CN107034989A - A kind of prefabrication prefabricated components exempt to support installation method - Google Patents

A kind of prefabrication prefabricated components exempt to support installation method Download PDF

Info

Publication number
CN107034989A
CN107034989A CN201611104213.4A CN201611104213A CN107034989A CN 107034989 A CN107034989 A CN 107034989A CN 201611104213 A CN201611104213 A CN 201611104213A CN 107034989 A CN107034989 A CN 107034989A
Authority
CN
China
Prior art keywords
support
corner brace
prefabricated
capital
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611104213.4A
Other languages
Chinese (zh)
Other versions
CN107034989B (en
Inventor
常波
卓建明
金睿
徐拥建
郭士新
沈剑
金昊
皇浦飞飞
王坚
张江
梅献忠
宣震宏
张维炎
何良犇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Construction Engineering Group Co Ltd
Original Assignee
Zhejiang Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Construction Engineering Group Co Ltd filed Critical Zhejiang Construction Engineering Group Co Ltd
Priority to CN201611104213.4A priority Critical patent/CN107034989B/en
Publication of CN107034989A publication Critical patent/CN107034989A/en
Application granted granted Critical
Publication of CN107034989B publication Critical patent/CN107034989B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/20Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/02Structures consisting primarily of load-supporting, block-shaped, or slab-shaped elements
    • E04B1/04Structures consisting primarily of load-supporting, block-shaped, or slab-shaped elements the elements consisting of concrete, e.g. reinforced concrete, or other stone-like material
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/16Load-carrying floor structures wholly or partly cast or similarly formed in situ
    • E04B5/32Floor structures wholly cast in situ with or without form units or reinforcements
    • E04B5/36Floor structures wholly cast in situ with or without form units or reinforcements with form units as part of the floor
    • E04B5/38Floor structures wholly cast in situ with or without form units or reinforcements with form units as part of the floor with slab-shaped form units acting simultaneously as reinforcement; Form slabs with reinforcements extending laterally outside the element
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/16Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
    • E04C5/162Connectors or means for connecting parts for reinforcements
    • E04C5/163Connectors or means for connecting parts for reinforcements the reinforcements running in one single direction
    • E04C5/165Coaxial connection by means of sleeves
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/24Safety or protective measures preventing damage to building parts or finishing work during construction
    • E04G21/26Strutting means for wall parts; Supports or the like, e.g. for holding in position prefabricated walls

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Mechanical Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The present invention relates to technical field of building construction, and in particular to a kind of prefabrication prefabricated components exempt to support installation method.It is that prefabricated post, Prefabricated superposed beam top are fixed on using sizing corner brace, to support the components such as Prefabricated superposed beam, superimposed sheet, realizes the installation method for not setting up adjustable independent support system or steel tube fastener support system of assembled architecture prefabricated components.After component is installed in place, easily adjustable independent support or steel pipe support etc. can be increased, method is flexible, convenient under composite beam, superimposed sheet according to load handling situations in superimposed sheet structure or preloading situation.The support corner brace of prefabricated capital and composite beam side, pours to smash and completes and conserve to strength of mould stripping in structure flooring whole casting layer, dismountable to recycle.

Description

A kind of prefabrication prefabricated components exempt to support installation method
Technical field
The present invention relates to technical field of building construction, and in particular to a kind of prefabrication prefabricated components exempt from support peace Dress method.
Background technology
Building industrialization is the inevitable direction of Building Trade in China sustainable development, is to raise labour productivity, improve engineering Quality and technological progress, the important channel for realizing construction industry transition and upgrade.Implementing building industrialization building technology can be greatly decreased Recruitment, shortening duration, improvement workman operating condition, reduction labor intensity, meet " environmental protection of four section one " requirement, are that China builds enterprise The only way of industry, building trade Transformation Development, flourishes at home.
Prefabricated assembled concrete structural construction is one of building industrialization structural system, is also present domestic with most It is many, promote one of most popular structural system, prefabricated assembled concrete structure includes precast concrete column, precast concrete and folded The structural elements such as beam, precast concrete superimposed sheet are closed, are mainly taken at this stage using adjustable independent support or steel tube fastener support etc. If bearing system, supporting member installation is relatively complicated and there is certain potential safety hazard, in the urgent need to finding a kind of peace Entirely, high-quality, quick construction method, improve prefabricated assembled concrete structural elements installation effectiveness and security.
The content of the invention
The Prefabricated superposed beam of current prefabrication, the lifting of prefabricated superimposed sheet need stable support system, Conventional construction scheme is existed using adjustable independent support system or steel tube fastener support system etc. and is set up complex procedures, safety The problem of hidden danger is numerous, there is provided a kind of prefabrication prefabricated structure the problem of the invention aims to solve described Part exempts to support installation method.
A kind of prefabrication prefabricated components of the present invention exempt to support installation method, are fixed on using sizing corner brace At the top of prefabricated post, Prefabricated superposed beam, to support the components such as Prefabricated superposed beam, superimposed sheet, assembled architecture prefabricated components are realized The installation method for not setting up adjustable independent support system or steel tube fastener support system., easily can basis after component is installed in place Load handling situations or preloading situation in superimposed sheet structure, increase adjustable independent support or steel pipe branch under composite beam, superimposed sheet Support etc., method is flexible, convenient.The support corner brace of prefabricated capital and composite beam side, pours to smash and completes and support in structure flooring whole casting layer It is dismountable to recycle after shield to strength of mould stripping.
The fixation of corner brace is supported, is to use M20 bolts by adapter sleeve pre-buried in corner brace and prefabricated post or Prefabricated superposed beam What cylinder was connected;Corner brace, branch sleeve, M20 bolts etc. use tool, regularization part, and purchasing convenient, quality can Lean on.
Branch sleeve is embedded in prefabricated components processing factory, with prefabricated together pre-buried, the making of batch production of component It ensure that accurate, the embedded quality and safety of pre-buried position.
In order to reach foregoing invention purpose, the present invention uses following technical scheme:
A kind of prefabrication prefabricated components exempt to support installation method, it is characterised in that specifically include following steps:
(1)Precast concrete beam, plate, post component and support corner brace Deepen Design, precast concrete is modeled, In-depth, arrangement support corner brace and pre-buried branch sleeve position in component;
(2)Prefabricated post, Prefabricated superposed beam, the processing of prefabricated superimposed sheet, according to the pre-buried branch sleeve in Deepen Design position;In component dies After the completion of tool and framework of steel reinforcement, in the pre-buried branch sleeve of design attitude;2, beam two ends bottom correspondence post position are arranged in conventional capital Each arrangement 1 is put, the side of beam two is arranged according to the piecemeal of plate, every piece of edges of boards two ends correspondence position respectively arranges 1, and plate correspondence beam is set Seated position is arranged;
(3)Prefabricated components are transported to scene, first hoisting prefabricated post, and install in capital support corner brace, using M20 bolts by corner brace It is connected with capital embedded sleeve barrel;According to the first prefabricated post of component, in the lifting sequence of Prefabricated superposed beam, then prefabricated superimposed sheet, First be connected capital support corner brace, and the bar hole set in corner brace can facilitate the regulation of setting height(from bottom);
(4)Beam is installed in place, and beam is hoisted into capital, is shelved in capital support corner brace, and will using M20 bolts at beam two ends Capital support corner brace is connected with beam-ends embedded sleeve barrel;The pre-buried branch sleeve of beam-ends is with supporting the fixation of corner brace to ensure The stabilization of beam, firmly, and the problems such as landings will not be produced in prefabricated board hoisting process, offset;
