CN104405419B - The parallel median septum construction method of wall multiple-arch tunnel in implicit expression - Google Patents

The parallel median septum construction method of wall multiple-arch tunnel in implicit expression Download PDF

Info

Publication number
CN104405419B
CN104405419B CN201410538377.2A CN201410538377A CN104405419B CN 104405419 B CN104405419 B CN 104405419B CN 201410538377 A CN201410538377 A CN 201410538377A CN 104405419 B CN104405419 B CN 104405419B
Authority
CN
China
Prior art keywords
hole
preliminary bracing
quarter
excavate
apply
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410538377.2A
Other languages
Chinese (zh)
Other versions
CN104405419A (en
Inventor
李海军
张万斌
王明年
曹林卫
付刚
刘大刚
于茂春
朱小兵
李鸿
旷文涛
刘保林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CREEC Chongqing Survey Design and Research Co Ltd
Original Assignee
CREEC Chongqing Survey Design and Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CREEC Chongqing Survey Design and Research Co Ltd filed Critical CREEC Chongqing Survey Design and Research Co Ltd
Priority to CN201410538377.2A priority Critical patent/CN104405419B/en
Publication of CN104405419A publication Critical patent/CN104405419A/en
Application granted granted Critical
Publication of CN104405419B publication Critical patent/CN104405419B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D19/00Provisional protective covers for working space

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses the parallel median septum construction method of wall multiple-arch tunnel in a kind of implicit expression, comprise the upper left quarter that excavates left and right hole, apply preliminary bracing and gib; Excavate the lower left quarter in left and right hole, apply preliminary bracing and gib; Set up diagonal brace, in middle wall lining is built steelframe and the spray of diagonal brace region build concrete; Excavate right hole upper right quarter, apply preliminary bracing; Excavate left hole upper right quarter, apply preliminary bracing; Excavate right hole right lower quadrant, apply preliminary bracing; Excavate left hole right lower quadrant, apply the steps such as preliminary bracing. In implicit expression of the present invention, wall compound multiple-arch tunnel adopts composite lining structure, and middle wall adopts " steel fiber reinforced concrete+profile steel frame " version, and its structure alienation is in hole preliminary bracing in advance; In structure, wall is without gib, can reduce construction way and save investment, and significantly improving Multi-arch Tunnel Construction efficiency, has broad application prospects growing up in tunnel and city tunnel.

