CN103343655A - Wall window construction method - Google Patents

Wall window construction method Download PDF

Info

Publication number
CN103343655A
CN103343655A CN2013103008570A CN201310300857A CN103343655A CN 103343655 A CN103343655 A CN 103343655A CN 2013103008570 A CN2013103008570 A CN 2013103008570A CN 201310300857 A CN201310300857 A CN 201310300857A CN 103343655 A CN103343655 A CN 103343655A
Authority
CN
China
Prior art keywords
window
wall
frame
window frame
opening mouth
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013103008570A
Other languages
Chinese (zh)
Other versions
CN103343655B (en
Inventor
张叶锋
王进
韩浏
李建英
潘力
华永亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Construction Group Co Ltd
Original Assignee
Nanjing Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Construction Group Co Ltd filed Critical Nanjing Construction Group Co Ltd
Priority to CN201310300857.0A priority Critical patent/CN103343655B/en
Publication of CN103343655A publication Critical patent/CN103343655A/en
Application granted granted Critical
Publication of CN103343655B publication Critical patent/CN103343655B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Door And Window Frames Mounted To Openings (AREA)
  • Building Environments (AREA)

Abstract

The invention discloses a wall window construction method. A spigot is painted on a window opening firstly, wherein the balancing thickness of the spigot is about 15mm; a uniform and regular clearance cavity is formed among a small surface of the spigot, a plastering forming surface of a window frame and the window opening; materials behind the window frame and sealants can be packed sufficiently, evenly and densely and be bonded sufficiently and firmly with a base surface which is painted in advance; good air tightness and water tightness are guaranteed, and the waterproof and heat-preserving using effect is also guaranteed. By means of the wall window construction method, an external window can be installed in place at one time, so that the installation speed of the window is greatly increased; the packing materials are filled in the uniform and regular clearance cavity, so that the amount of foaming agents and the sealants for use is also reduced; the window opening check process is optimized, the installation of the window saves time, labor and materials, and the probability that the window is subjected to secondary pollution is greatly lowered; the problem of leakage around the window is solved fundamentally, the waterproof effect is good, the cost is low, maintenance responsibilities are clear, and the maintenance is convenient.

