WO2012026458A1 - 充電システム - Google Patents

充電システム Download PDF

Info

Publication number
WO2012026458A1
WO2012026458A1 PCT/JP2011/068951 JP2011068951W WO2012026458A1 WO 2012026458 A1 WO2012026458 A1 WO 2012026458A1 JP 2011068951 W JP2011068951 W JP 2011068951W WO 2012026458 A1 WO2012026458 A1 WO 2012026458A1
Authority
WO
WIPO (PCT)
Prior art keywords
charging
unit
power
time
battery
Prior art date
Application number
PCT/JP2011/068951
Other languages
English (en)
French (fr)
Inventor
敦史 須山
岩▲崎▼ 利哉
敦志 清水
弘嗣 村島
山▲崎▼ 淳
Original Assignee
三洋電機株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 三洋電機株式会社 filed Critical 三洋電機株式会社
Priority to EP11819921.5A priority Critical patent/EP2610992B1/en
Priority to US13/637,439 priority patent/US9225188B2/en
Priority to CN2011800168011A priority patent/CN102823105A/zh
Publication of WO2012026458A1 publication Critical patent/WO2012026458A1/ja

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L53/00Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
    • B60L53/30Constructional details of charging stations
    • B60L53/305Communication interfaces
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L53/00Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
    • B60L53/50Charging stations characterised by energy-storage or power-generation means
    • B60L53/51Photovoltaic means
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L53/00Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
    • B60L53/60Monitoring or controlling charging stations
    • B60L53/63Monitoring or controlling charging stations in response to network capacity
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L53/00Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
    • B60L53/60Monitoring or controlling charging stations
    • B60L53/64Optimising energy costs, e.g. responding to electricity rates
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00Secondary cells; Manufacture thereof
    • H01M10/42Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
    • H01M10/44Methods for charging or discharging
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/12Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
    • H02J3/14Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/28Arrangements for balancing of the load in a network by storage of energy
    • H02J3/32Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
    • H02J3/322Arrangements for balancing of the load in a network by storage of energy using batteries with converting means the battery being on-board an electric or hybrid vehicle, e.g. vehicle to grid arrangements [V2G], power aggregation, use of the battery for network load balancing, coordinated or cooperative battery charging
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/34Parallel operation in networks using both storage and other dc sources, e.g. providing buffering
    • H02J7/342The other DC source being a battery actively interacting with the first one, i.e. battery to battery charging
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L2250/00Driver interactions
    • B60L2250/10Driver interactions by alarm
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L2250/00Driver interactions
    • B60L2250/16Driver interactions by display
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2310/00The network for supplying or distributing electric power characterised by its spatial reach or by the load
    • H02J2310/50The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads
    • H02J2310/54The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads according to a pre-established time schedule
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2310/00The network for supplying or distributing electric power characterised by its spatial reach or by the load
    • H02J2310/50The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads
    • H02J2310/56The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads characterised by the condition upon which the selective controlling is based
    • H02J2310/58The condition being electrical
    • H02J2310/60Limiting power consumption in the network or in one section of the network, e.g. load shedding or peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/10Energy storage using batteries
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/70Energy storage systems for electromobility, e.g. batteries
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/7072Electromobility specific charging systems or methods for batteries, ultracapacitors, supercapacitors or double-layer capacitors
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/80Technologies aiming to reduce greenhouse gasses emissions common to all road transportation technologies
    • Y02T10/92Energy efficient charging or discharging systems for batteries, ultracapacitors, supercapacitors or double-layer capacitors specially adapted for vehicles
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02T90/10Technologies relating to charging of electric vehicles
    • Y02T90/12Electric charging stations
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02T90/10Technologies relating to charging of electric vehicles
    • Y02T90/14Plug-in electric vehicles
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02T90/10Technologies relating to charging of electric vehicles
    • Y02T90/16Information or communication technologies improving the operation of electric vehicles
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02T90/10Technologies relating to charging of electric vehicles
    • Y02T90/16Information or communication technologies improving the operation of electric vehicles
    • Y02T90/167Systems integrating technologies related to power network operation and communication or information technologies for supporting the interoperability of electric or hybrid vehicles, i.e. smartgrids as interface for battery charging of electric vehicles [EV] or hybrid vehicles [HEV]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/12Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation
    • Y04S10/126Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation the energy generation units being or involving electric vehicles [EV] or hybrid vehicles [HEV], i.e. power aggregation of EV or HEV, vehicle to grid arrangements [V2G]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S30/00Systems supporting specific end-user applications in the sector of transportation
    • Y04S30/10Systems supporting the interoperability of electric or hybrid vehicles
    • Y04S30/14Details associated with the interoperability, e.g. vehicle recognition, authentication, identification or billing

