit is by control signal to the first automatically controlled air valve to the 6th automatically controlled air valve, heater and wind
Machine is controlled as follows:
1. the heater of unlatching is closed, the wind communicated on the bulkhead of thermal regeneration room with outside atmosphere of open and close
Road, the air channel for being located at air purifying room lower wall and being communicated with outside atmosphere of unlatching is closed, close thermal regeneration room and the sky of unlatching
Air channel set by thermal insulation board lower end between gas clean room, the air channel communicated on air purifying room lower wall with interior is opened, keep heating
Air channel set by thermal insulation board upper end is opened between regeneration room and air purifying room, keeps set air channel on purification of air chamber upper wall to close
Close, keep blower fan Positive work, that is, keep purification of air indoor air flow to flow from the bottom to top, dirty gas is heated in purification of air room
Air channel set by thermal insulation board upper end is set to being communicated with outside atmosphere on the bulkhead of thermal regeneration room between regeneration room and air purifying room
Air channel, arrange to outdoor, room air is by set purified to air with indoor phase ventilating duct on the lower wall of the purified room of air
Indoor supplement, set when the blowdown stage, the blower fan duration of runs reached 10min, into the step of the blowdown stage 2.,
2. thermal insulation board lower end between set air channel and thermal regeneration room and air purifying room on unlatching purification of air chamber upper wall
Set air channel, closing air purifying room lower wall, up to set by interior air channel, closes thermal regeneration room and the interval of air purifying room
Air channel set by hot plate upper end, keep communicating set air channel unlatching on the bulkhead of thermal regeneration room with outside atmosphere, holding is located at air
The air channel that clean room's lower wall communicates with outside atmosphere is closed, and changes blower fan rotation direction, that is, controls blower fan reversed operation, is changed empty
Gas purification indoor air flow flow direction, purification of air indoor air flow from top to bottom flow, the dirty heated regeneration room of gas in purification of air room
Air channel set by thermal insulation board lower end is arranged to set air channel is communicated with outside atmosphere on the bulkhead of thermal regeneration room between air purifying room
To outdoor, room air passes through air channel set by the upper wall of the purified room of air to the purified indoor supplement of air, to air through net
The dust adsorbed on low efficient filter is discharged into outside atmosphere while changing room blowdown, treats the blower fan antiport time in blowdown stage
The step of entering the blowdown stage when reaching 10min 3.,
3. control processor unit is continued to monitor by the first temperature sensor to air themperature in cabin, pass through second
Temperature sensor continues to monitor to indoor air temperature, and in the cabin that the first temperature sensor is measured air themperature T1 with
The indoor air temperature T2 that second temperature sensor measures is compared in real time:It is to be monitored to arrive T1 and absolute value≤1 of T2 differences
DEG C when return to purification pattern step (1) cleansing phase running.
It is above-described selection fresh air pattern when set air purifier successively circulation work ventilation, two stages of dedusting
Process, there is following control:
(1) divulge information running
Control processor unit is carried out by control signal to the first automatically controlled air valve to the 6th automatically controlled air valve and blower fan
Control, closing air purifying room lower wall, up to set by interior air channel, closes thermal insulation board between thermal regeneration room and air purifying room
Air channel set by upper and lower end, closes on the bulkhead of thermal regeneration room the air channel communicated with outside atmosphere, and unlatching is located at purification of air
The air channel that room lower wall communicates with outside atmosphere, set air channel on purification of air chamber upper wall is opened, blower fan Positive work is controlled, to room
Interior ventilation, and accumulative timing unit is run to ventilation and carries out accumulative timing, purification of air indoor air flow flows from the bottom to top, outdoor
Air by after being flowed into located at the air channel that air purifying room lower wall communicates with outside atmosphere through filtering and adsorption treatment after it is net from air
Change chamber upper wall upper air duct to get in, setting when until the ventilation operation accumulative timing unit cumulative time reach setting needed for enter
During the row dedusting time, the positive operation of pause blower fan, suspend and timing is added up to room ventilation, the accumulative timing unit of pause ventilation operation
And time for adding up is removed, into (2) dedusting running the step of fresh air pattern;
(2) dedusting running
Control processor unit is carried out by control signal to the first automatically controlled air valve to the 6th automatically controlled air valve and blower fan
Control, the air purifying room lower wall remained turned-off air channel, the thermal regeneration room remained turned-off and purification of air up to set by interior
Air channel set by thermal insulation board upper end between room, air channel set by thermal insulation board lower end between thermal regeneration room and air purifying room is opened, is opened
The air channel communicated on the bulkhead of thermal regeneration room with outside atmosphere is opened, closing is located at air purifying room lower wall and outside atmosphere phase
Logical air channel, set air channel on the purification of air chamber upper wall kept it turned on, blower fan reversed operation is controlled, low efficient filter is removed
Dirt, room air are from top to bottom flowed through air inlet clean room in air channel set by purification of air chamber upper wall, heated regeneration room and
Air channel set by thermal insulation board lower end with outside atmosphere to communicating set air channel flow direction on the bulkhead of thermal regeneration room between air purifying room
Outdoor, so as to which the dust adsorbed on low efficient filter is discharged into outside atmosphere, setting treats that the blower fan antikinesis time reaches 10min
When, (1) the step of stopping blower fan antikinesis, returning to fresh air pattern, divulges information running.
The above-described air purifier that automatically wakes up carries out desorption decontamination, has following steps:
1) it is desorbed
Control processor unit outputs control signals to the first automatically controlled air valve to the 6th automatically controlled air valve, heater and wind
Machine, the air channel communicated on the upper and lower wall of air purifying room with interior is closed, open the spaced heat of thermal regeneration room and air purifying room
Air channel set by plate upper end, blower fan Positive work is controlled, kept between thermal regeneration room and air purifying room set by thermal insulation board lower end
Air channel is closed, and the air channel for keeping communicating with outside atmosphere on the bulkhead of thermal regeneration room is closed and located at air purifying room
The air channel that lower wall communicates with outside atmosphere is closed, and is kept heater to close, is passed through second temperature sensor and the 3rd TEMP
Device detects indoor and outdoor air temperature and keeps in the indoor air temperature of detection, and temporary indoor air temperature is set into T2 ',
And the indoor air temperature T2 that second temperature sensor the measures outside air temperature T3 measured with three-temperature sensor are entered
Row compares:
1. T3-T2 is worked as in setting<At 2 DEG C or when T3-T2 >=2 DEG C, and during 65 DEG C of T3 >, holding is located at thermal regeneration room bulkhead
The upper air channel communicated with outside atmosphere is closed and closed located at the air channel that air purifying room lower wall communicates with outside atmosphere, and carries out
Desorption starts timing, into following steps 5.,
2. T3-T2 >=2 DEG C are worked as in setting, and during 55 DEG C≤T3≤65 DEG C, are opened and be located on the bulkhead of thermal regeneration room and outdoor
The air channel and be desorbed located at the air channel that air purifying room lower wall communicates with outside atmosphere, setting after 10 seconds that air communicates
Start timing, and air themperature in cabin is continued to monitor and by three-temperature sensor pair by the first temperature sensor
Outside air temperature is continued to monitor in real time:
Set the T3 to be monitored measured to three-temperature sensor continue 5 seconds be less than 55 DEG C or continue 5 seconds be more than 65 DEG C when,
Into following steps 4., otherwise, when desorption timing time reaches and completes to be desorbed the setting time needed for processing, into step 2)
Blowdown,
3. T3-T2 >=2 DEG C, and T3 are worked as in setting<At 55 DEG C, open and communicated on the bulkhead of thermal regeneration room with outside atmosphere
Air channel and located at the air channel that air purifying room lower wall communicates with outside atmosphere, set after 10 seconds, pass through the first TEMP
Device is continued to monitor to air themperature in cabin and outside air temperature is continued to monitor by three-temperature sensor, and
Continue to carry out in cabin temperature T1 in real time compared with outdoor temperature T3:
When setting absolute value≤0.5 DEG C to be monitored to T1 and T3 differences, carry out desorption and start timing, into following steps
4. otherwise, by the T3 continued to monitor compared with temporary indoor air temperature T2 ', it is to be monitored continue to be not more than for 5 seconds to T3 be equal to
During 2 DEG C of temporary indoor air temperature T2 ', or when monitoring that T3 continues 5 seconds and is more than 65 DEG C, carry out desorption and start timing, enter
Following steps 4.,
4. close on the bulkhead of thermal regeneration room the air channel communicated with outside atmosphere and located at air purifying room lower wall with
The air channel that outside atmosphere communicates, into following steps 5.,
5. opening air channel set by thermal insulation board lower end between thermal regeneration room and air purifying room and opening heater heating, lead to
Cross the first temperature sensor to continue to monitor air themperature in cabin, air is heated by heater in cabin, air in control cabinet
Temperature maintains setting value, and the air after heating passes through sorbing material, promotes in efficiently renewable VOCs and methyl aldehyde adsorption material
The VOCs and the desorption of formaldehyde adsorbed, when desorption timing time reaches and completes to be desorbed the setting time needed for processing, entrance
Step 2) blowdown;
2) blowdown
Control processor unit is by control signal to the first automatically controlled air valve to the 6th automatically controlled air valve, heater and wind
Machine is controlled as follows:
1. the heater of unlatching is closed, the wind communicated on the bulkhead of thermal regeneration room with outside atmosphere of open and close
Road, the air channel for being located at air purifying room lower wall and being communicated with outside atmosphere of unlatching is closed, close thermal regeneration room and the sky of unlatching
Air channel set by thermal insulation board lower end between gas clean room, the air channel communicated on air purifying room lower wall with interior is opened, keep heating
Air channel set by thermal insulation board upper end is opened between regeneration room and air purifying room, keeps set air channel on purification of air chamber upper wall to close
Close, keep blower fan Positive work, that is, keep purification of air indoor air flow to flow from the bottom to top, dirty gas is heated in purification of air room
Air channel set by thermal insulation board upper end is set to being communicated with outside atmosphere on the bulkhead of thermal regeneration room between regeneration room and air purifying room
Air channel, arrange to outdoor, room air is by set purified to air with indoor phase ventilating duct on the lower wall of the purified room of air
Indoor supplement, set when the blowdown stage, the blower fan duration of runs reached 10min, into following steps 2.,
2. thermal insulation board lower end between set air channel and thermal regeneration room and air purifying room on unlatching purification of air chamber upper wall
Set air channel, closing air purifying room lower wall, up to set by interior air channel, closes thermal regeneration room and the interval of air purifying room
Air channel set by hot plate upper end, keep communicating set air channel unlatching on the bulkhead of thermal regeneration room with outside atmosphere, holding is located at air
The air channel that clean room's lower wall communicates with outside atmosphere is closed, and changes blower fan rotation direction, that is, controls blower fan reversed operation, is changed empty
Gas purification indoor air flow flow direction, purification of air indoor air flow from top to bottom flow, the dirty heated regeneration room of gas in purification of air room
Air channel set by thermal insulation board lower end is arranged to set air channel is communicated with outside atmosphere on the bulkhead of thermal regeneration room between air purifying room
To outdoor, room air passes through air channel set by the upper wall of the purified room of air to the purified indoor supplement of air, to air through net
The dust adsorbed on low efficient filter is discharged into outside atmosphere while changing room blowdown, treats that the blower fan antiport time reaches
Enter following steps 3. during 10min,
3. control processor unit is continued to monitor by the first temperature sensor to air themperature in cabin, pass through second
Temperature sensor continues to monitor to indoor air temperature, and in the cabin that the first temperature sensor is measured air themperature T1 with
The indoor air temperature T2 that second temperature sensor measures is compared in real time:It is to be monitored to arrive T1 and absolute value≤1 of T2 differences
DEG C when enter following steps 3);
3) when during the air purifier automatically waken up is desorbed and decontaminated, having recognized purification pattern or fresh air mould
During the operation of formula, the corresponding modes to be monitored to response operation during absolute value≤1 DEG C of temperature in cabin and indoor temperature difference are no
Then, holding state is entered during absolute value≤1 DEG C to be monitored to temperature in cabin and indoor temperature difference.
