CN103306371A - Manufacturing and mounting structure of PC prefabricated part of prefabricated house - Google Patents

Manufacturing and mounting structure of PC prefabricated part of prefabricated house Download PDF

Info

Publication number
CN103306371A
CN103306371A CN2013102319125A CN201310231912A CN103306371A CN 103306371 A CN103306371 A CN 103306371A CN 2013102319125 A CN2013102319125 A CN 2013102319125A CN 201310231912 A CN201310231912 A CN 201310231912A CN 103306371 A CN103306371 A CN 103306371A
Authority
CN
China
Prior art keywords
prefabricated units
sleeve
plural
embedded
type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013102319125A
Other languages
Chinese (zh)
Other versions
CN103306371B (en
Inventor
陈广林
黎金亮
于新平
赵亚军
陈俊杰
陈界羽
周洪涛
王桂玲
王法道
马荣全
孙建运
范新海
郭志鑫
张磊
杨晓杰
童思哲
吴宏庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China State Construction Engineering Corp Ltd CSCEC
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201310231912.5A priority Critical patent/CN103306371B/en
Publication of CN103306371A publication Critical patent/CN103306371A/en
Application granted granted Critical
Publication of CN103306371B publication Critical patent/CN103306371B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention discloses a manufacturing and mounting structure of a PC (polycarbonate) prefabricated part of a prefabricated house. The manufacturing and mounting structure mainly comprises an installation spacing system, a supporting and fixing system, a demoulding and hoisting system, a template installation pull rod connecting system, a leveling system and I type hanging nails. According to the invention, steel bolt sleeves are embedded in a prefabricated part according to design positions when the concrete casting work of the prefabricated part is carried out, and the ends of the steel bolt sleeves are aligned with the surface of the concrete prefabricated part; the prefabricated part is hung, fixed, installed and spaced by using embedded sleeves of different specifications as connection connectors; and in order to meet the requirements on hoisting and mounting of the prefabricated part, straight thread sleeves of different specifications and models are embedded in the prefabricated part to be used for hoisting, installing and pulling.