Description

The parallel median septum construction method of wall multiple-arch tunnel in implicit expression
Technical field
The invention belongs to tunnel construction technology field, specifically, particularly wall arcading tunnel in a kind of implicit expressionThe parallel median septum construction method in road.
Background technology
At present, the structural shape that multiple-arch tunnel adopts both at home and abroad mainly contains wall multiple-arch tunnel and compound in monoblock typeWall multiple-arch tunnel in formula. In monoblock type, wall multiple-arch tunnel is because difficulty of construction is large, and waterproof effect is poor, and structure is resistance toProperty is poor for a long time, seldom adopts at present. In common combined type, wall multiple-arch tunnel is to adopt at present maximum arcading tunnelsRoad structural shape, but its speed of application is slow, circuit bad adaptability, invest high, efficiency of construction is low.
For this present situation, domestic and international numerous technical staff have studied a lot of improved multiple-arch tunnel structures, thisWall gib during a little structures need mostly, or adopt hole two linings in advance to go to resist pressure from surrounding rock, the executing of employingWork method can be divided into the extended method of middle pilot tunnel method, three pilot tunnel methods, two holes method and first three class, and to two holesMethod transforms, and reduces the impact of leading hole on subsequent handling, to improve efficiency of construction. But, all do not have from rootThe problem that in solving in basis, wall excavation disturbs other operations.
Therefore, wall gib waste of material and the construction of middle wall construction infection in multiple-arch tunnel engineering method existence at presentThe drawback of efficiency, the larger potential safety hazard of tool while simultaneously bringing middle wall gib to remove, anti-drainage effect poor andThe problems such as structure durability is poor, have seriously restricted the extensive use of multiple-arch tunnel.
Summary of the invention
Technical problem to be solved by this invention is to provide the parallel median septum of wall multiple-arch tunnel in a kind of implicit expression to executeWork method.
Technical scheme of the present invention is as follows: the parallel median septum construction method of wall multiple-arch tunnel in a kind of implicit expression, itsBe characterised in that and comprise the following steps:
1) utilize a upper circulation supporting, excavate the upper left quarter in left and right hole, the initial stage that applies each hole upper left quarter props upProtect (1), and form Zhong Qiang top steelframe (3); Apply top in the centre position on top, each hole faces simultaneouslyTime supporting (2), the upper end of top gib (2) and the preliminary bracing (1) of corresponding hole upper left quarter are connectedConnect;
2) excavate the lower left quarter in left and right hole, apply the preliminary bracing (4) of each hole lower left quarter, and in formingWall bottom steelframe (6), makes the preliminary bracing (4) of each hole lower left quarter and preliminary bracing (1) phase of upper left quarterConnect, Zhong Qiang bottom steelframe (6) and Zhong Qiang top steelframe (3) connect to form middle wall lining and build steelframe; SimultaneouslyApply bottom gib (5) in the centre position of bottom, each hole, make the lower end of bottom gib (5)Connect with the preliminary bracing (4) of corresponding hole lower left quarter, upper end and the top of bottom gib (5) are interimThe lower end of supporting (2) connects to form median septum, and the median septum in hole, left and right parallels;
3) left low right high diagonal brace (7) is set in the upper right side of Zhong Qiang top steelframe (3), makes diagonal brace (7)Yu Zhongqiang top, one end steelframe (3) connect, the other end is connected with the preliminary bracing (1) of right hole upper left quarter;Then in middle wall lining is built steelframe and the spray of diagonal brace (7) region build concrete;
4) excavate right hole upper right quarter, apply the preliminary bracing (8) of right hole upper right quarter, make right hole upper right quarterPreliminary bracing (8) is connected with the preliminary bracing (1) of right hole upper left quarter;
5) excavate left hole upper right quarter, apply the preliminary bracing (9) of left hole upper right quarter, make left hole upper right quarterThe preliminary bracing (1) of Yu Zuo hole, preliminary bracing (9) one end upper left quarter connects, the other end and right hole upper left quarterPreliminary bracing (1) connect;
6) excavate right hole right lower quadrant, apply the preliminary bracing (10) of right hole right lower quadrant, make right hole right lower quadrantThe preliminary bracing (8) of Yu You hole, preliminary bracing (10) one end upper right quarter connects, the other end and right hole lower left quarterPreliminary bracing (4) connect;
7) excavate left hole right lower quadrant, apply the preliminary bracing (11) of left hole right lower quadrant, make left hole right lower quadrantThe preliminary bracing (4) of Yu Zuo hole, preliminary bracing (11) one end lower left quarter connects, the other end and right hole lower left quarterPreliminary bracing (4) connect;
8), after preliminary bracing stabilization, remove top gib (2) and bottom gib (5)The interim steelframe forming, then lays each hole inverted arch and abutment wall bottom splash guard, placing inverted arch abutment wall basisWith inverted arch, after the initial set of inverted arch concrete, placing inverted arch is filled;
9) lay hoop french drain difference laying water-proof coiled material, utilize the each hole of the disposable placing of lining template trolley for baffleArch wall lining cutting.
The invention has the beneficial effects as follows:
1, the present invention do not excavate in pilot tunnel, two cavity parallels constructions, the two interim mid-boards in hole are bordering on parallel, middle wallSynchronously excavate in alienation structure side in space, and secondary sets up steel bearing diagonal, and middle wall concrete is built in secondary spray, lastThe left base tunnel of excavation get out of a predicament or an embarrassing situation country rock ensure in wall stability, the construction of two holes is relatively independent, disturb little, can be largeWidth improves Multi-arch Tunnel Construction efficiency, can realize multiple-arch tunnel and fast construct.
2, the present invention is in conjunction with wall multiple-arch tunnel structure in implicit expression, and first During Initial Stage Construction supporting and Zhong Qiang, finally applyWatertight composition and secondary lining, secondary liner structure is built, two after adopting independent anti-drainage system and uniform thickness in two tunnelsRepeatedly stress state is not experienced in inferior lining cutting, and waterproof system integrality is good, and secondary lining is not easy to crack, has solvedThe anti-drainage effect of multiple-arch tunnel is poor, structure durability is poor, efficiency of construction is low and invest high problem.
3, the present invention construct after structure to have good waterproof system integrality, working security, structure durableProperty and long-term safety, can realize multiple-arch tunnel fast to construct, and has significant engineering significance and social economyBenefit, has broad application prospects in tunnel and city tunnel growing up.
Brief description of the drawings
Fig. 1 is structural representation of the present invention.
Detailed description of the invention
Below in conjunction with drawings and Examples, the invention will be further described:
As shown in Figure 1, in implicit expression, the parallel median septum construction method of wall multiple-arch tunnel has following steps:
1) utilize a upper circulation supporting, excavate the upper left quarter in left and right hole simultaneously, apply each hole upper left quarter at the beginning ofPhase supporting 1, and form Zhong Qiang top steelframe 3; Apply top in the centre position on top, each hole props up simultaneously temporarilyProtect 2, the upper end of top gib 2 is connected with the preliminary bracing 1 of corresponding hole upper left quarter.
2) excavate the lower left quarter in left and right hole, apply the preliminary bracing 4 of each hole lower left quarter, and in forming under wallPortion's steelframe 6, is connected the preliminary bracing 4 of each hole lower left quarter and the preliminary bracing 1 of upper left quarter, Zhong Qiang bottomSteelframe 6 and Zhong Qiang top steelframe 3 connect to form middle wall lining and build steelframe; While is in the centre position of bottom, each holeApply bottom gib 5, the lower end of bottom gib 5 and the preliminary bracing of corresponding hole lower left quarter 4 are connectedConnect, the lower end of the upper end of bottom gib 5 and top gib 2 connects to form median septum, hole, left and rightMedian septum parallel; Preliminary bracing 1, preliminary bracing 4, bottom gib 5 and the top in each hole are interimSupporting 2 is adjacent successively, composition closed-loop structure.
3) left low right high diagonal brace 7 is set in the upper right side of Zhong Qiang top steelframe 3, the one end that makes diagonal brace 7 withZhong Qiang top steelframe 3 connects, and the other end is connected with the preliminary bracing 1 of right hole upper left quarter; Then at middle wall liningIn block steelframe and diagonal brace 7 regions are sprayed and are built concrete.
4) excavate right hole upper right quarter, apply the preliminary bracing 8 of right hole upper right quarter, make the initial stage of right hole upper right quarterSupporting 8 is connected with the preliminary bracing 1 of right hole upper left quarter.
5) excavate left hole upper right quarter, apply the preliminary bracing 9 of left hole upper right quarter, make the initial stage of left hole upper right quarterThe preliminary bracing 1 of supporting 9 Yu Zuo hole, one end upper left quarters connects, the preliminary bracing 1 of the other end and right hole upper left quarterConnect.
6) excavate right hole right lower quadrant, apply the preliminary bracing 10 of right hole right lower quadrant, make the initial stage of right hole right lower quadrantThe preliminary bracing 8 of supporting 10 Yu You hole, one end upper right quarters connects, the preliminary bracing of the other end and right hole lower left quarter4 connect.
7) excavate left hole right lower quadrant, apply the preliminary bracing 11 of left hole right lower quadrant, make the initial stage of left hole right lower quadrantThe preliminary bracing 4 of supporting 11 Yu Zuo hole, one end lower left quarters connects, the preliminary bracing of the other end and right hole lower left quarter4 connect; The preliminary bracing skeleton of whole multiple-arch tunnel completes.
8), after preliminary bracing stabilization, remove top gib 2 and form with bottom gib 5Interim steelframe, then lay each hole inverted arch and abutment wall bottom splash guard, placing inverted arch abutment wall basis and inverted arch,After the initial set of inverted arch concrete, placing inverted arch is filled.
9) lay hoop french drain difference laying water-proof coiled material, utilize the each hole of the disposable placing of lining template trolley for baffleArch wall lining cutting.
In above operation, each preliminary bracing and gib are steel frame construction; Step 8) remove interim steelframeAfter operation and step 9) be prior art, therefore not to repeat here.

