CN106287960B - A kind of wall-mounted air purification device and its purification method based on hot recycling - Google Patents

A kind of wall-mounted air purification device and its purification method based on hot recycling Download PDF

Info

Publication number
CN106287960B
CN106287960B CN201610707205.2A CN201610707205A CN106287960B CN 106287960 B CN106287960 B CN 106287960B CN 201610707205 A CN201610707205 A CN 201610707205A CN 106287960 B CN106287960 B CN 106287960B
Authority
CN
China
Prior art keywords
air
room
air duct
automatically controlled
valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610707205.2A
Other languages
Chinese (zh)
Other versions
CN106287960A (en
Inventor
王长宝
邵长斌
于化龙
胡广朋
董海燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Kingdom New Control Instrument Co.,Ltd.
Original Assignee
NANJING KINGDOM NEW CONTROL INSTRUMENT CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANJING KINGDOM NEW CONTROL INSTRUMENT CO Ltd filed Critical NANJING KINGDOM NEW CONTROL INSTRUMENT CO Ltd
Priority to CN201610707205.2A priority Critical patent/CN106287960B/en
Publication of CN106287960A publication Critical patent/CN106287960A/en
Application granted granted Critical
Publication of CN106287960B publication Critical patent/CN106287960B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F8/00Treatment, e.g. purification, of air supplied to human living or working spaces otherwise than by heating, cooling, humidifying or drying
    • F24F8/10Treatment, e.g. purification, of air supplied to human living or working spaces otherwise than by heating, cooling, humidifying or drying by separation, e.g. by filtering
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D53/00Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols
    • B01D53/02Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols by adsorption, e.g. preparative gas chromatography
    • B01D53/04Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols by adsorption, e.g. preparative gas chromatography with stationary adsorbents
    • B01D53/0454Controlling adsorption
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F13/00Details common to, or for air-conditioning, air-humidification, ventilation or use of air currents for screening
    • F24F13/28Arrangement or mounting of filters
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F8/00Treatment, e.g. purification, of air supplied to human living or working spaces otherwise than by heating, cooling, humidifying or drying
    • F24F8/10Treatment, e.g. purification, of air supplied to human living or working spaces otherwise than by heating, cooling, humidifying or drying by separation, e.g. by filtering
    • F24F8/15Treatment, e.g. purification, of air supplied to human living or working spaces otherwise than by heating, cooling, humidifying or drying by separation, e.g. by filtering by chemical means
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F8/00Treatment, e.g. purification, of air supplied to human living or working spaces otherwise than by heating, cooling, humidifying or drying
    • F24F8/90Cleaning of purification apparatus
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F2221/00Details or features not otherwise provided for
    • F24F2221/17Details or features not otherwise provided for mounted in a wall
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F2221/00Details or features not otherwise provided for
    • F24F2221/34Heater, e.g. gas burner, electric air heater

Abstract

The invention discloses a kind of wall-mounted air purification device and its purification method based on hot recycling, clarifier includes the closed cabin for being divided into left and right heating regeneration room and air purifying room, the VOCs sensor being from top to bottom successively installed in air cleaning room, two-way blower fan, efficient renewable VOCs and methyl aldehyde adsorption material, low efficient filter, it is from top to bottom successively installed on heating and regenerates indoor heater, first temperature sensor, the air valve in five control air ducts, its feature, which is also wrapped, is installed on heating regeneration room bulkhead by through walls with the outdoor relief valve communicated and is installed on the second temperature sensor of indoor thermometric, relief valve ensures when temperature control causes the excessively high equal energy pressure release of lock pressure, and it will not be to indoor formation secondary pollution;Method is that the wind direction of setting change blower in the blowdown stage and fresh air mode of purification pattern to low efficient filter ash discharge to outdoor, ensures that blowdown terminates temperature and room temperature in cabin and is adapted using timing plus temp measuring method control of sewage disposal duration.