The above-described air purifier that automatically wakes up carries out dedusting, has following steps:
1) dedusting
Control processor unit is carried out by control signal to the first automatically controlled air valve to the 6th automatically controlled air valve and blower fan
Control, closing air purifying room lower wall, up to set by interior air channel, keeps thermal insulation board between thermal regeneration room and air purifying room
Air channel set by upper end is closed, and opens air channel set by thermal insulation board lower end between thermal regeneration room and air purifying room, and unlatching, which is located at, to be added
The air channel communicated on the bulkhead of hot recycling room with outside atmosphere, keep located at the air channel that air purifying room lower wall communicates with outside atmosphere
Close, set air channel on the purification of air chamber upper wall kept it turned on, blower fan reversed operation is controlled, to low efficient filter dedusting, room
Interior air from top to bottom flows, heated regeneration room and air through air inlet clean room in air channel set by purification of air chamber upper wall
Air channel set by thermal insulation board lower end is outdoor to set air channel flow direction is communicated on the bulkhead of thermal regeneration room with outside atmosphere between clean room,
So as to which the dust adsorbed on low efficient filter is discharged into outside atmosphere, sets when the blower fan antikinesis time 10min is reached, stop
Only blower fan antikinesis, into following steps 2);
2) when during dedusting, recognizing the operation of purification pattern or fresh air pattern, treat that blower fan antiport is run
The corresponding modes of response operation, otherwise, enter when blower fan antiport run time reaches 10min when time reaches 10min
Holding state.
In above-mentioned, it is described needed for carry out that the desorption decontamination time sets be 300h;The described required carry out dedusting time sets
It is 300h to put;Time required for the completion desorption processing of described setting is arranged to 120min;Described makes air themperature in cabin
Setting value is maintained, setting value is arranged to:60±5℃.
When the present invention is operated in purification pattern and fresh air pattern, desorption except purification pattern, in addition to the decontamination stage, to keyboard
Operation, makes an immediate response;Desorption, decontamination stage in purification pattern, the operation to keyboard, responded after desorption decontamination terminates.
Claims (10)
1. a kind of air purifier, including:Closed cabin, blower fan, the first automatically controlled air valve to the 6th automatically controlled air valve, thick effect filtering
Device, efficiently renewable VOCs and methyl aldehyde adsorption material, heater, VOCs sensors, at first to three-temperature sensor, control
Manage device unit, relief valve;Described first to the input with control processor unit respectively of three-temperature sensor, VOCs sensors
End is connected;The blower fan, heater, the first automatically controlled air valve to the 6th automatically controlled air valve respectively with control processor unit
Output end is connected;The closed cabin is with the left and right thermal regeneration room for being set to be isolated with thermal insulation board and air purifying room, isolation
Thermal insulation board upper and lower end between thermal regeneration room and air purifying room is respectively equipped with air channel, isolates thermal regeneration room and air is net
Change room to communicate by air channel set by thermal insulation board upper and lower end;It is respectively equipped with the upper and lower wall of air purifying room to the wind of interior
It is logical;In the position corresponding with thermal insulation board lower end air channel provided with big with outdoor in a manner of through walls on the bulkhead of the thermal regeneration room
The logical air channel of gas phase;The first automatically controlled air valve is placed in the set wind to interior on purification of air chamber upper wall and led to, the second electricity
Control air valve is placed in the set wind to interior on air purifying room lower wall and led to, and the 3rd automatically controlled air valve is placed in isolation thermal regeneration
The air channel that thermal insulation board upper end between room and air purifying room is set, the 4th automatically controlled air valve are placed in isolation thermal regeneration room and sky
The air channel that thermal insulation board lower end between gas clean room is set, the 5th automatically controlled air valve be placed on the bulkhead of thermal regeneration room with it is heat-insulated
The air channel communicated in a manner of through walls with outside atmosphere that the corresponding position in plate lower end air channel is set;The heater and the first temperature
Degree sensor is from top to bottom sequentially arranged in thermal regeneration room;The low efficient filter, efficiently renewable VOCs and formaldehyde inhale
Enclosure material, blower fan, VOCs sensors are sequentially arranged in purification of air room from the bottom to top, and low efficient filter is arranged on isolation and added
Air channel space above between hot recycling room and air purifying room set by thermal insulation board lower end, assembling is in isolation thermal regeneration room
Space below air channel between air purifying room set by thermal insulation board upper end;Add characterized in that, described relief valve is installed on
On the bulkhead of hot recycling room, communicated by mode through walls with outside atmosphere;Described second temperature sensor is installed on interior;Institute
The three-temperature sensor stated is installed on outdoor;It is additionally provided with described air purifying room lower wall in a manner of through walls and outside atmosphere
The air channel communicated, the 6th automatically controlled air valve are placed on air purifying room lower wall being communicated in a manner of through walls with outside atmosphere of setting
Air channel.
2. a kind of air purifier according to claim 1, it is characterised in that described blower fan is Bidirectional axial flow fan.
3. a kind of air purifier according to claim 1, it is characterised in that described three-temperature sensor is installed on
Outdoor, refer to that three-temperature sensor is installed on air purifying room lower wall and set communicated in a manner of through walls with outside atmosphere
In air channel, and closely directly contacted with outdoor air.
4. a kind of air purifier according to claim 1, it is characterised in that the first automatically controlled air valve and the second electricity
Air valve is controlled as single automatically controlled open type electromagnetic air valve, the 3rd automatically controlled air valve to the 6th automatically controlled air valve is single automatically controlled closed type
Electromagnetic air valve.
5. a kind of air purifier according to claim 1, it is characterised in that the heater is PTC heaters.
6. the control method of a kind of air purifier according to claim any one of 1-3, it is characterised in that including as follows
Step:
1) temperature for setting control processor unit to be measured by the first temperature sensor is set as T1, is sensed by second temperature
The temperature that device measures is set as T2, and the temperature measured by three-temperature sensor is set as T3, and accumulative provided with purification operation
Timing unit and the accumulative timing unit of ventilation operation, working method is provided with purification pattern and fresh air pattern, when selecting purification pattern
Setting air purifier, circulation work sets air in purification, desorption, blowdown three phases process, selection fresh air pattern successively
Clarifier successively circulation work ventilation, two phase process of dedusting;
2) when air purifier is in holding state, setting is standby to reach 30min, reads the accumulative timing unit of purification operation
Control is identified in the time added up:
When recognize the time that the accumulative timing unit of purification operation add up be more than or equal to set needed for carry out desorption decontamination
Time 80% when, automatically wake up air purifier and carry out desorption decontamination, and remove the accumulative timing unit of purification operation and add up
Time,
(2) it is less than needed for setting and carries out desorption and decontaminate the time when recognizing the time that the accumulative timing unit of purification operation add up
80% when, retain the time that the accumulative timing unit of purification operation add up, the purification operation of reading added up into timing unit institute
The time that the accumulative time adds up with the accumulative timing unit of ventilation operation read is added, if sum is more than or equal to setting
The required carry out dedusting time 80%, automatically wake up air purifier and carry out dedusting, and remove the accumulative timing list of ventilation operation
The time that member adds up, otherwise, keep standby, and retain the time that the accumulative timing unit of ventilation operation adds up,
(3) during the air purifier automatically waken up carries out desorption decontamination with the air purifier automatically waken up is carried out the dedusting phase
Between, there is the operation of purification pattern or fresh air pattern, the control processor list after the corresponding running automatically waken up terminates is set
Member response corresponding modes, otherwise, after the corresponding running automatically waken up terminates, immediately enter holding state;
3) air purifier carries out purification pattern or the operation of fresh air pattern, wakes up enter corresponding modes immediately in holding state.
A kind of 7. control method of air purifier according to claim 6, it is characterised in that described selection purification mould
Air purifier is set during formula, and circulation work is being purified, is being desorbed, blowdown three phases process successively, has following steps:
(1) cleansing phase running
Control processor unit outputs control signals to the first automatically controlled air valve to the 6th automatically controlled air valve and blower fan, opens air
The air channel communicated on the upper and lower wall in clean room with interior, close thermal insulation board upper and lower end institute between thermal regeneration room and air purifying room
If air channel, and close on the bulkhead of thermal regeneration room the air channel communicated with outside atmosphere and close and be located under air purifying room
The air channel that wall communicates with outside atmosphere, blower fan Positive work is controlled, purification of air indoor air flow flows from the bottom to top, room air
Got in after being flowed into by air purifying room lower wall to the air channel of interior through filtering with after adsorption treatment from upper wall air channel, and to net
Change the accumulative timing unit of operation and carry out accumulative timing, reach and to carry out when until purifying operation accumulative timing unit institute's cumulative time
During the time being desorbed set by processing, pause purification runs the accumulative timing of accumulative timing unit and simultaneously removes the time added up, enters
Enter purification pattern step (2) desorption stage running;
(2) desorption stage running
Control processor unit outputs control signals to the first automatically controlled air valve to the 6th automatically controlled air valve, heater and blower fan,
The air channel communicated on the upper and lower wall of air purifying room with interior is closed, opens thermal insulation board between thermal regeneration room and air purifying room
Air channel set by upper end, blower fan Positive work is kept, keep wind set by thermal insulation board lower end between thermal regeneration room and air purifying room
Road is closed, and keep the air channel that is communicated with outside atmosphere on the bulkhead of thermal regeneration room and located at air purifying room lower wall with
The air channel that outside atmosphere communicates is closed, and keeps heater to close, and is detected by second temperature sensor and three-temperature sensor
Indoor and outdoor air temperature and the indoor air temperature of detection is kept in, and temporary indoor air temperature is set to T2 ', and by the
The indoor air temperature T2 that two temperature sensors measure is compared with the outside air temperature T3 that three-temperature sensor measures:
1. T3-T2 is worked as in setting<At 2 DEG C or when T3-T2 >=2 DEG C, and during 65 DEG C of T3 >, keep on the bulkhead of thermal regeneration room with
The air channel and closed located at the air channel that air purifying room lower wall communicates with outside atmosphere that outside atmosphere communicates, and carry out desorption and start
Timing, into the step of desorption stage 5.,
2. T3-T2 >=2 DEG C are worked as in setting, and during 55 DEG C≤T3≤65 DEG C, are opened and be located on the bulkhead of thermal regeneration room and outside atmosphere
The air channel that communicates and located at the air channel that air purifying room lower wall communicates with outside atmosphere, sets after 10 seconds, carries out desorption and start
Timing, and air themperature in cabin is continued to monitor and by three-temperature sensor to outdoor by the first temperature sensor
Air themperature is continued to monitor in real time:
Set the T3 to be monitored measured to three-temperature sensor continue 5 seconds be less than 55 DEG C or continue 5 seconds be more than 65 DEG C when, enter
The step of desorption stage 4., otherwise, wait be desorbed timing time reach complete desorption processing needed for setting time when, into purification
Mode step (3) blowdown stage running process,
3. T3-T2 >=2 DEG C, and T3 are worked as in setting<At 55 DEG C, the wind communicated on the bulkhead of thermal regeneration room with outside atmosphere is opened
Road and located at the air channel that air purifying room lower wall communicates with outside atmosphere, sets after 10 seconds, passes through the first temperature sensor pair
Air themperature is continued to monitor and outside air temperature is continued to monitor by three-temperature sensor in cabin, and is continued
Temperature T1 is compared with outdoor temperature T3 in real-time progress cabin:
When setting absolute value≤0.5 DEG C to be monitored to T1 and T3 differences, carry out desorption and start timing, into the step of desorption stage
Suddenly 4., otherwise, it is to be monitored to continue 5 seconds to be not more than to T3 etc. by the T3 continued to monitor compared with temporary indoor air temperature T2 '
When 2 DEG C of temporary indoor air temperature T2 ', or when monitoring that T3 continues 5 seconds and is more than 65 DEG C, carry out desorption and start timing, enter
The step of entering desorption stage 4.,
4. closing on the bulkhead of thermal regeneration room the air channel communicated with outside atmosphere and located at air purifying room lower wall and outdoor
The air channel that air communicates, into the step of desorption stage 5.,
5. open air channel set by thermal insulation board lower end between thermal regeneration room and air purifying room and open heater heating, by the
One temperature sensor continues to monitor to air themperature in cabin, and air is heated by heater in cabin, air themperature in control cabinet
Setting value is maintained, the air after heating passes through sorbing material, promotes to be inhaled in efficiently renewable VOCs and methyl aldehyde adsorption material
Attached VOCs and the desorption of formaldehyde, when desorption timing time reaches and completes to be desorbed the setting time needed for processing, into purification
Mode step (3) blowdown stage running process;
(3) blowdown stage running process
Control processor unit is entered by control signal to the first automatically controlled air valve to the 6th automatically controlled air valve, heater and blower fan
The following control of row:
1. closing the heater of unlatching, the air channel communicated on the bulkhead of thermal regeneration room with outside atmosphere of open and close, close
The air channel for being located at air purifying room lower wall and being communicated with outside atmosphere that make and break is opened, close thermal regeneration room and the purification of air of unlatching
Air channel set by thermal insulation board lower end between room, the air channel communicated on air purifying room lower wall with interior is opened, keep thermal regeneration room
Air channel set by thermal insulation board upper end is opened between air purifying room, is kept set air channel on purification of air chamber upper wall to close, is kept
Blower fan Positive work, that is, purification of air indoor air flow is kept to flow from the bottom to top, the dirty heated regeneration room of gas in purification of air room
Air channel set by thermal insulation board upper end is arranged to set air channel is communicated with outside atmosphere on the bulkhead of thermal regeneration room between air purifying room
To outdoor, room air by the lower wall of the purified room of air it is set with indoor phase ventilating duct to the purified indoor benefit of air
Fill, set when the blowdown stage, the blower fan duration of runs reached 10min, into the step of the blowdown stage 2.,
2. on unlatching purification of air chamber upper wall between set air channel and thermal regeneration room and air purifying room set by thermal insulation board lower end
Air channel, closing air purifying room lower wall, up to set by interior air channel, closes thermal insulation board between thermal regeneration room and air purifying room
Air channel set by upper end, keep communicating set air channel unlatching on the bulkhead of thermal regeneration room with outside atmosphere, holding is located at purification of air
The air channel that room lower wall communicates with outside atmosphere is closed, and changes blower fan rotation direction, that is, controls blower fan reversed operation, and it is net to change air
Change indoor air flow flow direction, purification of air indoor air flow from top to bottom flows, the heated regeneration room of dirty gas and sky in purification of air room
Air channel set by thermal insulation board lower end is arranged to room to set air channel is communicated with outside atmosphere on the bulkhead of thermal regeneration room between gas clean room
Outside, room air is by air channel is to the purified indoor supplement of air set by the upper wall of the purified room of air, to the purified room of air
The dust adsorbed on low efficient filter is discharged into outside atmosphere while blowdown, treats that the blower fan antiport time in blowdown stage reaches
The step of entering the blowdown stage during 10min 3.,
3. control processor unit is continued to monitor by the first temperature sensor to air themperature in cabin, pass through second temperature
Sensor continues to monitor to indoor air temperature, and air themperature T1 and second in the cabin that the first temperature sensor is measured
The indoor air temperature T2 that temperature sensor measures is compared in real time:During absolute value≤1 DEG C to be monitored to T1 and T2 differences
Return to purification pattern step (1) cleansing phase running.