Definitions

  • the present invention relates to a charging system for charging a battery or the like provided in an electric vehicle.
  • the spread of a charging system for charging a storage battery (hereinafter referred to as a battery) for driving the electric vehicle is indispensable.
  • a charging system for charging a battery of an electric vehicle outside a home is indispensable.
  • a concept of providing a charging system in a store such as a convenience store has been proposed.
  • the store or the like When a store or the like is equipped with a charging system, the store or the like needs to supply power consumed by the charging system in addition to power consumed by various devices such as lighting, an air conditioner, and a refrigerator.
  • the electric power consumed by the charging system can be as large as the electric power consumed by the store or the like with various devices (for example, the order of electric power is substantially equal). Then, an increase in the amount of electric power purchased by a store or the like from a power company causes a problem that the power charge increases, and this problem may be a factor that hinders the spread of the charging system.
  • Patent Document 1 proposes a charging system that reduces power charges by preferentially charging a storage battery by using a time zone with a low power unit price or a time zone with less power demand.
  • Patent Document 1 cannot reduce the power charge unless it is charged inconveniently and at a limited time such as midnight or early morning.
  • a user of an electric vehicle hereinafter simply referred to as a user
  • a user rarely visits a store or the like and charges it during an inconvenient time such as midnight or early morning.
  • frequent charging is required because many electric vehicles visit stores or the like during the daytime, which is convenient for the user. Therefore, in the above charging system, it is difficult to reduce the power charge.
  • an object of the present invention is to provide a charging system capable of reducing a power charge even if charging is performed frequently without limiting the time zone for charging.
  • a charging system is a charging system for charging a battery, which is charged by consuming grid power supplied from an electric power company, and supplying the charged power by discharging.
  • a charging unit that consumes system power and power supplied from the power storage unit to charge the battery, and at least one charging performed by the charging unit extends over two unit times.
  • the power storage unit supplies power to the charging unit in at least one unit time other than the two unit times.
  • the electricity charge set by the electric power company includes a fixed basic charge and a usage-based charge, and as the maximum value of the amount of power supplied per unit time increases, The basic fee may be increased.
  • the power storage unit may be charged at least one of two unit times in which the charging unit is charged once.
  • n is an integer of 2 or more
  • the charging unit It is assumed that one charge is performed over two unit times, and another n-1 charge is performed in each of n-1 unit times other than the two unit times. It doesn't matter.
  • the unit time for one charge by the charging unit is less than two, and even if it is difficult to charge the charging unit several times over two unit times, it is consumed per unit time. It is possible to reduce the maximum value of the amount of grid power to be generated.
  • the amount of grid power consumed in each of the two unit times during which the charging unit is charged once is the grid power consumed in other unit times. It does not matter if the amount is not exceeded.
  • This configuration makes it possible to effectively reduce the maximum amount of grid power consumed per unit time.
  • the power storage unit may be charged once before and after the charging in two unit times in which the charging unit is charged once.
  • the power storage unit may be charged once in two unit times in which the charging unit is charged once.
  • the power storage unit can be continuously charged at a time.
  • an intermediate time of at least one charging of the charging unit and a time at a boundary between two unit times may be substantially equal.
  • This configuration makes it possible to effectively reduce the maximum amount of grid power consumed in two unit times.
  • the unit time for each charging may be different.
  • the amount of grid power consumed by charging the charging unit once is distributed to two unit times. In another unit time, the power supplied by discharging the power storage unit is consumed, and the charging unit performs charging. Therefore, even when the charging unit needs to be frequently charged, it is possible to reduce the maximum value of the amount of system power consumed per unit time. Therefore, it is possible to reduce the power charge.
  • FIG. 1 is a block diagram illustrating a configuration example of a charging system according to an embodiment of the present invention.
  • the solid line arrow which connects each block in a figure shows exchange of electric power
  • the broken line arrow has shown exchange of information.
  • a charging system 1 shown in FIG. 1 consumes supplied power to supply and charge power to a battery B provided in the electric vehicle C, and charges the supplied power and discharges power.
  • charging of the battery B of the electric vehicle C by the charging unit 11 is expressed as battery charging
  • charging of the power storage unit 12 is expressed as power storage unit charging.
  • the discharge of the power storage unit 12 is expressed as a power storage unit discharge.
  • the charging system 1 is supplied with electric power supplied from an electric power company (hereinafter referred to as system power).
  • system power is also supplied to and consumed by various devices such as stores equipped with the charging system 1 (for example, lighting, air conditioners, refrigerators, etc., hereinafter referred to as a load unit R).
  • the charging unit 11 appropriately converts system power and power supplied by the power storage unit discharge of the power storage unit 12 (for example, DC power converted to DC power or DC power supplied to the battery B of the electric vehicle C). The battery voltage is adjusted).
  • the power storage unit 12 converts the supplied grid power as necessary (for example, by converting AC power to DC power or adjusting the voltage value of the DC power) to charge the power storage unit. . Further, the power consumed by the power storage unit charge (stored in the power storage unit 12) is discharged to supply the power to the charging unit 11. In addition, you may comprise so that the electric power supplied by electrical storage part discharge may be supplied to the load part R. FIG.
  • the input unit 13 is operated by the user or receives an instruction content transmitted from the user's property (for example, a portable terminal), thereby inputting the user's instruction. In addition, the input unit 13 transmits the input user instruction to the control unit 15. Examples of user instructions include an instruction to start battery charging, an instruction to reserve battery charging, and an instruction to stop battery charging.
  • the notification unit 14 includes, for example, a display device, a speaker, and the like, outputs an image and sound, or includes a transmission device and transmits information to a user's property (for example, a portable terminal registered in the charging system 1 in advance). Is transmitted to the user. Examples of the content notified by the notification unit to the user include timing for performing reserved battery charging, and start, end, and stop of battery charging.
  • the control unit 15 controls battery charging by the charging unit 11, power storage unit charging and power storage unit discharging of the power storage unit 12. Moreover, if the control part 15 confirms that the instruction
  • control unit 15 creates a charging schedule that can reduce the power charge for the store or the like without limiting the time zone for battery charging. Then, the operation of the charging unit 11 and the power storage unit 12 is controlled in accordance with the created charging schedule. Details of the charging schedule (that is, the timing at which the charging unit 11 performs battery charging and the timing at which the power storage unit 12 performs charging and discharging of the power storage unit) will be described later.
  • the charging schedule can include the start time and end time of battery charging. Moreover, the time which performs electrical storage part charge and electrical storage part discharge may also be included.
  • the user is notified of the charging schedule by the notification unit 14, thereby recognizing at least the battery charging start time. For example, when the electric vehicle C and the charging unit 11 are configured as described above at the start, for example, when the user goes to a store or the like to charge the battery, other users charge the battery first. Therefore, it is possible to suppress the occurrence of a situation where the battery cannot be charged quickly (waiting for charging).
  • the charging system 1 can suppress the occurrence of waiting for charging and reduce the power charge, it is preferable for both the user side and the store side. Therefore, the spread of the charging system 1 can be expected. Then, by spreading the charging system 1, it is possible to promote the popularization of electric vehicles and to reduce the carbon dioxide emission.
  • the configuration of the charging system shown in FIG. 1 is merely an example, and other configurations may be used.
  • the power supply unit 11, the power storage unit 12, the load unit R, and the like may be configured to include other power sources (for example, solar cells) that can supply power.
  • the charging unit 11 may be connectable only to one electric vehicle C that performs battery charging, or may be connectable to a plurality of electric vehicles C.
  • the control unit 15 controls the charging unit 11 so that each battery B of each electric vehicle C connected to the charging unit 11 is controlled.
  • the battery may be sequentially charged.
  • the electricity charge for grid power includes, for example, a fixed basic charge and a usage-based charge.
  • power companies increase the basic charge as the maximum amount of grid power consumed per unit time increases for reasons such as generating power efficiently (equalizing the generated power). It is set.
  • the power amount WP consumed in the unit time from 13:00 to 13:30 is larger than the power amount consumed in the other unit times, and thus becomes the maximum value. Therefore, the basic charge is set based on the amount of power WP consumed in the unit time from 13:00 to 13:30.
  • the maximum value of electric energy is obtained from a larger number of unit times (for example, one year).
  • a charging schedule (a control method for timing of battery charging by the control unit 15) for reducing the maximum amount of grid power consumed per unit time will be described with reference to the drawings.
  • a charging schedule (a control method for timing of battery charging by the control unit 15) for reducing the maximum amount of grid power consumed per unit time will be described with reference to the drawings.
  • an unfavorable control method for timing of battery charging will be described with reference to FIGS. 3 and 4.
  • FIG. 3 is a graph showing an example of power consumed when the timing of battery charging is controlled by an unfavorable method.
  • FIG. 4 is a graph showing the amount of grid power consumed in each unit time when the timing of battery charging is controlled as shown in FIG. 3 and 4 show the same time as the time shown in FIG. 2 (12:00 to 14:00).
  • the magnitude of the system power consumed by battery charging is indicated by the height of the white area, and the magnitude of the system power consumed by the load unit R (hereinafter referred to as load unit consumption). Is indicated by the height of the gray area.
  • the load portion consumption is constant regardless of the time. Therefore, as shown in FIG. 4, the amount of power WR consumed by the load in each unit time is also constant. Further, as shown in FIG. 3, the amount of power consumed by battery charging (charged to battery B of electric vehicle C) is also constant regardless of time. Furthermore, as shown in FIG. 3, the time required for one battery charging (charging time per one electric vehicle C) is a time (20 minutes) equal to or less than a unit time (30 minutes), and the same time every time. To be.
  • the battery charging by the charging unit 11 is performed during the time from 12:00 to 12:20 and from 13: 5 to 13:25. All the times are within the unit time (12: 0 to 12:30, 13: 0 to 13:30).
  • the power charge (basic charge) is set based on the power amount WPU for the unit time (12: 0 to 12:30, 13: 0 to 13:30) at which the battery is charged at least. Is done. Therefore, the power charge can increase.
  • FIG. 5 is a graph showing an example of power consumed when the timing of battery charging is controlled by a preferable method, and corresponds to FIG. 3 showing an unfavorable control method.
  • FIG. 6 is a graph showing the amount of system power consumed in each unit time when the timing of battery charging is controlled as shown in FIG. 5, and corresponds to FIG. 4 showing an unfavorable control method.
  • To do. 5 is the same as FIG. 3 except that the timing at which the battery is charged is different from the timing shown in FIG. Therefore, in FIG. 5, the description of the same part as in FIG. 3 will be omitted, and the different part will be described in detail.
  • the battery is charged at 12:20 to 12:40 and 13:25 to 13:45.
  • Each battery charging time is different (non-overlapping) unit time (12: 0 to 12:30 and 12:30 to 13: 0, 13: 0 to 13:30 and 13 Hours 30 minutes to 14:00 hours).
  • the grid power consumed by one battery charge It becomes possible to distribute the electric energy to two unit times. Therefore, as shown in FIG. 6, it is possible to relatively reduce the power amounts WP1 to WP3 of the system power consumed in each unit time. For example, it becomes possible to make it smaller than the electric energy WPU shown in FIG. Therefore, it is possible to suppress the maximum value of the amount of grid power consumed per unit time, and to reduce the power charge.
  • the charging unit 11 performs a plurality of battery charges
  • the timing at which each battery charge is performed extends over different unit times. Therefore, it is possible to suppress an increase in the amount of grid power consumed during the unit time by distributing the grid power amount consumed by charging a plurality of batteries in overlapping unit times. It becomes.
  • the battery charging performed between 12:20 and 12:40 shown in FIG. 5 is performed at an intermediate time (12:30) and a time at the boundary between two unit times (12:30). ) And are substantially equal. If comprised in this way, it will become possible to distribute
  • the reference time in the above example, 20 to 40 minutes per hour (or 50 to 10 minutes per hour may be sufficient) It is difficult to control the battery to be charged. Further, if the time for battery charging is limited more than necessary, it is difficult to efficiently charge the battery.
  • a charging schedule (battery charging by the control unit 15) that can allow variation in time for battery charging while effectively suppressing the maximum amount of system power consumed per unit time. And a method for controlling the timing of discharging the power storage unit) will be described with reference to FIGS.
  • FIG. 7 is a graph showing an example of power consumed when the timing of performing battery charging and discharging of the power storage unit is controlled by a preferable method, and corresponds to FIG. 5 showing the above-described preferable method.
  • FIG. 8 is a graph showing the amount of grid power consumed in each unit time when the timing for performing battery charging and power storage unit discharge is controlled as shown in FIG. This corresponds to FIG. 7 is the same as FIG. 5 except that the battery charging timing is different from the time shown in FIG. 5 and that the power supplied by the power storage unit discharge is used for battery charging. Therefore, in FIG. 7, the description of the same part as in FIG. 5 is omitted, and the different part will be described in detail. In FIG. 7, the magnitude of the electric power supplied by the power storage unit discharge and consumed by the battery charging is indicated by the height of the black paint area.
  • the battery is charged at 12:15 to 12:35 and 13: 5 to 13:25.
  • 12:15 to 12:20 and 13: 5 to 13:15 not only the system power but also the power supplied by the power storage unit discharge is used. Charge the battery.
  • the upper limit in this example, the electric energy of the system electric power consumed by one battery charge
  • the electric energy of the system electric power consumed by battery charging It will be. Therefore, as shown in FIG. 8, it is possible to relatively reduce the power amounts WP1, WP2, and WR of the system power consumed in each unit time. For example, it becomes possible to make the electric energy WP1 or less shown in FIG. Therefore, it is possible to effectively suppress the maximum value of the amount of grid power consumed per unit time, and it is possible to further reduce the power charge.
  • the time for battery charging is set to 1 ⁇ 4 from the reference time (in the above example, 5 minutes).
  • power storage unit discharge is performed and power is supplied at a predetermined time after the start of battery charging, but power storage unit discharge is performed and power is supplied at a predetermined time before the end of battery charging. It doesn't matter.
  • the power storage unit is discharged at a predetermined time after the start of the battery charging, and when the battery charging is changed to the rear of the reference time, The power storage unit may be discharged at a predetermined time before the end of battery charging.
  • the battery charging that consumes the system power and the battery charging that consumes the power supplied by the power storage unit discharge are performed separately, but the case where they are performed simultaneously may be included. Specifically, for example, in battery charging from 12:15 to 12:35 in FIG. 7, instead of supplying power from 12:15 to 12:20 by discharging the power storage unit, 1/3 of the power is used. It may be supplied dispersedly from 12:15 to 12:30.
  • the power storage unit may be charged with the system power.
  • the power storage unit charging may be performed with the grid power at a time when the battery charging is performed.
  • the time shown in FIGS. 5 and 7 is measured with a clock attached to a power meter or the like installed by the electric power company, and there may be a deviation from the actual time. Due to the deviation, for example, the unit time is preferably 10 to 40 minutes and 40 to 10 minutes per hour in actual time. In this case, the start time of the reference time can be set to 0 minutes (or 30 minutes). Therefore, it is possible to set a battery charging start time that is clear and easy for the user to remember.
  • the amount of power consumed by battery charging is constant regardless of time, but may not be constant.
  • the intermediate time of battery charging is set to a time that is a boundary between two unit times. It may be set by shifting. Even in such a case, in order to simplify the control of the charging unit 11 by the control unit 15, the intermediate time of battery charging and the time at the boundary between two unit times are set to be substantially equal. It doesn't matter.
  • each specific example of the charging schedule described below controls not only the timing of performing battery charging and discharging of the power storage unit, but also the timing of performing charging of the power storage unit.
  • FIG. 9 is a graph showing a first specific example of the charging schedule.
  • the upper graph in FIG. 9 is a graph showing an example of power consumed when the timing of performing battery charging, power storage unit discharge, and power storage unit charging is controlled in an undesirable manner, and corresponds to FIG. .
  • FIG. 9 is a graph showing an example of power consumed when the timing of performing battery charging, power storage unit discharge, and power storage unit charging is controlled by a preferable method.
  • the lower graph of FIG. 9 shows the amount of electric power (remaining capacity) charged in the power storage unit 12 when the timing of performing battery charging, power storage unit discharge and power storage unit charging is controlled as shown in the middle graph. It is a graph.
  • the magnitude of the system power consumed by battery charging is indicated by the height of the white area, and is consumed by load portion consumption.
  • the magnitude of the grid power is indicated by the height of the gray area, and the magnitude of the power supplied by the power storage unit discharge is indicated by the height of the black area.
  • the magnitude of the system power consumed by charging the power storage unit is indicated by the height of the area with grid-like hatching.
  • the amount of grid power consumed per unit time and the amount of power supplied and consumed by the power storage unit discharge per unit time are displayed inside some representative areas.
  • the system power of 15 kWh is consumed for each unit time, and 20 kWh (a typical electric vehicle) It is assumed that the amount of power (equivalent to 80% of the amount of power (capacity) that can be charged by battery B of C) is consumed.
  • the battery is charged four times (four electric vehicles C) within five unit times (12: 0 to 14:30, 14:30 to 17:00) It is assumed that the battery charge is 30 minutes. Further, it is assumed that the power storage unit 12 has a sufficient remaining capacity (11 kWh) at the start of the charging schedule of this specific example (12:00).
  • the basic charge for one year is calculated by the hourly converted value of the maximum value (35 ⁇ 2) ⁇ the unit price of basic charge for one month (1600) ⁇ one year (12). It will be about 1.34 million yen.
  • control unit 15 controls the charging unit 11 and the power storage unit 12 to reduce the maximum value of the grid power consumed per unit time. Control.
  • one of the four battery charges is performed over two unit times as described above (see FIG. 5).
  • the last (or first) battery charge time of four times is extended to two unit times (13:30 to 14:30, 16: 0 to 17: 0) To be done.
  • the intermediate time of the battery charging (14: 0, 16:30) and the time of the boundary between two unit times (14: 0, 16:30) are substantially equal.
  • the maximum value of the amount of system power consumed in each of the two unit times is performed over two unit times as described above (see FIG. 5).
  • the last (or first) battery charge time of four times is extended to two unit times (13:30 to 14:30, 16: 0 to 17: 0) To be done.
  • the intermediate time of the battery charging (14: 0, 16:30) and the time of the boundary between two unit times (14: 0, 16:30) are substantially equal.
  • the power storage unit is charged in each of two unit times (13:30 to 14:30, 16: 0 to 17: 0) in which one battery is charged. .
  • the amount of system power consumed by charging the power storage unit (when obtaining a remaining capacity of 11 kWh before discharging the power storage unit with a charging efficiency of 85%, 11 ⁇ 0.85 ⁇ 2 ⁇ 6.5 kWh) is reduced to such an extent that the amount of system power consumed in each of the two unit times does not exceed the amount of system power consumed in other unit times (31.9 kWh). This is preferable because the maximum value of the amount of system power consumed per unit time can be effectively reduced.
  • the power of the grid power consumed by charging the power storage unit in each of two unit times (13:30 to 14:30, 16: 0 to 17: 0) in which one battery is charged The amount (6.5 kWh) is preferably large enough to supply a sufficient amount of power (3.1 kWh) by discharging the power storage unit in another unit time.
  • the power storage unit charging and the power storage unit discharging power amount are set so that the difference in the power amount of the system power consumed in each of the five unit times in which the battery is charged four times is reduced, You may select the electrical storage part 12 which has the capacity
  • the amount of grid power consumed by one battery charge is distributed to two unit times. Moreover, in other unit time, the battery charge which consumes the electric power supplied by electrical storage part discharge is performed. Therefore, even when it is necessary to frequently charge the battery, it is possible to reduce the maximum amount of system power consumed per unit time. Therefore, it is possible to reduce the power charge. For example, when the basic charge is calculated by the above formula, the basic charge for one year can be reduced to approximately 1,220,000 yen.
  • FIG. 10 is a graph showing a second specific example of the charging schedule. Note that the upper, middle, and lower graphs of FIG. 10 correspond to the upper, middle, and lower graphs of FIG. 9 for the first specific example. Therefore, the description of each graph in FIG. 10 is omitted with reference to the description of FIG.
  • the system power of 15 kWh is consumed for each unit time and the power of 20 kWh is consumed for one battery charge.
  • one battery charge is 30 minutes and the power storage unit 12 has a sufficient remaining capacity (9 kWh) at the start of the charging schedule (12:00).
  • the battery is charged three times (three electric vehicles C) within four unit times (12:00 to 14:00, 14:00 to 16:00). It is assumed that this is done.
  • the basic charge for one year is about 1.34 million yen.
  • control unit 15 causes the charging unit 11 and the power storage unit 12 to be reduced in order to reduce the maximum value of the grid power consumed per unit time. Control.
  • one of the three times of battery charging is performed over two unit times as described above (see FIG. 5).
  • the last (or first) battery charge time of three times is extended to two unit times (13: 0 to 14: 0, 15: 0 to 16: 0) To be done.
  • the intermediate time of the battery charging (13:30, 15:30) and the time of the boundary between two unit times (13:30, 15:30) are substantially equal.
  • the maximum value of the amount of system power consumed in each of the two unit times is performed over two unit times as described above (see FIG. 5).
  • the last (or first) battery charge time of three times is extended to two unit times (13: 0 to 14: 0, 15: 0 to 16: 0) To be done.
  • the intermediate time of the battery charging (13:30, 15:30) and the time of the boundary between two unit times (13:30, 15:30) are substantially equal.
  • the battery is charged twice except for the above two unit times (13:00 to 14:00, 15:00 to 16:00). 0 minutes to 13:00 and 14:00 to 15:00).
  • the power storage unit discharge is performed in each unit time.
  • an electric energy 9 ⁇ 2 ⁇ 0.85 ⁇ 3.8 kWh at a discharge efficiency of 85%
  • the power storage unit is charged in each of two unit times (13: 0 to 14: 0, 15: 0 to 16: 0) in which one battery is charged. .
  • the amount of system power consumed by charging the power storage unit (9 ⁇ 0.85 ⁇ 2 when obtaining a remaining capacity of 9 kWh before discharging the power storage unit with a charging efficiency of 85%) ⁇ 5.3 kWh) is reduced so that the amount of system power consumed in each of the two unit times does not exceed the amount of system power consumed in other unit times (31.2 kWh). This is preferable because the maximum value of the amount of system power consumed per unit time can be effectively reduced.
  • the power of the grid power consumed by the power storage unit charging in each of two unit times (13: 0 to 14: 0, 15: 0 to 16: 0) in which one battery is charged
  • the amount (5.3 kWh) is preferably large enough to supply a sufficient amount of power (3.8 kWh) by discharging the power storage unit in another unit time.
  • the amount of power to be charged and discharged from the power storage unit is set so that the difference in the power amount of the system power consumed in each of the four unit times when the battery is charged three times is reduced, You may select the electrical storage part 12 which has the capacity
  • the amount of grid power consumed by one battery charge is distributed to two unit times. Moreover, in other unit time, the battery charge which consumes the electric power supplied by electrical storage part discharge is performed. Therefore, even when it is necessary to frequently charge the battery, it is possible to reduce the maximum amount of system power consumed per unit time. Therefore, it is possible to reduce the power charge. For example, when the basic charge is calculated by the above formula, the basic charge for one year can be reduced to approximately 1,200,000 yen.
  • FIG. 11 is a graph showing a third specific example of the charging schedule. Note that the upper, middle, and lower graphs in FIG. 11 correspond to the upper, middle, and lower graphs in FIG. 9 for the first specific example. Therefore, the description of each graph in FIG. 11 is omitted, considering the description of FIG.
  • the system power of 15 kWh is consumed for each unit time and the power of 20 kWh is consumed for one battery charge.
  • one battery charge is 30 minutes and the power storage unit 12 has a sufficient remaining capacity (6 kWh) at the start of the charging schedule (12:00).
  • the battery is charged twice (two electric vehicles C) for three unit times (12: 0-13: 30, 13: 30-15: 30, 15:00). 0 to 16:30) is assumed.
  • the basic charge for one year is about 1.34 million yen.
  • control unit 15 controls the charging unit 11 and the power storage unit 12 to reduce the maximum value of the grid power consumed per unit time. Control.
  • one of the two battery charges is performed over two unit times as described above (see FIG. 5).
  • the time during which one of the batteries is charged is set to two unit times (12:30 to 13:30, 14: 0 to 15: 0, 15:30 to 16:30) Min)).
  • the intermediate time of the battery charging 13: 0, 14:30, 16: 0
  • the time between the two unit times 13: 0, 14:30, 16 (Hour 0 minute).
  • the battery is charged once except for the above two unit times (12:30 to 13:30, 14: 0 to 15: 0, 15:30 to 16:30) 1 unit time (12:00 to 12:30, 13:30 to 14:00, 15: 0 to 15:30).
  • the power storage unit is discharged in the unit time.
  • an electric energy (6 ⁇ 0.85 ⁇ 5.1 kWh at a discharge efficiency of 85%) that is substantially equal to the remaining capacity of the power storage unit 12 is supplied in the unit time, and is consumed in each unit time. It becomes possible to reduce the maximum value of the amount of electric power.
  • two unit times (12:30 to 13:30, 14: 0 to 15: 0, 15:30 to 16:30) in which one battery is charged are performed. )
  • the amount of system power consumed by charging the power storage unit (when obtaining a remaining capacity of 6 kWh before discharging the power storage unit with a charging efficiency of 85%, 6 ⁇ 0.85 ⁇ 2 ⁇ 3.5 kWh) is reduced to such an extent that the amount of grid power consumed in each of the two unit times does not exceed the amount of grid power consumed in other unit times (29.9 kWh).
  • the battery is stored in each of two unit times (12:30 to 13:30, 14: 0 to 15:30, 15:30 to 16:30) in which one battery is charged. It is preferable that the amount of power (3.5 kWh) of the grid power consumed by the partial charging is large enough to supply a sufficient amount of electric power (5.1 kWh) by discharging the power storage unit in other unit time.
  • the power storage unit charge and the power storage unit discharge power amount are set so that the difference in the power amount of the system power consumed in each of three unit times in which the battery is charged twice is reduced, You may select the electrical storage part 12 which has the capacity
  • the amount of grid power consumed by one battery charge is distributed to two unit times. Moreover, in other unit time, the battery charge which consumes the electric power supplied by electrical storage part discharge is performed. Therefore, even when it is necessary to frequently charge the battery, it is possible to reduce the maximum amount of system power consumed per unit time. Therefore, it is possible to reduce the power charge. For example, when the basic charge is calculated by the above formula, the basic charge for one year can be reduced to approximately 1.15 million yen.
  • the number of times of battery charging that can be performed in a certain time is reduced as compared with the first and second specific examples, but the power charge can be greatly reduced. Further, in this specific example, since the capacity of the power storage unit 12 is smaller than that of the first and second specific examples, the configuration of the charging system 1 can be simplified and the cost can be reduced.
  • n is an integer of 2 or more.
  • the control unit 15 may grasp that “battery charging is performed n times in n + 1 unit times” as one set. For example, the control unit 15 recognizes the battery charging reservation input from the user via the input unit 13 as a combination of several sets, and a control method corresponding to each set (for example, see FIGS. 9 to 11). ) To create a charging schedule.
  • FIG. 12 is a graph illustrating an execution example of charging the power storage unit.
  • FIG. 12 corresponds to the middle graph of FIG. Therefore, the description of the graph in FIG. 12 is omitted because the description of the middle graph in FIG. 9 is taken into consideration.
  • FIG. 12A is the same as that shown in the middle graphs of FIGS. Specifically, during the two unit times, the power storage unit charging is performed once before and after one battery charging performed over the two unit times.
  • FIG. 12B shows a case where the power storage unit is charged once regardless of whether or not the battery is charged.
  • the power storage unit charging in this example is performed over two unit times.
  • the amount of grid power consumed in each unit time is equal.
  • the power storage unit charging in FIG. 12A since the overlapping of the battery charging and the power storage unit charging is suppressed, the maximum value of the consumed grid power can be reduced.
  • FIG. 12B since the power storage unit charging is suppressed from being divided by the battery charging, the power storage unit charging can be continuously performed at a time.
  • the power storage unit charging is performed in both of two unit times in which one battery charging is performed is illustrated, it may be performed in either one. However, from the viewpoint of reducing the amount of grid power consumed per unit time, it is preferable to carry out over two unit times as in battery charging. ⁇ Modification> Note that the power supplied by the power storage unit discharge may be consumed as load unit consumption instead of (or in addition to) being consumed as battery charging.
  • a part or all of the operations of the control unit 15 and the like may be performed by a control device such as a microcomputer. Further, all or part of the functions realized by such a control device is described as a program, and the program is executed on a program execution device (for example, a computer) to realize all or part of the functions. It doesn't matter if you do.
  • the charging system 1 shown in FIG. 1 can be realized by hardware or a combination of hardware and software.
  • achieved by software shall represent the functional block of the site
  • the present invention can be used in a charging system that charges a battery or the like provided in an electric vehicle.
  • the present invention is suitable when applied to a charging system that can perform rapid charging in which power consumption is large and charging is performed within a unit time or less.

