CN107869790A - A kind of wall-mounted air purification device and its implementation - Google Patents
A kind of wall-mounted air purification device and its implementation Download PDFInfo
- Publication number
- CN107869790A CN107869790A CN201610846395.6A CN201610846395A CN107869790A CN 107869790 A CN107869790 A CN 107869790A CN 201610846395 A CN201610846395 A CN 201610846395A CN 107869790 A CN107869790 A CN 107869790A
- Authority
- CN
- China
- Prior art keywords
- air
- room
- temperature
- air channel
- purification
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F1/00—Room units for air-conditioning, e.g. separate or self-contained units or units receiving primary air from a central station
- F24F1/02—Self-contained room units for air-conditioning, i.e. with all apparatus for treatment installed in a common casing
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F13/00—Details common to, or for air-conditioning, air-humidification, ventilation or use of air currents for screening
- F24F13/28—Arrangement or mounting of filters
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F8/00—Treatment, e.g. purification, of air supplied to human living or working spaces otherwise than by heating, cooling, humidifying or drying
- F24F8/10—Treatment, e.g. purification, of air supplied to human living or working spaces otherwise than by heating, cooling, humidifying or drying by separation, e.g. by filtering
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F8/00—Treatment, e.g. purification, of air supplied to human living or working spaces otherwise than by heating, cooling, humidifying or drying
- F24F8/10—Treatment, e.g. purification, of air supplied to human living or working spaces otherwise than by heating, cooling, humidifying or drying by separation, e.g. by filtering
- F24F8/108—Treatment, e.g. purification, of air supplied to human living or working spaces otherwise than by heating, cooling, humidifying or drying by separation, e.g. by filtering using dry filter elements
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F8/00—Treatment, e.g. purification, of air supplied to human living or working spaces otherwise than by heating, cooling, humidifying or drying
- F24F8/10—Treatment, e.g. purification, of air supplied to human living or working spaces otherwise than by heating, cooling, humidifying or drying by separation, e.g. by filtering
- F24F8/15—Treatment, e.g. purification, of air supplied to human living or working spaces otherwise than by heating, cooling, humidifying or drying by separation, e.g. by filtering by chemical means
- F24F8/158—Treatment, e.g. purification, of air supplied to human living or working spaces otherwise than by heating, cooling, humidifying or drying by separation, e.g. by filtering by chemical means using active carbon
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F2221/00—Details or features not otherwise provided for
- F24F2221/17—Details or features not otherwise provided for mounted in a wall
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F2221/00—Details or features not otherwise provided for
- F24F2221/34—Heater, e.g. gas burner, electric air heater
Abstract
The present invention discloses a kind of wall-mounted air purification device and its implementation, and the clarifier, which is divided on the closed cabin of left and right thermal regeneration room and air purifying room, to be provided with:Relief valve is installed on the bulkhead of thermal regeneration room to be communicated by through walls with outdoor;Air purifying room lower wall is provided with the air channel for being controlled ON/OFF to be communicated with outdoor by air valve in a manner of through walls;Indoor and outdoor is respectively equipped with the sensor for surveying temperature.Methods described is, will not be to indoor formation secondary pollution during relief valve pressure release;During into desorption, if outside air temperature is more than indoor air temperature, and less than or equal to 65 DEG C, enters outdoor air in cabin, outside air temperature is as initial temperature when being desorbed or is directly desorption temperature;Using timing plus temp measuring method control of sewage disposal time length, it is ensured that blowdown terminates temperature in rear deck and is adapted with indoor temperature;During into holding state, if the time that purification operation adds up reaches more than 80% that setting need to carry out the desorption decontamination time, automatically waken up after holding state 30min and carry out desorption decontamination.
Description
Technical field
The invention belongs to Techniques for Indoor Air Purification field, the wall-mounted air purification device structure of more particularly to hot recycling is set
Meter and its implementation.
Background technology
With the high speed development of Chinese Urbanization, the annual newly-built enormous amount of building, increasing Novel decoration material
And chemical products are applied to interior decoration dress and drilled.It is organic that these new indoor finishing materials often discharge a large amount of volatility
The pollutant such as thing (VOCs) and formaldehyde, causes serious indoor pollution.According to statistics, after finishing, formaldehyde and VOCs in newly constructed house
Content is largely exceeded.
Volatile organic matter (VOCs) and formaldehyde significantly affect comfortable, the healthy and operating efficiency of people.Volatility is organic
Thing causes stimulus to the sense organ to human body, dries human body sensory, stimulates eye mucous membrane, schneiderian membrance, respiratory tract and skin etc.;Make one to produce
The discomfort such as headache, weak, drowsy.The pollutants such as alcohol, aromatic hydrocarbon and aldehydes can produce thorn to mucous membrane and the upper respiratory tract
Swash;Many VOC such as benzene, tetrachloro-ethylene, trichloroethanes, trichloro ethylenes etc. may be related to cancer.
In addition, formaldehyde is typical pollutant in China room.Oneself confirmation formaldehyde of the World Health Organization is carcinogenic and teratogenesis
Material, for one of potential strong mutagen.Long Term Contact low dosage formaldehyde can cause chronic respiratory disease, trigger nasopharynx
Cancer, colon cancer, paramenia etc..Especially, formaldehyde is bigger for children, pregnant woman's harm, can cause the pregnancy syndrome of pregnant woman,
Cause neonatal chromosome disorder, leukaemia so that teenager's memory and intelligence decline etc..
The time life more than 80% in life of people is indoors.Therefore, the pollutants such as indoor VOCs and formaldehyde are carried out
Purify particularly necessary.For this reason, it may be necessary to suitable air purifier is chosen to eliminate harm of these indoor pollutants to human body.
Current indoor purification techniques mainly includes ventilation, absorption, photochemical catalytic oxidation and plasma technology etc..Wherein adsorption material
Material the advantage such as no harmful side product, is most widely used due to relatively low with cost in the market.However, due to sorbing material
Adsorption capacity is limited, and sorbing material will often be taken out by, which needing, is desorbed, and otherwise will be had a strong impact on clean-up effect, and be made adsorption air
The life cycle of clarifier is shorter, and frequently changes sorbing material trouble.When this make it that adsorption cleaning device is difficult to realize longer
Between application.Therefore, this key issue of solution adsorbent saturation in technique is needed badly.
It is well-known:It is the method that skilled person generally uses that heating desorption is used to sorbing material, in order to overcome
The defects of adsorption cleaning device needs frequently to change sorbing material, and the method being desorbed is heated according to sorbing material, currently there are public affairs
Open document and record the new-type adsorption cleaning device integrated with thermal desorption function, as number of patent application is:
201510898501.0 a kind of wall-mounted air purification device and its purification method based on hot recycling, user selects as needed
To indoor purifying or force ventilation, when selection is to indoor purifying function, blowdown after thermal desorption will be carried out in the course of work, will be elected to
Select a good opportunity tool ventilation function when, outdoor fresh air is introduced it is indoor, but the wall-mounted air purification device and its purification method exist it is as follows
Defect:(1) because only that when heating is desorbed (hot recycling mode period), close that to be possible to pressure in closed cabin excessive, and by
In anti-device damage with relief valve be arranged on clarifier closed cabin air purifying room to interior wall on, once therefore relief valve
Pressure release is opened, just the high air of Cabin contamination thing concentration is let out to interior, makes indoor composition secondary pollution, and work as purification of air
Air valve between room and thermal regeneration room is closed and the air valve of outdoor is led in closing shape in thermal regeneration room
When state, i.e. clarifier are in purification pattern, to the electrical heating wire heating control circuit generation high temperature out of control in thermal regeneration room, and
Temperature sensor in thermal regeneration room damages again, in the thermal regeneration room now closed caused pressure be possible to it is excessive and
Device is damaged, because being arranged on air purifying room this moment can not possibly work to relief valve on the wall of interior;(2) because using nothing
Have by indoor/outdoor temperature-difference much, air initial temperature is indoor air temperature in cabin when proceeding by thermal desorption, so working as room
When outer temperature is more than indoor temperature, it is impossible to using outside air temperature as air is initially warm in cabin when proceeding by thermal desorption
Degree, that is, the air of outdoor high temperature can not be introduced when proceeding by thermal desorption in cabin, make air initial temperature and outdoor in cabin high
The air themperature of temperature is consistent, therefore when outdoor temperature is more than indoor temperature, now using at the beginning of air in cabin when proceeding by thermal desorption
Beginning temperature is the method for indoor air temperature, makes not save during desorption;(3) because that is opened under blowdown pattern is provided in air
Air valve at the top of clean room, and the air valve for being provided in air purifying room bottom is closed, therefore be desorbed in purification of air room
Air containing pollutant can not possibly be completely exhausted out, it is also possible to arranged to interior, formed secondary pollution;(4) because opening under fresh air pattern
The air valve of air purifying room bottom is provided in, and closes the air valve being provided at the top of air purifying room, thus it is outdoor new
Wind can not possibly introduce interior after filtering module purification in duct main, but purify straight-through interior without filtering module;Because
Using pure timing blowdown, timing there may be it is long or too short, as winter there may exist the overlong time of timing, summer
The heat that time of timing pass in nacelle is there may exist not dissipate;(6) because thermal desorption needs one or two hour, and use air net
Change device to being set during indoor air purification when reach setting to indoor air purification institute's cumulative time needs desorption time
When, pause is adopted to indoor air purification, carries out desorption blowdown, it is well known that:Typically had in room when being purified to room air
People is present, therefore the people that interior can be influenceed during desorption blowdown is carried out cannot breathe cleaned air.And it is well-known, interior only exists
When purification of air or ventilation, air purifier can be just operated under corresponding pattern, and otherwise, air purifier is in standby shape
State, user is waited to open corresponding modes, i.e. air purifier selects purification in holding state, wait corresponding modes operation, user
Pattern is opened, then into the purification pattern course of work, user selects fresh air pattern to open, then into the fresh air pattern course of work;
When user closes purification pattern and fresh air pattern, air purifier enters holding state.
It is well-known:Indoor air temperature is typically below 40 DEG C, and otherwise people normally can not live indoors.
The content of the invention
The purpose of the present invention is to overcome oneself to have the weak point of technology, proposes a kind of wall-mounted air purification device and in fact
Existing method, will not be to indoor formation secondary pollution when having a 1. pressure release;2. enter the desorption stage moment, if outside air temperature is big
In indoor air temperature, and less than or equal to 65 DEG C, set in cabin and enter outdoor air, using outside air temperature as when being desorbed
Initial temperature or directly as desorption temperature;3. using timing plus temp measuring method control of sewage disposal time length;4. treated entering
During machine state, if the time that purification operation adds up reaches more than 80% that setting need to carry out the desorption decontamination time, it is set into
Air purifier is automatically waken up after holding state 30min and carries out desorption decontamination, and removes the time added up.