Description

Body of wall window job practices
Technical field
The present invention relates to a kind of body of wall window job practices, belong to the construction project technical field.
Background technology
At present, traditional window is installed, and adopts first dress method construction substantially.Namely successively various frame sections are machined the assembling back that finishes at the construction field (site) and install earlier, relevant unit in charge of construction carries out that body of wall whitewashes, after the coating operation, installs and fixes glass and interior wing more subsequently.Packing material consumption is big behind the frame, and leakiness, and the reveal seepage can't guarantee tightness and watertightness, waterproof thermal-insulated weak effect easily.
Summary of the invention
Purpose: in order to overcome the deficiencies in the prior art, the invention provides a kind of body of wall window job practices.
Technical scheme: for solving the problems of the technologies described above, the technical solution used in the present invention is:
A kind of body of wall window job practices is characterized in that, may further comprise the steps,
Steps A, window frame processing and fabricating: make window frame according to dimensioned, reserve fixing hole;
Step B, the window opening mouth moulding of plastering: the seam of the thick adjustment of powder 15mm again in around the window inboard, seam limit and window opening mouth whitewash control line and match, form an evenly gap cavity of rule, be used for to make the abundant filling of material behind the window frame frame and fluid sealant, make it evenly closely knit;
Step C, window frame are installed: the window frame centering is in place, fixing temporarily, by reserving fixing hole, with the window frame left and right sides and upside, with expansion bolt frame and wall is connected and fixed, and window frame downside frame installed inside near the window spike is fixed; Can play the effect of other side force in antiseep, Wind-Pressure Resistance and the anti-use;
Step D, filling, processing window frame and body of wall slit: after window frame fixes, in time handle window frame and body of wall slit, back dress window frame and body of wall gap 5~8mm adopt the blowing agent joint filling, prepare to beat the fluid sealant filleting;
Step e, play fluid sealant construction; seal: lean on the periphery of wall on two sides inside and outside the window frame; and the seam crossing between frame and the frame; cut the residual protection sheet of housing periphery earlier; clean up again and glued joint tactile object surfaces, use the glue rifle along slit pressure injection fluid sealant then, and make that the glue face is smooth, even, smooth, pore-free; must guarantee in 24 hours, not shaken after playing glue, guarantee that sealed colloid obtains abundant air hardeningization.
Described body of wall window job practices is characterized in that described step B specifically refers to:
(b1) base treatment; Clean floating ash, greasy dirt, the garbage-cleaning of surface of wall around the window opening mouth, and before construction, water water-wet, water and should carry out in the previous day of plastering, if basic unit's overdrying, it is moistening once to water before plastering again, but metope can not have open fire when plastering;
(b2) window opening masonry surface whitewashing, get rid of hair: the building glairin cement paste with 1:4 gets rid of or is sprayed onto metope, and it gets rid of a little wants even, and burr length to be controlling in 6 millimeters, and water seasoning after its final set has with hand up to the cement paste burr and to break motionless intensity off with the fingers and thumb;
(b3) play control line around the window opening mouth, play the THICKNESS CONTROL line, draw vertical, horizontal control line, thickness, the smooth verticality of control rendering layer;
(b4) preparation mortar: cement mortar is with cement, sand, water, and according to certain part by weight, in the regular hour, mix forms;
(b5) smear the bottom mortar: THICKNESS CONTROL is at 7~9mm; Smear the thin ash of one deck before smearing earlier, matrix is smeared sternly, the compacting of exerting oneself when smearing is clamp-oned in the fine gap mortar, scrapes levelling with yoke and puts in order, and rubs hair with the hands with wood float; Check comprehensively then whether the bottom ash is smooth, whether the hole Fang Zhi, clean and tidy;