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Transportation (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • General Chemical & Material Sciences (AREA)
  • Electrochemistry (AREA)
  • Chemical & Material Sciences (AREA)
  • Manufacturing & Machinery (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)
  • Secondary Cells (AREA)
  • Electric Propulsion And Braking For Vehicles (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

【課題】充電する時間帯を制限せず頻繁に充電を行ったとしても、使用する系統電力の電力量の平準化を行い、また、電力料金を低減することが可能である充電システムを提供する。 【解決手段】充電システムは、電力会社から供給される系統電力を消費して充電され、充電した電力を放電により供給する蓄電部と、系統電力と蓄電部から供給される電力とを消費してバッテリを充電する充電部と、を備える。電力会社は、各単位時間に供給した電力量の最大値が大きくなるほど高くなる電力料金を設定する。そして、充電部により行われる少なくとも1回の充電が、2個の単位時間に及んで行われ、当該2個の単位時間以外の少なくとも1個の単位時間で、蓄電部が充電部に電力を供給する。

Description

充電システム
 本発明は、電動車両に備えられるバッテリなどを充電する充電システムに関する。
 近年、蓄電池の大容量化が進み、電動自動車や電動バイクなどの電動車両(Electric Vehicle)の駆動用や、家庭や店舗、ビルなどで消費される電力の貯蔵用などでの利用が検討され、今後広く普及することが見込まれている。また、二酸化炭素排出量の削減などの観点から、電動車両が広く普及することが望まれている。
 電動車両の普及には、電動車両の駆動用の蓄電池(以下、バッテリとする)を充電する充電システムの普及が不可欠である。特に、家庭以外で電動車両のバッテリを充電する充電システムの普及が不可欠である。これについて、コンビニエンスストアなどの店舗等に充電システムを備えさせる構想が提案されている。
 店舗等に充電システムを備える場合、照明や空調装置、冷蔵庫などの各種機器で消費する電力の他に、充電システムで消費する電力をも店舗等が供給する必要がある。充電システムで消費される電力は、店舗等が各種機器で消費する電力と同程度の(例えば、電力のオーダーが略等しい)大きさとなり得る。すると、店舗等が電力会社から購入する電力量が大きくなることで電力料金が増大することが問題となり、当該問題は充電システムの普及を妨げる要因になり得る。
 そこで、例えば特許文献1では、電力単価の安い時間帯や電力需要が少ない時間帯を優先的に利用して蓄電池を充電することで、電力料金を低減する充電システムが提案されている。
特開2008-67418号公報
 特許文献1で提案されている充電システムでは、深夜や早朝などの不便かつ限られた時間帯に充電しなければ、電力料金を低減することができない。しかしながら、電動車両の使用者(以下、単にユーザとする)が、深夜や早朝のような不便な時間帯に店舗等を訪れて充電することは、少ないと考えられる。また反対に、ユーザにとって便利な日中などの時間帯には、多数の電動車両が店舗等を訪れるため、頻繁に充電を行うことが必要になると考えられる。したがって、上記の充電システムでは、電力料金を低減することが困難になる。
 そこで本発明は、充電する時間帯を制限せず、頻繁に充電を行ったとしても、電力料金を低減することが可能である充電システムを提供することを目的とする。
 上記目的を達成するために、本発明における充電システムは、バッテリを充電する充電システムであって、電力会社から供給される系統電力を消費して充電され、充電した電力を放電により供給する蓄電部と、系統電力と前記蓄電部から供給される電力とを消費して前記バッテリを充電する充電部と、を備え、前記充電部により行われる少なくとも1回の充電が、2個の単位時間に及んで行われ、当該2個の単位時間以外の少なくとも1個の単位時間で、前記蓄電部が前記充電部に電力を供給することを特徴とする。
 また、上記構成の充電システムにおいて、前記電力会社が設定する電力料金に、固定性の基本料金と、従量制の使用料金とが含まれ、単位時間に供給した電力量の最大値が大きくなるほど、前記基本料金が高くなることとしても構わない。
 また、上記構成の充電システムにおいて、前記充電部の1回の充電が行われる2個の単位時間の少なくとも一方で、前記蓄電部の充電が行われることとしても構わない。
 このように構成すると、蓄電部の充電を行うタイミングを確保することが可能になる。
そのため、蓄電部の残容量が少ないことで、単位時間に消費される系統電力の電力量の最大値を低減することが困難になる事態が生じることを、抑制することが可能になる。
 また、上記構成の充電システムにおいて、前記充電部が、それぞれが単位時間以下の時間となるn(nは2以上の整数)回の充電を、n+1個の単位時間に行う場合、前記充電部による1回の充電が、2個の単位時間に及んで行われるとともに、他のn-1回の充電が、当該2個の単位時間以外のn-1個の単位時間のそれぞれで行われることとしても構わない。
 このように構成すると、充電部による1回の充電に対する単位時間が2個よりも少なく、2個の単位時間に及ぶ充電部の充電を複数回行うことが困難になる場合でも、単位時間に消費される系統電力の電力量の最大値を低減することが可能になる。
 また、上記構成の充電システムにおいて、前記充電部の1回の充電が行われる2個の単位時間のそれぞれで消費される系統電力の電力量が、他の単位時間に消費される系統電力の電力量を超えないこととしても構わない。
 このように構成すると、単位時間に消費される系統電力の電力量の最大値を効果的に低減することが可能になる。
 また、上記構成の充電システムにおいて、前記充電部の1回の充電が行われる2個の単位時間で、当該充電の前後に前記蓄電部の充電が1回ずつ行われることとしても構わない。
 このように構成すると、充電部による充電と蓄電部の充電との重複が抑制されるため、消費される系統電力の最大値を低減することが可能になる。
 また、上記構成の充電システムにおいて、前記充電部の1回の充電が行われる2個の単位時間で、前記蓄電部の充電が1回行われることとしても構わない。
 このように構成すると、蓄電部の充電が、充電部による充電によって分断されることが抑制されるため、蓄電部の充電を一度で連続的に行うことが可能になる。
 また、上記構成の充電システムにおいて、前記充電部の少なくとも1回の充電の中間の時刻と、2個の単位時間の境界の時刻と、が略等しくなることとしても構わない。
 このように構成すると、2個の単位時間に消費される系統電力の電力量の最大値を、効果的に低減することが可能となる。
 また、上記構成の充電システムにおいて、前記充電部により複数回の充電が行われる場合、それぞれの充電が行われる単位時間が、それぞれ異なることとしても構わない。
 このように構成すると、充電部の複数回の充電により消費される系統電力の電力量が、ある単位時間で重複することが抑制される。そのため、単位時間に消費される系統電力の電力量が増大することを、抑制することが可能となる。
 本発明の構成とすると、1回の充電部の充電で消費される系統電力の電力量が、2個の単位時間に分配される。また、他の単位時間では、蓄電部の放電により供給される電力を消費して、充電部が充電を行う。そのため、頻繁に充電部が充電を行う必要がある場合であっても、単位時間に消費される系統電力の電力量の最大値を低減することが可能となる。したがって、電力料金を低減することが可能となる。
 本発明の意義ないし効果は、以下に示す実施の形態の説明によりさらに明らかとなろう。ただし、以下の実施の形態は、あくまでも本発明の実施の形態の一つであって、本発明ないし各構成要件の用語の意義は、以下の実施の形態に記載されたものに制限されるものではない。
は、本発明の実施の一形態である充電システムの構成例を示すブロック図である。 は、系統電力の電力料金の算出方法の概要を示すグラフである。 は、バッテリ充電を行うタイミングを好ましくない方法で制御した場合に消費される電力の一例を示すグラフである。 は、図3に示すようにバッテリ充電を行うタイミングを制御した場合における、各単位時間に消費される系統電力の電力量を示すグラフである。 は、バッテリ充電を行うタイミングを好ましい方法で制御した場合に消費される電力の一例を示すグラフである。 は、図5に示すようにバッテリ充電を行うタイミングを制御した場合における、各単位時間に消費される系統電力の電力量を示すグラフである。 は、バッテリ充電及び蓄電部放電を行うタイミングを好ましい方法で制御した場合に消費される電力の一例を示すグラフである。 は、図7に示すようにバッテリ充電及び蓄電部放電を行うタイミングを制御した場合における、各単位時間に消費される系統電力の電力量を示すグラフである。 は、充電スケジュールの第1具体例を示すグラフである。 は、充電スケジュールの第2具体例を示すグラフである。 は、充電スケジュールの第3具体例を示すグラフである。 は、蓄電部充電の実行例を示すグラフである。
 本発明の実施の一形態である充電システムについて、以下図面を参照して説明する。まず、本発明の実施の一形態である充電システムの構成及び動作の一例について、図面を参照して説明する。
<充電システム>
 図1は、本発明の実施の一形態である充電システムの構成例を示すブロック図である。
なお、図中の各ブロックを接続する実線の矢印は電力のやり取りを示し、破線の矢印は情報のやり取りを示している。
 図1に示す充電システム1は、供給される電力を消費することで電動車両Cに備えられるバッテリBに電力を供給して充電する充電部11と、供給される電力を充電するとともに放電により電力を供給する蓄電部12と、ユーザの指示が入力される入力部13と、ユーザに報知を行う報知部14と、入力部13からユーザの指示が入力されるとともに充電部11及び蓄電部12の動作を制御する制御部15と、を備える。なお、以下では、充電部11による電動車両CのバッテリBの充電をバッテリ充電と表現し、蓄電部12の充電を蓄電部充電と表現することで、これらを区別する。また、蓄電部12の放電を、蓄電部放電と表現する。
 充電システム1には、電力会社から供給される電力(以下、系統電力とする)が供給される。系統電力は、充電システム1を備える店舗等の各種機器(例えば、照明や空調装置、冷蔵庫など。以下、負荷部Rとする)にも供給され、消費される。
 充電部11は、系統電力や、蓄電部12の蓄電部放電により供給される電力を適宜変換して(例えば、交流電力を直流電力に変換したり、電動車両CのバッテリBに供給する直流電力の電圧値などを調整したりして)、バッテリ充電を行う。
 蓄電部12は、供給される系統電力を必要に応じて変換して(例えば、交流電力を直流電力に変換したり、直流電力の電圧値などを調整したりして)、蓄電部充電を行う。また、蓄電部充電で消費した(蓄電部12に蓄えた)電力を蓄電部放電することで、充電部11に電力を供給する。なお、蓄電部放電により供給される電力が、負荷部Rに供給されるように構成しても構わない。
 入力部13は、ユーザに操作されたり、ユーザの所有物(例えば、携帯端末など)から送信される指示内容を受信したりすることで、ユーザの指示が入力される。また、入力部13は、入力されたユーザの指示を制御部15に伝える。ユーザの指示として、例えば、バッテリ充電を開始する指示や、バッテリ充電を予約する指示、バッテリ充電を停止する指示などがある。
 報知部14は、例えば、表示装置やスピーカなどを備えて画像や音声を出力したり、送信装置を備えてユーザの所有物(例えば、事前に充電システム1に登録された携帯端末など)に情報を送信したりすることで、ユーザに報知を行う。報知部がユーザに報知する内容として、例えば、予約されたバッテリ充電を行うタイミングや、バッテリ充電の開始や終了、停止などがある。
 制御部15は、充電部11によるバッテリ充電や、蓄電部12の蓄電部充電及び蓄電部放電を制御する。また、制御部15は、バッテリ充電を予約する旨の指示が入力部12に入力されたことを確認すると、当該指示に基づいて充電スケジュールを作成する。そして、報知部14を制御して、ユーザに充電スケジュールの一部または全部を報知する。
 また、制御部15は、バッテリ充電を行う時間帯を制限することなく、店舗等にかかる電力料金を低減することを可能とする充電スケジュールを作成する。そして、作成した充電スケジュールに沿って、充電部11や蓄電部12の動作を制御する。なお、充電スケジュール(即ち、充電部11がバッテリ充電を行うタイミングや、蓄電部12が蓄電部充電及び蓄電部放電を行うタイミングの制御方法)の詳細については、後述する。
 充電スケジュールには、バッテリ充電の開始時刻や終了時刻が含まれ得る。また、蓄電部充電及び蓄電部放電を行う時刻も含まれ得る。ユーザは、報知部14により充電スケジュールを報知されることで、少なくともバッテリ充電の開始時刻を認識する。そして、例えば電動車両Cと充電部11とが当該開始時 以上のように構成すると、例えば、バッテリ充電をするべくユーザが店舗等に出向いたときに、他のユーザが先にバッテリ充電を行っていることで迅速にバッテリ充電を行うことができない状況(充電待ち)が発生することを、抑制することが可能となる。
 また、充電システム1は、充電待ちの発生を抑制するとともに、電力料金を低減することができるため、ユーザ側にも店舗等の側にも好ましいものとなる。そのため、充電システム1の普及を見込むことができる。そして、充電システム1を普及させることで、電動車両の普及の促進、ひいては二酸化炭素排出量の削減を図ることが可能となる。
 なお、図1に示す充電システムの構成は一例に過ぎず、他の構成としても構わない。例えば、充電部11や蓄電部12、負荷部Rなどに電力を供給可能な他の電力源(例えば、太陽電池など)を備える構成としても構わない。
 また、充電部11が、バッテリ充電を行う1台の電動車両Cにのみ接続可能としても構わないし、複数の電動車両Cに接続可能としても構わない。また、充電部11を複数の電動車両Cに接続可能な構成とする場合、制御部15が充電部11を制御することで、充電部11に接続されたそれぞれの電動車両CのバッテリBに対して、順次バッテリ充電を行う構成としても構わない。
<電力料金の算出方法>
 次に、系統電力の電力料金の算出方法の一例について、図面を参照して説明する。図2は、系統電力の電力料金の算出方法の概要を示すグラフである。なお、図2に示すグラフは、12時0分~12時30分、12時30分~13時0分、13時0分~13時30分及び13時30分~14時0分のそれぞれの単位時間(毎時0分~30分及び30分~0分のそれぞれの30分間)において、充電システム1を備える店舗等の全体で消費された系統電力の電力量を、グラフの高さとして示したものである。
 系統電力の電力料金には、例えば、固定性の基本料金と、従量制の使用料金とが含まれる。一般的に電力会社は、効率良く発電する(発電する電力を平準化する)などの理由から、単位時間に消費される系統電力の電力量の最大値が大きくなるほど、基本料金が高くなるように設定している。
 図2に示す例では、13時0分~13時30分の単位時間に消費される電力量WPが、他の単位時間に消費される電力量よりも大きいため、最大値となる。そのため、13時0分~13時30分の単位時間に消費される電力量WPに基づいて、基本料金が設定されることになる。なお、図2では説明の簡略化のため、4個の単位時間のみを示しているが、
一般的な電力会社では、もっと多数の単位時間(例えば、1年分)の中から電力量の最大値を求めることとしている。
<充電スケジュール>
 上述のように、単位時間に消費される系統電力の電力量の最大値を低減することで、電力料金(特に、基本料金。以下同じ。)を低減することができる。以下、単位時間に消費される系統電力の電力量の最大値を低減するための充電スケジュール(制御部15によるバッテリ充電を行うタイミングの制御方法)について、図面を参照して説明する。まず、
比較のために、図3及び図4を参照して、バッテリ充電を行うタイミングの好ましくない制御方法について説明する。
 図3は、バッテリ充電を行うタイミングを好ましくない方法で制御した場合に消費される電力の一例を示すグラフである。また図4は、図3に示すようにバッテリ充電を行うタイミングを制御した場合における、各単位時間に消費される系統電力の電力量を示すグラフである。図3及び図4のいずれも、図2に示す時間(12時~14時)と同じ時間について示すものである。また、図3では、バッテリ充電で消費される系統電力の大きさを白塗の領域の高さで示し、負荷部Rで消費される(以下、負荷部消費と表現する)系統電力の大きさを、灰色塗の領域の高さで示している。
 また、以下では説明の簡略化のため、図3に示すように、負荷部消費の大きさが、時刻に関係なく一定であることとする。そのため、図4に示すように、各単位時間における負荷部消費の電力量WRも一定となる。また、図3に示すように、バッテリ充電で消費される(電動車両CのバッテリBに充電される)電力の大きさも、時刻に関係なく一定であることとする。さらに、図3に示すように、1回のバッテリ充電にかかる時間(電動車両Cの1台当たりの充電時間)が、単位時間(30分)以下の時間(20分)であり、毎回同
じ時間になることとする。
 図3に示す例では、12時0分~12時20分の時間と、13時5分~13時25分の時間とにおいて、充電部11によるバッテリ充電が行われることとしている。いずれの時間も、単位時間(12時0分~12時30分、13時0分~13時30分)内に全て収まっている。
 図3に示すようにバッテリ充電を行うと、1回のバッテリ充電で消費される電力量の全てが、1個の単位時間に充電部11で消費される系統電力の電力量になる。特に、単位時間以下の時間でバッテリ充電を行う急速充電では、消費する電力が大きくなる。そのため、1個の単位時間に消費される系統電力の電力量が、大きくなり得る。したがって、図4に示すように、バッテリ充電が行われた単位時間(12時0分~12時30分、13時0分~13時30分)に消費された系統電力の電力量WPUが、比較的大きくなる。
 この場合、最低でもバッテリ充電が行われた単位時間(12時0分~12時30分、13時0分~13時30分)の電力量WPUに基づいて、電力料金(基本料金)が設定される。したがって、電力料金が増大し得る。
 これに対して、図5及び図6を参照して、バッテリ充電を行うタイミングの好ましい制御方法について説明する。
 図5は、バッテリ充電を行うタイミングを好ましい方法で制御した場合に消費される電力の一例を示すグラフであり、好ましくない制御方法について示した図3に相当するものである。図6は、図5に示すようにバッテリ充電を行うタイミングを制御した場合における、各単位時間に消費される系統電力の電力量を示すグラフであり、好ましくない制御方法について示した図4に相当するものである。なお、図5において、バッテリ充電が行われるタイミングが図3に示すタイミングと異なること以外は、図3と同様である。そのため、以下図5について、図3と同様となる部分については説明を省略し、異なる部分について詳細に説明する。
 図5に示す例では、12時20分~12時40分の時間と、13時25分~13時45分の時間と、のそれぞれでバッテリ充電が行われることとしている。いずれのバッテリ充電が行われる時間も、それぞれ異なる(重複しない)単位時間(12時0分~12時30分及び12時30分~13時0分、13時0分~13時30分及び13時30分~14時0分)に及ぶ(またがる)ものとしている。
 以上のように構成すると、単位時間以下の時間でバッテリ充電を行うために消費する電力が大きくなりやすい場合(例えば、急速充電を行う場合)でも、1回のバッテリ充電で消費される系統電力の電力量を、2個の単位時間に分配することが可能となる。そのため、図6に示すように、各単位時間に消費される系統電力の電力量WP1~WP3を、比較的小さくすることが可能となる。例えば、図4に示す電力量WPUよりも小さくすること
が可能となる。したがって、単位時間に消費される系統電力の電力量の最大値を抑制することが可能となり、電力料金を低減することが可能となる。
 さらに、バッテリ充電を行う時間を僅かに変更するだけで済むため、バッテリ充電を行う時間帯を深夜や早朝などに制限する必要がない。したがって、バッテリ充電を行う時間帯を制限することなく、容易に電力料金を低減することが可能となる。
 また、充電部11が複数のバッテリ充電を行う場合に、それぞれのバッテリ充電が行われるタイミングが、それぞれ異なる単位時間に及ぶものとしている。そのため、複数のバッテリ充電で消費される系統電力の電力量が、重複した単位時間に分配されることで、当該単位時間に消費される系統電力の電力量が増大することを抑制することが可能となる。
 ところで、図5に示す12時20分~12時40分の時間で行われるバッテリ充電は、その中間の時刻(12時30分)と、2個の単位時間の境界の時刻(12時30分)と、が略等しくなるようにしている。このように構成すると、1回のバッテリ充電で消費する系統電力の電力量を、容易に2個の単位時間に略等しく分配することが可能となる。そのため、単位時間に消費される系統電力の電力量の最大値を、効果的に抑制することが可能となる(以下、このようにバッテリ充電が行われる時間を、「基準時間」とする)。
 しかしながら、諸般の事情(例えば、ユーザの都合によるバッテリ充電の開始時刻の変更など)により、基準時間(上述の例では毎時20分~40分(または毎時50分~10分でも良い))に必ずバッテリ充電が行われるように制御することは困難である。また、バッテリ充電を行う時間を必要以上に限定すると、効率良くバッテリ充電を行うことが困難になる。
 そこで以下では、単位時間に消費される系統電力の電力量の最大値を効果的に抑制しつつも、バッテリ充電を行う時間の変動を許容することができる充電スケジュール(制御部15による、バッテリ充電及び蓄電部放電を行うタイミングの制御方法)を、図7及び図8を参照して説明する。
 図7は、バッテリ充電及び蓄電部放電を行うタイミングを好ましい方法で制御した場合に消費される電力の一例を示すグラフであり、上述の好ましい方法について示した図5に相当するものである。図8は、図7に示すようにバッテリ充電及び蓄電部放電を行うタイミングを制御した場合における、各単位時間に消費される系統電力の電力量を示すグラフであり、上述の好ましい方法について示した図6に相当するものである。なお、図7において、バッテリ充電を行うタイミングが図5に示す時間と異なることや、蓄電部放電により供給される電力をバッテリ充電に利用すること以外は、図5と同様である。そのため、以下図7について、図5と同様となる部分については説明を省略し、異なる部分について詳細に説明する。なお、図7では、蓄電部放電により供給されてバッテリ充電で消費される電力の大きさを、黒塗の領域の高さで示している。
 図7に示す例では、12時15分~12時35分の時間と、13時5分~13時25分の時間と、のそれぞれでバッテリ充電が行われることとしている。ただし、12時15分~12時20分の時間と、13時5分~13時15分の時間とのそれぞれにおいて、系統電力だけでなく蓄電部放電により供給される電力をも用いて、バッテリ充電を行う。
 以上のように構成すると、各単位時間において、バッテリ充電により消費される系統電力の電力量に上限(本例では、1回のバッテリ充電で消費される系統電力の電力量の半分)が設けられることとなる。そのため、図8に示すように、各単位時間に消費される系統電力の電力量WP1,WP2,WRを、比較的小さくすることが可能となる。例えば、図6に示す電力量WP1以下にすることが可能となる。したがって、単位時間に消費される系統電力の電力量の最大値を効果的に抑制することが可能となり、電力料金をさらに低減することが可能となる。
 また、蓄電部放電により供給可能な電力量に対応した時間だけ、バッテリ充電を行う時間の変動を許容することが可能となる。例えば、蓄電部放電により供給可能な電力量が、バッテリ充電で消費される電力量の1/4に相当するものであれば、バッテリ充電を行う時間を基準時間から1/4(上述の例では5分)だけ変動させることが可能となる。
 したがって、単位時間に消費される系統電力の電力量の最大値を効果的に抑制しつつも、バッテリ充電を行う時間の変動を許容することが可能となる。具体的に例えば、ユーザがバッテリ充電を行う時間を予約した時間から変動させたとしても、その変動された時間にバッテリ充電を行いつつ、電力料金を効果的に低減することが可能となる。
 また、図7及び図8に示す制御方法において、バッテリ充電で消費される電力量の1/2以上に相当する電力量を蓄電部放電により供給可能な場合、例えば図7の13時5分~13時25分の時間のバッテリ充電に示すように、任意の時間にバッテリ充電を行うことが可能となる。
 なお、図7において、バッテリ充電開始後の所定の時間に、蓄電部放電を行って電力を供給することとしたが、バッテリ充電終了前の所定の時間に、蓄電部放電を行って電力を供給しても構わない。特に、バッテリ充電を行う時間を、基準時間の前方に変動させる場合は、図7に示すようにバッテリ充電開始後の所定の時間に蓄電部放電を行い、基準時間の後方に変動させる場合は、バッテリ充電終了前の所定の時間に蓄電部放電を行っても構わない。
 また、図7において、系統電力を消費するバッテリ充電と、蓄電部放電により供給される電力を消費するバッテリ充電と、を別々に行うこととしたが、同時に行う場合が含まれても構わない。具体的に例えば、図7の12時15分~12時35分のバッテリ充電において、蓄電部放電により12時15分~12時20分に電力を供給する代わりに、その1/3の電力を12時15分~12時30分に分散して供給しても構わない。
 このように構成すると、蓄電部放電により供給する電力を小さくすることが可能となる。そのため、蓄電部12が大きな電力を急激に放電(または、充電)することを抑制し、蓄電部12の負担を軽減することが可能となる。また、このような構成としても、上述のように、単位時間に消費される系統電力の電力量の最大値を、効果的に抑制することが可能である。
 また、バッテリ充電を行う時間を、基準時間の前方に変動させる場合、後方の単位時間(図8の例では、12時30分~13時0分、13時30分~14時0分)では、充電部11で消費される系統電力の電力量が小さくなり得る。そのため、この単位時間において、系統電力により蓄電部充電を行っても構わない。同様に、バッテリ充電を行う時間を、おいて、系統電力により蓄電部充電を行っても構わない。
 また、図5及び図7に示す時間は、電力会社が設置する電力計等に付随する時計で測定されるものであり、実際の時間に対してずれが生じる場合もある。当該ずれにより、例えば単位時間が、実際の時間で毎時10分~40分及び40分~10分になっていると、好ましい。この場合、基準時間の開始時刻を毎時0分(または30分でも良い)にすることが可能になる。そのため、ユーザにとってキリが良く覚えやすい時刻を、バッテリ充電の開始時刻とすることが可能となる。
 また、説明の簡略化のため、バッテリ充電で消費される電力の大きさを時刻によらず一定としたが、一定でなくても構わない。この場合、1回のバッテリ充電で消費される系統電力の電力量を2個の単位時間に略等しく分配するために、バッテリ充電の中間の時刻を、2個の単位時間の境界となる時刻とずらして設定しても構わない。また、このような場合でも、制御部15による充電部11の制御の簡略化のため、バッテリ充電の中間の時刻と、2個の単位時間の境界の時刻と、が略等しくなるように設定しても構わない。
<充電スケジュールの具体例>
 充電スケジュールの各具体例について、以下図面を参照して説明する。なお、以下において説明する充電スケジュールの各具体例は、図7及び図8に示したような、蓄電部放電を利用する(バッテリ充電を行うタイミングだけでなく、蓄電部放電を行うタイミングをも制御する)ものである。さらに、以下説明する充電スケジュールの各具体例は、バッテリ充電及び蓄電部放電を行うタイミングだけでなく、蓄電部充電を行うタイミングをも制御するものである。
 また、以下に示す充電スケジュールの各具体例は、充電システム1が、頻繁にバッテリ充電を行う必要がある場合を想定している。具体的には、1回のバッテリ充電に対する単位時間が2個よりも少なく、2個の単位時間に及ぶバッテリ充電(例えば、図5及び図7参照)を複数回行うことが困難になる場合を想定している。
[第1具体例]
 最初に、充電スケジュールの第1具体例について、図9を参照して説明する。図9は充電スケジュールの第1具体例を示すグラフである。図9の上段のグラフは、バッテリ充電、蓄電部放電及び蓄電部充電を行うタイミングを好ましくない方法で制御した場合に消費される電力の一例を示すグラフであり、図3に相当するものである。図9の中段のグラフは、バッテリ充電、蓄電部放電及び蓄電部充電を行うタイミングを好ましい方法で制御する場合に消費される電力の一例を示すグラフである。図9の下段のグラフは、中段のグラフに示すようにバッテリ充電、蓄電部放電及び蓄電部充電を行うタイミングを制御する場合における、蓄電部12に充電されている電力量(残容量)を示すグラフである。
 図9の上段及び中段のグラフでは、図3、図5及び図7と同様に、バッテリ充電で消費される系統電力の大きさを白塗の領域の高さで示し、負荷部消費で消費される系統電力の大きさを灰色塗の領域の高さで示し、蓄電部放電により供給される電力の大きさを黒塗の領域の高さで示している。さらに、蓄電部充電で消費される系統電力の大きさを、格子状のハッチングを付した領域の高さで示している。また、代表的ないくつかの領域の内部に、単位時間当たりに消費される系統電力の電力量や、単位時間当たりに蓄電部放電によって供給されて消費される電力量を、表示する。
 本具体例では、図9の上段及び中段のグラフに示すように、各単位時間において負荷部消費で15kWhの電力量の系統電力が消費され、1回のバッテリ充電で20kWh(一般的な電動車両CのバッテリBが充電可能な電力量(容量)の80%に相当)の電力量が消費される場合を想定している。また、4回(4台の電動車両C)のバッテリ充電を、5個の単位時間(12時0分~14時30分、14時30分~17時0分)内に行い、1回のバッテリ充電が30分である場合を想定している。また、本具体例の充電スケジュールの開始時(12時0分)に、蓄電部12が十分な残容量(11kWh)を有している場合を想定している。
 図9の上段のグラフに示すように、図3と同様にそれぞれのバッテリ充電をそれぞれの単位時間内に行うと、単位時間に消費される系統電力の電力量の最大値(本具体例では、15+20=35kWh)が大きくなり得る。例えば、1年分の基本料金が、当該最大値の1時間換算値(35×2)×1月分の基本料金の単価(1600)×1年分(12)で求められるものと仮定すると、およそ134万円となる。
 そこで、本具体例では、単位時間に消費される系統電力の電力量の最大値を低減するべく、図9中段及び下段のグラフに示すように、制御部15が充電部11及び蓄電部12を制御する。
 本具体例では、4回のバッテリ充電のうち1回を、上述のように2個の単位時間に及んで行われるようにする(図5参照)。例えば、4回のうち最後(または、最初)となるバッテリ充電が行われる時間を、2個の単位時間(13時30分~14時30分、16時0分~17時0分)に及んで行われるようにする。例えばこのとき、当該バッテリ充電の中間の時刻(14時0分、16時30分)と、2個の単位時間の境界の時刻(14時0分、16時30分)と、が略等しくなるようにする。これにより、当該2個の単位時間のそれぞれで消費される系統電力の電力量の最大値を、効果的に低減することが可能となる。
 一方、上記以外の3回のバッテリ充電は、上記の2個の単位時間(13時30分~14時30分、16時0分~17時0分)以外の3個の単位時間(12時0分~13時30分、14時30分~16時0分)のそれぞれで行う。ただし、当該単位時間のそれぞれで、蓄電部放電を行う。これにより、当該単位時間のそれぞれで、例えば蓄電部12の残容量の1/3と略等しい電力量(放電効率85%で11÷3×0.85≒3.1kWh)が供給され、当該単位時間のそれぞれで消費される系統電力の電力量の最大値を、低減することが可能となる。なお、本具体例では、当該単位時間に消費される系統電力の電力量(15+20-3.1=31.9kWh)が、最大値となる。
 さらに、本具体例では、1回のバッテリ充電が行われる2個の単位時間(13時30分~14時30分、16時0分~17時0分)のそれぞれで、蓄電部充電を行う。このとき、当該2個の単位時間のそれぞれにおいて、蓄電部充電で消費される系統電力の電力量(充電効率85%で蓄電部放電前の残容量11kWhを得る場合、11÷0.85÷2≒6.5kWh)を、当該2個の単位時間のそれぞれで消費される系統電力の電力量が他の単位時間に消費される系統電力の電力量(31.9kWh)を超えない程度に小さくすると、単位時間に消費される系統電力の電力量の最大値を効果的に低減することができるため、好ましい。
 また、1回のバッテリ充電が行われる2個の単位時間(13時30分~14時30分、16時0分~17時0分)のそれぞれにおいて蓄電部充電で消費される系統電力の電力量(6.5kWh)は、他の単位時間で蓄電部放電により十分な電力量(3.1kWh)を供給可能な程度に大きいと、好ましい。なお、例えば4回のバッテリ充電が行われる5回の単位時間のそれぞれで消費される系統電力の電力量の差が小さくなるように、蓄電部充電及び蓄電部放電する電力量を設定したり、当該電力量を充電及び放電可能な容量を有する蓄電部12を選定したりしても構わない。
 以上のように構成すると、1回のバッテリ充電で消費される系統電力の電力量が、2個の単位時間に分配される。また、他の単位時間では、蓄電部放電により供給される電力を消費するバッテリ充電が行われる。そのため、頻繁にバッテリ充電を行う必要がある場合であっても、単位時間に消費される系統電力の電力量の最大値を低減することが可能となる。したがって、電力料金を低減することが可能となる。例えば、上述の式によって基本料金が算出される場合、1年分の基本料金を、およそ122万円まで低減することができる。
 また、蓄電部充電を行うタイミングを確保することが可能になる。そのため、蓄電部12の残容量が少ないことで、単位時間に消費される系統電力の電力量の最大値を低減することが困難になる事態が生じることを、抑制することが可能になる。
[第2具体例]
 次に、充電スケジュールの第2具体例について、図10を参照して説明する。図10は充電スケジュールの第2具体例を示すグラフである。なお、図10の上段、中段及び下段のそれぞれのグラフは、第1具体例について示した図9の上段、中段及び下段のそれぞれのグラフに相当するものである。そのため、図10のそれぞれのグラフの説明については、図9の説明を参酌するものとして、省略する。
 本具体例では、第1具体例と同様に、各単位時間において負荷部消費で15kWhの電力量の系統電力が消費され、1回のバッテリ充電で20kWhの電力量が消費される場合を想定している。また、1回のバッテリ充電が30分であり、充電スケジュールの開始時(12時0分)に、蓄電部12が十分な残容量(9kWh)を有している場合を想定している。ただし、本具体例では、3回(3台の電動車両C)のバッテリ充電を、4個の単位時間(12時0分~14時0分、14時0分~16時0分)内に行う場合を想定している。
 図10の上段のグラフに示すように、図3と同様にそれぞれのバッテリ充電をそれぞれの単位時間内に行うと、単位時間に消費される系統電力の電力量の最大値(本具体例では、15+20=35kWh)が大きくなり得る。例えば、第1具体例において説明したように、1年分の基本料金がおよそ134万円となる。
 そこで、本具体例では、単位時間に消費される系統電力の電力量の最大値を低減するべく、図10中段及び下段のグラフに示すように、制御部15が充電部11及び蓄電部12を制御する。
 本具体例では、3回のバッテリ充電のうち1回を、上述のように2個の単位時間に及んで行われるようにする(図5参照)。例えば、3回のうち最後(または、最初)となるバッテリ充電が行われる時間を、2個の単位時間(13時0分~14時0分、15時0分~16時0分)に及んで行われるようにする。例えばこのとき、当該バッテリ充電の中間の時刻(13時30分、15時30分)と、2個の単位時間の境界の時刻(13時30分、15時30分)と、が略等しくなるようにする。これにより、当該2個の単位時間のそれぞれで消費される系統電力の電力量の最大値を、効果的に低減することが可能となる。
 一方、上記以外の2回のバッテリ充電は、上記の2個の単位時間(13時0分~14時0分、15時0分~16時0分)以外の2個の単位時間(12時0分~13時0分、14時0分~15時0分)のそれぞれで行う。ただし、当該単位時間のそれぞれで、蓄電部放電を行う。これにより、当該単位時間のそれぞれで、例えば蓄電部12の残容量の1/2と略等しい電力量(放電効率85%で9÷2×0.85≒3.8kWh)が供給され、当該単位時間のそれぞれで消費される系統電力の電力量の最大値を、低減することが可能となる。なお、本具体例では、当該単位時間に消費される系統電力の電力量(15+20-3.8=31.2kWh)が、最大値となる。
 さらに、本具体例では、1回のバッテリ充電が行われる2個の単位時間(13時0分~14時0分、15時0分~16時0分)のそれぞれで、蓄電部充電を行う。このとき、当該2個の単位時間のそれぞれにおいて、蓄電部充電で消費される系統電力の電力量(充電効率85%で蓄電部放電前の残容量9kWhを得る場合、9÷0.85÷2≒5.3kWh)を、当該2個の単位時間のそれぞれで消費される系統電力の電力量が他の単位時間に消費される系統電力の電力量(31.2kWh)を超えない程度に小さくすると、単位時間に消費される系統電力の電力量の最大値を効果的に低減することができるため、好ましい。
 また、1回のバッテリ充電が行われる2個の単位時間(13時0分~14時0分、15時0分~16時0分)のそれぞれにおいて蓄電部充電で消費される系統電力の電力量(5.3kWh)は、他の単位時間で蓄電部放電により十分な電力量(3.8kWh)を供給可能な程度に大きいと、好ましい。なお、例えば3回のバッテリ充電が行われる4回の単位時間のそれぞれで消費される系統電力の電力量の差が小さくなるように、蓄電部充電及び蓄電部放電する電力量を設定したり、当該電力量を充電及び放電可能な容量を有する蓄電部12を選定したりしても構わない。
 以上のように構成すると、1回のバッテリ充電で消費される系統電力の電力量が、2個の単位時間に分配される。また、他の単位時間では、蓄電部放電により供給される電力を消費するバッテリ充電が行われる。そのため、頻繁にバッテリ充電を行う必要がある場合であっても、単位時間に消費される系統電力の電力量の最大値を低減することが可能となる。したがって、電力料金を低減することが可能となる。例えば、上述の式によって基本料金が算出される場合、1年分の基本料金を、およそ120万円まで低減することができる。
 また、蓄電部充電を行うタイミングを確保することが可能になる。そのため、蓄電部12の残容量が少ないことで、単位時間に消費される系統電力の電力量の最大値を低減することが困難になる事態が生じることを、抑制することが可能になる。
 また、本具体例は、第1具体例と比較して、一定時間に行い得るバッテリ充電の回数は減少するが、電力料金をより大きく低減することが可能となる。また、本具体例は、蓄電部12の容量が、第1具体例よりも小さいもので済むため、充電システム1の構成の簡略化や低コスト化を図ることが可能になる。
[第3具体例]
 次に、充電スケジュールの第3具体例について、図11を参照して説明する。図11は充電スケジュールの第3具体例を示すグラフである。なお、図11の上段、中段及び下段のそれぞれのグラフは、第1具体例について示した図9の上段、中段及び下段のそれぞれのグラフに相当するものである。そのため、図11のそれぞれのグラフの説明については、図9の説明を参酌するものとして、省略する。
 本具体例では、第1具体例と同様に、各単位時間において負荷部消費で15kWhの電力量の系統電力が消費され、1回のバッテリ充電で20kWhの電力量が消費される場合を想定している。また、1回のバッテリ充電が30分であり、充電スケジュールの開始時(12時0分)に、蓄電部12が十分な残容量(6kWh)を有している場合を想定している。ただし、本具体例では、2回(2台の電動車両C)のバッテリ充電を、3個の単位時間(12時0分~13時30分、13時30分~15時0分、15時0分~16時30分)内に行う場合を想定している。
 図11の上段のグラフに示すように、図3と同様にそれぞれのバッテリ充電をそれぞれの単位時間内に行うと、単位時間に消費される系統電力の電力量の最大値(本具体例では、15+20=35kWh)が大きくなり得る。例えば、第1具体例において説明したように、1年分の基本料金がおよそ134万円となる。
 そこで、本具体例では、単位時間に消費される系統電力の電力量の最大値を低減するべく、図11中段及び下段のグラフに示すように、制御部15が充電部11及び蓄電部12を制御する。
 本具体例では、2回のバッテリ充電のうち1回を、上述のように2個の単位時間に及んで行われるようにする(図5参照)。例えば、2回のうちいずれかのバッテリ充電が行われる時間を、2個の単位時間(12時30分~13時30分、14時0分~15時0分、15時30~16時30分)に及んで行われるようにする。例えばこのとき、当該バッテリ充電の中間の時刻(13時0分、14時30分、16時0分)と、2個の単位時間の境界の時刻(13時0分、14時30分、16時0分)と、が略等しくなるようにする。これにより、当該2個の単位時間のそれぞれで消費される系統電力の電力量の最大値を、効果的に低減することが可能となる。
 一方、上記以外の1回のバッテリ充電は、上記の2個の単位時間(12時30分~13時30分、14時0分~15時0分、15時30~16時30分)以外の1個の単位時間(12時0分~12時30分、13時30分~14時0分、15時0分~15時30分)で行う。ただし、当該単位時間で、蓄電部放電を行う。これにより、当該単位時間で、例えば蓄電部12の残容量と略等しい電力量(放電効率85%で6×0.85≒5.1kWh)が供給され、当該単位時間のそれぞれで消費される系統電力の電力量の最大値を、低減することが可能となる。なお、本具体例では、当該単位時間に消費される系統電力の電力量(15+20-5.1=29.9kWh)が、最大値となる。
 さらに、本具体例では、1回のバッテリ充電が行われる2個の単位時間(12時30分~13時30分、14時0分~15時0分、15時30分~16時30分)のそれぞれで、蓄電部充電を行う。このとき、当該2個の単位時間のそれぞれにおいて、蓄電部充電で消費される系統電力の電力量(充電効率85%で蓄電部放電前の残容量6kWhを得る場合、6÷0.85÷2≒3.5kWh)を、当該2個の単位時間のそれぞれで消費される系統電力の電力量が他の単位時間に消費される系統電力の電力量(29.9kWh)を超えない程度に小さくすると、単位時間に消費される系統電力の電力量の最大値を効果的に低減することができるため、好ましい。
 また、1回のバッテリ充電が行われる2個の単位時間(12時30分~13時30分、14時0分~15時0分、15時30分~16時30分)のそれぞれにおいて蓄電部充電で消費される系統電力の電力量(3.5kWh)は、他の単位時間で蓄電部放電により十分な電力量(5.1kWh)を供給可能な程度に大きいと、好ましい。なお、例えば2回のバッテリ充電が行われる3回の単位時間のそれぞれで消費される系統電力の電力量の差が小さくなるように、蓄電部充電及び蓄電部放電する電力量を設定したり、当該電力量を充電及び放電可能な容量を有する蓄電部12を選定したりしても構わない。
 以上のように構成すると、1回のバッテリ充電で消費される系統電力の電力量が、2個の単位時間に分配される。また、他の単位時間では、蓄電部放電により供給される電力を消費するバッテリ充電が行われる。そのため、頻繁にバッテリ充電を行う必要がある場合であっても、単位時間に消費される系統電力の電力量の最大値を低減することが可能となる。したがって、電力料金を低減することが可能となる。例えば、上述の式によって基本料金が算出される場合、1年分の基本料金を、およそ115万円まで低減することができる。
 また、蓄電部充電を行うタイミングを確保することが可能になる。そのため、蓄電部12の残容量が少ないことで、単位時間に消費される系統電力の電力量の最大値を低減することが困難になる事態が生じることを、抑制することが可能になる。
 また、本具体例は、第1及び第2具体例と比較して、一定時間に行い得るバッテリ充電の回数は減少するが、電力料金をより大きく低減することが可能となる。また、本具体例は、蓄電部12の容量が、第1及び第2具体例よりも小さいもので済むため、充電システム1の構成の簡略化や低コスト化を図ることが可能になる。
 なお、上述の第1~第3具体例の充電スケジュールを、「n回のバッテリ充電をn+1個の単位時間に行う」ものとして解釈し、制御部15が、第1~第3具体例(n=4~2)と同様にn≧5の充電スケジュールを作成しても構わない。ただし、nは2以上の整数とする。また、制御部15が、「n回のバッテリ充電をn+1個の単位時間に行う」ことを、1つのセットとして把握しても構わない。例えば、制御部15が、入力部13を介してユーザから入力されるバッテリ充電の予約を、いくつかのセットの組み合わせとして把握し、セット毎に対応する制御方法(例えば、図9~図11参照)を組み合わせた充電スケジュールを作成しても構わない。
 また、蓄電部充電は、1回のバッテリ充電が行われる2個の単位時間中であれば、どのように行っても構わない。この蓄電部充電の実行例について、図12を参照して説明する。図12は、蓄電部充電の実行例を示すグラフである。また、図12は、図9の中段のグラフに相当するものである。そのため、図12のグラフの説明については、図9の中段のグラフの説明を参酌するものとして、省略する。
 図12(a)は、図9~図11のそれぞれの中段のグラフに示したものと同様である。
具体的には、2個の単位時間中であり、当該2個の単位時間に及んで行われる1回のバッテリ充電の前後に、1回ずつ蓄電部充電を行うものである。
 これに対して図12(b)は、バッテリ充電の有無にかかわらず、蓄電部充電を1回行うものである。また、本例の蓄電部充電は、2個の単位時間に及ぶように行われるものである。
 図12(a),(b)のいずれであっても、それぞれの単位時間に消費される系統電力の電力量は等しくなる。ただし、図12(a)の蓄電部充電では、バッテリ充電及び蓄電部充電の重複が抑制されるため、消費される系統電力の最大値を低減することが可能になる。一方、図12(b)では、蓄電部充電がバッテリ充電によって分断されることが抑制されるため、蓄電部充電を一度で連続的に行うことが可能になる。
 また、蓄電部充電が、1回のバッテリ充電が行われる2個の単位時間の両方で行われる場合について例示したが、いずれか一方で行っても構わない。ただし、単位時間に消費される系統電力の電力量を低減する観点から、バッテリ充電と同様に、2個の単位時間に及んで行うこととすると、好ましい。
<変形例>
 なお、蓄電部放電によって供給される電力が、バッテリ充電として消費されることに代えて(または、加えて)、負荷部消費として消費されても構わない。
 本発明の実施形態における充電システム1について、制御部15などの一部または全部の動作を、マイコンなどの制御装置が行うこととしても構わない。さらに、このような制御装置によって実現される機能の全部または一部をプログラムとして記述し、該プログラムをプログラム実行装置(例えばコンピュータ)上で実行することによって、その機能の全部または一部を実現するようにしても構わない。
 また、上述した場合に限らず、図1に示す充電システム1は、ハードウェア、或いは、ハードウェアとソフトウェアの組み合わせによって実現可能である。また、ソフトウェアを用いて充電システムの一部を構成する場合、ソフトウェアによって実現される部位についてのブロックは、その部位の機能ブロックを表すこととする。
 以上、本発明における実施形態について説明したが、本発明の範囲はこれに限定されるものではなく、発明の主旨を逸脱しない範囲で種々の変更を加えて実行することができる。
 本発明は、電動車両に備えられるバッテリなどを充電する充電システムに利用可能である。特に、消費する電力が大きく単位時間以下の時間で充電を行う急速充電を行い得る充電システムに適用すると、好適である。
   1  充電システム
  11  充電部
  12  蓄電部
  13  入力部
  14  報知部
  15  制御部
   B  バッテリ
   C  電動車両
   R  負荷部
 
 

Claims (6)

  1.  バッテリを充電する充電システムであって、
     電力会社から供給される系統電力を消費して充電され、充電した電力を放電により供給する蓄電部と、
     系統電力と前記蓄電部から供給される電力とを消費して前記バッテリを充電する充電部と、を備え、
     前記充電部により行われる少なくとも1回の充電が、前記系統電力から供給される電力を消費して2個の単位時間に及んで行われることを特徴とする充電システム。
  2.  前記2個の単位時間以外の少なくとも1個の単位時間で、前記蓄電部が前記充電部に電力を供給することを特徴とする請求項1に記載の充電システム。
  3.  前記充電部の1回の充電が行われる2個の単位時間の少なくとも一方で、前記蓄電部の充電が行われることを特徴とする請求項1または請求項2のいずれかに記載の充電システム。
  4.  前記充電部が、それぞれが単位時間以下の時間となるn(nは2以上の整数)回の充電を、n+1個の単位時間に行う場合、
     前記充電部による1回の充電が、2個の単位時間に及んで行われるとともに、他のn-1回の充電が、当該2個の単位時間以外のn-1個の単位時間のそれぞれで行われることを特徴とする請求項1~請求項3のいずれかに記載の充電システム。
  5.  前記充電部の1回の充電が行われる2個の単位時間のそれぞれで消費される系統電力の電力量が、他の単位時間に消費される系統電力の電力量を超えないことを特徴とする請求項1~請求項4のいずれかに記載の充電システム。
  6.  前記電力会社が、各単位時間に供給した電力量の最大値が大きくなるほど高くなる電力料金を設定するものである請求項1~請求項5のいずれかに記載の充電システム。
PCT/JP2011/068951 2010-08-23 2011-08-23 充電システム WO2012026458A1 (ja)

Priority Applications (3)

Application Number Priority Date Filing Date Title
EP11819921.5A EP2610992B1 (en) 2010-08-23 2011-08-23 Charging system
US13/637,439 US9225188B2 (en) 2010-08-23 2011-08-23 Charging system
CN2011800168011A CN102823105A (zh) 2010-08-23 2011-08-23 充电***

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2010185822A JP2012044822A (ja) 2010-08-23 2010-08-23 充電システム
JP2010-185822 2010-08-23

Publications (1)

Publication Number Publication Date
WO2012026458A1 true WO2012026458A1 (ja) 2012-03-01

Family

ID=45723452

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2011/068951 WO2012026458A1 (ja) 2010-08-23 2011-08-23 充電システム

Country Status (5)

Country Link
US (1) US9225188B2 (ja)
EP (1) EP2610992B1 (ja)
JP (1) JP2012044822A (ja)
CN (1) CN102823105A (ja)
WO (1) WO2012026458A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014099958A (ja) * 2012-11-13 2014-05-29 Toyota Industries Corp 充電システム

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5891931B2 (ja) * 2012-04-27 2016-03-23 ソニー株式会社 表示制御装置、表示制御方法、表示制御プログラムおよび携帯端末
KR101819253B1 (ko) 2013-08-29 2018-01-16 엘에스산전 주식회사 에너지 저장장치 및 그 동작 방법
DE102016215328A1 (de) * 2016-08-17 2018-02-22 Bayerische Motoren Werke Aktiengesellschaft Verfahren zur Steuerung des elektrischen Ladens einer Gruppe von Fahrzeugen
CN106394299A (zh) * 2016-11-08 2017-02-15 熊奕森 一种动力***及电动汽车
FR3060888B1 (fr) * 2016-12-19 2022-08-12 Electricite De France Dispositif de recharge ameliore, notamment pour vehicule electrique
US20200070665A1 (en) * 2018-08-28 2020-03-05 Ii-Vi Delaware, Inc. Adaptive Reservoir Charging Station
US20240140238A1 (en) * 2022-10-27 2024-05-02 Toyota Motor Engineering & Manufacturing North America, Inc. Charge optimization for carbon emissions reduction

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11221739A (ja) * 1998-02-06 1999-08-17 Tokyo Electric Power Co Inc:The 生産スケジューリング装置及び電力監視装置
JP2001069678A (ja) * 1999-08-31 2001-03-16 Seikichi Kobayashi 車両等の充電制御装置
JP2007535282A (ja) * 2003-07-10 2007-11-29 エアロヴァイロンメント インコーポレイテッド バッテリー充電システム及び方法
JP2008067418A (ja) * 2006-09-04 2008-03-21 Nippon Telegr & Teleph Corp <Ntt> 充電制御方法、蓄電装置および充電制御システム

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL1000915C2 (nl) * 1995-08-01 1997-02-04 Bartoli N V I O Werkwijze en inrichting voor het leveren van elektrische energie, en toestel voorzien van een dergelijke inrichting.
JPH11178234A (ja) * 1997-12-10 1999-07-02 Nissan Motor Co Ltd 電気自動車を用いた家庭用電力供給システム
JP2001008385A (ja) * 1999-06-22 2001-01-12 Sekisui Chem Co Ltd 電力貯蔵システム
US20020070705A1 (en) 2000-06-14 2002-06-13 Buchanan William D. Battery charging system and method
AT502460B1 (de) * 2004-02-19 2009-01-15 Siemens Ag Oesterreich Einrichtung zur spitzenlast-abdeckung
CN101150259B (zh) * 2006-09-18 2010-05-12 比亚迪股份有限公司 电动车充电***
US7782021B2 (en) * 2007-07-18 2010-08-24 Tesla Motors, Inc. Battery charging based on cost and life

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11221739A (ja) * 1998-02-06 1999-08-17 Tokyo Electric Power Co Inc:The 生産スケジューリング装置及び電力監視装置
JP2001069678A (ja) * 1999-08-31 2001-03-16 Seikichi Kobayashi 車両等の充電制御装置
JP2007535282A (ja) * 2003-07-10 2007-11-29 エアロヴァイロンメント インコーポレイテッド バッテリー充電システム及び方法
JP2008067418A (ja) * 2006-09-04 2008-03-21 Nippon Telegr & Teleph Corp <Ntt> 充電制御方法、蓄電装置および充電制御システム

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP2610992A4 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014099958A (ja) * 2012-11-13 2014-05-29 Toyota Industries Corp 充電システム

Also Published As

Publication number Publication date
US20130076297A1 (en) 2013-03-28
CN102823105A (zh) 2012-12-12
JP2012044822A (ja) 2012-03-01
EP2610992A1 (en) 2013-07-03
EP2610992A4 (en) 2016-03-30
US9225188B2 (en) 2015-12-29
EP2610992B1 (en) 2018-08-15

Similar Documents

Publication Publication Date Title
WO2012026458A1 (ja) 充電システム
JP5490834B2 (ja) 充給電器および充給電管理装置、エネルギーマネジメントシステム、並びに充給電管理方法
WO2012020756A1 (ja) 電力制御装置
JP5388708B2 (ja) 充電制御装置
JP2012123637A (ja) 充電制御装置、充電制御装置の制御方法、充放電制御装置、充放電制御装置の制御方法、制御プログラム、および、記録媒体
WO2012017942A1 (ja) 電力供給システム
JP5845474B2 (ja) 電力供給システム
JP5396549B1 (ja) 充給電器および充給電管理装置、エネルギーマネジメントシステム、並びに充給電管理方法
JP2013143838A (ja) 充放電制御装置
JP2014096928A (ja) 充電スケジュール管理装置及び方法ならびにプログラム、それを備えた充電スケジュール管理システム
JP2013176182A (ja) 蓄電池の電力管理装置、電力管理プログラムおよび記録媒体
JP5570835B2 (ja) 充電装置
JP5874038B2 (ja) 電力供給システム
WO2012029901A1 (ja) 電力供給システム
JP2014195369A (ja) 電気自動車充電システム
WO2012046832A1 (ja) 電力供給システム
WO2011122517A1 (ja) 充電システム
WO2017163747A1 (ja) 蓄電システム、充放電制御装置、その制御方法、およびプログラム
KR20180003054A (ko) 전력 저장 장치
JP6313922B2 (ja) 売電システム
JP2014002425A (ja) 電力供給システム
JP7278227B2 (ja) 充電制御装置、充電制御システム及び充電制御プログラム
JP2008289250A (ja) 監視制御装置および方法、受電制御装置および方法、受電システムおよび方法
JP6025637B2 (ja) 電力供給システム
JPWO2016166854A1 (ja) 制御装置、制御方法、及びプログラム

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 201180016801.1

Country of ref document: CN

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 11819921

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 2011819921

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 13637439

Country of ref document: US

NENP Non-entry into the national phase

Ref country code: DE