In order to realize above-mentioned purpose, the technical scheme is that:
A kind of wall-mounted air purification device, including:Closed cabin, blower fan, the first automatically controlled air valve to the 6th automatically controlled air valve,
Low efficient filter, efficiently renewable VOCs and methyl aldehyde adsorption material, heater, VOCs sensors, the first to the 3rd TEMP
Device, control processor unit, relief valve;Described first to three-temperature sensor, VOCs sensors respectively with control processor
The input of unit is connected;The blower fan, heater, the first automatically controlled air valve to the 6th automatically controlled air valve respectively with control
The output end of reason device unit is connected;The closed cabin is with the left and right thermal regeneration room for being set to be isolated with thermal insulation board and air
Clean room, the thermal insulation board upper and lower end isolated between thermal regeneration room and air purifying room are respectively equipped with air channel, isolate thermal regeneration
Room and air purifying room are communicated by air channel set by thermal insulation board upper and lower end;Be respectively equipped with the upper and lower wall of air purifying room to
Indoor wind leads to;It is provided with the bulkhead of the thermal regeneration room in the position corresponding with thermal insulation board lower end air channel in a manner of through walls
The air channel communicated with outside atmosphere;The first automatically controlled air valve is placed in set to indoor wind on purification of air chamber upper wall
It is logical, the second automatically controlled air valve be placed in it is set on air purifying room lower wall lead to indoor wind, the 3rd automatically controlled air valve be placed in every
The air channel set from the thermal insulation board upper end between thermal regeneration room and air purifying room, the 4th automatically controlled air valve are placed in isolation heating
The air channel that thermal insulation board lower end between regeneration room and air purifying room is set, the 5th automatically controlled air valve are placed in the cabin of thermal regeneration room
The air channel communicated in a manner of through walls with outside atmosphere that the position corresponding with thermal insulation board lower end air channel is set on wall;The heating
Body and the first temperature sensor are from top to bottom sequentially arranged in thermal regeneration room;The low efficient filter, efficiently it is renewable
VOCs and methyl aldehyde adsorption material, blower fan, VOCs sensors are sequentially arranged in purification of air room from the bottom to top, and low efficient filter
Air channel space above between isolation thermal regeneration room and air purifying room set by thermal insulation board lower end, assembling every
From space below the air channel set by thermal insulation board upper end between thermal regeneration room and air purifying room;Described relief valve, which is installed on, to be added
On the bulkhead of hot recycling room, communicated by mode through walls with outside atmosphere;Described second temperature sensor is installed on interior;Institute
The three-temperature sensor stated is installed on outdoor;It is additionally provided with described air purifying room lower wall in a manner of through walls and outside atmosphere
The air channel communicated, the 6th automatically controlled air valve are placed on air purifying room lower wall being communicated in a manner of through walls with outside atmosphere of setting
Air channel.
Above-described three-temperature sensor is installed on outdoor, refers to that three-temperature sensor is installed on air purifying room
On lower wall in the set air channel communicated in a manner of through walls with outside atmosphere, and closely directly contacted with outdoor air.
Above-described first automatically controlled air valve and the second automatically controlled air valve are single automatically controlled open type electromagnetic air valve, the 3rd
Automatically controlled air valve to the 6th automatically controlled air valve is single automatically controlled closed type electromagnetic air valve.
Above-described heater selects PTC heaters, it is ensured that adstante febre will not naked light.
Above-described blower fan is axial flow blower, and during blower fan work, purification of air indoor air flow flows from the bottom to top.
Above-described low efficient filter and efficiently renewable VOCs and methyl aldehyde adsorption material form air-purifying module;Slightly
Imitate conventional products of the filter from convenient installation, such as there is the screen pack of fire resistance fibre, be mainly used in particulate matter, i.e., it is main
It is used to adsorb dust, filters out the dust in air;Efficient renewable VOCs and methyl aldehyde adsorption material are for convenience of the routine installed
A shaped activated carbon be filling adsorption material, for volatile organic matter (VOCs) and formaldehyde absorbing.
Above control processor unit is used to control the first automatically controlled air valve to the 6th automatically controlled air valve ON/OFF, control shaft
The operation and stopping of flow fan, the ON/OFF and temperature adjustment of heater are controlled, and by the first temperature sensor to gas in cabin
Temperature detector is surveyed, and indoor air temperature is detected by second temperature sensor, and outside air temperature is detected by three-temperature sensor, passed through
VOCs sensors in cabin in upper wall outlet air VOCs Concentration Testings;Control processor unit includes MCU (micro-control unit)
Unit, data storage, real-time clock, display, the keyboard for including purification pattern and fresh air mode selecting key and with it is outer
If various input/output interfaces of connection etc., the accumulative timing unit of purification operation is additionally provided with control processor unit and is used for
Desorption and the timing unit of decontamination, control processor unit is according to selection purification pattern or fresh air pattern to automatically controlled air valve, wind
Machine, heater carry out corresponding running status control, and accordingly controlled according to the temperature and timing situation of measurement, pass through VOCs
Sensor send display to show cabin inner outlet air V OCs Concentration Testings.And it is set by the temperature that the first temperature sensor measures
Degree is set to T1, and the temperature measured by second temperature sensor is set to T2, and the temperature measured by three-temperature sensor is set to
T3。
In order to realize above-mentioned purpose, another technical scheme of the invention is:
A kind of implementation method of wall-mounted air purification device, comprises the following steps:
1) temperature for setting control processor unit to be measured by the first temperature sensor is set as T1, passes through second temperature
The temperature that sensor measures is set as T2, and the temperature measured by three-temperature sensor is set as T3, and provided with purification operation
Accumulative timing unit, working method are provided with purification pattern and fresh air pattern, select to set air purifier successively during purification pattern
Circulation work sets air purifier to be operated in outdoor in purification, desorption, blowdown three phases process, selection fresh air pattern
Phase process in Leads to new breeze room;
2) when air purifier is in holding state, setting is standby to reach 30min, reads the accumulative timing of purification operation
Control is identified in the time that unit adds up:
When recognize the time that the accumulative timing unit of purification operation add up be more than or equal to set needed for be desorbed
When decontaminating the 80% of time, automatically wake up air purifier and carry out desorption decontamination, and remove the accumulative timing unit institute of purification operation
The accumulative time, otherwise, keep standby, and retain the time that the accumulative timing unit of ventilation operation adds up,
(2) during the air purifier automatically waken up carries out desorption decontamination, the operation of purification pattern or fresh air pattern is had,
The control processor unit response corresponding modes after automatically waking up and being desorbed decontamination end of run to air purifier are set, it is no
Then, after automatically waking up and being desorbed decontamination end of run to air purifier, holding state is immediately entered.
Air purifier is set during above-described selection purification pattern, and circulation work is being purified, is being desorbed, blowdown three successively
Individual phase process, there are following steps:
1) purification pattern
Control processor unit outputs control signals to the first automatically controlled air valve to the 6th automatically controlled air valve and blower fan, opens
The air channel communicated on the upper and lower wall of air purifying room with interior, it is upper and lower to close thermal insulation board between thermal regeneration room and air purifying room
Air channel set by end, and close on the bulkhead of thermal regeneration room the air channel communicated with outside atmosphere and close and be located at purification of air
The air channel that room lower wall communicates with outside atmosphere, control blower fan operating, purification of air indoor air flow flow from the bottom to top, room air
Got in after being flowed into by air purifying room lower wall to the air channel of interior through filtering with after adsorption treatment from upper wall air channel, and to net
Change the accumulative timing unit of operation and carry out accumulative timing, reach and to carry out when until purifying operation accumulative timing unit institute's cumulative time
During the time being desorbed set by processing, pause purification runs the accumulative timing of accumulative timing unit and simultaneously removes the time added up, enters
Enter purification pattern step 2) desorption stage;
2) desorption stage
Control processor unit outputs control signals to the first automatically controlled air valve to the 6th automatically controlled air valve, heater and wind
Machine, the air channel communicated on the upper and lower wall of air purifying room with interior is closed, open the spaced heat of thermal regeneration room and air purifying room
Air channel set by plate upper end, keep blower fan to open, keep air channel set by thermal insulation board lower end between thermal regeneration room and air purifying room
Close, and keep the air channel that is communicated with outside atmosphere on the bulkhead of thermal regeneration room and located at air purifying room lower wall and room
The air channel that outer air communicates is closed, and is kept heater to close, is passed through second temperature sensor and three-temperature sensor sensing chamber
Inner air and outer air temperature and the indoor air temperature of detection is kept in, and temporary indoor air temperature is set to T2 ', and by second
The indoor air temperature T2 that temperature sensor measures is compared with the outside air temperature T3 that three-temperature sensor measures:
1. T3-T2 is worked as in setting<At 2 DEG C or when T3-T2 >=2 DEG C, and during 65 DEG C of T3 >, holding is located at thermal regeneration room bulkhead
Go up the air channel communicated with outside atmosphere and closed located at the air channel that air purifying room lower wall communicates with outside atmosphere, and be desorbed
Start timing, into step 5.,
2. T3-T2 >=2 DEG C are worked as in setting, and during 55 DEG C≤T3≤65 DEG C, are opened and be located on the bulkhead of thermal regeneration room and outdoor
The air channel and be desorbed located at the air channel that air purifying room lower wall communicates with outside atmosphere, setting after 10 seconds that air communicates
Start timing, and air themperature in cabin is continued to monitor and by three-temperature sensor pair by the first temperature sensor
Outside air temperature is continued to monitor in real time:
Set the T3 to be monitored measured to three-temperature sensor continue 5 seconds be less than 55 DEG C or continue 5 seconds be more than 65 DEG C when,
Into step 4., otherwise, when desorption timing time reaches and completes to be desorbed the setting time needed for processing, into purification pattern step
Rapid 3) the blowdown stage,
3. T3-T2 >=2 DEG C, and T3 are worked as in setting<At 55 DEG C, open and communicated on the bulkhead of thermal regeneration room with outside atmosphere
Air channel and located at the air channel that air purifying room lower wall communicates with outside atmosphere, set after 10 seconds, pass through the first TEMP
Device is continued to monitor to air themperature in cabin and outside air temperature is continued to monitor by three-temperature sensor, and
Continue to carry out in cabin temperature T1 in real time compared with outdoor temperature T3:
When setting absolute value≤0.5 DEG C to be monitored to T1 and T3 differences, carry out desorption and start timing, into step 4.,
Otherwise, it is to be monitored to continue to be not more than equal to temporary for 5 seconds to T3 by the T3 continued to monitor compared with temporary indoor air temperature T2 '
During 2 DEG C of the indoor air temperature T2 ' deposited, or when monitoring that T3 continues 5 seconds and is more than 65 DEG C, carry out desorption and start timing, into step
Suddenly 4.,
4. close on the bulkhead of thermal regeneration room the air channel communicated with outside atmosphere and located at air purifying room lower wall with
The air channel that outside atmosphere communicates, into step 5.,
5. opening air channel set by thermal insulation board lower end between thermal regeneration room and air purifying room and opening heater heating, lead to
Cross the first temperature sensor to continue to monitor air themperature in cabin, air is heated by heater in cabin, air in control cabinet
Temperature maintains setting value, and the air after heating passes through sorbing material, promotes in efficiently renewable VOCs and methyl aldehyde adsorption material
The VOCs and the desorption of formaldehyde adsorbed, when desorption timing time reaches and completes to be desorbed the setting time needed for processing, entrance
Purification pattern step 3) the blowdown stage;
3) the blowdown stage
Control processor unit is by control signal to the first automatically controlled air valve to the 6th automatically controlled air valve, heater and wind
Machine is controlled as follows:
The heater opened is closed, open and close is located on the bulkhead of thermal regeneration room the air channel communicated with outside atmosphere,
The air channel for being located at air purifying room lower wall and being communicated with outside atmosphere opened is closed, thermal regeneration room and the air for closing unlatching are net
Air channel set by thermal insulation board lower end between change room, opens the air channel communicated on air purifying room lower wall with interior, keeps thermal regeneration
Air channel set by thermal insulation board upper end is opened between room and air purifying room, is kept set air channel on purification of air chamber upper wall to close, is protected
Hold blower fan unlatching, that is, keep purification of air indoor air flow flow from the bottom to top, in purification of air room the dirty heated regeneration room of gas and
Air channel set by thermal insulation board upper end is to set air channel is communicated with outside atmosphere on the bulkhead of thermal regeneration room between air purifying room, arrange to
Outdoor, room air by the lower wall of the purified room of air it is set with indoor phase ventilating duct to the purified indoor supplement of air,
Setting is after after the blowdown stage, the blower fan duration of runs reaches 20min, and control processor unit is by the first temperature sensor in cabin
Air themperature is continued to monitor, and indoor air temperature is continued to monitor by second temperature sensor, and warm by first
Compared with air themperature T1 is carried out in real time with the indoor air temperature T2 that second temperature sensor measures in the cabin that degree sensor measures:
Purification pattern step 1) cleansing phase is returned to during absolute value≤1 DEG C to be monitored to T1 and T2 differences.
