CN203547773U - Channel combined support structure suitable for slowly inclined stratified rock mass - Google Patents

Channel combined support structure suitable for slowly inclined stratified rock mass Download PDF

Info

Publication number
CN203547773U
CN203547773U CN201320655835.1U CN201320655835U CN203547773U CN 203547773 U CN203547773 U CN 203547773U CN 201320655835 U CN201320655835 U CN 201320655835U CN 203547773 U CN203547773 U CN 203547773U
Authority
CN
China
Prior art keywords
arch
steel frame
rock mass
support structure
combined support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320655835.1U
Other languages
Chinese (zh)
Inventor
匡亮
高扬
潘建平
谭永杰
陈赤坤
陶伟明
郑宗溪
赵万强
熊祥雪
朱志远
刘翔宇
邱柏川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Eryuan Engineering Group Co Ltd CREEC
Original Assignee
China Railway Eryuan Engineering Group Co Ltd CREEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Eryuan Engineering Group Co Ltd CREEC filed Critical China Railway Eryuan Engineering Group Co Ltd CREEC
Priority to CN201320655835.1U priority Critical patent/CN203547773U/en
Application granted granted Critical
Publication of CN203547773U publication Critical patent/CN203547773U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

A channel combined support structure suitable for a slowly inclined stratified rock mass is used for effectively reinforcing a channel top plate rock mass, controlling the deformation and instability of surrounding rock, ensuring the rock stability at the arch top, fully ensuring the stability of surrounding rock and the support after excavation, maintaining the stability of an excavated surface, reducing the settling quantity of the arch top and ensuring construction safety. The channel combined support structure suitable for the slowly inclined stratified rock mass comprises a grating steel frame (1), a jetting concrete arch section (2), jetting concrete edge wall sections (3), arch part radial anchor rods (4) and advance anchor rods or advance small guide pipes (5); the arch radial anchor rods (4) and the advance anchor rod or advance small guide pipes (5) are arranged in a range of 120 degrees and are firmly connected with the grating steel frame (1); longitudinal steel bars (9) are arranged in the grating steel frame (1).

Description

Be applicable to the tunnel combined support structure of the slow beded rock mass that inclines
Technical field
The utility model relates to railway tunnel, particularly a kind of tunnel combined support structure that is applicable to the slow beded rock mass that inclines.
Background technology
Rock mass structure can be divided into complete structure, block structure, cataclastic texture, layer structure, the large class of prose style free from parallelism structure five conventionally, the analysis of stratified rock mass structure classification that the aspect of wherein take is structural plane can be divided into alternating layers, interbed, thin layer and soft formation, and its intensity is controlled by the destruction of sillar intensity, structural plane intensity, rock stratum face and maximum principal plane angle and generation mainly.The beded rock mass that the slow beded rock mass that inclines refers to that rock stratum face and horizontal plane angle are less than 20~30 °, be generally sedimentary rock, can be formed by single lithology, also can be combined by different lithology alternating layers or interlayer, aspect often has the interlayer changing of the relative positions, aspect adhesion a little less than, its destruction mostly is that top curved is sunk and produce absciss layer, when deflection is larger, the layering destruction that occurs fractureing.At layering, good and weak intercalated layer is grown, is excavated large span tunnel in the slow beded rock mass inclining of occurrence, hole top girth rock stability problem is outstanding, in beded rock mass, a large amount of slow shape structural planes that incline of depositing of composing easily cause tunnel thin layer and medium bed roof strata to sink to fractureing, if supporting intensity rigidity not or support time not in time, very easily there is inbreak in vault rock stratum, and inbreak span successively decreases from the bottom up successively, finally form the slump space of notch cuttype, stable unfavorable especially to arch crown part.
It is the New Austrian Tunneling Method construction of core that current tunnel generally adopts Shotcrete Rockbolt Support Technique, preliminary bracing layer is comprised of anchor pole, steel mesh reinforcement, sprayed mortar etc., anchor pole, steel mesh reinforcement are evenly arranged along arch wall position conventionally, sprayed mortar layer thickness equates along arch wall position thickness, the supporting and protecting system of tunnel of this routine is not had a specific aim in the slow beded rock mass that inclines, both having caused the waste of engineering material and investment,, easily there is engineering accident in the problem that simultaneously can not emphasis solves the inbreak of rock stratum, arch, caves in.Therefore need the special supporting structural system that solves arch, tunnel stability for the slow beded rock mass primary study that inclines badly.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of tunnel combined support structure that is applicable to the slow beded rock mass that inclines, with effective Strengthening Tunnel roof rock mass, deformation controlling for rock surrounding gateways and unstability, guarantee arch Rock Slide Stability, fully guarantee the stable of the rear country rock of excavation and supporting, and it is stable to maintain excavation face, reduces vault settling amount, guarantee construction safety.
The technical scheme that the purpose of this utility model adopts is as follows:
The utility model is applicable to the tunnel combined support structure of the slow beded rock mass that inclines, comprise grid steel frame, sprayed mortar arch section, sprayed mortar abutment wall section, arch radially anchor pole, advance anchor bolt or advanced tubule, it is characterized in that: described arch radially anchor pole, advance anchor bolt or advanced tubule is disposed within the scope of 120 ° of arch, and be firmly connected with grid steel frame, between grid steel frame, establish longitudinal dowel.
The beneficial effects of the utility model are, for the slow beded rock mass tunnel excavation destructive characteristics of inclining, emphasis is strengthened the strength and stiffness of arch supporting and protection structure, effective Strengthening Tunnel roof rock mass, deformation controlling for rock surrounding gateways and unstability, assurance arch Rock Slide Stability; The combining structure that leading pre-supporting and arch add strong supporting fully guarantees to excavate the stable of rear country rock and supporting, and it is stable to maintain excavation face, reduces vault settling amount, guarantees construction safety; Structure is light and handy, and manufacture craft is simple, installs and sets up conveniently, and stress condition is good, and energy immediate support, bears load fast, at the surrouding rock deformation initial stage, can effectively control distortion, prevents country rock generation injurious deformation; Cost savings, grid steel frame steel using amount is few, economical aspect is far superior to profile steel frame, artificial and machinery expenses also greatly reduces, cancel the little abutment wall anchor pole of use simultaneously, in the better situation of abutment wall wall rock condition, attenuate sprayed mortar thickness, cancellation abutment wall grid, save great amount of investment, guaranteeing to produce huge economy and social benefit in safe construction situation; Speed of application is fast, and the grid set-up time is short, and has saved abutment wall anchor pole and grid applies the time, can realize slow tunnel, the rock stratum quick supporting construction of inclining.
Accompanying drawing explanation
This manual comprises following five width accompanying drawings:
Fig. 1 is the profile that the utility model is applicable to the tunnel combined support structure embodiment 1 of the slow beded rock mass that inclines;
Fig. 2 is the sectional view along A-A line in Fig. 1;
Fig. 3 is the zoomed-in view of Local C in Fig. 1;
Fig. 4 is the profile that the utility model is applicable to the tunnel combined support structure embodiment 2 of the slow beded rock mass that inclines;
Fig. 5 is the sectional view along B-B line in Fig. 4;
Toponym and corresponding mark in figure: grid steel frame 1, sprayed mortar arch section 2, sprayed mortar abutment wall section 3, arch radially anchor pole 4, advance anchor bolt or advanced tubule 5, lock pin anchor tube 6, steel mesh reinforcement 13, face 7, get out of a predicament or an embarrassing situation not excavation portion 8, longitudinal dowel 9, pading plate 10, the main muscle 11 of grid, grid contact radially rock-bolt length l of muscle 12, arch 1, circumferential distance d 1, longitudinal pitch d 2, grid steel frame longitudinal pitch d 3, advance anchor bolt or ductule length l 2, longitudinal pitch d 4, top bar height h 1, get out of a predicament or an embarrassing situation height h 2, overall height H.
The specific embodiment