Description

A kind of wall-mounted air purification device and its purification method based on hot recycling
Technical field
The invention belongs to Techniques for Indoor Air Purification field, in particular to a kind of wall hanging type air purification based on hot recycling The design of device structure and its purification method.
Background technique
With the high speed development of Chinese Urbanization, annual building creates enormous amount, more and more Novel decoration materials And chemical products are applied to interior decoration dress and drill.It is organic that these new indoor finishing materials often release a large amount of volatility The pollutants such as object (VOCs) and formaldehyde, cause serious indoor pollution.According to statistics, after finishing, formaldehyde and VOCs in newly constructed house Content is largely exceeded.
Volatile organic matter (VOCs) and formaldehyde significantly affect comfortable, the healthy and working efficiency of people.Volatility is organic Object causes stimulus to the sense organ to human body, keeps human body sensory dry, stimulation eye mucous membrane, schneiderian membrance, respiratory tract and skin etc.;It makes one to generate The discomfort such as headache, out of strength, drowsy.The pollutants such as alcohol, aromatic hydrocarbon and aldehydes can generate thorn to mucous membrane and the upper respiratory tract Swash;Many volatile organic compounds such as benzene, tetrachloro-ethylene, trichloroethanes, trichloro ethylene etc. may be related to cancer.
In addition, formaldehyde is typical pollutant in China room.Oneself confirmation formaldehyde of the World Health Organization is carcinogenic and teratogenesis Substance, for one of potential strong mutagen.Long Term Contact low dosage formaldehyde can cause chronic respiratory disease, cause nasopharynx Cancer, colon cancer, paramenia etc..Particularly, formaldehyde is bigger for children, pregnant woman's harm, can lead to the pregnancy syndrome of pregnant woman, Cause neonatal chromosome disorder, leukaemia, so that teenager's memory and intelligence decline etc..
People be more than in life 80% time life indoors.Therefore, the pollutants such as indoor VOCs and formaldehyde are carried out It purifies particularly necessary.For this reason, it may be necessary to choose suitable air purifier to eliminate harm of these indoor pollutants to human body.
Current indoor purification techniques mainly includes ventilation, absorption, photochemical catalytic oxidation and plasma technology etc..Wherein adsorption material Material due to have cost is relatively low, the advantages such as no harmful side product are most widely used in the market.However, due to adsorbent material Adsorption capacity is limited, and adsorbent material will often be taken out by, which needing, is desorbed, and otherwise will seriously affect clean-up effect, makes adsorption air The life cycle of clarifier is shorter, and frequently replacement adsorbent material trouble.When this makes adsorption cleaning device be difficult to realize longer Between application.Therefore, it needs the solution adsorbent in technique and is saturated this critical issue.
It is known that: using heating desorption to adsorbent material is the method that skilled person generallys use, in order to overcome Adsorption cleaning device needs to frequently replace the defect of adsorbent material, and according to the method for adsorbent material heating desorption, currently there is public affairs It opens document and records the new-type adsorption cleaning device integrated with thermal desorption function, such as number of patent application are as follows: 201510898501.0 a kind of wall-mounted air purification device and its purification method based on hot recycling, user selects as needed To indoor purifying or force ventilation, when selection is to indoor purifying function, blowdown after thermal desorption will be carried out in the course of work, will be elected to Select a good opportunity tool ventilation function when, outdoor fresh air is introduced it is indoor, but the wall-mounted air purification device and its purification method exist it is as follows Defect: (1) because only that when (hot recycling mode period) is desorbed in heating, closing that be possible to pressure in closed cabin excessive, and by The air purifying room of the closed cabin of clarifier is mounted on relief valve in anti-device damage on indoor wall, once therefore relief valve Pressure release is opened, just the highly concentrated air of Cabin contamination object is let out to interior, makes indoor composition secondary pollution, and work as air cleaning Air valve between room and heating regeneration room is in close state and heats regeneration room and leads to outdoor air valve in closing shape When state, i.e. clarifier are in purification pattern, indoor electric heating wire heating control circuit generation high temperature out of control is regenerated to heating, and Heating regenerates indoor temperature sensor and damage again, at this time the pressure of the closed interior generation of heating regeneration room be possible to it is excessive and Device is damaged, because being mounted on air purifying room relief valve on indoor wall this moment can not work;(2) cannot will adsorb Dust on low efficient filter is arranged to outdoor;(3) because what is opened under blowdown mode is the air being arranged at the top of air purifying room Valve, and closing is the air valve of air purifying room bottom to be arranged in, therefore the air containing pollutant being desorbed in air cleaning room can not It can be completely exhausted out, it is also possible to arrange to interior, form secondary pollution;(4) because what is opened under fresh air mode is arranged in air cleaning The air valve of room bottom, and closing is the air valve being arranged at the top of air purifying room, therefore outdoor fresh air can not be through air duct master Interior is introduced in body after filtering module purification, but purifies straight-through interior without filtering module;(5) fixed because using pure timing blowdown When the time there may be too long or too short, if winter there may be the overlong time of timing, summer there may be timing The heat that time passes in nacelle does not dissipate.
Summary of the invention
The purpose of the present invention is propose a kind of wall hanging type air based on hot recycling to overcome oneself to have the shortcoming of technology Clarifier and its purification method, when having the function of pressure release will not to indoor formation secondary pollution and automatically except on filter dust with And using timing plus temp measuring method control of sewage disposal length of time.
In order to achieve the above purpose, the technical scheme is that