Set air purifier to be operated in ventilating stage process during above-described selection fresh air pattern, there is following control
System:
Control processor unit is carried out by control signal to the first automatically controlled air valve to the 6th automatically controlled air valve and blower fan
Control, closing air purifying room lower wall, up to set by interior air channel, closes thermal insulation board between thermal regeneration room and air purifying room
Air channel set by upper and lower end, closes on the bulkhead of thermal regeneration room the air channel communicated with outside atmosphere, and unlatching is located at purification of air
The air channel that room lower wall communicates with outside atmosphere, set air channel on purification of air chamber upper wall is opened, open blower fan operating, purification of air
Indoor air flow flows from the bottom to top, and outdoor air after being flowed into located at the air channel that air purifying room lower wall communicates with outside atmosphere by passing through
Got in after filtering and adsorption treatment from purification of air chamber upper wall upper air duct.
The above-described air purifier that automatically wakes up carries out desorption decontamination, has following steps:
1) it is desorbed
Control processor unit outputs control signals to the first automatically controlled air valve to the 6th automatically controlled air valve, heater and wind
Machine, the air channel communicated on the upper and lower wall of air purifying room with interior is closed, open the spaced heat of thermal regeneration room and air purifying room
Air channel set by plate upper end, blower fan is opened, keeps air channel set by thermal insulation board lower end between thermal regeneration room and air purifying room to close,
And keep the air channel that is communicated with outside atmosphere on the bulkhead of thermal regeneration room and big located at air purifying room lower wall and outdoor
The logical air channel of gas phase is closed, and keeps heater to close, inside and outside second temperature sensor and three-temperature sensor sensing chamber
Air themperature and the indoor air temperature of detection is kept in, and temporary indoor air temperature is set to T2 ', and by second temperature
The indoor air temperature T2 that sensor measures is compared with the outside air temperature T3 that three-temperature sensor measures:
1. T3-T2 is worked as in setting<At 2 DEG C or when T3-T2 >=2 DEG C, and during 65 DEG C of T3 >, holding is located at thermal regeneration room bulkhead
Go up the air channel communicated with outside atmosphere and closed located at the air channel that air purifying room lower wall communicates with outside atmosphere, and be desorbed
Start timing, into step 5.,
2. T3-T2 >=2 DEG C are worked as in setting, and during 55 DEG C≤T3≤65 DEG C, are opened and be located on the bulkhead of thermal regeneration room and outdoor
The air channel and be desorbed located at the air channel that air purifying room lower wall communicates with outside atmosphere, setting after 10 seconds that air communicates
Start timing, and air themperature in cabin is continued to monitor and by three-temperature sensor pair by the first temperature sensor
Outside air temperature is continued to monitor in real time:
Set the T3 to be monitored measured to three-temperature sensor continue 5 seconds be less than 55 DEG C or continue 5 seconds be more than 65 DEG C when,
Into step 4., otherwise, when desorption timing time reaches and completes to be desorbed the setting time needed for processing, into step 2) row
Dirt,
3. T3-T2 >=2 DEG C, and T3 are worked as in setting<At 55 DEG C, open and communicated on the bulkhead of thermal regeneration room with outside atmosphere
Air channel and located at the air channel that air purifying room lower wall communicates with outside atmosphere, set after 10 seconds, pass through the first TEMP
Device is continued to monitor to air themperature in cabin and outside air temperature is continued to monitor by three-temperature sensor, and
Continue to carry out in cabin temperature T1 in real time compared with outdoor temperature T3:
When setting absolute value≤0.5 DEG C to be monitored to T1 and T3 differences, carry out desorption and start timing, into step 4.,
Otherwise, it is to be monitored to continue to be not more than equal to temporary for 5 seconds to T3 by the T3 continued to monitor compared with temporary indoor air temperature T2 '
During 2 DEG C of the indoor air temperature T2 ' deposited, or when monitoring that T3 continues 5 seconds and is more than 65 DEG C, carry out desorption and start timing, into step
Suddenly 4.,
4. close on the bulkhead of thermal regeneration room the air channel communicated with outside atmosphere and located at air purifying room lower wall with
The air channel that outside atmosphere communicates, into step 5.,
5. opening air channel set by thermal insulation board lower end between thermal regeneration room and air purifying room and opening heater heating, lead to
Cross the first temperature sensor to continue to monitor air themperature in cabin, air is heated by heater in cabin, air in control cabinet
Temperature maintains setting value, and the air after heating passes through sorbing material, promotes in efficiently renewable VOCs and methyl aldehyde adsorption material
The VOCs and the desorption of formaldehyde adsorbed, when desorption timing time reaches and completes to be desorbed the setting time needed for processing, entrance
Step 2) blowdown;
2) blowdown
Control processor unit is by control signal to the first automatically controlled air valve to the 6th automatically controlled air valve, heater and wind
Machine is controlled as follows:
(1) the heater of unlatching, the wind communicated on the bulkhead of thermal regeneration room with outside atmosphere of open and close are closed
Road, the air channel for being located at air purifying room lower wall and being communicated with outside atmosphere of unlatching is closed, close thermal regeneration room and the sky of unlatching
Air channel set by thermal insulation board lower end between gas clean room, the air channel communicated on air purifying room lower wall with interior is opened, keep heating
Air channel set by thermal insulation board upper end is opened between regeneration room and air purifying room, keeps set air channel on purification of air chamber upper wall to close
Close, keep blower fan to open, that is, keep purification of air indoor air flow to flow from the bottom to top, the dirty heated regeneration of gas in purification of air room
Air channel set by thermal insulation board upper end is to communicating set air channel with outside atmosphere on the bulkhead of thermal regeneration room between room and air purifying room,
Arrange to outdoor, room air by the lower wall of the purified room of air it is set with indoor phase ventilating duct to the purified indoor benefit of air
Fill, into next step (2),
(2) treat that the blower fan duration of runs reaches 20min in being set in step (1), control processor unit is passed by the first temperature
Sensor is continued to monitor to air themperature in cabin, and indoor air temperature is continued to monitor by second temperature sensor,
And the indoor air temperature T2 that air themperature T1 measures with second temperature sensor in the cabin for measuring the first temperature sensor enters
Row compares in real time:Enter next step 3 during absolute value≤1 DEG C to be monitored to T1 and T2 differences);
3) when during the air purifier automatically waken up is desorbed and decontaminated, having recognized purification pattern or fresh air mould
During the operation of formula, the corresponding modes to be monitored to response operation during absolute value≤1 DEG C of temperature in cabin and indoor temperature difference are no
Then, holding state is entered during absolute value≤1 DEG C to be monitored to temperature in cabin and indoor temperature difference.
Beneficial effect:
The present invention will not be to indoor formation secondary pollution when realizing 1. pressure release;2. enter desorption, if outdoor air temperature
Degree is more than indoor air temperature, and less than or equal to 65 DEG C, outdoor air is entered in cabin, using outside air temperature as when being desorbed
Initial temperature or directly as desorption temperature, energy-conservation;3. using timing plus temp measuring method control of sewage disposal time length, it is ensured that
Blowdown terminates temperature in rear deck and is adapted with indoor temperature;4. when entering holding state, if the time that purification operation adds up
Reach setting need to carry out the desorption decontamination time more than 80%, purification of air is automatically waken up after being set into holding state 30min
Device carries out desorption decontamination, and removes the time added up.Simple in construction, easy to operate, safety and stability of the invention, there is provided a kind of
The permanently effective mode to purify the air of a room.
Brief description of the drawings
Fig. 1 is a kind of apparatus structure schematic diagram of wall-mounted air purification device of the present invention;
Fig. 2 is desorption process FB(flow block) in a kind of implementation method of wall-mounted air purification device of the present invention;
In figure:1. closed cabin, 2. blower fans, 3,4,5,6,7,17. first automatically controlled air valves are thick to the 6th automatically controlled air valve, 8.
