CN103389523A - Method and system for forecasting tunnel geology - Google Patents

Method and system for forecasting tunnel geology Download PDF

Info

Publication number
CN103389523A
CN103389523A CN2013103322500A CN201310332250A CN103389523A CN 103389523 A CN103389523 A CN 103389523A CN 2013103322500 A CN2013103322500 A CN 2013103322500A CN 201310332250 A CN201310332250 A CN 201310332250A CN 103389523 A CN103389523 A CN 103389523A
Authority
CN
China
Prior art keywords
geology section
section
tunnel
suspicious geology
analysis data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013103322500A
Other languages
Chinese (zh)
Other versions
CN103389523B (en
Inventor
马成
任刚
唐勇
熊勇
庹兴坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Engineering Division Corp Ltd
Original Assignee
China Construction Fourth Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Engineering Division Corp Ltd filed Critical China Construction Fourth Engineering Division Corp Ltd
Priority to CN201310332250.0A priority Critical patent/CN103389523B/en
Publication of CN103389523A publication Critical patent/CN103389523A/en
Application granted granted Critical
Publication of CN103389523B publication Critical patent/CN103389523B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Geophysics And Detection Of Objects (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The invention discloses a method and a system for forecasting tunnel geology. The method comprises steps as follows: surveying the tunnel geology with a seismic reflection method; determining a suspicious geological section according to a result surveyed with the seismic reflection method; surveying the determined suspicious geological section with an advanced drilling method, and obtaining geological analysis data of the suspicious geological section; and performing geological forecast according to the geological analysis data of the suspicious geological section. According to the method and the system, the potential safety hazard problem during tunnel construction due to the fact that the tunnel geological condition cannot be accurately forecasted with a single tunnel geological survey method is solved, and the forecasting practicability is improved.