Description

Assembled-type house PC prefabricated units fabrication and installation structure
Technical field
The present invention relates to a kind of assembled-type house PC prefabricated units fabrication and installation structure.
Background technology
In the assembled-type house PC prefabricated units design working drawing, usually only indicate the width of member, highly, the molded dimension of thickness of slab and member, bar gauge, reserve and get rid of the self informations such as raft reinforcing bar, strength grade of concrete.Can not be used for processing and lift the operation such as installation.Need to carry out Deepen Design to the PC prefabricated units, determine lifting and mount scheme, detailing is determined type selecting, location and the way of various set aside pre-embeddeds, and clear and definite each thin section node way makes prefabricated units possess lifting and installs and uses function.
Summary of the invention
Technical problem to be solved by this invention provides a kind of simplicity of design, and is easy to use, and installation accuracy is high, can improve the assembled-type house PC prefabricated units fabrication and installation structure of member installation effectiveness.
For realizing above-mentioned technique effect, the invention discloses a kind of assembled-type house PC prefabricated units fabrication and installation structure, comprising:
One mounting limit system, described mounting limit system comprises plural the first sleeve, described the first sleeve is pre-buried in the top side facade of described prefabricated units, has been bolted plural spacing angle steel;
One supports fixed system, described support fixed system comprises plural the second sleeve, described the second sleeve is embedded in respectively described prefabricated units bottom and top in advance, the second sleeve of described prefabricated units bottom has been bolted the complex number type steel bracket, and second sleeve on described prefabricated units top has been bolted plural adjustable diagonal bracing;
One demoulding Lift-on/Lift-off System, described demoulding Lift-on/Lift-off System comprise plural number the 3rd sleeve, and described the 3rd sleeve is embedded in described prefabricated units in advance, have been bolted plural number lifting steel plate connector;
One template is installed ties link system, and described template is installed ties link system is comprised plural quadruplet cylinder, and described quadruplet cylinder is embedded in described prefabricated units and cast-in-place structural junction in advance, is connected with plural Screw arbor with nut at both-ends.
The present invention further improves and is, described structure also comprises a leveling system, and described leveling system comprises plural number the 5th sleeve, and described the 5th sleeve is embedded in the top of described prefabricated units in advance, is connected with plural adjusting bolt.
The present invention further improves and is, corresponding described adjusting bolt is established the 10mm steel plate at the bottom of upper strata prefabricated units pad.
The present invention further improves and is, be embedded with plural number " I " type at the top of described prefabricated units and hang nail, it is M20 * 240mm that described " I " type hangs the nail model, described " I " type hangs under the nail and adds 2 " U " type φ 10HPB300 Bar Anchorages, anchorage length 30d, and described " I " type hangs the supporting special glue ripple of the pre-buried installation employing of nail.
The present invention further improves and is, 2 φ 10HPB300 Bar Anchorages of bottom welding of described each sleeve, anchorage length 25d.
The present invention has been owing to having adopted above technical scheme, makes it have following beneficial effect to be: by when the prefabricated units concrete pouring construction, according to design attitude the steel bolt sleeve is embedded in the prefabricated units, the sleeve termination is concordant with surface of concrete structure.The embedded sleeve barrel that utilizes different size is as linking connector, to prefabricated units lift, fix, mounting limit etc.For satisfying prefabricated part hanging and installing and using needs, pre-buried different size model straight screw sleeve in prefabricated units uses as lifting and installation drawknot.
Description of drawings
Fig. 1 is assembled-type house PC prefabricated units fabrication and installation structure vertical design figure of the present invention.
Fig. 2 is the mounting limit system schematic of assembled-type house PC prefabricated units fabrication and installation structure of the present invention.
Fig. 3 is the schematic diagram of the spacing steel plate in the mounting limit system of assembled-type house PC prefabricated units fabrication and installation structure of the present invention.
Fig. 4 is the support fixed system schematic diagram of assembled-type house PC prefabricated units fabrication and installation structure of the present invention.
Fig. 5 is that assembled-type house PC prefabricated units fabrication and installation structures of the present invention " I " type hangs nail mounting plane schematic diagram.
Fig. 6 is that assembled-type house PC prefabricated units fabrication and installation structures of the present invention " I " type hangs nail mounting plane sectional view.
Fig. 7 is the schematic bottom view of upper strata prefabricated units of the leveling system of assembled-type house PC prefabricated units fabrication and installation structure of the present invention.
Fig. 8 is the end face schematic diagram of lower floor's prefabricated units of the leveling system of assembled-type house PC prefabricated units fabrication and installation structure of the present invention.
Fig. 9 is the schematic diagram of the leveling system of assembled-type house PC prefabricated units fabrication and installation structure of the present invention.
Figure 10 is the sectional drawing of Fig. 9.
Figure 11 is the use view of the leveling system of assembled-type house PC prefabricated units fabrication and installation structure of the present invention.
The specific embodiment
The present invention is further detailed explanation below in conjunction with the drawings and specific embodiments.
Consult Fig. 1~shown in Figure 11, assembled-type house PC prefabricated units fabrication and installation structure of the present invention mainly supports fixed system, a demoulding Lift-on/Lift-off System, a template by a mounting limit system, and installs and ties link system, a leveling system and " I " type are hung nail consist of.
