CN102691406A - Ceiling model positioning system and construction method - Google Patents

Ceiling model positioning system and construction method Download PDF

Info

Publication number
CN102691406A
CN102691406A CN2012101848112A CN201210184811A CN102691406A CN 102691406 A CN102691406 A CN 102691406A CN 2012101848112 A CN2012101848112 A CN 2012101848112A CN 201210184811 A CN201210184811 A CN 201210184811A CN 102691406 A CN102691406 A CN 102691406A
Authority
CN
China
Prior art keywords
moulding
ceiling
chi
furred ceiling
spring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012101848112A
Other languages
Chinese (zh)
Other versions
CN102691406B (en
Inventor
周国良
王小磊
吴安然
陈燕
刘丽娜
戴五平
王卫新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Suming Decoration Co Ltd
Original Assignee
Suzhou Suming Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Suming Decoration Co Ltd filed Critical Suzhou Suming Decoration Co Ltd
Priority to CN201210184811.2A priority Critical patent/CN102691406B/en
Publication of CN102691406A publication Critical patent/CN102691406A/en
Application granted granted Critical
Publication of CN102691406B publication Critical patent/CN102691406B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)
  • Finishing Walls (AREA)

Abstract

The invention discloses a ceiling model positioning system. The system is characterized by comprising a plurality of ruler blocks, at least one spring bar for connecting the ruler blocks and at least one pair of locking nuts, wherein each ruler block is provided with a temporary fixing hole and a connecting duct; a plurality of ruler blocks are connected in series with the spring bar through the connecting holes; a bolt matched with each locking nut is arranged at each of two ends of the spring bar; and the locking nuts are screwed on the bolts to form a positioning flexible ruler. A method comprises the following steps of: spreading a first layer of base plate on a keel; sticking a lofting drawing; customizing the positioning flexible ruler, and fixing the positioning flexible ruler according to the lofting drawing; spreading panel base strips and a panel; detaching the positioning flexible ruler; and integrally spraying latex paint to the panel and grooves. The positioning flexible ruler is customized by using the arc partition principle, so that construction of a ceiling of any drawing is realized; the construction is convenient; and the flexible ruler can be reused and is flexible and convenient.

Description

A kind of ceiling furred ceiling moulding navigation system and job practices
Technical field
The present invention relates to a kind of indoor decoration orientation tool and job practices, relate in particular to a kind of ceiling furred ceiling moulding navigation system and job practices, be specially adapted to irregular furred ceiling moulding location and use, improve efficiency of construction and quality, simplify working process.
Background technology
Along with people's increases for the live and work environment requirement day by day; The application of furred ceiling also more and more widely; And become the important component part of Modern Interior Decoration; Not only can bring into play absorption and reflection sound equipment, illumination, ventilation and waterproof effect, but also can beautify indoor environment and improve whole indoor artistic effect.Furred ceiling is the indispensable decoration project of interior decoration, often by furred ceiling forms by hanging head, keel and facing plate, the keel installation process of its high and medium furred ceiling mainly contains the location, ground and assembles, lifts to this two step of absolute altitude.
Ground location assembling is meant according to design drawing the moulding of furred ceiling is projected to ground, then with three-ply board or five-layer plywood with the subpoint location that is linked in sequence, design desired moulding thereby form, make 1: 1 mock-up at last according to formed moulding; Hang high then being meant the reproduced model moulding that assembles is promoted to the absolute altitude place through setting up scaffold or lifting means to absolute altitude.
Yet, some deficiency below present job practices and orientation tool exist:
(1) when the process of location, ground assembling, because three-ply board or these positioning device structures of five-layer plywood are very unstable, thereby easy deformation causes the inaccurate and distortion of formed model accuracy in location process;
(2) after accomplish the location of furred ceiling; These three-ply boards or five-layer plywood can't reuse; Simultaneously corresponding each different furred ceiling need be produced different mock-ups; These mock-ups are difficult to rationally reclaim once more use, thus not only increased the installation cost of furred ceiling, but also reduced efficiency of construction;
(3) emerging in an endless stream owing to the Modern Decorative effect; The moulding of furred ceiling is more complicated and changeable; Unique and be rich in characteristic, no longer be confined to square-folded straight line moulding, increasing camber line, irregular line plastic furred ceiling have increased the difficulty of Design Orientation to the constructor; Need the man power and material of labor to position, otherwise be difficult to reach the effect of these furred ceiling moulding;
(4) design ribbon formula moulding on hang ceiling panel; The groove moulding of arc promptly is set on panel; The bore of these grooves is less and be curve modeling; Therefore the working space of inside grooves is less, is easy to cause that the end face location is inaccurate, arc is yielding, can't carry out effective coating operation, is prone to break the generation of the problems such as external corner of groove.
Summary of the invention
The object of the invention provides a kind of ceiling furred ceiling moulding navigation system and job practices; Through using this navigation system and corresponding construction method, make the furred ceiling construction of irregular moulding more convenient, improve stability, the accuracy of location; Efficiency of construction is high; Recyclable utilization again, more environmental protection, and reduced installation cost.
For achieving the above object; The technical scheme that the present invention adopts is: a kind of ceiling furred ceiling moulding navigation system; Comprise that a plurality of chi pieces, at least one connect spring and at least one pair of locking nut of each chi piece; Each said chi piece is provided with the temporary fixed hole of vertically running through the chi piece and laterally runs through the connection duct of chi piece, and a plurality of said chi pieces are serially connected with on the said spring through said connection duct, and the two ends of said spring are respectively equipped with the double-screw bolt that cooperates with said locking nut; Said locking nut is bolted on the said double-screw bolt, constitutes the location tape.
In the technique scheme, said chi piece can adopt bakelite to process, according to the needs of detail of design line plastic; Select to be fit to the spring of length; The chi piece is serially connected with on the spring through connecting the duct successively, and the two ends that are positioned at spring are respectively equipped with double-screw bolt, treat that chi piece serial connection finishes; With the locking of chi piece, constitute the location tape with locking nut.Owing to be connected in series with spring between chi piece and the chi piece, utilize arc to separate principle, locate at will bending of tape; Satisfy the lines tendency needs of irregular detail of design; The constructor arranges the position of each piece chi piece according to the tendency of detail of design lines, then is screwed in temporary fixed hole with hold-down screw; The trend of stationary positioned tape conforms to detail of design.After treating that panel finishes along location tape laying, the hold-down screw on each chi piece is taken out just dismountable location tape; And the location tape of pulling down can be turned on the locking nut at two ends, and the chi piece is pulled down recovery, so; Just can avoid all analogue formations of corresponding each pattern moulding; The chi piece of forming the location tape simultaneously can use repeatedly, has reduced construction cost, has accelerated efficiency of construction.
In the technique scheme; The upper and lower connection duct that is respectively equipped with of said chi piece; Be provided with a said spring in each said connection duct, the two ends of each said spring are bolted with a said locking nut respectively, and said temporary fixed hole is positioned at the centre in two said connection ducts.
In the technique scheme, also comprise the plurality of fixed screw, said hold-down screw and said temporary fixed hole are complementary, and said hold-down screw is connected with modeling skeleton through this temporary fixed hole.
In the technique scheme, the width of the width of said chi piece and moulding groove adapts, and the thickness of chi piece is higher than moulding depth of groove 5mm at least.After laying finishes panel, remove the location tape, just form the moulding groove, meet the detail of design needs.
In the technique scheme, be provided with pad between said locking nut and the said location tape end face.
For achieving the above object, the method and technology scheme that the present invention adopts is: a kind of ceiling furred ceiling moulding job practices may further comprise the steps:
(1) moulding according to design customizes a plurality of chi pieces, and the chi piece is concatenated into the location tape with spring;
(2) make modeling skeleton according to detail of design, and be lifted in the lump on the ceiling,, the first floor skin plate is installed on the lightgage steel joist this first floor skin plate edge and the amalgamation mutually of said modeling skeleton edge along modeling skeleton with the substrate skeleton;
(3), will locate tape and pass temporary fixed hole through hold-down screw and be fixed on the modeling skeleton along the modeling skeleton tendency;
(4) along the tendency of location tape, panel base bar is passed the first floor skin plate through screw, be fixed on the lightgage steel joist;
(5) along the tendency of location tape, second layer panel is installed on the display panel substrate, and second layer skin plate is done surfacing;
(6) remove hold-down screw, remove the location tape, form and reserve the groove on panel, groove is carried out surfacing;
(7) counter plate and groove are done whole emulsion paint spraying.
In the technique scheme, the surfacing in the said step (5) does, to second layer skin plate surface batch putty 3 times, and the polishing sanding.
In the technique scheme, the surfacing in the said step (6) does, use floating rule with width to carry out putty to groove floor and repair levelling, and the polishing sanding.
In the technique scheme, during said step (2) lifting modeling skeleton, project to furred ceiling moulding setting-out on the ground according to design drawing size 1: 1; Make modeling skeleton; Again according to detail of design size 1: 1, with the mode of three one arcs, by ground back projection to ceiling; Confirm the moulding hoisting point position, then lift modeling skeleton.
Because the technique scheme utilization, the present invention compared with prior art has advantage:
1. be serially connected with on the spring by plural piece chi piece among the present invention, fix, constitute the location tape mutually suitable with detail of design by the locking nut at spring two ends; Rely on the retractility of spring, adjust the position of each piece chi piece, meet the tendency of modeling skeleton (being detail of design); And fix through temporary fixed hole and substrate with hold-down screw, the constructor just can lay panel base bar and panel along location tape tendency subsequently, removes the location tape at last; Just formed and the corresponding to groove of detail of design, realized the ribbon design of hang ceiling panel, easy construction; Avoid analogue formation repeatedly, improve efficiency of construction; Locating tape simultaneously can recover independently chi piece through removing locking nut, thereby realizes recycling use, has reduced construction cost, also more environmental protection;
2. according to the tendency of detail of design, tape is located in bending, and fixes with the temporary fixed hole of hold-down screw on the chi piece, thereby obtains precisely location, and the stable height of moulding, is easy to the laying of second layer skin plate, has guaranteed the perfection of later stage coating effect;
Among the present invention to the camber line moulding time, according to realizing detail of design, select for use one or more tape splicing to be shaped, guaranteed continuity, fluency, the naturality of moulding, make finished product more attractive in appearance, saved in the past model and done the trouble at angle.
Description of drawings
Fig. 1 is the structural representation of location tape in the embodiment of the invention one;
Fig. 2 is the vertical view of Fig. 1;
Fig. 3 is the user mode figure of location tape in the embodiment of the invention one;
Fig. 4 is the structural representation of chi piece among Fig. 1;
Fig. 5 is the construction positioning states sketch map of location tape in the embodiment of the invention one;
Fig. 6 is the sketch map of construction method step in the embodiment of the invention one (1)~(4);
Fig. 7 is the sketch map of construction method step in the embodiment of the invention one (5)~(7).
Wherein: 1, chi piece; 2, spring; 3, locking nut; 4, temporary fixed hole; 5, connect the duct; 6, double-screw bolt; 7, pad; 8, location tape; 9, arc groove; 10, hold-down screw; 11, first floor skin plate; 12, lightgage steel joist; 13, modeling skeleton; 14, panel base bar; 15, second layer skin plate; 16, putty; 17, groove.
The specific embodiment
Below in conjunction with accompanying drawing and embodiment the present invention is further described:
Embodiment one: shown in Fig. 1~7; A kind of roof furred ceiling moulding navigation system; Comprise 1,2 5mm spring 2 and 2 pairs of locking nuts 3 that connect each chi piece 1 of a plurality of chi pieces, each said chi piece 1 is provided with the temporary fixed hole 4 of vertically running through chi piece 1 and the connection duct 5 of laterally running through chi piece 1, and a plurality of said chi pieces 1 are serially connected with on the said spring 2 through said connection duct 5; The two ends of said spring 2 are respectively equipped with the double-screw bolt 6 that cooperates with said locking nut 3; Said locking nut 3 through pad 7 be bolted in said on, constitute location tape 8 (as shown in Figure 3), the length of the number of chi piece 1, spring 2 adapts with the pattern lines length at construction place to be positioned; The width of the width of said chi piece 1 and moulding groove adapts, and the thickness of chi piece 1 is higher than moulding depth of groove 5mm.
As shown in Figure 2; Said chi piece 1 is the bakelite piece; The chi piece 1 upper and lower connection duct 5 that is respectively equipped with; Be provided with a said spring 2 in each said connection duct 5, the two ends of each said spring 2 are bolted with a said locking nut 3 respectively, and said temporary fixed hole 4 is positioned at the centre in two said connection ducts 5.Corresponding hold-down screw 10 on each piece chi piece 1, said hold-down screw 10 and said temporary fixed hole 4 couplings, said hold-down screw 10 connects through these temporary fixed hole 4 modeling skeleton 13.
Job practices like Fig. 6, shown in 7, may further comprise the steps:
(1) moulding according to design customizes a plurality of chi pieces 1, and chi piece 1 usefulness spring 2 is concatenated into location tape 8, according to the pattern length of design, makes one or more location tape 8;
(2) project to furred ceiling moulding setting-out on the ground according to design drawing size 1: 1, make modeling skeleton 13, again according to detail of design size 1: 1; With the mode of three one arcs, to ceiling, confirm the moulding hoisting point position by ground back projection; Then lift modeling skeleton 13 and lightgage steel joist 12 on ceiling; Along modeling skeleton 13, first floor skin plate 11 is installed on the lightgage steel joist 12 these first floor skin plate 11 edges and the amalgamation mutually of said modeling skeleton 13 edges;
(3) along modeling skeleton 13 tendencies, one or more location tape 8 is passed temporary fixed hole 4 through hold-down screw 10 be fixed on the modeling skeleton 13, piece together the ribbon moulding that conforms to detail of design;
(4) along the tendency of location tape 8, panel base bar 14 is passed first floor skin plate 11 through screw, be fixed on the lightgage steel joist 12;
(5) along the tendency of location tape 8, second layer skin plate 15 is layed on the panel base bar 14, and to second layer skin plate 15 surface batch 3 times putty 16, and the polishing sanding;
(6) remove hold-down screw 10, remove location tape 8, form and reserve the groove 17 on panel 15, use floating rule to carry out putty 16 repairing levellings with width to groove floor, and the polishing sanding;
(7) second layer skin plate 15 and groove 17 are done whole emulsion paint spraying.
The principle of utilizing arc to separate through the combination of polylith chi piece 1, by the telescopic resilience of spring 2, is imbued with the ability that location tape 8 has crooked radian arbitrarily and moulding, satisfies the needs of detail of design.After second layer skin plate 15 is laid and accomplished, remove soft 8 chis in location, form the arc groove 9 (as shown in Figure 5) consistent with detail of design; And the location tape 8 that is removed is detachable, and recycling use reduces construction cost; With the method construction, the continuity of moulding, fluency, naturality are better.

Claims (9)

1. ceiling furred ceiling moulding navigation system; It is characterized in that: comprise that a plurality of chi pieces, at least one connect spring and at least one pair of locking nut of each chi piece; Each said chi piece is provided with the temporary fixed hole of vertically running through the chi piece and laterally runs through the connection duct of chi piece; A plurality of said chi pieces are serially connected with on the said spring through said connection duct; The two ends of said spring are respectively equipped with the double-screw bolt that cooperates with said locking nut, and said locking nut is bolted on the said double-screw bolt, constitute the location tape.
2. ceiling furred ceiling moulding navigation system according to claim 1; It is characterized in that: the upper and lower connection duct that is respectively equipped with of said chi piece; Be provided with a said spring in each said connection duct; The two ends of each said spring are bolted with a said locking nut respectively, and said temporary fixed hole is positioned at the centre in two said connection ducts.
3. according to claim 1,2 described ceiling furred ceiling moulding navigation systems, it is characterized in that: also comprise the plurality of fixed screw, said hold-down screw and said temporary fixed hole are complementary, and said hold-down screw is connected with modeling skeleton through this temporary fixed hole.
4. ceiling furred ceiling moulding navigation system according to claim 1, it is characterized in that: the width of said chi piece matches with the width of moulding groove, and the thickness of chi piece is higher than moulding depth of groove 5mm at least.
5. ceiling furred ceiling moulding navigation system according to claim 1 is characterized in that: be provided with pad between said locking nut and the said location tape end face.
6. ceiling furred ceiling moulding job practices may further comprise the steps:
(1) moulding according to design customizes a plurality of chi pieces, and the chi piece is concatenated into the location tape with spring;
(2) make modeling skeleton according to detail of design, and be lifted in the lump on the ceiling,, the first floor skin plate is installed on the lightgage steel joist this first floor skin plate edge and the amalgamation mutually of said modeling skeleton edge along modeling skeleton with the substrate skeleton;
(3) walking to locate tape along modeling skeleton passes temporary fixed hole through hold-down screw and is fixed on the first floor skin plate;
(4) along the tendency of location tape, panel base bar is passed the first floor skin plate through screw, be fixed on the lightgage steel joist;
(5) along the tendency of location tape, second layer panel is installed on the display panel substrate, and second layer skin plate is done surfacing;
(6) remove hold-down screw, remove the location tape, form and reserve the groove on panel, groove is carried out surfacing;
(7) counter plate and groove are done whole emulsion paint spraying.
7. ceiling furred ceiling moulding job practices according to claim 6 is characterized in that: the surfacing in the said step (5) does, to second layer skin plate surface batch putty 3 times, and the polishing sanding.
8. ceiling furred ceiling moulding job practices according to claim 6 is characterized in that: the surfacing in the said step (6) does, use floating rule with width to carry out putty to groove floor and repair levelling, and the polishing sanding.
9. ceiling furred ceiling moulding job practices according to claim 6 is characterized in that: during said step (2) lifting modeling skeleton, project to furred ceiling moulding setting-out on the ground according to design drawing size 1: 1; Make modeling skeleton; Again according to detail of design size 1: 1, with the mode of three one arcs, by ground back projection to ceiling; Confirm the moulding hoisting point position, then lift modeling skeleton.
CN201210184811.2A 2012-06-07 2012-06-07 Ceiling model positioning system and construction method Active CN102691406B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210184811.2A CN102691406B (en) 2012-06-07 2012-06-07 Ceiling model positioning system and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210184811.2A CN102691406B (en) 2012-06-07 2012-06-07 Ceiling model positioning system and construction method

Publications (2)

Publication Number Publication Date
CN102691406A true CN102691406A (en) 2012-09-26
CN102691406B CN102691406B (en) 2014-08-20

Family

ID=46857130

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210184811.2A Active CN102691406B (en) 2012-06-07 2012-06-07 Ceiling model positioning system and construction method

Country Status (1)

Country Link
CN (1) CN102691406B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103912089A (en) * 2014-04-18 2014-07-09 中建八局第二建设有限公司 Construction method of lift ceiling of auditorium hall
CN104612306A (en) * 2014-12-20 2015-05-13 山西省第五建筑工程公司 Construction method of large-space multi-layer multi-curved-surface special-shaped aluminum magnesium alloy profile suspended ceiling
CN105672657A (en) * 2016-01-27 2016-06-15 湖南省第五工程有限公司 Suspended ceiling installation method
CN106351425A (en) * 2016-08-30 2017-01-25 江苏嘉洋华联建筑装饰股份有限公司 Construction process for repeated modeling ceiling
CN109515040A (en) * 2018-11-18 2019-03-26 满洪流 A kind of curve tracing tape and curve mapping arrangements

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5653083A (en) * 1995-09-29 1997-08-05 Owens-Corning Fiberglas Technology, Inc. Raisable side guides for apparatus for paying out an insulation support sheet
CN201221190Y (en) * 2008-06-26 2009-04-15 上海桐井建材有限公司 Leveling apparatus of vertical and horizontal directions of light steel keel frame
CN102409790A (en) * 2011-08-23 2012-04-11 周建成 Seamless suspended ceiling device and installation method thereof
CN202596185U (en) * 2012-06-07 2012-12-12 苏州苏明装饰有限公司 Ceiling and shaping locating system for ceiling

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5653083A (en) * 1995-09-29 1997-08-05 Owens-Corning Fiberglas Technology, Inc. Raisable side guides for apparatus for paying out an insulation support sheet
CN201221190Y (en) * 2008-06-26 2009-04-15 上海桐井建材有限公司 Leveling apparatus of vertical and horizontal directions of light steel keel frame
CN102409790A (en) * 2011-08-23 2012-04-11 周建成 Seamless suspended ceiling device and installation method thereof
CN202596185U (en) * 2012-06-07 2012-12-12 苏州苏明装饰有限公司 Ceiling and shaping locating system for ceiling

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103912089A (en) * 2014-04-18 2014-07-09 中建八局第二建设有限公司 Construction method of lift ceiling of auditorium hall
CN104612306A (en) * 2014-12-20 2015-05-13 山西省第五建筑工程公司 Construction method of large-space multi-layer multi-curved-surface special-shaped aluminum magnesium alloy profile suspended ceiling
CN104612306B (en) * 2014-12-20 2017-02-01 山西五建集团有限公司 Construction method of large-space multi-layer multi-curved-surface special-shaped aluminum magnesium alloy profile suspended ceiling
CN105672657A (en) * 2016-01-27 2016-06-15 湖南省第五工程有限公司 Suspended ceiling installation method
CN106351425A (en) * 2016-08-30 2017-01-25 江苏嘉洋华联建筑装饰股份有限公司 Construction process for repeated modeling ceiling
CN109515040A (en) * 2018-11-18 2019-03-26 满洪流 A kind of curve tracing tape and curve mapping arrangements

Also Published As

Publication number Publication date
CN102691406B (en) 2014-08-20

Similar Documents

Publication Publication Date Title
CN102691406B (en) Ceiling model positioning system and construction method
CN105569251B (en) Device for split-level ceiling and installation method
CN101585205B (en) Method for producing and mounting moulded concrete anaglyph unit plate
CN104612306B (en) Construction method of large-space multi-layer multi-curved-surface special-shaped aluminum magnesium alloy profile suspended ceiling
CN103857859A (en) A building array
CN103375000A (en) Process for constructing waterborne fluorocarbon metal paint on elastic floating-coat nap surface
CN202596185U (en) Ceiling and shaping locating system for ceiling
CN103696547B (en) A kind ofly decorate the modularization mounting method of solid on wall and decorative module
CN102535807B (en) Modular wall tile pre-bonding structure and construction method thereof
CN106609583A (en) A functional wall surface plastic panel
CN210917935U (en) Assembled integrated upgrade version gypsum board top wall
CN104405092B (en) Exterior wall true stone paint shifting formwork construction method
CN205530908U (en) Furred ceiling falls a grade device
CN1192151C (en) Horizon adjustable wooden floor board and its paving process
CN201908415U (en) Wall decorative board layer structure
CN100585112C (en) Installation method for building decorative board
CN204781758U (en) Portable decoration wallboard
CN206189783U (en) Wallboard splicing structure
CN210622231U (en) Novel stainless steel skirting line
CN211114334U (en) Blue or green brick furred ceiling basic unit structure
TW201710584A (en) Construction method of post-fabricating old building wall surface into exposed concrete without needs of templates and grouting, thereby reducing cost and increasing construction efficiency
CN104989057A (en) Concave-convex clamp groove type composite multi-layer wall surface suspended ceiling decoration integrated board
CN206681304U (en) Floor panel assembly
CN206987259U (en) A kind of building decoration wallboard
CN105239703B (en) A kind of Wooden decoration board curtain wall construction method of installation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: 215000 Xiangcheng District, Jiangsu Province, Yang Cheng Road, No. 98, No.

Applicant after: Suzhou Suming Decoration Co., Ltd.

Address before: 215000 Xiangcheng District, Jiangsu Province, Yang Cheng Road, No. 98, No.

Applicant before: Suzhou Suming Decoration Co.,Ltd.

C14 Grant of patent or utility model
GR01 Patent grant