CN101806095A - Full-fabricated assembly overall reinforced concrete house and building method thereof - Google Patents
Full-fabricated assembly overall reinforced concrete house and building method thereof Download PDFInfo
- Publication number
- CN101806095A CN101806095A CN 201010147499 CN201010147499A CN101806095A CN 101806095 A CN101806095 A CN 101806095A CN 201010147499 CN201010147499 CN 201010147499 CN 201010147499 A CN201010147499 A CN 201010147499A CN 101806095 A CN101806095 A CN 101806095A
- Authority
- CN
- China
- Prior art keywords
- wall
- prefabricated
- cylinder
- hole
- full
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Working Measures On Existing Buildindgs (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention discloses a full-fabricated assembly overall reinforced concrete house which comprises a plurality of column ribs arranged at intervals and respectively and fixedly connected with a foundation, a plurality of column bodies prefabricated in a modularized way, a plurality of wall bodies prefabricated in the modularized way, and a floor slab prefabricated in the modularized way. The invention aims to overcome the defects of the prior art, and improve the full-fabricated assembly overall reinforced concrete house which has simple structure, is convenient to install, saves building materials, is quick to build, and has good overall safety performance. Another purpose of the invention is to provide a method for building the house.
Description
Technical field
The present invention relates to a kind of full-fabricated assembly overall reinforced concrete house, the invention still further relates to a kind of method of building this house, belong to building field.
Background technology
Traditional reinforced concrete building all is to build by the mode of cast in situs, there is long construction period, waste of material is big, quality level is widely different, uneconomical also not environmental protection, once big both at home and abroad quantity research fabricated construction and cast in place and precast construction, wherein fabricated construction exists globality and shock resistance poor, the disadvantage of waterproof and sound insulation value deficiency, the pillar in general cast in place and precast construction house and shear wall all are that employing is cast-in-place, the prefabricated rate of building is very low, general prefabricated rate is no more than 60%, because a large amount of cast-in-place work still exists, it is few that the cast-in-place mode of main body construction period ratio shortens, and the quality of cast-in-place part also is difficult to guarantee.
Summary of the invention
The objective of the invention is provides a kind of simple in structure, easy for installation in order to overcome weak point of the prior art, saves constructional materials, builds fast the full-fabricated assembly overall reinforced concrete house that the general safety performance is good.
Another object of the present invention is for a kind of method of building premises is provided.
In order to achieve the above object, the present invention adopts following scheme:
A kind of full-fabricated assembly overall reinforced concrete house, it comprises:
The pillar joint bar that a plurality of intervals are provided with and are connected with basic fixed respectively;
A plurality of by the prefabricated cylinder of modularization, on described cylinder, be provided with can ccontaining pillar joint bar through hole, be provided with the connection position on described cylinder, described cylinder is sleeved on the pillar joint bar and can makes cylinder and pillar joint bar be combined into integral body by fluid concrete in through hole;
A plurality of by the prefabricated body of wall of modularization, on described body of wall, be provided with the reservation connecting reinforcement, described reservation connecting reinforcement is arranged on the connection position of cylinder and with the pillar joint bar fixedlys connected, and can be by making cylinder and body of wall be combined into integral body to a described connection position cast contraction-free grouting concrete;
A plurality ofly be provided with reserved steel bar by the prefabricated beam of modularization at described beam, described reserved steel bar is arranged on the link position of cylinder upper end, and can be by making cylinder and beam be combined into integral body to described link position fluid concrete;
On described body of wall top, be provided with the long raised line in location, be provided with the long recess that can be fastened on the long raised line in described location on the described beam bottom, described beam is arranged on the body of wall top, on described body of wall, be provided with a plurality of vertical wall through holes, on described beam, be provided with a plurality of can with the involutory vertical beam through hole that is communicated with of described wall through hole, in the wall through hole of described involutory connection and beam through hole, can insert reinforcing bar, and can make beam and body of wall be combined into integral body by fluid concrete in described beam through hole and wall through hole;
With by the prefabricated floor of modularization, described floor is arranged on the beam.
Aforesaid a kind of full-fabricated assembly overall reinforced concrete house, wherein on described floor, be provided with connecting reinforcement, described connecting reinforcement stretches into the link position on the described back end, and can be by making floor and beam be combined into integral body to the link position fluid concrete.
Aforesaid a kind of full-fabricated assembly overall reinforced concrete house, the side that wherein said cylinder is connected with body of wall are provided with a thin layer that is easy to crack.
Aforesaid a kind of full-fabricated assembly overall reinforced concrete house wherein is provided with on described body of wall and side that described cylinder is connected and is used for the washing hair side that new-old concrete is connected.
Aforesaid a kind of full-fabricated assembly overall reinforced concrete house wherein also comprises one by the prefabricated stair of modularization, and described stair are connected with floor, basic fixed.
Aforesaid a kind of full-fabricated assembly overall reinforced concrete house wherein is respectively equipped with the bolt hole that is connected usefulness when assembling on described cylinder, beam and body of wall.
Aforesaid a kind of full-fabricated assembly overall reinforced concrete house wherein is provided with the insulation layer and the decorative layer of one on described body of wall, can be embedded with water, fulgurite road and combined socket and switch in described body of wall.
Aforesaid a kind of full-fabricated assembly overall reinforced concrete house wherein can be provided with decorative layer on described stair surface.
Aforesaid a kind of full-fabricated assembly overall reinforced concrete house wherein can be provided with decorative layer and insulation layer on described damaged surface.
A kind of method of building described full-fabricated assembly overall reinforced concrete house of the present invention, comprising following steps:
A, pre-buried pillar joint bar, position unwrapping wire
On the basis or the pillar position of flooring shift to an earlier date pre-buried pillar joint bar on the basis or flooring, ground unwrapping wire, the position of the pillar that draws, body of wall, door opening;
B, installation prefabricated panel
Hoisting prefabricated wallboard is accurately located prefabricated panel according to the position of wallboard, with interim diagonal brace prefabricated panel is reinforced, and makes wallboard be in stable status;
C, prefabricated cylinder is installed
Prefabricated cylinder is needed to crack with the epidermis of body of wall connecting portion, make this locate to such an extent that the cylinder through hole is communicated with the groove of body of wall, hoisting prefabricated post, pillar is enclosed within on the pillar joint bar of reservation, and accurately locate, with interim instrument prefabricated post and prefabricated panel are linked together, be in the milk to the pillar vertical through holes, the slit between prefabricated post and the dry wall is shut in slit during pouring between slurry inflow and the dry wall;
D, installation precast beam
On the dry wall top one deck is set and does not have the contraction adhesive mortar, hoisting prefabricated beam, the long recess left-hand thread that makes the beam lower end are on the long raised line at dry wall top, and with the hole aligning of precast beam and prefabricated panel, in the vertical hole of precast beam and dry wall, insert reinforcing bar, irritate real with grouting agent;
E, precast beam and prefabricated post are connected into integral body
Utilize the pre-embedded bolt hole on precast beam and the prefabricated post to install the node area template, placing of concrete makes precast beam, post member connect into integral body;
F, installation floor
Hoisting prefabricated floor, the reservation that reserved steel bar on the precast floor slab is stretched on the beam connects the position, and fixes with the top negative reinforcement colligation of precast beam, utilizes the prepared screw-bolt hole on the precast beam to install the limit mould, placing of concrete makes precast floor slab and precast beam become integral body.
In sum, beneficial effect of the present invention:
1, the beam in house of the present invention, post, wall, floor can be prefabricated in advance in factory, on-the-spot based on assembling work, scantling is accurate, concrete surface is smooth smooth, does not need secondary to plaster, and reduces the situ wet operation;
2, leave concave-convex type tongue and groove groove and the raised line that cooperatively interacts between the prefabricated units,, improve the house quality with convenient on-the-spot attended operation;
When 3, prefabricated post is produced, reserved the through hole of up/down perforation at main vertical reinforcement position, made things convenient for pillar to install, pillar can be square column, cylinder, hetermorphiscal column;
4, body of wall leaves the vertical through holes of up/down perforation as required, save material, weight reduction on the one hand, strengthen thermal and insulating performance on the other hand, when needs body of wall antidetonation, can in the hole, insert the reinforcing bar of perforation and hole is irritated real, just form prefabricated shear wall structure; Can be when body of wall be produced pre-buried door and window, also can install later on, materials for wall can be an ordinary reinforced concrete, also can be reinforcing bar and light weight concrete construction.
5, the vertical through holes of a plurality of up/down perforations is left in precast beam two ends and center, and corresponding with dry wall vertical through holes position, precast beam behind hoisted in position on the dry wall, can be inserted reinforcing bar as required in the hole, to irritate real in the hole, guarantee the globality of structure.
6, set up to make things convenient for being connected and fixed with support between the member in pre-embedded bolt hole on the member, and work progress uses interim instrument to be connected to become " statically determinate structrue " between the member, to guarantee construction safety.
7, flooring construction does not need a large amount of scaffolds and template, and it is convenient and swift to build operation.Outdoor needs of work progress are set up the decoration scaffold, are dismountable scaffold after binding, and whenever finish one deck main body construction, and the construction of water power and interior trim can be followed up, and do not have the multiplex (MUX) to plant to fight for the situation of the scope of operation, and the convenient construction tissue helps finished product protection.
Description of drawings
Fig. 1 is a schematic perspective view of the present invention;
Fig. 2 is the schematic diagram of cylinder and body of wall junction;
Fig. 3 is the schematic diagram of cylinder and body of wall, beam junction;
Fig. 4 is the schematic diagram of cylinder and body of wall, beam, floor junction;
Fig. 5 is the schematic diagram of cylinder among the present invention;
Fig. 6 is the schematic diagram of body of wall among the present invention;
Fig. 7 is the schematic diagram of central sill of the present invention;
Fig. 8 is the schematic diagram of floor of the present invention;
Schematic diagram when Fig. 9 is cylinder, body of wall, beam assembly unit;
Figure 10 is the schematic diagram that the pillar joint bar is connected with the basis.
The specific embodiment
Below in conjunction with the description of drawings and the specific embodiment the present invention is described further:
A kind of full-fabricated assembly overall reinforced concrete house shown in Fig. 1 to 10, it comprises:
The pillar joint bar 1 that a plurality of intervals are provided with and are connected with basic fixed respectively;
A plurality of by the prefabricated cylinder 2 of modularization, on described cylinder 2, be provided with can ccontaining pillar joint bar 1 through hole 21, be provided with connection position 22 on described cylinder 2, described cylinder 2 is sleeved on the pillar joint bar 1 and can makes cylinder 2 and pillar joint bar 1 be combined into integral body by fluid concrete in through hole 21;
A plurality of by the prefabricated body of wall 4 of modularization, on described body of wall 4, be provided with and reserve connecting reinforcement 41, described reservation connecting reinforcement 41 is arranged on the connection position 22 of cylinder 2 and with pillar joint bar 1 fixedlys connected, and can be by making cylinder 2 and body of wall 4 be combined into integral body to described connection position 22 cast contraction-free grouting concretes;
A plurality ofly be provided with reserved steel bar 31,32 by the prefabricated beam 3 of modularization at described beam 3, described reserved steel bar 31 is arranged on the connection position of cylinder 2 upper ends, and can be by making cylinder 2 and beam 3 be combined into integral body to a described connection position fluid concrete;
On described body of wall 4 tops, be provided with the long raised line 43 in location, be provided with the long recess that can be fastened on the long raised line 43 in described location on described beam 3 bottoms, described beam 3 is arranged on body of wall 4 tops, on described body of wall 4, be provided with a plurality of vertical wall through holes 44, on described beam 3, be provided with a plurality of can with the described wall through hole 44 involutory vertical beam through holes 33 that are communicated with, in the wall through hole 44 of described involutory connection and beam through hole 33, can insert reinforcing bar, and can make beam 3 and body of wall 4 be combined into integral body by fluid concrete in described beam through hole 33 and wall through hole 44;
With by the prefabricated floor 5 of modularization, described floor 5 is arranged on the beam 3, be provided with connecting reinforcement 51 on described floor 5, described connecting reinforcement 51 stretches into the link position on described beam 3 tops, and can be combined into integral body by make floor 5 and beam 3 to the link position fluid concrete.
First kind of embodiment of cylinder 2 wherein of the present invention as shown in Figures 2 and 3, described connection position 22 is the strip groove that is communicated with through hole 21; The strip groove is communicated with through hole 21 in cylinder 2 prefabricated processes one-body moldedly.
The another kind of embodiment of cylinder 2 of the present invention as shown in Figure 5, the side that described cylinder 2 is connected with body of wall 4 is provided with a thin layer that is easy to crack.In assembly unit, thin layer can be cracked, will form with through hole 21 on the limit of this moment pillar 2 and dry wall 4 combinations and be communicated with the strip groove, when pillar 2 through holes were in the milk, slurry can flow into the strip groove between cylinder 2 and the dry wall 4, and the slit between prefabricated post 2 and the dry wall 4 is shut.
Be provided with on described body of wall 4 and side that described cylinder 2 is connected among the present invention and be used for the washing hair side that new-old concrete is connected, described washing hair side exposes concrete stone, helps new-old concrete and connects.
Also comprise one among the present invention by the prefabricated stair of modularization, described stair are connected with floor 5, basic fixed.Be provided with the reservation connecting reinforcement that can be connected in described stair upper end, be provided with the hole that can be connected in described stair lower end with the steel crab-bolt of reservation on basis or the floor 5 with floor 5.The bolt hole 9 that is connected usefulness when on described cylinder 2, beam 3 and body of wall 4, being respectively equipped with assembling.
The present invention is provided with the insulation layer and the decorative layer of one on described body of wall 4, can be embedded with water, fulgurite road and combined socket and switch in described body of wall 4.On described stair surface, can be provided with decorative layer.On described cylinder 2 surfaces, can be provided with decorative layer and insulation layer.
The present invention builds the method for above-mentioned the above full-fabricated assembly overall reinforced concrete house of construction, may further comprise the steps:
Pre-buried pillar joint bar, position unwrapping wire
On the basis or the pillar position of flooring shift to an earlier date pre-buried pillar joint bar on the basis or flooring, ground unwrapping wire, the position of the pillar that draws, body of wall, door opening;
Prefabricated panel is installed
Hoisting prefabricated wallboard is accurately located prefabricated panel according to the position of wallboard, with interim diagonal brace prefabricated panel is reinforced, and makes wallboard be in stable status;
Prefabricated cylinder is installed
Prefabricated cylinder is needed to crack with the epidermis of body of wall connecting portion, make this locate to such an extent that the cylinder through hole is communicated with the groove of body of wall, hoisting prefabricated post, pillar is enclosed within on the pillar joint bar of reservation, and accurately locate, with interim instrument prefabricated post and prefabricated panel are linked together, be in the milk to the pillar vertical through holes, the slit between prefabricated post and the dry wall is shut in slit during pouring between slurry inflow and the dry wall;
Precast beam is installed
On the dry wall top one deck is set and does not have the contraction adhesive mortar, hoisting prefabricated beam, the long recess left-hand thread that makes the beam lower end are on the long raised line at dry wall top, and with the hole aligning of precast beam and prefabricated panel, in the vertical hole of precast beam and dry wall, insert reinforcing bar, irritate real with grouting agent;
Precast beam and prefabricated post are connected into integral body
Utilize the pre-embedded bolt hole on precast beam and the prefabricated post to install the node area template, placing of concrete makes precast beam, post member connect into integral body;
Floor is installed
Hoisting prefabricated floor, reserved steel bar on the precast floor slab is stretched into link position on the beam, and fix, utilize the prepared screw-bolt hole on the precast beam to install the limit mould with the top negative reinforcement colligation of precast beam, placing of concrete makes precast floor slab and precast beam become integral body.
Because precast floor slab is provided with steel bar girder and has strengthened rigidity, underfloor needs only interim safety supports frame in the work progress, has saved a large amount of scaffolds, and concrete reaches stripping after the intensity, support, diagonal brace, and one deck main house body is constructed and finished.
Repeat above method of operating, can carry out construction many, high-story house, until binding.When high level was set, the scheme that precast stair is installed was similar with the method that body of wall or beam are installed.
Claims (10)
1. full-fabricated assembly overall reinforced concrete house is characterized in that it comprises:
The pillar joint bar (1) that a plurality of intervals are provided with and are connected with basic fixed respectively;
A plurality of by the prefabricated cylinder of modularization (2), on described cylinder (2), be provided with can ccontaining pillar joint bar (1) through hole (21), be provided with connection position (22) on described cylinder (2), described cylinder (2) is sleeved on pillar joint bar (1) and goes up also and can make cylinder (2) and pillar joint bar (1) be combined into integral body by fluid concrete in through hole (21);
A plurality of by the prefabricated body of wall of modularization (4), on described body of wall (4), be provided with and reserve connecting reinforcement (41), the connection position (22) that described reservation connecting reinforcement (41) is arranged on cylinder (2) is gone up and is fixedlyed connected with pillar joint bar (1), and can make cylinder (2) and body of wall (4) be combined into integral body by pour into a mould a contraction-free grouting concrete to described connections position (22);
A plurality of by the prefabricated beam of modularization (3), be provided with reserved steel bar (31 at described beam (3), 32), described reserved steel bar (31) is arranged on the link position of cylinder (2) upper end, and can be combined into integral body by make cylinder (2) and beam (3) to described link position fluid concrete;
On described body of wall (4) top, be provided with location long raised line (43), on described beam (3) bottom, be provided with the long recess that can be fastened on the long raised line in described location (43), described beam (3) is arranged on body of wall (4) top, on described body of wall (4), be provided with a plurality of vertical wall through holes (44), on described beam (3), be provided with a plurality of can with the involutory vertical beam through hole (33) that is communicated with of described wall through hole (44), in the wall through hole (44) of described involutory connection and beam through hole (33), can insert reinforcing bar, and can make beam (3) and body of wall (4) be combined into integral body by fluid concrete in described beam through hole (33) and wall through hole (44);
With by the prefabricated floor of modularization (5), described floor (5) is arranged on the beam (3).
2. a kind of full-fabricated assembly overall reinforced concrete house according to claim 1, it is characterized in that on described floor (5), being provided with connecting reinforcement (51), described connecting reinforcement (51) stretches into the link position on described beam (3) top, and can be combined into integral body by make floor (5) and beam (3) to the link position fluid concrete.
3. a kind of full-fabricated assembly overall reinforced concrete house according to claim 1 is characterized in that the side that described cylinder (2) is connected with body of wall (4) is provided with a thin layer that is easy to crack.
4. a kind of full-fabricated assembly overall reinforced concrete house according to claim 1 and 2 is characterized in that being provided with on described body of wall (4) and side that described cylinder (2) is connected and is used for the washing hair side that new-old concrete is connected.
5. a kind of full-fabricated assembly overall reinforced concrete house according to claim 1 is characterized in that also comprising one by the prefabricated stair of modularization, and described stair are connected with floor (5), basic fixed.
6. a kind of full-fabricated assembly overall reinforced concrete house according to claim 1 is characterized in that being respectively equipped with the bolt hole (9) that is connected usefulness when assembling on described cylinder (2), beam (3) and body of wall (4).
7. a kind of full-fabricated assembly overall reinforced concrete house according to claim 1 is characterized in that being provided with the insulation layer and the decorative layer of one on described body of wall (4), can be embedded with water, fulgurite road and combined socket and switch in described body of wall (4).
8. a kind of full-fabricated assembly overall reinforced concrete house according to claim 5 is characterized in that can being provided with decorative layer on described stair surface.
9. a kind of full-fabricated assembly overall reinforced concrete house according to claim 1 is characterized in that can being provided with decorative layer and insulation layer on described cylinder (2) surface.
10. method of building the described full-fabricated assembly overall reinforced concrete house of claim 3 is characterized in that may further comprise the steps:
A, pre-buried pillar joint bar, position unwrapping wire
On the basis or the pillar position of flooring shift to an earlier date pre-buried pillar joint bar on the basis or flooring, ground unwrapping wire, the position of the pillar that draws, body of wall, door opening;
B, installation prefabricated panel
Hoisting prefabricated wallboard is accurately located prefabricated panel according to the position of wallboard, with interim diagonal brace prefabricated panel is reinforced, and makes wallboard be in stable status;
C, prefabricated cylinder is installed
Prefabricated cylinder is needed to crack with the epidermis of body of wall connecting portion, make this locate to such an extent that the cylinder through hole is communicated with the groove of body of wall, hoisting prefabricated post, pillar is enclosed within on the pillar joint bar of reservation, and accurately locate, with interim instrument prefabricated post and prefabricated panel are linked together, be in the milk to the pillar vertical through holes, the slit between prefabricated post and the dry wall is shut in slit during pouring between slurry inflow and the dry wall;
D, installation precast beam
On the dry wall top one deck is set and does not have the contraction adhesive mortar, hoisting prefabricated beam, the long recess left-hand thread that makes the beam lower end are on the long raised line at dry wall top, and with the hole aligning of precast beam and prefabricated panel, in the vertical hole of precast beam and dry wall, insert reinforcing bar, irritate real with grouting agent;
E, precast beam and prefabricated post are connected into integral body
Utilize the pre-embedded bolt hole on precast beam and the prefabricated post to install the node area template, placing of concrete makes precast beam, post member connect into integral body;
F, installation floor
Hoisting prefabricated floor, reserved steel bar on the precast floor slab is stretched into link position on the beam, and fix, utilize the prepared screw-bolt hole on the precast beam to install the limit mould with the top negative reinforcement colligation of precast beam, placing of concrete makes precast floor slab and precast beam become integral body.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010101474990A CN101806095B (en) | 2010-03-15 | 2010-03-15 | Full-fabricated assembly overall reinforced concrete house and building method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010101474990A CN101806095B (en) | 2010-03-15 | 2010-03-15 | Full-fabricated assembly overall reinforced concrete house and building method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101806095A true CN101806095A (en) | 2010-08-18 |
CN101806095B CN101806095B (en) | 2012-01-11 |
Family
ID=42608032
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010101474990A Expired - Fee Related CN101806095B (en) | 2010-03-15 | 2010-03-15 | Full-fabricated assembly overall reinforced concrete house and building method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101806095B (en) |
Cited By (54)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101985856A (en) * | 2010-11-19 | 2011-03-16 | 清华大学建筑设计研究院 | Removal-free prefabricated reinforced concrete template with cross holes inside and manufacturing method thereof |
CN102061803A (en) * | 2010-11-26 | 2011-05-18 | 清华大学建筑设计研究院 | Shear wall structure building based on cross-hole prefabricated reinforced concrete template and construction method thereof |