Effect filter, 9. efficient renewable VOCs and methyl aldehyde adsorption material, 10. heaters, 11.VOCs sensors, 12,16,18. first
Temperature sensor is to three-temperature sensor, 13. control processor units, 14. relief valves, 15. walls, a. thermal regenerations room,
B. air purifying room.
Embodiment
As shown in figure 1, a kind of wall-mounted air purification device, including:Closed cabin 1, blower fan 2, the first automatically controlled air valve 3,
Two automatically controlled air valves 4, the 3rd automatically controlled air valve 5, the 4th automatically controlled air valve 6, the 5th automatically controlled air valve 7, the 6th automatically controlled air valve
17th, low efficient filter 8, efficiently renewable VOCs and methyl aldehyde adsorption material 9, heater 10, VOCs sensors 11, the first temperature biography
Sensor 12, second temperature sensor 16, three-temperature sensor 18, control processor unit 13, relief valve 14;First temperature
Spend sensor 12, second temperature sensor 16, three-temperature sensor 18 and VOCs sensors 11 respectively with control processor list
The input of member 13 is connected;The first automatically controlled air valve 3, the second automatically controlled air valve 4, the 3rd automatically controlled electricity of air valve the 5, the 4th
Control air valve 6, the 5th automatically controlled air valve 7, the 6th automatically controlled air valve 17, blower fan 2 and heater 10 respectively with control processor list
The output end of member 13 is connected;The closed cabin 1 is net with the left and right thermal regeneration room a and air for being set to be isolated with thermal insulation board
Change room b, the thermal insulation board upper and lower end between isolation thermal regeneration room a and air purifying room b is respectively equipped with air channel, and isolation heating is again
Raw room a and air purifying room b is communicated by air channel set by thermal insulation board upper and lower end;On the upper and lower walls of air purifying room b respectively
Lead to provided with the wind to interior;On the bulkhead of the thermal regeneration room a the position corresponding with thermal insulation board lower end air channel be provided with
The air channel that mode through walls is communicated by wall 15 (external wall) with outside atmosphere;It is net that the first automatically controlled air valve 3 is placed in air
Change the set wind to interior on the b upper walls of room to lead to, the first automatically controlled air valve 3 controls set to indoor on air purifying room b upper walls
Wind lead to ON/OFF;The second automatically controlled air valve 4 is placed in the set wind to interior on air purifying room b lower walls and led to, the second electricity
Controlling air valve 4 controls the set wind to interior on air purifying room b lower walls to lead to ON/OFF;The 3rd automatically controlled air valve 5 be placed in every
The air channel set from the thermal insulation board upper end between thermal regeneration room a and air purifying room b, the 3rd automatically controlled control of air valve 5 isolation
Air channel ON/OFF between thermal regeneration room a and air purifying room b set by thermal insulation board upper end;The 4th automatically controlled air valve 6 is placed in
The air channel that the thermal insulation board lower end isolated between thermal regeneration room a and air purifying room b is set, the 4th automatically controlled air valve 6 control every
From the air channel ON/OFF set by thermal insulation board lower end between thermal regeneration room a and air purifying room b;The 5th automatically controlled air valve 7 is put
In the position corresponding with thermal insulation board lower end air channel on thermal regeneration room a bulkhead set in a manner of through walls with outside atmosphere phase
Logical air channel, the 5th automatically controlled air valve 7 control position corresponding with thermal insulation board lower end air channel on thermal regeneration room a bulkhead to set
The air channel ON/OFF communicated in a manner of through walls with outside atmosphere put;The temperature sensor 12 of heater 10 and first is by up to
Under be sequentially arranged in a of thermal regeneration room;The low efficient filter 8, efficiently renewable VOCs and methyl aldehyde adsorption material 9, blower fan
2nd, VOCs sensors 11 are sequentially arranged in air purifying room b from the bottom to top, and low efficient filter 8 is arranged on isolation thermal regeneration
Air channel space above between room a and air purifying room b set by thermal insulation board lower end, blower fan 2 be arranged on isolation thermal regeneration room a and
Space below air channel between air purifying room b set by thermal insulation board upper end;Described relief valve 14 is installed on thermal regeneration room a's
On bulkhead, air channel is set to be communicated with outside atmosphere by wall 15 (external wall) in a manner of through walls;Described second temperature sensing
Device 16 is installed on interior, for measuring indoor air temperature;Described three-temperature sensor 18 is installed on outdoor, for measuring chamber outside
Temperature;It is additionally provided with described air purifying room b lower walls and is communicated in a manner of through walls by wall 15 (external wall) with outside atmosphere
Air channel, the 6th automatically controlled air valve 17 is placed on air purifying room b lower walls being communicated in a manner of through walls with outside atmosphere of setting
Air channel, the 6th automatically controlled air valve 17 control the wind communicated in a manner of through walls with outside atmosphere set on air purifying room b lower walls
Road ON/OFF.
Above-described three-temperature sensor 18 is installed on outdoor, and it is net to refer to that three-temperature sensor 18 is installed on air
Change in the air channel communicated in a manner of through walls with outside atmosphere set on the b lower walls of room, and closely directly contacted with outdoor air,
For measuring the air channel and the outdoor outside air temperature for communicating place, that is, be used to measuring set on air purifying room b lower walls with through walls
Temperature of the air channel that mode communicates with outside atmosphere in outdoor port.
The set air channel communicated in a manner of through walls with outside atmosphere on above-described air purifying room b lower walls, with institute
Set on the thermal regeneration room a stated bulkhead in a manner of through walls in the position corresponding with thermal insulation board lower end air channel and outside atmosphere
The air channel communicated, certain distance must be kept when through wall 15 (external wall), prevent extraneous air in disengaging air purifier
When short circuit.
The relief valve 14 is automatic decompression valve, for maintaining pressure stability in cabin, that is, is used for when pressure is excessive in cabin
Releasing pressure automatically, so as to ensure that pressure is in safe range in cabin, in order to avoid the excessive damage device of pressure in cabin;Relief valve 14 is arranged on
On thermal regeneration room a bulkhead, by being connected through wall 15 with outside atmosphere, both realize that thermal runaway causes pressure mistake in cabin
When big relief valve 14 can releasing pressure automatically, it is outdoor big to ensure that the high air of the Cabin contamination thing concentration that relief valve 14 is released leads to again
Gas, i.e., will not be to indoor composition secondary pollution when relief valve 14 is released.
The first automatically controlled air valve 3, the second automatically controlled air valve 4, the 3rd automatically controlled air valve 5, the 4th automatically controlled air valve 6,
5th automatically controlled 7 and the 6th automatically controlled air valve 17 of air valve is two-way air valve, the first automatically controlled air valve 3, the second automatically controlled air valve
4th, the ON/OFF control of the 3rd automatically controlled air valve 5, the 4th automatically controlled air valve 6, the 5th automatically controlled 7 and the 6th automatically controlled air valve 17 of air valve
End processed is connected with the output end of control processor unit 13 respectively, and control processor unit 13 is according to condition to corresponding automatically controlled sky
Air valve exports corresponding control signal, realizes ON/OFF, and air valve is opened when opening, and air valve is closed during pass, so as to realize automatically controlled air
The controlled corresponding air channel of valve ON/OFF;The first automatically controlled 3 and second automatically controlled air valve 4 of air valve is from single automatically controlled normally opened in the present invention
Type electromagnetic air valve, the 3rd automatically controlled air valve 5, the 4th automatically controlled air valve 6, the 5th automatically controlled 7 and the 6th automatically controlled air valve of air valve
17 from single automatically controlled closed type electromagnetic air valve.
First temperature sensor 12 is used to detect temperature in closed cabin 1, and the first temperature sensor 12 is installed on heating
In regeneration room a spaces, the thermal insulation board lower end air channel isolated between thermal regeneration room a and air purifying room b is arranged on, to heating again
Pass through wall 15 (external wall) in a manner of through walls what the position corresponding with thermal insulation board lower end air channel was set on raw room a bulkhead
Between the air channel communicated with outside atmosphere.Temperature in the closed cabin 1 measured when thermal regeneration room a and air purifying room b are communicated
Represent temperature in air purifying room b;
The second temperature sensor 16 is used for the indoor temperature for detecting room, and second temperature sensor 16 is installed on should
The device interior to be purified.
First temperature sensor 12, second temperature sensor 16 and three-temperature sensor 18 pass the signal of collection respectively
It is handed to control processor unit 13 and carries out processing control.
The low efficient filter 8 and efficiently renewable VOCs and methyl aldehyde adsorption material 9 form air-purifying module;Slightly imitated
Filter 8 selects the conventional products of convenient installation, such as has the screen pack of fire resistance fibre, is mainly used in particulate matter, i.e., mainly
For adsorbing dust, the dust in air is filtered out;Efficient renewable VOCs and methyl aldehyde adsorption material 9 are conventional for convenience of what is installed
Shaped activated carbon is filling adsorption material, for volatile organic matter (VOCs) and formaldehyde absorbing.
The closed cabin 1 hangs (fixation) on wall 15 (exterior wall) inwall, and closed cabin 1 uses stainless steel environmental chamber,
Bulkhead is double-decker, and heat preserving and insulating material is filled between two layers of bulkhead;Closed cabin 1 is arranged to left and right two locellus, that is, sets
For thermal regeneration room a and air purifying room b two parts, thermal regeneration room a is used for heat and produced, and it is net that air purifying room b is used for air
Change;Isolated between thermal regeneration room a and air purifying room b two parts by the thermal insulation board filled with heat-barrier material, heated
The upper and lower end of thermal insulation board is equipped with air channel respectively between regeneration room a and air purifying room b two parts, makes thermal regeneration room a and sky
Gas clean room b is connected;Air channel ON/OFF set by thermal insulation board upper end is controlled by the 3rd automatically controlled air valve 5, wind set by thermal insulation board lower end
Road ON/OFF is controlled by the 4th automatically controlled air valve 6;It is equipped with air purifying room b upper wall and is controlled by the first automatically controlled air valve 3
The air channel communicated with room air of ON/OFF;Be equipped with air purifying room b lower wall opened by the second automatically controlled air valve 4 control/
The air channel communicated with room air closed;Also be equipped with air purifying room b lower wall opened by the 6th automatically controlled air valve 17 control/
The air channel led to outer space gas phase closed.The upper end air channel of thermal insulation board is all disposed within blower fan 2 with air purifying room b upper wall air channel
Upper part space;The lower end air channel of thermal insulation board is all disposed within the bottom of air-purifying module with air purifying room b lower wall air channel
Space.
The closed cabin 1 hung on the wall 15 of interior, sets and is provided with by the 5th on thermal regeneration room a bulkhead
The air channel communicated through wall 15 and the external world of the automatically controlled control of air valve 7 ON/OFF, and set by a bulkheads of thermal regeneration room
ON/OFF is controlled to be passed through wall 15 and the extraneous air channel position communicated by the 5th automatically controlled air valve 7, with thermal regeneration room a and sky
The air channel position that thermal insulation board lower end is laid between gas clean room b two parts is corresponding, i.e., in same level.
The heater 10 is used to provide heat energy needed for desorption during hot recycling, ON/OFF control terminal and the control of heater 10
The output end of processor unit 13 is connected, and control processor unit 13 outputs control signals to heater 10, controls heater
10 ON/OFF and temperature adjustment;Heater 10 is added from PTC heaters (ptc heater) from PTC types ceramics in the present invention
Hot device, it is ensured that adstante febre will not naked light.For making air themperature in cabin maintain 60 ± 5 DEG C in desorption.
The temperature sensor 12 of heater 10 and first is from top to bottom sequentially arranged in thermal regeneration room a space,
And heater 10 is fixed on the upper and lower end laying of thermal insulation board between thermal regeneration room a and air purifying room b two parts by support
Air channel partition on.
The blower fan 2 is axial flow blower, is fixed on the duct main of closed cabin 1.At the control terminal of blower fan 2 and control
The output of reason device unit 13 is connected.When control of the air-blower control signal to blower fan 2 is opened in the output of control processor unit 13
During end, blower fan 2 operates (work), i.e., wind direction flows (suction) from bottom to top;When wind is closed in the output of control processor unit 13
Machine control signal to blower fan 2 control terminal when, blower fan 2 is closed and (is stopped), i.e., blower fan 2 shuts down.
The VOCs sensors 11 are installed in air purifying room b to upper wall ducting outlet, for measuring air purifying room b
The VOCs concentration of upper wall ducting outlet air, is transferred to control processor unit 13 by the signal of collection and carries out processing and show.
The low efficient filter 8, efficiently renewable VOCs and methyl aldehyde adsorption material 9, blower fan 2, VOCs sensors 11 are under
In the supreme air purifying room b for being sequentially arranged at closed cabin 1 space, and low efficient filter 8 is set to be arranged on thermal regeneration room a
The air channel position space above that thermal insulation board lower end is laid between air purifying room b two parts, makes blower fan 2 be arranged on thermal regeneration
Space below the air channel position that thermal insulation board upper end is laid between room a and air purifying room b two parts.
The control processor unit 13 is used for the ON/OFF for controlling the first automatically controlled air valve to the 6th automatically controlled air valve, control
The operation and stopping of axial flow blower 2 processed, control the ON/OFF and temperature adjustment of heater 10, and pass through the first temperature sensor
Temperature detects in 12 pairs of cabins, indoor air temperature is detected by second temperature sensor 16, by three-temperature sensor 18 to room
Outer gas temperature detector survey, by VOCs sensors 11 in cabin in upper wall outlet air VOCs Concentration Testings;Control processor unit 13
Including MCU (micro-control unit) unit, data storage, real-time clock, display, include purification pattern and fresh air pattern choosing
Select the keyboard of key and the various input/output interfaces that are connected with peripheral hardware etc., purification fortune is additionally provided with control processor unit 13
The accumulative timing unit of row and the timing unit for being desorbed and decontaminating, control processor unit 13 according to the purification pattern of selection or
Fresh air pattern carries out corresponding running status control to the first automatically controlled air valve to the 6th automatically controlled air valve, blower fan 2,10 bodies of heating,
And accordingly controlled according to the temperature and timing situation of measurement, cabin inner outlet air V OCs concentration is examined by VOCs sensors
Survey send display to show.Control processor unit 13 installs the place for being easy to human users close to closed cabin 1 indoors;And set
The temperature measured by the first temperature sensor is set to T1, and the temperature measured by second temperature sensor is set to T2, passes through
The temperature that three-temperature sensor measures is set to T3.
Air purifier is selected to be worked under purification pattern or fresh air pattern by the upper keyboard of control processor unit 13, when
Air purifier is set during selection purification pattern, and circulation work is being purified, is being desorbed, blowdown three phases process successively;When selection is new
Set air purifier to be operated in during wind pattern and outdoor fresh air is introduced to indoor phase process.
After air purifier is closed, setting 10min control processor units 13 do not recognize keyboard operation, then enter
Holding state.
Accumulative timing when the accumulative timing unit of purification operation is used for indoor air purification, and set whenever purification is transported
When the accumulative timing of the accumulative timing unit of row reaches 300h, desorption is carried out once to air-purifying module and is decontaminated;That is when
The accumulative timing of the accumulative timing unit of purification operation reach needed for when carrying out the desorption decontamination time, one is carried out to air-purifying module
Secondary desorption decontamination, and the desorption decontamination time is carried out needed for this and is set as 300h.
When air purifier is desorbed, time 120min required for the completion desorption processing of setting, and set desorption
Temperature should maintain 60 ± 5 DEG C in cabin during processing.
A kind of implementation method of wall-mounted air purification device of the present invention, comprises the following steps:
1) temperature for setting control processor unit to be measured by the first temperature sensor is set as T1, passes through second temperature
The temperature that sensor measures is set as T2, and the temperature measured by three-temperature sensor is set as T3, and provided with purification operation
Accumulative timing unit, working method are provided with purification pattern and fresh air pattern, select to set air purifier successively during purification pattern
Circulation work sets air purifier to be operated in outdoor in purification, desorption, blowdown three phases process, selection fresh air pattern
Phase process in Leads to new breeze room;
2) when air purifier is in holding state, setting is standby to reach 30min, reads the accumulative timing of purification operation
Control is identified in the time that unit adds up:
When recognize the time that the accumulative timing unit of purification operation add up be more than or equal to set needed for be desorbed
When decontaminating the 80% of time, automatically wake up air purifier and carry out desorption decontamination, and remove the accumulative timing unit institute of purification operation
The accumulative time, otherwise, keep standby, and retain the time that the accumulative timing unit of ventilation operation adds up,
(2) during the air purifier automatically waken up carries out desorption decontamination, the operation of purification pattern or fresh air pattern is had,
The control processor unit response corresponding modes after automatically waking up and being desorbed decontamination end of run to air purifier are set, it is no
Then, after automatically waking up and being desorbed decontamination end of run to air purifier, holding state is immediately entered.
Air purifier is set during above-described selection purification pattern, and circulation work is being purified, is being desorbed, blowdown three successively
Individual phase process, there are following steps:
1) purification pattern
Control processor unit outputs control signals to the first automatically controlled air valve to the 6th automatically controlled air valve and blower fan, opens
The air channel communicated on the upper and lower wall of air purifying room with interior, it is upper and lower to close thermal insulation board between thermal regeneration room and air purifying room
Air channel set by end, and close on the bulkhead of thermal regeneration room the air channel communicated with outside atmosphere and close and be located at purification of air
The air channel that room lower wall communicates with outside atmosphere, control blower fan operating, purification of air indoor air flow flow from the bottom to top, room air
Got in after being flowed into by air purifying room lower wall to the air channel of interior through filtering with after adsorption treatment from upper wall air channel, and to net
Change the accumulative timing unit of operation and carry out accumulative timing, reach and to carry out when until purifying operation accumulative timing unit institute's cumulative time
During the time being desorbed set by processing, pause purification runs the accumulative timing of accumulative timing unit and simultaneously removes the time added up, enters
Enter purification pattern step 2) desorption stage;
2) desorption stage, as shown in Figure 2
Control processor unit outputs control signals to the first automatically controlled air valve to the 6th automatically controlled air valve, heater and wind
Machine, the air channel communicated on the upper and lower wall of air purifying room with interior is closed, open the spaced heat of thermal regeneration room and air purifying room
Air channel set by plate upper end, keep blower fan to open, keep air channel set by thermal insulation board lower end between thermal regeneration room and air purifying room
Close, and keep the air channel that is communicated with outside atmosphere on the bulkhead of thermal regeneration room and located at air purifying room lower wall and room
The air channel that outer air communicates is closed, and is kept heater to close, is passed through second temperature sensor and three-temperature sensor sensing chamber
Inner air and outer air temperature and the indoor air temperature of detection is kept in, and temporary indoor air temperature is set to T2 ', and by second
The indoor air temperature T2 that temperature sensor measures is compared with the outside air temperature T3 that three-temperature sensor measures:
1. T3-T2 is worked as in setting<At 2 DEG C or when T3-T2 >=2 DEG C, and during 65 DEG C of T3 >, holding is located at thermal regeneration room bulkhead
Go up the air channel communicated with outside atmosphere and closed located at the air channel that air purifying room lower wall communicates with outside atmosphere, and be desorbed
Start timing, into step 5.,
2. T3-T2 >=2 DEG C are worked as in setting, and during 55 DEG C≤T3≤65 DEG C, are opened and be located on the bulkhead of thermal regeneration room and outdoor
The air channel and be desorbed located at the air channel that air purifying room lower wall communicates with outside atmosphere, setting after 10 seconds that air communicates
Start timing, and air themperature in cabin is continued to monitor and by three-temperature sensor pair by the first temperature sensor
Outside air temperature is continued to monitor in real time:
Set the T3 to be monitored measured to three-temperature sensor continue 5 seconds be less than 55 DEG C or continue 5 seconds be more than 65 DEG C when,
Into step 4., otherwise, when desorption timing time reaches and completes to be desorbed the setting time needed for processing, into purification pattern step
Rapid 3) the blowdown stage,
3. T3-T2 >=2 DEG C, and T3 are worked as in setting<At 55 DEG C, open and communicated on the bulkhead of thermal regeneration room with outside atmosphere
Air channel and located at the air channel that air purifying room lower wall communicates with outside atmosphere, set after 10 seconds, pass through the first TEMP
Device is continued to monitor to air themperature in cabin and outside air temperature is continued to monitor by three-temperature sensor, and
Continue to carry out in cabin temperature T1 in real time compared with outdoor temperature T3:
When setting absolute value≤0.5 DEG C to be monitored to T1 and T3 differences, carry out desorption and start timing, into step 4.,
Otherwise, it is to be monitored to continue to be not more than equal to temporary for 5 seconds to T3 by the T3 continued to monitor compared with temporary indoor air temperature T2 '
During 2 DEG C of the indoor air temperature T2 ' deposited, or when monitoring that T3 continues 5 seconds and is more than 65 DEG C, carry out desorption and start timing, into step
Suddenly 4.,
4. close on the bulkhead of thermal regeneration room the air channel communicated with outside atmosphere and located at air purifying room lower wall with
The air channel that outside atmosphere communicates, into step 5.,
5. opening air channel set by thermal insulation board lower end between thermal regeneration room and air purifying room and opening heater heating, lead to
Cross the first temperature sensor to continue to monitor air themperature in cabin, air is heated by heater in cabin, air in control cabinet
Temperature maintains setting value, and the air after heating passes through sorbing material, promotes in efficiently renewable VOCs and methyl aldehyde adsorption material
The VOCs and the desorption of formaldehyde adsorbed, when desorption timing time reaches and completes to be desorbed the setting time needed for processing, entrance
Purification pattern step 3) the blowdown stage;
3) the blowdown stage
Control processor unit is by control signal to the first automatically controlled air valve to the 6th automatically controlled air valve, heater and wind
Machine is controlled as follows:
The heater opened is closed, open and close is located on the bulkhead of thermal regeneration room the air channel communicated with outside atmosphere,
The air channel for being located at air purifying room lower wall and being communicated with outside atmosphere opened is closed, thermal regeneration room and the air for closing unlatching are net
Air channel set by thermal insulation board lower end between change room, opens the air channel communicated on air purifying room lower wall with interior, keeps thermal regeneration
Air channel set by thermal insulation board upper end is opened between room and air purifying room, is kept set air channel on purification of air chamber upper wall to close, is protected
Hold blower fan unlatching, that is, keep purification of air indoor air flow flow from the bottom to top, in purification of air room the dirty heated regeneration room of gas and
Air channel set by thermal insulation board upper end is to set air channel is communicated with outside atmosphere on the bulkhead of thermal regeneration room between air purifying room, arrange to
Outdoor, room air by the lower wall of the purified room of air it is set with indoor phase ventilating duct to the purified indoor supplement of air,
Setting is after after the blowdown stage, the blower fan duration of runs reaches 20min, and control processor unit is by the first temperature sensor in cabin
Air themperature is continued to monitor, and indoor air temperature is continued to monitor by second temperature sensor, and warm by first
Compared with air themperature T1 is carried out in real time with the indoor air temperature T2 that second temperature sensor measures in the cabin that degree sensor measures:
Purification pattern step 1) cleansing phase is returned to during absolute value≤1 DEG C to be monitored to T1 and T2 differences.