(5)Corner brace, is connected by mounting rail lateral support corner brace using M20 bolts with two sides embedded sleeve barrel;Liang Cebianjiao Code is mainly used in supporting the bar hole set in superimposed sheet, support corner brace to facilitate the regulation of setting height(from bottom);Bolt should be tightened.
(6)Plate is installed in place, and plate is hoisted into beam face, is shelved on the collateral support angle code of beam, and use M20 bolts by beam side Support corner brace is fixed with embedded sleeve barrel in plate;Pre-buried branch sleeve is with supporting the fixation of corner brace to ensure the steady of plate in plate It is fixed, firm, and superimposed sheet will not produce cunning in the operation process such as hydropower installation construction, reinforcing bar colligation construction on prefabricated superimposed sheet The problems such as falling, offset;
(7)Complete prefabricated components to install, visual engineering structure situation, set up under beam slab and support, reinforced;Consider engineering difference Property, if having heavy load operation or larger preloading on superimposed sheet, reinforcing support can be increased under precast beam, prefabricated board;
(8)Structure flooring whole casting layer pours to smash and completes and conserve to strength of mould stripping, removes each component support corner brace.
It is used as further preferred scheme, step(1)In precast concrete beam, plate, post component and support corner brace it is deep Change design, be on the basis of using revit softwares to precast concrete beam, plate, post Component Modeling, to strut angle code bit Put, size is arranged, precast concrete beam, plate, the model of post component include rebar model, lifting and molding embedded part Model, electromechanical preheating embedding line and cavern model and the pre-buried branch sleeve model of support corner brace and support corner brace model, are formed Component drawing and exploded view, technical support is provided for the processing of component, lifting;By in-depth and position, size design, carry out Collision detection, it is ensured that position it is accurate, it is to avoid component inside grade puts the defect that causes of conflict with doing over again.
It is used as further preferred scheme, step(2)In pre-buried branch sleeve be pre-buried when prefabricated components are processed, in factory Interior embedded completion, factory operation avoids the error and defect of job site operation, it is ensured that the Forming Quality of embedded part;It is embedded Method is:After the completion of element mold and framework of steel reinforcement, in the pre-buried branch sleeve of design attitude, 1, beam two are arranged in conventional capital Bottom correspondence post position respectively arrangement one is held, long bridge both sides side is according to two ends, middle each arrangement 3, and the short side of bridge two is pressed 2, plate correspondence beam set location arrangement are respectively arranged according to two ends.
It is used as further preferred scheme, step(3)After the completion of middle prefabricated post lifting, support corner brace is installed in capital, used Corner brace is connected by M20 bolts with capital embedded sleeve barrel;The support corner brace main function of capital is support Prefabricated superposed beam, angle Bar hole is provided with code can facilitate the regulation of setting height(from bottom), and M20 bolts are screwed into pre-buried branch sleeve, spiral shell using common wrench Bolt should tighten, closely knit.
It is used as further preferred scheme, step(4)Central sill is hoisted to from capital 30CM or so, and loop wheel machine falling speed slows down, Behind location of proofreading position, it is shelved in capital support corner brace;Capital is supported corner brace and the pre-buried set of beam-ends by beam two ends with M20 bolts Cylinder is connected, i.e., M20 bolts are screwed into pre-buried branch sleeve using common wrench, and bolt should tighten, closely knit, and be connected work Be ensure beam stabilization, firmly, and in prefabricated board hoisting process precast beam will not produce landings, offset the problems such as.
It is used as further preferred scheme, step(5)The support corner brace of central sill side, is to use M20 bolts by corner brace and both sides Face embedded sleeve barrel is connected, and main function is that the bar hole set in support superimposed sheet, support corner brace can facilitate setting height(from bottom) Regulation, i.e., M20 bolts are screwed into by pre-buried branch sleeve using common wrench, bolt should tighten, closely knit.
It is used as further preferred scheme, step(6)Middle plate is hoisted to apart from beam face 30CM or so, and loop wheel machine falling speed is put It is slow, behind location of proofreading position, it is shelved in support corner brace, is fixed the collateral support angle code of beam with embedded sleeve barrel in plate with M20 bolts, M20 bolts are screwed into by pre-buried branch sleeve using common wrench, bolt should tighten, closely knit, and the effect of being connected is to ensure plate Stabilization, firmly, and on prefabricated superimposed sheet hydropower installation construction, reinforcing bar colligation construction etc. in operation process superimposed sheet will not produce The problems such as raw landing, skew.
It is used as further preferred scheme, step(7)After middle prefabricated part hanging is in place, visual engineering structure situation, construction Situation, the extension supporting under Prefabricated superposed beam, superimposed sheet, is reinforced, and support can independently be supported using adjustable steel pipe, can also be adopted Supported with common steel tube.Such a situation is mainly when having heavy load operation or larger preloading on superimposed sheet.
It is used as further preferred scheme, step(8)Middle structure flooring whole casting layer pours to smash and completes and conserve to strength of mould stripping, Each component supports the dismounting of corner brace, is predominantly back-outed M20 bolts using spanner, and bolt and the corner brace of dismounting can be sharp again With.
Compared with prior art, beneficial effect is the present invention:
This construction method has:
(1)It is easy to process, accurate, simulated using three-dimensional modeling, component, it is pre- to being reserved in prefabricated components, reinforcing bar, embedded part, component Buried pipeline etc. is deepened, arranged, it is ensured that each module position it is accurate, by model, component simulation instruct processing, construction, More convenient and quicker;
(2)Construction is convenient, and Prefabricated superposed beam, overlapping board member are supported using corner brace, installs, convenient disassembly, and eliminate can Setting up for the support frames such as independent support system or steel pipe supporting system is adjusted, the duration has been saved with manually, reducing cost;
(3)Construction is reasonable, takes full advantage of the intensity and rigidity of prefabricated components itself, passes through corner brace, bolt, pre-buried branch sleeve Be connected, form stable, succinct temporary structure system, can stablize and bear vertical, lateral load, it is ensured that building structure with The safety of construction.
Brief description of the drawings
Fig. 1 is corner brace and branch sleeve three-dimensional model diagram;
Fig. 2 is that prefabricated post supports connection diagram with Prefabricated superposed beam corner brace;
Fig. 3 is that Prefabricated superposed beam supports connection diagram with prefabricated superimposed sheet corner brace;
Fig. 4 is the connection diagram that Prefabricated superposed beam supports another visual angle with prefabricated superimposed sheet corner brace.
Embodiment
Explanation is further described to technical scheme below by specific embodiment.
If without specified otherwise, the raw material employed in embodiments of the invention is raw material commonly used in the art, is implemented Method employed in example, is the conventional method of this area.
Embodiment:
A kind of prefabrication prefabricated components exempt to support installation method, it is characterised in that specifically include following steps:
(1)Precast concrete beam, plate, post component and support corner brace Deepen Design, precast concrete is modeled, In-depth, arrangement support corner brace and pre-buried branch sleeve position in component;Precast concrete beam, plate, post component and support Corner brace Deepen Design, is on the basis of using revit softwares to precast concrete beam, plate, post Component Modeling, to strut angle Code position, size are arranged, and precast concrete beam, plate, the model of post component include rebar model, lifting and molding Embedded part model, electromechanical preheating embedding line and cavern model and the pre-buried branch sleeve model of support corner brace and support corner brace model, Component drawing and exploded view are formed, technical support is provided for the processing of component, lifting;By in-depth and position, size design, Carry out collision detection, it is ensured that position it is accurate, it is to avoid component inside grade puts the defect that causes of conflict with doing over again.
Model is set up:The prefabrication component data drawing three-dimensional provided using REVIT mapping softwares design Model, model includes element structure model, framework of steel reinforcement and built-in fitting model, water and electricity installation project set aside pre-embedded pipeline mould Type, lifting and branch sleeve embedded part model etc., this model be member reinforcing steel bar and pre-buried embedded part make, hydropower installation it is pre-buried it is reserved, Lifting and the pre-buried, lifting component of branch sleeve etc. provide the technical support for turning over master drawing, by model node, section refinement point Solution, can form each position construction in-depth figure.
Corner brace supported design with it is pre-buried:, it is necessary to carry out arrangement design to the position of corner brace supporting embedded part after model is set up, Corner brace support is arranged on capital or back, i.e. the cast-in-place area bottom surface of corner brace support top surface and prefabricated components is put down, therefore need to be according to structure Reinforcing bar distribution situation adjusts branch sleeve position up and down in part, and prefabricated capital branch sleeve position connects with Prefabricated superposed beam bottom Arrangement should be corresponded to by connecing sleeve portion;Tackled with prefabricated superimposed sheet bottom branch sleeve position Prefabricated superposed beam side branch sleeve position It should arrange.Pass through in-depth and position, size design, carry out collision detection, it is ensured that position it is accurate, it is to avoid component inside product The defect that position conflict is caused is with doing over again.Corner brace size must be calculated according to scantling and designed.
(2)Prefabricated post, Prefabricated superposed beam, the processing of prefabricated superimposed sheet, according to the pre-buried branch sleeve in Deepen Design position;In structure After the completion of part mould and framework of steel reinforcement, in the pre-buried branch sleeve of design attitude;2, beam two ends bottom correspondence are arranged in conventional capital Post position respectively arranges 1, and the side of beam two is arranged according to the piecemeal of plate, and every piece of edges of boards two ends correspondence position respectively arranges 1, plate correspondence Beam set location is arranged;Pre-buried branch sleeve is pre-buried when prefabricated components are processed, and buries and completes in factory, factory operation Avoid the error and defect of job site operation, it is ensured that the Forming Quality of embedded part;Method for embedding is:In element mold and steel After the completion of muscles and bones frame, in the pre-buried branch sleeve of design attitude, 1, the beam two ends bottom correspondence each cloth in post position are arranged in conventional capital One is put, long bridge both sides side is according to two ends, middle each arrangement 3, and the short side of bridge two respectively arranges 2, plate pair according to two ends Beam set location is answered to arrange.
(3)Prefabricated components are transported to scene, first hoisting prefabricated post, and install support corner brace in capital, will using M20 bolts Corner brace is connected with capital embedded sleeve barrel;It is suitable in Prefabricated superposed beam, then the lifting of prefabricated superimposed sheet according to the first prefabricated post of component Sequence, be first connected capital support corner brace, and the bar hole set in corner brace can facilitate the regulation of setting height(from bottom);
After the completion of prefabricated post lifting, support corner brace is installed in capital, corner brace is connected solid with capital embedded sleeve barrel using M20 bolts It is fixed;The support corner brace main function of capital is to be provided with bar hole in support Prefabricated superposed beam, corner brace to facilitate setting height(from bottom) Regulation, pre-buried branch sleeve is screwed into using common wrench by M20 bolts, and bolt should tighten, closely knit.
(4)Beam is installed in place, and beam is hoisted into capital, is shelved in capital support corner brace, and use M20 spiral shells at beam two ends Capital support corner brace is connected by bolt with beam-ends embedded sleeve barrel;The fixation of the pre-buried branch sleeve of beam-ends and support corner brace can be with The problems such as ensureing the stabilization, firmly of beam, and landings will not be produced in prefabricated board hoisting process, offset;Beam is hoisted to from post 30CM or so is pushed up, loop wheel machine falling speed slows down, behind location of proofreading position, be shelved in capital support corner brace;Beam two ends M20 spiral shells Capital support corner brace is connected by bolt with beam-ends embedded sleeve barrel, i.e., M20 bolts are screwed into pre-buried adapter sleeve using common wrench Cylinder, bolt should tighten, closely knit, and the effect of being connected is the stabilization, firmly for ensureing beam, and prefabricated in prefabricated board hoisting process Beam will not produce the problems such as landing, skew.30CM or so be specially above and below 2CM error range.
(5)Corner brace, is connected by mounting rail lateral support corner brace using M20 bolts with two sides embedded sleeve barrel;Beam side Corner code is mainly used in supporting the bar hole set in superimposed sheet, support corner brace to facilitate the regulation of setting height(from bottom);Bolt should be twisted Tightly.The support corner brace of beam side, is that corner brace is connected with two sides embedded sleeve barrel with M20 bolts, and main function is support The bar hole set in superimposed sheet, support corner brace can facilitate the regulation of setting height(from bottom), i.e., be screwed into M20 bolts using common wrench Pre-buried branch sleeve, bolt should tighten, closely knit.
(6)Plate is installed in place, and plate is hoisted into beam face, is shelved on the collateral support angle code of beam, and use M20 bolts by beam side Support corner brace is fixed with embedded sleeve barrel in plate;Pre-buried branch sleeve is with supporting the fixation of corner brace to ensure the steady of plate in plate It is fixed, firm, and superimposed sheet will not produce cunning in the operation process such as hydropower installation construction, reinforcing bar colligation construction on prefabricated superimposed sheet The problems such as falling, offset;Plate is hoisted to apart from beam face 30CM or so, and loop wheel machine falling speed slows down, and behind location of proofreading position, is shelved on Support in corner brace, fixed beam collateral support angle code with embedded sleeve barrel in plate with M20 bolts, i.e., using common wrench by M20 bolts It is screwed into pre-buried branch sleeve, bolt should tighten, closely knit, the effect of being connected is the stabilization, firmly for ensureing plate, and prefabricated overlapping Superimposed sheet will not produce the problems such as landing, skew in the operation process such as hydropower installation construction, reinforcing bar colligation construction on plate.
(7)Complete prefabricated components to install, visual engineering structure situation, set up under beam slab and support, reinforced;Consider engineering Otherness, if having heavy load operation or larger preloading on superimposed sheet, can increase reinforcing support under precast beam, prefabricated board;In advance After lifting component processed is in place, visual engineering structure situation, condition of construction, the extension supporting under Prefabricated superposed beam, superimposed sheet are carried out Reinforce, support can independently be supported using adjustable steel pipe, also can be using common steel tube support.Such a situation is mainly to have on superimposed sheet When heavy load operation or larger preloading.
(8)Structure flooring whole casting layer pours to smash and completes and conserve to strength of mould stripping, removes each component support corner brace.Structure building Face whole casting layer pours to smash and completes and conserve to strength of mould stripping, and each component supports the dismounting of corner brace, predominantly using spanner by M20 spiral shells Bolt is back-outed, and the bolt of dismounting can be reused with corner brace.

Claims (9)

1. a kind of prefabrication prefabricated components exempt to support installation method, it is characterised in that specifically include following steps:
(1)Precast concrete beam, plate, post component and support corner brace Deepen Design, precast concrete is modeled, In-depth, arrangement support corner brace and pre-buried branch sleeve position in component;
(2)Prefabricated post, Prefabricated superposed beam, the processing of prefabricated superimposed sheet, according to the pre-buried branch sleeve in Deepen Design position;In component dies After the completion of tool and framework of steel reinforcement, in the pre-buried branch sleeve of design attitude;
(3)Prefabricated components are transported to scene, first hoisting prefabricated post, and install support corner brace in capital, and corner brace is pre-buried with capital Sleeve connection is fixed;According to the first prefabricated post of component, in the lifting sequence of Prefabricated superposed beam, then prefabricated superimposed sheet, first it is connected Capital supports the bar hole set in corner brace, corner brace to facilitate the regulation of setting height(from bottom);
(4)Beam is installed in place, and beam is hoisted into capital, is shelved in capital support corner brace, and at beam two ends by capital strut angle Code is connected with beam-ends embedded sleeve barrel;
(5)Mounting rail lateral support corner brace, corner brace is connected with two sides embedded sleeve barrel;
(6)Plate is installed in place, and plate is hoisted into beam face, is shelved on the collateral support angle code of beam, and use bolt by the collateral support angle of beam Code is fixed with embedded sleeve barrel in plate;
(7)Complete prefabricated components to install, visual engineering structure situation, set up under beam slab and support, reinforced;Consider engineering difference Property, if having heavy load operation or larger preloading on superimposed sheet, support is reinforced in increase under precast beam, prefabricated board;
(8)Structure flooring whole casting layer pours to smash and completes and conserve to strength of mould stripping, removes each component support corner brace.
2. a kind of prefabrication prefabricated components according to claim 1 exempt to support installation method, it is characterised in that Step(1)In precast concrete beam, plate, post component with support corner brace Deepen Design, be using revit softwares to prefabricated On the basis of concrete structured beam, plate, post Component Modeling, strut angle code position, size are arranged, precast concrete Beam, plate, the model of post component include rebar model, lifting and molding embedded part model, electromechanical preheating embedding line and cavern model with And the pre-buried branch sleeve model of support corner brace and support corner brace model, component drawing and exploded view are formed, is adding for component Work, lifting provide technical support.
3. a kind of prefabrication prefabricated components according to claim 1 exempt to support installation method, it is characterised in that Step(2)In pre-buried branch sleeve be pre-buried when prefabricated components are processed, in factory bury complete;Method for embedding is:In structure After the completion of part mould and framework of steel reinforcement, in the pre-buried branch sleeve of design attitude, 1, beam two ends bottom correspondence are arranged in conventional capital Post position respectively arranges one, and long bridge both sides side is according to two ends, middle each arrangement 3, and the short side of bridge two is according to each cloth in two ends Put 2, plate correspondence beam set location arrangement.
4. a kind of prefabrication prefabricated components according to claim 1 exempt to support installation method, it is characterised in that Step(3)After the completion of middle prefabricated post lifting, support corner brace is installed in capital, is connected corner brace with capital embedded sleeve barrel using bolt It is fixed;The support corner brace main function of capital is the bar that the regulation for facilitating setting height(from bottom) is set in support Prefabricated superposed beam, corner brace Shape hole, pre-buried branch sleeve is screwed into by bolt, and bolt should tighten, closely knit.
5. a kind of prefabrication prefabricated components according to claim 1 exempt to support installation method, it is characterised in that Step(4)Central sill is hoisted to from above and below capital 30cm 2cm, and loop wheel machine falling speed slows down, and behind location of proofreading position, is shelved on capital Support in corner brace;Capital support corner brace is connected by beam two ends with bolt with beam-ends embedded sleeve barrel, specially will using spanner Bolt is screwed into pre-buried branch sleeve, and bolt should tighten, closely knit.
6. a kind of prefabrication prefabricated components according to claim 1 exempt to support installation method, it is characterised in that Step(5)The support corner brace of central sill side, is that corner brace is connected with two sides embedded sleeve barrel with bolt, specially using general Bolt is screwed into pre-buried branch sleeve by logical spanner, and bolt should tighten, closely knit.
7. a kind of prefabrication prefabricated components according to claim 1 exempt to support installation method, it is characterised in that Step(6)Middle plate is hoisted to apart from above and below beam face 30cm 2cm, and loop wheel machine falling speed slows down, behind location of proofreading position, is shelved on branch On support angle code, the collateral support angle code of beam is fixed with embedded sleeve barrel in plate with bolt, i.e., is screwed into bolt using common wrench pre-buried Branch sleeve, bolt should tighten, closely knit.
8. a kind of prefabrication prefabricated components according to claim 1 exempt to support installation method, it is characterised in that Step(7)After middle prefabricated part hanging is in place, visual engineering structure situation, condition of construction increase under Prefabricated superposed beam, superimposed sheet If support, is reinforced, support is independently supported or common steel tube support using adjustable steel pipe.
9. a kind of prefabrication prefabricated components according to claim 1 exempt to support installation method, it is characterised in that Step(8)Middle structure flooring whole casting layer pours to smash and completes and conserve to strength of mould stripping, and each component supports the dismounting of corner brace, is specially Bolt is back-outed using spanner, the bolt of dismounting can be reused with corner brace.
CN201611104213.4A 2016-12-05 2016-12-05 A kind of prefabrication prefabricated components exempt to support installation method Active CN107034989B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611104213.4A CN107034989B (en) 2016-12-05 2016-12-05 A kind of prefabrication prefabricated components exempt to support installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611104213.4A CN107034989B (en) 2016-12-05 2016-12-05 A kind of prefabrication prefabricated components exempt to support installation method