CN102277904A (en) * | 2011-05-05 | 2011-12-14 | 杨东佐 | Beam column connecting member and forming method thereof, building frame structure and installing method thereof |
CN102418425A (en) * | 2010-09-28 | 2012-04-18 | 杨峰 | Prefabrication integral casting building structure system with cast-in-site haunched beams, and construction method for prefabrication integral casting building structure system |
CN102493603A (en) * | 2011-12-30 | 2012-06-13 | 王夏静 | Prefabricated column of reserved concealed column channel, concealed column type complete assembled earthquake-resistant building and its method |
CN102493647A (en) * | 2011-12-05 | 2012-06-13 | 中冶天工集团有限公司 | Construction method for high-rise concrete structure |
CN102535738A (en) * | 2012-02-14 | 2012-07-04 | 黄昆 | Prefabricated house wallboards, fully prefabricated house using wallboards, and installation method for fully prefabricated house |
CN102650153A (en) * | 2012-04-24 | 2012-08-29 | 南通建筑工程总承包有限公司 | Prefabricated reinforced concrete gutter |
CN102720272A (en) * | 2012-06-29 | 2012-10-10 | 初明进 | Embedded column type prefabricated part connection node and manufacturing method thereof |
CN102864855A (en) * | 2012-09-19 | 2013-01-09 | 初明进 | T-shaped precast concrete wall connection |
CN102864854A (en) * | 2012-09-19 | 2013-01-09 | 初明进 | L-shaped precast concrete wall connection |
CN103061516A (en) * | 2013-01-15 | 2013-04-24 | 中南大学 | Method for assembling novel substructure module type preformed assembled frame structure |
CN103088939A (en) * | 2013-01-29 | 2013-05-08 | 湖南大学 | Assembly interlocking prestressing force shear wall system and construction method thereof |
CN103243913A (en) * | 2013-05-17 | 2013-08-14 | 中国建筑东北设计研究院有限公司 | Plugging method for grout blanket at connecting position of upper layer and lower layer of assembling shear wall building |
CN103291065A (en) * | 2013-06-05 | 2013-09-11 | 盐城工学院 | Prefabricated concrete supporting device and lifting and positioning method |
CN103306371A (en) * | 2013-06-09 | 2013-09-18 | 中国建筑第八工程局有限公司 | Manufacturing and mounting structure of PC prefabricated part of prefabricated house |
CN103306483A (en) * | 2013-06-21 | 2013-09-18 | 深圳海龙建筑制品有限公司 | Industrial construction method of building |
CN103422672A (en) * | 2013-08-29 | 2013-12-04 | 杜新智 | Construction method for reinforced concrete prefabricated house |
CN103758279A (en) * | 2013-12-16 | 2014-04-30 | 清华大学建筑设计研究院有限公司 | Prefabricated concrete large wallboard with grooves at two sides and with hidden beam and manufacturing method thereof |
CN103758345A (en) * | 2011-12-31 | 2014-04-30 | 常熟古建园林建设集团有限公司 | Method for assembling floorslab |
CN103883024A (en) * | 2013-12-16 | 2014-06-25 | 清华大学建筑设计研究院有限公司 | Short-leg shear wall structure assembled on basis of large hidden-beam prefabricated concrete wallboards with grooves on two sides and construction method of short-leg shear wall structure |
US20150040505A1 (en) * | 2012-04-27 | 2015-02-12 | Mingjin CHU | Precast reinforced concrete structure and method for forming the same |
CN104727440A (en) * | 2014-11-17 | 2015-06-24 | 马恒忠 | Novel industrialized production efficiently-assembled type building frame column beam and manufacturing method |
CN104884714A (en) * | 2012-10-18 | 2015-09-02 | 迈尔希斯有限公司 | Methods, systems and components for multi-storey building construction |
CN105781125A (en) * | 2016-03-04 | 2016-07-20 | 李藏柱 | Installation method for assembly type building |
CN106013811A (en) * | 2016-05-13 | 2016-10-12 | 李藏柱 | Mounting method of prefabricated building |
CN106032705A (en) * | 2015-11-06 | 2016-10-19 | 广州容联建筑科技有限公司 | Integrated casting molding construction method of reinforced concrete floor system |
CN106193623A (en) * | 2016-07-29 | 2016-12-07 | 刘祥锦 | A kind of prefabricated concrete structure construction method |
CN106436893A (en) * | 2016-11-11 | 2017-02-22 | 鹤壁东江建筑工业科技有限公司 | Fully-prefabricated structure and construction method thereof |
CN106522372A (en) * | 2016-09-20 | 2017-03-22 | 上海迅铸建筑科技有限公司 | Mixed type integrated house and construction method |
CN106545111A (en) * | 2017-01-18 | 2017-03-29 | 天津城建大学 | For the prefabricated constructional column at body of wall external corner, rammed earth wall construction and its construction method |
CN106703287A (en) * | 2015-11-18 | 2017-05-24 | 长沙理工大学 | Assembled integral type beam, and construction method thereof |
CN107060396A (en) * | 2017-01-23 | 2017-08-18 | 深圳市粤网电力建设发展有限公司 | A kind of fully-prefabricated assembled construction of transformer substation method and structure |
CN107268782A (en) * | 2017-07-01 | 2017-10-20 | 广东电网有限责任公司清远供电局 | A kind of prefabricated frame posture device and its implementation |
CN107514074A (en) * | 2017-09-28 | 2017-12-26 | 成都福仕特科技有限责任公司 | A kind of wall of assembled architecture for exempting from decoration and preparation method thereof |
CN107675809A (en) * | 2017-08-12 | 2018-02-09 | 孔令 | Intelligent passive type building module |
CN107806264A (en) * | 2017-09-29 | 2018-03-16 | 中铁科建有限公司 | A kind of engineering method and jiffy stand of assembled jiffy stand |
CN107905385A (en) * | 2017-11-27 | 2018-04-13 | 黄昆 | The assembled arthitecutral structure and method of construction that steel construction is combined with concrete structure |
CN108277998A (en) * | 2018-04-04 | 2018-07-13 | 四川森宇建筑工程有限公司 | A kind of concrete strengthening wall body structure |
CN108560585A (en) * | 2018-05-30 | 2018-09-21 | 上海城建建设实业集团新型建筑材料嘉兴有限公司 | The full assembling structure of outer wall of basement and its construction method |
CN109025016A (en) * | 2018-09-21 | 2018-12-18 | 中国二十二冶集团有限公司 | Plate and its construction method integrally drop in concrete |
CN109937282A (en) * | 2016-10-10 | 2019-06-25 | 韩国建宇工程有限公司 | Reinforced concrete frame antidetonation is reinforced using PC wallboard, reinforced concrete frame antidetonation reinforcement structure and its construction method using PC wallboard |
CN110258784A (en) * | 2019-07-02 | 2019-09-20 | 广东工业大学 | A kind of assembled arthitecutral structure |
CN110387956A (en) * | 2019-08-14 | 2019-10-29 | 河北蓝堡住宅工业有限公司 | LBZG exempts from building system technique in whole 33 layers of house |
CN111255059A (en) * | 2020-03-17 | 2020-06-09 | 和筑印象(天津)集成房屋有限公司 | Assembly type concrete house structure and node connection method thereof |
CN111997200A (en) * | 2020-07-15 | 2020-11-27 | 中建三局第一建设工程有限责任公司 | Recyclable full-assembly concrete temporary building board house and manufacturing method thereof |
CN112376755A (en) * | 2020-11-04 | 2021-02-19 | 三一筑工科技有限公司 | Connecting structure of prefabricated wall and beam and construction method |
CN112922337A (en) * | 2021-01-24 | 2021-06-08 | 南京创企和利科技有限公司 | Low-energy-consumption assembly type green building and construction method |
CN113250325A (en) * | 2021-06-21 | 2021-08-13 | 扬州工业职业技术学院 | Assembly type node and construction method thereof |
CN113389268A (en) * | 2021-06-29 | 2021-09-14 | 黑龙江松瑞科技有限公司 | Assembly type reinforced concrete frame disassembly-free formwork combined connecting system and construction method thereof |
CN113863679A (en) * | 2021-10-09 | 2021-12-31 | 中国十九冶集团有限公司 | Construction method of prefabricated house structure |
CN114033219A (en) * | 2021-12-21 | 2022-02-11 | 吴云涛 | Concrete box type building module, modular building and construction method thereof |
CN114856264A (en) * | 2022-05-31 | 2022-08-05 | 中铁第四勘察设计院集团有限公司 | Emergency evacuation stair ground structure and construction method thereof |
CN115262637A (en) * | 2022-09-27 | 2022-11-01 | 中建六局(天津)绿色建筑科技有限公司 | Subway station platform board assembled structure system |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4095380A (en) * | 1972-11-01 | 1978-06-20 | Forest City Dillon, Inc. | Building and elevator module for use therein |
JPH1025804A (en) * | 1996-07-10 | 1998-01-27 | Shimizu Corp | Constructing method for building |
CN2632183Y (en) * | 2003-03-11 | 2004-08-11 | 陈来 | Normalized assembled house |
CN101395324A (en) * | 2006-03-03 | 2009-03-25 | 考文尼克斯有限公司 | Prefabricated reinforced-concrete single-family dwelling and method for erecting said dwelling |
CN201326219Y (en) * | 2008-10-11 | 2009-10-14 | 黄昆 | Modularized building structure |
CN201326246Y (en) * | 2008-10-30 | 2009-10-14 | 黄昆 | Supporting post for modularized building structure |
-
2010
- 2010-03-15 CN CN2010101474990A patent/CN101806095B/en not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4095380A (en) * | 1972-11-01 | 1978-06-20 | Forest City Dillon, Inc. | Building and elevator module for use therein |
JPH1025804A (en) * | 1996-07-10 | 1998-01-27 | Shimizu Corp | Constructing method for building |
CN2632183Y (en) * | 2003-03-11 | 2004-08-11 | 陈来 | Normalized assembled house |
CN101395324A (en) * | 2006-03-03 | 2009-03-25 | 考文尼克斯有限公司 | Prefabricated reinforced-concrete single-family dwelling and method for erecting said dwelling |
CN201326219Y (en) * | 2008-10-11 | 2009-10-14 | 黄昆 | Modularized building structure |
CN201326246Y (en) * | 2008-10-30 | 2009-10-14 | 黄昆 | Supporting post for modularized building structure |
Cited By (78)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102418425A (en) * | 2010-09-28 | 2012-04-18 | 杨峰 | Prefabrication integral casting building structure system with cast-in-site haunched beams, and construction method for prefabrication integral casting building structure system |
CN101985856A (en) * | 2010-11-19 | 2011-03-16 | 清华大学建筑设计研究院 | Removal-free prefabricated reinforced concrete template with cross holes inside and manufacturing method thereof |
CN101985856B (en) * | 2010-11-19 | 2014-04-16 | 清华大学建筑设计研究院 | Removal-free prefabricated reinforced concrete template with cross holes inside and manufacturing method thereof |
CN102061803A (en) * | 2010-11-26 | 2011-05-18 | 清华大学建筑设计研究院 | Shear wall structure building based on cross-hole prefabricated reinforced concrete template and construction method thereof |
CN102061803B (en) * | 2010-11-26 | 2012-05-23 | 清华大学建筑设计研究院 | Shear wall structure building based on cross-hole prefabricated reinforced concrete template and construction method thereof |
CN102277904A (en) * | 2011-05-05 | 2011-12-14 | 杨东佐 | Beam column connecting member and forming method thereof, building frame structure and installing method thereof |
CN102493647B (en) * | 2011-12-05 | 2014-05-28 | 中冶天工集团有限公司 | Construction method for high-rise concrete structure |
CN102493647A (en) * | 2011-12-05 | 2012-06-13 | 中冶天工集团有限公司 | Construction method for high-rise concrete structure |
CN102493603B (en) * | 2011-12-30 | 2013-11-27 | 王夏静 | Prefabricated column of reserved concealed column channel, concealed column type complete assembled earthquake-resistant building and its method |
CN102493603A (en) * | 2011-12-30 | 2012-06-13 | 王夏静 | Prefabricated column of reserved concealed column channel, concealed column type complete assembled earthquake-resistant building and its method |
CN103758345A (en) * | 2011-12-31 | 2014-04-30 | 常熟古建园林建设集团有限公司 | Method for assembling floorslab |
CN102535738A (en) * | 2012-02-14 | 2012-07-04 | 黄昆 | Prefabricated house wallboards, fully prefabricated house using wallboards, and installation method for fully prefabricated house |
CN102535738B (en) * | 2012-02-14 | 2014-07-02 | 黄昆 | Fully prefabricated house and installation method for fully prefabricated house |
CN102650153B (en) * | 2012-04-24 | 2014-12-24 | 江苏中南建筑产业集团有限责任公司 | Prefabricated reinforced concrete gutter |
CN102650153A (en) * | 2012-04-24 | 2012-08-29 | 南通建筑工程总承包有限公司 | Prefabricated reinforced concrete gutter |
US20150040505A1 (en) * | 2012-04-27 | 2015-02-12 | Mingjin CHU | Precast reinforced concrete structure and method for forming the same |
CN102720272B (en) * | 2012-06-29 | 2014-08-27 | 初明进 | Embedded column type prefabricated part connection node and manufacturing method thereof |
CN102720272A (en) * | 2012-06-29 | 2012-10-10 | 初明进 | Embedded column type prefabricated part connection node and manufacturing method thereof |
CN102864855B (en) * | 2012-09-19 | 2015-02-04 | 初明进 | T-shaped precast concrete wall connection |
CN102864854B (en) * | 2012-09-19 | 2015-02-04 | 初明进 | L-shaped precast concrete wall connection |
CN102864854A (en) * | 2012-09-19 | 2013-01-09 | 初明进 | L-shaped precast concrete wall connection |
CN102864855A (en) * | 2012-09-19 | 2013-01-09 | 初明进 | T-shaped precast concrete wall connection |
CN104884714A (en) * | 2012-10-18 | 2015-09-02 | 迈尔希斯有限公司 | Methods, systems and components for multi-storey building construction |
CN103061516B (en) * | 2013-01-15 | 2015-07-08 | 中南大学 | Method for assembling novel substructure module type preformed assembled frame structure |
CN103061516A (en) * | 2013-01-15 | 2013-04-24 | 中南大学 | Method for assembling novel substructure module type preformed assembled frame structure |
CN103088939A (en) * | 2013-01-29 | 2013-05-08 | 湖南大学 | Assembly interlocking prestressing force shear wall system and construction method thereof |
CN103243913A (en) * | 2013-05-17 | 2013-08-14 | 中国建筑东北设计研究院有限公司 | Plugging method for grout blanket at connecting position of upper layer and lower layer of assembling shear wall building |
CN103243913B (en) * | 2013-05-17 | 2015-09-09 | 中国建筑东北设计研究院有限公司 | The method for blocking of fabricated shear wall architectural lower floor junction grout blanket |
CN103291065B (en) * | 2013-06-05 | 2015-12-09 | 盐城工学院 | A kind of assembly concrete bracing or strutting arrangement and lifting localization method |
CN103291065A (en) * | 2013-06-05 | 2013-09-11 | 盐城工学院 | Prefabricated concrete supporting device and lifting and positioning method |
CN103306371A (en) * | 2013-06-09 | 2013-09-18 | 中国建筑第八工程局有限公司 | Manufacturing and mounting structure of PC prefabricated part of prefabricated house |
CN103306371B (en) * | 2013-06-09 | 2015-10-14 | 中国建筑第八工程局有限公司 | Assembled-type house PC prefabricated units fabrication and installation structure |
CN103306483B (en) * | 2013-06-21 | 2015-11-18 | 深圳海龙建筑制品有限公司 | The industrial construction method of building |
CN103306483A (en) * | 2013-06-21 | 2013-09-18 | 深圳海龙建筑制品有限公司 | Industrial construction method of building |
CN103422672B (en) * | 2013-08-29 | 2016-01-20 | 杜新智 | A kind of reinforced concrete precast assembling housing construction construction method |
CN103422672A (en) * | 2013-08-29 | 2013-12-04 | 杜新智 | Construction method for reinforced concrete prefabricated house |
CN103883024A (en) * | 2013-12-16 | 2014-06-25 | 清华大学建筑设计研究院有限公司 | Short-leg shear wall structure assembled on basis of large hidden-beam prefabricated concrete wallboards with grooves on two sides and construction method of short-leg shear wall structure |
CN103758279A (en) * | 2013-12-16 | 2014-04-30 | 清华大学建筑设计研究院有限公司 | Prefabricated concrete large wallboard with grooves at two sides and with hidden beam and manufacturing method thereof |
CN104727440A (en) * | 2014-11-17 | 2015-06-24 | 马恒忠 | Novel industrialized production efficiently-assembled type building frame column beam and manufacturing method |
CN106032705A (en) * | 2015-11-06 | 2016-10-19 | 广州容联建筑科技有限公司 | Integrated casting molding construction method of reinforced concrete floor system |
CN106032705B (en) * | 2015-11-06 | 2018-01-09 | 广州容联建筑科技有限公司 | A kind of integral type pouring molding construction method of reinforced concrete floor |
CN106703287A (en) * | 2015-11-18 | 2017-05-24 | 长沙理工大学 | Assembled integral type beam, and construction method thereof |
CN105781125B (en) * | 2016-03-04 | 2018-07-10 | 李藏柱 | A kind of installation method of assembled architecture |
CN105781125A (en) * | 2016-03-04 | 2016-07-20 | 李藏柱 | Installation method for assembly type building |
CN106013811A (en) * | 2016-05-13 | 2016-10-12 | 李藏柱 | Mounting method of prefabricated building |
CN106013811B (en) * | 2016-05-13 | 2018-08-10 | 李藏柱 | A kind of installation method of assembled architecture |
CN106193623A (en) * | 2016-07-29 | 2016-12-07 | 刘祥锦 | A kind of prefabricated concrete structure construction method |
CN106522372B (en) * | 2016-09-20 | 2019-01-15 | 上海迅铸建筑科技有限公司 | A kind of hybrid integrated house and construction method |
CN106522372A (en) * | 2016-09-20 | 2017-03-22 | 上海迅铸建筑科技有限公司 | Mixed type integrated house and construction method |
CN109937282A (en) * | 2016-10-10 | 2019-06-25 | 韩国建宇工程有限公司 | Reinforced concrete frame antidetonation is reinforced using PC wallboard, reinforced concrete frame antidetonation reinforcement structure and its construction method using PC wallboard |
CN106436893A (en) * | 2016-11-11 | 2017-02-22 | 鹤壁东江建筑工业科技有限公司 | Fully-prefabricated structure and construction method thereof |
CN106545111A (en) * | 2017-01-18 | 2017-03-29 | 天津城建大学 | For the prefabricated constructional column at body of wall external corner, rammed earth wall construction and its construction method |
CN107060396A (en) * | 2017-01-23 | 2017-08-18 | 深圳市粤网电力建设发展有限公司 | A kind of fully-prefabricated assembled construction of transformer substation method and structure |
CN107268782A (en) * | 2017-07-01 | 2017-10-20 | 广东电网有限责任公司清远供电局 | A kind of prefabricated frame posture device and its implementation |
CN107675809A (en) * | 2017-08-12 | 2018-02-09 | 孔令 | Intelligent passive type building module |
CN107514074A (en) * | 2017-09-28 | 2017-12-26 | 成都福仕特科技有限责任公司 | A kind of wall of assembled architecture for exempting from decoration and preparation method thereof |
CN107806264A (en) * | 2017-09-29 | 2018-03-16 | 中铁科建有限公司 | A kind of engineering method and jiffy stand of assembled jiffy stand |
CN107806264B (en) * | 2017-09-29 | 2023-12-15 | 中铁科建有限公司 | Engineering method of assembled parking frame and parking frame |
CN107905385A (en) * | 2017-11-27 | 2018-04-13 | 黄昆 | The assembled arthitecutral structure and method of construction that steel construction is combined with concrete structure |
CN108277998A (en) * | 2018-04-04 | 2018-07-13 | 四川森宇建筑工程有限公司 | A kind of concrete strengthening wall body structure |
CN108560585B (en) * | 2018-05-30 | 2023-12-19 | 上海城建建设实业集团新型建筑材料嘉兴有限公司 | Basement outer wall full assembly structure and construction method thereof |
CN108560585A (en) * | 2018-05-30 | 2018-09-21 | 上海城建建设实业集团新型建筑材料嘉兴有限公司 | The full assembling structure of outer wall of basement and its construction method |
CN109025016A (en) * | 2018-09-21 | 2018-12-18 | 中国二十二冶集团有限公司 | Plate and its construction method integrally drop in concrete |
CN110258784A (en) * | 2019-07-02 | 2019-09-20 | 广东工业大学 | A kind of assembled arthitecutral structure |
CN110387956A (en) * | 2019-08-14 | 2019-10-29 | 河北蓝堡住宅工业有限公司 | LBZG exempts from building system technique in whole 33 layers of house |
CN110387956B (en) * | 2019-08-14 | 2021-06-22 | 河北蓝堡住宅工业有限公司 | LBZG integral 33-layer house building-free system process |
CN111255059A (en) * | 2020-03-17 | 2020-06-09 | 和筑印象(天津)集成房屋有限公司 | Assembly type concrete house structure and node connection method thereof |
CN111997200A (en) * | 2020-07-15 | 2020-11-27 | 中建三局第一建设工程有限责任公司 | Recyclable full-assembly concrete temporary building board house and manufacturing method thereof |
CN112376755A (en) * | 2020-11-04 | 2021-02-19 | 三一筑工科技有限公司 | Connecting structure of prefabricated wall and beam and construction method |
CN112922337B (en) * | 2021-01-24 | 2022-05-27 | 中亿丰建设集团股份有限公司 | Low-energy-consumption assembly type green building |
CN112922337A (en) * | 2021-01-24 | 2021-06-08 | 南京创企和利科技有限公司 | Low-energy-consumption assembly type green building and construction method |
CN113250325A (en) * | 2021-06-21 | 2021-08-13 | 扬州工业职业技术学院 | Assembly type node and construction method thereof |
CN113389268A (en) * | 2021-06-29 | 2021-09-14 | 黑龙江松瑞科技有限公司 | Assembly type reinforced concrete frame disassembly-free formwork combined connecting system and construction method thereof |
CN113863679A (en) * | 2021-10-09 | 2021-12-31 | 中国十九冶集团有限公司 | Construction method of prefabricated house structure |
CN114033219A (en) * | 2021-12-21 | 2022-02-11 | 吴云涛 | Concrete box type building module, modular building and construction method thereof |
CN114856264A (en) * | 2022-05-31 | 2022-08-05 | 中铁第四勘察设计院集团有限公司 | Emergency evacuation stair ground structure and construction method thereof |
CN115262637A (en) * | 2022-09-27 | 2022-11-01 | 中建六局(天津)绿色建筑科技有限公司 | Subway station platform board assembled structure system |
CN115262637B (en) * | 2022-09-27 | 2022-12-30 | 中建六局(天津)绿色建筑科技有限公司 | Subway station platform board assembled structure system |
Also Published As
Publication number | Publication date |
---|---|
CN101806095B (en) | 2012-01-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101806095B (en) | Full-fabricated assembly overall reinforced concrete house and building method thereof | |
CN201661086U (en) | Fully-prefabricated assembled integral reinforced concrete house | |
CN200968053Y (en) | Reinforced concrete detaching-free formwork | |
CN201217898Y (en) | Concrete prefabricated stairs | |
CN101629440A (en) | Integrally prefabricated composite external wall panel and manufacturing method thereof | |
CN109322392A (en) | A kind of light steel house and its build construction method | |
CN202787603U (en) | Light-weight heat preservation house roof plate or floor plate | |
CN204491984U (en) | Stone facing precast wall panel and external wall system | |
CN1888344B (en) | Composite thermal insulation concrete load-bearing wall | |
CN2931627Y (en) | Framework and wall panel combination floor | |
CN201202181Y (en) | Connection structure for precast concrete board and beam and construction including the same | |
CN212295037U (en) | But rapid Assembly's structural system | |
CN109707111B (en) | Assembled concrete archaized roof and construction method thereof | |
CN209308156U (en) | A kind of prefabricated buildings that can be recycled | |
CN204753834U (en) | Partition plate of scissors stair and connection structure of floor roof beam | |
CN101565984A (en) | Precast concrete slab and preparation method thereof | |
CN217480420U (en) | Assembly type composite wallboard and floor slab self-tapping nail cluster and post-cast strip combined connection structure | |
CN115977278A (en) | Assembled light steel combined truss supported steel wire mesh frame mortar-perlite-polyphenyl composite shear wall and manufacturing method thereof | |
CN110359612A (en) | A kind of novel two-way ribs profiled steel sheet combination floor of assembled | |
CN205776780U (en) | Integrated assembled type dwelling house system | |
CN114687459A (en) | Assembly type composite wallboard and floor slab self-tapping nail cluster and post-cast strip combined connecting structure and manufacturing method | |
CN114658141A (en) | Connecting structure and method for T-shaped constructional column and independent foundation of assembled composite wallboard | |
CN2276953Y (en) | Prestressed concrete hollow floor | |
CN103225373A (en) | Roof eaves board | |
CN207892081U (en) | One body composite board T shape walls of Fast Installation heat insulation decorative load-bearing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120111 Termination date: 20190315 |
|
CF01 | Termination of patent right due to non-payment of annual fee |