CN104120716A - Slurry wall protection construction method for bored pile - Google Patents

Slurry wall protection construction method for bored pile Download PDF

Info

Publication number
CN104120716A
CN104120716A CN201310154457.3A CN201310154457A CN104120716A CN 104120716 A CN104120716 A CN 104120716A CN 201310154457 A CN201310154457 A CN 201310154457A CN 104120716 A CN104120716 A CN 104120716A
Authority
CN
China
Prior art keywords
hole
concrete
casing
mud
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310154457.3A
Other languages
Chinese (zh)
Inventor
杨哲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201310154457.3A priority Critical patent/CN104120716A/en
Publication of CN104120716A publication Critical patent/CN104120716A/en
Pending legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a slurry wall protection construction method for a bored pile. The slurry wall protection construction method includes the following steps that step 1, a pile hole is positioned; step 2, a pile casing is buried; step 3, a drilling machine is in place; step 4, qualified slurry is prepared; step 5, hole forming and hole clearing are performed; step 6, a steel reinforcement cage is lifted for placing; step 7, underwater concrete is cast. According to the slurry wall protection construction method for the bored pile, operation is easy, the problems that the pile hole deviates, and pile body concrete is mixed with slurry are solved, and the construction method is suitable for slurry wall protection hole forming bored pile engineering of soft and hard soil layers high in underground water level in industrial and civil buildings.

Description

A kind of holing with slurry wall protection cast-in-place pile construction method
Technical field
The present invention relates to a kind of holing with slurry wall protection cast-in-place pile construction method, belong to technical field of building construction.
Background technology
Castinplace pile system refers at engineering site and in foundation soil, forms stake hole by means such as machine drilling, steel pipe soil compaction or manpower excavations, and place reinforcing cage, concrete perfusion therein and the stake of making, according to hole forming method difference, castinplace pile can be divided into again several classes such as tube-sinking cast-in-situ pile, bored pile and digging hole filling pile.Bored pile is a kind of stake type of definition by piling method classification.
The construction of bored pile, because of the difference that its selected retaining wall forms, has two kinds of mud off construction method and full-sleeve construction methods, and existing holing with slurry wall protection filling pile construction exists the easy shortcoming that produces stake hole deflection and concrete piles folder mud.
Summary of the invention
Goal of the invention: the object of the invention is to for the deficiencies in the prior art, a kind of holing with slurry wall protection cast-in-place pile construction method is provided, this technological operation is simple, the problem that has solved stake hole deflection and concrete piles folder mud, is applicable to high soft, the hardpan mud off pore-creating filling pile engineering of groundwater table in industry and civilian construction.
Technical scheme: a kind of holing with slurry wall protection cast-in-place pile construction method of the present invention, comprises the steps:
(1) stake hole location: before construction, according to the axis of stake, draw the cross centre line of each position, center line is with tingle stickfast near timber stake hole, and pile position deviation is controlled in 10mm, and stake is buried underground and is firmly had eye-catching mark;
(2) casing is buried underground: the position of casing is buried underground accurately and be stable, between casing and hole wall, tamp with clay, casing plasma discharge mouth communicates with mud ditch, casing center line is not more than 50mm with stake bit line deviation, casing 1.0 meters of buried depths in cohesive soil, casing 100~200mm above ground level suitable for reading, exempts from mud face for wall and fluctuates, wash away hole wall and draw and cause the hole that collapses, more than retaining hole entoplasm face exceeds groundwater table 1.0m;
(3) rig is in place: rig maintenance balance in place, and in the time creeping into operation, not run-off the straight displacement, measure drilling rod verticality at both direction with transit in advance, drilling rod perpendicularity deviation is controlled in 0.2%, and drill bit is accurate to hole, and bit central and casing deviation are less than 15mm;
(4) prepare qualified mud: the clay of index of plasticity Ip≤17 for mud materials, tap water, the pH value of water body is 7~9, add appropriate swell soil, dispersing agent and tackifier stir and form, and mud circulating system arranges circulatory pool, pulp storage tank and sedimentation basin, and it is arranged by the unearthed amount of three times and calculates;
(5) pore-forming and clear hole: in boring procedure, the 5 meters of left and right of often advancing, measure the verticality of a hole wall, until absolute altitude at the bottom of design hole, often hole depth, aperture, vertical degree of the peg hole are checked, guarantee to meet design requirement, carry out hole clearly,, want mud face in retaining hole not reduce when in clear the hole, prevent shrinkage cavity, collapse hole, after reinforcing cage hand-hole and catheter placement, before filling concrete, to using premium mud secondary pile hole cleaning at the bottom of hole, make sediment drift about overflow, pour into front hole at the bottom of sediment thickness be less than 100mm;
(6) reinforcing cage hangs: reinforcing cage preliminary election is made moulding by design drawing, for ensureing that reinforcing cage is in transport, in hoisting process, do not deform, with spiral or welding ring u stirrup u, add reinforcement stirrup one every 2 meters, and pointwise and main muscle weld, the protective layer used precast concrete roundel of reinforcing bar is enclosed within to be strengthened on hoop dish, both can prevent from transferring reinforcing bar collision hole wall, work again the steel bar cage protecting layer effect of controlling, reinforcing cage sling and vertical righting after, slowly transfer along guiding steel pipe, must not collide hole wall, after pore-forming, lay as early as possible reinforcing cage, at the bottom of reducing hole, back-silt, end face and bottom surface absolute altitude meet designing requirement, be less than ± 50mm of error,
(7) cast underwater concrete: before pouring concrete, sediment thickness at the bottom of repetition measurement hole, tremie collocation and assembling need be calculated in advance according to hole depth, determine that reasonably collocation is beneficial to the dismounting of mixed pouring and conduit, conduit is suitable for reading to be directly connected with concrete storage bin hopper end opening, and higher than 3 meters, mud face, storage bin hopper inner concrete storage capacity must meet cuts plug requirement, while perfusion first, tremie bottom is as the criterion with 0.8~1.2 meter of Transducers Embedded in Concrete, concrete is answered continuous pouring, forbid to stop work midway, in filling process, survey the lifting height of concrete surface through conventional plummet, and conduit is dismantled in lifting in good time step by step, strictly control the minimum depth of conduit according to actual conditions, to ensure the continuous uniform of pile concrete, the rate of climb of filling concrete is more than or equal to 2m/h.
Further improve technique scheme, described step (two) casing application tool formula steel casing, adopts abrasion drill, and internal diameter is than the large 100mm of bit diameter, and top is opened height and established 1~2 slurry hole of overflowing.
Further improve technique scheme, described step (five) is selected mud direct circulation and anti-round-robin method operation according to concrete engineering situation, and dissimilar soil layer adopts different drill bits.
Further, while creeping into through cohesive soil, mud and mucky soil and sand, select fishtail bit or cage type bit; Through not thick sand folder cobble or in the time that decayed rock layer creeps into, select the cage type bit of seting welding carbide cutter head.
Further, when described step (seven) is kept a grip on underground concrete, infusion time is controlled at the concrete imbedded in conduit not in time of lost flowability, adds if desired appropriate retarding agent.
The present invention compared with prior art, its beneficial effect is: holing with slurry wall protection cast-in-place pile construction method of the present invention, simple to operate, the problem that has solved stake hole deflection and concrete piles folder mud, is applicable to high soft, the hardpan mud off pore-creating filling pile engineering of groundwater table in industry and civilian construction.
Detailed description of the invention
Below technical solution of the present invention is elaborated, but protection scope of the present invention is not limited to described embodiment.
embodiment 1:a kind of holing with slurry wall protection cast-in-place pile construction method, comprises the steps:
(1) stake hole location: before construction, according to the axis of stake, draw the cross centre line of each position, center line is with tingle stickfast near timber stake hole, and pile position deviation is controlled in 10mm, and stake is buried underground and is firmly had eye-catching mark;
(2) casing is buried underground: the position of casing is buried underground accurately and be stable, between casing and hole wall, tamp with clay, casing plasma discharge mouth communicates with mud ditch, casing center line is not more than 50mm with stake bit line deviation, casing 1.0 meters of buried depths in cohesive soil, casing 100~200mm above ground level suitable for reading, exempts from mud face for wall and fluctuates, wash away hole wall and draw and cause the hole that collapses, more than retaining hole entoplasm face exceeds groundwater table 1.0m;
(3) rig is in place: rig maintenance balance in place, and in the time creeping into operation, not run-off the straight displacement, measure drilling rod verticality at both direction with transit in advance, drilling rod perpendicularity deviation is controlled in 0.2%, and drill bit is accurate to hole, and bit central and casing deviation are less than 15mm;
(4) prepare qualified mud: the clay of index of plasticity Ip≤17 for mud materials, tap water, the pH value of water body is 7~9, add appropriate swell soil, dispersing agent and tackifier stir and form, and mud circulating system arranges circulatory pool, pulp storage tank and sedimentation basin, and it is arranged by the unearthed amount of three times and calculates;
(5) pore-forming and clear hole: in boring procedure, the 5 meters of left and right of often advancing, measure the verticality of a hole wall, until absolute altitude at the bottom of design hole, often hole depth, aperture, vertical degree of the peg hole are checked, guarantee to meet design requirement, carry out hole clearly,, want mud face in retaining hole not reduce when in clear the hole, prevent shrinkage cavity, collapse hole, after reinforcing cage hand-hole and catheter placement, before filling concrete, to using premium mud secondary pile hole cleaning at the bottom of hole, make sediment drift about overflow, pour into front hole at the bottom of sediment thickness be less than 100mm;
(6) reinforcing cage hangs: reinforcing cage preliminary election is made moulding by design drawing, for ensureing that reinforcing cage is in transport, in hoisting process, do not deform, with spiral or welding ring u stirrup u, add reinforcement stirrup one every 2 meters, and pointwise and main muscle weld, the protective layer used precast concrete roundel of reinforcing bar is enclosed within to be strengthened on hoop dish, both can prevent from transferring reinforcing bar collision hole wall, work again the steel bar cage protecting layer effect of controlling, reinforcing cage sling and vertical righting after, slowly transfer along guiding steel pipe, must not collide hole wall, after pore-forming, lay as early as possible reinforcing cage, at the bottom of reducing hole, back-silt, end face and bottom surface absolute altitude meet designing requirement, be less than ± 50mm of error,
(7) cast underwater concrete: before pouring concrete, sediment thickness at the bottom of repetition measurement hole, tremie collocation and assembling need be calculated in advance according to hole depth, determine that reasonably collocation is beneficial to the dismounting of mixed pouring and conduit, conduit is suitable for reading to be directly connected with concrete storage bin hopper end opening, and higher than 3 meters, mud face, storage bin hopper inner concrete storage capacity must meet cuts plug requirement, while perfusion first, tremie bottom is as the criterion with 0.8~1.2 meter of Transducers Embedded in Concrete, concrete is answered continuous pouring, forbid to stop work midway, in filling process, survey the lifting height of concrete surface through conventional plummet, and conduit is dismantled in lifting in good time step by step, strictly control the minimum depth of conduit according to actual conditions, to ensure the continuous uniform of pile concrete, the rate of climb of filling concrete is more than or equal to 2m/h.
When Specific construction:
Described (two) casing application tool formula steel casing, adopts abrasion drill, and internal diameter is than the large 100mm of bit diameter, and top is opened height and established 1~2 slurry hole of overflowing.
Described step (five) is selected mud direct circulation and anti-round-robin method operation according to concrete engineering situation, and dissimilar soil layer adopts different drill bits.While creeping into through cohesive soil, mud and mucky soil and sand, select fishtail bit or cage type bit; Through not thick sand folder cobble or in the time that decayed rock layer creeps into, select the cage type bit of seting welding carbide cutter head.
When described step (seven) is kept a grip on underground concrete, infusion time is controlled at the concrete imbedded in conduit not in time of lost flowability, adds if desired appropriate retarding agent.
As mentioned above, although represented and explained the present invention with reference to specific preferred embodiment, it shall not be construed as the restriction to the present invention self.Not departing under the spirit and scope of the present invention prerequisite of claims definition, can make in the form and details various variations to it.

Claims (5)

1. a holing with slurry wall protection cast-in-place pile construction method, is characterized in that, comprises the steps:
(1) stake hole location: before construction, according to the axis of stake, draw the cross centre line of each position, center line is with tingle stickfast near timber stake hole, and pile position deviation is controlled in 10mm, and stake is buried underground and is firmly had eye-catching mark;
(2) casing is buried underground: the position of casing is buried underground accurately and be stable, between casing and hole wall, tamp with clay, casing plasma discharge mouth communicates with mud ditch, casing center line is less than 40mm with stake bit line deviation, casing 1.0 meters of buried depths in cohesive soil, casing 100~200mm above ground level suitable for reading, exempts from mud face for wall and fluctuates, wash away hole wall and draw and cause the hole that collapses, more than retaining hole entoplasm face exceeds groundwater table 1.0m;
(3) rig is in place: rig maintenance balance in place, and in the time creeping into operation, not run-off the straight displacement, first measure drilling rod verticality at both direction with transit, drilling rod perpendicularity deviation is controlled in 0.2%, and drill bit is accurate to hole, and bit central and casing deviation are less than 15mm;
(4) prepare qualified mud: the clay of index of plasticity Ip≤17 for mud materials, the pH value of water body is 7~9, adds swell soil, and dispersing agent and tackifier stir and form, and mud circulating system is provided with circulatory pool, pulp storage tank and sedimentation basin;
(5) pore-forming and clear hole: in boring procedure, the 5 meters of left and right of often advancing, the verticality of a hole wall of measurement, until absolute altitude at the bottom of design hole, guarantee to meet design requirement, carry out hole clearly,, want mud face in retaining hole not reduce when in clear the hole, prevent shrinkage cavity, collapse hole, after reinforcing cage hand-hole and catheter placement, before filling concrete, to using premium mud secondary pile hole cleaning at the bottom of hole, make sediment drift about overflow, pour into front hole at the bottom of sediment thickness be less than 100mm;
(6) reinforcing cage hangs: reinforcing cage preliminary election is made moulding by design drawing, welding ring u stirrup u, adds reinforcement stirrup one every 2 meters, and pointwise and main muscle weld, the protective layer used precast concrete roundel of reinforcing bar is enclosed within to be strengthened on hoop dish, reinforcing cage sling and vertical righting after, slowly transfer along guiding steel pipe, must not collide hole wall, after pore-forming, lay as early as possible reinforcing cage, at the bottom of reducing hole, back-silt, end face and bottom surface absolute altitude meet designing requirement, be less than ± 50mm of error;
(7) cast underwater concrete: before pouring concrete, sediment thickness at the bottom of repetition measurement hole, tremie collocation and assembling, conduit is suitable for reading to be directly connected with concrete storage bin hopper end opening, and higher than 3 meters, mud face, storage bin hopper inner concrete storage capacity must meet cuts plug requirement, while perfusion first, tremie bottom is with 0.8~1.2 meter of Transducers Embedded in Concrete, concrete is answered continuous pouring, forbid to stop work midway, in filling process, survey the lifting height of concrete surface through conventional plummet, and conduit is dismantled in lifting in good time step by step, strictly control the minimum depth of conduit according to actual conditions, to ensure the continuous uniform of pile concrete, the rate of climb of filling concrete is more than or equal to 2m/h.
2. holing with slurry wall protection cast-in-place pile construction method according to claim 1, is characterized in that, described step (two) casing application tool formula steel casing adopts abrasion drill, and internal diameter is than the large 100mm of bit diameter, and top is opened height and established 1~2 slurry hole of overflowing.
3. holing with slurry wall protection cast-in-place pile construction method according to claim 1, is characterized in that, described step (five) is selected mud direct circulation and anti-round-robin method operation according to concrete engineering situation, and dissimilar soil layer adopts different drill bits.
4. holing with slurry wall protection cast-in-place pile construction method according to claim 3, is characterized in that, while creeping into, selects fishtail bit or cage type bit through cohesive soil, mud and mucky soil and sand; Through not thick sand folder cobble or in the time that decayed rock layer creeps into, select the cage type bit of seting welding carbide cutter head.
5. holing with slurry wall protection cast-in-place pile construction method according to claim 3, it is characterized in that, when described step (seven) is built underground concrete, infusion time is controlled at the concrete imbedded in conduit not in time of lost flowability, and must add retarding agent.
CN201310154457.3A 2013-04-28 2013-04-28 Slurry wall protection construction method for bored pile Pending CN104120716A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310154457.3A CN104120716A (en) 2013-04-28 2013-04-28 Slurry wall protection construction method for bored pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310154457.3A CN104120716A (en) 2013-04-28 2013-04-28 Slurry wall protection construction method for bored pile

Publications (1)

Publication Number Publication Date
CN104120716A true CN104120716A (en) 2014-10-29

Family

ID=51766333

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310154457.3A Pending CN104120716A (en) 2013-04-28 2013-04-28 Slurry wall protection construction method for bored pile

Country Status (1)

Country Link
CN (1) CN104120716A (en)

Cited By (28)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104747088A (en) * 2015-03-31 2015-07-01 浙江禹建建设集团有限公司 Single-waist multi-leaf hose bit for bored pile and drilling construction method thereof
CN104831708A (en) * 2015-03-20 2015-08-12 深圳市工勘岩土集团有限公司 Foundation excavation retaining and protecting cast-in-situ bored pile construction method and equipment thereof
CN104895054A (en) * 2015-04-23 2015-09-09 侨健新能源科技(苏州)有限公司 Construction method of fiber rib concrete uplift pile
CN105239562A (en) * 2015-09-25 2016-01-13 黄国庆 Hole-forming pouring pile
CN105568961A (en) * 2015-12-28 2016-05-11 中国电建集团贵阳勘测设计研究院有限公司 Hole forming method for soft plastic red clay stratum pile foundations
CN105714768A (en) * 2016-03-09 2016-06-29 中国水利水电第十一工程局有限公司 Application method of wall protecting fluid to pile foundation construction
CN105839619A (en) * 2016-06-14 2016-08-10 江苏燕宁建设工程有限公司 Construction method for drilling pile under bad geological conditions
CN107327314A (en) * 2017-06-13 2017-11-07 中化(舟山)兴海建设有限公司 Super thick backfills layer pile base construction method
CN107448137A (en) * 2017-08-18 2017-12-08 新地能源工程技术有限公司 A kind of rig that circles round enters the construction method of rock pore-forming
CN107604904A (en) * 2017-10-23 2018-01-19 重庆建工住宅建设有限公司 A kind of rotary digging pile construction method
CN107905118A (en) * 2017-12-26 2018-04-13 杭州市城市建设基础工程有限公司 Large bridge pile base construction method
CN108894214A (en) * 2018-08-27 2018-11-27 孙德明 A kind of solution cavity geological environment bored concrete pile and its bore forming method
CN109469052A (en) * 2018-09-13 2019-03-15 深圳市蛇口招商港湾工程有限公司 A kind of miscellaneous fill and muddy terrain pile base construction method
CN109826208A (en) * 2019-01-21 2019-05-31 三峡大学 The anti-collapse aperture apparatus of electromagnetism and method
CN110159186A (en) * 2019-05-24 2019-08-23 中国建筑第五工程局有限公司 Slurry drilled pile drilling construction method
CN110258540A (en) * 2019-06-25 2019-09-20 安徽皖宏建筑工程有限公司 A kind of construction method of cast-in-situ bored pile
CN110374093A (en) * 2019-07-16 2019-10-25 深圳市市政工程总公司 High pressure-bearing crevice water earth-boring cast-in-place pile construction method
CN110528578A (en) * 2019-08-14 2019-12-03 中铁六局集团太原铁路建设有限公司 Under wear existing railway double track tunnel cover and cut construction method
CN110700241A (en) * 2019-10-08 2020-01-17 上海建工一建集团有限公司 Cast-in-situ bored pile and construction method thereof
CN110965549A (en) * 2019-12-17 2020-04-07 广东省水利水电第三工程局有限公司 Cast-in-situ bored pile construction method
CN112360344A (en) * 2020-10-23 2021-02-12 浙江迅犀建设有限责任公司 Shield type rapid hole forming construction method
CN112942341A (en) * 2021-02-06 2021-06-11 中建四局建设发展有限公司 Construction method for implanting prefabricated pipe pile into complex geology
CN113585993A (en) * 2021-07-22 2021-11-02 深圳市工勘岩土集团有限公司 Drilling and hole-cleaning pile-forming method for super-thick covering layer large-diameter rock-socketed cast-in-place pile
CN113914308A (en) * 2021-09-28 2022-01-11 深圳市桥梁维修设备科技有限公司 Construction method combining forward circulation and reverse circulation of cast-in-situ bored pile
WO2022096024A1 (en) * 2021-02-22 2022-05-12 中铁九局集团第四工程有限公司 Construction method for super-long small-diameter hole bored pile
CN114703831A (en) * 2022-04-20 2022-07-05 山西四建集团有限公司 Construction method of reinforced concrete cast-in-place pile under complex geological condition
CN115012403A (en) * 2022-06-27 2022-09-06 中煤长江基础建设有限公司 Hole wall treatment device and method for cast-in-place pile
CN115030146A (en) * 2022-06-15 2022-09-09 曾国海 Solidified soil composite foundation technology for pile mud capable of being solidified in situ to form pile body material

Cited By (32)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104831708A (en) * 2015-03-20 2015-08-12 深圳市工勘岩土集团有限公司 Foundation excavation retaining and protecting cast-in-situ bored pile construction method and equipment thereof
CN104747088A (en) * 2015-03-31 2015-07-01 浙江禹建建设集团有限公司 Single-waist multi-leaf hose bit for bored pile and drilling construction method thereof
CN104895054A (en) * 2015-04-23 2015-09-09 侨健新能源科技(苏州)有限公司 Construction method of fiber rib concrete uplift pile
CN105239562A (en) * 2015-09-25 2016-01-13 黄国庆 Hole-forming pouring pile
CN105568961A (en) * 2015-12-28 2016-05-11 中国电建集团贵阳勘测设计研究院有限公司 Hole forming method for soft plastic red clay stratum pile foundations
CN105714768A (en) * 2016-03-09 2016-06-29 中国水利水电第十一工程局有限公司 Application method of wall protecting fluid to pile foundation construction
CN105839619A (en) * 2016-06-14 2016-08-10 江苏燕宁建设工程有限公司 Construction method for drilling pile under bad geological conditions
CN107327314A (en) * 2017-06-13 2017-11-07 中化(舟山)兴海建设有限公司 Super thick backfills layer pile base construction method
CN107448137A (en) * 2017-08-18 2017-12-08 新地能源工程技术有限公司 A kind of rig that circles round enters the construction method of rock pore-forming
CN107448137B (en) * 2017-08-18 2023-10-24 新地能源工程技术有限公司 Construction method for rock entering and pore forming of rotary drilling machine
CN107604904A (en) * 2017-10-23 2018-01-19 重庆建工住宅建设有限公司 A kind of rotary digging pile construction method
CN107905118A (en) * 2017-12-26 2018-04-13 杭州市城市建设基础工程有限公司 Large bridge pile base construction method
CN108894214A (en) * 2018-08-27 2018-11-27 孙德明 A kind of solution cavity geological environment bored concrete pile and its bore forming method
CN109469052A (en) * 2018-09-13 2019-03-15 深圳市蛇口招商港湾工程有限公司 A kind of miscellaneous fill and muddy terrain pile base construction method
CN109826208A (en) * 2019-01-21 2019-05-31 三峡大学 The anti-collapse aperture apparatus of electromagnetism and method
CN110159186A (en) * 2019-05-24 2019-08-23 中国建筑第五工程局有限公司 Slurry drilled pile drilling construction method
CN110258540A (en) * 2019-06-25 2019-09-20 安徽皖宏建筑工程有限公司 A kind of construction method of cast-in-situ bored pile
CN110258540B (en) * 2019-06-25 2020-12-22 安徽皖宏建筑工程有限公司 Construction method of cast-in-situ bored pile
CN110374093A (en) * 2019-07-16 2019-10-25 深圳市市政工程总公司 High pressure-bearing crevice water earth-boring cast-in-place pile construction method
CN110374093B (en) * 2019-07-16 2021-07-06 深圳市市政工程总公司 Construction method of cast-in-situ bored pile for high-pressure-bearing fractured water stratum
CN110528578A (en) * 2019-08-14 2019-12-03 中铁六局集团太原铁路建设有限公司 Under wear existing railway double track tunnel cover and cut construction method
CN110700241A (en) * 2019-10-08 2020-01-17 上海建工一建集团有限公司 Cast-in-situ bored pile and construction method thereof
CN110965549B (en) * 2019-12-17 2020-11-24 广东省水利水电第三工程局有限公司 Cast-in-situ bored pile construction method
CN110965549A (en) * 2019-12-17 2020-04-07 广东省水利水电第三工程局有限公司 Cast-in-situ bored pile construction method
CN112360344A (en) * 2020-10-23 2021-02-12 浙江迅犀建设有限责任公司 Shield type rapid hole forming construction method
CN112942341A (en) * 2021-02-06 2021-06-11 中建四局建设发展有限公司 Construction method for implanting prefabricated pipe pile into complex geology
WO2022096024A1 (en) * 2021-02-22 2022-05-12 中铁九局集团第四工程有限公司 Construction method for super-long small-diameter hole bored pile
CN113585993A (en) * 2021-07-22 2021-11-02 深圳市工勘岩土集团有限公司 Drilling and hole-cleaning pile-forming method for super-thick covering layer large-diameter rock-socketed cast-in-place pile
CN113914308A (en) * 2021-09-28 2022-01-11 深圳市桥梁维修设备科技有限公司 Construction method combining forward circulation and reverse circulation of cast-in-situ bored pile
CN114703831A (en) * 2022-04-20 2022-07-05 山西四建集团有限公司 Construction method of reinforced concrete cast-in-place pile under complex geological condition
CN115030146A (en) * 2022-06-15 2022-09-09 曾国海 Solidified soil composite foundation technology for pile mud capable of being solidified in situ to form pile body material
CN115012403A (en) * 2022-06-27 2022-09-06 中煤长江基础建设有限公司 Hole wall treatment device and method for cast-in-place pile

Similar Documents

Publication Publication Date Title
CN104120716A (en) Slurry wall protection construction method for bored pile
WO2022096024A1 (en) Construction method for super-long small-diameter hole bored pile
CN100572683C (en) The large-diameter ultra-deep rock borehole bottom-expanding filling pile job practices
CN107524142A (en) A kind of holing with slurry wall protection cast-in-place pile construction method
CN203846485U (en) Long pile percussion drill hole forming construction device
CN106759379A (en) A kind of construction method of the asymmetric water-stop curtain of foundation ditch
CN109056706A (en) A kind of Karst Geological Landscape poured pile base construction method
CN103088814A (en) Rotary drilling rig coordinated with percussion drill hole-forming construction method
CN105275381A (en) Drilling construction method for water-rich cobble stratum by utilizing impact drill
CN104747088A (en) Single-waist multi-leaf hose bit for bored pile and drilling construction method thereof
CN106988302A (en) A kind of high inclination-angle competent bed rotary digging pile driving construction engineering method
CN108894214A (en) A kind of solution cavity geological environment bored concrete pile and its bore forming method
CN108894210A (en) The comprehensive construction method of continuous wall trench under a kind of COMPLEX MIXED formation condition for sea area
CN111236216A (en) Construction method of bridge drilled pile
WO2022227725A1 (en) Trench forming construction method
CN112482364A (en) Construction process of rotary digging cast-in-place pile under strong corrosive soft geological conditions in coastal region
CN111705786A (en) Method for vertical combination construction of composite stratum underground continuous wall and cast-in-situ bored pile
CN111636455A (en) Comprehensive construction method of TRD (Top gas recovery device) and rotary drilling lead hole depth waterproof curtain
CN206721870U (en) A kind of long auger guncreting pile steel reinforcement cage
CN112144514A (en) Simple method for forming hole and pile in sand and pebble stratum easy to collapse during rotary drilling machine
CN107653878A (en) Cast-in-situ bored pile is reusable to be longitudinally separated formula steel pile casting construction
CN113216215A (en) Deep groove support reverse construction method in complex environment
CN113685190B (en) Reinforcing system for shield to penetrate shallow soft clay and construction method
CN211735404U (en) Anti-over-irrigation system for long spiral bored pile
CN115110561A (en) Small-diameter pile foundation construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20141029