A kind of wall-mounted air purification device based on hot recycling, comprising: closed cabin, blower, the first automatically controlled air valve to Five automatically controlled air valves, low efficient filter, efficiently renewable VOCs and methyl aldehyde adsorption material, heater, VOCs sensor, the first temperature Spend sensor, second temperature sensor, control processor unit, relief valve;The VOCs sensor, the first temperature sensor and Second temperature sensor is connected with the input terminal of control processor unit respectively;The blower, heater, the first automatically controlled air Valve to the 5th automatically controlled air valve is connected with the output end of control processor unit respectively;The closed cabin with left and right be set as with every The heating regeneration room and air purifying room that hot plate is isolated, the automatically controlled air valve of third are mounted on thermal insulation board upper end, the 4th automatically controlled sky Air valve is mounted on thermal insulation board lower end, and the first automatically controlled air valve is installed on air cleaning chamber upper wall, and the second automatically controlled air valve is installed on Air purifying room lower wall;5th automatically controlled air valve is installed on the bulkhead of heating regeneration room and communicates with outside atmosphere, with thermal insulation board The automatically controlled air valve in lower end the 4th is corresponding;The heater and the first temperature sensor are from top to bottom sequentially arranged at heating regeneration It is indoor;The low efficient filter, efficiently renewable VOCs and methyl aldehyde adsorption material, blower, VOCs sensor are from the bottom to top successively It is mounted in air cleaning room, and low efficient filter is mounted on the 4th automatically controlled above space of air valve position, assembling is Space below three automatically controlled air valve positions;The relief valve is installed on the bulkhead of heating regeneration room, by passing through wall and room Outer atmosphere is connected, and the second temperature sensor is installed on interior.
Above-described blower is Bidirectional axial flow fan.
Above-described first automatically controlled air valve and the second automatically controlled air valve are selected as single automatically controlled open type electromagnetic air valve, The automatically controlled air valve of third and the 4th automatically controlled air valve and the 5th automatically controlled air valve are selected as single automatically controlled closed type electromagnetic air valve.
Above-described heater is PTC heater.
In order to achieve the above purpose, of the invention another solution is that
A kind of purification method of the wall-mounted air purification device based on hot recycling, includes the following steps:
1) setting air purifier is selected when purification pattern to circuit sequentially work in purification, desorption, blowdown three phases,
(1) cleansing phase,
Control processor unit controls the first automatically controlled air valve to the 5th automatically controlled air valve and blower by control signal, opens The air duct in the air purifying room of closing on lower wall is opened, is closed between the heating regeneration room of unlatching and air purifying room on thermal insulation board Air duct set by lower end, and close the air duct communicated on heating regeneration room bulkhead with outside atmosphere that is set to opened, control blower Positive work flows air cleaning indoor air flow from the bottom to top, after room air is flowed by air purifying room lower wall upper air duct It is entered the room with after adsorption treatment from upper wall upper air duct through filtering, the stage running cumulative time to be clean reaches at desorption to be carried out Enter desorption stage (2) when the time set by reason,
(2) desorption stage,
Control processor unit by control signal control the first automatically controlled air valve to the 5th automatically controlled air valve, heater and Blower closes the air duct in air purifying room on lower wall, opens thermal insulation board upper and lower side between heating regeneration room and air purifying room Set air duct, and keep communicating set air duct closing on heating regeneration room bulkhead with outside atmosphere, blower Positive work is kept, Air cleaning indoor air flow is kept to flow from the bottom to top, air themperature in cabin is carried out by the first temperature sensor to continue prison It surveys, control heater heating makes air themperature in cabin maintain setting value, and air is heated by heater, the air warp after heating Adsorbent material is crossed, promotes the desorption of adsorbed VOCs and formaldehyde in efficiently renewable VOCs and methyl aldehyde adsorption material, wait be desorbed The stage running time, which reaches, completes to enter the blowdown stage (3) when the setting time needed for desorption is handled,
(3) the blowdown stage,
Control processor unit by control signal control the first automatically controlled air valve to the 5th automatically controlled air valve, heater and Blower,
1. being first shut off heater, opens and communicate set air duct on heating regeneration room bulkhead with outside atmosphere, and open Set air duct on air purifying room lower wall is closed air duct set by thermal insulation board lower end between heating regeneration room and air purifying room, is protected It holds air duct set by thermal insulation board upper end between heating regeneration room and air purifying room to open, keeps set wind on air cleaning chamber upper wall Road is closed, and blower Positive work is kept, i.e. holding air cleaning indoor air flow flows from the bottom to top, dirty gas warp in air cleaning room It is communicated on air duct set by thermal insulation board upper end to heating regeneration room bulkhead with outside atmosphere between heating regeneration room and air purifying room Set air duct is arranged to outdoor, and room air is by set air duct on the lower wall of the purified room of air to the purified indoor benefit of air The step of filling, entering the blowdown stage when blowdown stage, the blower Positive work time reached 10min 2.,
2. opening set air duct on air cleaning chamber upper wall, and open the spaced heat of heating regeneration room and air purifying room Set air duct on air purifying room lower wall is closed in air duct set by plate lower end, closes the interval of heating regeneration room and air purifying room Air duct set by hot plate upper end keeps communicating set air duct unlatching on heating regeneration room bulkhead with outside atmosphere, and control blower is reversed Operating changes air cleaning indoor air flow flow direction, and air cleaning indoor air flow from top to bottom flows, dirty gas warp in air cleaning room It is communicated on air duct set by thermal insulation board lower end to heating regeneration room bulkhead with outside atmosphere between heating regeneration room and air purifying room Set air duct is arranged to outdoor, air duct set by upper wall of the room air by the purified room of air to the purified indoor supplement of air, The dust adsorbed on low efficient filter is discharged into outside atmosphere while room blowdown purified to air, it is anti-to blowdown stage blower The step of entering the blowdown stage when reaching 10min to the duration of runs 3.,