Below in conjunction with accompanying drawing and example, the utility model is further illustrated.
With reference to Fig. 1, Fig. 2 and Fig. 3, the utility model is applicable to the tunnel combined support structure of the slow beded rock mass that inclines, and comprises grid steel frame 1, sprayed mortar arch section 2, sprayed mortar abutment wall section 3, arch radially anchor pole 4, advance anchor bolt or advanced tubule 5.Described arch radially anchor pole 4, advance anchor bolt or advanced tubule 5 is disposed within the scope of 120 ° of arch, and is firmly connected with grid steel frame 1, and 1 of grid steel frame is established longitudinal dowel 9.This combined support structure effective Strengthening Tunnel roof rock mass in the slow beded rock mass constructing tunnel that inclines, fully guarantees the stable of country rock and face after excavation, controls wall rock destabilization and excessive sedimentation, assurance construction safety.Compare with the supporting and protection structure that profile steel frame forms, grid steel frame combined support structure has that speed of application is fast, structure is light and handy, manufacture craft is simple, install set up conveniently, stress condition is good, remarkable advantage that can immediate support, slow tunnel, the rock stratum fast and safe construction that inclines can be realized, huge economic and social benefit can be produced.Grid steel frame is compared profile steel frame simultaneously, and steel using amount is few, cost savings, artificial and machinery expenses also greatly reduces, economy aspect is much better than profile steel frame, and in the better situation of abutment wall wall rock condition, attenuate sprayed mortar thickness, cancellation abutment wall grid, can be engineering economy great amount of investment.
The slow rock stratum tunnel excavation damage envelope that inclines mainly occurs in vault, numerical analysis shows, the top board plastic zone degree of depth is about 2~3 times of abutment wall, and vault settling amount is much larger than abutment wall horizontal convergence amount, and therefore the slow rock stratum Tunnel Stability that inclines is controlled the strength and stiffness of answering emphasis to strengthen arch supporting and protection structure.The support action of system anchor bolt mainly contains suspention, compound beam, extruding reinforcement effect, effective Strengthening Tunnel roof rock mass, controlroof surrouding rock deformation and unstability, according to production practices and field measurement data, show, slow, incline in beded rock mass tunnel, within the scope of 120 ° of arch, the suffered axle power of anchor pole is larger, the abutment wall position suffered pulling force of anchor pole is very little, do not bring into play due effect, therefore the utility model proposes bolt support prioritization scheme, only within the scope of 120 ° of arch, configure radially anchor pole, abutment wall does not set anchor pole.Simultaneously, before tunnel excavation, take pre-supporting reinforcing technique extremely important to guaranteeing stablizing of the rear country rock of excavation and supporting, the utility model adopts the pre-supporting technology measure of advance anchor bolt or advanced tubule, with after excavation radially anchor pole, pneumatically placed concrete layer form support system jointly grid steel frame, arch, at tunnel cross section, form an arch non-individual body, make it reinforce excavation face earth layer in front.After tunnel excavation to before supporting and protection structure generation effect during this period of time, empty rock mass is faced in supporting, maintains excavation face stable, reduces settling amount.
Grid steel frame is a kind of Novel steel frame of being used widely after external experience of drawing, and it has, and steel using amount is few, stress condition good, make and to set up the advantages such as simple, supporting is timely, is particularly suitable for easily occurring use in the slow beded rock mass tunnel that inclines of top inbreak.According to abutment wall position country rock situation, grid steel frame can adopt the scope setting of 180 ° of arch or the setting of arch wall scope.The embodiment 1 that sees figures.1.and.2 and illustrate, if rock stratum, tunnel side wall position is more stable, integrality is better, 180 ° along arch scope settings of grid steel frame 1, grid is not established at abutment wall position, and the thickness of sprayed mortar arch section 2 is greater than the thickness of sprayed mortar abutment wall section 3.With reference to by the embodiment 2 shown in Fig. 4 and Fig. 5, as abutment wall rock crack is grown, integrality is poor, grid steel frame 1 is along the setting of arch wall position, and the thickness of sprayed mortar arch section 2, sprayed mortar abutment wall section 3 is equal.
Grid steel frame 1 sets up after excavation face is just sprayed one deck concrete, set arch radially after anchor pole 4 and advance anchor bolt or advanced tubule 5 more again pneumatically placed concrete to design thickness, arch radially anchor pole 4 requires to be firmly connected with grid steel frame 1 with advance anchor bolt or advanced tubule 5, can by arch radially anchor pole 4 and advance anchor bolt or advanced tubule 5 require with grid steel frame 1 integrally welded, stressed to increase supporting integral body.1 of grid steel frame is established longitudinal dowel 9, to strengthen steelframe resistance to overturning.Lock pin anchor tube 6 and pading plate 10 are established in steelframe footing or junction, unit, to increase base bearing capacity.Grid steel frame 1 is welded by main muscle, contact muscle, angle steel, and main muscle adopts three limbs or the main muscle of four limbs, and contact muscle adopts splayed to connect, with bolts between each unit grid.
The outer limb of described advance anchor bolt or advanced tubule 5 is 10~15 °, along circuit longitudinal lap joint length, is 0.5~1.0m.The body of advanced tubule plays the effect of advance anchor bolt simultaneously, pass through conduit slip casting simultaneously, can reinforce top certain limit rock mass, again can rest country rock, its support rigidity, pre-supporting effect are better than advance anchor bolt, be applicable to weak broken band, Shallow Section, underground water and grow the pre-supporting in section tunnel, advance anchor bolt is applicable to that surrouding rock stress is less, underground water is less, rock mass is compared with the pre-supporting in reduction stage tunnel.
The above the utility model that just explains through diagrams is applicable to some principles of the tunnel combined support structure of the slow beded rock mass that inclines, be not the utility model to be confined to shown in and in described concrete structure and the scope of application, therefore the corresponding modify being likely utilized every and equivalent, all belong to the scope of the claims that the utility model is applied for.

Claims (5)

1. be applicable to the tunnel combined support structure of the slow beded rock mass that inclines, comprise grid steel frame (1), sprayed mortar arch section (2), sprayed mortar abutment wall section (3), arch radially anchor pole (4), advance anchor bolt or advanced tubule (5), it is characterized in that: described arch radially anchor pole (4), advance anchor bolt or advanced tubule (5) is disposed within the scope of 120 ° of arch, and be firmly connected with grid steel frame (1), between grid steel frame (1), establish longitudinal dowel (9).
2. the tunnel combined support structure that is applicable to the slow beded rock mass that inclines as claimed in claim 1, it is characterized in that: 180 ° along arch scope settings of described grid steel frame (1), the thickness of sprayed mortar arch section (2) is greater than the thickness of sprayed mortar abutment wall section (3).
3. the tunnel combined support structure that is applicable to the slow beded rock mass that inclines as claimed in claim 1, is characterized in that: described grid steel frame (1) arranges along arch wall position, and the thickness of sprayed mortar arch section (2), sprayed mortar abutment wall section (3) equates.
4. the tunnel combined support structure that is applicable to the slow beded rock mass that inclines as claimed in claim 1, it is characterized in that: described grid steel frame (1) adopts three limbs or the main muscle of four limbs, contact muscle adopts splayed to connect, with bolts between each unit grid, lock pin anchor tube (6) and pading plate (10) are established in steelframe footing or junction, unit.
5. the tunnel combined support structure that is applicable to the slow beded rock mass that inclines as claimed in claim 1, is characterized in that: the outer limb of described advance anchor bolt or advanced tubule (5) is 10~15 °, along circuit longitudinal lap joint length, is 0.5~1.0m.
CN201320655835.1U 2013-10-23 2013-10-23 Channel combined support structure suitable for slowly inclined stratified rock mass Expired - Fee Related CN203547773U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320655835.1U CN203547773U (en) 2013-10-23 2013-10-23 Channel combined support structure suitable for slowly inclined stratified rock mass

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320655835.1U CN203547773U (en) 2013-10-23 2013-10-23 Channel combined support structure suitable for slowly inclined stratified rock mass

Publications (1)

Publication Number Publication Date
CN203547773U true CN203547773U (en) 2014-04-16

Family

ID=50465902

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320655835.1U Expired - Fee Related CN203547773U (en) 2013-10-23 2013-10-23 Channel combined support structure suitable for slowly inclined stratified rock mass

Country Status (1)

Country Link
CN (1) CN203547773U (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104343461A (en) * 2014-09-10 2015-02-11 西南交通大学 Light supporting method applicable to gently-dipping-stratum massive rock tunnel
CN106121693A (en) * 2016-07-21 2016-11-16 中电建路桥集团有限公司 A kind of horizontal interbedding of soft and hard rocks surrounding rock tunnel suspension roof support structure and method
CN106703839A (en) * 2016-12-28 2017-05-24 中铁第四勘察设计院集团有限公司 Lattice girder non-welding supporting structure for tunnel primary support construction
CN106703835A (en) * 2016-12-28 2017-05-24 中铁第四勘察设计院集团有限公司 Welding-free quick assembly supporting structure with grid steel frames for tunnel primary supporting construction
CN106761847A (en) * 2016-12-28 2017-05-31 中铁第四勘察设计院集团有限公司 A kind of profile steel frame for tunnel just branch construction is exempted to weld pin-connected panel supporting construction
CN106761846A (en) * 2016-12-28 2017-05-31 中铁第四勘察设计院集团有限公司 A kind of grid steel frame for tunnel just branch construction exempts to weld pin-connected panel supporting construction
CN107420121A (en) * 2017-09-20 2017-12-01 中铁十四局集团有限公司 A kind of interim steelframe locks pin construction method
CN108756948A (en) * 2018-06-15 2018-11-06 中铁工程设计咨询集团有限公司 A kind of longspan tunnel prestressed anchor net branch shell is from carrying supporting construction
CN111119963A (en) * 2020-03-05 2020-05-08 中铁(天津)隧道工程勘察设计有限公司 Large-span cavern two-lining steel bar hanging bracket combined structure and construction method
CN111577339A (en) * 2020-04-21 2020-08-25 中国建筑股份有限公司 High-ground-stress soft rock tunnel supporting structure system and construction method thereof
CN112727473A (en) * 2021-02-04 2021-04-30 中铁二院工程集团有限责任公司 Pre-anchoring rapid tunneling construction method for high-ground-stress large-deformation tunnel
CN112796795A (en) * 2020-12-28 2021-05-14 中国科学院武汉岩土力学研究所 Combined supporting device, combined supporting system and method for anchor rod and section steel

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104343461A (en) * 2014-09-10 2015-02-11 西南交通大学 Light supporting method applicable to gently-dipping-stratum massive rock tunnel
CN106121693A (en) * 2016-07-21 2016-11-16 中电建路桥集团有限公司 A kind of horizontal interbedding of soft and hard rocks surrounding rock tunnel suspension roof support structure and method
CN106703839B (en) * 2016-12-28 2019-02-05 中铁第四勘察设计院集团有限公司 It is a kind of at the beginning of tunnel branch construct grid steel frame exempt from weld supporting construction
CN106761847B (en) * 2016-12-28 2019-02-05 中铁第四勘察设计院集团有限公司 It is a kind of at the beginning of tunnel branch construct profile steel frame exempt from weld pin-connected panel supporting construction
CN106761847A (en) * 2016-12-28 2017-05-31 中铁第四勘察设计院集团有限公司 A kind of profile steel frame for tunnel just branch construction is exempted to weld pin-connected panel supporting construction
CN106761846A (en) * 2016-12-28 2017-05-31 中铁第四勘察设计院集团有限公司 A kind of grid steel frame for tunnel just branch construction exempts to weld pin-connected panel supporting construction
CN106703835A (en) * 2016-12-28 2017-05-24 中铁第四勘察设计院集团有限公司 Welding-free quick assembly supporting structure with grid steel frames for tunnel primary supporting construction
CN106703835B (en) * 2016-12-28 2019-02-05 中铁第四勘察设计院集团有限公司 It is a kind of at the beginning of tunnel branch construct grid steel frame exempt from weld quick assembling supporting construction
CN106703839A (en) * 2016-12-28 2017-05-24 中铁第四勘察设计院集团有限公司 Lattice girder non-welding supporting structure for tunnel primary support construction
CN106761846B (en) * 2016-12-28 2019-02-05 中铁第四勘察设计院集团有限公司 It is a kind of at the beginning of tunnel branch construct grid steel frame exempt from weld pin-connected panel supporting construction
CN107420121A (en) * 2017-09-20 2017-12-01 中铁十四局集团有限公司 A kind of interim steelframe locks pin construction method
CN108756948A (en) * 2018-06-15 2018-11-06 中铁工程设计咨询集团有限公司 A kind of longspan tunnel prestressed anchor net branch shell is from carrying supporting construction
CN108756948B (en) * 2018-06-15 2023-06-20 中铁工程设计咨询集团有限公司 Self-bearing supporting structure for large-span tunnel prestress anchor net supporting rock shell
CN111119963A (en) * 2020-03-05 2020-05-08 中铁(天津)隧道工程勘察设计有限公司 Large-span cavern two-lining steel bar hanging bracket combined structure and construction method
CN111577339A (en) * 2020-04-21 2020-08-25 中国建筑股份有限公司 High-ground-stress soft rock tunnel supporting structure system and construction method thereof
CN111577339B (en) * 2020-04-21 2021-09-28 中国建筑股份有限公司 High-ground-stress soft rock tunnel supporting structure system and construction method thereof
CN112796795A (en) * 2020-12-28 2021-05-14 中国科学院武汉岩土力学研究所 Combined supporting device, combined supporting system and method for anchor rod and section steel
CN112727473A (en) * 2021-02-04 2021-04-30 中铁二院工程集团有限责任公司 Pre-anchoring rapid tunneling construction method for high-ground-stress large-deformation tunnel

Similar Documents

Publication Publication Date Title
CN203547773U (en) Channel combined support structure suitable for slowly inclined stratified rock mass
CN102562075B (en) Large cross-section weak surrounding rock tunnel three-step and six-part short-distance construction method
CN104533446A (en) Construction method and structure of two-layer preliminary support for preventing geological disaster of large-section weak surrounding rock tunnel
CN104963689A (en) Three-step seven-procedure excavation method for tunnel
CN107288653A (en) A kind of the benching tunnelling method excavation supporting structure of weak surrounding rock large cross-section tunnel double -side approach three and construction method
CN201771517U (en) Tunnel support structure
CN104863597B (en) A kind of construction method transverse direction hole lid method in shallow buried covered excavation Large Underground space
CN203515604U (en) Tunnel Support structure for schist layer in deformation
CN106761778A (en) A kind of underground digging in subway station construction technology suitable for upper-soft lower-hard ground
CN103244130A (en) Quick excavation and expanding construction method of herringbone tunnel section
CN109026020B (en) Water-rich tunnel karst cave treatment and excavation method
CN110130927A (en) A kind of carbonaceous slate serious deformation control construction method
CN104405411A (en) Oversized variable cross section tunnel supporting structure
CN204311459U (en) Oblique double soldier pile body structure before chair shape
CN203488189U (en) Tunnel structure for emptying renovation
CN105134269A (en) Control technology for roadway surrounding rock achieving cooperative load bearing by enabling anchor cables to penetrate through sheds
CN102817621B (en) Comprehensive construction method applicable to controlling arch basement sedimentation for tunnel in unfavorable geological conditions
CN107905814A (en) Large span loess tunnel top bar CD construction methods
CN109056790A (en) Stake three layers of retaining wall structure of support and construction method
CN207111103U (en) A kind of benching tunnelling method excavation supporting structure of weak surrounding rock large cross-section tunnel double -side approach three
CN114352358B (en) Dynamic grading control method and system for large deformation of high-ground-stress deep-buried soft rock tunnel
CN103244129A (en) Construction method for three-dimensional intersection concave-convex fulcrums
CN109538236B (en) Tunnel entering structure and tunnel entering construction method
CN104532855A (en) Combined pile supporting structure in deep and thick peat soil layer
CN104594297A (en) Double-deck concrete faced rock-fill dam and construction method thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140416