According to the prefabricated units working drawing, drawing is carried out Deepen Design, determine profile, size, the thickness of slab of member; Determine title, numbering and the quantity of member; Determine the thin section node way of prefabricated units;
According to each Components Shape characteristics, determine the assembling and mounting scheme of each member.Select to determine that lifting component and installation are with hanging nail, embedded sleeve barrel kind, position, quantity; And the contents such as the quantity of other reserving holes, built-in fitting, position.According to design scheme lifting component and installation process stress and matching used component and fitting are carried out mechanics check computation.
1) embedded sleeve barrel that utilizes different size is as linking connector, to prefabricated units lift, fix, mounting limit etc.For satisfying prefabricated part hanging and installing and using needs, pre-buried different size model straight screw sleeve in prefabricated units uses as lifting and installation drawknot.
The embedded sleeve barrel model mainly contains three kinds: M16 * 50mm, M14 * 50mm, M20 * 150mm, wall thickness 4mm.2 φ 10HPB300 Bar Anchorages of embedded sleeve barrel bottom welding, anchorage length 25d.
Wherein embedded sleeve barrel type selecting and function are as follows:
As shown in Figures 2 and 3, the first sleeve 11 in the mounting limit system: mounting limit sleeve, model is M16 * 50mm, be embedded in advance the top side facade of prefabricated units 101, use bolt and the first sleeve 11 that a spacing angle steel 110 is fixed on lower floor's prefabricated units 101 tops, itself and lower floor's prefabricated units 101 are adjacent to; When upper strata prefabricated units 102 are installed, itself and spacing angle steel 110 are close to, make upper strata prefabricated units 102 and lower floor's prefabricated units 101 plate faces on same plane, improve installation accuracy and speed.
As shown in Figure 4, support the second sleeve 12 of fixed system: member is installed and is fixedly connected with sleeve, model is M16 * 50mm, be embedded in advance respectively prefabricated units 101 bottoms and top, the second sleeve 12 of prefabricated units 101 bottoms is bolted complex number type steel bracket 121, fixedly PC prefabricated units 101 bottoms; Second sleeve 12 on prefabricated units 101 tops is bolted plural adjustable diagonal bracing 122, regulates prefabricated units 101 verticality, and carries out temporary fixed.
The 3rd sleeve 13 of demoulding Lift-on/Lift-off System: demoulding lifting sleeve, model is M20 * 150mm, uses bolt and the 3rd sleeve 13 will lift the steel plate connector and is fixed on the prefabricated units, is used for the prefabricated units demoulding and lifting.
Template is installed the quadruplet cylinder 14 to ties link system: template is installed pull bar is linked sleeve, model is M14 * 50mm, in PC prefabricated units and cast-in-place structural junction, when installing the cast-in-place structural template, Screw arbor with nut at both-ends and quadruplet cylinder 14 are connect, fixedly the drawknot template.
2) in conjunction with Fig. 5 and shown in Figure 6, adopt pre-buried special use " I " type to hang the mode of nail 15, be equipped with special hanger and carry out vertical handling installation exercise.Hanging nail 15 models is M20 * 240mm, and each hangs nail and adds 150 anchorings of 2 " U " type φ 10HPB300 reinforcing bars, anchorage length 30d 15 times.Hang nail 15 pre-buried installations and adopt supporting special glue ripple.
Hang nail 15 arrangement principle: because the prefabricated units size is larger, according to the profile characteristics, 3~4 suspension centres are set at the prefabricated units top.Generally at prefabricated units middle part inner side, according to the principle of hoisting point position symmetry, suspension centre is arranged at two ends, prefabricated units top to the prefabricated units center of gravity, and being arranged on has preferably position of sleeper or stressing conditions in the wallboard.
3) utilize built-in bolt sleeve to use as mounting limit.
Consult Fig. 2 and shown in Figure 3,2~3 of the pre-buried steel bolt sleeves of lower floor's prefabricated units 101 top side facades, when upper strata prefabricated units 102 are installed, straight spacing angle steel 110 is fixed by bolts to lower floor's prefabricated units 101 tops, and exceeds top 150mm.Install concordantly when upper strata prefabricated units 102 are installed along spacing angle steel 110 and lower floor prefabricated units 101 plate faces, the location is installed soon, efficient is high, has overcome the shortcoming that common field measurement efficient is low, error is large.
4) cooperate Fig. 7~shown in Figure 11, at the pre-buried steel bolt sleeve in lower floor's prefabricated units 101 tops: the 5th sleeve 16, adjusting bolt 160 is installed, as upper strata prefabricated units 102 leveling are installed and support.
According to the Components Shape rule, push up 3~4 of pre-buried M20 steel bolt sleeves at prefabricated units 101 plates, should locate the relevant position in upper strata prefabricated units 102 bottoms, the plate bottom surface is designed and produced into the plane.
When prefabricated units 102 are installed, at first install lower floor's prefabricated units 101, M20 standard bolt 160 is screwed in the 5th sleeve 16 on lower floor's prefabricated units 101 plates top, according to installed height mark at the bottom of upper strata prefabricated units 102 plates, that bolt 160 end face absolute altitude leveling are consistent.When upper strata prefabricated units 102 are installed, directly upper strata prefabricated units 102 are installed in bolt 160 tops, check again and detect upper strata prefabricated units 102 absolute altitudes, for the absolute altitude deviation, come adjusting elevation by heightening or turn down bolt 160 again.For bearing capacity at the bottom of prefabricated units 102 plates of enhancing upper strata, can establish 10mm steel plate 161 at upper strata prefabricated units 102 plate heelpieces during installation.
After cast-in-place structural concreting is finished, after cast-in-place structural can bear the member load, bolt 160 is unscrewed, shed the load of 102 pairs of lower floor's prefabricated units 101 of upper strata prefabricated units.
Below embodiment has been described in detail the present invention by reference to the accompanying drawings, and those skilled in the art can make the many variations example to the present invention according to the above description.Thereby some details among the embodiment should not consist of limitation of the invention, and the scope that the present invention will define with appended claims is as protection scope of the present invention.

Claims (5)

1. assembled-type house PC prefabricated units fabrication and installation structure is characterized in that described structure comprises:
One mounting limit system, described mounting limit system comprises plural the first sleeve, described the first sleeve is pre-buried in the top side facade of described prefabricated units, has been bolted plural spacing angle steel;
One supports fixed system, described support fixed system comprises plural the second sleeve, described the second sleeve is embedded in respectively described prefabricated units bottom and top in advance, the second sleeve of described prefabricated units bottom has been bolted the complex number type steel bracket, and second sleeve on described prefabricated units top has been bolted plural adjustable diagonal bracing;
One demoulding Lift-on/Lift-off System, described demoulding Lift-on/Lift-off System comprise plural number the 3rd sleeve, and described the 3rd sleeve is embedded in described prefabricated units in advance, have been bolted plural number lifting steel plate connector;
One template is installed ties link system, and described template is installed ties link system is comprised plural quadruplet cylinder, and described quadruplet cylinder is embedded in described prefabricated units and cast-in-place structural junction in advance, is connected with plural Screw arbor with nut at both-ends.
2. structure as claimed in claim 1, it is characterized in that: described structure also comprises a leveling system, and described leveling system comprises plural number the 5th sleeve, and described the 5th sleeve is embedded in the top of described prefabricated units in advance, is connected with plural adjusting bolt.
3. structure as claimed in claim 2, it is characterized in that: corresponding described adjusting bolt is established the 10mm steel plate at the bottom of upper strata prefabricated units pad.
4. structure as claimed in claim 3, it is characterized in that: be embedded with plural number " I " type at the top of described prefabricated units and hang nail, it is M20 * 240mm that described " I " type hangs the nail model, described " I " type hangs under the nail and adds 2 " U " type φ 10HPB300 Bar Anchorages, anchorage length 30d, and described " I " type hangs the supporting special glue ripple of the pre-buried installation employing of nail.
5. structure as claimed in claim 4 is characterized in that: 2 φ 10HPB300 Bar Anchorages of bottom welding of described each sleeve, anchorage length 25d.
CN201310231912.5A 2013-06-09 2013-06-09 Assembled-type house PC prefabricated units fabrication and installation structure Active CN103306371B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310231912.5A CN103306371B (en) 2013-06-09 2013-06-09 Assembled-type house PC prefabricated units fabrication and installation structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310231912.5A CN103306371B (en) 2013-06-09 2013-06-09 Assembled-type house PC prefabricated units fabrication and installation structure

Publications (2)

Publication Number Publication Date
CN103306371A true CN103306371A (en) 2013-09-18
CN103306371B CN103306371B (en) 2015-10-14

Family

ID=49132055

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310231912.5A Active CN103306371B (en) 2013-06-09 2013-06-09 Assembled-type house PC prefabricated units fabrication and installation structure

Country Status (1)

Country Link
CN (1) CN103306371B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103982380A (en) * 2014-05-27 2014-08-13 北京金风科创风电设备有限公司 Precast concrete tower member, assembly thereof, stacking method thereof and embedded part
CN104234267A (en) * 2014-09-04 2014-12-24 中国建筑股份有限公司 Height-adjustable prefabricated assembly reinforced concrete shear wall plate and installation method of height-adjustable prefabricated assembly reinforced concrete shear wall plate
CN106930401A (en) * 2015-12-31 2017-07-07 中国三冶集团有限公司 A kind of assembled industrialization steel structure house
CN107034989A (en) * 2016-12-05 2017-08-11 浙江省建工集团有限责任公司 A kind of prefabrication prefabricated components exempt to support installation method
CN108086698A (en) * 2016-11-22 2018-05-29 吴方华 Levelling device and application method are fixed in a kind of prefabricated components installation

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201106287Y (en) * 2007-10-30 2008-08-27 上海市第二建筑有限公司 Apparatus for regulating building block verticality
CN101806095A (en) * 2010-03-15 2010-08-18 中山市快而居房屋预制件有限公司 Full-fabricated assembly overall reinforced concrete house and building method thereof
CN201665917U (en) * 2010-03-08 2010-12-08 浙江桔乡建设有限公司 Prefabricated part fastener
CN103061505A (en) * 2013-01-14 2013-04-24 河北省第四建筑工程公司 Multifunctional split bolt and application thereof

