CN103032037A CN 201110304796 CN201110304796A CN103032037A CN 103032037 A CN103032037 A CN 103032037A CN 201110304796 CN201110304796 CN 201110304796 CN 201110304796 A CN201110304796 A CN 201110304796A CN 103032037 A CN103032037 A CN 103032037A
Authority
CN
China
Prior art keywords
machine
pipe
dolly
steel pipe
full
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201110304796
Other languages
Chinese (zh)
Inventor
邹家福
邹永平
胡冬梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 201110304796 priority Critical patent/CN103032037A/en
Publication of CN103032037A publication Critical patent/CN103032037A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The invention relates to a full-automatic discharging conveyer for drilling rods, which is mainly composed of a steel pipe (drilling rod) pushing mechanism, a hanging mechanism, a transition frame and a catwalk machine, wherein the drilling rods are stacked in multiple layers on the two sides of the catwalk machine; a lower layer of cushion pipes and an upper layer of drilling rods are stacked in a staggered and repeated form; two cushion pipes are arranged in each layer; all the drilling rods and the steel pipes are stacked together during a drilling process; the transition frame or the catwalk machine is lifted for adapting to the height of the drilling rods in each layer in the stacked pipes; the steel pipe pushing mechanism and a cushion pipe hanging mechanism are both mounted on an operation control frame and work in turn; the drilling rods are pushed one by one and layer by layer from the transition frame to the catwalk machine by the pushing mechanism and then are conveyed to a well platform from the catwalk machine; after a layer of drilling rods are completely conveyed, two cushion pipes are lifted to appointed positions by the hanging mechanism; when the drilling rods are taken, the pushing mechanism and the transition frame work in turn, the two cushion pipes are hung back, and a layer of drilling rods are pushed and arrayed, so as to repeatedly stack in such a mode; and during the whole drilling process, the full automatic conveying and discharging of the ground drilling rods are realized.

Description

The full-automatic dispatch machine of drilling rod
Technical field
The invention belongs to oil-well drilling equipment, particularly the full-automatic dispatch machine of drilling rod.
Background technology
Existing oil, gas drilling, drilling rod is transported on the raised platform around a well from ground, and great majority are manually-operateds, with wire rope drilling rod are hung on.The workman is transplanted on the drilling rod of hundreds of kilogram weight the position of " can handling ".Work efficiency is too slow, and is a kind of heavy manual labor.No matter blowing is rained, scorching summer and freezing winter, all get enduring in turn round the clock dried.A kind of cat road machine is arranged now, without wire rope handling drilling rod, with slideway drilling rod is pushed to upper brace.But the discharging frame of cat road machine can only discharge a little several drilling rods temporarily, be put into machine top, cat road to a lot of drilling rod orderliness of quantity by the time, must operate special lifting machine with the workman and wait round the clock on dutyly, doing.When getting drilling rod, cat road machine is transported the drilling rod that gets off and also must be leaned on the manually-operated lifting machine drilling rod of slinging to discharge in the appointed area.In a word, the discharging of this drilling rod is not still broken away from manually-operated with conveying.
Summary of the invention
Purpose of the present invention, the discharging that provides ground drilling rod in a kind of drilling process realizes automation fully and does not want manually-operated mechanical device with conveying.
The present invention is achieved in that mainly by ejector sleeve mechanism (hereinafter referred to as pushing away beam), push away beam elevating mechanism, pad pipe hoisting mechanism, operation control frame (hereinafter referred to as controlling frame), transition frame mechanism and cat road machine forms.
This installs take existing cat road machine as the basis, changes aspect lifting.From ground drilling rod is delivered to raised platform around a well, still finish with existing cat road machine.Per two of pad pipe is one deck, on machine both sides, cat road, with vertical placement of cat road machine.Vertical flat raft is placed one deck steel pipe (following claim steel pipe drilling rod) on every one deck pad pipe, and steel pipe is parallel with cat road machine.Which floor the staggered multi-layer stacking of one deck pad pipe, one deck steel pipe can discharge to tens layers, hundreds of root, thousands of steel pipes all can disposable discharge pile in a zone.Cat road machine make can lifting structure, upper plane can be elevated to concordant with the upper plane of arbitrary layer of pad pipe.Ejector sleeve mechanism by girder steel, dolly, push away card, hydraulic cylinder, motor, reel, wire rope, directive wheel and form.Push away and be provided with chute on the beam sides.Dolly slides freely in pushing away the chute of beam.Dolly is linked to be with motor, reel with wire rope.The rotating of driven by motor reel, namely drive dolly push away beam upper left, move right.Be fixed with on the dolly and push away card.The card point that pushes away card do not regain and go by the time spent.In the time will using, dolly is advanced in the other direction to cat road machine.When pushing away Ka Kajian and go to from the nearest steel pipe back of machine, cat road, dolly stops.Push away Ka Kajian and be inserted at once this steel pipe back downwards.Subsequently, dolly is to the walking of cat road machine direction, and steel pipe is pushing away rolling under the card promotion.At this time, lifting of plane becomes concordant with this upper plane of layer pad pipe on the cat road machine.Push away card push away steel pipe to the pad pipe end stop.Steel pipe rolls in cat road machine " V " the shape groove because of inertia.After cat road machine is readjusted height, namely begin to carry drilling rod to raised platform around a well.Subsequently, dolly is oppositely walked again and is awaited orders to the appropriate location.Finished above-mentioned drilling rod to the conveying of raised platform around a well when cat road machine, returned and answer postpone in place, dolly to begin again the said sequence action.Subsequently, cat road machine is ready, and obtain on the raised platform around a well after the instruction, restarts upwards conveying program.Dolly has order to push steel pipe, is from the last layer in steel tube stacking district.When the top one deck steel pipe has pushed completely, just remaining two pad pipes are topmost.Next step is just hung away two pad pipes by pad pipe hoisting mechanism.Ejector sleeve mechanism and pad pipe hoisting mechanism all are installed on the same pair of operation control frame (hereinafter referred to as controlling frame).Control the two ends that frame is installed in steel tube stacking district, everywhere.Controlling frame column bottom is base plate, lands; Column top is provided with two arms.The arm direction of controlling on the frame that install at each two, steel tube stacking district is relative.Pushing away beam, is pushed to steel pipe in cat road machine " V " the shape groove by root topmost one deck steel pipe from the steel tube stacking district first.When top first floor steel pipe pushes complete, after pad pipe hoisting mechanism hangs away two pad pipes, push away the beam elevating mechanism at once push away beam drop to this row's steel pipe of appearing at topmost (i.e. total layer from top to bottom second layer steel pipe) top suitably distance (with push away the beam bottom do not wipe bump steel pipe and be as the criterion), begin again next round and circulate.Until the whole drilling rods in the drilling process are served raised platform around a well.When raised platform around a well was got drilling rod, steel pipe was from successively upwards discharging of basecoat.Cat road machine send drilling rod get off from raised platform around a well.The plane lifting is concordant with plane on the basecoat pad pipe on the cat road machine.Cat road machine is shifted steel pipe on the pad pipe onto.Subsequently, the card counter-rotating that pushes away of dolly pushes steel pipe, cooperates carriage walking, and the steel pipe of cat road machine being delivered to the pad pipe end pushes (rolling) to the discharging in good order of the pad pipe other end well one by one.After first floor was booked, derricking gear hung two pad pipes again and gets back to this row's steel pipe top and vertically place.When cat road machine sent steel pipe to this layer pad pipe, lifting was concordant with this upper plane of layer pad pipe again.Repeat again later on above-mentioned action, until drilling rod all takes off and neatly stacking.
After using this device, have suffered in the drilling process, the overall process of drilling rod and the overall process of taking off drilling rod are carried to raised platform around a well in ground, all without manually-operated.Realized ground to raised platform around a well, raised platform around a well is carried the full automation of drilling rod earthward, has greatly alleviated workman's labour intensity, has improved production efficiency.
Description of drawings
Fig. 1 is the installation site figure of this device in the well site.
Fig. 2 is that steel pipe is drilling rod and the stacking figure and the transition frame installation site figure that fill up pipe.
Fig. 3 is the structure chart of ejector sleeve mechanism.
Fig. 4 is the transition frame structure chart.
Fig. 5 be push away card push steel pipe and with transition frame, cat road machine cooperating figure.
Fig. 6 pushes away card, exploration card, block card cooperating figure.
Fig. 7 is installation and the lifting figure that pushes away beam.
Fig. 8 pushes away beam wire rope lifting figure.
Fig. 9 is pad pipe hoisting mechanism mounting structure figure.
Figure 10 pushes away beam to control cooperating figure on the frame with pad pipe hoisting mechanism.
Figure 11 is the schematic diagram that plural steel tube stacking district is arranged in cat road machine one side.
In the accompanying drawing, steel pipe 1, push away beam 2, transition frame 3, control frame 4, cat road machine 5, pad pipe 6, cushion block 7, reel 8, motor 9, girder steel 10, push away card 11, dolly 12, wire rope 13, directive wheel 14, pylon 15, screw mandrel 16, base plate 17, pivot pin 18, hydraulic cylinder 19, pipe clamp 20, supporting plate 21, guide pipe 22, Hydraulic Station 23, gear pier 24, extension spring 25, exploration card 26, signaling switch 27, block card 28, arm 29, support arm 30, inner slide 31, interior dolly 32, company piece 33, external slideway 34, outer dolly 35, take piece 36, shelf assembly 37, clamp 38, connecting rod 39.
Among Fig. 1, steel pipe (being drilling rod) 1 layering is deposited in cat road machine 5 dual-sides, is provided with transition frame 3 between machine 5 both sides, cat road and the steel tube stacking district, and transition frame 3 is each cover on machine 5 both sides, cat road.When cat road machine 5 was on the ground level, setting it here highly was not lifting.The effect of transition frame 3 is arbitrary layer heights that can be elevated to the steel tube stacking district, can be rolled into smoothly (referring to Fig. 5) on the transition frame 3 after this layer steel pipe 1 is pushed.When transition frame 3 supports behind steel pipe 1, can be elevated to again and cat road machine 5 equal heights.Steel pipe 1 can be rolled into again in " V " shape groove of cat road machine 5 and go.Control each cover of two that frame 4 is arranged on the steel tube stacking district.Push away beam 2 and be installed in and control on the frame 4, vertically run through whole steel pipe discharging face.
Among Fig. 2, cushion block 7 is placed on two of ground support first row pad pipe 6(), one deck steel pipe 1 is neatly being discharged in these pad pipe 6 tops.Second layer pad pipe 6 is placed on the first floor steel pipe 1.Which floor can be stacked to tens layers of steel pipe by above-mentioned stacking method.Distance is the same between the two every layer pad pipes 6.Transition frame 3 is installed in the right, steel tube stacking district.Pad pipe appropriate location, 6 two ends is provided with cannelure, and those two on every one deck steel pipe both sides, steel tube stacking district are placed on respectively in the cannelure, and the both sides steel pipe can not fallen down.Suitably push away, steel pipe just can roll out cannelure.
Among Fig. 3, girder steel is provided with chute on 10 sides.The wheel of dolly 12 is walked in chute.The left end of girder steel 10 is fixed with motor (comprising speed changer) 9, and drives reel 8 forward and backwards.The right-hand member of girder steel 10 is equipped with directive wheel 14.Two of dolly 12 is connected with wire rope 13.Wire rope 13 stretches from dolly 12 right-hand members and walks around directive wheel 14, and after moving reel 8 always to and twine the suitable number of turns from girder steel 10 back sides, the termination is fixed on the reel 8.Dolly is moved to the rightmost of girder steel 10, again the wire rope 13 of dolly 12 left ends is moved on the reel 8 to fixedly termination left.Reel 8(motor 9 drives like this, below only carries reel 8) forward and backward, namely drive dolly 12 left and right walkings.The chute of girder steel 10 sides can be various.As use dovetail groove, just do not establish wheel on the dolly 12.Above ejector sleeve mechanism all occurs with " pushing away beam " 2 in following narration and mark.
Fig. 4 is the transition frame structure chart.Transition frame 3 mainly is made of body (Guan Liang), pylon 15, base plate 17, pipe clamp 20, supporting plate 21, hydraulic cylinder 19, motor 9, screw mandrel 16.Transition frame 3 bodies are a long pipe beam or long steel frame.Two is pylon 15, is a rectangle slideway between two root posts of pylon 15.Slideway is passed at transition frame 3 two.Be provided with screw mandrel 16 in the middle of two columns of pylon 15, screw mandrel 16 is driven by the motor (comprising reducer and gear) 9 on the column top.The nut of screw mandrel 16 is installed in the square tube of transition frame 3, and screw mandrel 16 passes the nut in transition frame 3 square tubes, and two is separately fixed on the base plate 17 on the upper and lower limit of frame-saw of pylon 15 tops, rotates freely.When motor 9 drive screw mandrels 16 forward and backwards, then transition frame 3 has just realized ascending, descending.Installed and fixed supporting plate 21 on the transition frame 3.Two pipe clamps 20 have been fixed with pivot pin 18 in the top, and each one on supporting plate 21 both sides, such as enlarged drawing.Hydraulic cylinder 19 lower ends connect with pipe frame inner bottom surface strand, and piston rod and pipe clamp 20 hook portions below strand connect.Following piston rod and hydraulic cylinder general designation " hydraulic cylinder ".Two pipe clamps 20 are oppositely installed on supporting plate 21 both sides.Supporting plate 21 is parts that steel pipe 1 is picked in transition frame 3 liftings.Transition frame 3 is provided with the above-mentioned same structure in two places.Transition frame 3 liftings also can be used reel 8, wire rope 13 up-down modes, can be without screw mandrel 16, nut.The shelf at transition frame 3 two also can only be established a root post, and fixing hitch on the transition frame 3, hitch can upper and lower slips on column, also play the guiding role.
Among Fig. 5, it is small-sized that Hydraulic Station 23(is installed on the dolly 12), make things convenient for hydraulic cylinder 19 uses on the dolly 12.Pushing away card 11 tops is guide pegs, and the piston rod of guide peg and hydraulic cylinder 19 connects together.Guide peg is guide pipe 22 interior can upper and lowerly slips.Hydraulic cylinder 19 and guide pipe 22 all are fixed on the dolly 12.Transition frame 3 on the right, again the right be cat road machine 5.
Among Fig. 6, on the right side of the guide pipe 22 that pushes away card 11 and hydraulic cylinder 19, set up guide pipe 22 and the hydraulic cylinder 19 of a block card 28 and top.At the guide pipe 22 that pushes away card 11 and block card 28 and fixed a block plate above the hydraulic cylinder 19.Exploration card 26 usefulness pivot pins 18 are fixed on this block plate, can rotate freely.Exploration card 26 the right hang with extension spring 25, are provided with gear pier 24.Below extension spring 25, be fixed with hydraulic cylinder 19 on steel plate.The piston rod of this hydraulic cylinder 19 directly facing to exploration card 26 top right, is not connected with exploration card.The left side, exploration card bottom is equipped with signaling switch 27.
Among Fig. 7, column (target among the figure " shelf the assembly 37 ") top of controlling frame 4 is fixed with two arms 29.Arm 29 short ends are equipped with motor 9 and reel 8.Two inner side edges of two arms 29 are provided with inner slide 31.Two outer side edges are provided with external slideway 34.Interior dolly 32 slides in inner slide 31.Outer dolly 35 slides in external slideway 34.Support arm 30 upper ends are fixed on the outer dolly 35 with pivot pin.Support arm 30 lower ends such as enlarged drawing, termination and company's piece 33 are hinged.Connect piece 33 and push away beam 2 and admittedly be integral, can not become flexible.Hydraulic cylinder 19 rear ends and support arm 30 strands connect, its piston rod with connect piece 33 following strands and connect.Like this, hydraulic cylinder 19 piston rods flexible can change and push away the downward angle of beam 2.Can satisfy that to push away the depth of beam direction perpendicular to the ground all the time.The piston rod strand of the middle part of support arm 30 and hydraulic cylinder 19 connects, and this hydraulic cylinder rear end and outer dolly 35 strands connect.The flexible angle that can change support arm 30 and arm 29 of this piston rod can be so that push away beam 2 liftings.External slideway 34 is mounted with hydraulic cylinder 19 by motor 9 these sides.Its piston rod is connected with outer dolly 35, controls outer dolly 35 and can horizontally slip on external slideway 34.Control and be equipped with many on the column of frame 4 and take piece 36, be fixed on the column with pivot pin 18.Take piece 36 short ends hydraulic cylinder (small-sized) 19 is installed.These hydraulic cylinder 19 rear ends are hinged on the lattice framing of shelf assembly 37.This hydraulic cylinder piston rod flexible can make to be taken piece 36 long ends and puts down and upwards pack up.The levelling device of hydraulic cylinder lifting or bolt and nut lifting is installed on the base plate 17, not shown in FIG..Pushing away the beam elevating mechanism has the mode that is made of shelf assembly, arm, slideway, dolly, support arm, hydraulic cylinder, and also useful wire rope hangs the mode of lower lifting from arm.
Among Fig. 8, the lifting that pushes away beam 2 is directly to adopt wire rope 13 to promote and the mode of putting down.Wire rope 13 is hung oneself down from the fixed pulley of arm 29 terminations, and lower end is fixed on support arm 30 lower ends.Lifting hydraulic cylinder just no longer is installed on the support arm 30.Push away beam 2 under the clamping of support arm 30, except being subjected to wire rope 13 pulling, removable up and down outside, other any directions all can not be rocked.Support arm 30 is heavier, is enough to overcome upper and lower the rocking in the ejector sleeve process.Arm 29 back motors, reel are many groups, opposed or upper and lower installation.Wire rope lifting among Fig. 8, available one group of motor, reel.
Among Fig. 9, be the installation drawing of pad pipe hoisting mechanism in controlling frame 4.Clamp 38 is such as enlarged drawing, and two jaw inner edges are equipped with hydraulic cylinder 19, and hydraulic cylinder 19 bottoms are equipped with signaling switch 27.Between two clamps connecting rod 39 is installed, connecting rod 39 becomes with pivot pin 18 fixeds of clamp 38.Wire rope 13 is hung on the pivot pin head.Hang oneself from interior dolly 32 in the wire rope top.Be connected with wire rope 13 on the interior dolly 32, this wire rope links to each other with reel 8.The rotating of reel 8, dolly 32 is walked at inner slide 31 upper left right laterals in namely driving.The effect of connecting rod 39 is that two clamps decline crawl pad pipes can not swung in 6 o'clock in deflection.
Among Figure 10, be to control pad pipe hoisting mechanism and the cooperating figure of ejector sleeve mechanism that installs on the frame.Among the figure, clamp 38 has moved to the column next door of close shelf assembly 37 with interior dolly 32.Handling a pad pipe 6 be placed on the base plate 17.Support arm 30 upwards lifts under hydraulic cylinder 19 effects, is lifted to steel tube stacking district maximum layer comb height pushing away beam 2.In this figure, outer dolly 35 has been retracted suitable distance by hydraulic cylinder 19.
The number of plies that pushes along with steel pipe successively descends, and pushing away beam 2 will successively reduce.Support arm 30 rotates around pivot pin, because the transition mark is a camber line under support arm 30 terminations, makes gradually from top to bottom to push away beam 2 and be moved to the left, and can make that to push away beam 2 position on every one deck comb inconsistent.The hydraulic cylinder of outside dolly 35 left end settings moves to overcome this phenomenon with regard to the push-and-pull dolly.
The dolly of pad pipe hoisting mechanism, push away beam and be used for the dolly of lifting at arm, respectively on arm in separately the slideway.
Among Figure 11, two independently the steel tube stacking district be arranged side by side in a side of cat road machine.Can share a transition frame between two steel tube stacking districts.
Controlling frame has split typely, and Contiuum type is also arranged.The split type of picture in the accompanying drawing.Also can the two corresponding arms of frame of controlling that install at two, steel tube stacking district be linked to be together, make two whole hanging beams.
For adapting to the height that pushes each layer steel pipe in the steel pipe process, the machine lifting of cat road, two kinds of modes of transition frame lifting are arranged.In " summary of the invention ", in order to narrate conveniently, directly carry out overall description as an example of the machine lifting of cat road example.In fact, the transition frame lifting some the time very convenient.Below, mainly be described as an example of the transition frame lifting example.
The specific embodiment
Steel pipe 1 is that drilling rod is stacked by Fig. 1, and installs frame 4, transition frame 3, the cat road machine 5 controlled.How each floor steel pipe of steel tube stacking district successively is pushed in " V " shape groove of cat road machine 5 by root, concentrates and narrate with Fig. 5.
Among Fig. 5, A figure, transition frame 3 has been elevated to and the top one deck pad pipe 6 concordant (more lower slightly).Push away card 11 and took in before this in the guide pipe 22, dolly 12 is from right to left walking before this.In the time of in the middle of pushing away the sharp semi circular surface facing to going up most between steel pipe 1 of row's rightmost and the adjacent steel pipe of card 11 cards, dolly parking (brake), be exactly present position among the figure, push away card 11 and under the effect of hydraulic cylinder 19, insert down by force, on the left side of the rightest above-mentioned steel pipe at once.At this moment, pipe clamp 20 bills on left side part is pulled under hydraulic cylinder 19 effects on the transition frame 3, is lower than transition frame 3 supporting plates 21 end faces.Subsequently, push away card 11 and push away steel pipe 1 in the pad pipe 6 edge transition frame 3 directions walking to the right of rolling, scheme referring to B.Dolly is gone to and is pushed away beam 2 terminations and stop, and pushes away card 11 and stops walking.Steel pipe 1 rolls in transition frame 3 middle " V " shape grooves because inertia continues to roll to the right, and is blocked by the pipe clamp 20 on the right on the transition frame 3, does not fall down.
Subsequently, transition frame 3 drops to the cat road machine 5 on the right flat.Such as C figure, the pipe clamp 20 on the right is retracted by hydraulic cylinder 19.The hydraulic cylinder 19 on transition frame 3 left sides is the top upwards, and the left side is raise, and steel pipe 1 is rolled in cat road machine 5 " V " the shape groove and goes at once.Next step is exactly that cat road machine 5 has independently been transported the thing of steel pipe to raised platform around a well.Subsequently, pushing away card 11 regains again in the guide pipe 22.Dolly to left side walking, repeats said process again.
To push away card and can accurately inject the steel pipe back that pushes away at every turn in order to make, be provided with especially exploration card 26.Because the place, well site can not be very flat, the pad pipe 6 of placement is probably high short on one side on one side again, and the high end of an end is short.Steel pipe is pushed away card and is promoted, and probably one is rolled very soon, and one slow, causes with former parallel lines tilting too much, has established especially block card 28, such as Fig. 6.
Among Fig. 6 A figure, push away card, block card all is recovered in the guide pipe.Exploration card 26 is under extension spring 25 effects, and lower checkpost point has rotated downwards, and top is against gear pier 24.At this moment, dolly 12 is to walk from right to left.When exploration card 26 touched a steel pipe 1 of rightmost, signaling switch 27 sent a signal to control system immediately.Control system on the one hand instruction dolly is stopped (brake), and the instruction hydraulic cylinder that pushes away card, block card moves on the one hand, makes and pushes away card, block card stretches out downwards.Pushing away card forces down by force along the arc surface (wiping the right steel pipe cambered surface) of following steel pipe.In this course, the right steel pipe is altered to the right immediately, is blocked by block card.Such as B figure among Fig. 6, steel pipe alters to the right that process does not draw.Subsequently, dolly is walked to the right, and rotate under Hydraulic Cylinder on exploration card top, and the bottom is all upwards regained and gone.Steel pipe rolls to the right pushing away between card and the block card.Scheme such as the C among Fig. 6.When dolly apart from push away termination, beam 2 the right also have suitably apart from the time, block card is just upwards regained in the guide pipe.Dolly continues right lateral, stops to pushing away the beam-ends head.Steel pipe rolls in cat road machine 5 " V " the shape groove because inertia also continues to roll at once.For reducing narration, save the transition frame said process, Fig. 6 directly draws cat road machine.
Pushing away the distance between the signaling switch 27 on card 11 and the exploration card, generally just is steel pipe 1 diameter.Become large such as diameter of steel tube, generally be no more than former steel pipe diameter 30%,, pushing away Ka Kajian is the inclined-plane, inserts down from pushing away steel pipe cambered surface again, can accomplish, and exploration card can swing to the right, and block card and push away larger distance is arranged again between the card can adapt to than big steel pipe and pushes.When pushing the larger diameter steel pipe, control system makes the piston rod of exploration card hydraulic cylinder stretch out a bit at the location-appropriate that originally shrank back, and can make the following signaling switch of exploration card and push away card apart from becoming large.Just can adapt to the more propelling movement of big steel pipe.
The cat road is confidential to be obtained on the raised platform around a well upwards transporting steel pipe after the instruction again.Subsequently, dolly is awaited orders to the suitable distance of left side walking.
Control frame and be installed in steel tube stacking district two ends.Push away beam on the steel pipe of discharging.For drawing clear (the too many pipe circle of termination, steel tube stacking district peaceful look like lines intensive among Fig. 1), the steel tube stacking district does not all draw in Fig. 7~10.Control base plate the right of frame against the pad pipe of having placed part in addition, it is following all will to be placed into the steel tube stacking district, referring to Fig. 9, Figure 10." wall " that the steel tube head in steel tube stacking district forms as a lot of circles.This together " wall " against clamp 38 by wire rope play can be smoothly up and down position, namely do not affect clamp up and down just.Pushing away beam and can also raise again among Fig. 8 is to desired location topmost.Go up row's steel pipe most and push away beam and only stays a little gap in the steel tube stacking district.By pushing away the distance of beam adjustment with the discharging steel pipe, do not contact steel pipe and be as the criterion to push away beam below.
Push away beam and push away in the steel pipe process, clamp is moved by the column direction of interior dolly 32 from inner slide 31 to shelf assembly 37.In the moving process, clamp is pulled on, and namely moves in steel pipe top, steel tube stacking district.Clamp in Figure 10 be moved to the left put in place after, wire rope puts down situation maps after some.In a word, when pushing away card work, clamp is abdicated the space, does not disturb.
Push away beam and push steel pipe by situation among Fig. 5, Fig. 6.When one deck steel pipe above the steel tube stacking district pushed complete after, two pad pipes just appear in steel tube stacking district topmost one deck.Subsequently, push away beam and just quit work, the space is abdicated in work to clamp.At this moment the hydraulic cylinder on the outer dolly left side pushes away outer dolly and moves right, shifts extreme position onto and stops, and top and the rear of pad pipe are available fully.Subsequently, clamp is lifted, and interior dolly is walked to the right.In the time of directly over going to the pad pipe, interior dolly stops.Clamp opens jaw, and wire rope slowly puts down clamp, over against the pad pipe.When the pad pipe enters jaw, when the top hits signaling switch in the jaw, this signaling switch sends a signal to control system at once, control system is the hydraulic cylinder action of instruction clamp at once, receive in the jaw and clamp pad pipe (not clamping), and the wire rope that dolly stops on the clamp immediately in the instruction descends.Subsequently, interior dolly is sling clamp together with the pad pipe.Until setting height, interior dolly is walking left on inner slide.When walking behind desired location, stop.Dolly begins slowly to put down clamp, pad pipe.After in the pad pipe descends, falling assigned position, stop.Because after clamp is clamped the pad pipe, appropriate gap is arranged, at this moment clamp continues, after putting in place, the pad pipe again hits signaling switch, and control system is after obtaining for the second time signal, and the instruction dolly stops to put down wire rope at once.Simultaneously, the hydraulic cylinder counteragent of instruction clamp opens jaw.Subsequently, dolly is awaited orders mentioning on the clamp such as Figure 10 position.Clamp is abdicated again the space and is started working to pushing away beam.
Subsequently, push away beam the hydraulic cylinder effect of the dolly left side is drop-down outside and go back, and readjust height and adapt with new " first row " steel pipe.Support arm middle part institute connected the hydraulic cylinder adjustment and pushed away depth of beam among Figure 10 before this, again by distance about the hydraulic cylinder adjustment on the outer dolly left side.Make and push away each time rise and fall of beam substantially at (error is as far as possible in 10 centimeters) on the same vertical line.Push away depth of beam with the wire rope adjustment among Fig. 8, only the hydraulic cylinder on the mobile outer dolly left side with regard to capable of regulating about distance.At last, the verticality that pushes away beam (it doesn't matter for a small amount of deviation, pushes away just that beam drops to lower position and degree perpendicular to the ground when differing too large, just is necessary adjustment) is adjusted in the hydraulic cylinder of supporting arm front end action.
Pad pipe hoisting mechanism independence handling pad pipe is take Fig. 9 as example.Among Fig. 9, be handling of clamp two pad pipes are placed on base plate and take on the piece, also in the situation of filling up pipe of slinging.
First pad pipe of clamp handling is placed on the base plate.Take piece and dropping under the hydraulic cylinder effect on this pad pipe for following first group subsequently.After second pad pipe put in place by handling, be placed on taking on the piece of having set level.Subsequently, one group of top is taken piece and is put down again and drop on second pad pipe.Clamp clamp the pad pipe after, rise first be raised to setting height after, interior dolly is walked left.Behind desired location, stop.Then, clamp falls, and puts down the pad pipe.
When getting drilling rod on the raised platform around a well, process is opposite with the top.Be from the steel tube stacking district bottom one deck pad pipe begin to discharge steel pipe.Bottom one deck pad pipe steel pipe heap above that send complete after, can not hang away.Cat road machine send steel pipe and gets off to push transition frame from raised platform around a well.Concordant with this one deck pad pipe after the transition frame lifting.Dolly has waited and has pushed away beam near this square end head of transition frame.In this process, push away card and block card uses conversely, push away card variable block card, block card becomes and pushes away card.Referring to Fig. 6, only to take here and push away card, exploration card, the original position of block card three, its each card motion changes and order, redescribes fully.1, push away card, block card and upwards regain guide pipe, the exploration card lower end is under the hydraulic cylinder effect, and upwards rotation is completely retracted into and pushes away more than the beam lower plane.2, the transition frame supporting plate left side is a little more than the pad pipe, and the right pipe clamp raises, and steel pipe " is fallen " on the pad pipe.Steel pipe is because inertia is managed the other direction rolling to pad.3, block card falls immediately, and exploration card also falls, and pushes away card and does not fall.Dolly is walking left immediately, and when catching up with this root steel pipe, the signaling switch on the exploration card gives a signal to control system, and the control system instruction pushes away card and falls.Simultaneously instruction exploration card inhour is rotated to get back to and is pushed away more than the following plane of beam.Like this, push away card and be used as block card usefulness, block card pushes away steel pipe to pad pipe other end appropriate location.Dolly stops, and pushes away card, the block card withdrawal is gone.Dolly is walking to the right again, repeats said process.After the discharging of first floor steel pipe is complete, push away beam and rise, abdicate the space to the operation of pad pipe hoisting mechanism.Clamp is clamped one of the top of the pad pipe of placing among Fig. 9 (at this moment having placed many pad pipes), rise, and walking to the right is to setpoint distance.Interior dolly stops.Clamp puts down the pad pipe.Push away beam and start working, until the discharging drilling rod is complete.The lifting of pad pipe has two kinds of modes, and a kind of is above-mentioned clamp lifting method, and another kind is magnetic force lifting method (not shown in FIG.).
Under the restriction of well site orographic condition, in the more situation of steel pipe specifications and models that maybe will push, can be arranged in machine side in cat road to two above steel tube stacking districts.Plural steel tube stacking district is arranged in cat road machine one side, and the transition frame of the steel pipe above the outside steel tube stacking district through the centre is rolled on the pad pipe of the steel tube stacking district the superiors placement near apart from cat road machine, pushes through pushing away beam, arrives transition frame, to cat road machine again.Followingly claim " square formation " a steel tube stacking district, such as Figure 11.Here claiming the first square formation by the steel tube stacking district of cat road machine direction, the left side be the second square formation.The steel pipe model specification of setting two square formations is different.The beam that pushes away of the first square formation is put row's steel pipe and row's pad is managed following lacking than the second square formation.If the steel pipe of the second square formation is pushed on the cat road machine, is sling two by the first square formation pad pipe hoisting mechanism and to fill up pipe and be placed on topmost on one deck steel pipe.If the pushed part of one deck steel pipe and reducing topmost then pushes 1~2 steel pipe again and puts well to appropriate location, termination, pad pipe the right by pushing away beam from the left side.Subsequently, hoisting mechanism hang two the pad pipes be placed on this row steel pipe on.This situation just among Figure 11.Steel pipe in the second square formation is pushed away beam and is pushed, and is rolled into through the lifting of middle transition frame on the pad pipe of the first square formation.The beam that pushes away of the first square formation namely pushes away this root steel pipe to the right transition frame, in cat road machine V-shaped groove.When needs push the specifications and models steel pipe of the first square formation, by pad pipe hoisting mechanism the top two pads pipes are hung out again.Namely recover the first square formation course of work in the past.
Above-mentioned control system refers to travel switch, signaling switch, relay switch in mainboard, each circuit etc., and with the relevant line of each component.More than in the narration, for simply, straight-line beginning with stop, the beginning of tumbler with stop, travel switch, signaling switch have all been installed in the place of all not mentioned travel switches, signaling switch.
Can only adapt to, finish picking of each floor steel pipe of steel tube stacking district with the machine lifting of cat road, pick each layer steel pipe with the machine lifting of cat road, machine both sides, cat road just do not arrange transition frame.
Without the well site of cat road machine, can directly deliver to assigned address to steel pipe with transition frame.
Be the part of power with hydraulic pressure, also available air pressure is power.
The full-automatic dispatch machine of drilling rod also applies to drilling rod manufacturing, workshop, and discharge and sends steel pipe the steel tube factory.

Claims (10)

1. the full-automatic dispatch machine of drilling rod regularly successively is pushed to raised platform around a well to concentrated multi-layer stacking drilling rod together by root in the drilling process and gets on, when getting drilling rod drilling rod successively by root at ground release in a pile, it is characterized in that:
(1). mainly by ejector sleeve mechanism, push away beam elevating mechanism, pad pipe hoisting mechanism, control frame, transition frame and cat road machine and form;
(2). one deck pad pipe, the staggered multi-layer stacking of one deck steel pipe are pressed by the steel tube stacking district;
(3). for adapting to the height of each floor comb of steel tube stacking district, transition frame lifting and two kinds of modes of cat road machine lifting are arranged.
2. the full-automatic dispatch machine of drilling rod according to claim 1 is characterized in that, ejector sleeve mechanism by girder steel, dolly, push away card, motor, reel, wire rope, directive wheel and form.
According to claim 1 with the full-automatic dispatch machine of 2 described drilling rods, it is characterized in that, be equipped with on the dolly of ejector sleeve mechanism and push away card, exploration card, block card, signaling switch.
According to claim 1 with the full-automatic dispatch machine of 2 described drilling rods, it is characterized in that push away beam sides and be provided with chute, dolly is walked in chute.
5. the full-automatic dispatch machine of drilling rod according to claim 1 is characterized in that, pad pipe hoisting mechanism mainly by shelf assembly, arm, motor, reel, clamp, connecting rod, wire rope, dolly, take piece, hydraulic cylinder forms.
6. the full-automatic dispatch machine of drilling rod according to claim 1 is characterized in that, ejector sleeve mechanism and pad pipe hoisting mechanism all are installed in same pair and control on the frame, take turns to operate, and abdicate mutually the operating space.
7. the full-automatic dispatch machine of drilling rod according to claim 1 is characterized in that, pushes away the beam elevating mechanism, and the mode that is made of shelf assembly, arm, slideway, dolly, support arm, hydraulic cylinder is arranged, and also useful wire rope hangs the mode of lower lifting from arm.
According to claim 1 with the full-automatic dispatch machine of 6 described drilling rods, it is characterized in that adapt to, finish that each floor steel pipe of steel tube stacking district picks with the machine lifting of cat road, machine both sides, cat road just do not arrange transition frame.
According to claim 1 with the full-automatic dispatch machine of 6 described drilling rods, it is characterized in that, plural steel tube stacking district is arranged in cat road machine one side, the transition frame of steel pipe above the steel tube stacking district, outside through the centre is rolled on the pad pipe of the steel tube stacking district the superiors placement near apart from cat road machine, push through pushing away beam, arrive again transition frame, to cat road machine.
10. the full-automatic dispatch machine of drilling rod according to claim 1 is characterized in that, without the well site of cat road machine, directly with transition frame steel pipe is delivered to assigned address.
CN 201110304796 2011-10-10 2011-10-10 Full-automatic discharging conveyer for drilling rods Pending CN103032037A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110304796 CN103032037A (en) 2011-10-10 2011-10-10 Full-automatic discharging conveyer for drilling rods

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110304796 CN103032037A (en) 2011-10-10 2011-10-10 Full-automatic discharging conveyer for drilling rods

Publications (1)

Publication Number Publication Date
CN103032037A true CN103032037A (en) 2013-04-10

Family

ID=48019383

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110304796 Pending CN103032037A (en) 2011-10-10 2011-10-10 Full-automatic discharging conveyer for drilling rods

Country Status (1)

Country Link
CN (1) CN103032037A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105952395A (en) * 2016-06-24 2016-09-21 中国地质大学(北京) Automatic discharging device of geological prospecting drill stem
CN112096320A (en) * 2020-08-14 2020-12-18 四川宏华石油设备有限公司 Conveying device and method for pipe

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105952395A (en) * 2016-06-24 2016-09-21 中国地质大学(北京) Automatic discharging device of geological prospecting drill stem
CN105952395B (en) * 2016-06-24 2018-09-21 中国地质大学(北京) A kind of geological drilling automatic racking device for drill rod
CN112096320A (en) * 2020-08-14 2020-12-18 四川宏华石油设备有限公司 Conveying device and method for pipe

Similar Documents

Publication Publication Date Title
CN103032036A (en) Full-automatic discharging conveying device for drilling rods
CN106194066B (en) A kind of automated three-dimensional formula drill pipe storage
CN104444388A (en) Steel angle sectional bar stacking machine and stacking method
CN206569714U (en) Sheet material tilts feed mechanism
CN105464604B (en) Open type pipe column storage and discharge device
CN102877802B (en) Numerical-control petroleum workover line
CN105059602A (en) Automatic and horizontal steel pipe arrangement device and steel pipe arrangement method thereof
CN107840133B (en) Steel reinforcement framework stacking and conveying device and method
CN105986690A (en) Car-carrying plate stacking machine and intelligent stereo garage using car-carrying plate stacking machine
CN210451492U (en) Longitudinal short rib feeding and distributing device used during welding of reinforcing mesh
CN103306617A (en) Drill rod automatic stacking and conveying device
CN104210795B (en) Traffic conic road-sign automobile-used liftable multilamellar road cone stack storage and conveying box
CN103032037A (en) Full-automatic discharging conveyer for drilling rods
CN202673193U (en) Drill stem automatic stacking and transporting device
CN110510423A (en) A kind of ecological brick Palletizer
JPH0429538B2 (en)
CN113183308B (en) Concrete pipe pile production method convenient for demolding
CN201347293Y (en) Simple brick stacking machine
CN206284278U (en) Dried bean curd tinuous production enters frame stacking collection system automatically
CN215052164U (en) Bridge guardrail template dismouting platform
CN209684699U (en) Online vehicle is transported in reinforced mesh storage device and mesh sheet storage
CN112145102B (en) Power catwalk
CN210795025U (en) Stacking device capable of automatically feeding trays
CN204124841U (en) A kind of setting machine device robot system
CN113620056A (en) Automatic change enamel plate production line

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130410