CN106351425A - Construction process for repeated modeling ceiling - Google Patents
Construction process for repeated modeling ceiling Download PDFInfo
- Publication number
- CN106351425A CN106351425A CN201610748469.2A CN201610748469A CN106351425A CN 106351425 A CN106351425 A CN 106351425A CN 201610748469 A CN201610748469 A CN 201610748469A CN 106351425 A CN106351425 A CN 106351425A
- Authority
- CN
- China
- Prior art keywords
- moulding
- ceiling
- semi
- finished product
- keel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F21/00—Implements for finishing work on buildings
- E04F21/18—Implements for finishing work on buildings for setting wall or ceiling slabs or plates
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a construction process for a repeated modeling ceiling, wherein the ceiling is uniformly manufactured and assembled by a standard template in the processing area; the ceiling is hoisted in the field; the modeling specification and quantity are counted in early stage; and then each modeling detail size drawing is drawn by CAD; the standard template with each specification is manufactured; the ceiling is uniformly blanked in the woodworking processing area according to the standard model; after the qualified acceptance, the ceiling is assembled according to the sample drawing;fireproof or antirust treatment of the frame is carried out; the panel is installed and the bottom putty is scraped; and the processed modeling semi-finished product can be carried to the construction site to be lifted. By the above method, the process in the invention can ensure the uniform modeling with same specification, improve the construction effect of the complex modeling, reduce the crossed operation of the field ceiling, improve the construction quality and save cost.
Description
Technical field
The present invention relates to building field, more particularly to a kind of repetition moulding ceiling construction flow process.
Background technology
Paper-faced gyp plate moulding ceiling construction flow process: surveying setting-out → edgewise keel installation → hanger erection → bearing keel
Installation → cover surface keel installation → moulding position skeleton installation → plasterboard installation → emulsion paint facing, wherein, moulding position bone
Frame makes detailed process: hanger erection, live modeling skeleton fabrication and installation, and skeleton basic unit prevents fires or antirust treatment.Shaping sector
Position skeleton need to must installation checking and accepting by rear installation in top surface electrical conduits, air-conditioning, fire-fighting etc..Existing mounting means
It is primarily present some deficiency following: 1, same specification moulding quantity is many, the having differences property of moulding after the completion of different personnel's constructions;2、
Moulding is complicated, and site operation efficiency is low, long construction period;3rd, live furred ceiling cross-operation amount is big.
Content of the invention
The invention mainly solves the technical problem of providing a kind of repetition moulding ceiling construction flow process, ensure that same specification
Moulding uniformity, raising complex model construction efficiency, the reduction of erection time, the live furred ceiling cross-operation amount of minimizing, raising construction quality,
Cost-effective.
For solving above-mentioned technical problem, one aspect of the present invention is: provides a kind of moulding furred ceiling that repeats to apply
Work flow process mainly comprises the steps:
First, surveying setting-out:
One), according to construction drawing, job site is measured with unwrapping wire, determine+1.000 elevation line and the minimum elevation line of furred ceiling;
Two), each posed positions are determined;
2nd, edgewise keel installation: install keelson along metope;
3rd, hanger erection:
One) hoisting point position of suspension rod, is marked by unwrapping wire position;
Two), suspension rod is installed;
4th, bearing keel is installed:
One) bearing keel hanging piece, is used to connect suspension rod and bearing keel;
Two), carry main joist to be held on keelson by wall end;
5th, cover surface keel is installed:
One), cover surface keel vertical bearing spine arrangement, is fixed on bearing keel by fastener;
Two), cover surface keel snaps in keelson by wall end;
6th, repeat or complex model processing district make: high-volume unified blanking in carpenter processing district makes,
One), draw moulding full-page proof dimensional drawing: after technical staff is familiar with drawing, sorted out various modeling parameters, with cad one by one
Depict all size moulding processing drawing, its size must be drawn it is ensured that blanking is correct on processing drawing in detail;
Two), unwrapping wire draws moulding blanking figure: workmen signs the cad full-size drawing confirming first in multi-layer sheet according to technical staff
Upper unwrapping wire draws moulding full-page proof, then compares cad drawing by technical staff and carry out size one by one and be combined it is ensured that the Pattern plate ruler of setting-out
Very little errorless, carry out next step mould making;
Three), make standard mould: according to mould drawing, produce standard mould, technical staff is true on the spot
Recognize, errorless after, this moulding then be blanking setting-out standard mould;
Four), blanking high-volume making moulding is unified in processing district: according to all size moulding drawing in carpenter processing district according to mark
The unified blanking of quasi-mode plate batch, wooden processing district completes various moulding, is assembled into semi-finished product after technical staff's acceptance(check),
First a moulding is assembled by skilled worker squad leader's on-the-spot demonstration and confide a technological secret, then by each operating personnel's Batch assemblage;Carry out
The fire prevention of skeleton or antirust treatment, and complete panel install and bottom putty criticize and scrape
7th, live semi-finished product lifting:
One), moulding semi-finished product are transported at furred ceiling: be transported to each furred ceiling portion after wooden processing district completes semi-finished product after acceptance(check)
The lifting of position lower section;
Two), hanging position in top determines: first releases formation skeleton line on ground during lifting, by the hoisting point position mark on semi-finished product
On ground;Projected corresponding for ground hoisting point position to ceiling with radar stealthy materials;
Three), semi-finished product lifting: using suspension rod, semi-finished product moulding and top surface are carried out hanging and install;
8th, non-moulding position hang ceiling panel is installed:
One), with cover surface keel, non-moulding position is connected with moulding position skeleton;
Two), using self-tapping screw, Thistle board and cover surface keel are fixed;
Three), seam crossing first uses putty filleting filling-in, then double applying kraft paper, and Puttying is criticized in face;
9th, emulsion paint facing: Paper-faced gyp board finish emulsion paint facing.
The invention has the beneficial effects as follows: compared with prior art, the method can guarantee that the unification of same specification moulding to the present invention
Property, construction accuracy is high;Do not conflict with other operations, efficiency of construction is high, the reduction of erection time;Unified processing and fabricating, in-site installation can
Reduce live furred ceiling cross-operation amount, it is to avoid the quality problems that cross interference leads to, reduce do over again and personnel's work holdup problem it is ensured that
Construction quality, cost-effective.
Brief description
Fig. 1 is a kind of flow chart repeating moulding ceiling construction flow process one preferred embodiment of the present invention.
Specific embodiment
Below in conjunction with the accompanying drawings presently preferred embodiments of the present invention is described in detail, so that advantages and features of the invention energy
It is easier to be readily appreciated by one skilled in the art, thus protection scope of the present invention is made apparent clearly defining.
Refer to Fig. 1, the embodiment of the present invention includes:
A kind of moulding ceiling construction flow process that repeats mainly comprises the steps:
First, surveying setting-out:
One), according to construction drawing, job site is measured with unwrapping wire, determine+1.000 elevation line and the minimum elevation line of furred ceiling;
Two), each posed positions are determined;
2nd, edgewise keel installation: install keelson along metope;
3rd, hanger erection:
One) hoisting point position of suspension rod, is marked by unwrapping wire position;
Two), suspension rod is installed;
4th, bearing keel is installed:
One) bearing keel hanging piece, is used to connect suspension rod and bearing keel;
Two), carry main joist to be held on keelson by wall end;
5th, cover surface keel is installed:
One), cover surface keel vertical bearing spine arrangement, is fixed on bearing keel by fastener;
Two), cover surface keel snaps in keelson by wall end;
6th, repeat or complex model processing district make: high-volume unified blanking in carpenter processing district makes,
One), draw moulding full-page proof dimensional drawing: after technical staff is familiar with drawing, sorted out various modeling parameters, with cad one by one
Depict all size moulding processing drawing, its size must be drawn it is ensured that blanking is correct on processing drawing in detail;
Two), unwrapping wire draws moulding blanking figure: workmen signs the cad full-size drawing confirming first in multi-layer sheet according to technical staff
Upper unwrapping wire draws moulding full-page proof, then compares cad drawing by technical staff and carry out size one by one and be combined it is ensured that the Pattern plate ruler of setting-out
Very little errorless, carry out next step mould making;
Three), make standard mould: according to mould drawing, produce standard mould, technical staff is true on the spot
Recognize, errorless after, this moulding then be blanking setting-out standard mould;
Four), blanking high-volume making moulding is unified in processing district: according to all size moulding drawing in carpenter processing district according to mark
The unified blanking of quasi-mode plate batch, wooden processing district completes various moulding, is assembled into semi-finished product after technical staff's acceptance(check),
First a moulding is assembled by skilled worker squad leader's on-the-spot demonstration and confide a technological secret, then by each operating personnel's Batch assemblage;Carry out
The fire prevention of skeleton or antirust treatment, and complete panel install and bottom putty criticize and scrape
7th, live semi-finished product lifting:
One), moulding semi-finished product are transported at furred ceiling: be transported to each furred ceiling portion after wooden processing district completes semi-finished product after acceptance(check)
The lifting of position lower section;
Two), hanging position in top determines: first releases formation skeleton line on ground during lifting, by the hoisting point position mark on semi-finished product
On ground;Projected corresponding for ground hoisting point position to ceiling with radar stealthy materials;
Three), semi-finished product lifting: using suspension rod, semi-finished product moulding and top surface are carried out hanging and install;
8th, non-moulding position hang ceiling panel is installed:
One), with cover surface keel, non-moulding position is connected with moulding position skeleton;
Two), using self-tapping screw, Thistle board and cover surface keel are fixed;
Three), seam crossing first uses putty filleting filling-in, then double applying kraft paper, and Puttying is criticized in face;
9th, emulsion paint facing: Paper-faced gyp board finish emulsion paint facing.
The present invention adopts standard form, processing district main unified make, assembling, on-site hoisting: early stage statistics form fac-tor and
Each quantity;Then draw each moulding full-page proof dimensional drawing with cad, make the standard form of each specification;According to each master pattern,
The unified blanking of carpenter processing district batch, is completed to assemble by drawing after acceptance(check), carries out fire prevention or the antirust treatment of skeleton, and
Complete panel installation and bottom putty is criticized and scraped;The moulding semi-finished product processing be transported to building-site lifted it is ensured that with
Specification moulding uniformity, improves complex model construction efficiency, shortens the duration, decreases live furred ceiling cross-operation amount, carries
High construction quality, save cost.
The foregoing is only embodiments of the invention, not thereby limit the present invention the scope of the claims, every using this
Equivalent structure or equivalent flow conversion that bright description and accompanying drawing content are made, or directly or indirectly it is used in other related skills
Art field, is included within the scope of the present invention.
Claims (1)
1. a kind of moulding ceiling construction flow process that repeats is it is characterised in that mainly comprise the steps:
First, surveying setting-out:
One), according to construction drawing, job site is measured with unwrapping wire, determine+1.000 elevation line and the minimum elevation line of furred ceiling;
Two), each posed positions are determined;
2nd, edgewise keel installation: install keelson along metope;
3rd, hanger erection:
One) hoisting point position of suspension rod, is marked by unwrapping wire position;
Two), suspension rod is installed;
4th, bearing keel is installed:
One) bearing keel hanging piece, is used to connect suspension rod and bearing keel;
Two), carry main joist to be held on keelson by wall end;
5th, cover surface keel is installed:
One), cover surface keel vertical bearing spine arrangement, is fixed on bearing keel by fastener;
Two), cover surface keel snaps in keelson by wall end;
6th, repeat or complex model processing district make: high-volume unified blanking in carpenter processing district makes,
One), draw moulding full-page proof dimensional drawing: after technical staff is familiar with drawing, sorted out various modeling parameters, with cad one by one
Depict all size moulding processing drawing, its size must be drawn it is ensured that blanking is correct on processing drawing in detail;
Two), unwrapping wire draws moulding blanking figure: workmen signs the cad full-size drawing confirming first in multi-layer sheet according to technical staff
Upper unwrapping wire draws moulding full-page proof, then compares cad drawing by technical staff and carry out size one by one and be combined it is ensured that the Pattern plate ruler of setting-out
Very little errorless, carry out next step mould making;
Three), make standard mould: according to mould drawing, produce standard mould, technical staff is true on the spot
Recognize, errorless after, this moulding then be blanking setting-out standard mould;
Four), blanking high-volume making moulding is unified in processing district: according to all size moulding drawing in carpenter processing district according to mark
The unified blanking of quasi-mode plate batch, wooden processing district completes various moulding, is assembled into semi-finished product after technical staff's acceptance(check),
First a moulding is assembled by skilled worker squad leader's on-the-spot demonstration and confide a technological secret, then by each operating personnel's Batch assemblage;Carry out
The fire prevention of skeleton or antirust treatment, and complete panel install and bottom putty criticize and scrape
7th, live semi-finished product lifting:
One), moulding semi-finished product are transported at furred ceiling: be transported to each furred ceiling portion after wooden processing district completes semi-finished product after acceptance(check)
The lifting of position lower section;
Two), hanging position in top determines: first releases formation skeleton line on ground during lifting, by the hoisting point position mark on semi-finished product
On ground;Projected corresponding for ground hoisting point position to ceiling with radar stealthy materials;
Three), semi-finished product lifting: using suspension rod, semi-finished product moulding and top surface are carried out hanging and install;
8th, non-moulding position hang ceiling panel is installed:
One), with cover surface keel, non-moulding position is connected with moulding position skeleton;
Two), using self-tapping screw, Thistle board and cover surface keel are fixed;
Three), seam crossing first uses putty filleting filling-in, then double applying kraft paper, and Puttying is criticized in face;
9th, emulsion paint facing: Paper-faced gyp board finish emulsion paint facing.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610748469.2A CN106351425A (en) | 2016-08-30 | 2016-08-30 | Construction process for repeated modeling ceiling |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610748469.2A CN106351425A (en) | 2016-08-30 | 2016-08-30 | Construction process for repeated modeling ceiling |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106351425A true CN106351425A (en) | 2017-01-25 |
Family
ID=57855485
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610748469.2A Pending CN106351425A (en) | 2016-08-30 | 2016-08-30 | Construction process for repeated modeling ceiling |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106351425A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109111546A (en) * | 2018-08-13 | 2019-01-01 | 浙江云信装饰工程有限公司 | A kind of decorative ceiling and its construction method |
CN113360993A (en) * | 2021-06-30 | 2021-09-07 | 浙江乔兴建设集团有限公司 | BIM technology-based construction method for large-area complex-modeling suspended ceiling |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2439354A2 (en) * | 2010-10-08 | 2012-04-11 | Helmut Hummel | Stairs and method of making same |
CN102691406A (en) * | 2012-06-07 | 2012-09-26 | 苏州苏明装饰有限公司 | Ceiling model positioning system and construction method |
CN102864867A (en) * | 2011-08-24 | 2013-01-09 | 苏州苏明装饰有限公司 | Method for ceiling hyperboloidal arch |
CN103603456A (en) * | 2013-11-07 | 2014-02-26 | 苏州金螳螂建筑装饰股份有限公司 | Large dome concave-convex face modeling ceiling |
CN105421773A (en) * | 2015-10-30 | 2016-03-23 | 深圳市亚泰国际建设股份有限公司 | Construction method for light steel skeleton special-shaped model suspended ceiling |
-
2016
- 2016-08-30 CN CN201610748469.2A patent/CN106351425A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2439354A2 (en) * | 2010-10-08 | 2012-04-11 | Helmut Hummel | Stairs and method of making same |
CN102864867A (en) * | 2011-08-24 | 2013-01-09 | 苏州苏明装饰有限公司 | Method for ceiling hyperboloidal arch |
CN102691406A (en) * | 2012-06-07 | 2012-09-26 | 苏州苏明装饰有限公司 | Ceiling model positioning system and construction method |
CN103603456A (en) * | 2013-11-07 | 2014-02-26 | 苏州金螳螂建筑装饰股份有限公司 | Large dome concave-convex face modeling ceiling |
CN105421773A (en) * | 2015-10-30 | 2016-03-23 | 深圳市亚泰国际建设股份有限公司 | Construction method for light steel skeleton special-shaped model suspended ceiling |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109111546A (en) * | 2018-08-13 | 2019-01-01 | 浙江云信装饰工程有限公司 | A kind of decorative ceiling and its construction method |
CN113360993A (en) * | 2021-06-30 | 2021-09-07 | 浙江乔兴建设集团有限公司 | BIM technology-based construction method for large-area complex-modeling suspended ceiling |
CN113360993B (en) * | 2021-06-30 | 2022-04-29 | 浙江乔兴建设集团有限公司 | BIM technology-based construction method for large-area complex-modeling suspended ceiling |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2018145510A1 (en) | Bim-based construction and decoration method | |
CN109441034A (en) | A kind of construction technology of BIM auxiliary hyperboloid Special-Shaped Column set square installation | |
WO2023272593A1 (en) | Bim-technology-based large-area complex-shape suspended ceiling construction method | |
CN106351425A (en) | Construction process for repeated modeling ceiling | |
CN104060746A (en) | Reverse support construction method of suspended ceiling angle steel support | |
CN209227776U (en) | A kind of three-dimensional building module | |
CN206538969U (en) | Assembled wall decoration structure | |
CN202672534U (en) | Aerated concrete wall surface coating | |
CN108505662B (en) | Construction method for self-lifting hyperboloid dense-hole GRC solid wood-skin-attached ceiling lamp | |
CN108915136A (en) | A kind of construction method of open stone curtain wall | |
CN205530908U (en) | Furred ceiling falls a grade device | |
CN110748172A (en) | Household mark paying-off method | |
CN113360993B (en) | BIM technology-based construction method for large-area complex-modeling suspended ceiling | |
CN207063281U (en) | One kind falls grade bending plate and falls a grade furred ceiling frame | |
CN115637809A (en) | Assembly type construction method for indoor high and large space modeling aluminum plate ceiling of pseudo-classic building | |
CN205063276U (en) | Apex angle moulding with wall decoration board | |
CN204876490U (en) | Sliding access hole structure of furred ceiling | |
CN207998972U (en) | vertical air outlet | |
CN208235774U (en) | Lateral air outlet | |
Ginzburg et al. | Automated identification of construction works and structural elements at an early stage of investment and construction projects’ implementation | |
CN206538901U (en) | A kind of assembling type partition wall | |
CN110607874A (en) | Large-area inclined plane perforation gypsum board suspended ceiling falling-level molding installation structure | |
CN204040284U (en) | A kind of stone material composite honeycomb board installation of ceiling system | |
CN111209617A (en) | Port ventilation system forward design method based on BIM technology | |
CN105298050B (en) | A kind of detachable reclaiming type interior decoration Assembled lamp pond and its construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170125 |