CN201865121U - Intergraded profile steel positioning bracket device for embedding overlong foundation anchor bolts - Google Patents

Intergraded profile steel positioning bracket device for embedding overlong foundation anchor bolts Download PDF

Info

Publication number
CN201865121U
CN201865121U CN2010205869082U CN201020586908U CN201865121U CN 201865121 U CN201865121 U CN 201865121U CN 2010205869082 U CN2010205869082 U CN 2010205869082U CN 201020586908 U CN201020586908 U CN 201020586908U CN 201865121 U CN201865121 U CN 201865121U
Authority
CN
China
Prior art keywords
longeron
supporting traverse
buried
foundation
embedding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010205869082U
Other languages
Chinese (zh)
Inventor
罗萍
裴晓峰
李文恩
杨临军
刘昌凡
牟建军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GANSU OVERSEAS ENGINEERING Corp
Original Assignee
GANSU OVERSEAS ENGINEERING Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GANSU OVERSEAS ENGINEERING Corp filed Critical GANSU OVERSEAS ENGINEERING Corp
Priority to CN2010205869082U priority Critical patent/CN201865121U/en
Application granted granted Critical
Publication of CN201865121U publication Critical patent/CN201865121U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a foundation anchor bolt embedding construction technology in a large-scale industrial building and large-scale steel structure with overlong and more foundation anchor bolts, in particular to an intergraded profile steel positioning bracket device for embedding overlong foundation anchor bolts. The device comprises a positioning bracket which comprises two longitudinal beams and a plurality of connecting transverse beams vertically connected with the two longitudinal beams; the positioning bracket further comprises a plurality of supporting transverse beams vertically connected with the longitudinal beams; the two ends of each supporting transverse beam are arranged at the periphery of the foundation structure outside each longitudinal beam; a plurality of concrete buttresses are fixedly arranged at the position where the periphery of the foundation structure corresponds to the two ends of each supporting transverse beam; the two ends of each supporting transverse beam are fixedly connected with the concrete buttresses; the side walls of the longitudinal beams, the supporting transverse beams and the connecting transverse beams are fixedly provided with a plurality of positioning packing ears for connecting with the foundation embedding anchor bolts; and the position of the positioning packing ears corresponds to the position of the foundation embedding anchor bolts. After the device is adopted, the embedding position is exact, the construction period is short, and the operation technology is simple, so that the device is particularly suitable for embedding foundation anchor bolts of large-scale equipment with bent anchors and vibration.

Description

Be used for the pre-buried overlength whole shaped steel locating rack device of foot bolt fundamentally
Technical field the utility model relates to stone bolt Embedment Construction technology such as overlength, a fairly large number of large scale industry building of pre-embedded anchoring bolts and large-scale steel structure basis, particularly relates to a kind of pre-buried overlength whole shaped steel locating rack device of foot bolt fundamentally that is used for.
Background technology for as projects such as large-scale industrial construction such as thermal power plant, plant gas, power station, large-scale steel structure basis and various boiler rooms in construction, it is pre-buried to face the high-strength stone bolt of a lot of large equipment bases, the basic pre-embedded bolt specification of this class building is many, quantity big and construction precision is had relatively high expectations, and has produced normal mounting and the debugging that bigger deviation will directly influence equipment in case bolt is pre-buried individually.
Usually, the main following two kinds of forms of large equipment base built-in process many for the pre-embedded bolt specification, that quantity is big:
1, adopt inner support to fix, the mounting process pre-embedded anchoring bolts of primary concreting concrete location.This method is common built-in process for a fairly large number of Equipment Foundations of pre-embedded anchoring bolts, and its location is relatively accurate, and is pre-buried fair guaranteed.But the inner support of the method is built in Equipment Foundations with pre-buried stone bolt when concreting in the lump for once using, and stone bolt is subjected to the external force effect and is offset in that concreting is appropriate to the occasion, for the installation of equipment is made troubles.
2, adopt support arm to fix, support arm adopts the fulcrum of scaffold building to be arranged at the foundation structure outside, comes pre-embedded anchoring bolts.Its location of this kind built-in process is relatively accurate, and pre-buried quality is better, but if the scaffold large usage quantity that is to use be subjected to construction machinery or personnel's external force effect in construction after, is difficult for checking, reset and adjusting.
Ghana's plant gas first and second phases of projects that my company undertakes the construction of amount to six combustion machine bases, single key dimension 21.3m * 4.0m * 1.3m, the curved anchor of pre-buried 34 M45-772 band, the stone bolt that flat segments 150mm is long.Two on combustion gas basis is in all bases maximum one, single key dimension 22.249m * 7.25m * 2.655m/1.63m/1.0m, the stone bolt of the curved anchor of pre-buried 47 M45 band.Many large equipment bases are piece formula basis independently, have much to give on base surface to bury ironware and give and stay bolt housings or direct-burried bolt; During construction to basic foundation, give embedded part, give and stay absolute altitude, axial location, planeness and the verticality etc. of bolt hole and direct-burried bolt etc. that higher requirement is arranged, particularly foot bolt is installed comparatively dispersion to this project equipment fundamentally, required precision is higher, and boiler foundation, steam turbine pedestal etc. all belongs to concrete in mass.At this basis overlength, pre-embedded anchoring bolts quantity is more and have the characteristics of curved anchor and vibrations, adopts common job practices can't satisfy working procedure and is connected and the duration needs, required precision can't guarantee, does not reach the effect of economic use simultaneously.For this reason, in order to ensure the accuracy of pre-embedded anchoring bolts, I have used whole shaped steel locating rack to come pre-embedded anchoring bolts at company's design.
Utility model content the technical problems to be solved in the utility model is to provide a kind of pre-buried overlength whole shaped steel locating rack device of foot bolt fundamentally that is used for rational in infrastructure, easy to install.Use this device, locating support can be reused, and guarantees the accuracy of pre-embedded anchoring bolts location, and construction cost is low, convenient and quick construction, and installation rate is fast, short construction period.
It is as follows that the utility model solves the problems of the technologies described above the technical scheme of taking: a kind of pre-buried overlength whole shaped steel locating rack device of foot bolt fundamentally that is used for, comprise locating support, locating support comprises that two longerons reach and longeron several crossbeams of getting in touch connected vertically; It is characterized in that: locating support also comprises and longeron several supporting traverses connected vertically, the supporting traverse two ends are positioned at foundation structure periphery, longeron outside, the peripheral position corresponding with the supporting traverse two ends of foundation structure is installed with concrete buttress, fixedlys connected with concrete buttress in the supporting traverse two ends; It is corresponding that longeron sidewall, supporting traverse and get in touch crossbeam and be installed with several location that are used to be connected basic pre-embedded anchoring bolts and choose ear, location are chosen the position of the position of ear and basic pre-embedded anchoring bolts.
The utility model locating support section steel manufacture mainly is to utilize shaped steel support arm system, carries out stone bolt and locatees pre-buried.The fulcrum that is used for fixing the locating support of basic pre-embedded anchoring bolts is that the supporting traverse two ends are fixed on the foundation structure concrete buttress in addition, locating support is on foundation structure, locating support and Equipment Foundations structure break away from fully, choose on the ear wanting pre-buried basic pre-embedded anchoring bolts to be fixed on the location that the shaped steel locating support is provided with.By the processing dimension of control shaped steel locating support and the accuracy of hoisted in position, control the position precision of the horizontal direction of basic pre-embedded anchoring bolts; The up-down adjustment nut on the ear is chosen in the up-down adjustment nut of two screw rods by regulating concrete buttress upper support point steel plate and location, controls the vertical position precision of stone bolt.
Ghana's plant gas first and second phases of projects that the utility model has been undertaken the construction of in my company amount to six combustion machine foundation constructions and use.By to four combustion machines fundamentally the multi-form built-in process contrast of two kinds of foot bolts calculate and analyze, use only four combustion machines, 3.8 ten thousand yuan of the pre-buried way cost savings usually of foot bolt fundamentally of monolithic devices steelframe locating support pre-embedded anchoring bolts construction system.Concrete pouring is finished and is reached detachable locating support after the prescribed strength requirement, and reusable characteristics are arranged, and after all bases finished construction, used shaped steel of shaped steel locating support and nut also can be used for the construction at other position.
Facts have proved employing the utility model, pre-buried position is accurate, and short construction period need be few with equipment, and operating procedure is simple, and surcharge is few.Particularly be applicable to the pre-buried of curved anchor of band and the large equipment base stone bolt that has vibrations.
Description of drawings Fig. 1 is that the utility model is used for the pre-buried floor map in combustion machine basis,
Fig. 2 is the enlarged drawing of A portion among Fig. 1,
Fig. 3 is the enlarged drawing of B portion among Fig. 1,
Fig. 4 is the I-I generalized section among Fig. 3,
Fig. 5 is the II-II generalized section among Fig. 3,
Fig. 6 is the enlarged drawing of C portion among Fig. 1,
Fig. 7 is III among Fig. 6-III generalized section,
Fig. 8 is the enlarged drawing of D portion among Fig. 1,
Fig. 9 is IV among Fig. 8-IV generalized section,
Figure 10 is a foundation bottom steel plate scheme of installation,
Figure 11 is V among Figure 10-V generalized section.
Among the figure: 1-foundation structure, 2-supporting traverse, 3-longeron, 4-gets in touch crossbeam, the 5-bearing diagonal, 6-connects steel plate, the two-in-one wooden model of 7-, 8-chooses ear in the location, the 9-concrete buttress, 10-buttress pre-embedded steel slab, 11-strong point screw rod bottom steel plate, 12-strong point screw rod top steel plate, 13-strong point up-down adjustment nut, 14-dual-gripper point studdle, 15-basis pre-embedded anchoring bolts, 16-chooses ear up-down adjustment nut, the 17-connecting bolt, the 18-linkage levelling screw, the 19-wooden model is reserved foundation trench, 20-device bottom steel plate, 21-stone bolt adjusting nut.
The specific embodiment is as shown in Figure 1: a kind of pre-buried overlength whole shaped steel locating rack device of foot bolt fundamentally that is used for, comprise locating support, locating support comprise two longerons 3 and with longeron 3 several crossbeams 4 of getting in touch connected vertically; Locating support also comprises and longeron 3 several supporting traverses 2 connected vertically, supporting traverse 2 two ends are positioned at longeron 3 outside foundation structures 1 periphery, the foundation structure 1 peripheral position corresponding with supporting traverse 2 two ends is installed with concrete buttress 9, fixedlys connected with concrete buttress 9 in supporting traverse 2 two ends; Be installed with several location on two longeron 3 sidewalls and choose ear 8, supporting traverse 2 also is installed with several location and chooses ear 8 with getting in touch on the crossbeam 4, it is corresponding that the position of the position of ear 8 and basic pre-embedded anchoring bolts 15 is chosen in the location, in other words, choose ear 8 according to the fixed-site installing and locating of wanting pre-buried basic pre-embedded anchoring bolts 15.
Fig. 3 to Fig. 5 expresses locating support with the structural relation of concrete buttress as its fulcrum: concrete buttress 9 tops are provided with buttress pre-embedded steel slab 10, buttress pre-embedded steel slab 10 is equipped with dual-gripper point studdle 14, the two ends of supporting traverse 2 are welded with strong point screw rod top steel plate 12, strong point screw rod top steel plate 12 is fixedlyed connected with dual-gripper point studdle 14 upper ends by strong point up-down adjustment nut 13, and supporting traverse 2 is fixing; Strong point screw rod bottom steel plate 11 is housed, 10 its firm qualification effects of 11 pairs of buttress pre-embedded steel slabs of strong point screw rod bottom steel plate above the buttress pre-embedded steel slab 10.In order to guarantee the firmly firm of the strong point, buttress pre-embedded steel slab 10 longitudinally is equipped with two dual-gripper point studdles 14.
In order to make the locating support overall structure more stable, contact crossbeam 4 and longeron 3 be connected intersection point, supporting traverse 2 fixedly is equipped with bearing diagonal 5 with the intersection point that is connected of longeron 3; Referring to Fig. 2: the two ends of bearing diagonal 5 are welded with and connect steel plate 6, and connecting bolt 17 will connect steel plate 6 and be fixed on longeron 3 and get in touch crossbeam 4 or above the supporting traverse 2.
Fig. 6 and Fig. 7 express longeron 3, location and choose being connected and the relation of installing between ear 8 and the basic pre-embedded anchoring bolts 15: locate and choose ear 8 and be welded on longeron 3 inside walls, the location is chosen ear 8 and is provided with bolt hole, and basic pre-embedded anchoring bolts 15 is suspended on the location and chooses on the ear 8 by choosing ear up-down adjustment nut 16.Supporting traverse 2 with get in touch being connected and the relation of installing and longeron identical between crossbeam 4 and the basic pre-embedded anchoring bolts 15, do not giving unnecessary details.
During with concrete pouring foundation structure 1, install two-in-one wooden model 7 in basic pre-embedded anchoring bolts 15 peripheries, the bottom of basis pre-embedded anchoring bolts 15 places below the two-in-one wooden model 7, casting complete, two-in-one wooden model 7 is removed in foundation structure 1 concrete setting, and the wooden model that is formed for second pouring is reserved foundation trench 19.
The basis that Fig. 8 and Fig. 9 express adjacent nearer two basic pre-embedded anchoring bolts 15 makes, two basic pre-embedded anchoring bolts 15 are used a two-in-one wooden model 7, other chooses being connected and the relation of installing between ear 8 and the basic pre-embedded anchoring bolts 15 such as longeron 3, location, identical with a basic pre-embedded anchoring bolts 15.
During the utility model practical application, determine to be used for fixing the technical requirements of the concrete buttress of locating rack and locating rack etc. according to on-site actual situations.When the pre-buried density of stone bolt was big, the spacing of concrete buttress should suitably be dwindled.Supporting traverse 2, longeron 3 made of the 20# channel-section steels usually with getting in touch crossbeam 4, the making of bearing diagonal 5 usefulness 70 * 5# angle steel.
Making of the present utility model is as follows with main application process:
Be made into the locating rack framework with supporting traverse 2, longeron 3, contact crossbeam 4 with bearing diagonal 5, according to the position location of basic pre-embedded anchoring bolts 15 ear 8 chosen in the location and be welded to longeron 3; Carry out concrete buttress 9 constructions according to the position of supporting traverse 2, pre-buried buttress pre-embedded steel slab 10, foundation pad and formwork erection, locating rack lifting and adjustment, basic pre-embedded anchoring bolts 15 installs and fixes, cast foundation structure 1 concrete.
After concreting is finished and reached design strength, remove wooden form 7 and locating rack, more pre-buried basic pre-embedded anchoring bolts 15 is checked, carry out the installation and the back-grouting of device bottom steel plate 20 after qualified, back-grouting as shown in figure 10.By the processing dimension of control shaped steel locating support and the accuracy of hoisted in position, control the position precision of the horizontal direction of basic pre-embedded anchoring bolts 15; The up-down adjustment nut on the ear is chosen in the up-down adjustment nut of two screw rods by regulating concrete buttress 9 upper support point steel plates and location, controls the vertical position precision of stone bolt.
Referring to Figure 10 and Figure 11: 18 pairs of device bottom steel plate 20 leveling of linkage levelling screw by device bottom steel plate 20 two ends before the back-grouting, and it is device bottom steel plate 20 is fixing with stone bolt adjusting nut 21, reserve foundation trench 19 fluid concretes to wooden model, finish second pouring basic pre-embedded anchoring bolts 15.

Claims (6)

1. one kind is used for the pre-buried overlength whole shaped steel locating rack device of foot bolt fundamentally, comprises locating support, and locating support comprises that two longerons reach and longeron several crossbeams of getting in touch connected vertically; It is characterized in that: described locating support also comprises and described longeron (3) several supporting traverses connected vertically (2), described supporting traverse (2) two ends are positioned at foundation structure (1) periphery, described longeron (3) outside, the peripheral position corresponding with described supporting traverse (2) two ends of described foundation structure (1) is installed with concrete buttress (9), fixedlys connected with described concrete buttress (9) in described supporting traverse (2) two ends; Described longeron (3) sidewall, described supporting traverse (2) are installed with several location and choose ear (8) with the described crossbeam (4) of getting in touch, and it is corresponding that the position of the position of ear (8) and basic pre-embedded anchoring bolts (15) is chosen in described location.
2. a kind of pre-buried overlength whole shaped steel locating rack device of foot bolt fundamentally that is used for as claimed in claim 1, it is characterized in that: described concrete buttress (9) top is provided with buttress pre-embedded steel slab (10), described buttress pre-embedded steel slab (10) is equipped with dual-gripper point studdle (14), the two ends of described supporting traverse (2) are welded with strong point screw rod top steel plate (12), described strong point screw rod top steel plate (12) is fixedlyed connected with described dual-gripper point studdle (14) upper end by strong point up-down adjustment nut (13), and strong point screw rod bottom steel plate (11) is housed above the described buttress pre-embedded steel slab (10).
3. a kind of pre-buried overlength whole shaped steel locating rack device of foot bolt fundamentally that is used for as claimed in claim 2, it is characterized in that: described buttress pre-embedded steel slab (10) longitudinally is equipped with two described dual-gripper point studdles (14).
4. a kind of pre-buried overlength whole shaped steel locating rack device of foot bolt fundamentally that is used for as claimed in claim 1 is characterized in that: described location is chosen ear (8) and is welded on described longeron (3) inside wall or/and be welded on described supporting traverse (2) or/and be welded on contact crossbeam (4); Described location is chosen ear (8) and is provided with bolt hole, and described basic pre-embedded anchoring bolts (15) is suspended on described location and chooses on the ear (8) by choosing ear up-down adjustment nut (16).
5. as any described a kind of pre-buried overlength whole shaped steel locating rack device of foot bolt fundamentally that is used for of claim 1 to 4, it is characterized in that: described contact crossbeam (4) and described longeron (3) be connected intersection point, described supporting traverse (2) fixedly is equipped with bearing diagonal (5) with the intersection point that is connected of described longeron (3); The two ends of described bearing diagonal (5) are welded with and connect steel plate (6), and (60 are fixed on described longeron (3) gets in touch crossbeam (4) or above the described supporting traverse (2) with described to connecting bolt (17) with described connection steel plate.
6. a kind of pre-buried overlength whole shaped steel locating rack device of foot bolt fundamentally that is used for as claimed in claim 5, it is characterized in that: described supporting traverse (2), described longeron (3) are made of the 20# channel-section steel with the described crossbeam (4) of getting in touch, and described bearing diagonal (5) is made of 70 * 5# angle steel.
CN2010205869082U 2010-10-30 2010-10-30 Intergraded profile steel positioning bracket device for embedding overlong foundation anchor bolts Expired - Fee Related CN201865121U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010205869082U CN201865121U (en) 2010-10-30 2010-10-30 Intergraded profile steel positioning bracket device for embedding overlong foundation anchor bolts

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010205869082U CN201865121U (en) 2010-10-30 2010-10-30 Intergraded profile steel positioning bracket device for embedding overlong foundation anchor bolts

Publications (1)

Publication Number Publication Date
CN201865121U true CN201865121U (en) 2011-06-15

Family

ID=44136281

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010205869082U Expired - Fee Related CN201865121U (en) 2010-10-30 2010-10-30 Intergraded profile steel positioning bracket device for embedding overlong foundation anchor bolts

Country Status (1)

Country Link
CN (1) CN201865121U (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102619236A (en) * 2012-04-26 2012-08-01 中国化学工程第四建设有限公司 Compound type ice chest foundation construction method
CN102704697A (en) * 2012-07-06 2012-10-03 平煤神马建工集团有限公司土建处 Assembled bolt group mold
CN102995653A (en) * 2012-11-30 2013-03-27 成都市工业设备安装公司 Side-type high-precision rapid locator for foundation bolts
CN104785904A (en) * 2015-04-01 2015-07-22 中石化工建设有限公司 Technology for installing pre-buried bolts to large-scale air separation device cold box
CN105040717A (en) * 2015-07-24 2015-11-11 中国十九冶集团有限公司 Foundation bolt fixing support and installation method
CN105239596A (en) * 2015-10-03 2016-01-13 中国轻工业长沙工程有限公司 Method for mounting pre-embedded bolts of large paper machine
CN107191464A (en) * 2017-07-21 2017-09-22 五冶集团上海有限公司 A kind of di rect-buried bolt means of defence and device
CN110130391A (en) * 2019-05-31 2019-08-16 中国五冶集团有限公司 Isolated footing pre-embedded bolt mounting structure and method
CN110439019A (en) * 2019-08-01 2019-11-12 青海送变电工程有限公司 A kind of pre-embedded bolt integrated locating device and construction method
CN111764425A (en) * 2020-05-22 2020-10-13 甘肃久智建筑科技有限公司 Fine adjustment fixing device for foundation bolt
CN113202132A (en) * 2021-04-12 2021-08-03 北京首钢建设集团有限公司 Bottom grouting construction method for large equipment
CN113756594A (en) * 2021-09-30 2021-12-07 浙江钢泰钢结构(集团)有限公司 Concrete embedded fastener and construction method thereof

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102619236A (en) * 2012-04-26 2012-08-01 中国化学工程第四建设有限公司 Compound type ice chest foundation construction method
CN102704697A (en) * 2012-07-06 2012-10-03 平煤神马建工集团有限公司土建处 Assembled bolt group mold
CN102704697B (en) * 2012-07-06 2014-06-18 平煤神马建工集团有限公司土建处 Assembled bolt group mold
CN102995653A (en) * 2012-11-30 2013-03-27 成都市工业设备安装公司 Side-type high-precision rapid locator for foundation bolts
CN104785904A (en) * 2015-04-01 2015-07-22 中石化工建设有限公司 Technology for installing pre-buried bolts to large-scale air separation device cold box
CN104785904B (en) * 2015-04-01 2017-03-22 中石化工建设有限公司 Technology for installing pre-buried bolts to large-scale air separation device cold box
CN105040717A (en) * 2015-07-24 2015-11-11 中国十九冶集团有限公司 Foundation bolt fixing support and installation method
CN105239596A (en) * 2015-10-03 2016-01-13 中国轻工业长沙工程有限公司 Method for mounting pre-embedded bolts of large paper machine
CN107191464A (en) * 2017-07-21 2017-09-22 五冶集团上海有限公司 A kind of di rect-buried bolt means of defence and device
CN107191464B (en) * 2017-07-21 2023-02-21 五冶集团上海有限公司 Method and device for protecting directly-buried bolt
CN110130391A (en) * 2019-05-31 2019-08-16 中国五冶集团有限公司 Isolated footing pre-embedded bolt mounting structure and method
CN110439019A (en) * 2019-08-01 2019-11-12 青海送变电工程有限公司 A kind of pre-embedded bolt integrated locating device and construction method
CN110439019B (en) * 2019-08-01 2021-07-06 青海送变电工程有限公司 Integral positioning device for embedded bolt and construction method
CN111764425A (en) * 2020-05-22 2020-10-13 甘肃久智建筑科技有限公司 Fine adjustment fixing device for foundation bolt
CN113202132A (en) * 2021-04-12 2021-08-03 北京首钢建设集团有限公司 Bottom grouting construction method for large equipment
CN113202132B (en) * 2021-04-12 2022-07-12 北京首钢建设集团有限公司 Bottom grouting construction method for large equipment
CN113756594A (en) * 2021-09-30 2021-12-07 浙江钢泰钢结构(集团)有限公司 Concrete embedded fastener and construction method thereof

Similar Documents

Publication Publication Date Title
CN201865121U (en) Intergraded profile steel positioning bracket device for embedding overlong foundation anchor bolts
CN102912900A (en) Prefabricated assembled superposed plate type concrete shear wall and construction method thereof
CN104790676A (en) Rapid leveling and alignment device and method for installation of prefabricated wallboards
CN107700533A (en) A kind of box quick assembly and disassembly mould piping lane construction technology
CN104032969A (en) Precise positioning and process regulation and control device for vibration isolation support embedded plate
CN102493471A (en) Suspending installation construction process method of structural foot margin anchor bolt
CN103469732B (en) Construction method of preformed holes for foundation bolts of bridge support
CN202925721U (en) Prefabricated superimposed sheet-type concrete shear wall structure
CN103306371B (en) Assembled-type house PC prefabricated units fabrication and installation structure
CN203429564U (en) Accurate installation and construction structure for bridge support
CN102434007A (en) Construction process for installing vibration isolation support among floors
CN215594016U (en) Mounting structure of shock insulation support
CN202706582U (en) Installation elevation adjusting device for base steel column of cup rabbet
CN103174231B (en) Hybrid controlled damping structure construction method
JP2011074632A (en) Unit structure of anchor bolt used for construction of foundation for equipment, and method of construction of foundation for equipment using the unit structure
CN215055273U (en) A assembled template for installing support bracket embedded box
CN206015523U (en) The built-in steel anchor beam accurate positioning device of free-standing Sarasota
CN101476308B (en) Construction method for large cast-in-situ steel reinforced concrete inlet channel and turbine housing
CN112212135A (en) Horizontal adjustable supporting structure of counter-force pedestal loading hole module and construction method thereof
CN203222810U (en) Steel column and base structure system
CN203113226U (en) Formwork support system with towering asymmetric concrete cantilever structure
CN201827604U (en) Base for high-precision universal mechanical equipment
CN216239839U (en) Pre-buried mount of steel column rag bolt and fixed knot construct
CN214462572U (en) Support frame for concrete construction
CN113106863A (en) Anchor backing plate mounting device and anchor backing plate rapid mounting and positioning method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110615

Termination date: 20161030

CF01 Termination of patent right due to non-payment of annual fee