Description

The forecasting procedure of tunnel geology and system
Technical field
The present invention relates to the constructing tunnel field, in particular to a kind of forecasting procedure and system of tunnel geology.
Background technology
In method for tunnel construction, advance geologic prediction is on the basis of Tunnel Design, for guaranteeing safety for tunnel engineering, instruct tunnel construction, improving tunnel unfavorable geology and the work of construction geology disaster advanced prediction that the tunnel construction quality is carried out.Simultaneously, for different geographical environments, the method for the advance geologic prediction that constructing tunnel is used is also different.For example, in the area that has underground river, when wearing underground river under needs while carrying out constructing tunnel, must carry out advance geologic prediction, the situation that may gush gushing water to survey front of tunnel heading, thus the constructing tunnel correct decisions can be instructed, avoid the generation of construction geology disaster.
But in correlation technique, the exploration mode of tunnel geology situation is more single, and geological condition that can't the accurate forecast tunnel, cause constructing tunnel to have potential safety hazard; For the problem of this potential safety hazard, effective solution is proposed not yet at present.
Summary of the invention
The object of the present invention is to provide a kind of forecasting procedure and system of tunnel geology, in order to address the above problem.
According to an aspect of the present invention, provide a kind of forecasting procedure of tunnel geology, having comprised: the geology in tunnel has been carried out the seismic reflection method exploration; Determine suspicious geology section according to the result of this seismic reflection method exploration; The suspicious geology section of determining is carried out the exploration of Advance Drilling method, obtain the geological analysis data of this suspicious geology section; The geological analysis data of geology section suspicious according to this are carried out geologic prediction.
Preferably, above-mentioned is suspicious geology section with the following location positioning in the result of seismic reflection method exploration: can cause the 50m that caves in 3Above fault belt position; Can cause water burst speed is 50m 3The above rich water level of/h is put; The poorly plastid position of prominent mud gushing water.
Preferably, above-mentioned suspicious geology section is carried out Advance Drilling method exploration, the geological analysis data that obtain suspicious geology section comprise: suspicious geology section is holed, obtain test data; Determine the geological analysis data of suspicious geology section according to test data, wherein, these geological analysis data comprise one of following at least: the intensity index of rock, drillability index, formation lithology data, rock mass completeness, underground water yield and water burst hydraulic pressure data and gas density and pressure data.
Preferably, the above-mentioned data of geological analysis according to suspicious geology section are carried out geologic prediction and comprised: when the geological analysis data according to suspicious geology section are determined to have one of following situation at least, carry out the geologic hazard nowcasting: suspicious geology section exists gushes gushing water; There is landslide in suspicious geology section; There is prominent mud gushing water in suspicious geology section; There is rock burst in suspicious geology section; There is Gas Outburst in suspicious geology section.
According to a further aspect in the invention, provide a kind of forecast system of tunnel geology, having comprised: the tunnel seismic survey apparatus is used for the geology in tunnel is carried out the seismic reflection method exploration; The Advance Drilling search equipment, be used for determining suspicious geology section according to the exploration result of tunnel seismic survey apparatus, and the suspicious geology section of determining is carried out the exploration of Advance Drilling method, obtains the geological analysis data of suspicious geology section; Geologic prediction equipment, the geological analysis data that are used for the above-mentioned suspicious geology section that obtains according to the Advance Drilling search equipment are carried out geologic prediction.
Preferably, above-mentioned Advance Drilling search equipment comprises: suspicious geology section determination module, being used for the following location positioning of the result of tunnel seismic survey apparatus exploration is suspicious geology section: can cause the 50m that caves in 3Above fault belt position; Can cause water burst speed is 50m 3The above rich water level of/h is put; The poorly plastid position of prominent mud gushing water.
Preferably, above-mentioned geologic prediction equipment comprises: the hazard forecasting judge module is used for judging whether the geological analysis data of suspicious geology section exist one of following situation at least: suspicious geology section exists gushes gushing water; There is landslide in suspicious geology section; There is prominent mud gushing water in suspicious geology section; There is rock burst in suspicious geology section; There is Gas Outburst in suspicious geology section; The hazard forecasting module, be used for carrying out the geologic hazard nowcasting when judgment result is that of hazard forecasting judge module is.
The present invention adopts seismic reflection method and Advance Drilling method to survey, obtain the geological analysis data of suspicious geology section, these data are because combining above-mentioned investigation method, therefore reliability is more intense, the geologic prediction that carries out based on these data is more accurate, and then the tunnel geology investigation method that has solved single mode can't the accurate forecast tunnel geological condition, cause constructing tunnel to have the problem of potential safety hazard, promoted the practicality of forecast.
Description of drawings
The accompanying drawing that forms the application's a part is used to provide a further understanding of the present invention, and illustrative examples of the present invention and explanation thereof are used for explaining the present invention, do not form improper restriction of the present invention.In the accompanying drawings:
Fig. 1 is the forecasting procedure process flow diagram of the tunnel geology that provides of the embodiment of the present invention;
Fig. 2 is the forecast system structured flowchart of the tunnel geology that provides of the embodiment of the present invention.
Embodiment
Hereinafter with reference to accompanying drawing, also describe in conjunction with the embodiments the present invention in detail.Need to prove, in the situation that do not conflict, embodiment and the feature in embodiment in the application can make up mutually.
In order to optimize the prospecting technique of tunnel geology, obtain surveying more accurately result, and then, for constructing tunnel provides reliable data, promote the security of constructing tunnel, the embodiment of the present invention provides a kind of forecasting procedure and system of tunnel geology.