Publications (2)

Publication Number Publication Date
CN107034989A true CN107034989A (en) 2017-08-11
CN107034989B CN107034989B (en) 2018-03-27

Family

ID=59530643

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611104213.4A Active CN107034989B (en) 2016-12-05 2016-12-05 A kind of prefabrication prefabricated components exempt to support installation method

Country Status (1)

Country Link
CN (1) CN107034989B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108166770A (en) * 2017-11-27 2018-06-15 广东精特建设工程有限公司 Exempt from a kind of cutting method of support about the cutting of building structure column
CN110005110A (en) * 2019-04-22 2019-07-12 智聚装配式绿色建筑创新中心南通有限公司 A kind of prestressing force laminated floor slab construction method for exempting from support
CN111441593A (en) * 2020-01-22 2020-07-24 广东建远建筑装配工业有限公司 Support-free installation method of assembly type concrete frame building
CN111456230A (en) * 2020-01-22 2020-07-28 广州地铁设计研究院股份有限公司 Assembled exempts from braced frame structure
CN112962981A (en) * 2021-02-22 2021-06-15 浙江省建材集团有限公司 Scaffold-free beam column installation method for prefabricated frame structure
CN113006528A (en) * 2021-02-22 2021-06-22 浙江省建设投资集团有限公司 Full-assembly support-free device
CN113513178A (en) * 2021-03-02 2021-10-19 江苏吴中建设集团有限公司 Rack-shaped seam assembly type beam plate
CN114232791A (en) * 2021-12-30 2022-03-25 甘肃安居建设工程集团有限公司 Self-bearing system for construction load of fabricated building and construction method thereof
WO2022083380A1 (en) * 2020-10-22 2022-04-28 中铁上海设计院集团有限公司 Overhead cover structure system applicable in operational railway line and implementation method for system
CN115387604A (en) * 2022-03-10 2022-11-25 安徽宝业建工集团有限公司 Application method of PCF (photo-fiber reinforced Polymer) plate fixing angle plate of fabricated building

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002242309A (en) * 2001-02-16 2002-08-28 Log Resort Kk Method for building wooden prefabricated house
CN101457546A (en) * 2007-12-13 2009-06-17 冯刚克 Novel energy-conserving emission reduction pseudo-classic architecture and construction method thereof
CN103306371A (en) * 2013-06-09 2013-09-18 中国建筑第八工程局有限公司 Manufacturing and mounting structure of PC prefabricated part of prefabricated house
CN106013435A (en) * 2016-07-18 2016-10-12 江苏工程职业技术学院 Node fixing structure for prefabricated structure type end beam column and mounting method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002242309A (en) * 2001-02-16 2002-08-28 Log Resort Kk Method for building wooden prefabricated house
CN101457546A (en) * 2007-12-13 2009-06-17 冯刚克 Novel energy-conserving emission reduction pseudo-classic architecture and construction method thereof
CN103306371A (en) * 2013-06-09 2013-09-18 中国建筑第八工程局有限公司 Manufacturing and mounting structure of PC prefabricated part of prefabricated house
CN106013435A (en) * 2016-07-18 2016-10-12 江苏工程职业技术学院 Node fixing structure for prefabricated structure type end beam column and mounting method

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108166770A (en) * 2017-11-27 2018-06-15 广东精特建设工程有限公司 Exempt from a kind of cutting method of support about the cutting of building structure column
CN110005110A (en) * 2019-04-22 2019-07-12 智聚装配式绿色建筑创新中心南通有限公司 A kind of prestressing force laminated floor slab construction method for exempting from support
CN111441593A (en) * 2020-01-22 2020-07-24 广东建远建筑装配工业有限公司 Support-free installation method of assembly type concrete frame building
CN111456230A (en) * 2020-01-22 2020-07-28 广州地铁设计研究院股份有限公司 Assembled exempts from braced frame structure
WO2022083380A1 (en) * 2020-10-22 2022-04-28 中铁上海设计院集团有限公司 Overhead cover structure system applicable in operational railway line and implementation method for system
CN112962981A (en) * 2021-02-22 2021-06-15 浙江省建材集团有限公司 Scaffold-free beam column installation method for prefabricated frame structure
CN113006528A (en) * 2021-02-22 2021-06-22 浙江省建设投资集团有限公司 Full-assembly support-free device
CN112962981B (en) * 2021-02-22 2023-03-10 浙江省建材集团有限公司 Scaffold-free prefabricated frame structure beam column installation method
CN113513178A (en) * 2021-03-02 2021-10-19 江苏吴中建设集团有限公司 Rack-shaped seam assembly type beam plate
CN114232791A (en) * 2021-12-30 2022-03-25 甘肃安居建设工程集团有限公司 Self-bearing system for construction load of fabricated building and construction method thereof
CN115387604A (en) * 2022-03-10 2022-11-25 安徽宝业建工集团有限公司 Application method of PCF (photo-fiber reinforced Polymer) plate fixing angle plate of fabricated building

Also Published As

Publication number Publication date
CN107034989B (en) 2018-03-27

Similar Documents

Publication Publication Date Title
CN107034989B (en) A kind of prefabrication prefabricated components exempt to support installation method
CN104141383B (en) A kind of Bailey beam pendent form support system and construction thereof
CN103114681B (en) High-altitude long-span reinforced concrete beam treat pouring structure
CN106869489A (en) Super High Core Walls Structure level and vertical synchronous construction top module system and construction method
CN104674945A (en) Tree-shaped steel pipe column structure and construction method thereof
CN105350454B (en) Steel arch rib outer wrapped concrete construction method for steel trussed arch bridge
CN104695337A (en) Self-lifting sliding and turnover construction system and construction method
CN203947771U (en) A kind of Bailey beam pendent form support system
CN106351445B (en) A kind of strengthening concrete sloping core form assembly bracing reinforcement system and construction method of installation
CN105781100B (en) Template component for subway station side wall
CN103174166A (en) Recreation facility embedded part integrally arranged in complete-set mode and installation method thereof
CN105586833A (en) Construction method for integrally forming large cast-in-place thin-wall high pier through stiff skeleton reinforcement cage
CN106368430A (en) Aluminum formwork installation process
CN107859058A (en) A kind of cast-in-place concrete retaining wall anti-incline anti-floating large steel moulding plate device and installation method
CN107806019A (en) Large-span suspension bridge gate Sarasota construction method
CN105649213A (en) Construction method for large steel structural embedded part in dense reinforcement distribution region
CN101417460B (en) Post welding mounting construction method of pseudo-classic architecture element
CN204418662U (en) A kind of building vertical structure typified form negative and positive angle bracing means
CN204825652U (en) Bridge pier stud bent cap formwork support device
CN203248170U (en) Lining trolley for secondary lining construction of pedestrian crosswalk
CN204920210U (en) Dysmorphism spar template reinforced structure
CN106906750B (en) Multi-functional across the railway line swing bridge girder closing construction mould bases of one kind and its construction method
CN106088579B (en) The erection method of reinforced concrete wall template
CN208830444U (en) Inspection shaft steel combined template
CN205224420U (en) Anticorrosive industry factory building precast concrete stand

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant