CN106320712A - Method for grouting of assembly type building shear wall sleeve - Google Patents

Method for grouting of assembly type building shear wall sleeve Download PDF

Info

Publication number
CN106320712A
CN106320712A CN201510384618.7A CN201510384618A CN106320712A CN 106320712 A CN106320712 A CN 106320712A CN 201510384618 A CN201510384618 A CN 201510384618A CN 106320712 A CN106320712 A CN 106320712A
Authority
CN
China
Prior art keywords
grouting
sleeve
shear wall
wall sleeve
grout
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510384618.7A
Other languages
Chinese (zh)
Inventor
魏金龙
阳刚
朱长根
刘晓
左权
马冰洋
叶华
周代杰
姜顺
构明
范振江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Group Corp Ltd
Shanghai Baoye Engineering Technology Co Ltd
Original Assignee
Shanghai Baoye Group Corp Ltd
Shanghai Baoye Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Group Corp Ltd, Shanghai Baoye Engineering Technology Co Ltd filed Critical Shanghai Baoye Group Corp Ltd
Priority to CN201510384618.7A priority Critical patent/CN106320712A/en
Publication of CN106320712A publication Critical patent/CN106320712A/en
Pending legal-status Critical Current

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The invention relates to assembly type buildings, in particular to an assembly type building shear wall sleeve. A method for grouting of the assembly type building shear wall sleeve comprises the steps that 1, a grouting area is isolated into a plurality of bins through rubber strips, the grouting length of each bin is 400-800 mm, and the surrounding of each bin is sealed in a bed-mortar mode with bed-mortar slurry; 2, an obliquely upward diversion pipe is inserted into an upper grouting hole in the upper portion of the sleeve, so that the liquid level difference is increased, and compact grouting is ensured; and 3, grouting is carried out through pressure of a grouting pump. According to the method, the grouting quality is high, and the degree of compactness is high.

Description

A kind of assembled architecture shear wall sleeve grouting method
Technical field
The present invention relates to assembled architecture, particularly relate to assembled architecture shear wall sleeve.
Background technology
Reinforced bar sleeve grouting connects and is connected reinforcing bar and sleeve by the sleeve processed specially and reinforcing bar by injecting the interlocking that coheres between grouting material dependence material, and the degree of compaction of grouting directly affects the safety of sleeve connection.
In reinforced bar sleeve grouting, there is certain pressure in sleeve, in pressure releasing process, grouting material has the process of a backflow, if not having supplementing of grouting material in reflux course, can cause the hollowing that sleeve is in the milk, and Grouted density reduces.
Summary of the invention
Present invention seek to address that the defect of prior art, it is provided that a kind of assembled architecture shear wall sleeve grouting method.Grouting quality of the present invention is good, and degree of compaction is high.
In order to solve above-mentioned technical problem, a kind of assembled architecture shear wall sleeve grouting method, it includes
Step one, uses adhesive tape to be isolated into several storehouses, each storehouse grouting length 400-800mm to grouting region, and the mode of surrounding seat slurry seat slurry seals;
Step 2, upper cartridge grout hole uses mozzle obliquely to insert upper strata grout hole, closely knit to ensure grouting;
Step 3, uses grouting pump machine pressure grouting;
Described a kind of assembled architecture shear wall sleeve grouting method, described step 3 includes
A calculates the volume that need to irrigate joint quantity or grouting space according to drawing, calculates the consumption of grouting material;By weight, the product report that amount of water provides according to producer provides data to grouting material mixing water, uses compression pump pumping;
During b grouting, successively the plasma discharge hole overflowing mortar is clogged with special blocking when grout outlet pulp, when all sleeve plasma discharge holes all have mortar to overflow, stop grouting, and by grouting hole plugging;
C grouting is complete, cleans blender, grouting pump or the utensil such as grouting lance and grout pipe with water immediately.
The present invention carries out specification explanation to the grouting construction of assembled architecture shear wall sleeve, to ensure the grouting quality in filling process, enables filling sleeve node out to meet the performance indications of sleeve connection.
Detailed description of the invention
Below in conjunction with embodiment, this technology is described in further detail and completely:
One assembled architecture shear wall sleeve grouting method of the present invention, it includes
1. the installation of body of wall
Component uses crane lifting, shroud member and reinforcement component to use backing plate to reserve the space of 20mm height, adjusts reinforcing bar and make reinforcing bar in sleeve centre position in lifting.
2. a slurry
Filling in the colloid of 20mm thickness in two component 20mm spaces, adhesive tape fills in distance edge 20mm, then uses BY fast hard seat slurry seat slurry.
3. mozzle is installed
Upper cartridge grout hole uses mozzle obliquely to insert upper strata grout hole.
4. pressure grouting (according to assembled architecture shear wall sleeve grouting technique)
Using grouting pump machine pressure grouting, grouting material is the special grouting material of sleeve, and grouting process is as follows:
1) volume of joint quantity or grouting space need to be irrigated according to drawing calculating, calculate the consumption of grouting material.
2) according to the water consumption mix grouting material calculated, mixing water should meet the regulation of " concrete mixing water standard " (JGJ63).
3), after grouting material stirs, grouting material is poured into grouting pump carries out cementing operations.
4) during grouting, overflow the order of mortar according to grouting and plasma discharge hole, successively the plasma discharge hole overflowing mortar is clogged with special blocking, when all sleeve plasma discharge holes all have mortar to overflow, stop grouting, and by grouting hole plugging.
5) it is in the milk complete, cleans the utensils such as blender, grouting pump and grout pipe immediately with water.
4. the drawing experiment of sleeve after curing cycle
Removing experiment concrete, the degree of compaction using this grouting technique to be in the milk is preferable, and sleeve grouting connector is carried out drawing experiment.Experimental data such as table 1 below:
The grouting of table 1 reinforced bar sleeve connects drawing experimental data
Numbering Fracture position Tensile strength/MPa
1-1 Connect reinforcing bar 609.1
1-2 Connect reinforcing bar 610.0
2-1 Connect reinforcing bar 601.8
2-2 Connect reinforcing bar 617.1

Claims (2)

1. an assembled architecture shear wall sleeve grouting method, it is characterised in that it includes
Step one, uses adhesive tape to be isolated into several storehouses, each storehouse grouting length 400-800mm to grouting region, and the mode of surrounding seat slurry seat slurry seals;
Step 2, upper cartridge grout hole uses mozzle obliquely to insert upper strata grout hole, closely knit to ensure grouting;
Step 3. use grouting pump machine pressure grouting.
A kind of assembled architecture shear wall sleeve grouting method the most according to claim 1, it is characterised in that described step 2 includes
Using mozzle obliquely to insert upper strata grout hole before a grouting, mozzle design height is higher than sleeve top surface, to improve grouting potential difference;
B calculates the volume that need to irrigate joint quantity or grouting space according to drawing, calculates the consumption of grouting material;By weight, the product report that amount of water provides according to producer provides data to grouting material mixing water, uses compression pump pumping;
During c grouting, successively the plasma discharge hole overflowing mortar is clogged with special blocking when grout outlet pulp, when all sleeve plasma discharge holes all have mortar to overflow, stop grouting, and by grouting hole plugging;
D grouting is complete, cleans the utensils such as blender, grouting pump and grout pipe immediately with water.
CN201510384618.7A 2015-06-30 2015-06-30 Method for grouting of assembly type building shear wall sleeve Pending CN106320712A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510384618.7A CN106320712A (en) 2015-06-30 2015-06-30 Method for grouting of assembly type building shear wall sleeve

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510384618.7A CN106320712A (en) 2015-06-30 2015-06-30 Method for grouting of assembly type building shear wall sleeve

Publications (1)

Publication Number Publication Date
CN106320712A true CN106320712A (en) 2017-01-11

Family

ID=57728485

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510384618.7A Pending CN106320712A (en) 2015-06-30 2015-06-30 Method for grouting of assembly type building shear wall sleeve

Country Status (1)

Country Link
CN (1) CN106320712A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110426317A (en) * 2019-07-10 2019-11-08 中交公路养护工程技术有限公司 A kind of grouting material compactness inspection method of the underwater reinforced concrete column of sleeve
CN111395775A (en) * 2020-04-07 2020-07-10 中铁十二局集团建筑安装工程有限公司 Construction method for plugging outer wall base mortar of sandwich insulation board of fabricated building

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102900168A (en) * 2012-10-08 2013-01-30 沈阳建筑大学 Splitting and assembling structure and assembling connecting method of assembled type concrete frame-shear wall
WO2014067924A1 (en) * 2012-11-02 2014-05-08 Hilti Aktiengesellschaft Method for connecting prefabricated concrete elements
CN103883034A (en) * 2014-03-14 2014-06-25 东南大学 Assembled shear wall and wall-beam connecting structure with edge restraining component
CN104314314A (en) * 2014-11-17 2015-01-28 中冶建筑研究总院有限公司 Grouting connection construction method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102900168A (en) * 2012-10-08 2013-01-30 沈阳建筑大学 Splitting and assembling structure and assembling connecting method of assembled type concrete frame-shear wall
WO2014067924A1 (en) * 2012-11-02 2014-05-08 Hilti Aktiengesellschaft Method for connecting prefabricated concrete elements
CN103883034A (en) * 2014-03-14 2014-06-25 东南大学 Assembled shear wall and wall-beam connecting structure with edge restraining component
CN104314314A (en) * 2014-11-17 2015-01-28 中冶建筑研究总院有限公司 Grouting connection construction method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王召新: "《混凝土装配式住宅施工技术研究》", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110426317A (en) * 2019-07-10 2019-11-08 中交公路养护工程技术有限公司 A kind of grouting material compactness inspection method of the underwater reinforced concrete column of sleeve
CN111395775A (en) * 2020-04-07 2020-07-10 中铁十二局集团建筑安装工程有限公司 Construction method for plugging outer wall base mortar of sandwich insulation board of fabricated building
CN111395775B (en) * 2020-04-07 2021-09-24 中铁十二局集团建筑安装工程有限公司 Construction method for plugging outer wall base mortar of sandwich insulation board of fabricated building

Similar Documents

Publication Publication Date Title
CN107060116B (en) A kind of high-pressure slip-casting blocking method for building settlement seam
CN209145035U (en) The node structure blocked when for being in the milk at assembled architecture shear wall installation seam
CN108517899A (en) Mouth high-pressure grouting leak stopping processing method is buried in the leakage drilling of deep basal pit diaphram wall
CN110984160B (en) Underwater repair method for water seepage crack of concrete panel
CN109973117B (en) Leaking stoppage and reinforcement method for structure crack
CN103898873A (en) Water seepage plugging construction method of shaft construction seams under high water head
KR101594576B1 (en) Method for preventing leakage of Concrete Dam Structure
CN106592614A (en) Water leakage point blockage method in foundation pit water stop curtain
CN202023532U (en) Hole packer for reinforcing for grouting in coal mine
CN106320712A (en) Method for grouting of assembly type building shear wall sleeve
CN104047266A (en) Seepage-proofing and leaking-stoppage method of leakage passage
CN109235668A (en) Residential building curtain wall and wall crack plugging structure
CN103174428B (en) A kind of applied chemistry slurries implement the method for grouting for water blocking to vertical shaft
CN205530340U (en) Precast concrete retaining wall block
RU2600576C1 (en) Method of making plugging material for repair-isolation operations in oil and gas wells
CN107700749A (en) The structure and assembly method of through ribbed prefabricated one-way slabs entirely
CN204919373U (en) Spray of molten steel pipe slip casting structure
CN108286270B (en) Deviation rectifying construction method for building with raft foundation
CN215519999U (en) Grouting device for grouting sleeve of prefabricated vertical component
CN206143935U (en) Bathroom threshold waterproof construction
CN110206016A (en) A kind of soft foundation treatment process using vacuum preloading
CN106320355B (en) A kind of rich water karst area mixes the ejection for water plugging method of more slurries
US2853858A (en) Method of stabilizing foundations
CN204199324U (en) Connecting reinforcement cage i iron in construction of diaphragm wall
JP2016196779A (en) Vacuum grout injection method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170111

WD01 Invention patent application deemed withdrawn after publication