The forecasting procedure process flow diagram of tunnel geology as shown in Figure 1, the method comprises the following steps:
Step S102, carry out the seismic reflection method exploration to the geology in tunnel;
Step S104, determine suspicious geology section according to the result of above-mentioned seismic reflection method exploration;
Step S106, carry out the exploration of Advance Drilling method to the suspicious geology section of determining, obtains the geological analysis data of this suspicious geology section;
Step S108, carry out geologic prediction according to the geological analysis data of above-mentioned suspicious geology section.
The said method of the embodiment of the present invention adopts seismic reflection method and Advance Drilling method to survey, obtain the geological analysis data of suspicious geology section, these data are because combining above-mentioned investigation method, therefore reliability is more intense, the geologic prediction that carries out based on these data is more accurate, and then the tunnel geology investigation method that has solved single mode can't the accurate forecast tunnel geological condition, cause constructing tunnel to have the problem of potential safety hazard, promoted the practicality of forecast.
In order to strengthen the validity of follow-up exploration process, determine to need to continue targetedly the highway section of exploration, above-mentioned steps S104 can comprise: be suspicious geology section with the following location positioning in the result of seismic reflection method exploration: can cause the 50m that caves in 3Above fault belt position; Can cause water burst speed is 50m 3The above rich water level of/h is put; The poorly plastid position of prominent mud gushing water.
Above-mentioned suspicious geology section is carried out Advance Drilling method exploration, the geological analysis data that obtain suspicious geology section can comprise: 1) suspicious geology section is holed, obtain test data; 2) determine the geological analysis data of suspicious geology section according to test data, wherein, these geological analysis data comprise one of following at least: the intensity index of rock, drillability index, formation lithology data, rock mass completeness, underground water yield and water burst hydraulic pressure data and gas density and pressure data.
Consider the safety issue of construction, in the embodiment of the present invention, carrying out geologic prediction according to the geological analysis data of suspicious geology section can comprise: when the geological analysis data according to suspicious geology section are determined to have one of following situation at least, carry out the geologic hazard nowcasting:
1) suspicious geology section exists and gushes gushing water;
2) there is landslide in suspicious geology section;
3) there is prominent mud gushing water in suspicious geology section;
4) there is rock burst in suspicious geology section;
5) there is Gas Outburst in suspicious geology section.
This shows, geologic prediction method in the above embodiment of the present invention, take the Advance Drilling method as main, Synthetic Geological Prediction Ahead of Construction is carried out in conjunction with multiple physical prospecting means in centre, forms macroscopical prediction and instructs microcosmic forecast, long method apart from the forecast of forecast guidance short-distance and medium-distance.
During the specific implementation said method, the mode that can adopt geophysical prospecting (TSP203)+Advance Drilling method (Advance Drilling 5 holes+add deep blasting hole) to combine is carried out.For example: adopt the seismic wave method reflectometry to forecast the unfavorable geology in front of tunnel heading 100-150m scope; Adopt the checking of forward probe hole on the basis of seismic reflection method exploration, geological condition in the scope of front of tunnel heading 30m left and right is done forecast more accurately, each section is laid 5 inspecting holes (one of them hole coring), and the lap of splice between the adjacent exploration hole in front and back is 5m.Data to multiforecasing forecast means gained is carried out analysis-by-synthesis and judge, confirmation mutually, and according to geologic condition, the rule of development, trend and omen that face discloses, predict judgement, according to advance geologic prediction result, corresponding Optimized Adjustment Measures, to guarantee construction safety and structural safety.
Consider under tunnel the complicacy of wearing underground river geology, below take the tunnel, underground river as example, the detailed process that realizes above-mentioned geologic prediction be described:
The first step: determine bore position, adopt the long distance measurement of seismic reflection method, with forecast construction many water that can run into or rich water poorly position and the scale of plastid, the Grades of Surrounding Rock of forecast tunnel section, verify rock stratum contact area band and larger Karst Features, the integrality of forecast rock mass and the developmental state of karst and underground water, the possibility that gushing water is gushed in forecast; The distance of long distance measurement is front of tunnel heading 100-150m;
The available result of this step comprises: the fault belt that the general constructing tunnel that forecasts with unerring accuracy runs into etc. causes position and the scale of the poorly plastid that caves in or cave in; Generally can not omit and can cause the 50m that caves in 3Above poorly plastid; The old kiln that the fault crevice water that the general constructing tunnel that forecasts with unerring accuracy runs into, the solution cavity that Karst Tunnel runs into, underground river, karst mud band and gas tunnel may run into, old Kong or other many water or rich water is position and the scale of plastid poorly; Generally can not omit and can cause large water burst (50m 3More than/h), the poorly plastid of even prominent mud gushing water; The Grades of Surrounding Rock (error is less than half grade) of section forecasts with unerring accuracy; And can forecast qualitatively the possibility of the construction geology disasters such as the main unfavorable geology of section caves in, prominent mud gushing water.
In addition, the seismic reflection method in this step can adopt tunnel seismic survey instrument (Tunnel Seismic Prediction, TSP) to survey; And the method for definite bore position is: see a side tunnel side wall laying borehole boring of main unfavorable geology at first; Laying sensor sleeve boring apart from last borehole 15-20m place, and sensor sleeve is holed, and two walls are arranged symmetrically with along tunnel.
Wherein, in the TSP detection process, the accuracy of determining directly to affect result of detection of bore position.Adopt definite method of above-mentioned preferred bore position, can improve the accuracy of anticipation as a result.
Second step: adopt Advance Drilling method proximity detection,, in conjunction with the result of detection of the first step, determine to gush the gushing water position simultaneously; Proximity detection front of tunnel heading 20-30m;