Set air purifier to be operated in ventilating stage process during above-described selection fresh air pattern, there is following control
System:
Control processor unit is carried out by control signal to the first automatically controlled air valve to the 6th automatically controlled air valve and blower fan
Control, closing air purifying room lower wall, up to set by interior air channel, closes thermal insulation board between thermal regeneration room and air purifying room
Air channel set by upper and lower end, closes on the bulkhead of thermal regeneration room the air channel communicated with outside atmosphere, and unlatching is located at purification of air
The air channel that room lower wall communicates with outside atmosphere, set air channel on purification of air chamber upper wall is opened, open blower fan operating, purification of air
Indoor air flow flows from the bottom to top, and outdoor air after being flowed into located at the air channel that air purifying room lower wall communicates with outside atmosphere by passing through
Got in after filtering and adsorption treatment from purification of air chamber upper wall upper air duct.
The above-described air purifier that automatically wakes up carries out desorption decontamination, has following steps:
1) it is desorbed
Control processor unit outputs control signals to the first automatically controlled air valve to the 6th automatically controlled air valve, heater and wind
Machine, the air channel communicated on the upper and lower wall of air purifying room with interior is closed, open the spaced heat of thermal regeneration room and air purifying room
Air channel set by plate upper end, blower fan is opened, keeps air channel set by thermal insulation board lower end between thermal regeneration room and air purifying room to close,
And keep the air channel that is communicated with outside atmosphere on the bulkhead of thermal regeneration room and big located at air purifying room lower wall and outdoor
The logical air channel of gas phase is closed, and keeps heater to close, inside and outside second temperature sensor and three-temperature sensor sensing chamber
Air themperature and the indoor air temperature of detection is kept in, and temporary indoor air temperature is set to T2 ', and by second temperature
The indoor air temperature T2 that sensor measures is compared with the outside air temperature T3 that three-temperature sensor measures:
1. T3-T2 is worked as in setting<At 2 DEG C or when T3-T2 >=2 DEG C, and during 65 DEG C of T3 >, holding is located at thermal regeneration room bulkhead
Go up the air channel communicated with outside atmosphere and closed located at the air channel that air purifying room lower wall communicates with outside atmosphere, and be desorbed
Start timing, into step 5.,
2. T3-T2 >=2 DEG C are worked as in setting, and during 55 DEG C≤T3≤65 DEG C, are opened and be located on the bulkhead of thermal regeneration room and outdoor
The air channel and be desorbed located at the air channel that air purifying room lower wall communicates with outside atmosphere, setting after 10 seconds that air communicates
Start timing, and air themperature in cabin is continued to monitor and by three-temperature sensor pair by the first temperature sensor
Outside air temperature is continued to monitor in real time:
Set the T3 to be monitored measured to three-temperature sensor continue 5 seconds be less than 55 DEG C or continue 5 seconds be more than 65 DEG C when,
Into step 4., otherwise, when desorption timing time reaches and completes to be desorbed the setting time needed for processing, into step 2) row
Dirt,
3. T3-T2 >=2 DEG C, and T3 are worked as in setting<At 55 DEG C, open and communicated on the bulkhead of thermal regeneration room with outside atmosphere
Air channel and located at the air channel that air purifying room lower wall communicates with outside atmosphere, set after 10 seconds, pass through the first TEMP
Device is continued to monitor to air themperature in cabin and outside air temperature is continued to monitor by three-temperature sensor, and
Continue to carry out in cabin temperature T1 in real time compared with outdoor temperature T3:
When setting absolute value≤0.5 DEG C to be monitored to T1 and T3 differences, carry out desorption and start timing, into step 4.,
Otherwise, it is to be monitored to continue to be not more than equal to temporary for 5 seconds to T3 by the T3 continued to monitor compared with temporary indoor air temperature T2 '
During 2 DEG C of the indoor air temperature T2 ' deposited, or when monitoring that T3 continues 5 seconds and is more than 65 DEG C, carry out desorption and start timing, into step
Suddenly 4.,
4. close on the bulkhead of thermal regeneration room the air channel communicated with outside atmosphere and located at air purifying room lower wall with
The air channel that outside atmosphere communicates, into step 5.,
5. opening air channel set by thermal insulation board lower end between thermal regeneration room and air purifying room and opening heater heating, lead to
Cross the first temperature sensor to continue to monitor air themperature in cabin, air is heated by heater in cabin, air in control cabinet
Temperature maintains setting value, and the air after heating passes through sorbing material, promotes in efficiently renewable VOCs and methyl aldehyde adsorption material
The VOCs and the desorption of formaldehyde adsorbed, when desorption timing time reaches and completes to be desorbed the setting time needed for processing, entrance
Step 2) blowdown;
3) blowdown
Control processor unit is by control signal to the first automatically controlled air valve to the 6th automatically controlled air valve, heater and wind
Machine is controlled as follows:
(1) the heater of unlatching, the wind communicated on the bulkhead of thermal regeneration room with outside atmosphere of open and close are closed
Road, the air channel for being located at air purifying room lower wall and being communicated with outside atmosphere of unlatching is closed, close thermal regeneration room and the sky of unlatching
Air channel set by thermal insulation board lower end between gas clean room, the air channel communicated on air purifying room lower wall with interior is opened, keep heating
Air channel set by thermal insulation board upper end is opened between regeneration room and air purifying room, keeps set air channel on purification of air chamber upper wall to close
Close, keep blower fan to open, that is, keep purification of air indoor air flow to flow from the bottom to top, the dirty heated regeneration of gas in purification of air room
Air channel set by thermal insulation board upper end is to communicating set air channel with outside atmosphere on the bulkhead of thermal regeneration room between room and air purifying room,
Arrange to outdoor, room air by the lower wall of the purified room of air it is set with indoor phase ventilating duct to the purified indoor benefit of air
Fill, in this process after the blower fan duration of runs reaches 20min, control processor unit passes through the first temperature sensor pair for setting
Air themperature is continued to monitor in cabin, and indoor air temperature is continued to monitor by second temperature sensor, and by
The air themperature T1 and indoor air temperature T2 that second temperature sensor measures is carried out real-time in the cabin that one temperature sensor measures
Compare:It is to be monitored to enter next step (2) to during absolute value≤1 DEG C of T1 and T2 differences,
(2) when during the air purifier automatically waken up is desorbed and decontaminated, having recognized purification pattern or fresh air mould
During the operation of formula, the corresponding modes to be monitored to response operation during absolute value≤1 DEG C of temperature in cabin and indoor temperature difference are no
Then, holding state is entered during absolute value≤1 DEG C to be monitored to temperature in cabin and indoor temperature difference.
In above-mentioned, it is described needed for carry out that the desorption decontamination time sets be 300h;The completion desorption processing of described setting
The required time is arranged to 120min;Described makes air themperature in cabin maintain setting value, and setting value is arranged to:60±5℃.
When the present invention is operated in purification pattern and fresh air pattern, desorption except purification pattern, in addition to the decontamination stage, to keyboard
Operation, makes an immediate response;Desorption, decontamination stage in purification pattern, the operation to keyboard, responded after desorption decontamination terminates.
Claims (8)
1. a kind of wall-mounted air purification device, including:It is closed cabin, blower fan, the first automatically controlled air valve to the 6th automatically controlled air valve, thick
Imitate filter, efficiently renewable VOCs and methyl aldehyde adsorption material, heater, VOCs sensors, first to three-temperature sensor,
Control processor unit, relief valve;Described first to three-temperature sensor, VOCs sensors respectively with control processor unit
Input be connected;The blower fan, heater, the first automatically controlled air valve to the 6th automatically controlled air valve respectively with control processor
The output end of unit is connected;The closed cabin is with the left and right thermal regeneration room for being set to be isolated with thermal insulation board and purification of air
Room, the thermal insulation board upper and lower end isolated between thermal regeneration room and air purifying room are respectively equipped with air channel, isolation thermal regeneration room and
Air purifying room is communicated by air channel set by thermal insulation board upper and lower end;It is respectively equipped with the upper and lower wall of air purifying room to interior
Wind lead to;It is provided with the bulkhead of the thermal regeneration room in the position corresponding with thermal insulation board lower end air channel in a manner of through walls and room
The air channel that outer air communicates;The first automatically controlled air valve is placed in the set wind to interior on purification of air chamber upper wall and led to, the
Two automatically controlled air valves are placed in the set wind to interior on air purifying room lower wall and led to, and the 3rd automatically controlled air valve is placed in isolation heating
The air channel that thermal insulation board upper end between regeneration room and air purifying room is set, the 4th automatically controlled air valve are placed in isolation thermal regeneration room
The air channel that thermal insulation board lower end between air purifying room is set, the 5th automatically controlled air valve be placed on the bulkhead of thermal regeneration room with
The air channel communicated in a manner of through walls with outside atmosphere that the corresponding position in thermal insulation board lower end air channel is set;The heater and
One temperature sensor is from top to bottom sequentially arranged in thermal regeneration room;The low efficient filter, efficiently renewable VOCs and first
Aldehyde sorbing material, blower fan, VOCs sensors are sequentially arranged in purification of air room from the bottom to top, and low efficient filter be arranged on every
From the air channel space above set by thermal insulation board lower end between thermal regeneration room and air purifying room, assembling heats again in isolation
Space below air channel between raw room and air purifying room set by thermal insulation board upper end;Characterized in that, described relief valve installation
In on the bulkhead of thermal regeneration room, communicated by mode through walls with outside atmosphere;Described second temperature sensor is installed on room
It is interior;Described three-temperature sensor is installed on outdoor;It is additionally provided with described air purifying room lower wall in a manner of through walls and room
The air channel that outer air communicates, the 6th automatically controlled air valve be placed on air purifying room lower wall set in a manner of through walls and outside atmosphere
The air channel communicated.
A kind of 2. wall-mounted air purification device according to claim 1, it is characterised in that described three-temperature sensor
Outdoor is installed on, it is set in a manner of through walls and outside atmosphere to refer to that three-temperature sensor is installed on air purifying room lower wall
In the air channel communicated, and closely directly contacted with outdoor air.
A kind of 3. wall-mounted air purification device according to claim 1, it is characterised in that the first automatically controlled air valve and
Second automatically controlled air valve is single automatically controlled open type electromagnetic air valve, and the 3rd automatically controlled air valve to the 6th automatically controlled air valve is single automatically controlled
Closed type electromagnetic air valve.
4. a kind of wall-mounted air purification device according to claim 1, it is characterised in that the heater generates heat for PTC
Body.
5. a kind of implementation method of wall-mounted air purification device according to claim 1 or 2, it is characterised in that including such as
Lower step:
1) temperature for setting control processor unit to be measured by the first temperature sensor is set as T1, is sensed by second temperature
The temperature that device measures is set as T2, and the temperature measured by three-temperature sensor is set as T3, and accumulative provided with purification operation
Timing unit, working method are provided with purification pattern and fresh air pattern, select to set air purifier to circulate successively during purification pattern
Purification, desorption, blowdown three phases process are operated in, selects to set air purifier to be operated in outdoor fresh air during fresh air pattern
Introduce indoor phase process;
2) when air purifier is in holding state, setting is standby to reach 30min, reads the accumulative timing unit of purification operation
Control is identified in the time added up:
When recognize the time that the accumulative timing unit of purification operation add up be more than or equal to set needed for carry out desorption decontamination
Time 80% when, automatically wake up air purifier and carry out desorption decontamination, and remove the accumulative timing unit of purification operation and add up
Time, otherwise, keep standby, and retain the time that the accumulative timing unit of ventilation operation adds up,
(2) during the air purifier automatically waken up carries out desorption decontamination, there is the operation of purification pattern or fresh air pattern, set
Control processor unit response corresponding modes, otherwise, are treated after automatically waking up and being desorbed decontamination end of run to air purifier
After what is automatically waken up is desorbed decontamination end of run to air purifier, holding state is immediately entered.
A kind of 6. implementation method of wall-mounted air purification device according to claim 5, it is characterised in that selection purification mould
Air purifier is set during formula, and circulation work is being purified, is being desorbed, blowdown three phases process successively, has following steps:
1) purification pattern
Control processor unit outputs control signals to the first automatically controlled air valve to the 6th automatically controlled air valve and blower fan, opens air
The air channel communicated on the upper and lower wall in clean room with interior, close thermal insulation board upper and lower end institute between thermal regeneration room and air purifying room
If air channel, and close on the bulkhead of thermal regeneration room the air channel communicated with outside atmosphere and close and be located under air purifying room
The air channel that wall communicates with outside atmosphere, control blower fan operating, purification of air indoor air flow flow from the bottom to top, and room air is by sky
Gas clean room lower wall is got in through filtering after being flowed into the air channel of interior with after adsorption treatment from upper wall air channel, and purification is transported
The accumulative timing unit of row carries out accumulative timing, reaches and to be desorbed when until purifying operation accumulative timing unit institute's cumulative time
During processing set time, the accumulative timing unit of pause purification operation adds up timing and simultaneously removes the time added up, into net
Change mode step 2) desorption stage;
2) desorption stage
Control processor unit outputs control signals to the first automatically controlled air valve to the 6th automatically controlled air valve, heater and blower fan,
The air channel communicated on the upper and lower wall of air purifying room with interior is closed, opens thermal insulation board between thermal regeneration room and air purifying room
Air channel set by upper end, keep blower fan to open, keep air channel set by thermal insulation board lower end between thermal regeneration room and air purifying room to close
Close, and keep the air channel that is communicated with outside atmosphere on the bulkhead of thermal regeneration room and located at air purifying room lower wall with it is outdoor
The air channel that air communicates is closed, and keeps heater to close, and is detected by second temperature sensor and three-temperature sensor indoor
Outer air themperature and the indoor air temperature of detection is kept in, and temporary indoor air temperature is set to T2 ', and by the second temperature
The indoor air temperature T2 that degree sensor measures is compared with the outside air temperature T3 that three-temperature sensor measures:
1. T3-T2 is worked as in setting<At 2 DEG C or when T3-T2 >=2 DEG C, and during 65 DEG C of T3 >, keep on the bulkhead of thermal regeneration room with
The air channel and closed located at the air channel that air purifying room lower wall communicates with outside atmosphere that outside atmosphere communicates, and carry out desorption and start
Timing, into step 5.,
2. T3-T2 >=2 DEG C are worked as in setting, and during 55 DEG C≤T3≤65 DEG C, are opened and be located on the bulkhead of thermal regeneration room and outside atmosphere
The air channel that communicates and located at the air channel that air purifying room lower wall communicates with outside atmosphere, sets after 10 seconds, carries out desorption and start
Timing, and air themperature in cabin is continued to monitor and by three-temperature sensor to outdoor by the first temperature sensor
Air themperature is continued to monitor in real time:
Set the T3 to be monitored measured to three-temperature sensor continue 5 seconds be less than 55 DEG C or continue 5 seconds be more than 65 DEG C when, enter
Step 4., otherwise, wait be desorbed timing time reach complete desorption processing needed for setting time when, into purification pattern step 3)
The blowdown stage,
3. T3-T2 >=2 DEG C, and T3 are worked as in setting<At 55 DEG C, the wind communicated on the bulkhead of thermal regeneration room with outside atmosphere is opened
Road and located at the air channel that air purifying room lower wall communicates with outside atmosphere, sets after 10 seconds, passes through the first temperature sensor pair
Air themperature is continued to monitor and outside air temperature is continued to monitor by three-temperature sensor in cabin, and is continued
Temperature T1 is compared with outdoor temperature T3 in real-time progress cabin:
When setting absolute value≤0.5 DEG C to be monitored to T1 and T3 differences, carry out desorption and start timing, into step 4., otherwise,
It is to be monitored to continue to be not more than within 5 seconds the room for being equal to and keeping in T3 by the T3 continued to monitor compared with temporary indoor air temperature T2 '
During 2 DEG C of interior air themperature T2 ', or when monitoring that T3 continues 5 seconds and is more than 65 DEG C, carry out desorption and start timing, into step 4.,
4. closing on the bulkhead of thermal regeneration room the air channel communicated with outside atmosphere and located at air purifying room lower wall and outdoor
The air channel that air communicates, into step 5.,
5. open air channel set by thermal insulation board lower end between thermal regeneration room and air purifying room and open heater heating, by the
One temperature sensor continues to monitor to air themperature in cabin, and air is heated by heater in cabin, air themperature in control cabinet
Setting value is maintained, the air after heating passes through sorbing material, promotes to be inhaled in efficiently renewable VOCs and methyl aldehyde adsorption material
Attached VOCs and the desorption of formaldehyde, when desorption timing time reaches and completes to be desorbed the setting time needed for processing, into purification
Mode step 3) the blowdown stage;
3) the blowdown stage
Control processor unit is entered by control signal to the first automatically controlled air valve to the 6th automatically controlled air valve, heater and blower fan
The following control of row:
The heater opened is closed, the air channel communicated on the bulkhead of thermal regeneration room with outside atmosphere of open and close, is closed
The air channel for being located at air purifying room lower wall and being communicated with outside atmosphere opened, close thermal regeneration room and the air purifying room of unlatching
Between air channel set by thermal insulation board lower end, open on air purifying room lower wall with the air channel that communicates of interior, keep thermal regeneration room and
Air channel set by thermal insulation board upper end is opened between air purifying room, is kept set air channel on purification of air chamber upper wall to close, is kept wind
Machine is opened, that is, keeps purification of air indoor air flow to flow from the bottom to top, the heated regeneration room of dirty gas and air in purification of air room
Air channel set by thermal insulation board upper end is arranged to room to set air channel is communicated with outside atmosphere on the bulkhead of thermal regeneration room between clean room
Outside, room air passes through set by the lower wall of the purified room of air with indoor phase ventilating duct to the purified indoor supplement of air, if
Surely after after the blowdown stage, the blower fan duration of runs reaches 20min, control processor unit is by the first temperature sensor to empty in cabin
Temperature degree is continued to monitor, and indoor air temperature is continued to monitor by second temperature sensor, and by the first temperature
Compared with air themperature T1 is carried out in real time with the indoor air temperature T2 that second temperature sensor measures in the cabin that sensor measures:Treat
Monitor to return to purification pattern step 1) cleansing phase when T1 and absolute value≤1 DEG C of T2 differences.
A kind of 7. implementation method of wall-mounted air purification device according to claim 5, it is characterised in that selection fresh air mould
Set air purifier to be operated in ventilating stage process during formula, there is following control:
Control processor unit is controlled by control signal to the first automatically controlled air valve to the 6th automatically controlled air valve and blower fan,
Closing air purifying room lower wall, up to set by interior air channel, and it is upper and lower to close thermal insulation board between thermal regeneration room and air purifying room
Air channel set by end, the air channel communicated with outside atmosphere is closed on the bulkhead of thermal regeneration room, open and be located under air purifying room
The air channel that wall communicates with outside atmosphere, set air channel on purification of air chamber upper wall is opened, open blower fan and operate, in purification of air room
Air-flow flows from the bottom to top, outdoor air by after being flowed into located at the air channel that air purifying room lower wall communicates with outside atmosphere through filtering
Got in after adsorption treatment from purification of air chamber upper wall upper air duct.
8. the implementation method of a kind of wall-mounted air purification device according to claim 5, it is characterised in that described is automatic
Wake up air purifier and carry out desorption decontamination, there are following steps:
1) it is desorbed
Control processor unit outputs control signals to the first automatically controlled air valve to the 6th automatically controlled air valve, heater and blower fan,
The air channel communicated on the upper and lower wall of air purifying room with interior is closed, opens thermal insulation board between thermal regeneration room and air purifying room
Air channel set by upper end, blower fan is opened, keep air channel set by thermal insulation board lower end between thermal regeneration room and air purifying room to close, with
And keep the air channel that is communicated with outside atmosphere on the bulkhead of thermal regeneration room and located at air purifying room lower wall and outside atmosphere
The air channel communicated is closed, and keeps heater to close, and indoor outer space is detected by second temperature sensor and three-temperature sensor
Temperature degree and the indoor air temperature of detection is kept in, and temporary indoor air temperature is set to T2 ', and second temperature is passed
The indoor air temperature T2 that sensor measures is compared with the outside air temperature T3 that three-temperature sensor measures:
1. T3-T2 is worked as in setting<At 2 DEG C or when T3-T2 >=2 DEG C, and during 65 DEG C of T3 >, keep on the bulkhead of thermal regeneration room with
The air channel and closed located at the air channel that air purifying room lower wall communicates with outside atmosphere that outside atmosphere communicates, and carry out desorption and start
Timing, into step 5.,
2. T3-T2 >=2 DEG C are worked as in setting, and during 55 DEG C≤T3≤65 DEG C, are opened and be located on the bulkhead of thermal regeneration room and outside atmosphere
The air channel that communicates and located at the air channel that air purifying room lower wall communicates with outside atmosphere, sets after 10 seconds, carries out desorption and start
Timing, and air themperature in cabin is continued to monitor and by three-temperature sensor to outdoor by the first temperature sensor
Air themperature is continued to monitor in real time:
Set the T3 to be monitored measured to three-temperature sensor continue 5 seconds be less than 55 DEG C or continue 5 seconds be more than 65 DEG C when, enter
Step 4., otherwise, wait be desorbed timing time reach complete the setting time needed for desorption processing when, into step 2) blowdown,
3. T3-T2 >=2 DEG C, and T3 are worked as in setting<At 55 DEG C, the wind communicated on the bulkhead of thermal regeneration room with outside atmosphere is opened
Road and located at the air channel that air purifying room lower wall communicates with outside atmosphere, sets after 10 seconds, passes through the first temperature sensor pair
Air themperature is continued to monitor and outside air temperature is continued to monitor by three-temperature sensor in cabin, and is continued
Temperature T1 is compared with outdoor temperature T3 in real-time progress cabin:
When setting absolute value≤0.5 DEG C to be monitored to T1 and T3 differences, carry out desorption and start timing, into step 4., otherwise,
It is to be monitored to continue to be not more than within 5 seconds the room for being equal to and keeping in T3 by the T3 continued to monitor compared with temporary indoor air temperature T2 '
During 2 DEG C of interior air themperature T2 ', or when monitoring that T3 continues 5 seconds and is more than 65 DEG C, carry out desorption and start timing, into step 4.,
4. closing on the bulkhead of thermal regeneration room the air channel communicated with outside atmosphere and located at air purifying room lower wall and outdoor
The air channel that air communicates, into step 5.,
5. open air channel set by thermal insulation board lower end between thermal regeneration room and air purifying room and open heater heating, by the
One temperature sensor continues to monitor to air themperature in cabin, and air is heated by heater in cabin, air themperature in control cabinet
Setting value is maintained, the air after heating passes through sorbing material, promotes to be inhaled in efficiently renewable VOCs and methyl aldehyde adsorption material
Attached VOCs and the desorption of formaldehyde, when desorption timing time reaches and completes to be desorbed the setting time needed for processing, into step
2) blowdown;
2) blowdown
Control processor unit is entered by control signal to the first automatically controlled air valve to the 6th automatically controlled air valve, heater and blower fan
The following control of row:
(1) the heater of unlatching is closed, the air channel communicated on the bulkhead of thermal regeneration room with outside atmosphere of open and close, is closed
The air channel for being located at air purifying room lower wall and being communicated with outside atmosphere that make and break is opened, close thermal regeneration room and the purification of air of unlatching
Air channel set by thermal insulation board lower end between room, the air channel communicated on air purifying room lower wall with interior is opened, keep thermal regeneration room
Air channel set by thermal insulation board upper end is opened between air purifying room, is kept set air channel on purification of air chamber upper wall to close, is kept
Blower fan is opened, that is, keeps purification of air indoor air flow to flow from the bottom to top, the heated regeneration room of dirty gas and sky in purification of air room
Air channel set by thermal insulation board upper end is arranged to room to set air channel is communicated with outside atmosphere on the bulkhead of thermal regeneration room between gas clean room
Outside, room air passes through set by the lower wall of the purified room of air with indoor phase ventilating duct to the purified indoor supplement of air, enters
Enter next step (2),
(2) in being set in step (1) after the blower fan duration of runs reaches 20min, control processor unit passes through the first TEMP
Device is continued to monitor to air themperature in cabin, and indoor air temperature is continued to monitor by second temperature sensor, and
The air themperature T1 and indoor air temperature T2 that second temperature sensor measures is carried out in the cabin that first temperature sensor is measured
In real time relatively:Enter next step 3 during absolute value≤1 DEG C to be monitored to T1 and T2 differences);
3) when during the air purifier automatically waken up is desorbed and decontaminated, recognizing purification pattern or fresh air pattern
During operation, the corresponding modes to be monitored to response operation during absolute value≤1 DEG C of temperature in cabin and indoor temperature difference, otherwise,
Enter holding state during absolute value≤1 DEG C to be monitored to temperature in cabin and indoor temperature difference.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610846395.6A CN107869790A (en) | 2016-09-23 | 2016-09-23 | A kind of wall-mounted air purification device and its implementation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610846395.6A CN107869790A (en) | 2016-09-23 | 2016-09-23 | A kind of wall-mounted air purification device and its implementation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107869790A true CN107869790A (en) | 2018-04-03 |
Family
ID=61751600
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610846395.6A Pending CN107869790A (en) | 2016-09-23 | 2016-09-23 | A kind of wall-mounted air purification device and its implementation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107869790A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107869799A (en) * | 2016-09-23 | 2018-04-03 | 江苏科技大学 | A kind of wall-mounted air purification device and its control method based on hot recycling |
CN114110867A (en) * | 2021-11-16 | 2022-03-01 | 青岛海信日立空调***有限公司 | Air conditioning device |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004097289A (en) * | 2002-09-05 | 2004-04-02 | Sharp Corp | Toothbrush storage device with disinfecting function |
JP2006105423A (en) * | 2004-09-30 | 2006-04-20 | Max Co Ltd | Ventilating device and building |
CN201105031Y (en) * | 2007-10-09 | 2008-08-27 | 李举 | Indoor air purifier |
CN105091250A (en) * | 2015-09-17 | 2015-11-25 | 北京金山安全软件有限公司 | Purifier filter screen expiration prompting method and device and purifier |
CN105115073A (en) * | 2015-09-10 | 2015-12-02 | 江苏永昇空调有限公司 | Explosion proof type forced draft air conditioning device for driller room |
CN105371383A (en) * | 2015-12-08 | 2016-03-02 | 清华大学 | Wall-mounted type air purifier based on thermal regeneration and purification method thereof |
CN105757815A (en) * | 2016-03-31 | 2016-07-13 | 吴焕雄 | Forced cleaning type air filtering system applied to indoor environments |
CN107869799A (en) * | 2016-09-23 | 2018-04-03 | 江苏科技大学 | A kind of wall-mounted air purification device and its control method based on hot recycling |
CN107869795A (en) * | 2016-09-23 | 2018-04-03 | 江苏科技大学 | A kind of wall-mounted air purification device and its control method with hot recycling |
-
2016
- 2016-09-23 CN CN201610846395.6A patent/CN107869790A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004097289A (en) * | 2002-09-05 | 2004-04-02 | Sharp Corp | Toothbrush storage device with disinfecting function |
JP2006105423A (en) * | 2004-09-30 | 2006-04-20 | Max Co Ltd | Ventilating device and building |
CN201105031Y (en) * | 2007-10-09 | 2008-08-27 | 李举 | Indoor air purifier |
CN105115073A (en) * | 2015-09-10 | 2015-12-02 | 江苏永昇空调有限公司 | Explosion proof type forced draft air conditioning device for driller room |
CN105091250A (en) * | 2015-09-17 | 2015-11-25 | 北京金山安全软件有限公司 | Purifier filter screen expiration prompting method and device and purifier |
CN105371383A (en) * | 2015-12-08 | 2016-03-02 | 清华大学 | Wall-mounted type air purifier based on thermal regeneration and purification method thereof |
CN105757815A (en) * | 2016-03-31 | 2016-07-13 | 吴焕雄 | Forced cleaning type air filtering system applied to indoor environments |
CN107869799A (en) * | 2016-09-23 | 2018-04-03 | 江苏科技大学 | A kind of wall-mounted air purification device and its control method based on hot recycling |
CN107869795A (en) * | 2016-09-23 | 2018-04-03 | 江苏科技大学 | A kind of wall-mounted air purification device and its control method with hot recycling |
Non-Patent Citations (1)
Title |
---|
姚仲鹏等: "《空气净化原理、设计与应用》", 30 September 2014 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107869799A (en) * | 2016-09-23 | 2018-04-03 | 江苏科技大学 | A kind of wall-mounted air purification device and its control method based on hot recycling |
CN114110867A (en) * | 2021-11-16 | 2022-03-01 | 青岛海信日立空调***有限公司 | Air conditioning device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107869798A (en) | A kind of wall-mounted air purification device and its implementation with hot recycling | |
CN107869793A (en) | A kind of air purifier and its implementation | |
CN105371383B (en) | A kind of wall-mounted air purification device and its purification method based on hot recycling | |
CN106287960B (en) | A kind of wall-mounted air purification device and its purification method based on hot recycling | |
CN107883534A (en) | A kind of wall-mounted air purification device and its control method based on hot recycling | |
CN107869800A (en) | A kind of wall-mounted air purification device and its control method | |
CN106369686A (en) | Wall-mounted air purifier based on heat regeneration and control method of wall-mounted air purifier | |
CN106352422A (en) | Wall-mounted air purifier with thermal regeneration function and purification method thereof | |
CN104296298B (en) | To the regulation cleaning system of the dual monitoring of indoor and outdoor air | |
CN107869789A (en) | A kind of air purifier and its implementation | |
CN107869796A (en) | A kind of wall-mounted air purification device and its implementation based on hot recycling | |
CN106382683A (en) | Wall-mounted type air purifier based on thermal regeneration and air purification method | |
CN107869797A (en) | A kind of wall-mounted air purification device and its implementation | |
CN106382712A (en) | Wall-mounted air purifier with heat regenerating function and control method thereof | |
CN107869790A (en) | A kind of wall-mounted air purification device and its implementation | |
CN107869795A (en) | A kind of wall-mounted air purification device and its control method with hot recycling | |
CN107869794A (en) | A kind of wall-mounted air purification device and its implementation | |
CN107869806A (en) | A kind of wall-mounted air purification device and its control method | |
CN105953399A (en) | Indoor air purification device | |
CN205261771U (en) | Wall -hanging air purifier based on heat regeneration | |
CN107869799A (en) | A kind of wall-mounted air purification device and its control method based on hot recycling | |
CN109028367A (en) | Space intelligent air pass purification system VP1.0 | |
CN107869791A (en) | A kind of wall-mounted air purification device and its implementation | |
CN107726464A (en) | A kind of circulation absorption intelligent air purifying system of simulating forest environment | |
CN107869792A (en) | A kind of air purifier and its control method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180403 |