A kind of 8. control method of air purifier according to claim 6, it is characterised in that described selection fresh air mould
Air purifier is set during formula, and circulation work in two ventilation, dedusting phase process, has following control successively:
(1) divulge information running
Control processor unit is controlled by control signal to the first automatically controlled air valve to the 6th automatically controlled air valve and blower fan,
Closing air purifying room lower wall, up to set by interior air channel, and it is upper and lower to close thermal insulation board between thermal regeneration room and air purifying room
Air channel set by end, the air channel communicated with outside atmosphere is closed on the bulkhead of thermal regeneration room, open and be located under air purifying room
The air channel that wall communicates with outside atmosphere, set air channel on purification of air chamber upper wall is opened, control blower fan Positive work, it is logical to interior
Wind, and accumulative timing unit is run to ventilation and carries out accumulative timing, purification of air indoor air flow flows from the bottom to top, outdoor air
By after being flowed into located at the air channel that air purifying room lower wall communicates with outside atmosphere after filtering and adsorption treatment from air purifying room
Upper wall upper air duct is got in, and is set when until the ventilation operation accumulative timing unit cumulative time reaches 300h, is stopped blower fan
Forward direction operation, suspend and are added up by timing and is removed the time added up, is entered for room ventilation, the accumulative timing unit of pause ventilation operation
The step of enter'sing fresh air pattern (2) dedusting running;
(2) dedusting running
Control processor unit is controlled by control signal to the first automatically controlled air valve to the 6th automatically controlled air valve and blower fan,
The air purifying room lower wall remained turned-off air channel up to set by interior, between the thermal regeneration room remained turned-off and air purifying room
Air channel set by thermal insulation board upper end, open air channel, unlatching set by thermal insulation board lower end between thermal regeneration room and air purifying room and be located at
The air channel communicated on the bulkhead of thermal regeneration room with outside atmosphere, close the wind communicated located at air purifying room lower wall with outside atmosphere
Road, set air channel on the purification of air chamber upper wall kept it turned on, blower fan reversed operation is controlled, it is indoor to low efficient filter dedusting
Air from top to bottom flows, heated regeneration room and air are net through air inlet clean room in air channel set by purification of air chamber upper wall
Air channel set by thermal insulation board lower end is outdoor to set air channel flow direction is communicated on the bulkhead of thermal regeneration room with outside atmosphere between changing room, from
And the dust adsorbed on low efficient filter is discharged into outside atmosphere, set when the blower fan antikinesis time 10min is reached, stop
(1) blower fan antikinesis, the step of returning to fresh air pattern, divulge information running.
9. the control method of a kind of air purifier according to claim 6, it is characterised in that described automatically wakes up sky
Gas purifier carries out desorption decontamination, has following steps:
1) it is desorbed
Control processor unit outputs control signals to the first automatically controlled air valve to the 6th automatically controlled air valve, heater and blower fan,
The air channel communicated on the upper and lower wall of air purifying room with interior is closed, opens thermal insulation board between thermal regeneration room and air purifying room
Air channel set by upper end, blower fan Positive work is controlled, keep wind set by thermal insulation board lower end between thermal regeneration room and air purifying room
Road is closed, and the air channel for keeping communicating with outside atmosphere on the bulkhead of thermal regeneration room is closed and under air purifying room
The air channel that wall communicates with outside atmosphere is closed, and is kept heater to close, is passed through second temperature sensor and three-temperature sensor
Detect indoor and outdoor air temperature and keep in the indoor air temperature of detection, and temporary indoor air temperature is set to T2 ', and
The indoor air temperature T2 that second temperature sensor the measures and outside air temperature T3 that three-temperature sensor measures is carried out
Compare:
1. T3-T2 is worked as in setting<At 2 DEG C or when T3-T2 >=2 DEG C, and during 65 DEG C of T3 >, keep on the bulkhead of thermal regeneration room with
The air channel that outside atmosphere communicates is closed and closed located at the air channel that air purifying room lower wall communicates with outside atmosphere, and is desorbed
Start timing, into following steps 5.,
2. T3-T2 >=2 DEG C are worked as in setting, and during 55 DEG C≤T3≤65 DEG C, are opened and be located on the bulkhead of thermal regeneration room and outside atmosphere
The air channel that communicates and located at the air channel that air purifying room lower wall communicates with outside atmosphere, sets after 10 seconds, carries out desorption and start
Timing, and air themperature in cabin is continued to monitor and by three-temperature sensor to outdoor by the first temperature sensor
Air themperature is continued to monitor in real time:
Set the T3 to be monitored measured to three-temperature sensor continue 5 seconds be less than 55 DEG C or continue 5 seconds be more than 65 DEG C when, enter
Following steps 4., otherwise, wait be desorbed timing time reach complete desorption processing needed for setting time when, into step 2) arrange
Dirt,
3. T3-T2 >=2 DEG C, and T3 are worked as in setting<At 55 DEG C, the wind communicated on the bulkhead of thermal regeneration room with outside atmosphere is opened
Road and located at the air channel that air purifying room lower wall communicates with outside atmosphere, sets after 10 seconds, passes through the first temperature sensor pair
Air themperature is continued to monitor and outside air temperature is continued to monitor by three-temperature sensor in cabin, and is continued
Temperature T1 is compared with outdoor temperature T3 in real-time progress cabin:
When setting absolute value≤0.5 DEG C to be monitored to T1 and T3 differences, carry out desorption and start timing, into following steps 4.,
Otherwise, it is to be monitored to continue to be not more than equal to temporary for 5 seconds to T3 by the T3 continued to monitor compared with temporary indoor air temperature T2 '
During 2 DEG C of the indoor air temperature T2 ' deposited, or when monitoring that T3 continues 5 seconds and is more than 65 DEG C, carry out desorption and start timing, into
Lower step 4.,
4. closing on the bulkhead of thermal regeneration room the air channel communicated with outside atmosphere and located at air purifying room lower wall and outdoor
The air channel that air communicates, into following steps 5.,
5. open air channel set by thermal insulation board lower end between thermal regeneration room and air purifying room and open heater heating, by the
One temperature sensor continues to monitor to air themperature in cabin, and air is heated by heater in cabin, air themperature in control cabinet
Setting value is maintained, the air after heating passes through sorbing material, promotes to be inhaled in efficiently renewable VOCs and methyl aldehyde adsorption material
Attached VOCs and the desorption of formaldehyde, when desorption timing time reaches and completes to be desorbed the setting time needed for processing, into step
2) blowdown;
2) blowdown
Control processor unit is entered by control signal to the first automatically controlled air valve to the 6th automatically controlled air valve, heater and blower fan
The following control of row:
1. closing the heater of unlatching, the air channel communicated on the bulkhead of thermal regeneration room with outside atmosphere of open and close, close
The air channel for being located at air purifying room lower wall and being communicated with outside atmosphere that make and break is opened, close thermal regeneration room and the purification of air of unlatching
Air channel set by thermal insulation board lower end between room, the air channel communicated on air purifying room lower wall with interior is opened, keep thermal regeneration room
Air channel set by thermal insulation board upper end is opened between air purifying room, is kept set air channel on purification of air chamber upper wall to close, is kept
Blower fan Positive work, that is, purification of air indoor air flow is kept to flow from the bottom to top, the dirty heated regeneration room of gas in purification of air room
Air channel set by thermal insulation board upper end is arranged to set air channel is communicated with outside atmosphere on the bulkhead of thermal regeneration room between air purifying room
To outdoor, room air by the lower wall of the purified room of air it is set with indoor phase ventilating duct to the purified indoor benefit of air
Fill, set when the blowdown stage, the blower fan duration of runs reached 10min, into following steps 2.,
2. on unlatching purification of air chamber upper wall between set air channel and thermal regeneration room and air purifying room set by thermal insulation board lower end
Air channel, closing air purifying room lower wall, up to set by interior air channel, closes thermal insulation board between thermal regeneration room and air purifying room
Air channel set by upper end, keep communicating set air channel unlatching on the bulkhead of thermal regeneration room with outside atmosphere, holding is located at purification of air
The air channel that room lower wall communicates with outside atmosphere is closed, and changes blower fan rotation direction, that is, controls blower fan reversed operation, and it is net to change air
Change indoor air flow flow direction, purification of air indoor air flow from top to bottom flows, the heated regeneration room of dirty gas and sky in purification of air room
Air channel set by thermal insulation board lower end is arranged to room to set air channel is communicated with outside atmosphere on the bulkhead of thermal regeneration room between gas clean room
Outside, room air is by air channel is to the purified indoor supplement of air set by the upper wall of the purified room of air, to the purified room of air
The dust adsorbed on low efficient filter is discharged into outside atmosphere while blowdown, when the blower fan antiport time 10min is reached
Into following steps 3.,
3. control processor unit is continued to monitor by the first temperature sensor to air themperature in cabin, pass through second temperature
Sensor continues to monitor to indoor air temperature, and air themperature T1 and second in the cabin that the first temperature sensor is measured
The indoor air temperature T2 that temperature sensor measures is compared in real time:During absolute value≤1 DEG C to be monitored to T1 and T2 differences
Into following steps 3);
3) when during the air purifier automatically waken up is desorbed and decontaminated, recognizing purification pattern or fresh air pattern
During operation, the corresponding modes to be monitored to response operation during absolute value≤1 DEG C of temperature in cabin and indoor temperature difference, otherwise,
Enter holding state during absolute value≤1 DEG C to be monitored to temperature in cabin and indoor temperature difference.
10. a kind of control method of air purifier according to claim 6, it is characterised in that described automatically wakes up sky
Gas purifier carries out dedusting, has following steps:
1) dedusting
Control processor unit is controlled by control signal to the first automatically controlled air valve to the 6th automatically controlled air valve and blower fan,
Closing air purifying room lower wall, up to set by interior air channel, keeps thermal insulation board upper end institute between thermal regeneration room and air purifying room
If air channel is closed, air channel set by thermal insulation board lower end between thermal regeneration room and air purifying room is opened, unlatching is located at thermal regeneration
The air channel communicated with outside atmosphere on the bulkhead of room, keep closing located at the air channel that air purifying room lower wall communicates with outside atmosphere,
Set air channel on the purification of air chamber upper wall kept it turned on, blower fan reversed operation is controlled, to low efficient filter dedusting, room air
Through air inlet clean room in air channel set by purification of air chamber upper wall, from top to bottom flow, heated regeneration room and air purifying room
Between air channel set by thermal insulation board lower end it is outdoor to set air channel flow direction is communicated on the bulkhead of thermal regeneration room with outside atmosphere, so as to will
The dust adsorbed on low efficient filter is discharged into outside atmosphere, sets when the blower fan antikinesis time 10min is reached, and stops blower fan
Antikinesis, into following steps 2);
2) when during dedusting, recognizing the operation of purification pattern or fresh air pattern, blower fan antiport run time is treated
The corresponding modes of response operation when reaching 10min, otherwise, enter when blower fan antiport run time reaches 10min standby
State.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610846441.2A CN107869792A (en) | 2016-09-23 | 2016-09-23 | A kind of air purifier and its control method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610846441.2A CN107869792A (en) | 2016-09-23 | 2016-09-23 | A kind of air purifier and its control method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107869792A true CN107869792A (en) | 2018-04-03 |
Family
ID=61751591
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610846441.2A Pending CN107869792A (en) | 2016-09-23 | 2016-09-23 | A kind of air purifier and its control method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107869792A (en) |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004097289A (en) * | 2002-09-05 | 2004-04-02 | Sharp Corp | Toothbrush storage device with disinfecting function |
JP2006105423A (en) * | 2004-09-30 | 2006-04-20 | Max Co Ltd | Ventilating device and building |
CN101444722A (en) * | 2008-11-10 | 2009-06-03 | 北京航空航天大学 | Adsorbent thermal desorption regeneration method and device thereof |
CN102938023A (en) * | 2012-11-15 | 2013-02-20 | 创天昱科技(深圳)有限公司 | Effective utilization time integrating method and device for filter screen in air purifier |
CN104361218A (en) * | 2014-10-29 | 2015-02-18 | 小米科技有限责任公司 | Method and device for changing filter cartridge |
CN105091250A (en) * | 2015-09-17 | 2015-11-25 | 北京金山安全软件有限公司 | Purifier filter screen expiration prompting method and device and purifier |
CN105115073A (en) * | 2015-09-10 | 2015-12-02 | 江苏永昇空调有限公司 | Explosion proof type forced draft air conditioning device for driller room |
CN105371383A (en) * | 2015-12-08 | 2016-03-02 | 清华大学 | Wall-mounted type air purifier based on thermal regeneration and purification method thereof |
CN105757815A (en) * | 2016-03-31 | 2016-07-13 | 吴焕雄 | Forced cleaning type air filtering system applied to indoor environments |
-
2016
- 2016-09-23 CN CN201610846441.2A patent/CN107869792A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004097289A (en) * | 2002-09-05 | 2004-04-02 | Sharp Corp | Toothbrush storage device with disinfecting function |
JP2006105423A (en) * | 2004-09-30 | 2006-04-20 | Max Co Ltd | Ventilating device and building |
CN101444722A (en) * | 2008-11-10 | 2009-06-03 | 北京航空航天大学 | Adsorbent thermal desorption regeneration method and device thereof |
CN102938023A (en) * | 2012-11-15 | 2013-02-20 | 创天昱科技(深圳)有限公司 | Effective utilization time integrating method and device for filter screen in air purifier |
CN104361218A (en) * | 2014-10-29 | 2015-02-18 | 小米科技有限责任公司 | Method and device for changing filter cartridge |
CN105115073A (en) * | 2015-09-10 | 2015-12-02 | 江苏永昇空调有限公司 | Explosion proof type forced draft air conditioning device for driller room |
CN105091250A (en) * | 2015-09-17 | 2015-11-25 | 北京金山安全软件有限公司 | Purifier filter screen expiration prompting method and device and purifier |
CN105371383A (en) * | 2015-12-08 | 2016-03-02 | 清华大学 | Wall-mounted type air purifier based on thermal regeneration and purification method thereof |
CN105757815A (en) * | 2016-03-31 | 2016-07-13 | 吴焕雄 | Forced cleaning type air filtering system applied to indoor environments |
Non-Patent Citations (1)
Title |
---|
姚仲鹏: "《空气净化原理、设计与应用》", 30 September 2014 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107869798A (en) | A kind of wall-mounted air purification device and its implementation with hot recycling | |
CN107869793A (en) | A kind of air purifier and its implementation | |
CN106287960B (en) | A kind of wall-mounted air purification device and its purification method based on hot recycling | |
CN105371383B (en) | A kind of wall-mounted air purification device and its purification method based on hot recycling | |
CN107869800A (en) | A kind of wall-mounted air purification device and its control method | |
CN107883534A (en) | A kind of wall-mounted air purification device and its control method based on hot recycling | |
CN106369686A (en) | Wall-mounted air purifier based on heat regeneration and control method of wall-mounted air purifier | |
CN106352422A (en) | Wall-mounted air purifier with thermal regeneration function and purification method thereof | |
CN107869789A (en) | A kind of air purifier and its implementation | |
CN107869796A (en) | A kind of wall-mounted air purification device and its implementation based on hot recycling | |
CN104296298A (en) | Purifying and regulating system for dual monitoring of indoor air and outdoor air | |
CN106382683A (en) | Wall-mounted type air purifier based on thermal regeneration and air purification method | |
CN107869797A (en) | A kind of wall-mounted air purification device and its implementation | |
CN106382712A (en) | Wall-mounted air purifier with heat regenerating function and control method thereof | |
CN207230864U (en) | A kind of fresh air purifying bathroom heating device | |
CN106322548A (en) | Window-type intelligent fresh air purification system | |
CN107869794A (en) | A kind of wall-mounted air purification device and its implementation | |
CN107869790A (en) | A kind of wall-mounted air purification device and its implementation | |
CN107869795A (en) | A kind of wall-mounted air purification device and its control method with hot recycling | |
CN205717599U (en) | A kind of air purifier with automatic humidification function | |
CN107869806A (en) | A kind of wall-mounted air purification device and its control method | |
CN208398250U (en) | A kind of window air purifier | |
CN105953399A (en) | Indoor air purification device | |
CN107869791A (en) | A kind of wall-mounted air purification device and its implementation | |
CN205261771U (en) | Wall -hanging air purifier based on heat regeneration |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180403 |