Adopting the Advance Drilling method is the most direct method in constructing tunnel phase geological advanced prediction method, is to the checking of other detection means achievements and supplements.Specifically in drilling process, be the accuracy that improves anticipation as a result, can adopt following preferred bore mode:
If the testing result of the first step is front of tunnel heading while having fault belt, arrange 3 probing holes, survey.
, if the testing result of the first step is front of tunnel heading may have the gushing water section time, arrange 5 probing holes.
And in above-mentioned two kinds of boring situations, the hole depth in probing hole is more than 3m.
The 3rd step: gush the gushing water situation according to result of detection and the face borehole of Advance Drilling method, to gushing gushing water in hole, launch monitoring, calculate simultaneously water yield and water burst hydraulic pressure.
Water yield and water burst hydraulic pressure have been determined by this step.Thereby when construction, can carry out the later stage preventive measure according to this situation, for example: the water yield and the water burst hydraulic pressure that calculate according to this step, to may occur in tunnel extensive (high pressure) gush (dash forward) but the Karst area of water, the mud of dashing forward carries out slip casting in advance in advance.
The method of concrete leading pre-slip casting can be in the following ways: grouting hole is being beaten at 5-10m place, gushing water position in the distance forecast, and grouting hole is the umbrella layout from face along excavating direction centered by the tunnel center line.Adopt this mode can produce larger grouting pressure, thus the water burst situation of preventing disasters property more effectively., in order to improve the degree of this effect, more preferably, can make a call to 8 ring grouting holes, and every ring grouting hole spacing is 60cm.
As described above, many water that said method employing seismic reflection method forecast construction can run into or rich water is position and the scale of plastid poorly, the Grades of Surrounding Rock of forecast tunnel section, verify rock stratum contact area band and larger Karst Features, the integrality of forecast rock mass and the developmental state of karst and underground water, the possibility that gushing water is gushed in forecast.Wherein, detectable distance is front of tunnel heading 100-150m.On the basis of this long distance measurement, adopt and further determine to gush the gushing water position.Finally, the gushing water that gushes that occurs is detected, calculate water yield and water burst hydraulic pressure, in order to the construction in later period reference.
Hence one can see that, said method takes from far near, definite by reporting for work in advance, by the mode of qualitative to quantitative, realized the purpose that the accurate detection front of tunnel heading gushes gushing water water yield and water burst hydraulic pressure.
Based on above-mentioned forecast, the follow-up appropriate method of can taking is carried out the excavation supporting construction to tunnel.Main construction techniques can comprise: the grouting for water-blocking validity check → forepoling construction → benching tunnelling method excavation → H-shaped steel supporting → sprayed concrete → bottomed → H-shaped steel supporting → shotcrete concrete → inverted arch of getting out of a predicament or an embarrassing situation seals into ring → next one circulation.
Corresponding to said method, the embodiment of the present invention also provides a kind of forecast system of tunnel geology, and referring to Fig. 2, this system comprises:
Tunnel seismic survey apparatus 22, be used for the geology in tunnel is carried out the seismic reflection method exploration;
Advance Drilling search equipment 24, be used for determining suspicious geology section according to the exploration result of tunnel seismic survey apparatus 22, and the suspicious geology section of determining is carried out the exploration of Advance Drilling method, obtains the geological analysis data of suspicious geology section;
Geologic prediction equipment 26, the geological analysis data that are used for the above-mentioned suspicious geology section that obtains according to Advance Drilling search equipment 24 are carried out geologic prediction.
The said system of the embodiment of the present invention adopts seismic reflection method and Advance Drilling method to survey, obtain the geological analysis data of suspicious geology section, these data are because combining above-mentioned investigation method, therefore reliability is more intense, the geologic prediction that carries out based on these data is more accurate, and then the tunnel geology investigation method that has solved single mode can't the accurate forecast tunnel geological condition, cause constructing tunnel to have the problem of potential safety hazard, promoted the practicality of forecast.
Above-mentioned Advance Drilling search equipment 24 comprises: suspicious geology section determination module, being used for the following location positioning of the result of tunnel seismic survey apparatus exploration is suspicious geology section: can cause the 50m that caves in 3Above fault belt position; Can cause water burst speed is 50m 3The above rich water level of/h is put; The poorly plastid position of prominent mud gushing water.
Particularly, above-mentioned geologic prediction equipment 26 comprises: the hazard forecasting judge module is used for judging whether the geological analysis data of suspicious geology section exist one of following situation at least: 1) suspicious geology section exists and gushes gushing water; 2) there is landslide in suspicious geology section; 3) there is prominent mud gushing water in suspicious geology section; 4) there is rock burst in suspicious geology section; 5) there is Gas Outburst in suspicious geology section; The hazard forecasting module, be used for carrying out the geologic hazard nowcasting when judgment result is that of hazard forecasting judge module is.
obviously, those skilled in the art should be understood that, above-mentioned each module of the present invention or each step can realize with general calculation element, they can concentrate on single calculation element, perhaps be distributed on the network that a plurality of calculation elements form, alternatively, they can be realized with the executable program code of calculation element, thereby, they can be stored in memory storage and be carried out by calculation element, and in some cases, can carry out step shown or that describe with the order that is different from herein, perhaps they are made into respectively each integrated circuit modules, perhaps a plurality of modules in them or step being made into the single integrated circuit module realizes.Like this, the present invention is not restricted to any specific hardware and software combination.
The foregoing is only the preferred embodiments of the present invention, be not limited to the present invention, for a person skilled in the art, the present invention can have various modifications and variations.Within the spirit and principles in the present invention all, any modification of doing, be equal to replacement, improvement etc., within all should being included in protection scope of the present invention.

Claims (7)

1. the forecasting procedure of a tunnel geology, is characterized in that, comprising:
The geology in tunnel is carried out the seismic reflection method exploration;
Determine suspicious geology section according to the result of described seismic reflection method exploration;
The described suspicious geology section of determining is carried out the exploration of Advance Drilling method, obtain the geological analysis data of described suspicious geology section;
Carry out geologic prediction according to the geological analysis data of described suspicious geology section.
2. method according to claim 1, is characterized in that, with the following location positioning in the result of described seismic reflection method exploration, is described suspicious geology section:
Can cause the 50m that caves in 3Above fault belt position;
Can cause water burst speed is 50m 3The above rich water level of/h is put;
The poorly plastid position of prominent mud gushing water.
3. method according to claim 1, is characterized in that, described suspicious geology section is carried out the exploration of Advance Drilling method, and the geological analysis data that obtain described suspicious geology section comprise:
Described suspicious geology section is holed, obtain test data;
Determine the geological analysis data of described suspicious geology section according to described test data, wherein, described geological analysis data comprise one of following at least: the intensity index of rock, drillability index, formation lithology data, rock mass completeness, underground water yield and water burst hydraulic pressure data and gas density and pressure data.
4. method according to claim 1, is characterized in that, carries out geologic prediction according to the geological analysis data of described suspicious geology section and comprise:
When the geological analysis data according to described suspicious geology section are determined to have one of following situation at least, carry out the geologic hazard nowcasting:
Described suspicious geology section exists gushes gushing water;
There is landslide in described suspicious geology section;
There is prominent mud gushing water in described suspicious geology section;
There is rock burst in described suspicious geology section;
There is Gas Outburst in described suspicious geology section.
5. the forecast system of a tunnel geology, is characterized in that, comprising:
The tunnel seismic survey apparatus, be used for the geology in tunnel is carried out the seismic reflection method exploration;
The Advance Drilling search equipment, be used for determining suspicious geology section according to the exploration result of described tunnel seismic survey apparatus, and the described suspicious geology section of determining is carried out the exploration of Advance Drilling method, obtains the geological analysis data of described suspicious geology section;
Geologic prediction equipment, the geological analysis data that are used for the above-mentioned suspicious geology section that obtains according to described Advance Drilling search equipment are carried out geologic prediction.
6. system according to claim 5, is characterized in that, described Advance Drilling search equipment comprises:
Suspicious geology section determination module, being used for the following location positioning of the result of described tunnel seismic survey apparatus exploration is described suspicious geology section: can cause the 50m that caves in 3Above fault belt position;
Can cause water burst speed is 50m 3The above rich water level of/h is put;
The poorly plastid position of prominent mud gushing water.
7. system according to claim 6, is characterized in that, described geologic prediction equipment comprises:
The hazard forecasting judge module is used for judging whether the geological analysis data of described suspicious geology section exist one of following situation at least: described suspicious geology section exists gushes gushing water; There is landslide in described suspicious geology section; There is prominent mud gushing water in described suspicious geology section; There is rock burst in described suspicious geology section; There is Gas Outburst in described suspicious geology section;
The hazard forecasting module, be used for carrying out the geologic hazard nowcasting when judgment result is that of described hazard forecasting judge module is.
CN201310332250.0A 2013-08-01 2013-08-01 The forecast of tunnel geology and the method and system of construction Expired - Fee Related CN103389523B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310332250.0A CN103389523B (en) 2013-08-01 2013-08-01 The forecast of tunnel geology and the method and system of construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310332250.0A CN103389523B (en) 2013-08-01 2013-08-01 The forecast of tunnel geology and the method and system of construction

Publications (2)

Publication Number Publication Date
CN103389523A true CN103389523A (en) 2013-11-13
CN103389523B CN103389523B (en) 2016-08-10

Family

ID=49533845

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310332250.0A Expired - Fee Related CN103389523B (en) 2013-08-01 2013-08-01 The forecast of tunnel geology and the method and system of construction

Country Status (1)

Country Link
CN (1) CN103389523B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103399356A (en) * 2013-08-01 2013-11-20 中国建筑第四工程局有限公司 Forecasting method and system for tunnel geology
CN105738942A (en) * 2016-03-09 2016-07-06 东北大学 Mine rock structure evolution three-dimension continuous exploration system and method for exploitation process
CN107831529A (en) * 2017-10-19 2018-03-23 云南省水利水电勘测设计研究院 A kind of method for lifting tunnel advance geologic prediction accuracy rate
CN107966733A (en) * 2017-11-29 2018-04-27 沈阳铁道勘察设计院有限公司 A kind of method explored for the huge loose media talus of macroporosity with basement rock interface comprehensive geology
CN108415066A (en) * 2017-12-13 2018-08-17 北方工业大学 Tunnel construction geological disaster forecasting method
CN109061762A (en) * 2018-08-30 2018-12-21 贵州省水利水电勘测设计研究院 Underground underground river detection method
CN110794478A (en) * 2019-11-13 2020-02-14 中铁十局集团有限公司 Comprehensive detection method for harmful gas in non-coal measure stratum tunnel
CN113189672A (en) * 2021-04-20 2021-07-30 山东大学 Tunnel advanced geological prediction method based on multi-attribute inversion

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102322294A (en) * 2011-05-31 2012-01-18 中铁二十局集团第一工程有限公司 Comprehensive geological prediction method for karst tunnel construction
CN102495434A (en) * 2011-11-25 2012-06-13 成都畅达通地下工程科技发展有限公司 Advanced geological prediction method for underground engineering

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102322294A (en) * 2011-05-31 2012-01-18 中铁二十局集团第一工程有限公司 Comprehensive geological prediction method for karst tunnel construction
CN102495434A (en) * 2011-11-25 2012-06-13 成都畅达通地下工程科技发展有限公司 Advanced geological prediction method for underground engineering

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
刘汝臣: "《宜万铁路岩溶隧道超前地质预报技术》", 《隧道建设》 *
吕恬等: "地质超前预报在葵岗隧道施工中的应用", 《公路交通技术》 *
胡兴: "隧洞施工期地质超前预报方法现状", 《贵州工业大学学报(自然科学版)》 *
裴尼松等: "隧道超前预报的综合物探方法与效果", 《勘察科学技术》 *
赵永贵: "隧道围岩含水性预报技术", 《地球与环境》 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103399356A (en) * 2013-08-01 2013-11-20 中国建筑第四工程局有限公司 Forecasting method and system for tunnel geology
CN105738942A (en) * 2016-03-09 2016-07-06 东北大学 Mine rock structure evolution three-dimension continuous exploration system and method for exploitation process
CN107831529A (en) * 2017-10-19 2018-03-23 云南省水利水电勘测设计研究院 A kind of method for lifting tunnel advance geologic prediction accuracy rate
CN107966733A (en) * 2017-11-29 2018-04-27 沈阳铁道勘察设计院有限公司 A kind of method explored for the huge loose media talus of macroporosity with basement rock interface comprehensive geology
CN107966733B (en) * 2017-11-29 2020-01-03 沈阳铁道勘察设计院有限公司 Method for comprehensive geological exploration of large-porosity giant loose rock pile and bedrock interface
CN108415066A (en) * 2017-12-13 2018-08-17 北方工业大学 Tunnel construction geological disaster forecasting method
CN109061762A (en) * 2018-08-30 2018-12-21 贵州省水利水电勘测设计研究院 Underground underground river detection method
CN110794478A (en) * 2019-11-13 2020-02-14 中铁十局集团有限公司 Comprehensive detection method for harmful gas in non-coal measure stratum tunnel
CN110794478B (en) * 2019-11-13 2021-10-29 中铁十局集团有限公司 Comprehensive detection method for harmful gas in non-coal measure stratum tunnel
CN113189672A (en) * 2021-04-20 2021-07-30 山东大学 Tunnel advanced geological prediction method based on multi-attribute inversion

Also Published As

Publication number Publication date
CN103389523B (en) 2016-08-10

Similar Documents

Publication Publication Date Title
CN103389523A (en) Method and system for forecasting tunnel geology
CN103389525B (en) The forecasting procedure of tunnel geology and system
CN102322294B (en) Comprehensive geological prediction method for karst tunnel construction
CN103399356A (en) Forecasting method and system for tunnel geology
CN107589471B (en) A kind of Railway Tunnel Synthetic Geological Prediction Ahead of Construction method
CN101270666B (en) Tunnel influence geological condition section-expanding horizontal drilling estimation and prediction method
CN103399354A (en) Forecasting method and system for tunnel geology
CN110221341A (en) A kind of constructing tunnel unfavorable geology advanced prediction method
CN110988992A (en) Advanced geological forecasting method for mining method construction
CN112965136B (en) Multi-means advanced detection method for water-rich karst tunnel
CN103389527A (en) Method and system for forecasting tunnel geology
CN110221340A (en) A kind of set of tunneling construction method for forecasting advanced geology
Willenberg et al. Internal structure and deformation of an unstable crystalline rock mass above Randa (Switzerland): part II—three-dimensional deformation patterns
CN106597528A (en) Tunnel geology three-dimensional seismic reflection and seismo-electric integrated advanced exploration device and method
Eberhardt et al. Geotechnical instrumentation
CN103399358A (en) Forecasting method and system for tunnel geology
CN103389524B (en) The forecasting procedure of tunnel geology and system
CN103399355A (en) Forecasting method and system for tunnel geology
CN115993103B (en) Goaf volume determination method and goaf volume determination device
CN103389526A (en) Method and system for forecasting tunnel geology
CN116381803A (en) Comprehensive geophysical prospecting method for tunnel construction
Eftekhari et al. Uncertainties and complexities of the geological model in slope stability: a case study of Sabzkuh tunnel
Aydin et al. Geomechanical characterization, 3-D optical monitoring and numerical modeling in Kirkgecit-1 tunnel, Turkey
Evseev et al. Remote instrumental monitoring of interchamber pillar stability
CN103389522A (en) Method and system for forecasting tunnel geology

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160810

Termination date: 20170801

CF01 Termination of patent right due to non-payment of annual fee