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201106287Y (en) * 2007-10-30 2008-08-27 上海市第二建筑有限公司 Apparatus for regulating building block verticality
CN201665917U (en) * 2010-03-08 2010-12-08 浙江桔乡建设有限公司 Prefabricated part fastener
CN101806095A (en) * 2010-03-15 2010-08-18 中山市快而居房屋预制件有限公司 Full-fabricated assembly overall reinforced concrete house and building method thereof
CN103061505A (en) * 2013-01-14 2013-04-24 河北省第四建筑工程公司 Multifunctional split bolt and application thereof

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
住房和城乡***工程质量***司等: "《工程建设国家级工法汇编》", 30 April 2011, 中国建筑出版社 *
何兆芳等: "住宅产业化试验楼项目的探索与实践", 《住宅产业》 *
张晓勇等: "预制全装配式混凝土框架结构施工技术", 《施工技术》 *
张鹏等: "工具式吊装***在装配式预制构件安装中的应用", 《施工技术》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103982380A (en) * 2014-05-27 2014-08-13 北京金风科创风电设备有限公司 Precast concrete tower member, assembly thereof, stacking method thereof and embedded part
CN104234267A (en) * 2014-09-04 2014-12-24 中国建筑股份有限公司 Height-adjustable prefabricated assembly reinforced concrete shear wall plate and installation method of height-adjustable prefabricated assembly reinforced concrete shear wall plate
CN106930401A (en) * 2015-12-31 2017-07-07 中国三冶集团有限公司 A kind of assembled industrialization steel structure house
CN108086698A (en) * 2016-11-22 2018-05-29 吴方华 Levelling device and application method are fixed in a kind of prefabricated components installation
CN107034989A (en) * 2016-12-05 2017-08-11 浙江省建工集团有限责任公司 A kind of prefabrication prefabricated components exempt to support installation method
CN107034989B (en) * 2016-12-05 2018-03-27 浙江省建工集团有限责任公司 A kind of prefabrication prefabricated components exempt to support installation method

Also Published As

Publication number Publication date
CN103306371B (en) 2015-10-14

Similar Documents

Publication Publication Date Title
CN104141383B (en) A kind of Bailey beam pendent form support system and construction thereof
CN104453197B (en) High Large Cantilever concrete structural steel shape supports platform
CN103306371B (en) Assembled-type house PC prefabricated units fabrication and installation structure
CN103243654B (en) Mounting method for steel anchor beam of cable-stayed bridge and assembly jig and cable bent tower mounting platform used in method
CN201865121U (en) Intergraded profile steel positioning bracket device for embedding overlong foundation anchor bolts
CN203904851U (en) Continuous beam side span straight section hanger support system
CN108708452B (en) U-shaped integral prefabricated bay window component, assembled bay window node structure and construction method thereof
CN103306206B (en) A kind of construction method adopting thin-wall hollow high-pier reinforcement bar support fixing of the forming frame reinforcing bar
CN203452266U (en) Fixing and leveling structure of H section steel column
CN213174260U (en) Laminated rubber shock insulation support mounting structure
CN107476583A (en) A kind of concrete assembled building builds construction method
CN108035546B (en) Template fixing device is pour to shear force wall for building
CN210685444U (en) Quick leveling, mounting and supporting device for prefabricated external wall panel
CN202882446U (en) Horse stool suspended by steel bars
CN202483154U (en) High bearing capacity suspending scaffold
CN204645343U (en) Prefabricated assembled concrete out-hung panel fastening devices
CN204662951U (en) High tower hydraulic climbing scaffold
CN101748692B (en) Production process for standard knot of assembled lattice support bracket and installation jig
CN108086523B (en) Light steel concrete block composite wall and construction method thereof
CN103174300B (en) Viscous damper installation construction method
CN205777531U (en) Floor slab construction beam string shuttering supporting equipment
CN215055273U (en) A assembled template for installing support bracket embedded box
CN104499435A (en) Bracket used for mounting self-anchored suspension bridge splay saddle base
CN204418027U (en) A kind of bracket of the cable saddle floor installation that falls apart for self-anchored suspension bridge
CN103938877B (en) The installation method of crab-bolt stock

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: CHINA STATE CONSTRUCTION ENG. CORP. LTD.

Effective date: 20140410

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20140410

Address after: 200135 Pudong New Area Century Avenue, Shanghai, No. 27, layer 1568

Applicant after: China Construction Eighth Engineering Division Co., Ltd.

Applicant after: China State Construction Corp.

Address before: 200135 Pudong New Area Century Avenue, Shanghai, No. 27, layer 1568

Applicant before: China Construction Eighth Engineering Division Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant