CN201696056U - Improved structure of twin-arch tunnel with composite middle partition wall - Google Patents

Improved structure of twin-arch tunnel with composite middle partition wall Download PDF

Info

Publication number
CN201696056U
CN201696056U CN2010201224539U CN201020122453U CN201696056U CN 201696056 U CN201696056 U CN 201696056U CN 2010201224539 U CN2010201224539 U CN 2010201224539U CN 201020122453 U CN201020122453 U CN 201020122453U CN 201696056 U CN201696056 U CN 201696056U
Authority
CN
China
Prior art keywords
partition wall
middle partition
arch tunnel
twin
arch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010201224539U
Other languages
Chinese (zh)
Inventor
易震宇
陈骅伟
***
张进华
傅立新
柏署
刘永胜
黄欣
王建华
刘正刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUNAN COMMUNICATION PLANNING AND PROSPECTING DESIGN ACADEMY
Hunan Provincial Communications Planning Survey and Design Institute Co Ltd
Original Assignee
HUNAN COMMUNICATION PLANNING AND PROSPECTING DESIGN ACADEMY
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUNAN COMMUNICATION PLANNING AND PROSPECTING DESIGN ACADEMY filed Critical HUNAN COMMUNICATION PLANNING AND PROSPECTING DESIGN ACADEMY
Priority to CN2010201224539U priority Critical patent/CN201696056U/en
Application granted granted Critical
Publication of CN201696056U publication Critical patent/CN201696056U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model relates to the field of structural design of highway tunnels, in particular to a structural design of a twin-arch tunnel with a composite middle partition wall, which aims to solve the problems of the conventional twin-arch tunnel with an integral or composite middle partition wall that cracking in the fixing positions between primary supports and the middle partition wall is a common phenomenon, particularly for unsymmetrial loading tunnels and tunnels in soft and weak geologic zones, and that the cracking of secondary linings even happens to some twin-arch tunnels after the construction of the secondary linings. The structure is characterized in that the primary supports and the secondary linings of the conventional twin-arch tunnel with the composite middle partition wall are independently shaped into rings, and joints in the fixing positions between the middle partition wall and the primary supports or the secondary linings are removed. The utility model can facilitate the construction, guarantee the construction quality, and effectively prevent the cracking of the primary supports and the arch haunches of the secondary linings.

Description

A kind of modified combined type mid-board multiple-arch tunnel structure
Technical field
The present invention relates to highway tunnel structure design class, specifically relate to a kind of structure design of combined type mid-board multiple-arch tunnel.
Background technology
At present, multiple-arch tunnel has monolithic mid-board shown in Figure 1 and two kinds of patterns of combined type mid-board shown in Figure 2.Wherein 4. the mid-board of monolithic mid-board multiple-arch tunnel is that Integratively is built, the preliminary bracing in hole, the multiple-arch tunnel left and right sides 3. with secondary lining 1. all be fixed in mid-board 4. on.The preliminary bracing of combined type mid-board multiple-arch tunnel 3. be fixed in mid-board 4. on, secondary lining is independent Cheng Huan 1..In the middle of the Road Multiple Arch Tunnel of having implemented, no matter monolithic mid-board multiple-arch tunnel still is a combined type mid-board multiple-arch tunnel, supporting in the early stage 3. with the 4. haunch position of bearing of mid-board, cracking phenomena often appears, especially general for unsymmetrial loading tunnel and geology weak broken tunnel.1. cracking phenomena of secondary lining also appears in the multiple-arch tunnel that has even after 1. secondary lining has applied.Trace it to its cause, preliminary bracing 3. or secondary lining 1. with mid-board 4. the joint of bearing apply difficulty, construction quality is difficult to guarantee.
Summary of the invention
For solving the problem that preliminary bracing of conventional multiple-arch tunnel structure and mid-board bearing are prone to cracking, 1. 3. the preliminary bracing of conventional combined type mid-board all be arranged to ring separately with secondary lining, remove the 4. joint of bearing of preliminary bracing and secondary lining and mid-board.Lay waterproofing course 2. between supporting in the early stage and the secondary lining.Apply secondary lining at last 1..As shown in Figure 3, this structure facility of not only constructing, construction quality can be guaranteed, can also effectively prevent preliminary bracing 3. with the 1. generation of haunch position cracking phenomena of secondary lining.
Description of drawings
Fig. 1 is a monolithic mid-board multiple-arch tunnel profile;
Fig. 2 is a combined type mid-board multiple-arch tunnel profile;
Fig. 3 is a modified combined type mid-board multiple-arch tunnel profile.
1 represents secondary lining among the figure, and 2 represent waterproofing course, and 3 represent preliminary bracing, and 4 represent mid-board.
The specific embodiment
In the practice of construction process, mid-board 4. apply finish after, 3. the preliminary bracing of combined type mid-board directly is supported on the basis, form that annular is closed to be supported.Supporting in the early stage 3. and secondary lining lay waterproofing course 2. between 1..Apply secondary lining at last 1..

Claims (1)

1. a modified combined type mid-board multiple-arch tunnel structure is characterized in that: the preliminary bracing and the secondary lining of combined type mid-board all are arranged to independently become ring structure, between supporting in the early stage and the secondary lining waterproofing course are set.
CN2010201224539U 2010-03-04 2010-03-04 Improved structure of twin-arch tunnel with composite middle partition wall Expired - Fee Related CN201696056U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010201224539U CN201696056U (en) 2010-03-04 2010-03-04 Improved structure of twin-arch tunnel with composite middle partition wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010201224539U CN201696056U (en) 2010-03-04 2010-03-04 Improved structure of twin-arch tunnel with composite middle partition wall

Publications (1)

Publication Number Publication Date
CN201696056U true CN201696056U (en) 2011-01-05

Family

ID=43397296

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010201224539U Expired - Fee Related CN201696056U (en) 2010-03-04 2010-03-04 Improved structure of twin-arch tunnel with composite middle partition wall

Country Status (1)

Country Link
CN (1) CN201696056U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102182469A (en) * 2011-05-04 2011-09-14 中铁三局集团有限公司 Construction method for preventing cracking of second lining of middle cavity of large span tunnel
CN102305077A (en) * 2011-09-23 2012-01-04 中南大学 Rapid construction method of large-section multi-arc tunnel
CN102797477A (en) * 2012-08-10 2012-11-28 中国建筑第四工程局有限公司 Method for preventing partition from biasing in tunnel
CN104405419A (en) * 2014-10-13 2015-03-11 中铁二院重庆勘察设计研究院有限责任公司 Parallel middle separation wall construction method for hidden type middle wall multi-arch tunnel
CN104612704A (en) * 2015-01-08 2015-05-13 云南省交通规划设计研究院 Middle-wall-free multi-arch tunnel
CN113931169A (en) * 2021-11-03 2022-01-14 中建五局土木工程有限公司 Bias multi-arch tunnel portal soft foundation zone combined structure and construction method

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102182469A (en) * 2011-05-04 2011-09-14 中铁三局集团有限公司 Construction method for preventing cracking of second lining of middle cavity of large span tunnel
CN102305077A (en) * 2011-09-23 2012-01-04 中南大学 Rapid construction method of large-section multi-arc tunnel
CN102797477A (en) * 2012-08-10 2012-11-28 中国建筑第四工程局有限公司 Method for preventing partition from biasing in tunnel
CN102797477B (en) * 2012-08-10 2015-05-27 中国建筑第四工程局有限公司 Method for preventing partition from biasing in tunnel
CN104405419A (en) * 2014-10-13 2015-03-11 中铁二院重庆勘察设计研究院有限责任公司 Parallel middle separation wall construction method for hidden type middle wall multi-arch tunnel
CN104612704A (en) * 2015-01-08 2015-05-13 云南省交通规划设计研究院 Middle-wall-free multi-arch tunnel
CN113931169A (en) * 2021-11-03 2022-01-14 中建五局土木工程有限公司 Bias multi-arch tunnel portal soft foundation zone combined structure and construction method

Similar Documents

Publication Publication Date Title
CN201696056U (en) Improved structure of twin-arch tunnel with composite middle partition wall
CN103953353A (en) Shield starting reaction frame and mounting and using method thereof
CN103775101A (en) Shield tunnel duct piece structure and shield tunnel lining with same
CN104213928A (en) Horseshoe-shaped shield tunnel lining structure
CN208220811U (en) A kind of inverted arch support component suitable for the tunnel shield formula TBM prefabricated pipe section liner structure
CN203822315U (en) Shield starting reaction frame
CN103758530A (en) Primary support multiple-arch dual-liner independent underground excavation subway interval structure and construction method
CN204327112U (en) Tunnel hole-exiting advance support system
CN102155236A (en) Shield starting counter-force base
CN104775823A (en) Double-line mining method subway tunnel inclined well entering main tunnel structure and process thereof
CN201674171U (en) Combined cable trough
CN103526776A (en) Rubber waterstop rigidity layering method and rubber waterstop for immersed tunnel
CN204476420U (en) A kind of tunnel being applicable to bias voltage landform
CN103016022B (en) Self-adaptation joint for deformation joint and application of self-adaptation joint for deformation joint
CN202055828U (en) Shield starting reaction support
CN103867210B (en) A kind of city underground list branch-cut bridge excavating construction method
CN103538147B (en) Special-shaped prestressing combination support pile punching block
RU134214U1 (en) TUNNEL TUBING RING FOR UNDERGROUND METRO STRUCTURES
CN104675560B (en) A kind of weld stress homogenization melon lobe forming store-vessel bottom
CN209569012U (en) A kind of pipe-plate lining ring suitable for vertical shaft
CN204987837U (en) Cement rotary kiln stove lining structure
CN204094659U (en) For the hand vice of construction opening back-up ring
CN208501675U (en) A kind of detachable civil engineering foundation pile
CN203579871U (en) Special-shaped prestressed combined support pile steel die
CN104266486B (en) EAF bottom annular masonry building method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110105

Termination date: 20190304

CF01 Termination of patent right due to non-payment of annual fee