3. control processor unit continues to monitor air themperature in cabin by the first temperature sensor, pass through second Temperature sensor continues to monitor indoor air temperature, and the absolute value to be monitored to temperature in cabin and room temperature difference≤ At 1 DEG C (1) back to cleansing phase;
2) select fresh air mode when setting air purifier circuit sequentially work ventilation, two stages of deliming,
Control processor unit controls the first automatically controlled air valve to the 5th automatically controlled air valve by control signal, closes air Set air duct on clean room's lower wall closes air duct set by thermal insulation board upper end between heating regeneration room and air purifying room, opens and add Set air duct on air cleaning chamber upper wall is opened in air duct set by thermal insulation board lower end between hot recycling room and air purifying room, is opened The air duct communicated on heating regeneration room bulkhead with outside atmosphere,
(1) ventilating stage, control processor unit control blower Positive work by control signal, make in air cleaning room Air-flow flows from the bottom to top, outdoor air by be set on heating regeneration room bulkhead after the air duct that communicates with outside atmosphere flows by Air duct set by thermal insulation board lower end enters air purifying room between heating regeneration room and air purifying room, after filtering and adsorption treatment It is entered the room from air cleaning chamber upper wall upper air duct, enters the deliming stage when ventilating stage operation cumulative time reaching 300h (2),
(2) deliming stage, control processor unit control blower antiport by control signal, make in air cleaning room Air-flow from top to bottom flows, and room air enters air purifying room through set air duct on air cleaning chamber upper wall, from top to bottom flows It is dynamic, between heated regeneration room and air purifying room on air duct set by thermal insulation board lower end to heating regeneration room bulkhead with outside atmosphere Set air duct is communicated, is arranged to outdoor, so that the dust adsorbed on low efficient filter is discharged into outside atmosphere, to deliming stage running (1) time enters ventilating stage when reaching 10min.
The utility model has the advantages that
1, the present invention, which realizes, not only realizes to efficient renewable VOCs and methyl aldehyde adsorption material desorption, also to thick effect filtering Device deliming, because ensuring that blowdown terminates temperature and room temperature phase in cabin using timing plus temp measuring method control of sewage disposal length of time It adapts to, and is connected by passing through wall with outside atmosphere because relief valve is installed on the bulkhead of heating regeneration room, realized Whenever temperature control cause in cabin high pressure can pressure release, and will not be to indoor formation secondary pollution when pressure release.
2, the configuration of the present invention is simple, easy to operate, safety and stability provide a kind of permanently effective side to purify the air of a room Formula.
Detailed description of the invention
Fig. 1 is a kind of apparatus structure schematic diagram of wall-mounted air purification device based on hot recycling of the invention.
In figure: 1. closed cabins, 2. blowers, 3,4,5,6,7. first automatically controlled air valves to the 5th automatically controlled air valve, 8. thick effects Filter, 9. efficient renewable VOCs and methyl aldehyde adsorption material, 10. heaters, 11.VOCs sensor, 12,16. first temperature Sensor and second temperature sensor, 13. control processor units, 14. relief valves, 15. walls.
Specific embodiment
As shown in Figure 1, a kind of wall-mounted air purification device based on hot recycling, comprising: closed cabin 1, the 2, first electricity of blower Control the automatically controlled air valve 7 of air valve 3 to the 5th, low efficient filter 8, efficiently renewable VOCs and methyl aldehyde adsorption material 9, heater 10, VOCs sensor 11, the first temperature sensor 12, second temperature sensor 16, control processor unit 13, relief valve 14; The VOCs sensor 11, the first temperature sensor 12 and second temperature sensor 16 are defeated with control processor unit 13 respectively Enter end to be connected;The blower 2, heater 10, the first automatically controlled air valve 7 of automatically controlled air valve 3 to the 5th are handled with control respectively The output end of device unit 13 is connected.
The low efficient filter 8 and efficiently renewable VOCs and methyl aldehyde adsorption material 9 constitute air-purifying module;Slightly imitated Filter 8 selects the conventional products for facilitating installation, and the present invention selects traditional filter screen, is mainly used for particulate matter, i.e., mainly For adsorbing dust, the dust in air is filtered out;Efficient renewable VOCs and methyl aldehyde adsorption material 9 are for convenience of the routine installed Shaped activated carbon is filling adsorption material, is used for volatile organic matter (VOCs) and formaldehyde absorbing.
The closed cabin 1 hangs (fixation) on wall 15 (exterior wall) inner wall, and closed cabin 1 uses stainless steel environmental chamber, Bulkhead is double-layer structure, is filled with heat preserving and insulating material between two layers of bulkhead;Closed cabin 1 is set as left and right two locellus, that is, is arranged For heating regeneration room a and air purifying room b two parts, for heating regeneration room a for heat production, air purifying room b is net for air Change;It is isolated between heating regeneration room a and air purifying room b two parts by the thermal insulation board filled with heat-barrier material;
Air duct is equipped with respectively on the upper lower wall of air purifying room b to be connected with room air;Air purifying room b upper wall First automatically controlled air valve 3 is installed, i.e., the first automatically controlled air valve 3 controls air duct set by air purifying room b upper wall in set air duct ON/OFF;Second automatically controlled air valve 4 is installed, i.e., the second automatically controlled air valve 4 controls air in air duct set by air purifying room b lower wall The ON/OFF in air duct set by clean room's b lower wall;
The upper and lower end of thermal insulation board is equipped with air duct respectively and is connected between heating regeneration room a and air purifying room b two parts It is logical;And be arranged: the upper end air duct on thermal insulation board is connected with the air duct of air purifying room b upper wall, i.e., the upper end wind on thermal insulation board Road and the upper wall air duct of air purifying room b are all disposed within the upper space of blower 2;Lower end air duct and air cleaning on thermal insulation board The air duct of room b lower wall is connected, i.e., it is net that the lower wall air duct of the lower end air duct on thermal insulation board and air purifying room b are all disposed within air Change the lower space of module;
Third automatically controlled air valve 5 is installed, i.e. the automatically controlled air valve 5 of third controls thermal insulation board upper end wind in the air duct of thermal insulation board upper end The ON/OFF in road;4th automatically controlled air valve 6 is installed, i.e., the 4th automatically controlled air valve 6 controls thermal insulation board lower end in the air duct of thermal insulation board lower end The ON/OFF in air duct;
The closed cabin 1 on indoor wall 15 is hung on, be arranged on the bulkhead of heating regeneration room a and the 5th electricity is installed The fresh flue of air valve 7 is controlled, fresh flue is connected by passing through wall 15 with the external world, and heats set on regeneration room a bulkhead The air duct position phase that thermal insulation board lower end is laid between the fresh flue position set and heating regeneration room a and air purifying room b two parts It is corresponding, i.e., in same level;Heating regeneration room a is communicated by the in fresh flue the 5th automatically controlled air valve 7 with outside atmosphere, i.e., and the Five automatically controlled air valves 7 control the ON/OFF of fresh flue.
The relief valve 14 is automatic pressure relief valve, for maintaining pressure in cabin to stablize, i.e., for when pressure is excessive in cabin Releasing pressure automatically, thus guarantee that pressure is in safe range in cabin, in order to avoid the excessive damage device of pressure in cabin;Relief valve 14 is mounted on On the bulkhead for heating regeneration room a, it is connected by passing through wall 15 with outside atmosphere, has both realized that thermal runaway causes pressure mistake in cabin When big relief valve 14 can releasing pressure automatically, and it is outdoor big to guarantee that the highly concentrated air of Cabin contamination object that relief valve 14 is released leads to Gas, i.e., will not be to indoor composition secondary pollution when relief valve 14 is released.
The first automatically controlled air valve 7 of automatically controlled air valve 3 to the 5th is two-way air valve, the first automatically controlled air valve 3 to the Five automatically controlled 7 ON/OFF control terminals of air valve are connected with 13 output end of control processor unit respectively, and control processor unit 13 Corresponding control signal is exported to corresponding automatically controlled air valve according to condition, realizes ON/OFF, air valve is opened when opening, air valve when pass It closes;The first automatically controlled air valve 3 and the second automatically controlled air valve 4 select single automatically controlled open type electromagnetic air valve, third in the present invention Automatically controlled air valve 5, the 4th automatically controlled air valve 6 and the 5th automatically controlled air valve 7 select single automatically controlled closed type electromagnetic air valve.
The heater 10, which is used to provide when hot recycling, is desorbed required thermal energy, the ON/OFF control terminal and control of heater 10 The output end of processor unit 13 is connected, and control processor unit 13 outputs control signals to heater 10, controls heater 10 ON/OFF and temperature are adjusted;Heater 10 selects PTC heater (ptc heater) in the present invention, i.e. selection PTC type ceramics add Hot device, for making air themperature in cabin maintain 60 ± 5 DEG C in desorption.
First temperature sensor 12 is installed on for detecting temperature in heating regeneration room a, the first temperature sensor 12 It heats in the space regeneration room a, is arranged between the 4th automatically controlled air valve 6 and the 5th automatically controlled air valve 7.Heating regeneration room a and Air purifying room b communicates Shi Shiye and represents temperature in air purifying room b;The second temperature sensor 16 is for detecting room Room temperature, second temperature sensor 16 is installed on should the device interior to be purified;First temperature sensor 12 and second The signal of acquisition is transferred to control processor unit 13 respectively and carries out processing control by temperature sensor 16.
The heater 10 and the first temperature sensor 12 are from top to bottom sequentially arranged in the space of heating regeneration room a, And heater 10 is fixed by the bracket the upper and lower end laying of the thermal insulation board between heating regeneration room a and air purifying room b two parts Air duct partition on.
The blower 2 is Bidirectional axial flow fan, and blower 2 is mounted on the space of air purifying room b internal upper part, i.e. blower 2 is pacified Loaded between the first automatically controlled air valve 3 in efficient renewable VOCs and methyl aldehyde adsorption material 9 and air duct, it is fixed on closed cabin 1 On the main body of air duct.The control terminal of blower 2 is connected with the output of control processor unit 13.When control processor unit 13 The positive control signal of output to blower 2 control terminal when, 2 Positive work of blower, i.e. wind direction is upward;When control processor unit 13 Output reverse control signal to blower 2 control terminal when, 2 antiport of blower, i.e. wind direction is downward;Work as control processor unit 13 output closing control signal to blower 2 control terminal when, blower 2 close, i.e., blower 2 shuts down.
The VOCs sensor 11 is installed on 2 top of air purifying room b inner blower to space between upper wall, is used for survey room The VOCs concentration of interior upper wall ducting outlet air, is transferred to control processor unit 13 for the signal of acquisition and carries out processing and show.
The low efficient filter 8, efficiently renewable VOCs and methyl aldehyde adsorption material 9, blower 2, VOCs sensor 11 are under In the space of the supreme air purifying room b for being sequentially arranged at closed cabin 1, and low efficient filter 8 is made to be mounted on heating regeneration room a The above space in air duct position that thermal insulation board lower end is laid between air purifying room b two parts makes blower 2 be mounted on heating regeneration The air duct position that thermal insulation board upper end is laid between room a and air purifying room b two parts is with down space.
The control processor unit 13 is for controlling the first automatically controlled 7 ON/OFF of air valve of automatically controlled air valve 3 to the 5th, control The change of the wind of Bidirectional axial flow fan 2 processed and out of service, the ON/OFF and temperature for controlling heater 10 are adjusted, and pass through the One temperature sensor 12 detects room room temperature to temperature detection in cabin, by second temperature sensor 16, passes through VOCs Sensor 11 is to cabin inner outlet air V OCs Concentration Testing.Control processor unit 13 includes MCU (micro-control unit) unit, number According to memory, real-time clock, display, operation key and the various interfaces being connect with peripheral hardware etc., control processor unit 13 Are carried out by corresponding operating status control, and passes through temperature sensing for automatically controlled air valve, blower, heater according to the function selection of operation key Device accordingly controls temperature detection result, send display to cabin inner outlet air V OCs Concentration Testing by VOCs sensor Display.The place of personnel's operation is convenient in the installation of control processor unit 13 close to closed cabin 1 indoors.
A kind of purification method of the wall-mounted air purification device based on hot recycling includes:
Air purifier is selected to work under purification pattern or fresh air mode by operation key in control processor unit 13, When selecting purification pattern, operational process circuits sequentially purification, desorption, blowdown three phases, and in the blowdown stage to slightly imitating Filter 8 carries out ash disposal processing;Outdoor fresh air is introduced into interior when selecting fresh air mode, and in the fresh air mode operation cumulative time Ash disposal processing is carried out to low efficient filter 8 when reaching certain time length.
It is as follows to select to circuit sequentially the purification of operation, desorption, blowdown three phases process when purification pattern:
It is introduced into purification operational process, control processor unit 13 opens the first automatically controlled 3 He of air valve by control signal Second automatically controlled air valve 4 closes the automatically controlled air valve 5 of third, the 4th automatically controlled air valve 6 and the 5th automatically controlled air valve 7, controls blower 2 Positive works.Room air is recycled in the air purifying room b of closed cabin 1 and interior, air purifying room b inner air-cleaning Module carries out adsorption cleaning to room air.When operational process accumulated running time to be clean reaches 300h, it is transferred to desorption operation Process is converted and is opened to automatically controlled air valve ON/OFF heater 10, purification process otherwise continued to run, until manual switching mould Formula closes air purifier.In purification operational process, control processor unit 13 is empty by the 11 pairs of outlets of VOCs sensor VOCs concentration is continued to monitor in gas, and display is sent to show air cleaning quality.
Operational process is desorbed, control processor unit 13 opens the automatically controlled air valve 5 of third and the 4th electricity by control signal Air valve 6 is controlled, the first automatically controlled air valve 3, the second automatically controlled air valve 4 are closed and the 5th automatically controlled air valve 7 is kept to close, opens hair Hot body 10, and keep 2 Positive work of blower.Air is heated by heater 10, and the air after heating passes through adsorbent material, is promoted high Imitate the desorption of adsorbed VOCs and formaldehyde in renewable VOCs and methyl aldehyde adsorption material 9.At the same time, control processor unit 13 continue to monitor air themperature in cabin by the first temperature sensor 12, and control heater 10 heats, and remain empty in cabin Temperature degree is at 60 ± 5 DEG C.When reaching 120min wait which operational process runing time is desorbed, it is transferred to blowdown operational process, to automatically controlled sky The conversion of air valve ON/OFF and closing heater 10, otherwise continue to run desorption operational process, until manual switching mode or close empty Gas purifier.
Blowdown operational process, control processor unit 13 are first shut off heater 10 by controlling signal, open the second electricity It controls air valve 4 and the 5th automatically controlled air valve 7 and keeps the automatically controlled air valve 5 of third to open, close the 4th automatically controlled air valve 6 and keep First automatically controlled air valve 3 is closed, and keeps 2 Positive work of blower, is reached to the 2 Positive work time of blower in blowdown operational process When 10min, control processor unit 13 again by control signal open the first automatically controlled air valve 3 and the 4th automatically controlled air valve 6 and It keeps the 5th automatically controlled air valve 7 to open, closes the second automatically controlled air valve 4 and the automatically controlled air valve 5 of third, and change the operating of blower 2 Direction controls 2 antiport of blower;Air and outside atmosphere constitute circuit in cabin, and the highly concentrated air of Cabin contamination object is arranged Enter outside atmosphere, the dust adsorbed on low efficient filter 8 is also discharged into outside atmosphere simultaneously in 2 antiport of blower;Wait arrange When the 2 antiport time of blower reaches 10min in dirty operational process, control processor unit 13 passes through the first temperature sensor 12 Air themperature in cabin is continued to monitor, indoor air temperature is continued to monitor by second temperature sensor 16, to Purification operational process is come back to when absolute value≤1 DEG C of temperature and room temperature difference in cabin, otherwise continues to run blowdown fortune Row process until manual switching mode or closes air purifier.
Operational process is as follows when selection fresh air mode:
Control processor unit 13 opens the first automatically controlled air valve 3 and the 4th automatically controlled air valve 6 and the by control signal Five automatically controlled air valves 7 close the second automatically controlled air valve 4 and the automatically controlled air valve 5 of third, open 2 Positive work of blower, outdoor at this time Fresh air purifies through air-purifying module and introduces interior, effectively promotion indoor air quality, in fresh air operational process, control processing Device unit 13 equally continues to monitor VOCs concentration in outlet air by VOCs sensor 11, and display is sent to show newly Wind depuration quality;When the fresh air mode operation cumulative time reaching 300h, control processor unit 13 is changed by control signal 2 rotation direction of blower controls 2 antiport of blower, the dust adsorbed on low efficient filter 8 is discharged into outside atmosphere;To blower 2 When the antiport time reaches 10min, control processor unit 13 changes 2 rotation direction of blower by control signal, controls wind 2 Positive work of machine turns again to outdoor air purifying introducing interior through air-purifying module;Fresh air mode operation process until Manual switching mode closes air purifier.

Claims (2)

1. a kind of implementation method of the wall-mounted air purification device based on hot recycling, the wall-mounted air purification device based on hot recycling It include: closed cabin, blower, the first automatically controlled air valve to the 5th automatically controlled air valve, low efficient filter, efficiently renewable VOCs and first Aldehyde adsorbent material, VOCs sensor, the first temperature sensor, second temperature sensor, control processor unit, is let out heater Pressure valve;The VOCs sensor, the first temperature sensor and second temperature sensor respectively with the input of control processor unit End is connected;The blower, heater, the first automatically controlled air valve to the 5th automatically controlled air valve respectively with control processor unit Output end is connected;Described closed cabin or so is set as the heating regeneration room being isolated with thermal insulation board and air purifying room, it is described every The upper and lower side of hot plate is equipped with air duct, heats and is connected between regeneration room and air purifying room by air duct set by thermal insulation board upper and lower side It is logical;Air duct is respectively equipped on the upper lower wall of the air purifying room to be connected with room air;It heats horizontal on regeneration room bulkhead The position in corresponding thermal insulation board lower end air duct is equipped with across the air duct that wall is connected with outside atmosphere;The automatically controlled air valve installation of third In the air duct of thermal insulation board upper end, the 4th automatically controlled air valve is mounted in the air duct of thermal insulation board lower end, the first automatically controlled air valve peace In air duct loaded on air cleaning chamber upper wall, the second automatically controlled air valve is installed in the air duct of air purifying room lower wall;5th electricity Control air valve is installed in the air duct communicated on the bulkhead of heating regeneration room with outside atmosphere;The first automatically controlled air valve is to The ON/OFF in air duct where five automatically controlled air valves control it;The heater and the first temperature sensor are from top to bottom successively installed In heating regeneration room;The low efficient filter, efficiently renewable VOCs and methyl aldehyde adsorption material, blower, VOCs sensor by Under it is supreme be sequentially arranged in air cleaning room, and low efficient filter is mounted on the above space in thermal insulation board lower end air duct position, wind Machine is mounted on thermal insulation board upper end air duct position with down space;The second temperature sensor is installed on interior;The relief valve peace On bulkhead loaded on closed cabin, it is connected by passing through wall with outside atmosphere;The blower is Bidirectional axial flow fan, and blower is just Upward to wind direction when operating, wind direction is downward when blower antiport;It is characterized in that, the implementation method includes the following:
(1) the relief valve is installed on the bulkhead of heating regeneration room of closed cabin;
(2) setting air purifier when purification pattern is selected to circuit sequentially work in purification, desorption, blowdown three phases, the row The dirty stage, control processor unit by control signal control the first automatically controlled air valve to the 5th automatically controlled air valve, heater and Blower:
1. being first shut off heater, opens and communicate set air duct on heating regeneration room bulkhead with outside atmosphere, and open air Air duct set by thermal insulation board lower end between heating regeneration room and air purifying room is closed in set air duct on clean room's lower wall, keeps adding Air duct set by thermal insulation board upper end is opened between hot recycling room and air purifying room, and set air duct on air cleaning chamber upper wall is kept to close It closes, keeps blower Positive work, is i.e. holding air cleaning indoor air flow flows from the bottom to top, and dirty gas is heated in air cleaning room It is communicated on air duct set by thermal insulation board upper end to heating regeneration room bulkhead with outside atmosphere between regeneration room and air purifying room set Air duct is arranged to outdoor, and set air duct is supplemented into air cleaning room on lower wall of the room air Jing Guo air purifying room, to blowdown The step of blower Positive work time in stage enters the blowdown stage when reaching l0min is 2.;
2. opening set air duct on air cleaning chamber upper wall, and open between heating regeneration room and air purifying room under thermal insulation board Set air duct is held, set air duct on air purifying room lower wall is closed, closes thermal insulation board between heating regeneration room and air purifying room Air duct set by upper end keeps communicating set air duct unlatching on heating regeneration room bulkhead with outside atmosphere, controls blower antiport, Change air cleaning indoor air flow flow direction, air cleaning indoor air flow from top to bottom flows, and dirty gas is heated in air cleaning room It is communicated on air duct set by thermal insulation board lower end to heating regeneration room bulkhead with outside atmosphere between regeneration room and air purifying room set Air duct is arranged to outdoor, and room air passes through air duct set by the upper wall of the purified room of air and supplements into air cleaning room, to air The dust adsorbed on low efficient filter is discharged into outside atmosphere while clean room's blowdown, when blowdown stage blower antiport Between the step of entering the blowdown stage when reaching l0min 3.;
3. control processor unit continues to monitor air themperature in cabin by the first temperature sensor, pass through second temperature Sensor continues to monitor indoor air temperature, absolute value≤1 DEG C to be monitored to temperature in cabin and room temperature difference When return to cleansing phase;
(3) setting air purifier when fresh air mode is selected to circuit sequentially work in ventilation, two stages of deliming, control processor Unit controls the first automatically controlled air valve to the 5th automatically controlled air valve by control signal, closes set wind on air purifying room lower wall Road closes air duct set by thermal insulation board upper end between heating regeneration room and air purifying room, opens heating regeneration room and air cleaning Set air duct on air cleaning chamber upper wall is opened in air duct set by thermal insulation board lower end between room, is opened and is set to heating regeneration room bulkhead The upper air duct communicated with outside atmosphere:
1. ventilating stage, control processor unit controls blower Positive work by control signal, makes air cleaning indoor air flow It flows from the bottom to top, outdoor air is by being set to after the air duct communicated on heating regeneration room bulkhead with outside atmosphere flows by heating Air duct set by thermal insulation board lower end enters air purifying room between regeneration room and air purifying room, from sky after filtering and adsorption treatment Gas purification chamber upper wall upper air duct enters the room, and enters the deliming stage 2. when the ventilating stage operation cumulative time reaching 300h;
2. the deliming stage, control processor unit controls blower antiport by control signal, makes air cleaning indoor air flow It from top to bottom flows, room air enters air purifying room through set air duct on air cleaning chamber upper wall, from top to bottom flows, and passes through It is communicated on air duct set by thermal insulation board lower end to heating regeneration room bulkhead with outside atmosphere between heating regeneration room and air purifying room Set air duct is arranged to outdoor, so that the dust adsorbed on low efficient filter is discharged into outside atmosphere, to the deliming stage running time Enter ventilating stage when reaching l0min 1..
2. a kind of implementation method of wall-mounted air purification device based on hot recycling according to claim 1, feature exist In the first automatically controlled air valve and the second automatically controlled air valve are single automatically controlled open type electromagnetic air valve, the automatically controlled air valve of third It is single automatically controlled closed type electromagnetic air valve with the 4th automatically controlled air valve and the 5th automatically controlled air valve.
CN201610707205.2A 2016-08-23 2016-08-23 A kind of wall-mounted air purification device and its purification method based on hot recycling Active CN106287960B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610707205.2A CN106287960B (en) 2016-08-23 2016-08-23 A kind of wall-mounted air purification device and its purification method based on hot recycling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610707205.2A CN106287960B (en) 2016-08-23 2016-08-23 A kind of wall-mounted air purification device and its purification method based on hot recycling

Publications (2)

Publication Number Publication Date
CN106287960A CN106287960A (en) 2017-01-04
CN106287960B true CN106287960B (en) 2019-05-24

Family

ID=57615420

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610707205.2A Active CN106287960B (en) 2016-08-23 2016-08-23 A kind of wall-mounted air purification device and its purification method based on hot recycling

Country Status (1)

Country Link
CN (1) CN106287960B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107491111B (en) * 2017-08-16 2019-10-11 中国船舶工业***工程研究院 A kind of temprature control method based on TEC
CN107477732B (en) * 2017-09-25 2020-04-07 中国科学院城市环境研究所 Air purification device and method capable of continuously degrading indoor VOCs (volatile organic compounds)
CN108317646B (en) * 2017-12-23 2024-01-02 天津沐歌医疗科技发展有限公司 Air purification device based on air source heat pump
CN109187872A (en) * 2018-09-25 2019-01-11 南京白云环境科技集团股份有限公司 The measurement device and its measuring method of formaldehyde in a kind of surrounding air
CN111237907A (en) * 2020-03-06 2020-06-05 东南大学 Pollution discharge method for thermal regeneration wall-mounted air purifier after cyclic desorption
CN113188244B (en) * 2021-04-16 2022-05-10 珠海格力电器股份有限公司 Air conditioning unit control method and device, air conditioning unit and storage medium

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06165910A (en) * 1992-04-23 1994-06-14 Nippon Ceramic Co Ltd Air cleaner
CN201105031Y (en) * 2007-10-09 2008-08-27 李举 Indoor air purifier
CN101995055A (en) * 2009-08-18 2011-03-30 松下电器产业株式会社 Air conditioner capable of automatically removing dust
CN105115073A (en) * 2015-09-10 2015-12-02 江苏永昇空调有限公司 Explosion proof type forced draft air conditioning device for driller room
CN105371383B (en) * 2015-12-08 2018-08-28 清华大学 A kind of wall-mounted air purification device and its purification method based on hot recycling

Also Published As

Publication number Publication date
CN106287960A (en) 2017-01-04

Similar Documents

Publication Publication Date Title
CN106287960B (en) A kind of wall-mounted air purification device and its purification method based on hot recycling
CN105371383B (en) A kind of wall-mounted air purification device and its purification method based on hot recycling
CN106352422A (en) Wall-mounted air purifier with thermal regeneration function and purification method thereof
CN107869793A (en) A kind of air purifier and its implementation
CN106369686A (en) Wall-mounted air purifier based on heat regeneration and control method of wall-mounted air purifier
CN107869798A (en) A kind of wall-mounted air purification device and its implementation with hot recycling
CN107883534A (en) A kind of wall-mounted air purification device and its control method based on hot recycling
CN107869800A (en) A kind of wall-mounted air purification device and its control method
CN106382683A (en) Wall-mounted type air purifier based on thermal regeneration and air purification method
CN107869789A (en) A kind of air purifier and its implementation
CN107869796A (en) A kind of wall-mounted air purification device and its implementation based on hot recycling
CN107869797A (en) A kind of wall-mounted air purification device and its implementation
CN205261771U (en) Wall -hanging air purifier based on heat regeneration
CN109764421A (en) A kind of Multifunctional air clarifying device
CN208398250U (en) A kind of window air purifier
CN106382712A (en) Wall-mounted air purifier with heat regenerating function and control method thereof
CN105953399A (en) Indoor air purification device
CN107869806A (en) A kind of wall-mounted air purification device and its control method
CN107869795A (en) A kind of wall-mounted air purification device and its control method with hot recycling
CN107869790A (en) A kind of wall-mounted air purification device and its implementation
CN107869794A (en) A kind of wall-mounted air purification device and its implementation
CN107869799A (en) A kind of wall-mounted air purification device and its control method based on hot recycling
CN107869791A (en) A kind of wall-mounted air purification device and its implementation
CN107726464A (en) A kind of circulation absorption intelligent air purifying system of simulating forest environment
CN204404387U (en) A kind of permanent oxygen constant-temperature purification machine

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20190328

Address after: 210014 2nd Floor, Building A, Cloud Computing Base, No. 6 Shuizhi Road, Qinhuai District, Nanjing City, Jiangsu Province

Applicant after: Nanjing Kingdom New Control Instrument Co.,Ltd.

Address before: 212003 Mengxi Road, Jingkou District, Zhenjiang, Jiangsu Province, No. 2

Applicant before: Jiangsu University of Science and Technology

TA01 Transfer of patent application right
CB02 Change of applicant information

Address after: 210014 2nd Floor, Building A, Cloud Computing Base, No. 6 Yongzhi Road, Qinhuai District, Nanjing City, Jiangsu Province

Applicant after: Nanjing Kingdom New Control Instrument Co.,Ltd.

Address before: 210014 2nd Floor, Building A, Cloud Computing Base, No. 6 Shuizhi Road, Qinhuai District, Nanjing City, Jiangsu Province

Applicant before: Nanjing Kingdom New Control Instrument Co.,Ltd.

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Wall-mounted type air purifier based on thermal regeneration and purification method thereof

Effective date of registration: 20190902

Granted publication date: 20190524

Pledgee: Chengdong Branch of Nanjing Bank Co., Ltd.

Pledgor: Nanjing Kingdom New Control Instrument Co.,Ltd.

Registration number: Y2019980000099

PE01 Entry into force of the registration of the contract for pledge of patent right