Claims (1)

1. the parallel median septum construction method of wall multiple-arch tunnel in implicit expression, is characterized in that comprising the following steps:
1) utilize a upper circulation supporting, excavate the upper left quarter in left and right hole, the initial stage that applies each hole upper left quarter props upProtect (1), and form Zhong Qiang top steelframe (3); Apply top in the centre position on top, each hole faces simultaneouslyTime supporting (2), the upper end of top gib (2) and the preliminary bracing (1) of corresponding hole upper left quarter are connectedConnect;
2) excavate the lower left quarter in left and right hole, apply the preliminary bracing (4) of each hole lower left quarter, and in formingWall bottom steelframe (6), makes the preliminary bracing (4) of each hole lower left quarter and preliminary bracing (1) phase of upper left quarterConnect, Zhong Qiang bottom steelframe (6) and Zhong Qiang top steelframe (3) connect to form middle wall lining and build steelframe; SimultaneouslyApply bottom gib (5) in the centre position of bottom, each hole, make the lower end of bottom gib (5)Connect with the preliminary bracing (4) of corresponding hole lower left quarter, upper end and the top of bottom gib (5) are interimThe lower end of supporting (2) connects to form median septum, and the median septum in left and right hole parallels;
3) left low right high diagonal brace (7) is set in the upper right side of Zhong Qiang top steelframe (3), makes diagonal brace (7)Yu Zhongqiang top, one end steelframe (3) connect, the other end is connected with the preliminary bracing (1) of right hole upper left quarter;Then in middle wall lining is built steelframe and the spray of diagonal brace (7) region build concrete;
4) excavate right hole upper right quarter, apply the preliminary bracing (8) of right hole upper right quarter, make right hole upper right quarterPreliminary bracing (8) is connected with the preliminary bracing (1) of right hole upper left quarter;
5) excavate left hole upper right quarter, apply the preliminary bracing (9) of left hole upper right quarter, make left hole upper right quarterThe preliminary bracing (1) of Yu Zuo hole, preliminary bracing (9) one end upper left quarter connects, the other end and right hole upper left quarterPreliminary bracing (1) connect;
6) excavate right hole right lower quadrant, apply the preliminary bracing (10) of right hole right lower quadrant, make right hole right lower quadrantThe preliminary bracing (8) of Yu You hole, preliminary bracing (10) one end upper right quarter connects, the other end and right hole lower left quarterPreliminary bracing (4) connect;
7) excavate left hole right lower quadrant, apply the preliminary bracing (11) of left hole right lower quadrant, make left hole right lower quadrantThe preliminary bracing (4) of Yu Zuo hole, preliminary bracing (11) one end lower left quarter connects, the other end and right hole lower left quarterPreliminary bracing (4) connect;
8), after preliminary bracing stabilization, remove top gib (2) and bottom gib (5)The interim steelframe forming, then lays each hole inverted arch and abutment wall bottom splash guard, placing inverted arch abutment wall basisWith inverted arch, after the initial set of inverted arch concrete, placing inverted arch is filled;
9) lay hoop french drain difference laying water-proof coiled material, utilize the each hole of the disposable placing of lining template trolley for baffleArch wall lining cutting.
CN201410538377.2A 2014-10-13 2014-10-13 The parallel median septum construction method of wall multiple-arch tunnel in implicit expression Active CN104405419B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410538377.2A CN104405419B (en) 2014-10-13 2014-10-13 The parallel median septum construction method of wall multiple-arch tunnel in implicit expression

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410538377.2A CN104405419B (en) 2014-10-13 2014-10-13 The parallel median septum construction method of wall multiple-arch tunnel in implicit expression

Publications (2)

Publication Number Publication Date
CN104405419A CN104405419A (en) 2015-03-11
CN104405419B true CN104405419B (en) 2016-05-18

Family

ID=52643075

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410538377.2A Active CN104405419B (en) 2014-10-13 2014-10-13 The parallel median septum construction method of wall multiple-arch tunnel in implicit expression

Country Status (1)

Country Link
CN (1) CN104405419B (en)

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101737061B (en) * 2009-12-24 2011-11-16 中国水电顾问集团华东勘测设计研究院 Method for constructing double-arch tunnel by rebuilding and expanding existing single-hole tunnel
CN201696056U (en) * 2010-03-04 2011-01-05 湖南省交通规划勘察设计院 Improved structure of twin-arch tunnel with composite middle partition wall
CN201635745U (en) * 2010-04-08 2010-11-17 安徽省交通规划设计研究院 Ribbed-arch multi-arch tunnel
CN101864960B (en) * 2010-05-17 2013-06-19 中铁二十局集团有限公司 Carst region double-arch road tunnel construction method
CN102305077A (en) * 2011-09-23 2012-01-04 中南大学 Rapid construction method of large-section multi-arc tunnel
CN203685204U (en) * 2013-12-20 2014-07-02 中铁二院重庆勘察设计研究院有限责任公司 Spraying building concealed irregular middle wall combined type multiple-arch tunnel lining structure

Also Published As

Publication number Publication date
CN104405419A (en) 2015-03-11

Similar Documents

Publication Publication Date Title
CN101864963B (en) Large-section loess tunnel construction method
CN203239357U (en) Adjacent tunnel supporting structure suitable for collapsible loess
CN104963689A (en) Three-step seven-procedure excavation method for tunnel
CN203547773U (en) Channel combined support structure suitable for slowly inclined stratified rock mass
CN106223967B (en) A kind of great burying rectangle or class rectangle tunneling shield constructing device and method
CN106050245A (en) Supporting structure for zero distance underneath pass of existing station of rectangular tunnel section and construction method
CN104653187B (en) Method for excavating geological large-section tunnel with water-rich sand layer
CN107605490B (en) Single hole large cross-section tunnel double side wall construction conversion process
CN204877493U (en) Soft rock tunnel supporting construction
CN104405411A (en) Oversized variable cross section tunnel supporting structure
CN204551487U (en) A kind of steel support structure that can realize Adjacent Pit synchronous construction
CN104806251A (en) Subsidiary inverted excavation construction method for urban subway station under complex environment
CN203531925U (en) Self-propelled integral template of tunnel inverted arch
CN101539021A (en) Road tunnel excavation method
CN204532364U (en) Tunneling boring rock tunnel development machine engineering method subway tunnel pressure release type liner structure
CN104405402A (en) Symmetric middle separation wall construction method for hidden type middle wall multi-arch tunnel
CN204436407U (en) The structure that the pre-Geological disaster prevention of the double-deck preliminary bracing of a kind of big cross section Support System in Soft Rock Tunnels occurs
CN203835403U (en) Clearance strengthening system for serious cracking of existing tunnel lining arch
CN203822325U (en) Steel grating steel arch frame combined support for initial stage of expansibility soil layer tunnel
CN103291328B (en) Swelling rock roadway bottom plate treatment method
CN204941551U (en) A kind of subway station of Curve Pipe Jacking supporting and protection structure enlarging shield-tunneling construction
CN104405419B (en) The parallel median septum construction method of wall multiple-arch tunnel in implicit expression
CN204386617U (en) Consolidation grouting structure of low waterhead diversion tunnel
CN203809010U (en) Cavern stability improving structure
CN204783020U (en) Shallow undercut tunnel construction equipment that buries of large -span

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant