WO2014067924A1 - Method for connecting prefabricated concrete elements - Google Patents

Method for connecting prefabricated concrete elements Download PDF

Info

Publication number
WO2014067924A1
WO2014067924A1 PCT/EP2013/072568 EP2013072568W WO2014067924A1 WO 2014067924 A1 WO2014067924 A1 WO 2014067924A1 EP 2013072568 W EP2013072568 W EP 2013072568W WO 2014067924 A1 WO2014067924 A1 WO 2014067924A1
Authority
WO
WIPO (PCT)
Prior art keywords
concrete
precast concrete
precast
screw
elements
Prior art date
Application number
PCT/EP2013/072568
Other languages
German (de)
French (fr)
Inventor
Anke WILDERMUTH
Oliver Bahr
Original Assignee
Hilti Aktiengesellschaft
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hilti Aktiengesellschaft filed Critical Hilti Aktiengesellschaft
Publication of WO2014067924A1 publication Critical patent/WO2014067924A1/en

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16BDEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
    • F16B25/00Screws that cut thread in the body into which they are screwed, e.g. wood screws
    • F16B25/001Screws that cut thread in the body into which they are screwed, e.g. wood screws characterised by the material of the body into which the screw is screwed
    • F16B25/0026Screws that cut thread in the body into which they are screwed, e.g. wood screws characterised by the material of the body into which the screw is screwed the material being a hard non-organic material, e.g. stone, concrete or drywall
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/02Structures consisting primarily of load-supporting, block-shaped, or slab-shaped elements
    • E04B1/04Structures consisting primarily of load-supporting, block-shaped, or slab-shaped elements the elements consisting of concrete, e.g. reinforced concrete, or other stone-like material
    • E04B1/043Connections specially adapted therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/20Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
    • E04B1/21Connections specially adapted therefor
    • E04B1/215Connections specially adapted therefor comprising metallic plates or parts
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16BDEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
    • F16B13/00Dowels or other devices fastened in walls or the like by inserting them in holes made therein for that purpose
    • F16B13/14Non-metallic plugs or sleeves; Use of liquid, loose solid or kneadable material therefor
    • F16B13/141Fixing plugs in holes by the use of settable material
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16BDEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
    • F16B5/00Joining sheets or plates, e.g. panels, to one another or to strips or bars parallel to them
    • F16B5/0004Joining sheets, plates or panels in abutting relationship

Definitions

  • the present invention relates to a method for joining precast concrete elements according to the preamble of claim 1 and a precast concrete element according to the preamble of claim 14.
  • Prefabricated elements in particular precast concrete elements, are used in the manufacture of buildings.
  • the concrete precast elements are generally manufactured in a precast concrete factory and delivered by truck to the construction site. For the production of the building, it is necessary to connect the precast concrete elements together in order to transfer forces from one precast concrete element to another precast concrete element in the building.
  • the precast concrete elements form, for example, a wall, a ceiling or a staircase of the building.
  • the precast concrete elements can also be used in combination with in-situ concrete in the manufacture of the building, d. H. the precast elements are also to be combined with in situ concrete.
  • the precast concrete elements produced in the precast concrete factory are fitted with inserts.
  • the inserts are concreted in concreting or making the precast concrete elements in the precast concrete factory so that one part of the insert has an externally accessible outer surface and another part of the insert contacts the concrete and thereby an inner contact surface of the insert forms on the concrete or the concrete component of the precast concrete element.
  • the outer surfaces of the inserts made of metal are connected to each other at different precast concrete elements. For this purpose, different methods are known.
  • the outer surfaces of the inserts at the different precast concrete elements are formed in the region of a joint between the two different precast concrete elements and after the positioning of the precast concrete elements, this joint is mortared or concreted to secure composite. It is also known to form loops on the outer surfaces of the inserts and then pass rebars through the loops on different precast concrete elements and then mortar to secure the joint with the loops or verbeton Schl to verbeton Schl.
  • Such a connection of precast concrete elements is relatively complicated and costly in the manufacture or construction of the building.
  • the outer surfaces of the inserts on the precast concrete elements to be joined together can also be welded together at the construction site after the corresponding orientation of the different precast concrete elements in their final position.
  • welding on construction sites is sometimes not permitted and a correspondingly great effort is required for the production of the welded joint.
  • a welded joint poses a risk of corrosion and in the case of inserts Stainless steel, where appropriate, a particularly complicated production of the welded joint by means of a complex autogenous welding is required.
  • welding on construction sites means a special constructional hazard, since additional fire protection is required on the construction site.
  • the object of the present invention is therefore to provide a method for joining precast concrete elements and a precast concrete element, can be easily connected to the precast concrete elements with little technical effort and reliably together on a construction site.
  • This object is achieved with a method for joining precast concrete elements for buildings with the step: joining two precast concrete elements by connecting the two precast concrete elements with at least one screw, wherein the method is characterized in that the two precast concrete elements with at least one concrete screw together be connected and the concrete screw is disposed within the concrete component of at least one of the two concrete precast elements to be joined together, preferably disposed within the concrete components of the two precast concrete elements to be joined together.
  • the two precast concrete elements can be connected to the construction site particularly easy with the concrete screw directly.
  • the at least one concrete screw is preferably arranged within the two concrete precast elements to be joined together within the concrete component. In this case, the concrete screw is in direct connection with the concrete component or even to that effect in direct connection with the concrete component by a filler is or is disposed between the concrete screw and the concrete component of the precast concrete element.
  • each first has a recess in the respective one Concrete component formed and then introduced into the two recesses, the concrete screw.
  • the recesses are required in order to arrange the concrete screw within the respective concrete component.
  • at least the second recess has an arbitrary cross-sectional area, preferably the recess is circular in cross-section, but may also be triangular or rectangular, in particular square.
  • the concrete screw is self-tapping in concrete, but not self-drilling, so that a recess in both precast concrete elements is required.
  • one of the recesses during concreting of the precast concrete element in particular by inserting a hollow body and removing the hollow body after hardening of the concrete component is formed.
  • the precast concrete element is produced in a precast concrete factory and then transported to the site and there the two precast concrete elements are connected together. The insertion of the hollow body thus takes place in the precast concrete element in the precast concrete factory and the removal of the hollow body takes place either already in the precast concrete factory or on the construction site.
  • one of the recesses is formed with a drilling tool after concreting and hardening of the precast concrete element, in particular on the construction site.
  • the recess can be incorporated with a drilling tool in the concrete and the incorporation of the recess is preferably carried out after the hardening of the concrete or on the construction site, in particular after aligning the two precast concrete elements to be joined together.
  • the second recess in the second precast concrete element when concreting the second precast concrete element before hardening of the second Prefabricated concrete element is created and that the first recess in the first precast concrete element is created by drilling after concreting and after hardening of the first precast concrete element.
  • the first recess can be created by drilling through the second recess, that is to say that a drilling tool is drilled through the second recess into the first precast concrete element. This is advantageous in terms of tolerance compensation.
  • the concrete screw when inserted into the first recess with a thread cuts into the surrounding concrete component.
  • the concrete screw is screwed when inserted into the first recess in the concrete on the first precast concrete element with a thread on the concrete screw in the concrete component and thereby secured.
  • a first recess is formed and in the first precast concrete element with the first recess, the thread is screwed to the concrete screw and thereby the concrete screw positively connected to the concrete component of the precast concrete element.
  • an annular space between the concrete screw and the second precast concrete element is filled with a filler and then the filler is hardened.
  • the concrete screw in the second recess is attached to the second precast concrete element with a filler by the filling material is introduced between the concrete screw and the second precast concrete element on the at least one second recess and then the filling material, for.
  • a mineral mortar or a Kunststoffvergussmasse is hardened.
  • the diameter of the recess is greater than the diameter or outer diameter of the thread of the concrete screw, so that around the concrete screw around an annulus is given, which is filled with the filler is filled.
  • the first recess is formed on the first precast concrete element with a smaller diameter than the outer diameter of the thread of the concrete screw and the second recess on the second precast concrete element with a larger or substantially equal diameter formed as the outer diameter of the thread.
  • the screw is first passed through the second recess and then into the first recess, wherein when performing the concrete screw through the second recess preferably no screwing of the thread is done.
  • the concrete screw is screwed into the two concrete components and thereby secured.
  • the concrete screw is thus screwed to the first and second recess on the first and second precast concrete element element with the thread in the concrete component of the first and second precast concrete element.
  • the first and second recess on the first and second precast concrete element is formed with a smaller diameter than the outer diameter of the thread of the concrete screw.
  • the concrete screw is positively connected to the thread both at the first and second recess of the first and second precast concrete element with the concrete of the precast concrete element, so that the diameter of the first and second recess is smaller than the outer diameter of the thread of the concrete screw.
  • a screw head of the concrete screw is placed on the second precast concrete element and thereby positively connected the concrete screw with the second precast concrete element.
  • the second recess on the second precast concrete element element with a smaller diameter formed as the diameter of the at least one screw head of the concrete screw.
  • the two precast concrete elements are connected to each other with at least two, five or ten concrete screws.
  • the concrete screw extends substantially perpendicular to a fictitious plane spanned by the two precast concrete elements, and / or the concrete screw extends at a double fold of the two precast concrete elements.
  • each of the two precast concrete elements in the direction of the fictitious plane to a much larger extent than perpendicular to the fictitious plane.
  • the precast concrete element is formed as a wall and the fictitious plane is thus formed at the intended vertical orientation of the wall within the wall and vertically.
  • Substantially perpendicular to this means that a longitudinal axis of the concrete screw is aligned with a deviation of less than 20 °, 10 °, 5 ° or 3 ° perpendicular to the fictitious plane.
  • the concrete screw extends at an acute angle to a plane defined by the two precast concrete elements fictitious plane.
  • the concrete screw is directly connected to the concrete component of at least one of the two precast concrete elements, so that no intermediate connection part is arranged on the concrete screw for connection and / or the two precast concrete elements are provided as a wall or ceiling of a building.
  • the other precast concrete element is connected via the hardened filling material with the concrete screw.
  • the concrete screw is arranged within the two concrete precast elements and connected to the two precast concrete elements, so that no intermediate connection part, in particular of metal, is required.
  • the two precast concrete elements would be connected to each other by means of the additional intermediate connection part and the concrete screw would also be connected to the interconnecting part. However, this is not required in the present invention.
  • At least one precast concrete element is connected to cast-in-situ concrete, in particular an in-situ concrete wall or a Ortbetondecke by at least one concrete screw is connected to the at least one precast concrete element and thereby a part of the at least one concrete screw outside the at least one precast concrete element is arranged and preferably then the at least a portion of the at least one concrete screw outside the at least one precast concrete element is embedded in the in-situ concrete and the in-situ concrete hardens.
  • At least one precast concrete element to in-situ concrete, in particular an in-situ concrete wall or an in-situ concrete pavement, by providing a recess in the in-situ concrete, and then screwing the concrete screw through the precast concrete element into the recess.
  • Fig. 1 shows a cross section of two interconnected
  • Fig. 2 is a cross-section of two interconnected
  • Precast concrete elements in a second embodiment a first embodiment of two interconnected precast concrete elements 1 is shown.
  • the two illustrated in Fig. 1 precast concrete elements 1 are as a left in Fig. 1 shown first precast concrete element 1, 2 and a right in Fig. 1 illustrated second precast concrete element 1, 3 is formed.
  • the two precast concrete elements 1 each have a concrete component 5 of concrete 5 or reinforced concrete 5 or reinforced concrete 5.
  • the two concrete precast elements 1 shown in FIG. 1 form a wall 4 of a building with a significantly greater extent in the direction from left to right than from top to bottom in FIG. 1.
  • the two precast concrete elements 1 were produced in a precast concrete factory and transported by truck to the building site for the building. To connect the two precast concrete elements 1 they are brought to the construction site in the orientation shown in Fig. 1 to each other, in which the two precast concrete elements 1 overlap at a double fold. At the double fold can be formed between the precast concrete elements 1 a joint 6. At the fold of the second concrete precast element 3, two recesses 7 formed as second recesses 9 are provided, which are preferably perpendicular to a notional plane 15 of the two precast concrete elements 1, 3 and have a diameter 02. These second recesses 9 are preferably ex-works, i. they are preferably produced during casting of the second precast concrete element 3.
  • first recesses 7 designed as first recesses 8 are incorporated in the first precast concrete element 1, which are aligned with the second recesses 9.
  • an unillustrated drilling tool is passed through the second recesses 9 in the second precast concrete element 3 and drilled into the first precast concrete element 1.
  • the Both first recesses 8 in the first precast concrete element 2 have a diameter di which is smaller than the diameter 02.
  • connection of the two precast concrete elements 1 takes place with concrete screws 10 made of steel.
  • Each concrete screw 10 has a shaft 12 and at a rear end of the shaft 12 a screw head 13.
  • the front portion of the concrete screw 10 is formed with a thread 1 1.
  • the outer diameter of the thread 1 1 is smaller than the diameter d2 of the second recesses 9 and larger than the diameter di of the first recesses 8.
  • the concrete screw 10 can be freely inserted through the second recesses 9 on the second precast concrete element 3 and then the Thread 1 1 are screwed into the first recesses 8 on the first precast concrete element 2 with a screwing tool, not shown.
  • the screw head 13 has a hexagon, so that thereby a torque on the screw head 13 can be applied to the concrete screw 10.
  • the thread 1 1 is positively connected to the concrete component 5 of the first precast concrete element 2 at the first recess 8, since the diameter of the external thread or the thread 1 1 of the concrete screw 10 is greater than the diameter di of the first Recess 8. Further, the diameter of the shank 12 of the concrete screw 10 on the thread 1 1 is smaller than the diameter di of the first recess eighth
  • a hardenable filling material 14, z As a mineral mortar mass introduced. After hardening, the filling material 14 can absorb forces parallel to the wall 4 between the concrete screw 10 and the second precast concrete element 3.
  • a plurality of pairs of concrete screws 10 for connecting the two precast concrete elements 1 may be formed.
  • corresponding recesses 7 are previously formed analogously in the precast concrete elements 1 as described above.
  • a second embodiment of the two interconnected precast concrete elements 1 is shown.
  • the second embodiment differs from the first embodiment essentially in that the recesses 7 for the concrete screw 10 now extend at an angle to the plane 15, and / or that no double fold, but a simple joint between the two precast concrete elements 1 is provided.
  • a cross-sectional larger recess groove 16 is provided in the second embodiment in the extension of the second recess 9 on the second precast concrete element 3 .
  • the recess groove 16 facilitates access to the second recess 9, in particular when drilling the first recess 8.
  • the recess groove 16 forms a stop for the screw head 13.
  • the second recess 9 on the second precast concrete element 3 and the recess groove 16 are preferably not by means of a Drilling tool produced on the site, but again already during the casting of the second precast concrete element 3 in a precast concrete factory.
  • a corresponding hollow body is introduced before concreting in a formwork in the production of the second precast concrete element 3 and after hardening of the concrete, this hollow body is removed in the precast concrete factory or on the construction site again.
  • the first recess 7 in the first precast concrete element 2 can again be a bore, which is preferably produced by drilling a drilling tool through the second recess 8 in the second precast concrete element 3 into the first precast concrete element 2.
  • a concrete screw 10 in the first and second recesses 8, 9 are introduced. Due to the relatively large diameter of the second recess 9, the thread 1 1 of the concrete screw 10 can be pushed through the second recess 9, whereas the thread 1 1 of the concrete screw 10 cuts into the first recess 8.
  • a filling material 14 is introduced into the intermediate space between the shank 12 of the concrete screw 10, which is preferably threadless in the area of the second precast concrete element 3, and the second precast concrete element 3 at the second recess 9.
  • the screw 10 or the second precast concrete element 3 may have a feed channel. Both recesses 8, 9 can subsequently be produced in the hardened concrete, in particular on the construction site.
  • the first and second recesses 8, 9 on the first and second precast concrete element 2, 3 an identical diameter and the diameter of the two recesses 8, 9 is smaller than the outer diameter of the thread 1 1 of the concrete screw 10.
  • the concrete screw 10 can be screwed both to the first precast concrete element 2 on the first recess 8 and to the second precast concrete element 3 on the second recess 9.
  • the process according to the invention for joining precast concrete elements 1 has significant advantages.
  • the two precast concrete elements 1 can be connected to the concrete screws 10 on site very easily.
  • the concrete screws 10 in the first and second recesses 8, 9 introduce and screw with the first precast concrete element 2 and possibly also the second precast concrete element 3.
  • the recesses 7 can be produced particularly easily either in the manufacture of the precast concrete element 1 in a precast concrete factory or are simply incorporated into the concrete component 5 at the construction site by means of a drilling tool.

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention relates to a method for connecting prefabricated concrete elements (1) for buildings with the step of connecting two prefabricated concrete elements (1) by joining the two prefabricated concrete elements (1) with at least one bolt (10), according to which method it is to be possible for the prefabricated concrete elements (1) to be easily and reliably connected to one another at a construction site, with low technical effort. This problem is solved in that the two prefabricated concrete elements (1) are connected to one another with at least one concrete bolt (10) and the at least one concrete bolt (10) is arranged inside the concrete component (5) of the two prefabricated concrete elements (1) to be connected to one another.

Description

Verfahren zum Verbinden von Betonfertigteilelementen  Method for joining precast concrete elements
BESCHREIBUNG DESCRIPTION
Die vorliegende Erfindung betrifft ein Verfahren zum Verbinden von Betonfertigteilelementen gemäß dem Oberbegriff des Anspruches 1 und ein Betonfertigteilelement gemäß dem Oberbegriff des Anspruches 14. Fertigteilelemente, insbesondere Betonfertigteilelemente, werden bei der Herstellung von Gebäuden verwendet. Dabei werden die Betonfertigteilelemente im Allgemeinen in einem Betonfertigteilwerk hergestellt und per LKW zu der Baustelle angeliefert. Zur Herstellung des Gebäudes ist es erforderlich, die Betonfertigteilelemente miteinander zu verbinden, um Kräfte von einem Betonfertigteilelement auf ein anderes Betonfertigteilelement in dem Gebäude übertragen zu können. Die Betonfertigteilelemente bilden dabei beispielsweise eine Wand, eine Decke oder eine Treppe des Gebäudes. Dabei können die Betonfertigteilelemente auch in Kombination mit Ortbeton bei der Herstellung des Gebäudes eingesetzt werden, d. h. die Betonfertigteilelemente sind auch mit Ortbeton zu verbinden. The present invention relates to a method for joining precast concrete elements according to the preamble of claim 1 and a precast concrete element according to the preamble of claim 14. Prefabricated elements, in particular precast concrete elements, are used in the manufacture of buildings. The concrete precast elements are generally manufactured in a precast concrete factory and delivered by truck to the construction site. For the production of the building, it is necessary to connect the precast concrete elements together in order to transfer forces from one precast concrete element to another precast concrete element in the building. The precast concrete elements form, for example, a wall, a ceiling or a staircase of the building. In this case, the precast concrete elements can also be used in combination with in-situ concrete in the manufacture of the building, d. H. the precast elements are also to be combined with in situ concrete.
Die in dem Betonfertigteilwerk hergestellten Betonfertigteilelemente sind mit Einlegeteilen versehen. Die Einlegeteile werden beim Betonieren oder Herstellen der Betonfertigteilelemente in dem Betonfertigteilwerk einbetoniert, so dass ein Teil des Einlegeteils eine von außen zugängliche äußere Oberfläche aufweist und ein anderer Teil des Einlegeteils in Kontakt mit dem Beton steht und dadurch eine innere Kontaktfläche des Einlegeteils an dem Beton bzw. der Betonkomponente des Betonfertigteilelements bildet. Zur Verbindung der Betonfertigteilelemente werden die äußeren Oberflächen der Einlegeteile aus Metall an unterschiedlichen Betonfertigteilelementen miteinander verbunden. Hierfür sind unterschiedliche Verfahren bekannt. The precast concrete elements produced in the precast concrete factory are fitted with inserts. The inserts are concreted in concreting or making the precast concrete elements in the precast concrete factory so that one part of the insert has an externally accessible outer surface and another part of the insert contacts the concrete and thereby an inner contact surface of the insert forms on the concrete or the concrete component of the precast concrete element. To connect the precast concrete elements, the outer surfaces of the inserts made of metal are connected to each other at different precast concrete elements. For this purpose, different methods are known.
Die äußeren Oberflächen der Einlegeteile an den unterschiedlichen Betonfertigteilelementen sind im Bereich einer Fuge zwischen den beiden unterschiedlichen Betonfertigteilelementen ausgebildet und nach der Positionierung der Betonfertigteilelemente wird diese Fuge zur Verbundsicherung vermörtelt oder betoniert. Außerdem ist es bekannt, an den äußeren Oberflächen der Einlegeteile Schlaufen auszubilden und anschließend Bewehrungsstäbe durch die Schlaufen an unterschiedlichen Betonfertigteilelementen hindurchzuführen und anschließend zur Sicherung der Verbundwirkung die Fuge mit den Schlaufen zu vermörteln oder zu verbetonieren. Eine derartige Verbindung von Betonfertigteilelementen ist jedoch relativ aufwendig und kostenintensiv bei der Herstellung oder dem Bau des Gebäudes. The outer surfaces of the inserts at the different precast concrete elements are formed in the region of a joint between the two different precast concrete elements and after the positioning of the precast concrete elements, this joint is mortared or concreted to secure composite. It is also known to form loops on the outer surfaces of the inserts and then pass rebars through the loops on different precast concrete elements and then mortar to secure the joint with the loops or verbetonieren to verbetonieren. However, such a connection of precast concrete elements is relatively complicated and costly in the manufacture or construction of the building.
Ferner ist es bekannt, durch Schraubverbindungen an den äußeren Oberflächen der Einlegeteile zwei Betonfertigteilelemente mittelbar zu verbinden. Die Schrauben können dabei in werkseitig eingelegten Hülsen oder Ankerschienen befestigt sein. Eine derartige Verschraubung ist jedoch relativ aufwendig und baubetrieblich eventuell nicht erwünscht, da für Schraubverbindungen an Einlegeteilen aus Metall zur Herstellung an Gebäuden ein großes Maß an Sauberkeit erforderlich ist. Furthermore, it is known to connect indirectly by screw on the outer surfaces of the inserts two precast concrete elements. The screws can be fastened in factory inserted sleeves or anchor rails. However, such a screw is relatively expensive and construction may not be desirable, since a great deal of cleanliness is required for screw to metal inserts for the manufacture of buildings.
Die äußeren Oberflächen der Einlegeteile an den miteinander zu verbindenden Betonfertigteilelementen können auch auf der Baustelle nach der entsprechenden Ausrichtung der unterschiedlichen Betonfertigteilelemente in ihrer endgültigen Position miteinander verschweißt werden. Ein Schweißen auf Baustellen ist jedoch zum Teil nicht zulässig und es ist ein entsprechend großer Aufwand für die Herstellung der Schweißverbindung erforderlich. Ferner ist zu beachten, dass eine Schweißverbindung eine Korrosionsgefahr darstellt und bei Einlegeteilen aus Edelstahl gegebenenfalls eine besonders aufwendige Herstellung der Schweißverbindung mittels eines aufwendigen Autogenschweißens erforderlich ist. Zusätzlich bedeutet das Schweißen auf Baustellen eine besondere baubetriebliche Gefahr, da hier zusätzlicher Brandschutz auf der Baustelle erforderlich ist. The outer surfaces of the inserts on the precast concrete elements to be joined together can also be welded together at the construction site after the corresponding orientation of the different precast concrete elements in their final position. However, welding on construction sites is sometimes not permitted and a correspondingly great effort is required for the production of the welded joint. Furthermore, it should be noted that a welded joint poses a risk of corrosion and in the case of inserts Stainless steel, where appropriate, a particularly complicated production of the welded joint by means of a complex autogenous welding is required. In addition, welding on construction sites means a special constructional hazard, since additional fire protection is required on the construction site.
Die Aufgabe der vorliegenden Erfindung besteht deshalb darin, ein Verfahren zum Verbinden von Betonfertigteilelementen und ein Betonfertigteil zur Verfügung zu stellen, bei dem Betonfertigteilelemente einfach mit einem geringen technischen Aufwand und zuverlässig miteinander auf einer Baustelle verbunden werden können. The object of the present invention is therefore to provide a method for joining precast concrete elements and a precast concrete element, can be easily connected to the precast concrete elements with little technical effort and reliably together on a construction site.
Diese Aufgabe wird gelöst mit einem Verfahren zum Verbinden von Betonfertigteilelementen für Gebäude mit dem Schritt: Verbinden von zwei Betonfertigteilelementen, indem die beiden Betonfertigteilelemente mit wenigstens einer Schraube miteinander verbunden werden, wobei sich das Verfahren dadurch auszeichnet, dass die beiden Betonfertigteilelemente mit wenigstens einer Betonschraube miteinander verbunden werden und die Betonschraube innerhalb der Betonkomponente zumindest eines der beiden miteinander zu verbindenden Betonfertigteilelemente angeordnet wird, vorzugsweise innerhalb der Betonkomponenten der beiden miteinander zu verbindenden Betonfertigteilelemente angeordnet wird. Die beiden Betonfertigteilelemente können dabei auf der Baustelle besonders einfach mit der Betonschraube unmittelbar miteinander verbunden werden. Die wenigstens eine Betonschraube wird bevorzugt innerhalb der beiden miteinander zu verbindenden Betonfertigteilelemente innerhalb der Betonkomponente angeordnet. Dabei steht die Betonschraube in unmittelbarer Verbindung mit der Betonkomponente oder auch dahingehend in unmittelbarer Verbindung mit der Betonkomponente, indem zwischen der Betonschraube und der Betonkomponente des Betonfertigteilelements ein Füllmaterial angeordnet wird oder ist. This object is achieved with a method for joining precast concrete elements for buildings with the step: joining two precast concrete elements by connecting the two precast concrete elements with at least one screw, wherein the method is characterized in that the two precast concrete elements with at least one concrete screw together be connected and the concrete screw is disposed within the concrete component of at least one of the two concrete precast elements to be joined together, preferably disposed within the concrete components of the two precast concrete elements to be joined together. The two precast concrete elements can be connected to the construction site particularly easy with the concrete screw directly. The at least one concrete screw is preferably arranged within the two concrete precast elements to be joined together within the concrete component. In this case, the concrete screw is in direct connection with the concrete component or even to that effect in direct connection with the concrete component by a filler is or is disposed between the concrete screw and the concrete component of the precast concrete element.
Insbesondere wird in den beiden miteinander zu verbindenden Betonfertigteilelementen zuerst jeweils eine Ausnehmung in der jeweiligen Betonkomponente ausgebildet und anschließend in die beiden Ausnehmungen die Betonschraube eingeführt. Die Ausnehmungen sind erforderlich, um die Betonschraube innerhalb der jeweiligen Betonkomponente anordnen zu können. Dabei weist zumindest die zweite Ausnehmung eine beliebige Querschnittsfläche auf, vorzugsweise ist die Ausnehmung im Querschnitt kreisförmig ausgebildet, kann jedoch auch dreieckig oder rechteckförmig, insbesondere quadratisch ausgebildet sein. Die Betonschraube ist in Beton selbstschneidend, jedoch nicht selbstbohrend, so dass eine Ausnehmung in beiden Betonfertigteilelementen erforderlich ist. In particular, in the two concrete precast elements to be connected to one another, each first has a recess in the respective one Concrete component formed and then introduced into the two recesses, the concrete screw. The recesses are required in order to arrange the concrete screw within the respective concrete component. In this case, at least the second recess has an arbitrary cross-sectional area, preferably the recess is circular in cross-section, but may also be triangular or rectangular, in particular square. The concrete screw is self-tapping in concrete, but not self-drilling, so that a recess in both precast concrete elements is required.
In einer weiteren Ausgestaltung wird eine der Ausnehmungen beim Betonieren des Betonfertigteilelements, insbesondere durch Einlegen eines Hohlkörpers und Entfernen des Hohlkörpers nach dem Erhärten der Betonkomponente, ausgebildet. Das Betonfertigteilelement wird in einem Betonfertigteilwerk hergestellt und anschließend zu der Baustelle transportiert und dort werden die beiden Betonfertigteilelemente miteinander verbunden. Das Einlegen des Hohlkörpers erfolgt somit in dem Betonfertigteilelement in dem Betonfertigteilwerk und das Entfernen des Hohlkörpers erfolgt entweder bereits im Betonfertigteilwerk oder auf der Baustelle. In a further embodiment, one of the recesses during concreting of the precast concrete element, in particular by inserting a hollow body and removing the hollow body after hardening of the concrete component is formed. The precast concrete element is produced in a precast concrete factory and then transported to the site and there the two precast concrete elements are connected together. The insertion of the hollow body thus takes place in the precast concrete element in the precast concrete factory and the removal of the hollow body takes place either already in the precast concrete factory or on the construction site.
Alternativ oder zusätzlich kann vorgesehen sein, dass eine der Ausnehmungen mit einem Bohrwerkzeug nach dem Betonieren und Erhärten des Betonfertigteilelements, insbesondere auf der Baustelle, ausgebildet wird. Die Ausnehmung kann mit einem Bohrwerkzeug in den Beton eingearbeitet werden und das Einarbeiten der Ausnehmung erfolgt vorzugsweise nach dem Erhärten des Betons oder auf der Baustelle, insbesondere nach dem Ausrichten der beiden miteinander zu verbindenden Betonfertigteilelemente zueinander. Alternatively or additionally, it may be provided that one of the recesses is formed with a drilling tool after concreting and hardening of the precast concrete element, in particular on the construction site. The recess can be incorporated with a drilling tool in the concrete and the incorporation of the recess is preferably carried out after the hardening of the concrete or on the construction site, in particular after aligning the two precast concrete elements to be joined together.
Besonders vorteilhaft ist es, dass die zweite Ausnehmung im zweiten Betonfertigteilelement beim Betonieren des zweiten Betonfertigteilelements vor dem Erhärten des zweiten Betonfertigteilelements erstellt wird und dass die erste Ausnehmung im ersten Betonfertigteilelement durch Bohren nach dem Betonieren und nach dem Erhärten des ersten Betonfertigteilelements erstellt wird. Insbesondere kann die erste Ausnehmung dadurch erstellt werden, dass durch die zweite Ausnehmung hindurch gebohrt wird, dass also ein Bohrwerkzeug durch die zweite Ausnehmung hindurch in das erste Betonfertigteilelement eingebohrt wird. Dies im Hinblick auf den Toleranzausgleich vorteilhaft. In einer ergänzenden Ausführungsform ist vorgesehen, dass sich die Betonschraube beim Einführen in die erste Ausnehmung mit einem Gewinde in die umgebende Betonkomponente einschneidet. Somit wird die Betonschraube beim Einführen in die erste Ausnehmung im Beton am ersten Betonfertigteilelement mit einem Gewinde an der Betonschraube in die Betonkomponente eingeschraubt und dadurch befestigt. Am ersten Betonfertigteilelement ist eine erste Ausnehmung ausgebildet und in das erste Betonfertigteilelement mit der ersten Ausnehmung wird das Gewinde an der Betonschraube eingeschraubt und dadurch die Betonschraube formschlüssig mit der Betonkomponente des Betonfertigteilelements verbunden. It is particularly advantageous that the second recess in the second precast concrete element when concreting the second precast concrete element before hardening of the second Prefabricated concrete element is created and that the first recess in the first precast concrete element is created by drilling after concreting and after hardening of the first precast concrete element. In particular, the first recess can be created by drilling through the second recess, that is to say that a drilling tool is drilled through the second recess into the first precast concrete element. This is advantageous in terms of tolerance compensation. In a supplementary embodiment, it is provided that the concrete screw when inserted into the first recess with a thread cuts into the surrounding concrete component. Thus, the concrete screw is screwed when inserted into the first recess in the concrete on the first precast concrete element with a thread on the concrete screw in the concrete component and thereby secured. At the first precast concrete element a first recess is formed and in the first precast concrete element with the first recess, the thread is screwed to the concrete screw and thereby the concrete screw positively connected to the concrete component of the precast concrete element.
Weiterhin ist es bevorzugt, dass ein Ringraum zwischen der Betonschraube und dem zweiten Betonfertigteilelement mit einem Füllmaterial verfüllt wird und anschließend das Füllmaterial erhärtet wird. Vorzugsweise wird also die Betonschraube in der zweiten Ausnehmung am zweiten Betonfertigteilelement mit einem Füllmaterial befestigt, indem zwischen der Betonschraube und dem zweiten Betonfertigteilelement an der wenigstens einen zweiten Ausnehmung das Füllmaterial eingebracht wird und anschließend das Füllmaterial, z. B. eine mineralische Mörtelmasse oder eine Kunststoffvergussmasse, erhärtet wird. An dem zweiten Betonfertigteilelement mit der zweiten Ausnehmung ist der Durchmesser der Ausnehmung größer als der Durchmesser bzw. Außendurchmessers des Gewindes der Betonschraube, so dass um die Betonschraube herum ein Ringraum gegeben ist, der mit dem Füllmaterial verfüllt wird. Hierdurch können Toleranzen und Fertigungsungenauigkeiten kompensiert werden, wobei das erhärtete Füllmaterial zur Übertragung von lateralen Kräften dienen kann. In einer Variante wird die erste Ausnehmung an dem ersten Betonfertigteilelement mit einem kleineren Durchmesser ausgebildet als der Außendurchmessers des Gewindes der Betonschraube und die zweite Ausnehmung an dem zweiten Betonfertigteilelement mit einem größerem oder im Wesentlichen gleichen Durchmesser ausgebildet als der Außendurchmesser des Gewindes. Die Schraube wird zuerst durch die zweite Ausnehmung und anschließend in die erste Ausnehmung geführt, wobei beim Durchführen der Betonschraube durch die zweite Ausnehmung vorzugsweise kein Einschrauben des Gewindes erfolgt. Alternativ wird die Betonschraube in die beiden Betonkomponenten eingeschraubt und dadurch befestigt. Die Betonschraube wird somit an der ersten und zweiten Ausnehmung an dem ersten bzw. zweiten Betonfertigteilelement mit dem Gewinde in die Betonkomponente des ersten bzw. zweiten Betonfertigteilelements eingeschraubt. Dabei wird die erste und zweite Ausnehmung an dem ersten bzw. zweiten Betonfertigteilelement mit einem kleineren Durchmesser ausgebildet als der Außendurchmessers des Gewindes der Betonschraube. Die Betonschraube wird mit dem Gewinde sowohl an der ersten und zweiten Ausnehmung des ersten bzw. zweiten Betonfertigteilelements formschlüssig mit dem Beton des Betonfertigteilelements verbunden, so dass der Durchmesser der ersten und zweiten Ausnehmung kleiner ist als der Außendurchmesser des Gewindes der Betonschraube. Furthermore, it is preferred that an annular space between the concrete screw and the second precast concrete element is filled with a filler and then the filler is hardened. Preferably, therefore, the concrete screw in the second recess is attached to the second precast concrete element with a filler by the filling material is introduced between the concrete screw and the second precast concrete element on the at least one second recess and then the filling material, for. As a mineral mortar or a Kunststoffvergussmasse is hardened. At the second precast concrete element with the second recess, the diameter of the recess is greater than the diameter or outer diameter of the thread of the concrete screw, so that around the concrete screw around an annulus is given, which is filled with the filler is filled. As a result, tolerances and manufacturing inaccuracies can be compensated, wherein the hardened filling material can serve for the transmission of lateral forces. In one variant, the first recess is formed on the first precast concrete element with a smaller diameter than the outer diameter of the thread of the concrete screw and the second recess on the second precast concrete element with a larger or substantially equal diameter formed as the outer diameter of the thread. The screw is first passed through the second recess and then into the first recess, wherein when performing the concrete screw through the second recess preferably no screwing of the thread is done. Alternatively, the concrete screw is screwed into the two concrete components and thereby secured. The concrete screw is thus screwed to the first and second recess on the first and second precast concrete element element with the thread in the concrete component of the first and second precast concrete element. In this case, the first and second recess on the first and second precast concrete element is formed with a smaller diameter than the outer diameter of the thread of the concrete screw. The concrete screw is positively connected to the thread both at the first and second recess of the first and second precast concrete element with the concrete of the precast concrete element, so that the diameter of the first and second recess is smaller than the outer diameter of the thread of the concrete screw.
Insbesondere wird ein Schraubenkopf der Betonschraube auf das zweite Betonfertigteilelement aufgelegt und dadurch die Betonschraube mit dem zweiten Betonfertigteilelement formschlüssig verbunden. In particular, a screw head of the concrete screw is placed on the second precast concrete element and thereby positively connected the concrete screw with the second precast concrete element.
In einer weiteren Ausgestaltung wird die zweite Ausnehmung an dem zweiten Betonfertigteilelement mit einem kleineren Durchmesser ausgebildet als der Durchmessers des wenigstens einen Schraubenkopfes der Betonschraube. In a further embodiment, the second recess on the second precast concrete element element with a smaller diameter formed as the diameter of the at least one screw head of the concrete screw.
In einer weiteren Variante werden die beiden Betonfertigteilelemente mit wenigstens zwei, fünf oder zehn Betonschrauben miteinander verbunden. In a further variant, the two precast concrete elements are connected to each other with at least two, five or ten concrete screws.
In einer weiteren Ausgestaltung verläuft die Betonschraube im Wesentlichen senkrecht zu einer von den beiden Betonfertigteilelementen aufgespannten fiktiven Ebene, und/oder verläuft die Betonschraube an einem doppelten Falz der beiden Betonfertigteilelemente. Bevorzugt weist jedes der beiden Betonfertigteilelemente in Richtung der fiktiven Ebene eine wesentlich größere Ausdehnung auf als senkrecht zur fiktiven Ebene. Beispielsweise ist das Betonfertigteilelement als eine Wand ausgebildet und die fiktive Ebene ist somit bei der bestimmungsgemäßen vertikalen Ausrichtung der Wand innerhalb der Wand und vertikal ausgebildet. Im Wesentlichen senkrecht dazu bedeutet dabei, dass eine Längsachse der Betonschraube mit einer Abweichung von weniger als 20°, 10°, 5° oder 3° senkrecht zu der fiktiven Ebene ausgerichtet ist. Alternativ verläuft die Betonschraube in einem spitzen Winkel zu einer von den beiden Betonfertigteilelementen aufgespannten fiktiven Ebene. In a further embodiment, the concrete screw extends substantially perpendicular to a fictitious plane spanned by the two precast concrete elements, and / or the concrete screw extends at a double fold of the two precast concrete elements. Preferably, each of the two precast concrete elements in the direction of the fictitious plane to a much larger extent than perpendicular to the fictitious plane. For example, the precast concrete element is formed as a wall and the fictitious plane is thus formed at the intended vertical orientation of the wall within the wall and vertically. Substantially perpendicular to this means that a longitudinal axis of the concrete screw is aligned with a deviation of less than 20 °, 10 °, 5 ° or 3 ° perpendicular to the fictitious plane. Alternatively, the concrete screw extends at an acute angle to a plane defined by the two precast concrete elements fictitious plane.
Vorzugsweise wird die Betonschraube unmittelbar mit der Betonkomponente zumindest einer der beiden Betonfertigteilelemente verbunden, so dass an der Betonschraube zur Verbindung kein Zwischenverbindungsteil angeordnet ist und/oder die beiden Betonfertigteilelemente werden als eine Wand oder eine Decke eines Gebäudes zur Verfügung gestellt. Vorzugsweise ist das andere Betonfertigteilelement über das erhärtete Füllmaterial mit der Betonschraube verbunden. Die Betonschraube ist dabei innerhalb der beiden Betonfertigteilelemente angeordnet und mit den beiden Betonfertigteilelementen verbunden, so dass kein Zwischenverbindungsteil, insbesondere aus Metall, erforderlich ist. Bei einem Zwischenverbindungsteil wären die beiden Betonfertigteilelemente mittels des zusätzlichen Zwischenverbindungsteiles miteinander verbunden und die Betonschraube wäre auch mit dem Zwischenverbindungsteil verbunden. Dies ist jedoch in der vorliegenden Erfindung nicht erforderlich. Preferably, the concrete screw is directly connected to the concrete component of at least one of the two precast concrete elements, so that no intermediate connection part is arranged on the concrete screw for connection and / or the two precast concrete elements are provided as a wall or ceiling of a building. Preferably, the other precast concrete element is connected via the hardened filling material with the concrete screw. The concrete screw is arranged within the two concrete precast elements and connected to the two precast concrete elements, so that no intermediate connection part, in particular of metal, is required. In an intermediate connection part, the two precast concrete elements would be connected to each other by means of the additional intermediate connection part and the concrete screw would also be connected to the interconnecting part. However, this is not required in the present invention.
In einer weiteren Variante wird wenigstens ein Betonfertigteilelement mit Ortbeton, insbesondere einer Ortbetonwand oder einer Ortbetondecke, verbunden, indem wenigstens eine Betonschraube mit dem wenigstens einen Betonfertigteilelement verbunden wird und dabei ein Teil der wenigstens einen Betonschraube außerhalb des wenigstens einen Betonfertigteilelements angeordnet wird und vorzugsweise anschließend der wenigstens eine Teil der wenigstens einen Betonschraube außerhalb des wenigstens einen Betonfertigteilelements in den Ortbeton einbetoniert wird und der Ortbeton erhärtet. Es kann auch wenigstens ein Betonfertigteilelement mit Ortbeton, insbesondere einer Ortbetonwand oder einer Ortbetondecke, verbunden werden, indem im Ortbeton eine Ausnehmung vorgesehen wird, und anschließend die Betonschraube durch das Betonfertigteilelement in die Ausnehmung eingeschraubt wird. In a further variant, at least one precast concrete element is connected to cast-in-situ concrete, in particular an in-situ concrete wall or a Ortbetondecke by at least one concrete screw is connected to the at least one precast concrete element and thereby a part of the at least one concrete screw outside the at least one precast concrete element is arranged and preferably then the at least a portion of the at least one concrete screw outside the at least one precast concrete element is embedded in the in-situ concrete and the in-situ concrete hardens. It is also possible to connect at least one precast concrete element to in-situ concrete, in particular an in-situ concrete wall or an in-situ concrete pavement, by providing a recess in the in-situ concrete, and then screwing the concrete screw through the precast concrete element into the recess.
Erfindungsgemäßes Betonfertigteilelement für ein Gebäude mit einer Betonkomponente aus Beton oder Stahlbeton bzw. bewehrten Beton, wobei in dem Betonfertigteilelement an der Betonkomponente wenigstens eine Ausnehmung ausgebildet ist zur Einführung und Verbindung mit je einer Betonschraube. According to the invention concrete precast element for a building with a concrete component of concrete or reinforced concrete or reinforced concrete, wherein in the precast concrete element on the concrete component at least one recess is formed for insertion and connection with a concrete screw.
Im Nachfolgenden werden Ausführungsbeispiele der Erfindung unter Bezugnahme auf die beigefügten Zeichnungen näher beschrieben. Es zeigen: Hereinafter, embodiments of the invention will be described in more detail with reference to the accompanying drawings. Show it:
Fig. 1 einen Querschnitt von zwei miteinander verbundenen Fig. 1 shows a cross section of two interconnected
Betonfertigteilelementen in einem ersten Ausführungsbeispiel und  Prefabricated concrete elements in a first embodiment and
Fig. 2 einen Querschnitt von zwei miteinander verbundenen Fig. 2 is a cross-section of two interconnected
Betonfertigteilelementen in einem zweiten Ausführungsbeispiel. In Fig. 1 ist ein erstes Ausführungsbeispiel von zwei miteinander verbundenen Betonfertigteilelementen 1 dargestellt. Die beiden in Fig. 1 darstellten Betonfertigteilelemente 1 sind als ein in Fig. 1 links dargestelltes erstes Betonfertigteilelement 1 , 2 und ein in Fig. 1 rechts dargestelltes zweites Betonfertigteilelement 1 , 3 ausgebildet. Die beiden Betonfertigteilelemente 1 weisen jeweils eine Betonkomponente 5 aus Beton 5 oder Stahlbeton 5 bzw. bewehrtem Beton 5 auf. Die beiden in Fig. 1 dargestellten Betonfertigteilelemente 1 bilden dabei eine Wand 4 eines Gebäudes mit einer wesentlich größeren Ausdehnung in Richtung von links nach rechts als von oben nach unten in Fig. 1. Precast concrete elements in a second embodiment. In Fig. 1, a first embodiment of two interconnected precast concrete elements 1 is shown. The two illustrated in Fig. 1 precast concrete elements 1 are as a left in Fig. 1 shown first precast concrete element 1, 2 and a right in Fig. 1 illustrated second precast concrete element 1, 3 is formed. The two precast concrete elements 1 each have a concrete component 5 of concrete 5 or reinforced concrete 5 or reinforced concrete 5. The two concrete precast elements 1 shown in FIG. 1 form a wall 4 of a building with a significantly greater extent in the direction from left to right than from top to bottom in FIG. 1.
Die beiden Betonfertigteilelemente 1 wurden in einem Betonfertigteilwerk hergestellt und per LKW zu der Baustelle für das Gebäude transportiert. Zur Verbindung der beiden Betonfertigteilelemente 1 werden diese auf der Baustelle in die in Fig. 1 dargestellte Ausrichtung zueinander gebracht, in der sich die beiden Betonfertigteilelemente 1 an einem doppelten Falz überlappen. Am doppelten Falz kann zwischen den Betonfertigteilelementen 1 eine Fuge 6 gebildet sein. Am Falz des zweiten Betonfertigteilelements 3 sind zwei als zweite Ausnehmungen 9 ausgebildete Ausnehmungen 7 vorgesehen, die vorzugsweise senkrecht zu einer fiktiven Ebene 15 der beiden Betonfertigteilelemente 1 , 3 verlaufen und einen Durchmesser 02 aufweisen. Diese zweiten Ausnehmungen 9 sind vorzugsweise ab Werk vorhanden, d.h. sie werden vorzugsweise beim Gießen des zweiten Betonfertigteilelements 3 hergestellt. The two precast concrete elements 1 were produced in a precast concrete factory and transported by truck to the building site for the building. To connect the two precast concrete elements 1 they are brought to the construction site in the orientation shown in Fig. 1 to each other, in which the two precast concrete elements 1 overlap at a double fold. At the double fold can be formed between the precast concrete elements 1 a joint 6. At the fold of the second concrete precast element 3, two recesses 7 formed as second recesses 9 are provided, which are preferably perpendicular to a notional plane 15 of the two precast concrete elements 1, 3 and have a diameter 02. These second recesses 9 are preferably ex-works, i. they are preferably produced during casting of the second precast concrete element 3.
Auf der Baustelle werden im ersten Betonfertigteilelement 1 zwei als erste Ausnehmungen 8 ausgebildete Ausnehmung 7 eingearbeitet, welche mit den zweiten Ausnehmungen 9 fluchten. Zum Zwecke der Erstellung der ersten Ausnehmungen 8 wird ein nicht dargestelltes Bohrwerkzeug durch die zweiten Ausnehmungen 9 im zweiten Betonfertigteilelement 3 hindurchgeführt und in das erste Betonfertigteilelement 1 eingebohrt. Die beiden ersten Ausnehmungen 8 im ersten Betonfertigteilelement 2 weisen einen Durchmesser di auf, der kleiner ist als der Durchmesser 02. At the construction site, two recesses 7 designed as first recesses 8 are incorporated in the first precast concrete element 1, which are aligned with the second recesses 9. For the purpose of creating the first recesses 8, an unillustrated drilling tool is passed through the second recesses 9 in the second precast concrete element 3 and drilled into the first precast concrete element 1. The Both first recesses 8 in the first precast concrete element 2 have a diameter di which is smaller than the diameter 02.
Die Verbindung der beiden Betonfertigteilelemente 1 erfolgt mit Betonschrauben 10 aus Stahl. Jede Betonschraube 10 weist einen Schaft 12 sowie an einem hinteren Ende des Schafts 12 einen Schraubenkopf 13 auf. Der vordere Bereich der Betonschraube 10 ist mit einem Gewinde 1 1 ausgebildet. Dabei ist der Außendurchmesser des Gewindes 1 1 kleiner als der Durchmesser d2 der zweiten Ausnehmungen 9 und größer als der Durchmesser di der ersten Ausnehmungen 8. Dadurch kann die Betonschraube 10 ungehindert durch die zweiten Ausnehmungen 9 an dem zweiten Betonfertigteilelement 3 eingeführt werden und anschließend kann das Gewinde 1 1 in die ersten Ausnehmungen 8 an dem ersten Betonfertigteilelement 2 mit einem nicht dargestellten Schraubwerkzeug eingeschraubt werden. Hierzu weist der Schraubenkopf 13 einen Sechskant auf, so dass dadurch an dem Schraubenkopf 13 ein Drehmoment auf die Betonschraube 10 aufgebracht werden kann. Nach dem vollständigen Einschrauben der Betonschrauben 10 ist das Gewinde 1 1 formschlüssig mit der Betonkomponente 5 des ersten Betonfertigteilelements 2 an der ersten Ausnehmung 8 verbunden, da der Durchmesser des Außengewindes bzw. des Gewindes 1 1 der Betonschraube 10 größer ist als der Durchmesser di der ersten Ausnehmung 8. Ferner ist der Durchmesser des Schaftes 12 der Betonschraube 10 an dem Gewinde 1 1 kleiner als der Durchmesser di der ersten Ausnehmung 8. The connection of the two precast concrete elements 1 takes place with concrete screws 10 made of steel. Each concrete screw 10 has a shaft 12 and at a rear end of the shaft 12 a screw head 13. The front portion of the concrete screw 10 is formed with a thread 1 1. In this case, the outer diameter of the thread 1 1 is smaller than the diameter d2 of the second recesses 9 and larger than the diameter di of the first recesses 8. Thus, the concrete screw 10 can be freely inserted through the second recesses 9 on the second precast concrete element 3 and then the Thread 1 1 are screwed into the first recesses 8 on the first precast concrete element 2 with a screwing tool, not shown. For this purpose, the screw head 13 has a hexagon, so that thereby a torque on the screw head 13 can be applied to the concrete screw 10. After complete screwing in the concrete screws 10, the thread 1 1 is positively connected to the concrete component 5 of the first precast concrete element 2 at the first recess 8, since the diameter of the external thread or the thread 1 1 of the concrete screw 10 is greater than the diameter di of the first Recess 8. Further, the diameter of the shank 12 of the concrete screw 10 on the thread 1 1 is smaller than the diameter di of the first recess eighth
Nach dem vollständigen Einschrauben der Betonschraube 10 und dem Aufliegen des Schraubenkopfes 13 auf der Außenseite des zweiten Betonfertigteilelements 3 wird in einen ringförmigen Zwischenraum zwischen dem Schaft 12 ohne Gewinde 1 1 der Betonschraube 10 und der Betonkomponente 5 des zweiten Betonfertigteilelements 3 an der zweiten Ausnehmung 9 ein erhärtbares Füllmaterial 14, z. B. eine mineralische Mörtelmasse, eingeführt. Nach dem Erhärten kann das Füllmaterial 14 Kräfte parallel zur Wand 4 zwischen der Betonschraube 10 und dem zweiten Betonfertigteilelement 3 aufnehmen. Senkrecht zu der Zeichenebene von Fig. 1 kann eine Vielzahl von Paaren an Betonschrauben 10 zur Verbindung der beiden Betonfertigteilelemente 1 ausgebildet sein. Hierzu werden vorher entsprechende Ausnehmungen 7 in den Betonfertigteilelementen 1 analog ausgebildet wie oben beschrieben. Nach der abschließenden Verbindung der beiden Betonfertigteilelemente 1 durch eine Vielzahl von Betonschrauben 10, z. B. mit vierzig Betonschrauben 10, kann in die Fuge 6 eine Vergussmasse eingebracht werden, welche anschließend erhärtet. Die Betonschrauben 10 müssen aber nicht notwendigerweise in Paaren angeordnet sein. After the complete screwing in the concrete screw 10 and the resting of the screw head 13 on the outside of the second precast concrete element 3 is in an annular space between the shaft 12 without thread 1 1 of the concrete screw 10 and the concrete component 5 of the second precast concrete element 3 at the second recess 9 a hardenable filling material 14, z. As a mineral mortar mass introduced. After hardening, the filling material 14 can absorb forces parallel to the wall 4 between the concrete screw 10 and the second precast concrete element 3. Perpendicular to the plane of the drawing of FIG. 1, a plurality of pairs of concrete screws 10 for connecting the two precast concrete elements 1 may be formed. For this purpose, corresponding recesses 7 are previously formed analogously in the precast concrete elements 1 as described above. After the final connection of the two precast concrete elements 1 by a plurality of concrete screws 10, z. B. with forty concrete screws 10, 6, a grout can be introduced into the joint, which then hardens. However, the concrete screws 10 need not necessarily be arranged in pairs.
In Fig. 2 ist ein zweites Ausführungsbeispiel der zwei miteinander verbundenen Betonfertigteilelemente 1 dargestellt. Das zweite Ausführungsbeispiel unterscheidet sich vom ersten Ausführungsbeispiel im Wesentlichen dadurch, dass die Ausnehmungen 7 für die Betonschraube 10 nun schiefwinklig zur Ebene 15 verlaufen, und/oder dass kein doppelter Falz, sondern ein einfacher Stoß zwischen den beiden Betonfertigteilelementen 1 vorgesehen ist. Ferner ist beim zweiten Ausführungsbeispiel in der Verlängerung der zweiten Ausnehmung 9 am zweiten Betonfertigteilelement 3 eine querschnittsgrößere Aussparungsnut 16 vorgesehen. Die Aussparungsnut 16 erleichtert den Zugang zur zweiten Ausnehmung 9, insbesondere beim Bohren der ersten Ausnehmung 8. Darüber hinaus bildet die Aussparungsnut 16 einen Anschlag für den Schraubenkopf 13. Die zweite Ausnehmung 9 an dem zweiten Betonfertigteilelement 3 sowie die Aussparungsnut 16 werden bevorzugt nicht mittels eines Bohrwerkzeuges auf der Baustelle hergestellt, sondern abermals bereits beim Gießen des zweiten Betonfertigteilelements 3 in einem Betonfertigteilwerk. Hierzu wird in eine Schalung bei der Herstellung des zweiten Betonfertigteilelements 3 ein entsprechender Hohlkörper vor dem Betonieren eingebracht und nach dem Erhärten des Betons wird dieser Hohlkörper im Betonfertigteilwerk oder auf der Baustelle wieder entfernt. Die erste Ausnehmung 7 im ersten Betonfertigteilelement 2 kann abermals eine Bohrung sein, die vorzugsweise dadurch hergestellt wird, dass ein Bohrwerkzeug durch die zweite Ausnehmung 8 im zweiten Betonfertigteilelement 3 hindurch in das erste Betonfertigteilelement 2 gebohrt wird. 2, a second embodiment of the two interconnected precast concrete elements 1 is shown. The second embodiment differs from the first embodiment essentially in that the recesses 7 for the concrete screw 10 now extend at an angle to the plane 15, and / or that no double fold, but a simple joint between the two precast concrete elements 1 is provided. Further, in the second embodiment in the extension of the second recess 9 on the second precast concrete element 3 a cross-sectional larger recess groove 16 is provided. The recess groove 16 facilitates access to the second recess 9, in particular when drilling the first recess 8. In addition, the recess groove 16 forms a stop for the screw head 13. The second recess 9 on the second precast concrete element 3 and the recess groove 16 are preferably not by means of a Drilling tool produced on the site, but again already during the casting of the second precast concrete element 3 in a precast concrete factory. For this purpose, a corresponding hollow body is introduced before concreting in a formwork in the production of the second precast concrete element 3 and after hardening of the concrete, this hollow body is removed in the precast concrete factory or on the construction site again. The first recess 7 in the first precast concrete element 2 can again be a bore, which is preferably produced by drilling a drilling tool through the second recess 8 in the second precast concrete element 3 into the first precast concrete element 2.
Analog wie in dem ersten Ausführungsbeispiel kann eine Betonschraube 10 in die ersten und zweiten Ausnehmungen 8, 9 eingebracht werden. Aufgrund des relativ großen Durchmessers der zweiten Ausnehmung 9 kann das Gewinde 1 1 der Betonschraube 10 durch die zweite Ausnehmung 9 hindurchgeschoben werden, wohingegen sich das Gewinde 1 1 der Betonschraube 10 in die erste Ausnehmung 8 einschneidet. Nach dem Aufliegen des Schraubenkopfes 13 auf das zweite Betonfertigteilelement 3 wird ein Füllmaterial 14 in den Zwischenraum zwischen dem Schaft 12 der Betonschraube 10, der im Bereich des zweiten Betonfertigteilelements 3 vorzugsweise gewindelos ist, und dem zweiten Betonfertigteilelement 3 an der zweiten Ausnehmung 9 eingebracht. Hierzu kann die Schraube 10 oder das zweite Betonfertigteilelement 3 einen Zuführkanal aufweisen. Es können auch beide Ausnehmungen 8, 9 nachträglich im ausgehärteten Beton, insbesondere auf der Baustelle, hergestellt werden. Analogous to the first embodiment, a concrete screw 10 in the first and second recesses 8, 9 are introduced. Due to the relatively large diameter of the second recess 9, the thread 1 1 of the concrete screw 10 can be pushed through the second recess 9, whereas the thread 1 1 of the concrete screw 10 cuts into the first recess 8. After the screw head 13 has rested on the second precast concrete element 3, a filling material 14 is introduced into the intermediate space between the shank 12 of the concrete screw 10, which is preferably threadless in the area of the second precast concrete element 3, and the second precast concrete element 3 at the second recess 9. For this purpose, the screw 10 or the second precast concrete element 3 may have a feed channel. Both recesses 8, 9 can subsequently be produced in the hardened concrete, in particular on the construction site.
In einem weiteren, nicht dargestellten Ausführungsbeispiel weisen die erste und zweite Ausnehmung 8, 9 an dem ersten und zweiten Betonfertigteilelement 2, 3 einen identischen Durchmesser auf und der Durchmesser der beiden Ausnehmungen 8, 9 ist dabei kleiner als der Außendurchmesser des Gewindes 1 1 der Betonschraube 10. Dabei weist die Betonschraube 10 an dem gesamten Schaft 12 beginnend vom vorderen Ende bis zum hinteren Ende an dem Schraubenkopf 13 das Gewinde 1 1 auf. Dadurch kann die Betonschraube 10 sowohl mit dem ersten Betonfertigteilelement 2 an der ersten Ausnehmung 8 verschraubt werden als auch mit dem zweiten Betonfertigteilelement 3 an der zweiten Ausnehmung 9. Insgesamt betrachtet sind mit dem erfindungsgemäßen Verfahren zum Verbinden von Betonfertigteilelementen 1 wesentliche Vorteile verbunden. Die beiden Betonfertigteilelemente 1 können unmittelbar mit den Betonschrauben 10 auf der Baustelle besonders einfach miteinander verbunden werden. Hierzu sind lediglich die Betonschrauben 10 in die ersten und zweiten Ausnehmungen 8, 9 einzuführen und mit dem ersten Betonfertigteilelement 2 und gegebenenfalls auch dem zweiten Betonfertigteilelement 3 zu verschrauben. Die Ausnehmungen 7 können dabei besonders einfach entweder bei der Herstellung des Betonfertigteilelements 1 in einem Betonfertigteilwerk mit hergestellt werden oder werden einfach auf der Baustelle mittels eines Bohrwerkzeuges in die Betonkomponente 5 eingearbeitet. In a further embodiment, not shown, the first and second recesses 8, 9 on the first and second precast concrete element 2, 3 an identical diameter and the diameter of the two recesses 8, 9 is smaller than the outer diameter of the thread 1 1 of the concrete screw 10. The concrete screw 10 on the entire shaft 12, starting from the front end to the rear end of the screw head 13, the thread 1 1 on. As a result, the concrete screw 10 can be screwed both to the first precast concrete element 2 on the first recess 8 and to the second precast concrete element 3 on the second recess 9. Overall, the process according to the invention for joining precast concrete elements 1 has significant advantages. The two precast concrete elements 1 can be connected to the concrete screws 10 on site very easily. For this purpose, only the concrete screws 10 in the first and second recesses 8, 9 introduce and screw with the first precast concrete element 2 and possibly also the second precast concrete element 3. The recesses 7 can be produced particularly easily either in the manufacture of the precast concrete element 1 in a precast concrete factory or are simply incorporated into the concrete component 5 at the construction site by means of a drilling tool.

Claims

ANSPRÜCHE
1. Verfahren zum Verbinden von Betonfertigteilelementen (1 ) für 1. A method for joining precast concrete elements (1) for
Gebäude mit dem Schritt:  Building with the step:
- Verbinden von zwei Betonfertigteilelementen (1 ), indem die beiden Betonfertigteilelemente (1 ) mit wenigstens einer Schraube (10) miteinander verbunden werden, dadurch gekennzeichnet, dass die beiden Betonfertigteilelemente (1 ) mit wenigstens einer  - Connecting two precast concrete elements (1) by the two concrete precast elements (1) with at least one screw (10) are interconnected, characterized in that the two precast concrete elements (1) with at least one
Betonschraube (10) miteinander verbunden werden und die  Concrete screw (10) are interconnected and the
Betonschraube (10) innerhalb der Betonkomponente (5) zumindest eines der beiden miteinander zu verbindenden Betonfertigteilelemente (1 ) angeordnet wird, vorzugsweise innerhalb der Betonkomponenten (5) der beiden miteinander zu verbindenden Betonfertigteilelemente (1 ) angeordnet wird.  Concrete screw (10) within the concrete component (5) at least one of the two concrete precast elements to be joined together (1) is arranged, preferably within the concrete components (5) of the two to be joined together precast concrete elements (1).
2. Verfahren nach Anspruch 1 , dadurch gekennzeichnet, dass in den beiden miteinander zu verbindenden Betonfertigteilelementen (1 ) zuerst jeweils eine Ausnehmung (7) in der jeweiligen 2. The method according to claim 1, characterized in that in the two concrete precast elements to be joined together (1) each first a recess (7) in the respective
Betonkomponente (5) ausgebildet wird und anschließend in die beiden Ausnehmungen (7) die Betonschraube (10) eingeführt wird.  Concrete component (5) is formed and then in the two recesses (7) the concrete screw (10) is inserted.
3. Verfahren nach Anspruch 2, dadurch gekennzeichnet, dass eine der Ausnehmungen (7) beim Betonieren des 3. The method according to claim 2, characterized in that one of the recesses (7) in concreting the
Betonfertigteilelements (1 ), insbesondere durch Einlegen Hohlkörpers und Entfernen des Hohlkörpers nach dem Erhärten der Betonkomponente (5), ausgebildet wird und/oder eine der Precast concrete element (1), in particular by inserting Hollow body and removal of the hollow body after hardening of the concrete component (5), is formed and / or one of
Ausnehmungen (7) mit einem Bohrwerkzeug nach dem Betonieren und Erhärten des Betonfertigteilelements (1), insbesondere auf der Baustelle, ausgebildet wird.  Recesses (7) with a drilling tool after concreting and hardening of the precast concrete element (1), in particular on the construction site, is formed.
4. Verfahren nach einem oder mehreren der vorhergehenden 4. Method according to one or more of the preceding
Ansprüche, dadurch gekennzeichnet, dass sich die Betonschraube (10) beim Einführen in die erste Ausnehmung (7) mit einem Gewinde (11) in die umgebende Betonkomponente (5) einschneidet.  Claims, characterized in that the concrete screw (10) when inserted into the first recess (7) with a thread (11) cuts into the surrounding concrete component (5).
5. Verfahren nach Anspruch 4, dadurch gekennzeichnet, dass ein Ringraum zwischen der Betonschraube (10) und dem zweiten Betonfertigteilelement (1) mit einem Füllmaterial (14) verfüllt wird und anschließend das Füllmaterial (14) erhärtet wird. 5. The method according to claim 4, characterized in that an annular space between the concrete screw (10) and the second precast concrete element (1) with a filling material (14) is filled and then the filler material (14) is hardened.
6. Verfahren nach Anspruch 4 oder 5, dadurch gekennzeichnet, dass die erste Ausnehmung (8) an dem ersten Betonfertigteilelement (2) mit einem kleineren Durchmesser ausgebildet wird als der 6. The method according to claim 4 or 5, characterized in that the first recess (8) on the first precast concrete element (2) is formed with a smaller diameter than that
Außendurchmessers des Gewindes (11) der Betonschraube (10) und die zweite Ausnehmung (9) an dem zweiten Betonfertigteilelement (3) mit einem größerem oder im Wesentlichen gleichen Durchmesser ausgebildet wird als der Außendurchmesser des Gewindes (11). Outer diameter of the thread (11) of the concrete screw (10) and the second recess (9) on the second precast concrete element (3) is formed with a larger or substantially equal diameter than the outer diameter of the thread (11).
7. Verfahren nach einem oder mehreren der vorhergehenden 7. Method according to one or more of the preceding
Ansprüche, dadurch gekennzeichnet, dass ein Schraubenkopf (13) der Betonschraube (10) auf das zweite Betonfertigteilelement (1 ) aufgelegt wird und dadurch die  Claims, characterized in that a screw head (13) of the concrete screw (10) is placed on the second precast concrete element (1) and thereby the
Betonschraube (10) mit dem zweiten Betonfertigteilelement (3) formschlüssig verbunden wird.  Concrete screw (10) with the second precast concrete element (3) is positively connected.
8. Verfahren nach Anspruch 7, dadurch gekennzeichnet, dass die zweite Ausnehmung (7) an dem zweiten Betonfertigteilelement (1 ) mit einem kleineren Durchmesser ausgebildet wird als der 8. The method according to claim 7, characterized in that the second recess (7) on the second precast concrete element (1) is formed with a smaller diameter than that
Durchmessers des wenigstens einen Schraubenkopfes (13) der Betonschraube (10).  Diameter of the at least one screw head (13) of the concrete screw (10).
9. Verfahren nach einem oder mehreren der vorhergehenden 9. The method according to one or more of the preceding
Ansprüche, dadurch gekennzeichnet, dass die zwei Betonfertigteilelemente (1 ) mit wenigstens zwei, fünf oder zehn Betonschrauben (10) miteinander verbunden werden.  Claims, characterized in that the two precast concrete elements (1) with at least two, five or ten concrete screws (10) are interconnected.
10.Verfahren nach einem oder mehreren der vorhergehenden 10.A method according to one or more of the preceding
Ansprüche, dadurch gekennzeichnet, dass die Betonschraube (10) im Wesentlichen senkrecht zu einer von den beiden Betonfertigteilelementen (1 ) aufgespannten fiktiven Ebene (15) verläuft, insbesondere an einem doppelten Falz der beiden Claims, characterized in that the concrete screw (10) substantially perpendicular to one of the two precast concrete elements (1) spanned fictitious plane (15) runs, in particular at a double fold of the two
Betonfertigteilelemente (1 ).  Precast concrete elements (1).
1 1.Verfahren nach einem oder mehreren der vorhergehenden Ansprüche 1 bis 9, dadurch gekennzeichnet, dass die Betonschraube (10) in einem spitzen Winkel zu einer von den beiden Betonfertigteilelementen (1 ) aufgespannten fiktiven Ebene (15) verläuft. 1 1.Verfahren according to one or more of the preceding claims 1 to 9, characterized in that the concrete screw (10) extends at an acute angle to one of the two precast concrete elements (1) spanned fictitious plane (15).
12. Verfahren nach einem oder mehreren der vorhergehenden 12. The method according to one or more of the preceding
Ansprüche, dadurch gekennzeichnet, dass die Betonschraube (10) unmittelbar mit der Betonkomponente (5) zumindest einer der beiden Betonfertigteilelemente (1 ) verbunden wird,  Claims, characterized in that the concrete screw (10) is connected directly to the concrete component (5) of at least one of the two precast concrete elements (1),
und/oder  and or
die beiden Betonfertigteilelemente (1 ) als eine Wand (4) oder eine Decke eines Gebäudes zur Verfügung gestellt werden.  the two precast concrete elements (1) are provided as a wall (4) or a ceiling of a building.
13. Verfahren nach Anspruch 3, dadurch gekennzeichnet, dass die zweite Ausnehmung im zweiten Betonfertigteilelement beim Betonieren des zweiten Betonfertigteilelements vor dem Erhärten des zweiten Betonfertigteilelements erstellt wird, und dass die erste Ausnehmung im ersten Betonfertigteilelement durch Bohren nach dem Betonieren und nach dem Erhärten des ersten Betonfertigteilelements erstellt wird. 13. The method according to claim 3, characterized in that the second recess is created in the second precast concrete element in concreting the second precast concrete element prior to hardening of the second precast concrete element, and that the first recess in the first precast concrete element by drilling after concreting and after hardening of the first precast concrete element is created.
14. Betonfertigteilelement (1) für ein Gebäude mit einer Betonkomponente (5) aus Beton oder Stahlbeton bzw. bewehrtem Beton dadurch gekennzeichnet, dass in dem Betonfertigteilelement (1 ) an der Betonkomponente (5) wenigstens eine Ausnehmung (7) ausgebildet ist zur Einführung und Verbindung mit je einer Betonschraube (10). 14. precast concrete element (1) for a building with a concrete component (5) made of concrete or reinforced concrete or reinforced concrete characterized in that in the precast concrete element (1) on the concrete component (5) at least one recess (7) is formed for insertion and Connection with one concrete screw each (10).
PCT/EP2013/072568 2012-11-02 2013-10-29 Method for connecting prefabricated concrete elements WO2014067924A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE102012220058.4 2012-11-02
DE201210220058 DE102012220058A1 (en) 2012-11-02 2012-11-02 Method for joining precast concrete elements

Publications (1)

Publication Number Publication Date
WO2014067924A1 true WO2014067924A1 (en) 2014-05-08

Family

ID=49510170

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/EP2013/072568 WO2014067924A1 (en) 2012-11-02 2013-10-29 Method for connecting prefabricated concrete elements

Country Status (2)

Country Link
DE (1) DE102012220058A1 (en)
WO (1) WO2014067924A1 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105782698A (en) * 2016-04-29 2016-07-20 南京晨光艺术工程有限公司 Metal cast wall plate with connecting edge
CN106049666A (en) * 2016-08-05 2016-10-26 北京城建建设工程有限公司 Prefabricated assembled concrete structure and construction method thereof
CN106320712A (en) * 2015-06-30 2017-01-11 上海宝冶集团有限公司 Method for grouting of assembly type building shear wall sleeve
CN106388315A (en) * 2016-11-01 2017-02-15 重庆泰博塑胶制品有限公司 Shoe rack
CN108518316A (en) * 2018-04-03 2018-09-11 优利康达(天津)科技有限公司 A kind of hubcap with press mounting structure

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB555517A (en) * 1942-03-09 1943-08-26 William Moss Improvements relating to pre-cast concrete building units, and buildings constructed therefrom
GB819118A (en) * 1957-12-11 1959-08-26 Edward Emil Taylor Improvements in or relating to building units
AT303323B (en) * 1966-12-09 1972-11-27 Johann Stipek Dipl Ing Device for connecting prefabricated components
WO1996026055A1 (en) * 1993-08-12 1996-08-29 Rapid Building Systems Pty. Ltd. Means and method for the manufacture of building panels
US6176638B1 (en) * 1995-02-14 2001-01-23 Roger C. Kellison Chemically bonded anchor systems
DE10311841A1 (en) * 2003-01-29 2004-08-12 Erwin Keller Screw connection part, especially for wind power plant mast, has channel arrangement for passing setting material into gap between bolt shaft, wall of at least one passage after making connection
CN201024534Y (en) * 2007-04-17 2008-02-20 张长春 Standardized house structure subassembly

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19630841A1 (en) * 1996-07-31 1998-02-05 Maylaender Karl Heinz Prefabricated overflow channel element for swimming pool
DE19820671A1 (en) * 1998-05-08 1999-11-11 Fischer Artur Werke Gmbh Self-tapping screw for use in solid building materials
DE102005005861A1 (en) * 2005-02-09 2006-08-24 Peter De Candido Wall modular system for erection of water-tight structures has wall modules with anchoring device and counter-device formed on opposed body sections and brought into engagement for individual bracing of adjacent wall module
DE102009001815A1 (en) * 2009-03-24 2010-10-07 Hilti Aktiengesellschaft Method for anchoring a fastening element in a mineral component and fastening element for mineral components

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB555517A (en) * 1942-03-09 1943-08-26 William Moss Improvements relating to pre-cast concrete building units, and buildings constructed therefrom
GB819118A (en) * 1957-12-11 1959-08-26 Edward Emil Taylor Improvements in or relating to building units
AT303323B (en) * 1966-12-09 1972-11-27 Johann Stipek Dipl Ing Device for connecting prefabricated components
WO1996026055A1 (en) * 1993-08-12 1996-08-29 Rapid Building Systems Pty. Ltd. Means and method for the manufacture of building panels
US6176638B1 (en) * 1995-02-14 2001-01-23 Roger C. Kellison Chemically bonded anchor systems
DE10311841A1 (en) * 2003-01-29 2004-08-12 Erwin Keller Screw connection part, especially for wind power plant mast, has channel arrangement for passing setting material into gap between bolt shaft, wall of at least one passage after making connection
CN201024534Y (en) * 2007-04-17 2008-02-20 张长春 Standardized house structure subassembly

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106320712A (en) * 2015-06-30 2017-01-11 上海宝冶集团有限公司 Method for grouting of assembly type building shear wall sleeve
CN105782698A (en) * 2016-04-29 2016-07-20 南京晨光艺术工程有限公司 Metal cast wall plate with connecting edge
CN106049666A (en) * 2016-08-05 2016-10-26 北京城建建设工程有限公司 Prefabricated assembled concrete structure and construction method thereof
CN106388315A (en) * 2016-11-01 2017-02-15 重庆泰博塑胶制品有限公司 Shoe rack
CN108518316A (en) * 2018-04-03 2018-09-11 优利康达(天津)科技有限公司 A kind of hubcap with press mounting structure

Also Published As

Publication number Publication date
DE102012220058A1 (en) 2014-06-12

Similar Documents

Publication Publication Date Title
EP2563983B1 (en) Mounting rail
DE102010027661B4 (en) Shuttering apparatus and method for providing a recess during casting of a building component
DE102005041082A1 (en) Hollow barrier for use in construction site, has reinforcing bars that provide mechanical connection between shells and determine thickness of barrier, and heat insulating layer provided between shells
WO2014067924A1 (en) Method for connecting prefabricated concrete elements
EP1983111A1 (en) Formwork for limiting a diaphragm wall section, formwork element and method for manufacturing a diaphragm wall in the ground
AT513576B1 (en) Wall formwork system and a method for producing a wall section with a Isolierschalung
WO2005040526A1 (en) Formwork system
EP2715013B1 (en) Connecting arrangement and method for producing a punching shear reinforcement, a subsequent lateral-force reinforcement and/or a reinforcement connection
EP3519641B1 (en) Connecting device for connecting thin prefab elements, prefab elements therewith equipped, method for making such thin prefab elements equipped with such connecting device
EP2225428B1 (en) Anchoring element
DE102007057291A1 (en) Edge connection producing method for precast concrete walls in e.g. industrial building construction, involves tightening clamp bolt and reinforcement plate in such manner that concrete walls are connected by pre-stressing
DE102012223279A1 (en) Method for connecting prefabricated concrete elements for buildings, involves connecting two insert elements with each other at different prefabricated concrete elements, where fastening bolt is driven in two insert elements
EP2133480B1 (en) Method for connecting two wooden components
DE102014003022B4 (en) Composite screw for a wood-concrete structure
DE3834731C2 (en)
DE19835900C2 (en) Prefabricated concrete components and buildings constructed using precast concrete component groups
EP3851607A1 (en) Positioning means for a textile reinforcement layer of a concrete component, a textile reinforcement layer and a reinforced concrete component comprising a positioning means
DE202018105138U1 (en) cable connection
EP4283064B1 (en) Method for embedding and fixing anchor rails in a building
DE202017107261U1 (en) Prefabricated concrete element with at least one load-bearing component
CH713190A2 (en) Device and method for connecting two components in a specific relative orientation and thus created concrete structure.
DE202006019894U1 (en) Hollow barrier for use in construction site, has reinforcing bars that provide mechanical connection between shells and determine thickness of barrier, and heat insulating layer provided between shells
EP3130713B1 (en) Structure and method for construction of a structure
DE102009039337B4 (en) Concrete structure
DE10133976A1 (en) Connector plate for reinforcing adhesive joint between two pieces of wood is fitted into grooves in pieces which contain adhesive and has sloping hooks on each side which face bottom of groove

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 13783588

Country of ref document: EP

Kind code of ref document: A1

122 Ep: pct application non-entry in european phase

Ref document number: 13783588

Country of ref document: EP

Kind code of ref document: A1