(b6) float coat mortar: thickness is 5~8mm, and when smearing, if the bottom ash overdrying, it is moistening then to water, and and then uses the wood float rubbing and pressure, makes surfacing closely knit, and inner corner trim is rubbed with the hands straight with inside-corner trowel; Carry out the mat coat powder construction at last, thickness 1.5-2.5mm carries out according to the order under going up afterwards earlier, rolls real press polish then; The seam of the thick adjustment of powder 15mm again in the 80mm width range around the window inboard simultaneously, seam limit and window opening mouth whitewash control line and match, and minus deviation is no more than 1.5mm(namely, seam can be thin partially); Dipping in water with hairbrush at last cleans out mat coat powder pollution place.
Described body of wall window job practices is characterized in that described step C specifically refers to:
(c1) the window frame centering is in place, fixing temporarily: after according to the installation site line of having put well stile being installed, adjust, proofread and correct its verticality, levelness, diagonal and depth position, after meeting the requirements, temporary transient timber wedge is fixed;
(c2) being connected of window frame and wall: according to the reconnaissance trip situation, be the hollow brick material as body of wall, the window opening mouth is not reserved embedded part, should reserve the solid brick building block, do the connection mother metal so can only select solid brick building block position, the window frame left and right sides and upside are connected and fixed frame and wall with expansion bolt; Be concrete material as body of wall, then can directly punch, with expansion bolt frame and body of wall are fixed; The window frame downside is fixed with stator.In sum, can play Wind-Pressure Resistance and anti-other side force effects.
As preferred version, the position of stator or expansion bolt among the described step C should be apart from the angle of window frame, mullion, transom be smaller or equal to 180mm, and the distance between adjacent fixed sheet or the expansion bolt should be not more than 500mm.
Described body of wall window job practices is characterized in that: window opening mouth dimensional requirement is among the described step B: when frame outside window is of a size of b mm * h mm, the window opening mouth aftershaping size of plastering should be: [b+ (10~16)] * [h+ (10~16)] mm;
Window opening mouth plaster finished surface planeness and levelness allowable error, ± 1.5mm; The window opening mouth is plastered, and completion is positive, lateral vertical degree allowable error: ± 1.5mm.
Beneficial effect: body of wall window job practices provided by the invention, earlier the window opening mouth being whitewashed moulding finishes, carry out window frame again, the construction technology that sash is installed, both guaranteed the full of forms periphery packing material, closely knit, reached good waterproof quality effect, avoided forms to be damaged by civil engineering again, pollute, have the following advantages: 1 avoids the reveal seepage: go out a seam that the 15mm left and right sides is thick by first powder, seam facet and window frame and plaster between the forming surface, form an evenly gap cavity of rule, can make the filling of material behind the window frame frame and fluid sealant abundant, evenly closely knit, and and the basal plane that whitewashes in advance well-bonded firmly; The superperformance of tightness and watertightness and waterproof thermal-insulated result of use have been guaranteed; 2 reduce the destroyed or pollution of finished product: exterior window is installed and can be begun to carry out after whole wet trades are all finished, and is convenient to forms and avoids polluting and finished product protection; 3 reduce secondary installing has reduced the working procedure of installing, and has reduced construction cost, has shortened the exterior window installation duration, avoids crossed construction between the installation of body of wall window job practices and the wet trade.Simultaneously, the expansion of exterior plaster construction is not subjected to the restriction that attached frame is installed in the traditional handicraft in the civil engineering, can carry out in advance, can shorten the construction period; 4 have saved the consumption of materials such as blowing agent: because the gap at frame and hole is 5~8mm, and the consumption of the materials such as blowing agent that its slit is embedded, the consumption in the traditional handicraft in the irregular gap also significantly reduces.5 size Control are accurate, whitewash the confined space of face and window frame formation rule, are conducive to outer window frame sealing molding quality.
Description of drawings
Fig. 1 is the flow chart of body of wall window job practices of the present invention;
Fig. 2 is the structural representation of body of wall window of the present invention;
Fig. 3 is the structural representation of window frame among the present invention;
Fig. 4 is the generalized section of A-A face among Fig. 1;
Fig. 5 is the generalized section of B-B face among Fig. 1.
Among the figure: body of wall 1, window frame 2, window opening mouth 3, seam 4, expansion bolt 5, blowing agent 6, fluid sealant 7, spike 8, stator 9 is reserved fixing hole 10.
The specific embodiment
Below in conjunction with accompanying drawing the present invention is done further explanation.
As shown in Figure 1, a kind of body of wall window job practices may further comprise the steps:
A, window frame 2 processing and fabricatings, as shown in Figure 3,
1 raw material should check its specification and quality certificate, and qualified raw material could be used for processing and fabricating.
2 window frames should be reserved fixing hole 10 in process.
3 behind the erecting bed, and reply checks according to plan whether the size of window and deformity out of plane meet the requirements etc.
The moulding of plastering of B, window opening mouth 3
1) 1, window opening mouth dimensional requirement:
Frame size (mm): b * h outside window
The window opening mouth aftershaping size (mm) of plastering: [b+ (10~16)] * [h+ (10~16)];
2, the window opening mouth plaster completion surface evenness and levelness allowable error: ≦ ± 1.5mm.
3, the window opening mouth plaster be completed positive, lateral vertical degree allowable error: ≦ ± 1.5mm.
2) reveal face masonry should be reserved solid block, and suitable mark is made in the back reply position of plastering, and as reserving the colligation silk or tinting etc., carries out handover record, is beneficial to correct punching, the location.All the other execution countries and the corresponding masonry structure of provinces and cities, the standard of decorative engineering, standard, rules, regulation.
3) window opening mouth plastering technique
(1) base treatment.The floating ash of hole surface of wall, greasy dirt, rubbish etc. are cleaned out, and before construction, watered water-wet (water and should carry out in the previous day of plastering, if basic unit's overdrying, it is moistening once to water, but metope can not have open fire when plastering) again before plastering.Base treatment has been got well the probability that can reduce gaul.
(2) hair is whitewashed, is got rid of on the surface.Building glairin cement paste with 1:4 gets rid of (or spray) to metope, and it gets rid of a little wants evenly, and in 6 millimeters, water seasoning after its final set has higher-strength up to the cement paste burr to burr length, breaks motionless being as the criterion off with the fingers and thumb with hand with control.Whitewashing is got rid of hair and has been handled well, can increase the caking ability of plastering with metope, reduces the generation of gaul.
(3) play control line around the hole, play the THICKNESS CONTROL line, draw vertical, horizontal control line, thickness, planeness and the verticality of control rendering layer.
(4) preparation mortar.
Cement mortar is with cement, sand, water, and according to certain part by weight, in the regular hour, mix forms;
(5) smear the bottom mortar.Every time thickness should be controlled at 7~9mm.Should smear the thin ash of one deck earlier before smearing, require matrix is smeared sternly, the compacting of exerting oneself when smearing is squeezed in people's fine gap mortar, scrapes levelling with yoke and puts in order, and rubs hair with the hands with wood float.Check comprehensively then whether the bottom ash is smooth, whether the hole Fang Zhi, clean and tidy.
(6) float coat mortar.Thickness is 5~8mm.Begin float coat ash (when smearing such as bottom ash overdrying should water moistening) when the bottom ash reaches intensity about 60~70%, and then use the wood float rubbing and pressure, make surfacing closely knit, inner corner trim is rubbed with the hands straight with inside-corner trowel.Carry out the cover construction at last, the about 1.5~2.5mm of face plaster layer thickness.Best two people cooperate simultaneously and carry out during operation, and a people scrapes the thin ash of cover earlier, and another people is floating immediately.Carry out according to the order under going up afterwards earlier, roll real press polish then.The seam of powder 15mm again in the 80mm width range around the window inboard simultaneously, seam 4 limits should be whitewashed control line with window opening mouth 3 and match, and minus deviation is no more than 1.5mm(namely, seam can be thin partially).Dipping in water with hairbrush at last cleans out mat coat powder pollution place.
4) hole plastering quality control
(1) raw material quality control
1) sand: use medium sand or coarse sand to mix with medium sand and mix, forbid to adopt fine sand.Must test after sand is marched into the arena, particularly mud content and grating must satisfy match ratio design and job specfication requirement.Sandy control is directly connected to the quality quality of plastering, and must get hold of this key link.
2) cement: strength grade is not less than 32.5, must use after the assay was approved through retrial.
(2) mix procedure quality control processed
1) whitewash mortar kind and match ratio thereof, the character of the structure parent basic unit that should depend on according to forms is determined.
2) operating personnel are carried out safety technics and tell somebody what one's real intentions are, and on-the-spot guidance.
3) must carry out spice in strict accordance with match ratio.
(3) gaul Crack Control
1) base cleaning is clean or deal with improperly; Metope waters not saturating, and the moisture in the back mortar of plastering is very fast to be absorbed by basic unit's (or bottom ash), influences adhesion stress, should conscientiously clear up and water in advance, makes water infiltrate brick wall (or other structure parents) the inside and reaches 8~10mm, can reach requirement.
2) basic unit's deviation is bigger, and it is blocked up once to plaster, and easily produces dry shrinkage and cracking, should divide three layers of powder to put down and be advisable.
C, window frame are installed
1 window frame centering is in place, fixing temporarily
Behind the installation site line installation stile of having put well, should adjust, proofread and correct its verticality, levelness, diagonal and depth position, after meeting the requirements, temporarily fix with timber wedge.
2 window frames are connected with wall
As Fig. 2, Fig. 4 and shown in Figure 5, according to the reconnaissance trip situation, be hollow brick as masonry panel, the window opening mouth is not reserved embedded part, should reserve the solid brick building block, so can only select solid brick building block position, the window frame left and right sides and upside are connected and fixed frame and wall with expansion bolt 5.Be that concrete then can directly punch and with expansion bolt 5 frame and body of wall fixed as masonry panel.The window frame downside is fixing with stator 9, plays antiseep and Wind-Pressure Resistance effect.
The position of fixture (or hole) should be apart from the angle of window, mullion, transom be smaller or equal to 180mm, and the distance between the fixture (or hole) should be not more than 500mm.The spike 8 of end opening is installed the frame near the window inboard of trying one's best, and is convenient to the window limit and plays glue.
D, processing window frame and body of wall slit:
As shown in Figure 4 and Figure 5, after window frame fixes, should in time handle window frame and body of wall slit, blowing agent 6 joint fillings are adopted at 5~8mm in after loading window frame and body of wall gap, beat fluid sealant 7 filletings again.Noting when filling out embedding firmly should be not excessive, prevents window frame stressed back distortion.
E, fluid sealant construction
1 dozen of glue: lean on the periphery of wall on two sides inside and outside the window frame; and the seam crossing between frame and the frame; cut the residual protection sheet of housing periphery earlier; clean up again and glued joint tactile thing surface; use the glue rifle along slit pressure injection fluid sealant then; and make that the glue face is smooth, even, smooth, pore-free, and must guarantee in 24 hours, not shaken after playing glue, guarantee that sealing is firmly.
2 cleanings: will stain dirts such as cement paste on frame, fan, glass and windowsill, glue mark, and wipe clean clearly with wiping cloth (rags).
The above only is preferred embodiment of the present invention; be noted that for those skilled in the art; under the prerequisite that does not break away from the principle of the invention, can also make some improvements and modifications, these improvements and modifications also should be considered as protection scope of the present invention.

Claims (5)

1. a body of wall window job practices is characterized in that, may further comprise the steps,
Steps A, window frame processing and fabricating: make window frame according to dimensioned, reserve fixing hole;
Step B, the window opening mouth moulding of plastering: the seam of the thick adjustment of powder 15mm again in around the window inboard, seam limit and window opening mouth whitewash control line and match, form an evenly gap cavity of rule, be used for to make the abundant filling of material behind the window frame frame and fluid sealant, make it evenly closely knit;
Step C, window frame are installed: the window frame centering is in place, fixing temporarily, by reserving fixing hole, with the window frame left and right sides and upside, with expansion bolt frame and wall is connected and fixed, and window frame downside frame installed inside near the window spike is fixed; Can play the effect of other side force in antiseep, Wind-Pressure Resistance and the anti-use;
Step D, filling, processing window frame and body of wall slit: after window frame fixes, in time handle window frame and body of wall slit, back dress window frame and body of wall gap 5~8mm adopt the blowing agent joint filling, prepare to beat the fluid sealant filleting;
Step e, play fluid sealant construction; seal: lean on the periphery of wall on two sides inside and outside the window frame; and the seam crossing between frame and the frame; cut the residual protection sheet of housing periphery earlier; clean up again and glued joint tactile object surfaces, use the glue rifle along slit pressure injection fluid sealant then, and make that the glue face is smooth, even, smooth, pore-free; must guarantee in 24 hours, not shaken after playing glue, guarantee that sealed colloid obtains abundant air hardeningization.
2. body of wall window job practices according to claim 1 is characterized in that described step B specifically refers to:
(b1) base treatment; Clean floating ash, greasy dirt, the garbage-cleaning of surface of wall around the window opening mouth, and before construction, water water-wet, water and should carry out in the previous day of plastering, if basic unit's overdrying, it is moistening once to water before plastering again, but metope can not have open fire when plastering;
(b2) window opening masonry surface whitewashing, get rid of hair: the building glairin cement paste with 1:4 gets rid of or is sprayed onto metope, and it gets rid of a little wants even, and burr length to be controlling in 6 millimeters, and water seasoning after its final set has with hand up to the cement paste burr and to break motionless intensity off with the fingers and thumb;
(b3) play control line around the window opening mouth, play the THICKNESS CONTROL line, draw vertical, horizontal control line, thickness, the smooth verticality of control rendering layer;
(b4) preparation mortar: cement mortar is with cement, sand, water, and according to certain part by weight, in the regular hour, mix forms;
(b5) smear the bottom mortar: THICKNESS CONTROL is at 7~9mm; Smear the thin ash of one deck before smearing earlier, matrix is smeared sternly, the compacting of exerting oneself when smearing is clamp-oned in the fine gap mortar, scrapes levelling with yoke and puts in order, and rubs hair with the hands with wood float; Check comprehensively then whether the bottom ash is smooth, whether the hole Fang Zhi, clean and tidy;
(b6) float coat mortar: thickness is 5~8mm, and when smearing, if the bottom ash overdrying, it is moistening then to water, and and then uses the wood float rubbing and pressure, makes surfacing closely knit, and inner corner trim is rubbed with the hands straight with inside-corner trowel; Carry out the mat coat powder construction at last, thickness 1.5-2.5mm carries out according to the order under going up afterwards earlier, rolls real press polish then; The seam of the thick adjustment of powder 15mm again in the 80mm width range around the window inboard simultaneously, seam limit and window opening mouth whitewash control line and match, and minus deviation is no more than 1.5mm; Dipping in water with hairbrush at last cleans out mat coat powder pollution place.
3. body of wall window job practices according to claim 1 is characterized in that described step C specifically refers to:
(c1) the window frame centering is in place, fixing temporarily: after according to the installation site line of having put well stile being installed, adjust, proofread and correct its verticality, levelness, diagonal and depth position, after meeting the requirements, temporary transient timber wedge is fixed;
(c2) being connected of window frame and wall: according to the reconnaissance trip situation, be the hollow brick material as body of wall, the window opening mouth is not reserved embedded part, should reserve the solid brick building block, do the connection mother metal so can only select solid brick building block position, the window frame left and right sides and upside are connected and fixed frame and wall with expansion bolt; Be concrete material as body of wall, then can directly punch, with expansion bolt frame and body of wall are fixed; The window frame downside is fixed with stator.
4. body of wall window job practices according to claim 3, it is characterized in that: the position of stator or expansion bolt among the described step C, should be apart from the angle of window frame, mullion, transom be smaller or equal to 180mm, the distance between adjacent fixed sheet or the expansion bolt should be not more than 500mm.
5. body of wall window job practices according to claim 1, it is characterized in that: window opening mouth dimensional requirement is among the described step B: when frame outside window is of a size of b mm * h mm, the window opening mouth aftershaping size of plastering should be: [b+ (10~16)] * [h+ (10~16)] mm; Window opening mouth plaster finished surface planeness and levelness allowable error, ± 1.5mm; The window opening mouth is plastered, and completion is positive, lateral vertical degree allowable error: ± 1.5mm.
CN201310300857.0A 2013-07-18 2013-07-18 Wall window construction method Active CN103343655B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310300857.0A CN103343655B (en) 2013-07-18 2013-07-18 Wall window construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310300857.0A CN103343655B (en) 2013-07-18 2013-07-18 Wall window construction method

Publications (2)

Publication Number Publication Date
CN103343655A true CN103343655A (en) 2013-10-09
CN103343655B CN103343655B (en) 2015-01-28

Family

ID=49278480

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310300857.0A Active CN103343655B (en) 2013-07-18 2013-07-18 Wall window construction method

Country Status (1)

Country Link
CN (1) CN103343655B (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103806791A (en) * 2014-01-27 2014-05-21 陈禄民 Embedded installation method of bay window
CN103967386A (en) * 2014-05-13 2014-08-06 二十二冶集团第一建设有限公司 Anti-leakage joint processing method of first filling gap of outer window of building
CN107100489A (en) * 2017-06-23 2017-08-29 重庆亿金铝业有限公司 A kind of window installation method
CN108035657A (en) * 2017-11-10 2018-05-15 增城市碧桂园物业发展有限公司 Aluminum alloy doors and windows construction method
CN108561036A (en) * 2017-11-10 2018-09-21 增城市碧桂园物业发展有限公司 Aluminum alloy doors and windows construction method
CN108708651A (en) * 2018-05-25 2018-10-26 四川华厦建辉门窗幕墙装饰有限公司 A kind of installation method of building doors and windows
CN110284801A (en) * 2019-04-24 2019-09-27 中北大学 A kind of window heat preservation mounting structure and its installation method
CN110528829A (en) * 2019-08-21 2019-12-03 安徽金鹏住工有限公司 A kind of aluminum alloy doors and windows rapid installation process method
CN110821344A (en) * 2019-11-05 2020-02-21 中建鼎元建设工程有限公司 Corrosion-resistant aluminum alloy door and window frame mounting process
CN110984779A (en) * 2019-12-02 2020-04-10 江苏金贸科技发展有限公司 Connecting structure and mounting method for prefabricated window and wall
CN112127752A (en) * 2020-09-07 2020-12-25 青岛中筑置业有限公司 Construction process for installing and preventing leakage of outer flush type outer window
CN114658323A (en) * 2022-03-11 2022-06-24 通号建设集团第一工程有限公司 Method for plugging gap of hole of aluminum alloy window frame
CN114687643A (en) * 2022-04-12 2022-07-01 湖南教建集团有限公司 Novel installation and construction method for clean hole of aluminum alloy outer window

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3995843A (en) * 1973-08-13 1976-12-07 Kasteler Fred J Apparatus for supporting a window buck frame
CN1693609A (en) * 2005-04-04 2005-11-09 朱秦江 Concrete building combined with heat insulating framework and its construction method
KR20060025920A (en) * 2004-09-18 2006-03-22 주식회사 알루폼스코리아 Structure of fixing of window frame and construction method
CN101363269A (en) * 2008-08-13 2009-02-11 中建五局第三建设有限公司 Construction method of plastering-free concrete structure wall putty
CN101418640A (en) * 2008-10-17 2009-04-29 陕西省第三建筑工程公司 External window hole leaving construction method for shearing wall of construction concrete
CN101560858A (en) * 2009-02-20 2009-10-21 深圳市建设(集团)有限公司 Window anti-seepage installation and construction method
CN101592006A (en) * 2009-07-06 2009-12-02 东莞市彩丽建筑维护技术有限公司 A kind of window impaired method in construction that prevents

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3995843A (en) * 1973-08-13 1976-12-07 Kasteler Fred J Apparatus for supporting a window buck frame
KR20060025920A (en) * 2004-09-18 2006-03-22 주식회사 알루폼스코리아 Structure of fixing of window frame and construction method
CN1693609A (en) * 2005-04-04 2005-11-09 朱秦江 Concrete building combined with heat insulating framework and its construction method
CN101363269A (en) * 2008-08-13 2009-02-11 中建五局第三建设有限公司 Construction method of plastering-free concrete structure wall putty
CN101418640A (en) * 2008-10-17 2009-04-29 陕西省第三建筑工程公司 External window hole leaving construction method for shearing wall of construction concrete
CN101560858A (en) * 2009-02-20 2009-10-21 深圳市建设(集团)有限公司 Window anti-seepage installation and construction method
CN101592006A (en) * 2009-07-06 2009-12-02 东莞市彩丽建筑维护技术有限公司 A kind of window impaired method in construction that prevents

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103806791A (en) * 2014-01-27 2014-05-21 陈禄民 Embedded installation method of bay window
CN103806791B (en) * 2014-01-27 2015-11-25 陈禄民 Waft window bay window embedded installing method
CN103967386A (en) * 2014-05-13 2014-08-06 二十二冶集团第一建设有限公司 Anti-leakage joint processing method of first filling gap of outer window of building
CN103967386B (en) * 2014-05-13 2016-03-30 二十二冶集团第一建设有限公司 External window of building first closing in antiseep Node Processing Method
CN107100489A (en) * 2017-06-23 2017-08-29 重庆亿金铝业有限公司 A kind of window installation method
CN108561036A (en) * 2017-11-10 2018-09-21 增城市碧桂园物业发展有限公司 Aluminum alloy doors and windows construction method
CN108035657A (en) * 2017-11-10 2018-05-15 增城市碧桂园物业发展有限公司 Aluminum alloy doors and windows construction method
CN108708651A (en) * 2018-05-25 2018-10-26 四川华厦建辉门窗幕墙装饰有限公司 A kind of installation method of building doors and windows
CN110284801A (en) * 2019-04-24 2019-09-27 中北大学 A kind of window heat preservation mounting structure and its installation method
CN110528829A (en) * 2019-08-21 2019-12-03 安徽金鹏住工有限公司 A kind of aluminum alloy doors and windows rapid installation process method
CN110821344A (en) * 2019-11-05 2020-02-21 中建鼎元建设工程有限公司 Corrosion-resistant aluminum alloy door and window frame mounting process
CN110984779A (en) * 2019-12-02 2020-04-10 江苏金贸科技发展有限公司 Connecting structure and mounting method for prefabricated window and wall
CN112127752A (en) * 2020-09-07 2020-12-25 青岛中筑置业有限公司 Construction process for installing and preventing leakage of outer flush type outer window
CN114658323A (en) * 2022-03-11 2022-06-24 通号建设集团第一工程有限公司 Method for plugging gap of hole of aluminum alloy window frame
CN114687643A (en) * 2022-04-12 2022-07-01 湖南教建集团有限公司 Novel installation and construction method for clean hole of aluminum alloy outer window

Also Published As

Publication number Publication date
CN103343655B (en) 2015-01-28

Similar Documents

Publication Publication Date Title
CN103343655B (en) Wall window construction method
CN107060143B (en) A kind of construction method of prefabricated exterior wall clear-water concrete seam construction
CN103572845B (en) A kind of insulation clay reflective heat-insulation paint exterior wall heat-preserving system and construction technology thereof
CN104612261A (en) Method for external insulation construction of polystyrene board thin plastered surface in cold and windy area
CN108952041A (en) A kind of external wall Stucco finish structure and its method for repairing and constructing
CN106284706A (en) The construction method of external wall outer insulation rock cotton board
CN107255007A (en) Bridge-cut aluminum alloy outer window closing construction method
CN207017857U (en) Bridge cut-off aluminum alloy outer window binding off structure
CN204492025U (en) The waterproof construction of the contour deformation joint of roofing
CN208934297U (en) A kind of hollowing cracking falls off maintenance and renovation renewing outer wall
CN109750758A (en) The construction method that prefabricated sandwich heat preservation shear wall exterior wall is laterally stitched and vertically stitched
CN203783173U (en) Mold-proof structure for wall surface repair construction
KR100906565B1 (en) The remodeling method of structure with tiles
CN106284998A (en) Plastering on inner walls completely spreads fiberglass gridding cloth construction method
CN107237409A (en) Exterior wall heat-insulating paint construction method
US20060123736A1 (en) System and method for filling joints between exterior cement panels
CN111042350A (en) Anti-crack construction method for plastering layers on different interfaces of building outer wall
CN105625650B (en) A kind of parapet of roofing flashing protective layer construction method
CN204492022U (en) The waterproof construction of parapet high-low bay deformation joint
CN108979034A (en) Wall surface construction technology
CN209958651U (en) Ceramic tile outer wall waterproof construction
CN104652623A (en) Construction method for composite insulation mortar
CN203834826U (en) Novel staircase water drip tank
GB2500924A (en) A sill insulation member
CN103089112A (en) Face brick facing door/window side anti-leakage structure and construction method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant