WO2019019510A1 PCT/CN2017/114094 CN2017114094W WO2019019510A1 WO 2019019510 A1 WO2019019510 A1 WO 2019019510A1 CN 2017114094 W CN2017114094 W CN 2017114094W WO 2019019510 A1 WO2019019510 A1 WO 2019019510A1
Authority
WO
WIPO (PCT)
Prior art keywords
pulley
plate
bracket
rod
clamping plate
Prior art date
Application number
PCT/CN2017/114094
Other languages
English (en)
French (fr)
Inventor
张龙
陈庆城
徐晓凯
王东
杨润畴
Original Assignee
广船国际有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 广船国际有限公司 filed Critical 广船国际有限公司
Publication of WO2019019510A1 publication Critical patent/WO2019019510A1/zh

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66DCAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
    • B66D3/00Portable or mobile lifting or hauling appliances
    • B66D3/04Pulley blocks or like devices in which force is applied to a rope, cable, or chain which passes over one or more pulleys, e.g. to obtain mechanical advantage
    • B66D3/06Pulley blocks or like devices in which force is applied to a rope, cable, or chain which passes over one or more pulleys, e.g. to obtain mechanical advantage with more than one pulley

Definitions

  • the utility model relates to the technical field of lifting equipment, in particular to a lifting device.
  • the flat butt welds are generally welded by submerged arc welders, and these flat butt welds are generally found in flat bottom sections and raft sections where the position is not too low. Segment and side panel segments.
  • the most primitive method is used at the construction site, that is, manually lifting the submerged arc welding machine to the segment.
  • the existing submerged arc welding machine usually weighs about 75kg, at least two people need to move the segment, and the segment welding work platform is about 4 meters high.
  • the operator needs to carry the welding machine up and down through the space-limited scaffolding, greatly increasing the number of welders.
  • the difficulty and strength of handling, the slightest inattention during the handling process will rub the collision, and in severe cases, even the welder will drop the injured or break the welder.
  • the utility model aims to provide a lifting device which has a simple structure and can effectively carry out lifting and lifting of small objects, has small operation difficulty and strength, and high safety.
  • Providing a lifting device comprising:
  • a support rod assembly comprising a pole, a sleeve and a crossbar, the sleeve being sleeved on an upper end of the pole, the sleeve being away from an end of the lower end of the pole and the The crossbar is fixedly connected, and the sleeve is perpendicular to the crossbar;
  • a splint assembly fixed to a lower end of the upright for fixing the upright in a position to be mounted
  • a pulley assembly the pulley assembly being disposed at an end of the crossbar away from the sleeve, the pulley assembly including a first pulley bracket fixedly coupled to the crossbar, rotatably disposed on the first pulley bracket a first pulley and a drawstring disposed on the first pulley, one end of the drawstring for operating the grip and the other end for connecting the hanger.
  • the support bar assembly further includes a reinforcing strut, one end of the reinforcing brace being fixedly connected to the sleeve, and the other end being fixedly connected to the cross bar.
  • one end of the reinforcing bracing is connected to a non-end position of the sleeve, and the other end of the reinforcing brac is connected to a non-end position of the crossbar.
  • an angle between the reinforcing struts and the cross bar is a first angle
  • an angle between the reinforcing struts and the shank is a second clamping angle
  • the first angle is equal to the second angle.
  • the clamping plate assembly comprises a first clamping plate, a second clamping plate, a connecting plate and a top clamping rod, the first clamping plate being fixed at an end of the vertical rod, the second clamping plate Parallelly disposed on a side of the first clamping plate away from the vertical rod, the connecting plate connecting the first clamping plate and the second clamping plate, the top clamping rod is screwed on the first clamping plate, An end portion thereof extends between the first clamping plate and the second clamping plate for selectively tightening a fixed panel between the first clamping plate and the second clamping plate to be mounted.
  • At least one through hole is defined in the first clamping plate, and a top nut is fixed on the first clamping plate, and a screw hole of the top nut corresponds to the through hole.
  • the outer circumference of the top rod is provided with a thread matching the top nut, the end of the top rod sequentially passes through a screw hole of the top nut, and the through hole presses the fixing panel Close to the second plate.
  • the pressing rod is fixed with a pressing plate at an end between the first clamping plate and the second clamping plate.
  • the pulley assembly further includes a second pulley, a lower end of the first pulley bracket is provided with a first hook, and the second pulley is fixed by a second pulley bracket, the second pulley Rotating relative to the second pulley bracket about its own axis, the second pulley bracket is provided with a second hook for fixing the hanging member, and one end of the pulling rope sequentially bypasses the first pulley and the The second pulley is coupled to the first hook.
  • the first pulley bracket includes a first bracket plate fixedly coupled to the crossbar, and the first bracket panel is disposed away from the side of the crossbar with the first a second bracket plate parallel to the bracket plate, two first pulley support plates parallel to each other are disposed between the first bracket plate and the second bracket plate, and the first pulley is rotatably disposed on the first rotating shaft Between the two first pulley supporting plates, two ends of the first rotating shaft are respectively fixedly connected with two of the first pulley supporting plates;
  • the second pulley bracket includes a third bracket plate and a fourth bracket plate that are parallel to each other, and two second pulley support plates that are parallel to each other are disposed between the third bracket plate and the fourth bracket plate,
  • the two pulleys are rotatably disposed between the two second pulley support plates through the second rotating shaft, and two ends of the second rotating shaft are fixedly connected to the two second pulley supporting plates, respectively.
  • the first bracket plate is further provided with a reinforcing plate, one end of the reinforcing plate is fixedly connected with one end of the first bracket plate, and the other end bypasses the cross bar and the The other end of the first bracket plate is fixedly connected.
  • the utility model has the beneficial effects that: by providing a clamping plate assembly at the lower end of the vertical rod, the vertical rod can be clamped at the position to be installed, that is, the vertical rod can be detachably fixed at the position to be installed, so that the position adjustment and reuse can be facilitated;
  • the rod is disposed away from the end of the sleeve, and the pulley assembly is used to reduce the lifting of the hanger.
  • the difficulty and strength of the single person can also be operated, saving time and effort; by using the rod to connect the crossbar and the pole, the support rod assembly can be rotated 360° on the horizontal surface as needed to meet the lifting requirements of each angular position.
  • FIG. 1 is a schematic structural view of a lifting device according to an embodiment of the present invention.
  • FIG. 2 is a partial schematic view of the A direction of FIG. 1.
  • FIG. 2 is a partial schematic view of the A direction of FIG. 1.
  • Figure 3 is a cross-sectional view taken along line B-B of Figure 1.
  • FIG. 4 is a top plan view of a lifting device according to an embodiment of the present invention.
  • FIG. 5 is a schematic view showing the use state of the lifting device according to the embodiment of the present invention.
  • Support rod assembly 11, pole; 12, sleeve rod; 13, cross rod; 14, reinforcing diagonal support;
  • the pulley assembly 31, the first pulley bracket; 311, the first bracket plate; 312, the second bracket plate; 313, the first pulley support plate; 314, the first rotating shaft; 315, the reinforcing plate; 32, the first pulley 33, drawstring; 34, second pulley; 35, first hook; 36, second pulley bracket; 37, second hook;
  • an embodiment of the present invention provides a lifting device including a support rod assembly 1, a splint assembly 2, and a pulley assembly 3, wherein the support rod assembly 1 includes a pole 11 and a sleeve 12 with a cross bar 13 , the sleeve 12 is movably sleeved on an upper end of the upright 11 , and an end of the sleeve 12 away from a lower end of the upright 11 is fixedly connected to the cross bar 13 , and the sleeve is 12 is perpendicular to the cross bar 13; the splint assembly 2 is fixed to a lower end of the upright 11 for fixing the upright 11 in a position to be mounted; the pulley assembly 3 is disposed on the crossbar 13 Along from one end of the sleeve 12, the pulley assembly 3 includes a first pulley bracket 31 fixedly coupled to the crossbar 13, a first pulley 32 rotatably disposed on the first pulley bracket 31, and a
  • the upright 11 By providing the splint assembly 2 at the lower end of the upright 11, the upright 11 can be clamped in the position to be installed, that is, the upright 11 can be detachably fixed in the position to be installed, so that the position adjustment and reuse can be facilitated;
  • the pulley assembly 3 is disposed at one end of the sleeve 12, and the difficulty and strength of the lifting of the hanger are reduced by the principle of the pulley, so that the single person can also operate, saving time and labor; by connecting the crossbar 13 and the pole 11 by using the sleeve 12, The support bar assembly 1 is rotated 360° on a horizontal surface as needed to meet the lifting requirements of the various angular positions.
  • the support bar assembly 1 further includes a reinforcing bracing 14, one end of the reinforcing bracing 14 is fixedly connected with the sleeve 12, and the other end is opposite to the cross bar 13 Fixed connection.
  • one end of the reinforcing bracing 14 is connected to the non-end position of the sleeve 12, and the other end of the reinforcing bracing 14 is connected to the non-end position of the crossbar 13.
  • An angle between the reinforcing bracing 14 and the crossbar 13 is a first angle, and an angle between the reinforcing bracing 14 and the sleeve 12 is a second angle.
  • the first angle is equal to the second angle, both of which are 45°
  • the cross bar 13 and the sleeve 12 each adopt a seamless steel pipe of ⁇ 48*3 mm, and the length of the cross bar 13 Not less than 1000mm, the length of the sleeve 12 is not less than 500mm, the reinforcing bracing 14 is made of angle steel of 30*30*3mm, and the vertical pole 11 is made of seamless steel pipe of ⁇ 38*3mm, and its height is 1100mm.
  • the first angle may also be any angle between 10° and 60°, and the second angle is equal to the difference between the angle of 90° and the first angle.
  • the splint assembly 2 includes a first clamping plate 21, a second clamping plate 22, a connecting plate 23 and a top rod 24, the first clamping plate 21 being fixed to the vertical rod
  • the second clamping plate 22 is disposed in parallel on a side of the first clamping plate 21 away from the vertical rod 11 , and the connecting plate 23 connects the first clamping plate 21 and the second clamping plate 22
  • the top rod 24 is screwed onto the first clamping plate 21, and its end portion extends between the first clamping plate 21 and the second clamping plate 22 for selective tightening at the first A fixed panel 100 between the splint 21 and the second cleat 22 at a position to be mounted.
  • the fixed panel 100 refers to a segmented panel, a platform panel or a fixed plate structure in which any position to be mounted can be clamped.
  • the strength of the fixed panel 100 to be installed is sufficient, that is, the thickness.
  • the force can be tolerated to bear the premise that the entire lifting device and the suspended crane 200 are not deformed.
  • At least one through hole is defined in the first clamping plate 21, and a top nut 25 is fixed on the first clamping plate 21, and a screw hole of the top nut 25 corresponds to the through hole, and the top
  • the outer circumference of the tension rod 24 is provided with a thread matching the top nut 25, the end of the top rod 24 sequentially passes through the screw hole of the top nut 25, and the through hole will fix the fixed panel 100 is pressed against the second jaw 22.
  • the pressing rod 24 is fixed at a position between the first clamping plate 21 and the second clamping plate 22 with a pressing plate.
  • the pressing plate By setting the pressing plate in order to increase the contact area between the top bar 24 and the fixed panel 100, the tightening force is increased.
  • the first plate 21 and the second plate 22 are both made of a steel plate of 230*130*10, and the connecting plate 23 is made of a steel plate of 230*60*10.
  • the pulley assembly 3 further includes a second pulley 34.
  • the lower end of the first pulley bracket 31 is provided with a first hook 35, and the second pulley 34 is passed through a second pulley.
  • the bracket 36 is fixed, the second pulley 34 is rotatable relative to the second pulley bracket 36 about its own axis, and the second pulley bracket 36 is provided with a second hook 37 for fixing the hanger 200,
  • One end of the pull cord 33 sequentially passes around the first pulley 32, and the second pulley 34 is connected to the first hook 35.
  • the first pulley bracket 31 includes a first bracket plate 311 fixedly connected to the cross bar 13 , and a side of the first bracket plate 311 away from the cross bar 13 is disposed parallel to the first bracket plate 311 .
  • the second bracket plate 312 is disposed between the first bracket plate 311 and the second bracket plate 312.
  • the first pulley 32 is rotatable by the first rotating shaft 314.
  • the two sides of the first rotating shaft 314 are respectively fixedly connected to the two first pulley supporting plates 313;
  • the second pulley bracket 36 includes a third bracket plate and a fourth bracket plate parallel to each other, and two second pulley support plates parallel to each other are disposed between the third bracket plate and the fourth bracket plate,
  • the second pulley 34 is rotatably disposed between the two second pulley support plates through a second rotating shaft, and two ends of the second rotating shaft are fixedly connected to the two second pulley supporting plates, respectively.
  • a reinforcing plate 315 is further disposed on the first bracket plate 311.
  • One end of the reinforcing plate 315 is fixedly connected to one end of the first bracket plate 311, and the other end bypasses the cross bar 13 and the first bracket plate.
  • the other end of the 311 is fixedly connected.
  • the drawstring 33 is a hemp rope of ⁇ 16 mm.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Invalid Beds And Related Equipment (AREA)
  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

一种吊运装置,包括支撑杆组件(1)、夹板组件(2)和滑轮组件(3),支撑杆组件(1)包括立杆(11)、套杆(12)和横杆(13),套杆(12)活动套设在立杆(11)的上端,套杆(12)远离立杆(11)的下端的一端与横杆(13)固定连接,且套杆(12)垂直于横杆(13);夹板组件(2)固定在立杆(11)的下端,用于将立杆(11)固定在待安装位置;滑轮组件(3)设置在横杆(13)远离套杆(12)的一端,其包括与横杆(13)固定连接的第一滑轮支架(31)、可转动设置在第一滑轮支架(31)上的第一滑轮(32)以及绕设在第一滑轮(32)上的拉绳(33)。通过在立杆(11)的下端设置夹板组件(2),可以将立杆(11)夹设在待安装位置,便于后期位置调整和重复利用;通过在横杆(13)远离套杆(12)的一端设置滑轮组件(3),可以降低吊件吊运的难度和力度;利用套杆(12)连接横杆(13)和立杆(11),可以使支撑杆组件(1)根据需要在水平面上旋转360°。

Description

一种吊运装置 技术领域
本实用新型涉及吊装设备技术领域,尤其涉及一种吊运装置。
背景技术
船舶建造过程中不论分段组装还是总段大合拢,形成的平对接焊缝一般采用埋弧焊机进行焊接,而这些平对接焊缝普遍存在于位置不高不低的平底分段、舭部分段以及旁板段。目前,由于没有有效的工装工具,吊机用于吊装大物件时不可能频繁配合吊装小物件,因此,施工现场均使用最原始的方法,即人工搬抬埋弧焊机至分段上。现有的埋弧焊机通常重约75kg,至少需要两人才能搬上分段,而且分段焊接作业平台高约4米,作业人员需要通过空间有限的脚手架上下分段搬运焊机,大大增加了搬运的难度和力度,搬运过程中稍不注意就会磕擦碰撞,严重时甚至会出现焊机掉落砸伤人员或摔坏焊机。
实用新型内容
本实用新型的目的在于提供一种吊运装置,其结构简单,可有效的对小物件进行省力的吊运,操作难度和力度小,安全性高。
为达上述目的,本实用新型采用以下技术方案:
提供一种吊运装置,包括:
支撑杆组件,所述支撑杆组件包括立杆、套杆和横杆,所述套杆活动套设在所述立杆的上端,所述套杆远离所述立杆的下端的一端与所述横杆固定连接,且所述套杆垂直于所述横杆;
夹板组件,所述夹板组件固定在所述立杆的下端,用于将所述立杆固定在待安装位置;
滑轮组件,所述滑轮组件设置在所述横杆远离所述套杆的一端,所述滑轮组件包括与所述横杆固定连接的第一滑轮支架、可转动设置在所述第一滑轮支架上的第一滑轮以及绕设在所述第一滑轮上的拉绳,所述拉绳的一端用于操作握持,另一端用于连接吊件。
作为吊运装置的一种优选方案,所述支撑杆组件还包括加强斜撑,所述加强斜撑的一端与所述套杆固定连接,另一端与所述横杆固定连接。
作为吊运装置的一种优选方案,所述加强斜撑的一端与所述套杆的非端部位置连接,所述加强斜撑的另一端与所述横杆的非端部位置连接。
作为吊运装置的一种优选方案,所述加强斜撑与所述横杆之间的夹角为第一夹角,所述加强斜撑与所述套杆之间的夹角为第二夹角。
优选的,所述第一夹角与所述第二夹角相等。
作为吊运装置的一种优选方案,所述夹板组件包括第一夹板、第二夹板、连接板和顶紧杆,所述第一夹板固定在所述立杆的端部,所述第二夹板平行设置在所述第一夹板远离所述立杆的一侧,所述连接板连接所述第一夹板和所述第二夹板,所述顶紧杆螺纹旋接在所述第一夹板上,其端部延伸至所述第一夹板与所述第二夹板之间,用于选择性顶紧位于所述第一夹板和第二夹板之间的待安装位置的固定面板。
作为吊运装置的一种优选方案,所述第一夹板上开设至少一个通孔,在所述第一夹板上固定有顶紧螺母,所述顶紧螺母的螺孔与所述通孔对应,所述顶紧杆的外周设置有与所述顶紧螺母相匹配的螺纹,所述顶紧杆的端部依次穿过所述顶紧螺母的螺孔、所述通孔将所述固定面板压紧在所述第二夹板上。
作为吊运装置的一种优选方案,所述顶紧杆位于所述第一夹板和所述第二夹板之间的端部固定有压紧板。
作为吊运装置的一种优选方案,所述滑轮组件还包括第二滑轮,所述第一滑轮支架的下端设置第一挂钩,所述第二滑轮通过第二滑轮支架固定,所述第二滑轮可绕自身轴线相对于所述第二滑轮支架转动,所述第二滑轮支架上设置用于固定所述吊件的第二挂钩,所述拉绳的一端依次绕过所述第一滑轮、所述第二滑轮与所述第一挂钩连接。
作为吊运装置的一种优选方案,所述第一滑轮支架包括与所述横杆固定连接的第一支架板,所述第一支架板远离所述横杆的一侧设置有与所述第一支架板平行的第二支架板,所述第一支架板与所述第二支架板之间设置相互平行的两个第一滑轮支撑板,所述第一滑轮通过第一转轴可转动设置在两个所述第一滑轮支撑板之间,所述第一转轴的两端分别与两个所述第一滑轮支撑板固定连接;
所述第二滑轮支架包括相互平行的第三支架板和第四支架板,所述第三支架板与所述第四支架板之间设置相互平行的两个第二滑轮支撑板,所述第二滑轮通过第二转轴可转动设置在两个所述第二滑轮支撑板之间,所述第二转轴的两端分别与两个所述第二滑轮支撑板固定连接。
作为吊运装置的一种优选方案,所述第一支架板上还设置加强板,所述加强板的一端与所述第一支架板的一端固定连接,另一端绕过所述横杆与所述第一支架板的另一端固定连接。
本实用新型的有益效果:通过在立杆的下端设置夹板组件,可以将立杆夹设在待安装位置,即立杆可拆卸固定在待安装位置,便于后期位置调整和重复利用;通过在横杆远离套杆的一端设置滑轮组件,利用滑轮原理降低吊件吊运 的难度和力度,使得单人也能操作,省时省力;通过利用套杆连接横杆和立杆,可以使支撑杆组件根据需要在水平面上旋转360°,满足各个角度位置的吊运需求。
附图说明
图1为本实用新型实施例所述的吊运装置的结构示意图。
图2为图1的A向局部示意图。
图3为图1的B-B剖视示意图。
图4为本实用新型实施例所述的吊运装置的俯视示意图。
图5为本实用新型实施例所述的吊运装置的使用状态示意图。
图中:
1、支撑杆组件;11、立杆;12、套杆;13、横杆;14、加强斜撑;
2、夹板组件;21、第一夹板;22、第二夹板;23、连接板;24、顶紧杆;25、顶紧螺母;
3、滑轮组件;31、第一滑轮支架;311、第一支架板;312、第二支架板;313、第一滑轮支撑板;314、第一转轴;315、加强板;32、第一滑轮;33、拉绳;34、第二滑轮;35、第一挂钩;36、第二滑轮支架;37、第二挂钩;
100、固定面板;200、吊件。
具体实施方式
下面结合附图并通过具体实施方式来进一步说明本实用新型的技术方案。
如图1至5所示,本实用新型实施例提供一种吊运装置,包括支撑杆组件1、夹板组件2以及滑轮组件3,其中,所述支撑杆组件1包括立杆11、套杆12和 横杆13,所述套杆12活动套设在所述立杆11的上端,所述套杆12远离所述立杆11的下端的一端与所述横杆13固定连接,且所述套杆12垂直于所述横杆13;所述夹板组件2固定在所述立杆11的下端,用于将所述立杆11固定在待安装位置;所述滑轮组件3设置在所述横杆13远离所述套杆12的一端,所述滑轮组件3包括与所述横杆13固定连接的第一滑轮支架31、可转动设置在所述第一滑轮支架31上的第一滑轮32以及绕设在所述第一滑轮32上的拉绳33,所述拉绳33的一端用于操作握持,另一端用于连接吊件200。通过在立杆11的下端设置夹板组件2,可以将立杆11夹设在待安装位置,即立杆11可拆卸固定在待安装位置,便于后期位置调整和重复利用;通过在横杆13远离套杆12的一端设置滑轮组件3,利用滑轮原理降低吊件吊运的难度和力度,使得单人也能操作,省时省力;通过利用套杆12连接横杆13和立杆11,可以使支撑杆组件1根据需要在水平面上旋转360°,满足各个角度位置的吊运需求。
在本实用新型的一个优选的实施例中,所述支撑杆组件1还包括加强斜撑14,所述加强斜撑14的一端与所述套杆12固定连接,另一端与所述横杆13固定连接。
具体的,所述加强斜撑14的一端与所述套杆12的非端部位置连接,所述加强斜撑14的另一端与所述横杆13的非端部位置连接
所述加强斜撑14与所述横杆13之间的夹角为第一夹角,所述加强斜撑14与所述套杆12之间的夹角为第二夹角。
在本实施例中,所述第一夹角与所述第二夹角相等,两者均为45°,横杆13和套杆12均采用Φ48*3mm的无缝钢管,横杆13的长度不小于1000mm,套杆12的长度不小于500mm,加强斜撑14采用30*30*3mm的角钢,立杆11采用Φ38*3mm的无缝钢管,其高度为1100mm。
在其他实施例中,所述第一夹角还可以为10°~60°中的任意角度,第二夹角等于90°与第一夹角的角度之差。
在本实用新型的另一个优选的实施例中,所述夹板组件2包括第一夹板21、第二夹板22、连接板23和顶紧杆24,所述第一夹板21固定在所述立杆11的端部,所述第二夹板22平行设置在所述第一夹板21远离所述立杆11的一侧,所述连接板23连接所述第一夹板21和所述第二夹板22,所述顶紧杆24螺纹旋接在所述第一夹板21上,其端部延伸至所述第一夹板21与所述第二夹板22之间,用于选择性顶紧位于所述第一夹板21和第二夹板22之间的待安装位置的固定面板100。
固定面板100是指分段面板、平台面板或者任意待安装位置可以被夹紧的固定设置的板材结构,当然,为了保证吊运的安全,待安装位置的固定面板100的强度要足够,即厚度和可承受的力度要大,以承担整个吊运装置和被吊运的吊件200不变形为前提。
具体的,所述第一夹板21上开设至少一个通孔,在所述第一夹板21上固定有顶紧螺母25,所述顶紧螺母25的螺孔与所述通孔对应,所述顶紧杆24的外周设置有与所述顶紧螺母25相匹配的螺纹,所述顶紧杆24的端部依次穿过所述顶紧螺母25的螺孔、所述通孔将所述固定面板100压紧在所述第二夹板22上。
优选的,所述顶紧杆24位于所述第一夹板21和所述第二夹板22之间的端部固定有压紧板。通过设置压紧板是为了增加顶紧杆24与固定面板100之间的接触面积,增加顶紧作用力。
在本实施例中,第一夹板21和第二夹板22均采用230*130*10的钢板制成,而连接板23采用230*60*10的钢板制成。
在本实用新型的再一个优选的实施例中,所述滑轮组件3还包括第二滑轮34,所述第一滑轮支架31的下端设置第一挂钩35,所述第二滑轮34通过第二滑轮支架36固定,所述第二滑轮34可绕自身轴线相对于所述第二滑轮支架36转动,所述第二滑轮支架36上设置用于固定所述吊件200的第二挂钩37,所述拉绳33的一端依次绕过所述第一滑轮32、所述第二滑轮34与所述第一挂钩35连接。
所述第一滑轮支架31包括与所述横杆13固定连接的第一支架板311,所述第一支架板311远离所述横杆13的一侧设置有与所述第一支架板311平行的第二支架板312,所述第一支架板311与所述第二支架板312之间设置相互平行的两个第一滑轮支撑板313,所述第一滑轮32通过第一转轴314可转动设置在两个所述第一滑轮支撑板313之间,所述第一转轴314的两端分别与两个所述第一滑轮支撑板313固定连接;
所述第二滑轮支架36包括相互平行的第三支架板和第四支架板,所述第三支架板与所述第四支架板之间设置相互平行的两个第二滑轮支撑板,所述第二滑轮34通过第二转轴可转动设置在两个所述第二滑轮支撑板之间,所述第二转轴的两端分别与两个所述第二滑轮支撑板固定连接。
所述第一支架板311上还设置加强板315,所述加强板315的一端与所述第一支架板311的一端固定连接,另一端绕过所述横杆13与所述第一支架板311的另一端固定连接。
在本实施例中,拉绳33采用Φ16mm的麻绳。
于本实用新型的描述中,需要理解的是,术语“第一”、“第二”、“第三”、“第四”,仅仅用于在描述上加以区分,并没有特殊的含义。
需要声明的是,上述具体实施方式仅仅为本实用新型的较佳实施例及所运 用技术原理,在本实用新型所公开的技术范围内,任何熟悉本技术领域的技术人员所容易想到的变化或替换,都应涵盖在本实用新型的保护范围内。

Claims (10)

  1. 一种吊运装置,其特征在于,包括:
    支撑杆组件,所述支撑杆组件包括立杆、套杆和横杆,所述套杆活动套设在所述立杆的上端,所述套杆远离所述立杆的下端的一端与所述横杆固定连接,且所述套杆垂直于所述横杆;
    夹板组件,所述夹板组件固定在所述立杆的下端,用于将所述立杆固定在待安装位置;
    滑轮组件,所述滑轮组件设置在所述横杆远离所述套杆的一端,所述滑轮组件包括与所述横杆固定连接的第一滑轮支架、可转动设置在所述第一滑轮支架上的第一滑轮以及绕设在所述第一滑轮上的拉绳,所述拉绳的一端用于操作握持,另一端用于连接吊件。
  2. 根据权利要求1所述的吊运装置,其特征在于,所述支撑杆组件还包括加强斜撑,所述加强斜撑的一端与所述套杆固定连接,另一端与所述横杆固定连接。
  3. 根据权利要求2所述的吊运装置,其特征在于,所述加强斜撑的一端与所述套杆的非端部位置连接,另一端与所述横杆的非端部位置连接。
  4. 根据权利要求3所述的吊运装置,其特征在于,所述加强斜撑与所述横杆之间的夹角为第一夹角,所述加强斜撑与所述套杆之间的夹角为第二夹角。
  5. 根据权利要求1至4任一项所述的吊运装置,其特征在于,所述夹板组件包括第一夹板、第二夹板、连接板和顶紧杆,所述第一夹板固定在所述立杆的端部,所述第二夹板平行设置在所述第一夹板远离所述立杆的一侧,所述连接板连接所述第一夹板和所述第二夹板,所述顶紧杆螺纹旋接在所述第一夹板上,其端部延伸至所述第一夹板与所述第二夹板之间,用于选择性顶紧位于所述第一夹板和第二夹板之间的待安装位置的固定面板。
  6. 根据权利要求5所述的吊运装置,其特征在于,所述第一夹板上开设至少一个通孔,在所述第一夹板上固定有顶紧螺母,所述顶紧螺母的螺孔与所述通孔对应,所述顶紧杆的外周设置有与所述顶紧螺母相匹配的螺纹,所述顶紧杆的端部依次穿过所述顶紧螺母的螺孔、所述通孔将所述固定面板压紧在所述第二夹板上。
  7. 根据权利要求6所述的吊运装置,其特征在于,所述顶紧杆位于所述第一夹板和所述第二夹板之间的端部固定有压紧板。
  8. 根据权利要求1至4任一项所述的吊运装置,其特征在于,所述滑轮组件还包括第二滑轮,所述第一滑轮支架的下端设置第一挂钩,所述第二滑轮通过第二滑轮支架固定,所述第二滑轮可绕自身轴线相对于所述第二滑轮支架转动,所述第二滑轮支架上设置用于固定所述吊件的第二挂钩,所述拉绳的一端依次绕过所述第一滑轮、所述第二滑轮与所述第一挂钩连接。
  9. 根据权利要求8所述的吊运装置,其特征在于,所述第一滑轮支架包括与所述横杆固定连接的第一支架板,所述第一支架板远离所述横杆的一侧设置有与所述第一支架板平行的第二支架板,所述第一支架板与所述第二支架板之间设置相互平行的两个第一滑轮支撑板,所述第一滑轮通过第一转轴可转动设置在两个所述第一滑轮支撑板之间,所述第一转轴的两端分别与两个所述第一滑轮支撑板固定连接;
    所述第二滑轮支架包括相互平行的第三支架板和第四支架板,所述第三支架板与所述第四支架板之间设置相互平行的两个第二滑轮支撑板,所述第二滑轮通过第二转轴可转动设置在两个所述第二滑轮支撑板之间,所述第二转轴的两端分别与两个所述第二滑轮支撑板固定连接。
  10. 根据权利要求9所述的吊运装置,其特征在于,所述第一支架板上还设 置加强板,所述加强板的一端与所述第一支架板的一端固定连接,另一端绕过所述横杆与所述第一支架板的另一端固定连接。
PCT/CN2017/114094 2017-07-28 2017-11-30 一种吊运装置 WO2019019510A1 (zh)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201720938063.0U CN206970087U (zh) 2017-07-28 2017-07-28 一种吊运装置
CN201720938063.0 2017-07-28

Publications (1)

Publication Number Publication Date
WO2019019510A1 true WO2019019510A1 (zh) 2019-01-31

Family

ID=61398165

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2017/114094 WO2019019510A1 (zh) 2017-07-28 2017-11-30 一种吊运装置

Country Status (2)

Country Link
CN (1) CN206970087U (zh)
WO (1) WO2019019510A1 (zh)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108946540B (zh) * 2018-08-02 2021-09-24 广西南宁巨缘合工程机械有限公司 一种便于拆卸且具有缓冲结构的起重机滑轮组

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4240614A (en) * 1979-02-02 1980-12-23 Caterpillar Tractor Co. Sheave block and seal assembly therefor
CN2224832Y (zh) * 1995-01-13 1996-04-17 罗兴科 夹具式轻便提吊机
CN201442819U (zh) * 2009-07-22 2010-04-28 泰安泰山工程机械股份有限公司 一种焊接式滑轮组框架
CN201781203U (zh) * 2010-08-30 2011-03-30 荥阳市电业局 刀闸检修起吊装置
CN201877722U (zh) * 2010-10-25 2011-06-22 河北省电力公司超高压输变电分公司 应用于高压工作中的高空作业装置
CN203346000U (zh) * 2013-06-04 2013-12-18 浙江海洋学院 货舱物件提拉装置
CN203865929U (zh) * 2014-05-08 2014-10-08 王秀杰 一种便携式起重机
CN105398990A (zh) * 2015-12-14 2016-03-16 安徽理工大学 电力角钢塔用辅助提升装置
CN205222565U (zh) * 2015-11-15 2016-05-11 重庆南瑞博瑞变压器有限公司 一种变压器的吊挂装置

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4240614A (en) * 1979-02-02 1980-12-23 Caterpillar Tractor Co. Sheave block and seal assembly therefor
CN2224832Y (zh) * 1995-01-13 1996-04-17 罗兴科 夹具式轻便提吊机
CN201442819U (zh) * 2009-07-22 2010-04-28 泰安泰山工程机械股份有限公司 一种焊接式滑轮组框架
CN201781203U (zh) * 2010-08-30 2011-03-30 荥阳市电业局 刀闸检修起吊装置
CN201877722U (zh) * 2010-10-25 2011-06-22 河北省电力公司超高压输变电分公司 应用于高压工作中的高空作业装置
CN203346000U (zh) * 2013-06-04 2013-12-18 浙江海洋学院 货舱物件提拉装置
CN203865929U (zh) * 2014-05-08 2014-10-08 王秀杰 一种便携式起重机
CN205222565U (zh) * 2015-11-15 2016-05-11 重庆南瑞博瑞变压器有限公司 一种变压器的吊挂装置
CN105398990A (zh) * 2015-12-14 2016-03-16 安徽理工大学 电力角钢塔用辅助提升装置

Also Published As

Publication number Publication date
CN206970087U (zh) 2018-02-06

Similar Documents

Publication Publication Date Title
CN110329903B (zh) 可切换夹具的五金管件龙门吊车
CN203247012U (zh) 复合绝缘子吊装夹具
CN205653032U (zh) 一种异形钢板垂直吊装装置
WO2019019510A1 (zh) 一种吊运装置
WO2022111218A1 (zh) 一种护筒起吊扁担
CN117208735B (zh) 一种钢结构件吊装用装置
CN210413312U (zh) 一种新型悬吊管道焊接对接装置
CN216807824U (zh) 一种水利工程用管道移动装置
CN214141304U (zh) 一种铝管清洗线用吊装机构
CN213356726U (zh) 一种管屏吊装起重机
CN210505261U (zh) 一种铝锻件吊装安全夹具
CN205348817U (zh) 一种安全带挂件
CN209721363U (zh) 一种管道吊装辅助装置
CN211466419U (zh) 一种钢轨式吊架式搬运机械手
CN210176369U (zh) 管道操作移动平台
CN206985507U (zh) 一种混凝土管吊具
CN208166366U (zh) 一种用于大型板块垂直运送的装置
CN206599801U (zh) 外墙防水卷材施工操作平台
CN107738977A (zh) 冶金用组合吊运装置
CN208054770U (zh) 一种轻型重心可调吊装平衡梁装置
CN213597904U (zh) 液压驱动软管吊
CN206447497U (zh) 一种轻型钢桁架吊装工具
CN112027932A (zh) 一种修理铝电解打壳气缸的工装及其操作方法
CN212101608U (zh) 一种钢结构吊装防护装置
CN213894891U (zh) 风电塔筒吊装夹具

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 17919081

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 17919081