CN107100489A - A kind of window installation method - Google Patents

A kind of window installation method Download PDF

Info

Publication number
CN107100489A
CN107100489A CN201710486183.6A CN201710486183A CN107100489A CN 107100489 A CN107100489 A CN 107100489A CN 201710486183 A CN201710486183 A CN 201710486183A CN 107100489 A CN107100489 A CN 107100489A
Authority
CN
China
Prior art keywords
window
auxiliary frame
fluid sealant
cement cream
layer fluid
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710486183.6A
Other languages
Chinese (zh)
Inventor
李平安
冉小玉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Gold Billion Aluminum Industry Co Ltd
Original Assignee
Chongqing Gold Billion Aluminum Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Gold Billion Aluminum Industry Co Ltd filed Critical Chongqing Gold Billion Aluminum Industry Co Ltd
Priority to CN201710486183.6A priority Critical patent/CN107100489A/en
Publication of CN107100489A publication Critical patent/CN107100489A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E06DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
    • E06BFIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
    • E06B1/00Border constructions of openings in walls, floors, or ceilings; Frames to be rigidly mounted in such openings
    • E06B1/56Fastening frames to the border of openings or to similar contiguous frames
    • EFIXED CONSTRUCTIONS
    • E06DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
    • E06BFIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
    • E06B1/00Border constructions of openings in walls, floors, or ceilings; Frames to be rigidly mounted in such openings
    • E06B1/56Fastening frames to the border of openings or to similar contiguous frames
    • E06B1/58Fastening frames to the border of openings or to similar contiguous frames by filling up the joints, e.g. by cementing
    • EFIXED CONSTRUCTIONS
    • E06DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
    • E06BFIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
    • E06B1/00Border constructions of openings in walls, floors, or ceilings; Frames to be rigidly mounted in such openings
    • E06B1/62Tightening or covering joints between the border of openings and the frame or between contiguous frames

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)
  • Door And Window Frames Mounted To Openings (AREA)

Abstract

The invention discloses a kind of window installation method, comprise the following steps, S1, even window hole out;S2, cleaning window hole attachment, and window hole is soaked;S3, modulation cement cream, cement cream is applied on window opening;S4, cement cream is maintained;S5, installation auxiliary frame;S6, the centre position between auxiliary frame and window opening are beaten and smear first layer fluid sealant;S7, beaten in the indoor and outside of first layer fluid sealant and smear insulation glue;S8, in being beaten with the outer surface of indoor and outdoors air contact for insulation glue smear second layer fluid sealant;S9, the outer surface painting with indoor and outdoors air contact outside second layer fluid sealant are spread and plastered;S10, window is installed in auxiliary frame.The present invention is by setting cement cream to ensure that the adhesive strength between auxiliary frame and window opening as fluid sealant bond medium, by setting multi-layer sealed glue and insulation glue ensure that to be not in cold bridge between auxiliary frame and cement cream.

Description

A kind of window installation method
Technical field
The present invention relates to erection of doors and windows field, particularly a kind of window installation method.
Background technology
Window is part essential in building, and now current window mounting means is generally using directly in original building Any processing is not taken to be directly installed on auxiliary frame on window opening, the gap between auxiliary frame and window opening, which uses to beat, smears sealant sealing, But it is due to that window opening does not pass through any processing, the adhesive effect between fluid sealant and window opening is bad, usually occurs due to sealing Adhesive failure between glue and window opening, cause outdoor rainwater it is isotonic enter interior.
Only beaten in the installation process of conventional window between auxiliary frame and window opening and smear fluid sealant, cause the window of installation There is cold bridge beating the place of smearing fluid sealant in family, then beats and smears the place of fluid sealant and water-setting occur, heavy damage indoor wall enters And influence indoor inhabitation.
The content of the invention
In view of the presence of problem above, it is an object of the invention to provide a kind of window installation method, can effectively be protected The adhesive strength between the auxiliary frame and window opening of installation is demonstrate,proved, and ensures to be not in cold bridge between auxiliary frame and window opening.
The purpose of the present invention realizes that window installation method comprises the following steps by such technical scheme,
S1, the irregular projection that window hole one is enclosed evened out;
S2, using hairbrush the attachments such as the sand on window opening are cleaned out, and are repeatedly poured on window hole and spoon clear water, Until 5 minutes defensive position touching window holes have obvious moist feeling after stopping watering;
S3, modulation cement cream, cement cream are applied on window opening, it is ensured that smeared the window hole after cement cream up and down Auxiliary frame outer surface 5-10 millimeters to be mounted of distance institute;
S4, cement cream is maintained;
S5, window auxiliary frame is installed on window opening by window auxiliary frame using expansion bolt or screw;
S6, the centre position between auxiliary frame and window opening, which are beaten, smears first layer fluid sealant, and first layer fluid sealant is by auxiliary frame and window Gap between hole is fully sealed;
S7, beaten in the indoor and outside of first layer fluid sealant and smear insulation glue;Glue is incubated by between auxiliary frame and window opening Gap be fully sealed;
S8, in being beaten with the outer surface of indoor and outdoors air contact for insulation glue smear second layer fluid sealant;
S9, the outer surface painting with indoor and outdoors air contact outside second layer fluid sealant are spread and plastered;
S10, window is installed in auxiliary frame.
It is further, described that the progress maintenance of cement cream is comprised the following steps,
Moisturizing is carried out using sprayer after the cement cream half an hour that SB1, smearing are completed, is carried out continuously twice;
SB2, in cement cream after second of moisturizing of sprayer, cement cream is poured using clear water every 2 hours Drench, the duration is 1 day;
SB3, by cement cream stand maintenance 7 days.
Further, the thickness of the first layer fluid sealant is not less than 1 centimetre.
Further, the thickness of the second layer fluid sealant is not less than 0.5 millimeter.
Further, the insulation glue is insulating foam glue.
Further, the inner surface for smearing the cement cream completed is presented and is uniformly distributed fluted and projection, projection and Difference in height between groove is 1-1.5 centimetres, and the top of the projection and the appearance of auxiliary frame are at a distance of 5-10 millimeters.
By adopting the above-described technical solution, the present invention has the advantage that:By setting cement cream to be used as fluid sealant Bond medium ensure that the adhesive strength between auxiliary frame and window opening, by set between auxiliary frame and cement cream multi-layer sealed glue and Insulation glue ensure that to be not in cold bridge.
Other advantages, target and the feature of the present invention will be illustrated in the following description to a certain extent, and And to a certain extent, based on will be apparent to those skilled in the art to investigating hereafter, Huo Zheke To be instructed from the practice of the present invention.The target and other advantages of the present invention can be wanted by following specification and right Book is sought to realize and obtain.
Embodiment
With reference to embodiment, the invention will be further described.
Embodiment 1
Window installation method comprises the following steps,
S1, the irregular projection that window hole one is enclosed evened out;
S2, using hairbrush the attachments such as the sand on window opening are cleaned out, and are repeatedly poured on window hole and spoon clear water, Until 5 minutes defensive position touching window holes have obvious moist feeling after stopping watering;
S3, modulation cement cream, cement cream is applied on window opening, and the inner surface for smearing the cement cream completed presents uniform point Have a groove and raised, the difference in height between projection and groove is 1 centimetre, it is ensured that smeared bottom left on the window hole after cement cream Right distance institute 5 millimeters of auxiliary frame outer surface to be mounted;
S4, to smear complete cement cream half an hour after using sprayer carry out moisturizing, be carried out continuously twice;In cement Cream carries out pouring pouring, the duration is 1 day every 2 hours using clear water after second of moisturizing of sprayer to cement cream;Will Cement cream stands maintenance 7 days;
S5, window auxiliary frame is installed on window opening by window auxiliary frame using expansion bolt or screw;
S6, the centre position between auxiliary frame and window opening, which are beaten, smears first layer fluid sealant, and the thickness of first layer fluid sealant is 1.2 Centimetre, the gap between auxiliary frame and window opening is fully sealed first layer fluid sealant;
S7, beaten in the indoor and outside of first layer fluid sealant and smear insulating foam glue;Insulating foam glue by auxiliary frame with Gap between window opening is fully sealed;
S8, beaten in the outer surface of insulating foam glue and indoor and outdoors air contact and smear second layer fluid sealant, the second layer The thickness of fluid sealant is 0.6 millimeter;
S9, the outer surface painting with indoor and outdoors air contact outside second layer fluid sealant are spread and plastered;
S10, window is installed in auxiliary frame.
Embodiment 2
Window installation method comprises the following steps,
S1, the irregular projection that window hole one is enclosed evened out;
S2, using hairbrush the attachments such as the sand on window opening are cleaned out, and are repeatedly poured on window hole and spoon clear water, Until 5 minutes defensive position touching window holes have obvious moist feeling after stopping watering;
S3, modulation cement cream, cement cream is applied on window opening, and the inner surface for smearing the cement cream completed presents uniform point Have a groove and raised, the difference in height between projection and groove is 1.5 centimetres, it is ensured that smeared above and below the window hole after cement cream Left and right distance institute 10 millimeters of auxiliary frame outer surface to be mounted;
S4, to smear complete cement cream half an hour after using sprayer carry out moisturizing, be carried out continuously twice;In cement Cream carries out pouring pouring, the duration is 1 day every 2 hours using clear water after second of moisturizing of sprayer to cement cream;Will Cement cream stands maintenance 7 days;
S5, window auxiliary frame is installed on window opening by window auxiliary frame using expansion bolt or screw;
S6, the centre position between auxiliary frame and window opening, which are beaten, smears first layer fluid sealant, and the thickness of first layer fluid sealant is 1.2 Centimetre, the gap between auxiliary frame and window opening is fully sealed first layer fluid sealant;
S7, beaten in the indoor and outside of first layer fluid sealant and smear insulating foam glue;Insulating foam glue by auxiliary frame with Gap between window opening is fully sealed;
S8, beaten in the outer surface of insulating foam glue and indoor and outdoors air contact and smear second layer fluid sealant, the second layer The thickness of fluid sealant is 0.6 millimeter;
S9, the outer surface painting with indoor and outdoors air contact outside second layer fluid sealant are spread and plastered;
S10, window is installed in auxiliary frame.
Embodiment 3
Window installation method comprises the following steps,
S1, the irregular projection that window hole one is enclosed evened out;
S2, using hairbrush the attachments such as the sand on window opening are cleaned out, and are repeatedly poured on window hole and spoon clear water, Until 5 minutes defensive position touching window holes have obvious moist feeling after stopping watering;
S3, modulation cement cream, cement cream is applied on window opening, and the inner surface for smearing the cement cream completed presents uniform point Have a groove and raised, the difference in height between projection and groove is 1.2 centimetres, it is ensured that smeared above and below the window hole after cement cream Left and right distance institute 8 millimeters of auxiliary frame outer surface to be mounted;
S4, to smear complete cement cream half an hour after using sprayer carry out moisturizing, be carried out continuously twice;In cement Cream carries out pouring pouring, the duration is 1 day every 2 hours using clear water after second of moisturizing of sprayer to cement cream;Will Cement cream stands maintenance 7 days;
S5, window auxiliary frame is installed on window opening by window auxiliary frame using expansion bolt or screw;
S6, the centre position between auxiliary frame and window opening, which are beaten, smears first layer fluid sealant, and the thickness of first layer fluid sealant is 1.2 Centimetre, the gap between auxiliary frame and window opening is fully sealed first layer fluid sealant;
S7, beaten in the indoor and outside of first layer fluid sealant and smear insulating foam glue;Insulating foam glue by auxiliary frame with Gap between window opening is fully sealed;
S8, beaten in the outer surface of insulating foam glue and indoor and outdoors air contact and smear second layer fluid sealant, the second layer The thickness of fluid sealant is 0.6 millimeter;
S9, the outer surface painting with indoor and outdoors air contact outside second layer fluid sealant are spread and plastered;
S10, window is installed in auxiliary frame.
Finally illustrate, the above embodiments are merely illustrative of the technical solutions of the present invention and it is unrestricted, although with reference to compared with The present invention is described in detail good embodiment, it will be understood by those within the art that, can be to skill of the invention Art scheme is modified or equivalent substitution, and without departing from the objective and scope of the technical program, it all should cover in the present invention Right among.

Claims (6)

1. a kind of window installation method, it is characterised in that the window installation method comprises the following steps,
S1, the irregular projection that window hole one is enclosed evened out;
S2, using hairbrush the attachments such as the sand on window opening are cleaned out, and repeatedly poured on window hole and spoon clear water, until 5 minutes defensive position touching window holes have obvious moist feeling after stopping watering;
S3, modulation cement cream, cement cream are applied on window opening, it is ensured that smeared the distance up and down of the window hole after cement cream Outer surface 5-10 millimeters of auxiliary frame to be mounted;
S4, cement cream is maintained;
S5, window auxiliary frame is installed on window opening by window auxiliary frame using expansion bolt or screw;
S6, the centre position between auxiliary frame and window opening, which are beaten, smears first layer fluid sealant, first layer fluid sealant by auxiliary frame and window opening it Between gap be fully sealed;
S7, beaten in the indoor and outside of first layer fluid sealant and smear insulation glue;Glue is incubated by the seam between auxiliary frame and window opening Gap is fully sealed;
S8, in being beaten with the outer surface of indoor and outdoors air contact for insulation glue smear second layer fluid sealant;
S9, the outer surface painting with indoor and outdoors air contact outside second layer fluid sealant are spread and plastered;
S10, window is installed in auxiliary frame.
2. window installation method according to claim 1, it is characterised in that it is described cement cream is carried out maintenance include it is following Step,
Moisturizing is carried out using sprayer after the cement cream half an hour that SB1, smearing are completed, is carried out continuously twice;
SB2, in cement cream after second of moisturizing of sprayer, every 2 hours using clear water to cement cream carry out pour pouring, hold The continuous time is 1 day;
SB3, by cement cream stand maintenance 7 days.
3. window installation method according to claim 1, it is characterised in that the thickness of the first layer fluid sealant is not less than 1 centimetre.
4. window installation method according to claim 1, it is characterised in that the thickness of the second layer fluid sealant is not less than 0.5 millimeter.
5. window installation method according to claim 1, it is characterised in that the insulation glue is insulating foam glue.
6. window installation method according to claim 1, it is characterised in that the inner surface for the cement cream that the smearing is completed Present and be uniformly distributed fluted and projection, the difference in height between projection and groove be 1-1.5 centimetres, the top of the projection with it is attached The appearance of frame is at a distance of 5-10 millimeters.
CN201710486183.6A 2017-06-23 2017-06-23 A kind of window installation method Pending CN107100489A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710486183.6A CN107100489A (en) 2017-06-23 2017-06-23 A kind of window installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710486183.6A CN107100489A (en) 2017-06-23 2017-06-23 A kind of window installation method

Publications (1)

Publication Number Publication Date
CN107100489A true CN107100489A (en) 2017-08-29

Family

ID=59663844

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710486183.6A Pending CN107100489A (en) 2017-06-23 2017-06-23 A kind of window installation method

Country Status (1)

Country Link
CN (1) CN107100489A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110397372A (en) * 2019-06-22 2019-11-01 东莞市建工集团有限公司 Efficient erection of doors and windows method
CN115012767A (en) * 2022-07-11 2022-09-06 中亿丰罗普斯金材料科技股份有限公司 Old window reconstruction construction process

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2300019A (en) * 1995-04-05 1996-10-23 Veka Plc Template or base frame for mounting a window or door frame in a building aperture
DE19621920A1 (en) * 1996-05-31 1997-12-04 Pevg Patententwicklungs Und Ve Joint seal between window-frame and wall
CN1851224A (en) * 2006-05-25 2006-10-25 深圳市啟盛新型建材技术开发有限公司 Method for mounting door-window
CN102704792A (en) * 2012-05-30 2012-10-03 福建省泷澄建设集团有限公司 Building door and window mounting rigid foamed polyurethane filling construction process
CN103343655A (en) * 2013-07-18 2013-10-09 南京建工集团有限公司 Wall window construction method
CN105804618A (en) * 2016-02-23 2016-07-27 沈阳远大铝业工程有限公司 Aluminum alloy window side frame sealed connection structure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2300019A (en) * 1995-04-05 1996-10-23 Veka Plc Template or base frame for mounting a window or door frame in a building aperture
DE19621920A1 (en) * 1996-05-31 1997-12-04 Pevg Patententwicklungs Und Ve Joint seal between window-frame and wall
CN1851224A (en) * 2006-05-25 2006-10-25 深圳市啟盛新型建材技术开发有限公司 Method for mounting door-window
CN102704792A (en) * 2012-05-30 2012-10-03 福建省泷澄建设集团有限公司 Building door and window mounting rigid foamed polyurethane filling construction process
CN103343655A (en) * 2013-07-18 2013-10-09 南京建工集团有限公司 Wall window construction method
CN105804618A (en) * 2016-02-23 2016-07-27 沈阳远大铝业工程有限公司 Aluminum alloy window side frame sealed connection structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110397372A (en) * 2019-06-22 2019-11-01 东莞市建工集团有限公司 Efficient erection of doors and windows method
CN115012767A (en) * 2022-07-11 2022-09-06 中亿丰罗普斯金材料科技股份有限公司 Old window reconstruction construction process

Similar Documents

Publication Publication Date Title
CN103343655B (en) Wall window construction method
US2484240A (en) Shower pan construction
CN107255007A (en) A kind of broken-bridge aluminum alloy exterior window closing in construction method
CN102051923A (en) Fireproofing retardant cement calcium silicate board insulating wall body and construction method thereof
CN107100489A (en) A kind of window installation method
CN203145704U (en) Seepage-proof structure between aluminum alloy window and wall
CN104818855B (en) There is the waterproof thermal-insulated the exterior window of energy saving construction method of the anti-heat bridge of air-tightness
CN103572931A (en) Building ceramic thin plate hanging and cementing structure and construction method thereof
CN109267900A (en) A kind of aluminum alloy window frame and the fixed device of wall connecting
CN206646683U (en) Composite antidetonation partition wall batten device
CN208137737U (en) A kind of door and window tongue and groove aluminum alloy mould plate
CN206376469U (en) A kind of building decoration wall
CN207080092U (en) Close up construction on a kind of curtain wall window side
CN206545279U (en) A kind of toilet waterproofing structure
CN208023867U (en) Exterior wall is without the double hollow insulation decorative integrated plates of painting
CN108425436A (en) A kind of built-up thermal insulation board and preparation method thereof and installation method
CN209539044U (en) Closing-in structure outside a kind of exterior window room
CN208251944U (en) A kind of novel window screen integrated combination window
CN207392648U (en) A kind of exterior wall stringcourse eliminator plate of rainwater leakage prevention
CN204199587U (en) A kind of ultra-thin exterior wall composite thermal insulation stone plate
CN209704329U (en) A kind of passive type energy saving door and window node of stone material alien invasion
CN209603777U (en) A kind of passive type building three glass, two embedded structure of chamber aluminum-coated wood window
CN210564053U (en) Finished product EPS outer windowsill seepage maintenance structure
CN106688704A (en) Heat preservation wall of ecological sunshine greenhouse in cold region
CN207509875U (en) A kind of interior wall composite plate

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170829