WO2011092740A1 - 建物情報提供装置、建物情報提供方法およびコンピュータ・プログラム - Google Patents

建物情報提供装置、建物情報提供方法およびコンピュータ・プログラム Download PDF

Info

Publication number
WO2011092740A1
WO2011092740A1 PCT/JP2010/000527 JP2010000527W WO2011092740A1 WO 2011092740 A1 WO2011092740 A1 WO 2011092740A1 JP 2010000527 W JP2010000527 W JP 2010000527W WO 2011092740 A1 WO2011092740 A1 WO 2011092740A1
Authority
WO
WIPO (PCT)
Prior art keywords
information
building
change
unit
item
Prior art date
Application number
PCT/JP2010/000527
Other languages
English (en)
French (fr)
Inventor
望月伸一
Original Assignee
株式会社ファインコラボレート研究所
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社ファインコラボレート研究所 filed Critical 株式会社ファインコラボレート研究所
Priority to PCT/JP2010/000527 priority Critical patent/WO2011092740A1/ja
Publication of WO2011092740A1 publication Critical patent/WO2011092740A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling

Definitions

  • the present invention relates to a building information providing apparatus, a building information providing method, and a computer program.
  • the building materials as components constituting the building are picked up from a written document such as a design book, so-called “pick up” is performed to list all the building members. To do.
  • the unit price of the listed building materials is calculated for all building materials, and the construction cost is obtained by adding together labor costs and machine costs for each building operation (accumulation method). Is common.
  • Patent Document 1 discloses a technique in which building cost calculation by such a conventional integration method is performed collectively in an integration trustee terminal connected to a network, and information on the obtained building cost is transmitted to an estimate requester terminal. Is disclosed.
  • the present inventor prepares package information in which each part of the entire building is packaged in advance without having to pick up building components (each part) in the building.
  • a system that outputs package information that meets the request was constructed.
  • the present invention has been made to solve the above-mentioned problems, and the object of the present invention is design information that meets the demands of the building orderer, and can respond to changes in the demands without any problems.
  • the purpose is to provide building information.
  • a building information providing apparatus includes input information receiving means for receiving input information related to a building to be constructed, parts divided into items for building a building, building constituent materials, and building Unit information storage means for storing at least the equipment in the building, the land on which the building is constructed, the cost of the constituent material, the cost of the equipment and the cost of the facility, the specification of the building, the type and quantity of the part, the type and quantity of the constituent material
  • Package information storage means for classifying and storing package information including at least a combination of information including the type and quantity of equipment and the construction cost of the building into a plurality of folders according to the amount of input information, and according to the amount of input information Determination means for determining which folder in the package information storage means to access, and package information storage means
  • Data storage means for storing the specified data for specifying each information of the information based on the design criteria and / or statistics, and accessing a specific folder in the plurality of folders based on the determination by the determination means,
  • the group is formed based on the grade of the constituent material and / or equipment, and the other items in the same grade as the grade to which the changed execution means belong are the items. Change as well.
  • the group further summarizes items related to the design, and the change execution means also changes the changed items and other items related to the design.
  • the change accepting unit accepts a change of a plurality of items
  • the change executing unit in accordance with the order of the changed items, other items than the item for which the change has been accepted To change.
  • the group data storage means further stores the items in a hierarchy, and the change execution means changes only the items belonging to the same or lower hierarchy as the item for which the change is accepted.
  • the change execution means Do not make that change.
  • the building information provision method of the present invention constructs an input information receiving means for receiving input information related to a building to be constructed, a site divided into items for building a building, building constituent materials, equipment in the building, and building Unit price information storage means for storing at least land, component material cost, facility cost and land cost, building specification, type of part and quantity thereof, type and quantity of component material, type of equipment and quantity thereof,
  • Package information storage means for classifying and storing package information including at least a combination of information including building construction costs into a plurality of folders according to the amount of input information, and design information and / or each information in the package information storage means
  • Specified data storage means for storing stipulated data stipulated based on statistics, and at least the building specifications and building structure
  • a computer provided with group data storage means for storing a group of a plurality of specific items among the items as well as storing the items of the building materials and the equipment in the building receives input information from the outside thereof, thereby receiving predetermined information.
  • the information creation step to be created and the building design information created by the information creation step are output.
  • a building design information output step, a change acceptance step for accepting a change in part or all of the output building design information, and, if a change is accepted, information on items in the group related to the change is stored at least in the prescribed data storage It includes a change execution step for changing by referring to the prescribed data in the means, and a change item output step for outputting the item changed by the change execution step.
  • the computer receives input information related to the building to be built, input information receiving means, parts divided into items for building the building, and building constituent materials
  • Unit price information storage means for storing at least the equipment in the building, the land on which the building is constructed, the cost of the constituent material, the cost of the equipment, and the cost of the land, the specification of the building, the type and quantity of the part, the type of the constituent material and Package information storage means for classifying and storing package information including at least the information including the quantity, the type of equipment and the quantity, and the construction cost of the building into a plurality of folders according to the amount of input information, and the amount of input information Which folder in the package information storage means to access depending on Judgment means for judging, prescription data storage means for prescribing each piece of information in the package information storage means based on design criteria and / or statistics, and specification in a plurality of folders based on judgment by the judgment means And a unit created by the information creating means for creating one or more kinds
  • Building design information output means for outputting design information, and a group for storing at least building specifications, building materials and equipment items in the building, and storing a plurality of specific items as a group
  • Data storage means for storing at least building specifications, building materials and equipment items in the building, and storing a plurality of specific items as a group
  • change accepting means for accepting a change in part or all of the output building design information
  • the change execution means for changing the information of the item in the group related to the change with reference to at least the prescribed data in the prescribed data storage means, and the change item output for outputting the item changed by the change execution means It functions as an apparatus comprising means.
  • the group is formed on the basis of the grade of the constituent material and / or the equipment, and the other means in the same grade as the grade to which the changed execution means belongs are changed. Also works to change.
  • the group is a group of items related to design, and the change execution means changes the changed item and other items related to design. Function.
  • the change accepting unit accepts a change of a plurality of items
  • the change executing unit displays other items other than the item for which the change has been accepted according to the order of the changed items. Works to change.
  • the group data storage means stores the items in a hierarchy
  • the change execution means changes only the items belonging to the same or lower hierarchy as the item for which the change has been accepted.
  • the change execution means when the input information includes a construction cost, when the construction cost based on the change accepted by the change acceptance means exceeds the construction cost in the input information, the change execution means operates so that no changes are made.
  • FIG. 1 is a diagram showing functional blocks realized when a program is executed in the building information providing apparatus according to the embodiment of the present invention.
  • FIG. 2 is a schematic diagram illustrating a hardware configuration of the building information providing apparatus illustrated in FIG.
  • FIG. 3 is a schematic diagram for explaining data stored in four types of folders (budget level folder, plan level folder, basic design level folder, and implementation design level folder) in the package information storage unit shown in FIG. .
  • FIG. 4 is an example of a data file stored in the group data storage unit in the building information providing apparatus shown in FIG.
  • FIG. 5 is an example of a screen that is displayed first when the building information providing apparatus shown in FIG. 1 is accessed.
  • FIG. 6 is an example of an input screen that is displayed when a budget level display key is instructed and an OK key is instructed on the screen shown in FIG.
  • FIG. 7 is an example of an input screen that is displayed when a plan level display key is selected on the screen shown in FIG. 5 and an OK key is selected.
  • FIG. 8 is a diagram exemplarily showing an input screen displayed next to the input screen shown in FIG.
  • FIG. 9 is a diagram exemplarily showing an input screen displayed next to the input screen shown in FIG.
  • FIG. 10 is an example of an input screen that is displayed when a basic design level display key is instructed and an OK key is instructed on the screen shown in FIG.
  • FIG. 11 is a diagram exemplarily showing an input screen displayed next to the input screen shown in FIG. FIG.
  • FIG. 12 is a diagram exemplarily showing an input screen displayed next to the input screen shown in FIG.
  • FIG. 13 is an example of an input screen that is displayed when an instruction for selecting a display key at the implementation design level is selected on the screen shown in FIG. 5 and an OK key is selected.
  • FIG. 14 is a diagram exemplarily showing an input screen displayed next to the input screen shown in FIG.
  • FIG. 15 is an output screen that displays building design information that is output by inputting building conditions from each level of the input screen.
  • FIG. 16 shows a check on a box for selecting “seismic 1.25 times” in the structure from the client terminal, a check on a box for selecting grade A in the external finish of the building, and grade A in the internal finish of the building.
  • FIG. 17 is a diagram showing a change output screen when a change in the numerical value of the floor number and the numerical value in the reference floor room number display column is instructed from the client terminal.
  • FIG. 18 is an example of a flowchart of the building design information output operation and the subsequent change processing operation.
  • FIG. 19 is an example of a flowchart illustrating a modification of the building design information output operation and the subsequent change processing operation.
  • FIG. 1 is a diagram showing functional blocks realized when a program is executed in the building information providing device 1 according to the embodiment of the present invention.
  • the building information providing apparatus 10 when a computer program as software is executed, functions realized by cooperation of the computer program and a CPU or the like as hardware. An example will be described.
  • the building information providing apparatus 1 is a computer that can communicate with an external computer via a communication line network.
  • the building information providing apparatus 1 may be a stand-alone computer.
  • the building information providing apparatus 1 includes a communication module 10, an input information receiving unit 11, a cost table 12, a specified data storage unit 13, an input screen data storage unit 14, a package information storage unit 15, and a group data storage unit. 20, a determination unit 21, an information creation unit 22, an output unit 23, a change reception unit 24, and a change execution unit 25.
  • the communication module 10 is a component for communicating with an external communicable computer (for example, a client terminal communicable via the Internet).
  • the input information receiving unit 11 functions as input information receiving means for receiving input information related to an external building target building from the client terminal.
  • the cost table 12 is a unit price for storing at least the parts classified for building a building, the building material, the equipment in the building, the land for building the building, the cost of the building material, the cost of the equipment, and the cost of the land. It is a component that functions as information storage means.
  • “part” does not mean a predetermined part of a building, but means a unit in which structural units of a building are collected from the viewpoint of building work. “Parts” are organized in a hierarchy such as a large classification and a medium classification.
  • “common temporary” has a medium classification of “common temporary” and “special temporary”. “Civil engineering / Local industry” is classified into “Civil engineering” and “Yamadome / Pier”.
  • the “underground frame” includes “pile / ground industry”, “foundation”, “underground beam”, “pressure-resistant version”, “basement column”, “underground beam”, “underground beam”, “underground” There are medium categories: “floor”, “basement floor” and “basement”.
  • the “ground frame” has the middle classifications of “pillar”, “large beam”, “small beam”, “floor”, “wall”, and “miscellaneous”.
  • “External finishing” includes the middle categories of “roof / rooftop”, “outer wall”, “external opening”, “external ceiling”, “balcony”, “external floor”, and “external miscellaneous”.
  • the “inner finish” has the middle classification of “inner floor”, “inner wall”, “inner ceiling”, “inner opening”, “intermediate material”, and “inner miscellaneous”.
  • Equipment is classified into “mechanical equipment”, “electrical equipment”, “air-conditioning ventilation / smoke / exhaust equipment”, and “water supply / drainage / sanitation equipment”.
  • each middle category has more detailed sub-categories.
  • the major classification and middle classification are merely examples, and the part may be divided into any major classification or middle classification.
  • the prescribed data storage unit 13 uses information such as building specifications, part types and quantities, construction material types and quantities, equipment types and quantities, and building construction costs based on design criteria and / or statistics. It is a component functioning as a prescribed data storage means for storing prescribed data to be prescribed.
  • the regulation data storage unit 13 stores statistical values and coefficients for each type (model) of a building such as an office, a school, or a hospital.
  • the statistical value is information indicating the distribution status of the unit price for each part constituting each model. For example, taking the office as an example, the statistical values are the individual unit price of each component when the cabinet, the outer wall, the wall / floor members of each room, and when they are composed of multiple components.
  • the prescribed data storage unit 13 is a design formula necessary for calculating the number or form of constituent materials or facilities, and a legal regulation necessary for determining such a formula. Is also stored. For example, when building a building having a specific earthquake resistance, a calculation formula for calculating the number of reinforcing bars as an example of the constituent material and how much the thickness of the reinforcing bars is necessary is provided in the prescribed data storage unit 13. It is remembered.
  • the input screen data storage unit 14 is a component that stores input screen data for inputting conditions (cost, location, size, etc.) when building a building to an external client terminal.
  • the input screen data storage unit 14 further stores one or more types of screen data that can be displayed in response to a request from the client terminal.
  • the package information storage unit 15 inputs package information including at least a combination of information including building specifications, part types and quantities thereof, constituent material types and quantities, equipment types and quantities, and building construction costs. This is a component that functions as package information storage means for storing information in a plurality of folders classified according to the amount of information.
  • the package information storage unit 15 has a budget level folder 16 as a file to be accessed when the input information is the smallest, and a plan level folder 17 as a file to be accessed when the information is the next smallest.
  • a basic design level folder 18 is provided as a file to be accessed when the information is small
  • an implementation design level folder 19 is provided as a file to be accessed when the information is the largest.
  • the group data storage unit 20 functions as a group data storage unit that stores at least building specifications, building constituent materials, and equipment items in the building, and groups and stores a plurality of specific items. It is a component part.
  • the group is formed from the following two viewpoints.
  • a grade means a scale representing the degree of quality.
  • Grades are divided into three types: A, B, and C.
  • constituent materials represented by the material of the outer wall or equipment represented by the transformer are classified into any of the above grades. Therefore, for example, when grade A is instructed, constituent materials and equipment classified into the group of grade A are automatically selected. The same applies when other grades are specified.
  • the other is formed of specific items (building specifications, building materials and facilities in the building) that are related in design.
  • “room” belonging to the item “building specification” and “air conditioner” belonging to the item “equipment” belong to the same group as items that are related in design.
  • “room” and “window”, which are items of using the same building, belong to the same group.
  • the “special power receiving” and “dry transformer” belonging to the same facility item also belong to the same group.
  • the building specifications, building constituent materials, and facilities in the building are filed in a plurality of layers.
  • the hierarchy of “air-conditioning ventilation and smoke exhaust equipment” is positioned higher than the hierarchy of “air-conditioner”.
  • the building specifications belong to a higher level than the constituent materials and equipment.
  • the group data storage unit 20 stores each part of the building separately from “higher items”, “medium items”, “small items”, etc.
  • the constituent materials (mortar, steel, etc.) in the part are stored. For this reason, each part, each constituent material, and the high order and low order of each equipment can be distinguished, and it turns out that a constituent material and equipment are located in the lower order rather than the specification of a building.
  • the number of air conditioners is also changed when the number of rooms is changed. However, when the number of air conditioners is changed, the number of rooms belonging to a higher hierarchy is not changed.
  • the determination unit 21 is a component that functions as a determination unit that determines which folder 16, 17, 18, 19 in the package information storage unit 15 is to be accessed according to the amount of input information.
  • the determination unit 21 has a plurality of levels of information amount thresholds. After determining which threshold value the input information from the outside is between, below or above which threshold value, the information in the package information storage unit 15 is stored. Folders 16, 17, 18, and 19 are selected and data can be read from a specific folder.
  • the information creation unit 22 accesses a specific folder in a plurality of folders, accesses the cost table 12 and the specified data storage unit 13, and satisfies one or more types that satisfy the input information. It is a component that functions as information creation means for creating a kind of building design information.
  • the information creation unit 22 can calculate a cost for each part, calculate a construction cost obtained by accumulating the cost, and calculate the number of building components and facilities.
  • the output unit 23 When the input information is received by the input information receiving unit 11, the output unit 23 reads out appropriate input screen data from the input screen data in the input screen data storage unit 14, and transmits this through the communication module 10. Send to client terminal.
  • the output unit 23 transmits a budget level input screen in the case of budget level input, and a plan level input screen in the case of plan level input.
  • the output unit 23 functions as a component that functions as a building design information output unit that outputs the building design information created by the information creation unit 22 and a change item output unit that outputs an item changed by the change execution unit 25. It is a component part.
  • the change accepting unit 24 is a component that functions as a change accepting unit that accepts a change in part or all of the output building design information from the client terminal side.
  • the change executing unit 25 When the change receiving unit 24 receives a change, the change executing unit 25 functions as a change executing unit that changes information on items in the group related to the change with reference to at least the specified data in the specified data storage unit 13. It is a component part.
  • the process of the change execution unit 25 includes all processes in creating the building design information in the information creating unit 22. Therefore, the change execution unit 25 can also calculate the quantity and cost.
  • the change execution unit 25 does not have the function as the information creation unit 22 but the change execution unit 25 sends a command to the information creation unit 22 to cause the information creation unit 22 to calculate the quantity and cost. You may do it. Depending on the selection, one or all of the following changes can be performed.
  • the change executing unit 25 stores information on other items belonging to the same group as the item in addition to the accepted item changes according to the order of the changes. Can be changed. Moreover, the change execution part 25 can change only the item which belongs to the same or lower hierarchy as the item which received the change. Furthermore, when the input information includes a construction cost, when the construction cost based on the change accepted by the change acceptance unit 24 exceeds the construction cost in the input information, the change execution unit 25 does not execute the change.
  • FIG. 2 is a schematic diagram showing a hardware configuration of the building information providing apparatus 1.
  • the building information providing apparatus 1 includes a CPU (Central Processing Unit) 30, a ROM (Read Only Memory) 31, a RAM (Random Access Memory) 32, an HDD (Hard Disk Drive) 33, an I / F (Interface) 34, and a bus 35. Prepare mainly.
  • the CPU 30 controls each part of the building information providing apparatus 1 based on an OS (Operating System) 33a and a computer program (hereinafter simply referred to as a program) 33b stored in the HDD 33, and executes various arithmetic processes.
  • OS Operating System
  • a program computer program
  • the ROM 31 is a semiconductor memory that stores a basic control program executed by the CPU 30.
  • the RAM 32 is a semiconductor memory that temporarily stores various programs executed by the CPU 30 and data.
  • the HDD 33 is a device that magnetically records information on a hard disk as a magnetic storage medium.
  • the HDD 33 stores an OS 33a and a program 33b.
  • the OS 33a is software that provides basic functions commonly used by a plurality of application programs and manages the entire computer system.
  • the program 33b is for realizing the function of providing building information as the building information providing apparatus 1. That is, the functions of the components shown in FIG. 1 are realized by the cooperation of the program 33b as software and the CPU 30 and other components as hardware.
  • the I / F 34 executes protocol conversion processing and the like when the CPU 30 transmits and receives information via the network 40.
  • the bus 35 is a signal line group for mutually connecting the CPU 30, ROM 31, RAM 32, HDD 33, and I / F 34, and enabling exchange of information among them.
  • the functions of the communication module 10 described above are mainly realized by the I / F 34 and the program 33b.
  • the functions of the input information reception unit 11, the determination unit 21, the information creation unit 22, the output unit 23, the change reception unit 24, and the change execution unit 25 are mainly realized by the program 33b and the CPU 30.
  • the cost table 12, the prescribed data storage unit 13, the input screen data storage unit 14, the package information storage unit 15, and the group data storage unit 20 are mainly realized by the storage area of the HDD 33 other than the storage area of the program 33b and the program 33b, and the RAM 32. Is done.
  • FIG. 3 shows data stored in four types of folders (budget level folder 16, planning level folder 17, basic design level folder 18 and implementation design level folder 19) in the package information storage unit 15. It is a schematic diagram for demonstrating.
  • Secondudget level means the level at which the building is built at the earliest stage and only the budget and conditions equivalent to the budget (place of building, approximate size of building, etc.) are determined.
  • the “planning level” means a level that is one step higher than the budget level, and that is a rough drawing of the building.
  • the “basic design level” is a stage where more specific conditions are prepared than the planning level, and the basic design is completed to some extent. “Implementation design” means a level where the detailed matters necessary for the implementation stage of construction are complete.
  • the amount of information that can be input increases in the order of “budget level”, “planning level”, “basic design level”, and “implemented design level”. For this reason, building information (including cost) cannot be presented unless the information is compensated as the amount of information that can be input is small. For this reason, the amount of information prepared by default is gradually increased as the implementation design level folder 19, the basic design level folder 18, the planning level folder 17, and the budget level folder 16 are increased. That is, the ratio of the default information (D) in which the constituent materials, equipment, the number and cost thereof are packaged in the order of the implementation design level folder 19, the basic design level folder 18, the planning level folder 17, and the budget level folder 16. It is high.
  • the portion to be filled with the input information (I) decreases in the order of the implementation design level folder 19, the basic design level folder 18, the planning level folder 17, and the budget level folder 16.
  • the implementation design level folder 19 is composed of a portion (blank) filled with 10% default information (D) and 90% input information (I).
  • the basic design level folder 18 includes a portion (blank) filled with 40% default information (D) and 60% input information (I).
  • the planning level folder 17 is composed of a portion (blank) filled with 75% default information (D) and 25% input information (I).
  • the budget level folder 16 includes a portion (blank) filled with 95% default information (D) and 5% input information (I).
  • FIG. 4 is an example of the data files 50 and 60 stored in the group data storage unit 20.
  • the data file 50 in the group data storage unit 20 is a file in which building specifications are hierarchized.
  • the specifications of the building are composed of a plurality of items (major items) such as “structure” 51, “number of floors” 52, “building area” 53, “total floor area” 54, “number of rooms” 55, and the like.
  • items (small items) “RC structure 1.25” 56 and “RC structure 1.00” 57 are linked below the item “structure” 51.
  • the same subordinate items are linked to “number of floors” 52, “building area” 53, “total floor area” 54, and “number of rooms” 55.
  • the “item” in the group data storage unit 20 includes at least the specification of the building, the constituent material of the building, and the equipment in the building arranged in one or a plurality of layers.
  • each item of “number of floors” 52, “building area” 53, “total floor area” 54, “number of rooms” 55 is a code (for example, p, h).
  • “number of floors” 52, “total floor area” 54, and “number of rooms” 55 are denoted by symbols indicating that they belong to a design-related group “p”.
  • the data file 60 in the group data storage unit 20 is a file in which building materials and equipment are divided into parts and hierarchized.
  • the part of the building is composed of a plurality of items such as “common temporary”, “direct temporary”, “civil engineering / earthwork”, “underground frame”, “ground frame”, “external finish”, “facility” 61 and the like.
  • the lower items of “equipment” 61 are introduced.
  • Below the “equipment” 61 there are a plurality of items of equipment such as “electricity” 62, “water supply / drainage sanitation”, “air conditioning ventilation smoke” 63, and the like.
  • “Electricity” 62 there are a plurality of items of equipment such as “Receiving and transforming power” 64, “Main line”, “Communication” 65 and the like.
  • “receiving / transforming” 64 there are a plurality of equipment items such as “receiving system” 66, “transformer” 67, and “retraction type”.
  • “power reception method” 66 there are a plurality of items of equipment such as “special power reception” 68, “high voltage power reception” 69, “low voltage power reception” 70, and the like.
  • the “extra high power reception” 68 means a voltage reception system in the range of X (V) or more to less than Y (V).
  • the “high voltage power reception” 69 means a voltage power reception system in a range of W (V) or more and less than X (V).
  • “Low-voltage power reception” 70 means a voltage power reception method in a range of V (V) or more and less than W (V).
  • there are a plurality of items of equipment such as “air conditioner A” 71 and “air conditioner B” 72 below “air conditioning ventilation smoke” 63.
  • Below the “communication” 65 there are a plurality of items such as “optical communication” 73 and “ADSL” 74.
  • Below the “transformer” 67 there are a plurality of equipment items such as a “dry transformer” 75 and a “simple transformer” 76. Every item in the data file 60 is in a lower hierarchy than items related to the building specifications in the data file 50. Each item in the data file 60 is determined to be higher or lower by the above-described hierarchical structure.
  • a specific item is given a symbol representing a group to which the item belongs.
  • special power receiving” 68 is assigned “A”, which is a symbol 58 representing a group of grades, and “a”, which is a symbol 59 representing a group classified from the viewpoint of design relevance.
  • “High voltage power reception” 69 is denoted by “B” as 58 and “a” as 59.
  • Low-voltage power receiving” 70 is denoted by “C” as 58 and “b” as 59.
  • the “dry transformer” 75 is assigned “A” as 58 and “a” as 59.
  • the “simple transformer” 76 is provided with “C” as 58 and “b” as 59.
  • the “air conditioner A” 71 is given “A” as 58 and “p” as 59.
  • the “air conditioner B” 72 is assigned “B”, which is 58, and “p”, which is 59.
  • “Optical communication” 73 is denoted by “A” as 58 and “s” as 59.
  • “ADSL” 74 has “B” as 58 and “t” as 59. For this reason, when an instruction to change the grade to A is transmitted from the client terminal, all items with “A” are selected and are subject to change. Further, when an instruction to change the “number of rooms” 55 to increase or decrease is transmitted from the client terminal, the item with “p” is changed.
  • the number of “air conditioner A” 71 or “air conditioner B” 72 is selected as a change target.
  • the “number of floors” 52 is changed from the fourth floor to the third floor, the “total floor area” 54 and the “number of rooms” 55 in the same “p” group and the same hierarchy are changed,
  • the “air conditioner A” 71 or “air conditioner B” 72 in the lower hierarchy within the group “p” is also subject to change.
  • the change execution unit 25 refers to the data in the prescribed data storage unit 13 and causes the information creation unit 22 to calculate and determines the total floor area, the number of rooms, and the number of air conditioners when the number of floors is reduced to the third floor.
  • the number of air conditioners Since the number of air conditioners is stored in the specified data storage unit 13 as one unit per room, the above calculation can be performed. However, depending on the selection, the following functions can also be executed.
  • the “number of rooms” 55 in the hierarchy higher than the “air conditioners A” 71 can be prevented from being changed. Since the number of rooms is related to the structure of the building, the level can be set higher than that of an air conditioner that is one of the air-conditioning facilities, and the number of rooms that are higher than the level to be changed can be set not to change. Therefore, when the number of rooms is reduced from 10 to 5, the number of air conditioners can be reduced from 10 to 5. However, when the number of air conditioners is reduced from 10 to 5, the number of rooms cannot be reduced. . However, since this function can be executed by selection, all the items in the same group can be changed regardless of the level of the hierarchy if the selection is not made.
  • FIGS. 5 to 17 are diagrams showing an example of transition of various screens displayed on the client terminal.
  • FIG. 5 is an example of a screen that is displayed first when the building information providing apparatus 1 is accessed.
  • a screen 80 shown in FIG. 5 includes a display key 81 for displaying a budget level input screen, a display key 82 for displaying a plan level input screen, and a basic design level input screen.
  • a display key 83, a display key 84 for displaying an implementation design level input screen, a cancel key 85, and an OK key 86 are displayed as clickable keys.
  • the display key 81 is a key that is selected when there is very little information regarding the budget stage, that is, the building conditions.
  • the display key 82 is a key to be selected when there is more information regarding the planning stage, that is, the building conditions than in the budget stage, but has not yet reached the design stage.
  • the display key 83 is a key that is selected in a stage where the details of the building conditions are determined more than in the planning stage and the amount of information is larger than in the planning stage.
  • the display key 84 is a key that is selected in a stage where the details of the building conditions are determined more than in the basic design stage and the amount of information is larger than in the basic design stage.
  • FIG. 6 is an example of the input screen 90 that is displayed when the budget level display key 81 is instructed and the OK key 86 is instructed on the screen 80 shown in FIG.
  • the input information receiving unit 11 receives the selection instruction and sends it to the output unit 23.
  • the output unit 23 selects input screen data that matches the selection instruction from the input screen data storage unit 14 and sends the data to the communication module 10.
  • An input screen 90 displayed on the screen of the client terminal via the communication module 10 includes a field 91 for inputting an area, a field 92 for inputting a construction budget, and a field 93 for inputting a place where the building is to be built.
  • a grade selection key 94 for selecting a building grade, a cancel key 96, and an OK key 97 are displayed.
  • a plurality of grade keys 95 are displayed.
  • the plurality of grade keys 95 also include information for specifying each model such as an office model, a school model, and a hospital model. Therefore, when one of the plurality of grade keys 95 is selected, the type of building can be specified.
  • the user When the user inputs an area in the column 91, a budget in the column 92, a place (address) where the building is to be built in the column 93, selects a desired grade from a plurality of grade keys 95, and selects the OK key 97.
  • the input information and the selected information are transmitted to the building information providing apparatus 1.
  • the user instructs to select the cancel key 96 instead of the OK key 97, the input information and the selected information are cleared.
  • the information (input information) input on the screen 90 shown in FIG. 6 is transmitted to the input information receiving unit 11.
  • the input information reception unit 11 passes the input information to the determination unit 21.
  • the determination unit 21 selects the budget level folder 16 from the package information storage unit 15 and makes it possible to read a file that is a predetermined model and satisfies the input information. Most of the file is filled with default information.
  • the determination unit 21 passes input information to the information creation unit 22.
  • the information creation unit 22 reads a predetermined file in the budget level folder 16 and uses various statistical values, coefficients, calculation formulas, and the like in the cost table 12 and the specified data storage unit 13. Create building design information. Since there is very little input information at the budget level, the information creation unit 22 selects existing package information from the budget level folder 16 that matches the building area, budget, location, and grade, and the cost table 12 and rules. The utilization rate of data in the data storage unit 13 is extremely low. Thereafter, the output unit 23 sends the created building design information to the communication module 10. The communication module 10 sends the building design information to the client terminal.
  • FIG. 7 shows an example of the input screen 100 that is displayed when the planning level display key 82 is instructed and the OK key 86 is instructed on the screen 80 shown in FIG.
  • the input information receiving unit 11 receives the selection instruction and sends it to the output unit 23.
  • the output unit 23 selects input screen data that matches the selection instruction from the input screen data storage unit 14 and sends the data to the communication module 10.
  • An input screen 100 displayed on the screen of the client terminal via the communication module 10 includes a field 101 for inputting an area, a field 102 for inputting a construction budget, and a field 103 for inputting a place where a building is to be built. Then, a grade selection key 104 for selecting a building grade, a cancel key 106, and an OK key 107 are displayed. When the grade selection key 104 is instructed to select, a plurality of grade keys 105 are displayed. These various keys 101 to 107 are the same as the various keys 91 to 97 on the screen 90.
  • the next input screen 110 is displayed on the client terminal.
  • This input screen 110 may be included in a part of the data of the input screen sent to the client terminal in advance, or once an instruction for selecting the OK key 107 is sent to the building information providing apparatus 1 side, and the input screen is displayed. It may be read from the data storage unit 14.
  • FIG. 8 is a diagram exemplarily showing an input screen 110 displayed next to the input screen 100.
  • the input screen 110 displays information regarding external finishing.
  • “roof rooftop” 111 that is one of the parts is associated with one “pressing concrete” 112 that is the lower layer item, and the “pressing concrete” 112 and its lower layer are associated with each other.
  • One of the items, “xxx” 113 of the intermediate material is associated.
  • “xxx” 113 is associated with a miscellaneous “XXX” 114 which is a subordinate item.
  • “XXX” 114 is displayed by default, but the user may select to change to “XXX” 115 which is another miscellaneous. In this case, the thick frame around “XXX” 114 moves to “XXX” 115 below it.
  • outer wall 121 that is one of the parts is associated with one “tiling” 122 that is the lower layer item, and “tiling” 122 and “ ⁇ ” that is the lower layer item are associated with each other. 123 are associated with each other.
  • part is only an example, For example, the item regarding temporary structure, a structure, an installation, and an external structure is displayed so that input is possible.
  • a return key 124, a cancel key 125, and an OK key 127 are displayed in a clickable state. If there is no change in the external finishing item, the user selects and instructs the OK key 127. In response to the selection instruction, the next input screen is displayed on the client terminal.
  • the input screen may be included in part of the data of the input screen sent to the client terminal in advance, or once an instruction to select the OK key 127 is sent to the building information providing apparatus 1 side, and the input screen data It may be read from the storage unit 14.
  • the cancel key 125 is selected and instructed, the item changed by the user returns to the default display. If the return key 124 is selected and instructed, the screen returns to the screen shown in FIG.
  • FIG. 9 is a diagram exemplarily showing an input screen 130 displayed after the input screen 110.
  • the input screen 130 displays information about equipment.
  • a selection instruction column 140 for selecting and instructing a voltage level is displayed as detailed information.
  • “Yes”, “Yes”, “Individual”, and “High voltage” are selected as defaults, respectively, and the user can change the input. It is possible.
  • the input from the client terminal is only the selection of the presence or absence of a parking lot or elevator, the control unit of the air conditioner, and the voltage level. That is, there is no room for inputting further detailed information such as the number of parking lots and the number of elevators. In consideration of the fact that detailed building information is often not decided at the planning level, it is possible to provide simple input and rough cost and design information.
  • a return key 147, a cancel key 148, and an OK key 149 are displayed in a clickable state. If there is no change in the contents of the input screen 130, the user selects and instructs the OK key 149. Then, information (input information) input on the input screens 100, 110, and 130 is transmitted to the input information reception unit 11.
  • the input information reception unit 11 passes the input information to the determination unit 21. Based on the input information, the determination unit 21 selects the plan level folder 17 from the package information storage unit 15 and selects a file that is a predetermined model and satisfies the input information. Many parts of the file are filled with default information. At the same time, the determination unit 21 passes input information to the information creation unit 22.
  • the information creation unit 22 reads a predetermined file in the planning level folder 17 based on the input information, and uses various statistical values, coefficients, and calculation formulas in the cost table 12 and the specified data storage unit 13,
  • the building design information is created by calculating the quantity and cost of each component material and each equipment. Since there is little input information at the planning level, the information creation unit 22 selects existing package information suitable for the area, budget, location and grade of the building from the planning level folder 17 and inputs the input information in a portion lacking this information. Alternatively, the information created using the data in the cost table 12 and the prescribed data storage unit 13 based on the input information is filled. Thereafter, the output unit 23 sends the building design information to the communication module 10. The communication module 10 sends the building design information to the client terminal.
  • FIG. 10 is an example of the input screen 150 displayed when the basic design level display key 83 is instructed and the OK key 86 is instructed on the screen 80 shown in FIG.
  • the input information reception unit 11 receives the selection instruction and sends it to the output unit 23.
  • the output unit 23 selects input screen data that matches the selection instruction from the input screen data storage unit 14 and sends the data to the communication module 10.
  • An input screen 150 displayed on the screen of the client terminal via the communication module 10 includes a field 151 for inputting an area, a field 152 for inputting a construction budget, and a field 153 for inputting a place where the building is to be built.
  • a grade selection key 154 for selecting a building grade, a cancel key 156, and an OK key 157 are displayed.
  • a plurality of grade keys 155 are displayed.
  • the next input screen 160 is displayed on the client terminal.
  • This input screen 160 may be included in a part of the data of the input screen sent to the client terminal in advance, or once an instruction to select the OK key 157 is sent to the building information providing apparatus 1 side. It may be read from the data storage unit 14.
  • FIG. 11 is a diagram exemplarily showing an input screen 160 displayed next to the input screen 150.
  • the input screen 160 displays information regarding external finishing.
  • “Presser concrete” 162, “xxx” 163, and “ ⁇ ” 164 are displayed by default, but the user may select “waterproof sheet” 165 that is another finish. In that case, the thick frame around the “pressing concrete” 162 moves to the “waterproof sheet” 165 located below the thick frame. In addition, the user may select “xxx” 166 as the intermediate material. In this case, the thick frame around “xxx” 163 moves to “xxx” 166 below the thick frame. In addition, the user may select “XXX” 167 as a miscellaneous item. In this case, the thick frame around “XXX” 164 moves to “XXX” 167 below the thick frame.
  • a blank field 168 and a blank field 169 that can be directly input also exist in the choices of finishing and intermediate material.
  • the user can input his / her favorite information in the blanks 168 and 169.
  • information such as costs relating to the entered items is acquired from the cost table 12 of the building information providing apparatus 1 via the network 40 or acquired from another external server. You can also. The same applies to a case where a blank is directly entered at an implementation design level to be described later.
  • “outer wall” 171 that is one of the parts is associated with one “tiling” 172 that is a finish item that is the lower layer item, and “tileing” 172 that is the lower layer item “ “ ⁇ ” 173 is associated.
  • “Tiled” 172 and “ ⁇ ” 173 are displayed by default, but the user may select “curtain wall” 175 which is another finish. In that case, the thick frame around the “tiling” 172 moves to the “curtain wall” 175 below the thick frame. Further, the user may select “ ⁇ ” 176 or “ ⁇ ” 178. In this case, the thick frame around “ ⁇ ” 173 moves to “ ⁇ ” 176 or “ ⁇ ” 178 below it.
  • a blank field 177 that can be directly input exists as a finishing option. The user can input his / her favorite information in the blank 177.
  • the input screen 160 may be provided with a field for inputting the quantity.
  • a balloon portion 174 is displayed on the “outer wall” 171.
  • the balloon portion 174 includes items “energy saving material” and “long life material”. For example, when the user selects the item “energy saving material”, the finishing and variations below it are changed and displayed as materials belonging to the group called energy saving material.
  • the display of the input screen 160 shown in FIG. This display change is realized by the following processing.
  • the user instructs to select an item having the balloon portion 174 the selected information is passed to the information creation unit 22 via the communication module 10, the input information reception unit 11, and the determination unit 21. .
  • the information creation unit 22 sends a command to the change execution unit 25, and selects from the group data storage unit 20 information on the finish belonging to the category instructed to be selected (for example, a long-life material) and variations below it. To do. As a result, information on the finish and variations below it are displayed on the client terminal via the output unit 23 and the communication module 10. To explain this from the viewpoint of hardware processing, the CPU 30 reads out information belonging to the category selected and instructed by the user from at least one storage medium (memory) of the HDD 33, RAM 32, or ROM 31, and transfers it to the client. Send to the terminal.
  • a balloon part similar to the above-described balloon part 174 may be displayed on another part in the input screen 160, for example, “roof rooftop” 161.
  • a balloon portion may be displayed on each input screen displayed at the planning level or the implementation design level.
  • a return key 180, a cancel key 181 and an OK key 182 are displayed in a clickable state. If there is no change in the item of external finishing, the user selects and instructs the OK key 182. In response to the selection instruction, the next input screen is displayed on the client terminal.
  • the input screen may be included in part of the data of the input screen sent to the client terminal in advance, or once an instruction to select the OK key 182 is sent to the building information providing apparatus 1 side, and the input screen data It may be read from the storage unit 14.
  • the cancel key 181 is instructed to select, the item changed by the user returns to the default display.
  • the return key 180 is instructed to select, the previous input screen 150 is restored.
  • FIG. 12 is a diagram exemplarily showing an input screen 190 displayed next to the input screen 160.
  • the input screen 190 displays information about equipment as an example.
  • a selection instruction column 204 for instructing to install one unit in each office by individual control, one unit in each room (unit smaller than the office) by individual control.
  • a selection instruction field 206 for selecting and specifying central control for each floor
  • a selection instruction field 207 for selecting and specifying central control for all buildings
  • a blank field 208 that can be directly input.
  • a return key 210, a cancel key 211, and an OK key 212 are displayed in a clickable state. If there is no change in the content of the input screen 190, the user instructs to select the OK key 212. Then, information (input information) input on the input screens 150, 160, and 190 is transmitted to the input information receiving unit 11.
  • the input information reception unit 11 passes the input information to the determination unit 21. Based on the input information, the determination unit 21 selects the basic design level folder 18 from the package information storage unit 15 and selects a file that is a predetermined model and satisfies the input information. Part of the file is filled with default information.
  • the determination unit 21 passes the input information to the information creation unit 22.
  • the information creation unit 22 reads a predetermined file in the basic design level folder 18 based on the input information, and uses various statistical values, coefficients, calculation formulas, and the like in the cost table 12 and the specified data storage unit 13.
  • the building design information is created by calculating the quantity and cost of each constituent material and each equipment. Since there is a lot of input information at the basic design level, the information creation unit 22 selects existing package information suitable for the area, budget, location and grade of the building from the basic design level folder 18 and puts it in many parts other than this information.
  • the information created using the cost table 12 and the data in the specified data storage unit 13 based on the input information or the input information is filled. Thereafter, the output unit 23 sends the building design information to the communication module 10.
  • the communication module 10 sends the building design information to the client terminal.
  • the cancel key 211 is selected on the input screen 190, the information selected / changed by the user returns to the default state.
  • the return key 210 is selected, the previous input screen 160 is displayed.
  • FIG. 13 is an example of the input screen 220 that is displayed when the implementation design level display key 84 is selected on the screen 80 shown in FIG. 5 and the OK key 86 is selected.
  • the input information reception unit 11 receives the selection instruction and sends it to the output unit 23.
  • the output unit 23 selects input screen data that matches the selection instruction from the input screen data storage unit 14 and sends the data to the communication module 10.
  • the input screen 220 displayed on the screen of the client terminal via the communication module 10 includes a field 221 for inputting an area, a field 222 for inputting a construction budget, and a field 223 for inputting a place where a building is to be built. Then, a grade selection key 224 for selecting a building grade, a cancel key 226, and an OK key 227 are displayed. When the grade selection key 224 is selected and instructed, a plurality of grade keys 225 are displayed. These various keys 221 to 227 are the same as the various keys 91 to 97 on the screen 90.
  • the next input screen 230 is displayed on the client terminal.
  • This input screen 230 may be included in a part of the data of the input screen sent to the client terminal in advance, or once an instruction for selecting the OK key 227 is sent to the building information providing apparatus 1 side. It may be read from the data storage unit 14.
  • FIG. 14 is a diagram exemplarily showing an input screen 230 displayed after the input screen 220.
  • the input screen 230 displays information on equipment.
  • FIG. 14 shows only a part of the information related to the facility.
  • the user has the most information on the building conditions. For this reason, since it is necessary to output accurate design information (including cost information) corresponding to a large amount of information, there are the most choices for each item, and the user has the most fields for direct input. .
  • subordinate items such as “Electricity” 232, “Water Supply and Drainage Sanitation” 242, “Air Conditioning Ventilation Smoke” 243 are associated with the item “Equipment” 231.
  • “Electricity” 232 is associated with “detailed information 1”, which is a subordinate item thereof, such as “receiving and transforming power” 233, “main line” 234, “communication” 235, “voltage” 236, and the like.
  • “Receiving power transformation” 233 is associated with “detailed information 2”, which is a subordinate item thereof, such as “power receiving method” 237, “transformer” 238, “drawing type” 239, and the like. Note that “main line” 234, “communication” 235, and “voltage” 236 are similarly associated with a plurality of lower-layer items as “detailed information 2”.
  • Air-conditioning ventilation / exhaust smoke” 243 is associated with “detailed information 1”, which is a subordinate item thereof, such as “air conditioner” 244, “smoke exhaust device” 245, and a blank field 246 that can be directly input.
  • the “air conditioner” 244 includes “individual—one for each office” 247, “individual—one for each room” 248, “central—for each floor” 249, “central— “Entire building” 250 and the like are associated with each other. Further, in “individual-one for each office” 247, “model A” 251, “model B” 252, “model C” 253, and a blank field 254 that can be directly input as “detailed information 3” as a lower-level item thereof. Etc. are associated.
  • the user When the user completes selection or input for all items, the user instructs to select an OK key (not shown). Then, information (input information) input on the input screens 220 and 230 is transmitted to the input information receiving unit 11.
  • the input information reception unit 11 passes the input information to the determination unit 21. Based on the input information, the determination unit 21 selects an implementation design level folder 19 from the package information storage unit 15 and selects a file that satisfies a predetermined model and satisfies the input information. A portion of the file is filled with default information. At the same time, the determination unit 21 passes input information to the information creation unit 22.
  • the information creation unit 22 calculates the quantity and cost of each constituent material and each facility using various statistical values, coefficients, and calculation formulas in the cost table 12 and the prescribed data storage unit 13. To create building design information. Since there is a lot of input information at the implementation design level, the information creation unit 22 selects existing package information suitable for the area, budget, location and grade of the building from the implementation design level folder 19 and puts it in many parts other than this information. The information created using the cost table 12 and the data in the specified data storage unit 13 based on the input information or the input information is filled. Thereafter, the output unit 23 sends the building design information to the communication module 10. The communication module 10 sends the building design information to the client terminal.
  • FIG. 15 is an output screen 260 that displays building design information that is output by inputting building conditions from the input screen at each level.
  • the output screen 260 displays the conditions prepared by the user and the quantity derived from the conditions while including information prepared by default. For example, the output screen 260 displays the number of floors (the number of ground floors and the number of underground floors), the building height, the reference floor area, the reference floor ceiling height, and the reference floor room number as items belonging to the structure.
  • “3” is displayed in the ground floor display column 261
  • “1” is displayed in the basement floor display column 262
  • “10” is displayed in the building height display column (unit: meter) 263.
  • “150” is displayed in the display field (unit: square meter) 264
  • “3.0” is displayed in the standard floor ceiling height display field (unit: meter) 265, and “4” is displayed in the standard floor room number display field 266.
  • the output screen 260 displays external wall materials as items belonging to the external finish, floor materials and inner walls as items belonging to the internal finish, and air conditioners, boilers, voltages, transformers, and the like as items belonging to the equipment.
  • “tile” is displayed in the outer wall material display field 271
  • “wood” is displayed in the floor material display field 281
  • “cross B material” is displayed in the inner wall display field 282
  • “12” is displayed in the air conditioner number display field 291.
  • “,” “1” is displayed in the boiler number display column 292
  • “100” is displayed in the voltage display column 293
  • “Simple” is displayed in the transformer type display column 294.
  • the output screen 260 displays the structure, architecture, and equipment as items related to the grade. Further, items of external finishing and internal finishing are displayed as subordinate items of the architectural display. The item of electrical equipment is displayed as a subordinate item of the equipment display.
  • the item “structure” includes a box 301 for selecting “seismic 1.25 times” and a box 302 for selecting “seismic 1.00 times”.
  • the item “external finish” includes a box 311 for selecting grade A, a box 312 for selecting grade B, a box 313 for selecting grade C, and a box 314 for selecting grade D from the higher grade to the lower grade.
  • the item of internal finishing is selected from the higher grade to the lower grade, the box 321 for selecting the grade A, the box 322 for selecting the grade B, the box 323 for selecting the grade C, and the grade D. And a box 324.
  • the box 331 for selecting the grade A, the box 332 for selecting the grade B, the box 333 for selecting the grade C, and the grade D are selected from the higher grade to the lower grade, similarly to the item of the external finish.
  • a box 334 On the output screen 260, one of the boxes for each grade is checked based on the information input on the input screen.
  • the box 302 for selecting “seismic 1.00 times” for the structure the box 312 for selecting grade B for the external finish, the box 322 for selecting grade B for the internal finish, and the grade B for electrical equipment are selected.
  • Each of the check boxes 332 is checked.
  • a cost column 335 for displaying the total cost of the building and a breakdown key 336 are displayed. When the breakdown key 336 is pressed, a breakdown of the total cost is displayed for each part. In the cost column 335, “2,000,000,000” (unit: yen) is displayed.
  • the building information providing apparatus 1 changes each constituent material and / or each facility associated with the grade change.
  • FIG. 16 shows a check in the box 301 for selecting “seismic 1.25 times” in the structure from the client terminal, a check in the box 311 for selecting the grade A in the external finish of the building, and the grade A in the internal finish of the building. It is a figure which shows the change output screen 340 displayed as a result of instruct
  • the change output screen 340 shown in FIG. 16 according to the change instruction from the client terminal, in the box 301 for selecting “seismic 1.25 times” in the structure, in the box 311 for selecting grade A in the external finish of the building, The check is changed to a box 321 for selecting grade A in the internal finish and a box 331 for selecting grade A in the electrical equipment.
  • the numerical value of the reference floor ceiling height display column (unit: meter) 265 is changed from “3.0” to “2.5”
  • the material of the outer wall material display column 271 is changed from “tile” to artificial marble, flooring
  • the material of the display column 281 is “wood” to “artificial marble”
  • the material of the inner wall display column 282 is “cross B material” to “cross A material”
  • the boiler number display column 292 is “1” to “2”.
  • the voltage display column 293 is changed from” 100 "to” 220 "
  • the transformer type display column 294 is changed from" simple type "to” dry type ".
  • the change is an improvement in earthquake resistance, external finishing, internal finishing, and electrical equipment, the cost is also changed.
  • the display in the cost column 335 has been changed from 2 billion yen to 2,154.32 million yen.
  • the breakdown key 336 is pressed, the cost for each part is also changed.
  • the material of the flooring display column 281 has been changed from “wood” to “artificial marble”, and the material of the inner wall display column 282 has been changed from “cross B material” to “cross A material”. It is because it changed so that it might improve.
  • the boiler number display column 292 has been changed from “1” to “2”, the voltage display column 293 has been changed from “100” to “220”, and the transformer type display column 294 has been changed from “simple type” to “dry type”. This is because the electrical equipment has been changed to upgrade.
  • the change receiving unit 24 of the building information providing apparatus 1 receives the change instruction information via the communication module 10. Next, the information is transmitted to the change execution unit 25.
  • the change execution unit 25 refers to the data in the group data storage unit 20, and the group belonging to the group whose seismic resistance is 1.25 times the normal structure, the external finish, the internal finish, and the electrical equipment, each of which is a grade A group Read items belonging to. Further, the information creation unit 22 performs numerical calculation satisfying the seismic resistance after the change, numerical calculation associated with the grade change and / or numerical value selection, and cost calculation.
  • the change execution unit 25 summarizes the results, changes the initially displayed building design information, and transmits the changed information to the output unit 23.
  • the output unit 23 transmits the changed information to the client terminal side.
  • Information such as the number and thickness of reinforcing bars is not displayed on the output screen 260 and the change output screen 340, but is simply omitted. In practice, information such as the number and thickness of reinforcing bars is not displayed. A lot of information including the beginning is displayed as building design information. Furthermore, information on the number and thickness of reinforcing bars has also been changed due to the improvement in earthquake resistance. In addition, regarding the cost, when the budget is exceeded, the information for each part after the upgrade may not be displayed after displaying a warning to that effect. Alternatively, even if the budget is exceeded, the information on each part after the upgrade can be displayed after the cost is displayed.
  • the building information providing apparatus 1 When the user performs input change to change a part of the structure and facilities from the client terminal, the building information providing apparatus 1 also changes the items such as each constituent material, each facility, and their quantities accompanying the change. To do.
  • FIG. 17 shows the equipment voltage display from the client terminal from the ground floor display column 261 in the structure from “3” to “4”, from the standard floor room display column 266 from “4” to “5”. It is a figure which shows the change output screen 350 when a change instruction
  • the numerical value in the air conditioner number display column 291 of the equipment item is changed from the original “12” to “20”. This is because the number of floors is changed to 4 and the number of rooms on the reference floor is changed to 5 respectively, and in the case of 4 stories, 4 ⁇ 5 (this calculation formula is stored in the prescribed data storage unit 13), that is, Based on the calculation result that 20 air conditioners are required.
  • the transformer type display field 294 is also changed from “simple type” to “dry type”. This is changed with the increase of the voltage to 220V.
  • the display in the cost column 335 has been changed from 2 billion yen to 2,518.42 million yen. When the breakdown key 336 is pressed, the cost for each part is also changed.
  • the change accepting unit 24 of the building information providing apparatus 1 receives the information on the change instruction via the communication module 10. Next, the information is transmitted to the change execution unit 25.
  • the change execution unit 25 refers to the data in the group data storage unit 20 and reads items belonging to the same group as the items of floor number and room number.
  • the change execution unit 25 also reads items belonging to the same group as the voltage. Of the read items, only items that are the same as the number of floors and the number of rooms or assigned to a lower layer are to be changed. In this example, only the air conditioner is to be changed. Also, only items that are the same as or lower than the voltage are subject to change. In this example, only the transformer is to be changed.
  • the information creation unit 22 performs numerical calculation after the change (such as calculation of the required number of air conditioners) and also calculates the cost.
  • the change execution unit 25 summarizes the results, changes the initially displayed building design information, and transmits the changed information to the output unit 23.
  • the output unit 23 transmits the changed information to the client terminal side.
  • the cost when the budget is exceeded, the information for each item after the change may not be displayed after displaying a warning to that effect. Alternatively, even if the budget is exceeded, the information of each item after the change can be displayed after displaying the cost.
  • the change receiving unit 24 that has received the change information passes the change information to the change execution unit 25. If the change execution unit 25 refers to the data in the group data storage unit 20 and finds that there is no item that is in the same group as the air conditioner and is located below the air conditioner, the change execution unit 25 changes the number of air conditioners and accordingly Only the cost change (according to the calculation of the information creation unit 22) is executed, and the other items in the same group as the air conditioner are not changed.
  • the numerical value in the reference floor room number display column 266 is first changed, and then the grade item is changed to the same state as the check shown in FIG. Performs the following change process.
  • the building design information is changed based on the change in the numerical value in the standard floor room number display field 266.
  • the change output screen 350 is displayed on the client terminal.
  • the numerical value in the reference floor room number display field 266 is changed to a screen in the state of “5” in the change output screen 340 shown in FIG. . In this way, the change process is performed every time a change instruction is issued.
  • a change process based on the plurality of changes may be executed by clicking a key such as “execute”.
  • FIG. 18 is an example of a flowchart of the building design information output operation and the subsequent change processing operation.
  • Step S401 Input information reception step
  • the determination unit 21 receives the above input information, determines whether the input information is the budget level (A), the planning level (B), the basic design level (C), or the implementation design level (D), and the package It is determined which folder (any one of folders 16, 17, 18, and 19) in the information storage unit 15 is accessed (step S402: determination step).
  • which folder should be accessed is determined by the amount of input information. However, in addition to the amount of input information, it may be determined from the viewpoint of how much highly important information exists.
  • the information creation unit 22 accesses a specific folder (for example, the folder 18) and accesses the cost table 12 and the specified data storage unit 13 to satisfy the input information.
  • a specific folder for example, the folder 18
  • One or a plurality of types of building design information is created (step S403: information creation step).
  • the information creation unit 22 refers to the data in the cost table 12 and the prescribed data storage unit 13 by a command from the determination unit 21, and each component material (steel frame, heat insulating material, etc.) and each facility (elevator)
  • the building design information is created by calculating at least one of the quantity and cost of the air conditioner.
  • the output unit 23 outputs the building design information and sends it to the client terminal via the communication module 10 (step S404: building design information output step).
  • step S405 including a change receiving step
  • step S405 including a change receiving step
  • step S405 including a change receiving step
  • step S405 including a change receiving step
  • step S405 the change execution unit 25 receives the change instruction and the changed information, refers to the data in the group data storage unit 20, and changes It is determined whether or not there is an item located in the same group or lower in the same group as the item (step S406). If such an item does not exist (NO in step S406), change execution unit 25 does not make a change.
  • step S406 if such an item exists (YES in step S406), the change execution unit 25 changes the change target and other items in the group (limited to items located in the same or lower order).
  • Step S407 Change execution step.
  • the change execution unit 25 calculates the quantity and / or cost based on the change (step S408).
  • step S409 change item output step.
  • the process returns to the standby state in step S405.
  • step S406 is not essential. That is, all the items in the same group may be changed without determining whether or not the same item or a subordinate item exists. Further, step S408 may be performed before step S407.
  • FIG. 19 is an example of a flowchart showing a modification of the building design information output operation and the subsequent change processing operation.
  • the change execution unit 25 will be described using an example in which the information creation unit 22 performs the quantity and cost calculation without performing the quantity and cost calculation.
  • steps S401 to S404 are the same processes as steps S401 to S404 shown in FIG.
  • the change receiving unit 24 always monitors whether a change to the output building design information has been received (step S505: including a change receiving step), and if there is no change instruction from the client terminal (in step S505). NO), the process ends with the process of step S404.
  • the change execution unit 25 receives the change instruction and the changed information, refers to the data in the group data storage unit 20, and changes It is determined whether or not there is an item located in the same group or lower level in the same group as the item (step S506).
  • step S506 If such an item does not exist (NO in step S506), change execution unit 25 does not make a change. On the other hand, if such an item exists (YES in step S506), the change execution unit 25 sends a command to the information creation unit 22, and the information creation unit 22 calculates the quantity and cost associated with the change of various items. This is performed (step S507).
  • the information creation unit 22 determines whether or not the cost calculated in step S507 is equal to or less than the budget (step S508). If the cost is not less than the budget (NO in step S508), the process ends in step S404. On the other hand, if the cost is equal to or less than the budget (YES in step S508), the change execution unit 25 changes the item to be changed and other items in the same group as the item (limited to items located in the same group or lower). (Step S509: change execution step). Next, the output unit 23 outputs the building design information after the change (step S511: change item output step). Subsequently, the process returns to the standby state in step S505.
  • step S506 is not essential. In other words, all items in the same group may be changed without determining whether or not there is a peer or a subordinate item.
  • the above processing functions can be realized by a computer.
  • a program describing the processing contents of the functions that the building information providing apparatus 1 should have is provided.
  • the program describing the processing contents can be recorded on a computer-readable recording medium.
  • the computer-readable recording medium include a magnetic recording device, an optical disk, a magneto-optical recording medium, and a semiconductor memory.
  • the magnetic recording device include a hard disk device (HDD), a flexible disk (FD), and a magnetic tape.
  • Optical discs include DVD (Digital Versatile Disk) and DVD-RAM (Random Access Memory), CD-ROM (Compact Disk Read Only Memory), CD-R (Recordable) / RW (ReWritable), and the like.
  • Magneto-optical recording media include MO (Magneto-Optical disk).
  • a portable recording medium such as a DVD or CD-ROM in which the program is recorded is sold. It is also possible to store the program in a storage device of a server computer and transfer the program from the server computer to another computer via a network.
  • the computer that executes the program stores, for example, the program recorded on the portable recording medium or the program transferred from the server computer in its own storage device. Then, the computer reads the program from its own storage device and executes processing according to the program.
  • the computer can also read the program directly from the portable recording medium and execute processing according to the program.
  • the computer can sequentially execute processing according to the received program.
  • the building information providing apparatus 1 includes an input information receiving unit 11 that receives input information related to a building to be built, a site divided into items for building a building, building constituent materials, and equipment in the building.
  • a cost table 12 for storing at least the land on which the building is constructed, the cost of each constituent material and the cost of the land, the specification of the building, the type and quantity of each part, the type and quantity of each constituent material, and the type of each equipment
  • Package information storage unit 15 that stores at least a combination of the quantity and the construction cost of the building in a plurality of folders according to the amount of input information, and package information storage unit 15 according to the amount of input information.
  • An information creation unit 22 that accesses the table 12 and the prescribed data storage unit 13 to create one or more types of building design information that satisfies the input information, and at least the specifications of the building, the building materials, and the equipment in the building
  • a group data storage unit 20 that stores the items and groups and stores a plurality of specific items among the items, and a change reception unit 24 that receives a change in part or all of the output building design information.
  • information on the items in the group related to the change is at least stored in the specified data storage unit 13. It includes a changing execution unit 25 to change with reference to the data, an output unit 23 for outputting the changed item by Design information and changing execution unit 25 that are created by the information creating unit 22. For this reason, once the building design information is output, when various changes are made to narrow down the detailed specifications, even if the necessary changes are not input one by one, there is no problem in designing by making only some changes. It becomes possible to make a change or a change according to one change purpose at a time.
  • the building information providing apparatus 1 is further formed based on the constituent material and / or equipment grade, the building information providing apparatus 1 can change the configuration within the same grade together when the grade is changed up and down. Therefore, it can be easily changed without knowing items of the same grade one by one.
  • the building information providing apparatus 1 is configured so that the group includes items related to the design, a change item or a change that is indispensable for the design is required by changing some items. Even users who are not familiar with the items can easily make changes so that there are no design problems.
  • the change receiving unit 24 when the change receiving unit 24 receives a plurality of changes, the change executing unit 24 changes information of items other than the received item change according to the order of the changes. For this reason, even if there are a plurality of changes, the change process can be executed without contradiction. Moreover, the difference for every change location can be grasped
  • the building information providing apparatus 1 further stores each item in the group data storage unit 20 in a hierarchy, and only items belonging to the same level as or lower than the item received by the change execution unit 25 are lower. To change. For this reason, in accordance with the change of the lower hierarchy, the part or configuration of the higher importance hierarchy (upper hierarchy) is not changed. For example, if the number of rooms is changed, the number of air conditioners will be changed to increase the number of air conditioners in order to install one air conditioner in each room. Do not make changes to increase the number of rooms. This is because the number of rooms is positioned at a higher level for the building and it is necessary to prevent the room from being changed due to a change in the lower level.
  • the building information providing apparatus 1 further includes a change execution unit when the input information includes a building cost, and when the building cost based on the change received by the change receiving unit 24 exceeds the building cost (budget) in the input information.
  • No. 25 prevents the change from being executed. That is, the change is not performed until it is impossible to change the user in terms of cost. For this reason, it can be easily grasped by the user that the cost is over, and it can be informed that another change should be made.
  • the building information providing apparatus 1 may be a stand-alone type apparatus that directly inputs information without using the network 40.
  • the processing operations of the information creation unit 22, the determination unit 21, the output unit 23, and the change execution unit 25 can be supplemented with each other. That is, the information creation unit 22 can perform the same processing as the processing of the determination unit 21, the output unit 23, and the change execution unit 25 alone. The same applies to the determination unit 21, the output unit 23, or the change execution unit 25.
  • the change execution unit 25 may refer only to the specified data storage unit 13 and not refer to the cost table 12 when performing the item change.
  • the change execution unit 25 may refer only to the cost table 12 and not refer to the specified data storage unit 13 when changing the item.
  • the change execution part 25 makes only the item lower than the item which received the change a change object, and does not need to change a peer item.
  • the prescribed data in the prescribed data storage unit 13 can be data defined based on only the design criteria, only the statistics, or based on the design criteria and statistics.
  • the building design information created by the information creating unit 22 has been described as an example in which only one building design information is created based on input information, but two or more building design information may be created.
  • the groups in the group data storage unit 20 can be grouped according to grades of only constituent materials, grades of only equipment, or grades of both constituent materials and equipment.
  • the present invention can be used, for example, when building a building such as an office, a school, a hospital, or an apartment.

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Educational Administration (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

 建物の発注者の要望に合った設計上の情報であって、要望の変更にも支障なく対応した建物情報を提供する。 入力情報受付手段11と、単価情報記憶手段12と、パッケージ情報を複数のフォルダに分類して記憶するパッケージ情報記憶手段15と、どのフォルダにアクセスするかを判断する判断手段21と、パッケージ情報記憶手段15内の各情報を規定する規定データを記憶する規定データ記憶手段13と、特定のフォルダ、上記記憶手段12,13にアクセスし、入力情報を満足する建物設計情報を作成する情報作成手段22と、その情報を出力する建物設計情報出力手段23と、建物の仕様、構成材料および設備の項目の内、特定の項目をグループ化して記憶するグループデータ記憶手段20と、建物設計情報の内の変更を受け付ける変更受付手段24と、変更に関わるグループ内の項目の情報を変更する変更実行手段25と、変更された項目を出力する変更項目出力手段23を備える建物情報提供装置1とする。

Description

建物情報提供装置、建物情報提供方法およびコンピュータ・プログラム
 本発明は、建物情報提供装置、建物情報提供方法およびコンピュータ・プログラムに関する。
 従来において、建物の建築コストを算出する方法としては、まず、設計図書等の書面から、建物を構成する構成要素としての建築部材を拾い上げる、いわゆる「拾い上げ」を行って全ての建築部材をリストアップする。つぎに、リストアップされた建築部材の単価を全ての建築部材について積算するとともに、それぞれの建築作業毎に労務費および機械経費等を併せて積算することにより、建築コストを得る方法(積算方式)が一般的である。
 また、このような従来の積算方式による建築コストの算出をネットワークに接続された積算受託者端末において一括して行い、得られた建築コストに関する情報を見積依頼者端末に送信する技術が特許文献1に開示されている。
特開2006-209477号公報(要約書、請求項等)
 ところで、前述した積算方式では、設計図書からそれを構成する建築部材を拾い上げる必要があるが、設計図書から全ての部材を拾い上げるためには、専門の知識が必要であるとともに、そのような作業を行うためには多大な時間を要するという問題点がある。
 また、拾い上げを行うためには設計図書が存在している必要があるが、例えば、競争入札等においては、そのような図書が存在しない段階で見積を行う必要がある。そこで、従来においては、例えば、坪単価等のように、非常に概算的でしかも精度の低い方法で建築コストの見積を行い、落札後に詳細なコストを算出することが行われていた。そのため、精度の低い見積に起因して、十分な利益を確保できなかったり、あるいは、実際よりも高いコストで入札してしまい、落札できない場合があったり、という問題点がある。
 さらに、積算方式では、部材の拾い上げを行う際には、前述した専門の知識を有する者の経験または直感に依拠して行うことが多かったため、コストと時間を要する割には、見積の精度が期待するほど高くないという問題点もある。
 さらにまた、積算方式では、設計変更がなされた場合には、当該部分および関連する部分について、再度の拾い上げを行ってコスト計算をし直す必要があることから、設計変更が生じた場合には、コストの算出に時間を要するという問題点がある。その結果、部分的な見直しとコストの変更が困難であるという問題点がある。
 本発明者は、上記の事情に鑑みて、先に、建物の建築部材(各部位という)を一つ一つ拾い上げなくても、予め建物全体の各部位をパッケージ化したパッケージ情報を用意しておくことで、建物に関する要望を入力した際に、その要望に合ったパッケージ情報を出力するシステムを構築した。
 しかし、どのような種類や数のパッケージ情報を用意しておいても、建物を求めるユーザは、そのパッケージ情報そのものに満足せずに、自分の好みに合った修正を希望することが少なくない。その一方で、最初から自分の好みの情報を明確にもっているユーザはほとんどいないのも現状である。このため、ユーザが最終的に希望する建物を決定するまでには、ユーザの漠然とした要望に基づいて建物の施工者(設計者)が建物の仕様を作製してユーザに示し、それを見たユーザがさらに設計の変更を求めることの繰り返しを行う必要がある。これを、ユーザと設計者間で何度も行うと、その分、コストが高くなる。また、ユーザ自身がコンピュータを使用して変更の繰り返しを試みて、その都度、建物設計情報を出力することも可能である。しかし、一部の設計変更によって他の部位の変更も必要となることがあり、建築に関して一般的に素人であるユーザが、例えば、耐震設計上、それを含む建築に関する様々な法律上の制約を満足するように、正確な変更を行うことはほとんど不可能である。
 したがって、ユーザの変更の要望に対し、設計者側は、大まかな費用や仕様をユーザ側に提示するにとどめ、後はお任せの状態で設計するしかないのが実情であり、設計上の仕様、コストが不透明で、偽装が生じることも少なくない。
 本発明は、上記問題を解決するためになされたものであり、その目的とするところは、建物の発注者の要望に合った設計上の情報であって、要望の変更にも支障なく対応した建物情報を提供することを目的とする。
 上述の目的を達成するため、本発明の建物情報提供装置は、建築対象の建物に関する入力情報を受け付ける入力情報受付手段と、建物を建築するために項目分けされた部位、建物の構成材料、建物内の設備、建物を建築する土地、構成材料のコスト、設備のコストおよび土地のコストを少なくとも記憶する単価情報記憶手段と、建物の仕様、部位の種類およびその数量、構成材料の種類およびその数量、設備の種類およびその数量、および建物の建築コストを含む情報を少なくとも組み合わせたパッケージ情報を、入力情報の多寡によって複数のフォルダに分類して記憶するパッケージ情報記憶手段と、入力情報の多寡に応じて、パッケージ情報記憶手段内のどのフォルダにアクセスするかを判断する判断手段と、パッケージ情報記憶手段内の各情報を設計基準および/または統計にもとづき規定する規定データを記憶する規定データ記憶手段と、判断手段による判断に基づいて、複数のフォルダ内の特定のフォルダにアクセスすると共に、単価情報記憶手段および規定データ記憶手段にアクセスし、入力情報を満足する1種若しくは複数種の建物設計情報を作成する情報作成手段と、情報作成手段により作成された建物設計情報を出力する建物設計情報出力手段と、少なくとも建物の仕様、建物の構成材料および建物内の設備の項目を記憶するとともに、当該項目の内の複数の特定の項目をグループ化して記憶するグループデータ記憶手段と、出力された建物設計情報の内の一部若しくは全部の変更を受け付ける変更受付手段と、変更を受け付けると、変更に関わるグループ内の項目の情報を、少なくとも規定データ記憶手段内の規定データを参照して変更する変更実行手段と、変更実行手段により変更された項目を出力する変更項目出力手段とを備える。
 別の本発明の建物情報提供装置は、さらに、グループが構成材料および/または設備のグレードに基づいて形成されており、変更実行手段が変更された項目の属するグレードと同じグレード内の他の項目をも変更する。
 別の本発明の建物情報提供装置は、さらに、グループが設計上関係のある項目をまとめたものであり、変更実行手段が変更された項目と設計上関係のある他の項目をも変更する。
 別の本発明の建物情報提供装置は、さらに、変更受付手段が複数の項目の変更を受け付ける場合、変更実行手段がその変更された項目の順番に従って、その変更を受け付けた項目以外の他の項目を変更する。
 別の本発明の建物情報提供装置は、さらに、グループデータ記憶手段が階層に分けて項目を記憶し、変更実行手段が変更を受け付けた項目と同一若しくはより低い階層に属する項目のみを変更する。
 別の本発明の建物情報提供装置は、さらに、入力情報が建築コストを含む場合、変更受付手段によって受け付けられた変更に基づく建築コストが入力情報内の建築コストを上回るときには、変更実行手段は、その変更を実行しない。
 本発明の建物情報提供方法は、建築対象の建物に関する入力情報を受け付ける入力情報受付手段と、建物を建築するために項目分けされた部位、建物の構成材料、建物内の設備、建物を建築する土地、構成材料のコスト、設備のコストおよび土地のコストを少なくとも記憶する単価情報記憶手段と、建物の仕様、部位の種類およびその数量、構成材料の種類およびその数量、設備の種類およびその数量、および建物の建築コストを含む情報を少なくとも組み合わせたパッケージ情報を、入力情報の多寡によって複数のフォルダに分類して記憶するパッケージ情報記憶手段と、パッケージ情報記憶手段内の各情報を設計基準および/または統計にもとづき規定する規定データを記憶する規定データ記憶手段と、少なくとも建物の仕様、建物の構成材料および建物内の設備の項目を記憶するとともに、当該項目の内の複数の特定の項目をグループ化して記憶するグループデータ記憶手段を備えるコンピュータがその外部から入力情報を受け付けることにより、所定の建物設計情報を出力する建物情報提供方法であって、入力情報を受け付ける入力情報受付ステップと、入力情報の多寡に応じて、パッケージ情報記憶手段内のどのフォルダにアクセスするかを判断する判断ステップと、判断ステップによる判断に基づいて、複数のフォルダ内の特定のフォルダにアクセスすると共に、単価情報記憶手段および規定データ記憶手段にアクセスし、入力情報を満足する1種若しくは複数種の建物設計情報を作成する情報作成ステップと、情報作成ステップにより作成された建物設計情報を出力する建物設計情報出力ステップと、出力された建物設計情報の内の一部若しくは全部の変更を受け付ける変更受付ステップと、変更を受け付けると、変更に関わるグループ内の項目の情報を、少なくとも規定データ記憶手段内の規定データを参照して変更する変更実行ステップと、変更実行ステップにより変更された項目を出力する変更項目出力ステップとを含む。
 本発明のコンピュータ・プログラムは、コンピュータにインストールされることによって、コンピュータを、建築対象の建物に関する入力情報を受け付ける入力情報受付手段と、建物を建築するために項目分けされた部位、建物の構成材料、建物内の設備、建物を建築する土地、構成材料のコスト、設備のコストおよび土地のコストを少なくとも記憶する単価情報記憶手段と、建物の仕様、部位の種類およびその数量、構成材料の種類およびその数量、設備の種類およびその数量、および建物の建築コストを含む情報を少なくとも組み合わせたパッケージ情報を、入力情報の多寡によって複数のフォルダに分類して記憶するパッケージ情報記憶手段と、入力情報の多寡に応じて、パッケージ情報記憶手段内のどのフォルダにアクセスするかを判断する判断手段と、パッケージ情報記憶手段内の各情報を設計基準および/または統計にもとづき規定する規定データを記憶する規定データ記憶手段と、判断手段による判断に基づいて、複数のフォルダ内の特定のフォルダにアクセスすると共に、単価情報記憶手段および規定データ記憶手段にアクセスし、入力情報を満足する1種若しくは複数種の建物設計情報を作成する情報作成手段と、情報作成手段により作成された建物設計情報を出力する建物設計情報出力手段と、少なくとも建物の仕様、建物の構成材料および建物内の設備の項目を記憶するとともに、当該項目の内の複数の特定の項目をグループ化して記憶するグループデータ記憶手段と、出力された建物設計情報の内の一部若しくは全部の変更を受け付ける変更受付手段と、変更を受け付けると、変更に関わるグループ内の項目の情報を、少なくとも規定データ記憶手段内の規定データを参照して変更する変更実行手段と、変更実行手段により変更された項目を出力する変更項目出力手段を備える装置として機能させる。
 別の本発明のコンピュータ・プログラムは、さらに、グループが構成材料および/または設備のグレードに基づいて形成されており、変更実行手段が変更された項目の属するグレードと同じグレード内の他の項目をも変更するように機能する。
 別の本発明のコンピュータ・プログラムは、さらに、グループが設計上関係のある項目をまとめたものであり、変更実行手段が変更された項目と設計上関係のある他の項目をも変更するように機能する。
 別の本発明のコンピュータ・プログラムは、さらに、変更受付手段が複数の項目の変更を受け付ける場合、変更実行手段がその変更された項目の順番に従って、その変更を受け付けた項目以外の他の項目を変更するように機能する。
 別の本発明のコンピュータ・プログラムは、さらに、グループデータ記憶手段が階層に分けて項目を記憶し、変更実行手段が、変更を受け付けた項目と同一若しくはより低い階層に属する項目のみを変更するように機能する。
 別の本発明のコンピュータ・プログラムは、さらに、入力情報が建築コストを含む場合、変更受付手段によって受け付けられた変更に基づく建築コストが入力情報内の建築コストを上回るときには、変更実行手段が、その変更を実行しないように機能する。
 本発明によれば、建物の発注者の要望に合った設計上の情報であって、要望の変更にも支障なく対応した建物情報を提供することができる。
図1は、本発明の実施の形態に係る建物情報提供装置においてプログラムが実行される場合に実現される機能ブロックを示す図である。 図2は、図1に示す建物情報提供装置のハード構成を示す概略図である。 図3は、図1に示すパッケージ情報記憶部内の4種類のフォルダ(予算レベルフォルダ、企画レベルフォルダ、基本設計レベルフォルダおよび実施設計レベルフォルダ)に格納されるデータを説明するための模式図である。 図4は、図1に示す建物情報提供装置内のグループデータ記憶部に格納されているデータファイルの一例である。 図5は、図1に示す建物情報提供装置にアクセスして最初に表示される画面の一例である。 図6は、図5に示す画面において予算レベルの表示キーを選択指示し、OKキーを選択指示した際に表示される入力画面の一例である。 図7は、図5に示す画面において企画レベルの表示キーを選択指示し、OKキーを選択指示した際に表示される入力画面の一例である。 図8は、図7に示す入力画面の次に表示される入力画面を例示的に示す図である。 図9は、図8に示す入力画面の次に表示される入力画面を例示的に示す図である。 図10は、図5に示す画面において基本設計レベルの表示キーを選択指示し、OKキーを選択指示した際に表示される入力画面の一例である。 図11は、図10に示す入力画面の次に表示される入力画面を例示的に示す図である。 図12は、図11に示す入力画面の次に表示される入力画面を例示的に示す図である。 図13は、図5に示す画面において実施設計レベルの表示キーを選択指示し、OKキーを選択指示した際に表示される入力画面の一例である。 図14は、図13に示す入力画面の次に表示される入力画面を例示的に示す図である。 図15は、各レベルの入力画面から建築条件の入力を行い出力させた建物設計情報を表示する出力画面である。 図16は、クライアント端末から、構造において「耐震1.25倍」を選択するボックスへのチェック、建築の外部仕上においてグレードAを選択するボックスへのチェック、建築の内部仕上においてグレードAを選択するボックスへのチェック、設備においてグレードAを選択するボックスへのチェックに変更を行ったときの変更出力画面を示す図である。 図17は、クライアント端末から、階数の数値および基準階部屋数表示欄の数値を変更指示したときの変更出力画面を示す図である。 図18は、建物設計情報の出力動作およびその後の変更処理動作のフローチャートの一例である。 図19は、建物設計情報の出力動作およびその後の変更処理動作の変形例を示すフローチャートの一例である。
 以下、本発明の好適な実施の形態について、図面を参照して説明する。
1.建物情報提供装置の全体構成
 図1は、本発明の実施の形態に係る建物情報提供装置1においてプログラムが実行される場合に実現される機能ブロックを示す図である。図1を参照して、建物情報提供装置10において、ソフトウェアとしてのコンピュータ・プログラムが実行された場合に、当該コンピュータ・プログラムと、ハードウエアとしてのCPUその他が協働することにより実現される機能の一例について説明する。
 この実施の形態において、建物情報提供装置1は、通信回線網を介して外部のコンピュータと通信可能なコンピュータである。ただし、建物情報提供装置1を、スタンド・アローン型のコンピュータとしても良い。
 建物情報提供装置1は、通信モジュール10と、入力情報受付部11と、コストテーブル12と、規定データ記憶部13と、入力画面データ記憶部14と、パッケージ情報記憶部15と、グループデータ記憶部20と、判断部21と、情報作成部22と、出力部23と、変更受付部24と、変更実行部25とを備える。
 通信モジュール10は、外部の通信可能なコンピュータ(例えば、インターネットを介して通信可能なクライアント端末)と通信するための構成部分である。
 入力情報受付部11は、当該クライアント端末から、外部の建築対象の建物に関する入力情報を受け付ける入力情報受付手段として機能する。
 コストテーブル12は、建物を建築するために項目分けされた部位、建物の構成材料、建物内の設備、建物を建築する土地、構成材料のコスト、設備のコストおよび土地のコストを少なくとも記憶する単価情報記憶手段として機能する構成部分である。ここで、「部位」とは、建物の所定の箇所の意味ではなく、建物の構造上のユニットを建築作業の観点からまとめた単位を意味する。「部位」は、大分類、中分類のように階層をもってまとめられている。具体的には、例えば、大分類としては、「共通仮設」、「直接仮設」、「土木・地業」、「地下躯体」、「地上躯体」、「外部仕上げ」、「内部仕上げ」、「設備」という部位がある。「共通仮設」には、「共通仮設」と「特殊仮設」という中分類がある。「土木・地業」には、「土木」と「山留・桟橋」という中分類がある。「地下躯体」には、「杭・地業」、「基礎」、「地中梁」、「耐圧版」、「地下階柱」、「地下階大梁」、「地下階小梁」、「地下階床」、「地下階壁」および「地下階雑」という中分類がある。「地上躯体」には、「柱」、「大梁」、「小梁」、「床」、「壁」および「雑」という中分類がある。「外部仕上げ」には、「屋根・屋上」、「外壁」、「外部開口部」、「外部天井」、「バルコニー」、「外部床」および「外部雑」という中分類がある。「内部仕上げ」には、「内部床」、「内部壁」、「内部天井」、「内部開口部」、「中間材」および「内部雑」という中分類がある。「設備」には、「機械設備」、「電気設備」、「空調換気排煙設備」、「給排水衛生設備」などの中分類がある。その他、各中分類には、より詳細な小分類がある。なお、上記大分類、中分類は、一例に過ぎず、部位を、どのような大分類や中分類に分けても良い。
 規定データ記憶部13は、建物の仕様、部位の種類およびその数量、構成材料の種類およびその数量、設備の種類およびその数量、および建物の建築コストなどの情報を設計基準および/または統計にもとづき規定する規定データを記憶する規定データ記憶手段として機能する構成部分である。規定データ記憶部13には、オフィス、学校、病院等のような建物の種類(モデル)毎に、統計値および係数が記憶されている。ここで、統計値とは、各モデルを構成する部位毎の単価の分布状況を示す情報である。例えば、オフィスを例にとると、統計値は、オフィスを構成する躯体、外壁、各部屋の壁・床の部材、およびそれらが複数の構成部材から成る場合には各構成部材の単価が個々のオフィスによってバラツキがある場合、そのバラツキを統計処理したときの値を意味する。また、係数とは、単価から建築コストを算出する際に参照される、モデル毎の調整用の数値である。規定データ記憶部13は、上記統計値、係数の他に、構成材料あるいは設備の数または形態を計算する上で必要な設計上の計算式、そのような計算式を定める上で必要な法規上の条件式も記憶している。例えば、特定の耐震性を具備する建物を建てる場合には、構成材料の一例である鉄筋の数、その鉄筋の太さがどの程度必要かを計算するための計算式が規定データ記憶部13に記憶されている。
 入力画面データ記憶部14は、外部のクライアント端末に対して、建物を建てる際の条件(コスト、場所、大きさ等)を入力するための入力画面のデータを記憶している構成部分である。入力画面データ記憶部14は、さらに、クライアント端末からの要求に応じて表示可能な1または複数種の画面データも記憶している。
 パッケージ情報記憶部15は、建物の仕様、部位の種類およびその数量、構成材料の種類およびその数量、設備の種類およびその数量、および建物の建築コストを含む情報を少なくとも組み合わせたパッケージ情報を、入力情報の多寡によって複数のフォルダに分類して記憶するパッケージ情報記憶手段として機能する構成部分である。例えば、パッケージ情報記憶部15は、入力される情報が最も少ないときにアクセスするファイルとして予算レベルフォルダ16を有し、その次に当該情報が少ないときにアクセスするファイルとして企画レベルフォルダ17を有し、その次に当該情報が少ないときにアクセスするファイルとして基本設計レベルフォルダ18を有し、最も当該情報が多いときにアクセスするファイルとして実施設計レベルフォルダ19を有する。これら4種のファイル16,17,18,19中の各情報については、図3を参照しながら後述する。
 グループデータ記憶部20は、少なくとも建物の仕様、建物の構成材料および建物内の設備の項目を記憶するとともに、当該項目の内の複数の特定の項目をグループ化して記憶するグループデータ記憶手段として機能する構成部分である。ここで、グループは、次の2通りの観点で形成されている。
 1つは、建物を構成している構成材料(外壁の材料、断熱材の材料など)のグレードに基づき形成されている。グレードとは、品質の程度を表す尺度を意味する。グレードは、A、BおよびCの3種類に分けられている。例えば外壁の材料に代表される構成材料、あるいはトランスに代表される設備などは、上記いずれかのグレードに分類されている。したがって、例えば、グレードAを指示すると、そのグレードAというグループに分類されている構成材料や設備が自動的に選出される。他のグレードを指示した場合にも同様である。
 もう1つは、設計上関係のある特定の項目(建物の仕様、建物の構成材料および建物内の設備)で形成されている。例えば、建物の仕様という項目に属する「部屋」と設備という項目に属する「エアコン」は、設計上関係のある項目同士であるものとして、同じグループに属する。同じ建物の使用という項目である「部屋」と「窓」も同様に、同じグループに属する。さらに、同じ設備という項目に属する「特高受電」と「乾式トランス」も同じグループに属する。この結果、クライアント端末において、例えば、部屋の数の変更を入力すると、部屋の数のみならず、窓およびエアコンの数も自動的に変更できる。
 さらに、グループデータ記憶部20では、複数の階層に分けて、建物の仕様、建物の構成材料および建物内の設備がファイルされている。例えば、「空調換気排煙設備」という階層は、「エアコン」の階層より上位に位置する。また、建物の仕様は、構成材料や設備と比べて一段高い階層に属するようにしている。さらに、グループデータ記憶部20は、建物の各部位を、上位の階層から下位の階層に向かって、「大項目」、「中項目」、「小項目」等に分けて記憶するとともに、いずれかの部位内の構成材料(モルタル、鋼材等)を記憶している。このため、各部位同士、各構成材料同士、各設備同士の上位および下位が区別でき、かつ構成材料や設備が建物の仕様よりも下位に位置することがわかるようになっている。変更を受け付けた項目と同一若しくはより低い階層に属する項目のみを変更するようにしておくと、エアコンと部屋が同じグループに属する場合において、部屋の数を変更したときにはエアコンの数も変更される。しかし、エアコンの数を変更したときには、それより上位の階層に属する部屋の数は変更されない。
 判断部21は、入力情報の多寡に応じて、パッケージ情報記憶部15内のどのフォルダ16,17,18,19にアクセスするかを判断する判断手段として機能する構成部分である。判断部21は、情報量の閾値を複数段階有しており、外部からの入力情報がどの閾値の間、あるいはどの閾値以下若しくは以上であるかを判断した上で、パッケージ情報記憶部15内のフォルダ16,17,18,19を選択し、特定のフォルダからデータを読み出すことを可能にする。
 情報作成部22は、判断部21による判断に基づいて、複数のフォルダ内の特定のフォルダにアクセスすると共に、コストテーブル12および規定データ記憶部13にアクセスし、入力情報を満足する1種若しくは複数種の建物設計情報を作成する情報作成手段として機能する構成部分である。情報作成部22は、各部位別にコストを算出し、そのコストを積算した建築コストを算出し、建物の構成部材や設備の数量等を計算することができる。
 出力部23は、入力情報受付部11によって入力情報が受け付けられると、入力画面データ記憶部14内の入力画面データの中から適切な入力画面データを読み出し、通信モジュール10を経由して、これをクライアント端末に送信する。出力部23は、予算レベルの入力の場合には、予算レベルの入力画面を、企画レベルの入力の場合には、企画レベルの入力画面を送信する。出力部23は、情報作成部22により作成された建物設計情報を出力する建物設計情報出力手段として機能する構成部分、および変更実行部25により変更された項目を出力する変更項目出力手段として機能する構成部分である。
 変更受付部24は、クライアント端末側から、出力された建物設計情報の内の一部若しくは全部の変更を受け付ける変更受付手段として機能する構成部分である。
 変更実行部25は、変更受付部24が変更を受け付けると、その変更に関わるグループ内の項目の情報を、少なくとも規定データ記憶部13内の規定データを参照して変更する変更実行手段として機能する構成部分である。変更実行部25の処理には、情報作成部22における建物設計情報の作成におけるあらゆる処理も含まれる。したがって、変更実行部25は、数量やコストの計算も行うことができる。ただし、変更実行部25に情報作成部22としての機能を持たせずに、変更実行部25が、情報作成部22にコマンドを送り、情報作成部22に対して数量やコストの計算を行わせるようにしても良い。また、選択により、以下の変更の一つあるいは全部を実行できる。変更受付部24が複数の変更を受け付けた場合には、変更実行部25は、その変更の順番に従って、その受け付けた項目の変更以外に、当該項目と同じグループに属する他の項目の情報をも変更することができる。また、変更実行部25は、変更を受け付けた項目と同一若しくはそれよりも低い階層に属する項目のみを変更することができる。さらに、入力情報が建築コストを含む場合、変更受付部24によって受け付けられた変更に基づく建築コストが入力情報内の建築コストを上回るときには、変更実行部25は、その変更を実行しない。
 図2は、建物情報提供装置1のハード構成を示す概略図である。
 建物情報提供装置1は、CPU(Central Processing Unit)30、ROM(Read Only Memory)31、RAM(Random Access Memory)32、HDD(Hard Disk Drive)33、I/F(Interface)34およびバス35を主に備える。CPU30は、HDD33に格納されているOS(Operating System)33aおよびコンピュータ・プログラム(以後、単に、プログラムという)33bに基づいて建物情報提供装置1の各部を制御するとともに、各種演算処理を実行する。
 ROM31は、CPU30が実行する基本的な制御プログラムを格納している半導体メモリである。RAM32は、CPU30が実行する各種プログラムおよびデータを一時的に格納する半導体メモリである。
 HDD33は、磁気記憶媒体としてのハードディスクに情報を磁気的に記録する装置である。HDD33は、OS33aおよびプログラム33bを格納している。OS33aは、複数のアプリケーションプログラムから共通して利用される基本的な機能を提供し、コンピュータシステム全体を管理するソフトウエアである。プログラム33bは、建物情報提供装置1として建物情報を提供する機能を実現するためのものである。すなわち、ソフトウエアとしてのプログラム33bと、ハードウエアとしてのCPU30その他の構成が協働することにより、図1に示す各構成部の機能その他が実現される。
 I/F34は、CPU30がネットワーク40を介して情報を送受信する際に、プロトコルの変換処理等を実行する。バス35は、CPU30、ROM31、RAM32、HDD33、およびI/F34を相互に接続し、これらの間で情報の授受を可能とするための信号線群である。
 先に説明した通信モジュール10の機能は、主にI/F34とプログラム33bによって実現される。入力情報受付部11、判断部21、情報作成部22、出力部23、変更受付部24および変更実行部25の各機能は、主にプログラム33bとCPU30によって実現される。コストテーブル12、規定データ記憶部13、入力画面データ記憶部14、パッケージ情報記憶部15、およびグループデータ記憶部20は、主にプログラム33b、プログラム33b格納領域以外のHDD33の記憶領域、RAM32によって実現される。
2.主なフォルダ・ファイルの構成
 図3は、パッケージ情報記憶部15内の4種類のフォルダ(予算レベルフォルダ16、企画レベルフォルダ17、基本設計レベルフォルダ18および実施設計レベルフォルダ19)に格納されるデータを説明するための模式図である。
 「予算レベル」は、建物を建てる最も初期の段階であって予算およびそれと同等レベルの条件(建てる場所、建物のおおよその規模など)しか決まっていないレベルを意味する。「企画レベル」は、予算レベルより一段階進んだレベルであって、建物の大雑把な図面ができているレベルを意味する。「基本設計レベル」は、企画レベルより具体的な条件が揃っている段階であって、基本的な設計がある程度完了しているレベルである。「実施設計」は、建築の実施段階に要する詳細事項が揃っているレベルを意味する。
 したがって、「予算レベル」、「企画レベル」、「基本設計レベル」、「実施設計レベル」の順に、入力できる情報量が多くなる。このため、入力できる情報量が少ない段階ほど、情報を補填しないと、建物の情報(コスト含む)を提示できない。このため、実施設計レベルフォルダ19、基本設計レベルフォルダ18、企画レベルフォルダ17、予算レベルフォルダ16となるほど、デフォルトで用意しておく情報量を徐々に多くしている。すなわち、実施設計レベルフォルダ19、基本設計レベルフォルダ18、企画レベルフォルダ17、予算レベルフォルダ16の順に、構成材料、設備、それらの数やコストなどをパッケージ化したデフォルトの情報(D)の割合を高くしている。逆に、入力情報(I)で埋める部分は、実施設計レベルフォルダ19、基本設計レベルフォルダ18、企画レベルフォルダ17、予算レベルフォルダ16の順に、少なくなる。一例を挙げると、実施設計レベルフォルダ19は、10%のデフォルトの情報(D)と90%の入力情報(I)で埋める部分(空欄)から成る。基本設計レベルフォルダ18は、40%のデフォルトの情報(D)と60%の入力情報(I)で埋める部分(空欄)から成る。企画レベルフォルダ17は、75%のデフォルトの情報(D)と25%の入力情報(I)で埋める部分(空欄)から成る。予算レベルフォルダ16は、95%のデフォルトの情報(D)と5%の入力情報(I)で埋める部分(空欄)から成る。
 図4は、グループデータ記憶部20に格納されているデータファイル50,60の一例である。
 グループデータ記憶部20内のデータファイル50は、建物の仕様を階層化したファイルである。建物の仕様は、「構造」51、「階数」52、「建築面積」53、「延床面積」54、「部屋数」55等の複数の項目(大項目)から成る。例えば、「構造」51という項目の下位には、「RC造1.25」56および「RC造1.00」57という項目(小項目)がリンクされている。「階数」52、「建築面積」53、「延床面積」54、「部屋数」55にも、同様の下位の項目がリンクされている。ここで、グループデータ記憶部20における「項目」とは、1つあるいは複数階層に配置される建物の仕様、建物の構成材料および建物内の設備を少なくとも含むものをいう。
 また、「RC造1.25」56および「RC造1.00」57という項目には、グレード別に分けられたグループを表す記号(この実施の形態では、A、B、Cの3種類)58が付されている。さらに、「階数」52、「建築面積」53、「延床面積」54、「部屋数」55という各項目には、設計上関連のあるものをグループ別に分類して示す符号(例えば、p,h)が付されている。この実施の形態では、「階数」52、「延床面積」54、「部屋数」55には、「p」という設計上関連のあるグループに属することを示す符号が付されている。
 グループデータ記憶部20内のデータファイル60は、建物の構成材料および設備を部位別に分けて階層化したファイルである。建物の部位は、「共通仮設」、「直接仮設」、「土木・地業」、「地下躯体」、「地上躯体」、「外部仕上げ」、「設備」61等の複数の項目から成る。ここでは、これらの部位別の項目の内、「設備」61について、その下位の項目を紹介する。「設備」61の下位には、「電気」62、「給排水衛生」、「空調換気排煙」63等の複数の設備の項目が存在する。「電気」62の下位には、「受変電」64、「幹線」、「通信」65等の複数の設備の項目が存在する。「受変電」64の下位には、「受電方式」66、「トランス」67、「引込種」等の複数の設備の項目が存在する。「受電方式」66の下位には、「特高受電」68、「高圧受電」69、「低圧受電」70等の複数の設備の項目が存在する。「特高受電」68は、X(V)以上~Y(V)未満の範囲の電圧受電の方式であることを意味する。「高圧受電」69は、W(V)以上X(V)未満の範囲の電圧受電の方式であることを意味する。「低圧受電」70は、V(V)以上W(V)未満の範囲の電圧受電の方式であることを意味する。また、「空調換気排煙」63の下位には、「エアコンA」71、「エアコンB」72等の複数の設備の項目が存在する。「通信」65の下位には、「光通信」73、「ADSL」74等の複数の設備の項目が存在する。「トランス」67の下位には、「乾式トランス」75、「簡易型トランス」76等の複数の設備の項目が存在する。データファイル60内のどの項目も、データファイル50内の建物の仕様に関係する項目よりも下位の階層になる。データファイル60内の各項目は、上述の階層構造によって、上位か下位かが決定されている。
 データファイル60内の各項目の内、特定の項目には、当該項目が属するグループを表す符号が付されている。例えば、「特高受電」68には、グレードのグループを表す符号58である「A」と設計上の関連性の観点から分類されるグループを表す符号59である「a」が付されている。「高圧受電」69には、符号58である「B」と符号59である「a」が付されている。「低圧受電」70には、符号58である「C」と符号59である「b」が付されている。「乾式トランス」75には、符号58である「A」と符号59である「a」が付されている。「簡易型トランス」76には、符号58である「C」と符号59である「b」が付されている。「エアコンA」71には、符号58である「A」と符号59である「p」が付されている。「エアコンB」72には、符号58である「B」と符号59である「p」が付されている。「光通信」73には、符号58である「A」と符号59である「s」が付されている。「ADSL」74には、符号58である「B」と符号59である「t」が付されている。このため、クライアント端末からグレードをAに変更する指示を送信すると、「A」が付されている項目が全て選出され、変更の対象になる。また、クライアント端末から「部屋数」55を増やすあるいは減らすように変更する指示を送信すると、「p」が付されている項目が変更対象になる。このため、「エアコンA」71または「エアコンB」72の数などが変更の対象に選出される。同様に、「階数」52を4階から3階に変更した場合、同じ「p」というグループ内にあって同一階層の「延床面積」54と「部屋数」55が変更対象となると共に、「p」というグループ内で下位の階層にある「エアコンA」71または「エアコンB」72も変更対象となる。変更実行部25は、規定データ記憶部13内のデータを参照し、情報作成部22に計算させて、階数を3階に減らした際の延床面積や部屋数、エアコンの台数を決定する。エアコンの台数は、1部屋当たり1台というデータが規定データ記憶部13内に格納されているため、上記計算ができる。ただし、選択によって、以下の機能を実行することもできる。「エアコンA」71の数を変更した場合、「エアコンA」71より上位の階層にある「部屋数」55を変えないようにすることができる。部屋数は建物の構造に関与するので、冷暖房設備の一つであるエアコンよりも階層を高くし、変更対象の階層より高い階層にあるものの変更を行わないように設定することができる。このため、部屋数を10から5に減らした際にはエアコンの数を10から5に減らすことはできても、エアコンの数を10から5に減らした際には部屋数を減らすことはできない。ただし、これは、選択によってかかる機能を実行可能であるため、その選択をしない場合には、階層の高低に関わらず、同じグループ内の項目はすべて変更対象になるようにすることもできる。
2.クライアント端末に表示される画面の推移
 図5~図17は、クライアント端末に表示される各種画面の推移の一例を示す図である。
 図5は、建物情報提供装置1にアクセスして最初に表示される画面の一例である。
 図5に示す画面80には、予算レベルの入力画面を表示するための表示キー81と、企画レベルの入力画面を表示するための表示キー82と、基本設計レベルの入力画面を表示するための表示キー83と、実施設計レベルの入力画面を表示するための表示キー84と、取消キー85と、OKキー86とが、クリッカブルなキーとしてそれぞれ表示される。表示キー81は、予算段階、すなわち、建築条件に関する情報が非常に少ない場合に選択するキーである。表示キー82は、企画段階、すなわち、建築条件に関する情報が予算段階より多いものの、未だ設計の段階にまで至っていない場合に選択するキーである。表示キー83は、企画段階よりも建築条件の詳細が決定しており、情報量が企画段階よりも多い段階において選択するキーである。表示キー84は、基本設計段階よりもさらに建築条件の詳細が決定し、情報量が基本設計段階よりも多い段階において選択するキーである。ユーザは、表示キー81から84のいずれかを選択して、OKキー86を選択指示すると、その選択された表示キーの情報が建物情報提供装置1へと送信される。また、ユーザが表示キー81から84のいずれかを選択して、取消キー85を選択指示すると、表示キーの選択指示がクリアされる。
 図6は、図5に示す画面80において予算レベルの表示キー81を選択指示し、OKキー86を選択指示した際に表示される入力画面90の一例である。
 予算レベルの表示キー81の選択指示により、入力情報受付部11は、当該選択指示を受け付け、これを出力部23に送る。出力部23は、入力画面データ記憶部14から、当該選択指示に合致した入力画面のデータを選択し、そのデータを通信モジュール10に送る。通信モジュール10を介してクライアント端末の画面に表示された入力画面90には、面積を入力する欄91と、建築の予算を入力する欄92と、建物を建てようとする場所を入力する欄93と、建物のグレードを選択するグレード選択キー94と、取消キー96と、OKキー97とが表示される。グレード選択キー94を選択指示すると、複数のグレードキー95が表示される。複数のグレードキー95には、オフィスモデル、学校モデル、病院モデル等の各モデルを特定する情報も含まれている。したがって、複数のグレードキー95の内の1つを選択すると、建物の種類も特定できる。
 ユーザは、欄91に面積を、欄92に予算を、欄93に建物を建てる場所(住所)を入力し、複数のグレードキー95から所望のグレードを選択して、OKキー97を選択指示すると、上記入力された情報および選択された情報が建物情報提供装置1に送信される。また、ユーザが、OKキー97ではなく、取消キー96を選択指示すると、上記入力された情報および選択された情報がクリアされる。
 図6に示す画面90の入力が完了し、OKキー97が選択指示されると、図6に示す画面90において入力された情報(入力情報)が、入力情報受付部11へと送信される。入力情報受付部11は、判断部21に当該入力情報を渡す。判断部21は、当該入力情報に基づいて、パッケージ情報記憶部15の中から予算レベルフォルダ16を選択し、所定のモデルであって当該入力情報を満足するファイルを読み出し可能にする。そのファイルの大部分は、デフォルト情報で満たされている。これと同時に、判断部21は、情報作成部22に入力情報を渡す。情報作成部22は、入力情報に基づいて、予算レベルフォルダ16内の所定のファイルを読み出すと共に、コストテーブル12および規定データ記憶部13内の各種統計値や係数ならびに計算式等を利用しながら、建物設計情報を作成する。予算レベルでの入力情報は非常に少ないので、情報作成部22は、建物の面積、予算、場所およびグレードに合った既存のパッケージ情報を予算レベルフォルダ16から選ぶことになり、コストテーブル12および規定データ記憶部13内のデータの利用率は極めて低い。その後、出力部23は、作成した建物設計情報を通信モジュール10に送る。通信モジュール10は、その建物設計情報を、クライアント端末へ送る。
 図7は、図5に示す画面80において企画レベルの表示キー82を選択指示し、OKキー86を選択指示した際に表示される入力画面100の一例である。
 企画レベルの表示キー82の選択指示により、入力情報受付部11は、当該選択指示を受け付け、これを出力部23に送る。出力部23は、入力画面データ記憶部14から、当該選択指示に合致した入力画面のデータを選択し、そのデータを通信モジュール10に送る。通信モジュール10を介してクライアント端末の画面に表示された入力画面100には、面積を入力する欄101と、建築の予算を入力する欄102と、建物を建てようとする場所を入力する欄103と、建物のグレードを選択するグレード選択キー104と、取消キー106と、OKキー107とが表示される。グレード選択キー104を選択指示すると、複数のグレードキー105が表示される。これら各種のキー101~107は、画面90における各種キー91~97と同様のキーである。
 図7に示す画面100の入力が完了し、OKキー107が選択指示されると、次の入力画面110がクライアント端末に表示される。この入力画面110は、予めクライアント端末に送られた入力画面のデータの一部に含まれていても良く、あるいは一旦、建物情報提供装置1側にOKキー107の選択指示が送られ、入力画面データ記憶部14から読み出されたものであっても良い。
 図8は、入力画面100の次に表示される入力画面110を例示的に示す図である。入力画面110は、一例として、外部仕上げに関する情報を表示したものである。
 図8に示す入力画面110では、部位の一つである「屋根屋上」111とその下層項目である仕上げの一つの「押さえコンクリート」112とが対応付けられ、その「押さえコンクリート」112とその下層項目である中間材の一つの「×××」113とが対応付けられている。さらに、「×××」113とその下層項目である雑の一つの「○○○」114とが対応付けられている。「○○○」114は、デフォルトで表示されているが、ユーザは、別の雑である「○○○」115に変更するように選択しても良い。その場合、「○○○」114の周囲の太枠は、その下方にある「○○○」115に移る。また、部位の一つである「外壁」121とその下層項目である仕上げの一つの「タイル貼り」122とが対応付けられ、その「タイル貼り」122とその下層項目の「△△△△」123とが対応付けられている。なお、上記部位は、一例に過ぎず、その他に、例えば、仮設、構造、設備、外構に関する項目も入力可能に表示される。
 図8に示す入力画面110には、戻るキー124、取消キー125およびOKキー127がクリッカブルな状態で表示されている。外部仕上げの項目に変更がなければ、ユーザはOKキー127を選択指示する。その選択指示により、次の入力画面がクライアント端末に表示される。その入力画面は、予めクライアント端末に送られた入力画面のデータの一部に含まれていても良く、あるいは一旦、建物情報提供装置1側にOKキー127の選択指示が送られ、入力画面データ記憶部14から読み出されたものであっても良い。一方、取消キー125を選択指示すると、ユーザが変更した項目がデフォルト状態の表示に戻る。また、戻るキー124を選択指示すると、図7に示す画面に戻る。
 図9は、入力画面110の次に表示される入力画面130を例示的に示す図である。入力画面130は、一例として、設備に関する情報を表示したものである。
 図9に示す入力画面130では、設備の一種である「機械設備」131と「電気設備」132の各欄が表示されている。「機械設備」131の下位には、設備内訳として、「駐車場」133と「エレベータ」134が表示されている。また、「電気設備」132の下位には、設備内訳として、「エアコン」135と「電圧」136が表示されている。「駐車場」133および「エレベータ」134の各下位には、詳細情報として、それぞれ、その有無の選択指示欄137および138が表示されている。「エアコン」135の下位には、詳細情報として、セントラル制御かそれとも個別制御かを選択する選択指示欄139が表示されている。また、「電圧」136の下位には、詳細情報として、電圧のレベルを選択指示する選択指示欄140が表示されている。選択指示欄137,138,139,140には、デフォルトとして、それぞれ、「有」、「有」、「個別」、「高圧」が選択された状態で表示されており、ユーザによってその入力変更が可能な状態となっている。クライアント端末からの入力は、図9に示す入力画面130上では、駐車場やエレベータの有無、エアコンの制御単位、電圧レベルの選択のみである。すなわち、駐車場の収容台数、エレベータの数などのさらなる詳細情報を入力する余地はない。企画レベルにおいては、詳細な建物の情報が決まっていないことが多いことを考慮して、簡易な入力とそれによるラフな費用および設計情報の提示を可能とするためである。
 図9に示す入力画面130には、戻るキー147、取消キー148およびOKキー149がクリッカブルな状態で表示されている。入力画面130の内容に変更がなければ、ユーザはOKキー149を選択指示する。すると、入力画面100,110,130において入力された情報(入力情報)が、入力情報受付部11へと送信される。入力情報受付部11は、判断部21に当該入力情報を渡す。判断部21は、当該入力情報に基づいて、パッケージ情報記憶部15の中から企画レベルフォルダ17を選択し、所定のモデルであって当該入力情報を満足するファイルを選び出す。そのファイルの多くの部分は、デフォルト情報で満たされている。これと同時に、判断部21は、情報作成部22に入力情報を渡す。情報作成部22は、入力情報に基づいて、企画レベルフォルダ17内の所定のファイルを読み出すと共に、コストテーブル12および規定データ記憶部13内の各種統計値や係数ならびに計算式等を利用しながら、各構成材料や各設備の数量やコスト等の計算を行い、建物設計情報を作成する。企画レベルでの入力情報は少ないので、情報作成部22は、建物の面積、予算、場所およびグレードに合った既存のパッケージ情報を企画レベルフォルダ17から選び、この情報に足りない部分に、入力情報あるいは入力情報に基づきコストテーブル12および規定データ記憶部13内のデータを利用して作成した情報を埋める。その後、出力部23は、建物設計情報を通信モジュール10に送る。通信モジュール10は、その建物設計情報を、クライアント端末へ送る。
 一方、入力画面130において取消キー148が選択指示されると、ユーザが選択・変更した情報がデフォルトの状態に戻る。また、戻るキー147が選択指示されると、前の入力画面110に戻る。
 図10は、図5に示す画面80において基本設計レベルの表示キー83を選択指示し、OKキー86を選択指示した際に表示される入力画面150の一例である。
 基本設計レベルの表示キー83の選択指示により、入力情報受付部11は、当該選択指示を受け付け、これを出力部23に送る。出力部23は、入力画面データ記憶部14から、当該選択指示に合致した入力画面のデータを選択し、そのデータを通信モジュール10に送る。通信モジュール10を介してクライアント端末の画面に表示された入力画面150には、面積を入力する欄151と、建築の予算を入力する欄152と、建物を建てようとする場所を入力する欄153と、建物のグレードを選択するグレード選択キー154と、取消キー156と、OKキー157とが表示される。グレード選択キー154を選択指示すると、複数のグレードキー155が表示される。これら各種のキー151~157は、画面90における各種キー91~97と同様のキーである。
 図10に示す画面150の入力が完了し、OKキー157が選択指示されると、次の入力画面160がクライアント端末に表示される。この入力画面160は、予めクライアント端末に送られた入力画面のデータの一部に含まれていても良く、あるいは一旦、建物情報提供装置1側にOKキー157の選択指示が送られ、入力画面データ記憶部14から読み出されたものであっても良い。
 図11は、入力画面150の次に表示される入力画面160を例示的に示す図である。入力画面160は、一例として、外部仕上げに関する情報を表示したものである。
 基本設計の段階になると、予算あるいは企画の段階に比べて、ユーザが持っている建築の条件に関する情報が多い。このため、多くの情報に対応して正確な設計情報(コスト情報も含む)を出力できるようにする必要から、項目毎の選択肢が多く、またユーザが直接入力する欄も多い。図11に示す入力画面160では、部位の一つである「屋根屋上」161とその下層項目である仕上げの一つの「押さえコンクリート」162とが対応付けられ、その「押さえコンクリート」162とその下層項目である中間材の一つの「×××」163とが対応付けられている。さらに、「×××」163とその下層項目である雑の一つの「○○○」164とが対応付けられている。「押さえコンクリート」162、「×××」163および「○○○」164は、デフォルトで表示されているが、ユーザは、別の仕上げである「防水シート」165を選択しても良い。その場合、「押さえコンクリート」162の周囲の太枠は、その下方にある「防水シート」165に移る。また、ユーザは、中間材として、「×××」166を選択しても良い。その場合、「×××」163の周囲の太枠は、その下方にある「×××」166に移る。また、ユーザは、雑として、「○○○」167を選択しても良い。その場合、「○○○」164の周囲の太枠は、その下方にある「○○○」167に移る。入力画面160において、仕上げおよび中間材の各選択肢の中には、直接入力できる空欄168および空欄169も存在する。ユーザは、空欄168,169に、自分の好みの情報を入力できる。空欄168および空欄169に直接入力した場合、その入力された項目に関する費用等の情報は、ネットワーク40を介して建物情報提供装置1のコストテーブル12から取得し、あるいは他の外部サーバから取得することもできる。後述する実施設計レベルにおいて、空欄に直接入力した場合も同様である。
 また、入力画面160では、部位の一つである「外壁」171とその下層項目である仕上げの一つの「タイル貼り」172とが対応付けられ、その「タイル貼り」172とその下層項目の「△△△△」173とが対応付けられている。「タイル貼り」172および「△△△△」173は、デフォルトで表示されているが、ユーザは、別の仕上げである「カーテンウオール」175を選択しても良い。その場合、「タイル貼り」172の周囲の太枠は、その下方にある「カーテンウオール」175に移る。また、ユーザは、「△△△△」176または「△△△△」178を選択しても良い。その場合、「△△△△」173の周囲の太枠は、その下方にある「△△△△」176または「△△△△」178に移る。また、入力画面160において、仕上げの選択肢の中には、直接入力できる空欄177も存在する。ユーザは、空欄177に、自分の好みの情報を入力できる。なお、入力画面160に、数量を入力する欄を設けても良い。
 「外壁」171には、そこにポインティングデバイスの指示を行うと、吹き出し部分174が表示される。吹き出し部分174には、「省エネ材料」、「長寿命材料」という項目が存在する。例えば、ユーザが「省エネ材料」という項目を選択すると、仕上げおよびその下層のバリエーションが、省エネ材料という集合に属する材料に変更表示される。一方、ユーザが吹き出し部分174の各項目を選択指示しないと、図11に示す入力画面160の表示は、元のままである。この表示変更は、次のような処理によって実現される。ユーザが吹き出し部分174のある項目を選択指示すると、その選択指示された情報は、通信モジュール10を経由して、入力情報受付部11、判断部21を経由して、情報作成部22に渡される。情報作成部22は、変更実行部25にコマンドを送り、グループデータ記憶部20から、その選択指示されたカテゴリー(例えば、長寿命材料)に属する仕上げおよびその下層のバリエーションの情報を選択するようにする。その結果、仕上げおよびその下層のバリエーションの情報は、出力部23、通信モジュール10を経由して、クライアント端末に表示される。これをハードウェアの処理の観点から説明すれば、CPU30が、HDD33、RAM32若しくはROM31の少なくともいずれか1つの記憶媒体(メモリ)から、ユーザが選択指示したカテゴリーに属する情報を読み出して、それをクライアント端末に向けて送信する。なお、上述の吹き出し部分174と同様の吹き出し部分は、入力画面160内の他の部位、例えば「屋根屋上」161にて表示されるようにしても良い。また、企画レベルあるいは実施設計レベルで表示される各入力画面にて、吹き出し部分の表示がされても良い。
 入力画面160には、戻るキー180、取消キー181およびOKキー182がクリッカブルな状態で表示されている。外部仕上げの項目に変更がなければ、ユーザはOKキー182を選択指示する。その選択指示により、次の入力画面がクライアント端末に表示される。その入力画面は、予めクライアント端末に送られた入力画面のデータの一部に含まれていても良く、あるいは一旦、建物情報提供装置1側にOKキー182の選択指示が送られ、入力画面データ記憶部14から読み出されたものであっても良い。一方、取消キー181を選択指示すると、ユーザが変更した項目がデフォルト状態の表示に戻る。また、戻るキー180を選択指示すると、前の入力画面150に戻る。
 図12は、入力画面160の次に表示される入力画面190を例示的に示す図である。入力画面190は、一例として、設備に関する情報を表示したものである。
 図9に示す入力画面190では、設備の一種である「機械設備」191と「電気設備」202の各欄が表示されている。「機械設備」191の下位には、設備内訳として、「駐車場」192と「エレベータ」193が表示されている。また、「電気設備」202の下位には、設備内訳として、「エアコン」203が表示されている。「駐車場」192の下位には、詳細情報として、駐車台数の範囲を選択指示可能とした3種類の選択指示欄194,195,196と直接入力可能な空欄197が対応して表示されている。また、「エレベータ」193の下位には、詳細情報として、台数を選択指示可能とした3種類の選択指示欄198,199,200と直接入力可能な空欄201が対応して表示されている。また、「エアコン」203の下位には、詳細情報として、個別制御で各オフィスに1台設置することを選択指示する選択指示欄204、個別制御で各部屋(オフィスよりも小さい単位)に1台設置することを選択指示する選択指示欄205、各階セントラル制御とすることを選択指示する選択指示欄206、全館セントラル制御とすることを選択指示する選択指示欄207の他、直接入力可能な空欄208が対応して表示されている。企画レベルと比べて、選択する情報が多いのは、企画段階よりさらに建築条件の詳細が決定していることに対応するためである。
 図12に示す入力画面190には、戻るキー210、取消キー211およびOKキー212がクリッカブルな状態で表示されている。入力画面190の内容に変更がなければ、ユーザはOKキー212を選択指示する。すると、入力画面150,160,190において入力された情報(入力情報)が、入力情報受付部11へと送信される。入力情報受付部11は、判断部21に当該入力情報を渡す。判断部21は、当該入力情報に基づいて、パッケージ情報記憶部15の中から基本設計レベルフォルダ18を選択し、所定のモデルであって当該入力情報を満足するファイルを選び出す。そのファイルの一部は、デフォルト情報で満たされている。
 これと同時に、判断部21は、情報作成部22に入力情報を渡す。情報作成部22は、入力情報に基づいて、基本設計レベルフォルダ18内の所定のファイルを読み出すと共に、コストテーブル12および規定データ記憶部13内の各種統計値や係数ならびに計算式等を利用しながら、各構成材料や各設備の数量やコスト等の計算を行い、建物設計情報を作成する。基本設計レベルでの入力情報は多いので、情報作成部22は、建物の面積、予算、場所およびグレードに合った既存のパッケージ情報を基本設計レベルフォルダ18から選び、この情報以外の多くの部分に、入力情報あるいは入力情報に基づきコストテーブル12および規定データ記憶部13内のデータを利用して作成した情報を埋める。その後、出力部23は、建物設計情報を通信モジュール10に送る。通信モジュール10は、その建物設計情報を、クライアント端末へ送る。
 一方、入力画面190において取消キー211が選択指示されると、ユーザが選択・変更した情報がデフォルトの状態に戻る。また、戻るキー210が選択指示されると、前の入力画面160に戻る。
 図13は、図5に示す画面80において実施設計レベルの表示キー84を選択指示し、OKキー86を選択指示した際に表示される入力画面220の一例である。
 実施設計レベルの表示キー84の選択指示により、入力情報受付部11は、当該選択指示を受け付け、これを出力部23に送る。出力部23は、入力画面データ記憶部14から、当該選択指示に合致した入力画面のデータを選択し、そのデータを通信モジュール10に送る。通信モジュール10を介してクライアント端末の画面に表示された入力画面220には、面積を入力する欄221と、建築の予算を入力する欄222と、建物を建てようとする場所を入力する欄223と、建物のグレードを選択するグレード選択キー224と、取消キー226と、OKキー227とが表示される。グレード選択キー224を選択指示すると、複数のグレードキー225が表示される。これら各種のキー221~227は、画面90における各種キー91~97と同様のキーである。
 図13に示す入力画面220の入力が完了し、OKキー227が選択指示されると、次の入力画面230がクライアント端末に表示される。この入力画面230は、予めクライアント端末に送られた入力画面のデータの一部に含まれていても良く、あるいは一旦、建物情報提供装置1側にOKキー227の選択指示が送られ、入力画面データ記憶部14から読み出されたものであっても良い。
 図14は、入力画面220の次に表示される入力画面230を例示的に示す図である。入力画面230は、一例として、設備に関する情報を表示したものである。ただし、図14には、設備に関する情報の一部のみが示されている。
 実施設計の段階になると、ユーザが持っている建築の条件に関する情報が最も多くなる。このため、多くの情報に対応して正確な設計情報(コスト情報も含む)を出力できるようにする必要から、項目毎の選択肢が最も多く、またユーザが直接入力する欄も最も多くしている。図14に示す入力画面230では、「設備」231という項目の下に、「電気」232、「給排水衛生」242、「空調換気排煙」243等の下位の項目が対応付けられている。「電気」232には、その下層項目である「詳細情報1」として、「受変電」233、「幹線」234、「通信」235および「電圧」236などが対応付けられている。「受変電」233には、その下層項目である「詳細情報2」として、「受電方式」237、「トランス」238、「引込種」239などが対応付けられている。なお、「幹線」234、「通信」235および「電圧」236についても、同様に、「詳細情報2」として複数の下層項目が対応付けられている。
 「空調換気排煙」243には、その下層項目である「詳細情報1」として、「エアコン」244、「排煙装置」245、直接入力可能な空欄246などが対応付けられている。「エアコン」244には、その下層項目である「詳細情報2」として、「個別-オフィス毎1台」247、「個別-部屋毎一台」248、「セントラル-各階毎」249、「セントラル-全館」250などが対応付けられている。さらに、「個別-オフィス毎1台」247には、その下層項目である「詳細情報3」として、「機種A」251、「機種B」252、「機種C」253および直接入力可能な空欄254などが対応付けられている。なお、「個別-部屋毎一台」248、「セントラル-各階毎」249、「セントラル-全館」250、「排煙装置」245、「給排水衛生」242についても、同様に、詳細情報として複数の下層項目が対応付けられている。太枠内の項目はデフォルトで設定済みであるが、ユーザは他の項目に変更し、あるいは空欄246等に希望の条件を直接入力することができる。
 ユーザは、全ての項目に対して選択あるいは入力を完了すると、図示されないOKキーを選択指示する。すると、入力画面220,230において入力された情報(入力情報)が、入力情報受付部11へと送信される。入力情報受付部11は、判断部21に当該入力情報を渡す。判断部21は、当該入力情報に基づいて、パッケージ情報記憶部15の中から実施設計レベルフォルダ19を選択し、所定のモデルであって当該入力情報を満足するファイルを選び出す。そのファイルの一部分は、デフォルト情報で満たされている。これと同時に、判断部21は、情報作成部22に入力情報を渡す。情報作成部22は、入力情報に基づいて、コストテーブル12および規定データ記憶部13内の各種統計値や係数ならびに計算式等を利用しながら、各構成材料や各設備の数量やコスト等の計算を行い、建物設計情報を作成する。実施設計レベルでの入力情報は多いので、情報作成部22は、建物の面積、予算、場所およびグレードに合った既存のパッケージ情報を実施設計レベルフォルダ19から選び、この情報以外の多くの部分に、入力情報あるいは入力情報に基づきコストテーブル12および規定データ記憶部13内のデータを利用して作成した情報を埋める。その後、出力部23は、建物設計情報を通信モジュール10に送る。通信モジュール10は、その建物設計情報を、クライアント端末へ送る。
 一方、図14に図示されない取消キーが選択指示されると、ユーザが選択・変更した情報がデフォルトの状態に戻る。また、図14に図示されない戻るキーが選択指示されると、図13に示す入力画面220に戻る。なお、上記の「設備」231という項目は、一例に過ぎず、その他に、例えば、仮設、構造、外構に関する項目も入力可能に表示される。
 図15は、各レベルの入力画面から建築条件の入力を行い出力させた建物設計情報を表示する出力画面260である。
 出力画面260は、デフォルトで用意された情報を含みつつ、ユーザが入力した条件およびその条件から導き出された数量等を表示する。例えば、出力画面260には、構造に属する項目として、階数(地上階数、地下階数)、建物高さ、基準階面積、基準階天井高さおよび基準階部屋数がそれぞれ表示されている。この出力画面260の例では、地上階数表示欄261に「3」が、地下階数表示欄262に「1」が、建物高さ表示欄(単位:メートル)263に「10」が、基準階面積表示欄(単位:平方メートル)264に「150」が、基準階天井高さ表示欄(単位:メートル)265に「3.0」が、基準階部屋数表示欄266に「4」が、それぞれ表示されている。
 また、出力画面260には、外部仕上に属する項目として外壁材が、内部仕上に属する項目として床材および内壁が、設備に属する項目としてエアコン、ボイラー、電圧、トランス等が表示されている。この出力画面260の例では、外壁材表示欄271に「タイル」が、床材表示欄281に「木」が、内壁表示欄282に「クロスB材」が、エアコン台数表示欄291に「12」が、ボイラー台数表示欄292に「1」が、電圧表示欄293に「100」が、トランス種類表示欄294に「簡易型」が、それぞれ表示されている。
 加えて、出力画面260には、グレードに関する項目として、構造、建築および設備が表示されている。さらに、建築の表示の下位の項目として、外部仕上および内部仕上という項目が表示されている。設備の表示の下位の項目として、電気設備という項目が表示されている。構造という項目は、「耐震1.25倍」を選択するボックス301と、「耐震1.00倍」を選択するボックス302とを有する。外部仕上という項目は、グレードの高い方から低い方に、グレードAを選択するボックス311、グレードBを選択するボックス312、グレードCを選択するボックス313、グレードDを選択するボックス314とを有する。内部仕上という項目も、外部仕上という項目と同様、グレードの高い方から低い方に、グレードAを選択するボックス321、グレードBを選択するボックス322、グレードCを選択するボックス323、グレードDを選択するボックス324とを有する。電気設備という項目も、外部仕上という項目と同様、グレードの高い方から低い方に、グレードAを選択するボックス331、グレードBを選択するボックス332、グレードCを選択するボックス333、グレードDを選択するボックス334とを有する。出力画面260には、入力画面において入力した情報に基づいて、各グレードのボックスの一つにチェックが入っている。この例では、構造では「耐震1.00倍」を選択するボックス302と、外部仕上ではグレードBを選択するボックス312と、内部仕上ではグレードBを選択するボックス322と、電気設備ではグレードBを選択するボックス332に、それぞれチェックが入っている。また、建物建築の総コストを表示するコスト欄335と、内訳のキー336が表示されている。内訳のキー336を押すと、総コストの内訳が部位別に表示される。コスト欄335には、「2,000,000,000」(単位は円)が表示されている。
 ユーザがクライアント端末から、グレードの変更を行うべく入力変更を実行すると、建物情報提供装置1は、グレードの変更に伴う各構成材料および/または各設備を変更する。
 図16は、クライアント端末から、構造において「耐震1.25倍」を選択するボックス301へのチェック、建築の外部仕上においてグレードAを選択するボックス311へのチェック、建築の内部仕上においてグレードAを選択するボックス321へのチェック、電気設備においてグレードAを選択するボックス331へのチェックという変更を指示した結果表示される変更出力画面340を示す図である。
 図16に示す変更出力画面340では、クライアント端末からの変更指示通り、構造において「耐震1.25倍」を選択するボックス301に、建築の外部仕上においてグレードAを選択するボックス311に、建築の内部仕上においてグレードAを選択するボックス321に、電気設備においてグレードAを選択するボックス331に、それぞれチェックが変更されている。その他に、基準階天井高さ表示欄(単位:メートル)265の数値が「3.0」から「2.5」に、外壁材表示欄271の材質が「タイル」から人工大理石に、床材表示欄281の材質が「木」から「人工大理石」に、また、内壁表示欄282の材質が「クロスB材」から「クロスA材」に、ボイラー台数表示欄292が「1」から「2」に、電圧表示欄293が「100」から「220」に、トランス種類表示欄294が「簡易型」から「乾式」に、それぞれ変更されている。さらに、変更が耐震性アップ、外部仕上、内部仕上、電気設備の各グレードをアップするものであるため、コストもアップするように変更される。この結果、コスト欄335の表示は、20億円から21億5432万円に変更されている。内訳のキー336を押すと、各部位別のコストも変更されている。
 基準階天井高さ表示欄(単位:メートル)265の数値が「3.0」から「2.5」に変更されたのは、耐震性をアップするようにグレードを変更したからである。外壁材表示欄271の材質が「タイル」から人工大理石に変更されたのは、外部仕上のグレードをアップするように変更したからである。床材表示欄281の材質が「木」から「人工大理石」に、および内壁表示欄282の材質が「クロスB材」から「クロスA材」にそれぞれ変更されたのは、内部仕上のグレードをアップするように変更したからである。ボイラー台数表示欄292が「1」から「2」に、電圧表示欄293が「100」から「220」に、トランス種類表示欄294が「簡易型」から「乾式」にそれぞれ変更されたのは、電気設備のグレードをアップするように変更したからである。
 クライアント端末から上記のようなグレードの変更指示を行うと、建物情報提供装置1の変更受付部24が通信モジュール10を介してその変更指示の情報を受け取る。次に、その情報は、変更実行部25に送信される。変更実行部25は、グループデータ記憶部20内のデータを参照して、構造において耐震性が通常の1.25倍というグループに属する項目、外部仕上、内部仕上および電気設備においてそれぞれグレードAというグループに属する項目を読み出す。さらに、情報作成部22にて、変更後の耐震性を満足する数値計算や、グレード変更に伴う数値計算および/または数値選択を行うとともに、コスト計算も行う。変更実行部25は、その結果をまとめて、最初に表示した建物設計情報を変更し、その変更後の情報を出力部23に送信する。出力部23は、変更後の情報をクライアント端末側に送信する。
 出力画面260および変更出力画面340には、鉄筋の本数や太さ等の情報が表示されていないが、省略しているだけであって、実際には、鉄筋の本数や太さ等の情報をはじめとする多くの情報が建物設計情報として表示されている。さらに、耐震性のアップによって鉄筋の本数や太さの情報についても変更されている。なお、コストに関しては、予算をオーバーする場合には、その旨の注意喚起を行う表示をした上で、グレードアップ後の各部位の情報を表示しないようにすることもできる。あるいは、予算をオーバーしても、コストを表示した上で、グレードアップ後の各部位の情報を表示するようにすることもできる。
 ユーザがクライアント端末から、構造、設備の一部の変更を行うべく入力変更を実行すると、建物情報提供装置1は、その変更に伴う各構成材料、各設備、およびそれらの数量等の事項も変更する。
 図17は、クライアント端末から、構造における地上階数表示欄261の数値を「3」から「4」に、基準階部屋数表示欄266の数値を「4」から「5」に、設備の電圧表示欄293を「100」から「220」にそれぞれ増加するように変更指示したときの変更出力画面350を示す図である。
 図17に示す変更出力画面350では、クライアント端末からの変更指示に加えて、設備の項目のエアコン台数表示欄291の数値が元の「12」から「20」に変更される。これは、階数が4、基準階の部屋数が5にそれぞれ変更された結果、4階建ての場合に、4×5(この計算式は、規定データ記憶部13に記憶されている)、すなわち20台のエアコンが必要になるとういう計算結果に基づく。また、トランス種類表示欄294も、「簡易型」から「乾式型」に変更される。これは、電圧が220Vにアップしたことに伴い変更されたものである。コスト欄335の表示は、20億円から25億1842万円に変更されている。内訳のキー336を押すと、各部位別のコストも変更されている。
 クライアント端末から上記のような基準階部屋数の変更指示を行うと、建物情報提供装置1の変更受付部24が通信モジュール10を介してその変更指示の情報を受け取る。次に、その情報は、変更実行部25に送信される。変更実行部25は、グループデータ記憶部20内のデータを参照して、階数、部屋数という項目と同じグループに属する項目を読み出す。また、変更実行部25は、電圧と同じグループに属する項目も読み出す。読み出された項目の内、階数、部屋数と同じか若しくはより下層に割り当てられる項目のみが変更対象となる。この例では、エアコンのみが変更対象となっている。また、電圧と同じか若しくはより下層に割り当てられる項目のみが変更対象となる。この例では、トランスのみが変更対象となっている。さらに、情報作成部22にて、変更後の数値計算(エアコンの必要台数の計算など)を行うとともに、コスト計算も行う。変更実行部25は、その結果をまとめて、最初に表示した建物設計情報を変更し、その変更後の情報を出力部23に送信する。出力部23は、変更後の情報をクライアント端末側に送信する。なお、コストに関しては、予算をオーバーする場合には、その旨の注意喚起を行う表示をした上で、変更後の各項目の情報を表示しないようにすることもできる。あるいは、予算をオーバーしても、コストを表示した上で、変更後の各項目の情報を表示するようにすることもできる。
 なお、エアコンの台数のみを変更した場合には、その変更情報を受けた変更受付部24は、変更実行部25に当該変更情報を渡す。変更実行部25は、グループデータ記憶部20内のデータを参照した結果、エアコンと同じグループにあってエアコンより下層に位置する項目が存在しないということが判明すると、エアコンの台数の変更とそれに伴うコストの変更(情報作成部22の計算による)のみを実行し、エアコンと同じグループ内の他の項目については変更を行わない。
 また、出力画面260に表示される建物設計情報の内、最初に基準階部屋数表示欄266の数値を変更し、次に、グレードの項目を図16に示すチェックと同じ状態に変更する場合には、次のような変更処理を行う。
 まず、基準階部屋数表示欄266の数値の変更に基づく建物設計情報の変更を行う。この結果、変更出力画面350がクライアント端末に表示される。続いて、図16に示すグレードの変更と同じ変更指示を行うと、図16に示す変更出力画面340の内、基準階部屋数表示欄266の数値が「5」の状態の画面に変更される。このように、変更指示の度に、変更処理が行われる。
 ただし、複数の変更を入力した後に、例えば「実行」等のキーをクリックすることにより、当該複数の変更に基づく変更処理を実行してもよい。
3.建物設計情報の出力処理およびその後の変更処理の流れ
 図18は、建物設計情報の出力動作およびその後の変更処理動作のフローチャートの一例である。
 ユーザがクライアント端末から建物に関する条件(用途、予算、建設場所など)を入力すると、建物情報提供装置1の入力情報受付部11は、通信モジュール10を介して、当該入力された情報(入力情報)を受け付ける(ステップS401:入力情報受付ステップ)。次に、判断部21が、上記の入力情報を受け取って、入力情報が予算レベル(A)、企画レベル(B)、基本設計レベル(C)あるいは実施設計レベル(D)かを判断し、パッケージ情報記憶部15内のどのフォルダ(フォルダ16,17,18,19のいずれか)にアクセスするかを判断する(ステップS402:判断ステップ)。この実施の形態では、入力情報の多寡によって、どのフォルダにアクセスすべきかが決定される。ただし、入力情報の多寡以外に、重要度の高い情報がどのくらい存在するかという観点で判断するようにしても良い。
 次に、判断部21の判断に基づいて、情報作成部22は、特定のフォルダ(例えば、フォルダ18)にアクセスすると共に、コストテーブル12および規定データ記憶部13にアクセスし、入力情報を満足する1つ若しくは複数種の建物設計情報を作成する(ステップS403:情報作成ステップ)。具体的には、判断部21からのコマンドによって、情報作成部22がコストテーブル12および規定データ記憶部13内のデータを参照して、各構成材料(鉄骨、断熱材など)や各設備(エレベーター、エアコンなど)の数量、コストの少なくともいずれか1種を計算して、建物設計情報を作成する。次に、出力部23は、その建物設計情報を出力し、通信モジュール10経由にてクライアント端末に送る(ステップS404:建物設計情報出力ステップ)。
 次に、変更受付部24は、出力した建物設計情報に対する変更を受け付けたかを常に監視し(ステップS405:変更受付ステップを含む)、クライアント端末から変更の指示がなければ(ステップS405においてNO)、ステップS404の処理をもって終了する。一方、クライアント端末から変更の指示があると(ステップS405においてYES)、変更実行部25は、当該変更の指示及び変更した情報を受取り、グループデータ記憶部20内のデータを参照して、変更対象の項目と同じグループ内において、同位若しくはより下位に位置する項目が存在するか否かを判断する(ステップS406)。かかる項目が存在しなければ(ステップS406においてNO)、変更実行部25は、変更を行わない。一方、かかる項目が存在する場合には(ステップS406においてYES)、変更実行部25は、変更対象および同グループ内の他の項目(同位若しくはより下位に位置する項目に限る)の変更を実行する(ステップS407:変更実行ステップ)。これと同時もしくは後に、変更実行部25は、当該変更に基づき、数量および/またはコストを計算する(ステップS408)。次に、出力部23は、変更後の建物設計情報の出力を行う(ステップS409:変更項目出力ステップ)。続いて、ステップS405の待機状態に戻る。次の変更が指示されると、ステップS405以降の上述の各処理を繰り返す。
 上記各ステップの内、ステップS406は必須ではない。すなわち、同位または下位の項目の存否を判断することなく、同じグループ内のすべての項目を変更しても良い。また、ステップS408は、ステップS407より先に行っても良い。
 図19は、建物設計情報の出力動作およびその後の変更処理動作の変形例を示すフローチャートの一例である。なお、このフローでは、変更実行部25は数量やコスト計算を行わず、情報作成部22に数量やコスト計算を行わせる例にて説明する。
 図19に示すフローチャートにおいて、ステップS401~ステップS404は、図18に示すステップS401~ステップS404と同じ処理である。ステップS404に続いて、変更受付部24は、出力した建物設計情報に対する変更を受け付けたかを常に監視し(ステップS505:変更受付ステップを含む)、クライアント端末から変更の指示がなければ(ステップS505においてNO)、ステップS404の処理をもって終了する。一方、クライアント端末から変更の指示があると(ステップS505においてYES)、変更実行部25は、当該変更の指示及び変更した情報を受取り、グループデータ記憶部20内のデータを参照して、変更対象の項目と同じグループ内において、同位若しくはより下位に位置する項目が存在するか否かを判断する(ステップS506)。かかる項目が存在しなければ(ステップS506においてNO)、変更実行部25は、変更を行わない。一方、かかる項目が存在する場合には(ステップS506においてYES)、変更実行部25は、情報作成部22にコマンドを送り、情報作成部22に、各種項目の変更に伴う数量やコストの計算を行わせる(ステップS507)。
 次に、情報作成部22は、ステップS507によって計算されたコストが予算以下であるかどうかを判断する(ステップS508)。コストが予算以下でなければ(ステップS508においてNO)、ステップS404の処理をもって終了する。一方、コストが予算以下の場合には(ステップS508においてYES)、変更実行部25は、変更対象の項目およびその項目と同じグループ内の他の項目(同位あるいはより下位に位置する項目に限る)の変更を実行する(ステップS509:変更実行ステップ)。次に、出力部23は、変更後の建物設計情報の出力を行う(ステップS511:変更項目出力ステップ)。続いて、ステップS505の待機状態に戻る。次の変更が指示されると、ステップS505以降の上述の各処理を繰り返す。なお、上記各ステップの内、ステップS506は必須ではない。すなわち、同位あるいは下位の項目の存否を判断することなく、同じグループ内のすべての項目を変更しても良い。
 なお、上記の処理機能は、コンピュータによって実現することができる。その場合、建物情報提供装置1が有すべき機能の処理内容を記述したプログラムが提供される。そのプログラムをコンピュータで実行することにより、上記処理機能がコンピュータ上で実現される。処理内容を記述したプログラムは、コンピュータで読み取り可能な記録媒体に記録しておくことができる。コンピュータで読み取り可能な記録媒体としては、磁気記録装置、光ディスク、光磁気記録媒体、半導体メモリなどがある。磁気記録装置には、ハードディスク装置(HDD)、フレキシブルディスク(FD)、磁気テープなどがある。光ディスクには、DVD(Digital Versatile Disk)、DVD-RAM(Random
Access Memory)、CD-ROM(Compact Disk Read Only Memory)、CD-R(Recordable)/RW(ReWritable)などがある。光磁気記録媒体には、MO(Magneto-Optical disk)などがある。
 プログラムを流通させる場合には、例えば、そのプログラムが記録されたDVD、CD-ROMなどの可搬型記録媒体が販売される。また、プログラムをサーバコンピュータの記憶装置に格納しておき、ネットワークを介して、サーバコンピュータから他のコンピュータにそのプログラムを転送することもできる。プログラムを実行するコンピュータは、例えば、可搬型記録媒体に記録されたプログラムもしくはサーバコンピュータから転送されたプログラムを、自己の記憶装置に格納する。そして、コンピュータは、自己の記憶装置からプログラムを読み取り、プログラムに従った処理を実行する。なお、コンピュータは、可搬型記録媒体から直接プログラムを読み取り、そのプログラムに従った処理を実行することもできる。また、コンピュータは、サーバコンピュータからプログラムが転送される毎に、逐次、受け取ったプログラムに従った処理を実行することもできる。
 本実施の形態に係る建物情報提供装置1は、建築対象の建物に関する入力情報を受け付ける入力情報受付部11と、建物を建築するために項目分けされた部位、建物の構成材料、建物内の設備、建物を建築する土地、各構成材料のコストおよび土地のコストを少なくとも記憶するコストテーブル12と、建物の仕様、各部位の種類およびその数量、各構成材料の種類およびその数量、各設備の種類およびその数量および建物の建築コストを少なくとも組み合わせたパッケージ情報を、入力情報の多寡によって複数のフォルダに分類して記憶するパッケージ情報記憶部15と、入力情報の多寡に応じて、パッケージ情報記憶部15内のどのフォルダ16~19にアクセスするかを判断する判断部21と、パッケージ情報記憶部15内の各情報を設計基準および/または統計にもとづき規定する規定データを記憶する規定データ記憶部13と、判断部21による判断に基づいて、複数のフォルダ内16~19の内の特定のフォルダにアクセスすると共に、コストテーブル12および規定データ記憶部13にアクセスし、入力情報を満足する1種若しくは複数種の建物設計情報を作成する情報作成部22と、少なくとも建物の仕様、建物の構成材料および建物内の設備の項目を記憶するとともに、当該項目の内の複数の特定の項目をグループ化して記憶するグループデータ記憶部20と、出力された建物設計情報の内の一部若しくは全部の変更を受け付ける変更受付部24と、変更を受け付けるとその変更に関わるグループ内の項目の情報を、少なくとも規定データ記憶部13内の規定データを参照して変更する変更実行部25と、情報作成部22により作成された建物設計情報および変更実行部25により変更された項目を出力する出力部23を備える。このため、一旦、建物設計情報を出力した後に、詳細な仕様を詰めるために種々変更を行う際に、逐一必要な変更を入力しなくても、一部の変更を行うだけで設計上支障ない変更あるいは一つの変更趣旨に応じた変更を一時に行うことが可能となる。
 また、建物情報提供装置1は、さらに、グループが構成材料および/または設備のグレードに基づいて形成されているので、グレードを上下変更した際に、同じグレード内の構成を一緒に変更できる。よって、逐一、同じグレードの項目を把握していなくても簡単に変更できる。
 また、建物情報提供装置1は、さらに、グループを、設計上関係のある項目をまとめるように構成しているので、一部の項目を変更したことによって、設計上不可欠な変更項目あるいは変更を要する項目を熟知していないユーザであっても、簡単に設計上問題のないように変更ができる。
 また、建物情報提供装置1は、さらに、変更受付部24が複数の変更を受け付ける場合、変更実行部24は、その変更の順番に従って、その受け付けた項目の変更以外の項目の情報を変更する。このため、複数の変更箇所がっても、矛盾なく変更処理を実行できる。また、変更箇所毎の相違を把握できる。
 また、建物情報提供装置1は、さらに、グループデータ記憶部20に、階層に分けて各項目を記憶し、変更実行部25が変更を受け付けた項目と同位のあるいはより下位の階層に属する項目のみを変更するようにしている。このため、低い階層の変更に伴い、重要性が高い階層(上位の階層)の部位や構成の変更が行われない。例えば、部屋数を増やす変更を行った場合には、各部屋にエアコンを1台ずつ設置するようにするためにエアコンの台数も増やす変更を実行する一方で、エアコンの台数を増やした場合には部屋数を増やす変更を行わない。部屋数の方が建物にとって上位の階層に位置づけられており、下位の階層の変更によって変更されてしまうことを防止する必要からである。
 また、建物情報提供装置1は、さらに、入力情報が建築コストを含む場合、変更受付部24によって受け付けられた変更に基づく建築コストが入力情報内の建築コスト(予算)を上回るときには、変更実行部25は、その変更を実行しないようにしている。すなわち、ユーザの変更がコスト的に無理である場合にまで変更を実施しない。このため、ユーザにコストオーバーであることを容易に把握でき、別の変更をするべきであることを知らしめることができる。
 以上、本発明の好適な実施の形態について説明してきたが、本発明は、上記の形態に限定されず、種々変更を施して実施可能である。
 例えば、建物情報提供装置1は、ネットワーク40を介さずに、直接、情報を入力するスタンド・アローン型の装置であっても良い。
 また、情報作成部22、判断部21、出力部23、変更実行部25の各処理動作は、互いに補うこともできる。すなわち、情報作成部22は、それ単独で、判断部21、出力部23、変更実行部25の各処理と同じ処理を行うこともできる。判断部21、出力部23あるいは変更実行部25についても同様である。また、変更実行部25は、項目変更を行うにあたり、規定データ記憶部13のみを参照し、コストテーブル12を参照しなくても良い。さらに、変更実行部25は、項目変更を行うにあたり、コストテーブル12のみを参照し、規定データ記憶部13を参照しなくても良い。また、変更実行部25は、変更を受け付けた項目より下位の項目のみを変更対象とし、同位の項目を変更しなくても良い。さらに、規定データ記憶部13内の規定データは、設計基準のみ、統計のみ、設計基準と統計にそれぞれ基づき規定されるデータとすることができる。また、情報作成部22が作成する建物設計情報は、入力情報に基づき1つのみを作成する例で説明してきたが、2以上の建物設計情報を作成するようにしても良い。また、グループデータ記憶部20内のグループは、構成材料のみのグレード別に、設備のみのグレード別に、あるいは構成材料と設備の両方のグレード別にまとめたものとすることができる。
 本発明は、例えば、オフィス、学校、病院、マンション等の建物を建てようとする場合に利用することができる。
1   建物情報提供装置
11  入力情報受付部(入力情報受付手段)
12  コストテーブル(単価情報記憶手段)
13  規定データ記憶部(規定データ記憶手段)
15  パッケージ情報記憶部(パッケージ情報記憶手段)
16  予算レベルフォルダ(フォルダ)
17  企画レベルフォルダ(フォルダ)
18  基本設計レベルフォルダ(フォルダ)
19  実施設計レベルフォルダ(フォルダ)
20  グループデータ記憶部(グループデータ記憶手段)
21  判断部(判断手段)
22  情報作成部(情報作成手段)
23  出力部(建物設計情報出力手段、変更項目出力手段)
24  変更受付部(変更受付手段)
25  変更実行部(変更実行手段)

Claims (13)

  1.  建築対象の建物に関する入力情報を受け付ける入力情報受付手段と、
     上記建物を建築するために項目分けされた部位、上記建物の構成材料、上記建物内の設備、上記建物を建築する土地、上記構成材料のコスト、上記設備のコストおよび上記土地のコストを少なくとも記憶する単価情報記憶手段と、
     上記建物の仕様、上記部位の種類およびその数量、上記構成材料の種類およびその数量、上記設備の種類およびその数量、および上記建物の建築コストを含む情報を少なくとも組み合わせたパッケージ情報を、上記入力情報の多寡によって複数のフォルダに分類して記憶するパッケージ情報記憶手段と、
     上記入力情報の多寡に応じて、上記パッケージ情報記憶手段内のどのフォルダにアクセスするかを判断する判断手段と、
     上記パッケージ情報記憶手段内の各情報を設計基準および/または統計にもとづき規定する規定データを記憶する規定データ記憶手段と、
     上記判断手段による判断に基づいて、上記複数のフォルダ内の特定のフォルダにアクセスすると共に、上記単価情報記憶手段および上記規定データ記憶手段にアクセスし、上記入力情報を満足する1種若しくは複数種の建物設計情報を作成する情報作成手段と、
     上記情報作成手段により作成された上記建物設計情報を出力する建物設計情報出力手段と、
     少なくとも上記建物の仕様、上記建物の構成材料および上記建物内の設備の項目を記憶するとともに、当該項目の内の複数の特定の項目をグループ化して記憶するグループデータ記憶手段と、
     上記出力された上記建物設計情報の内の一部若しくは全部の変更を受け付ける変更受付手段と、
     上記変更を受け付けると、上記変更に関わる上記グループ内の上記項目の情報を、少なくとも上記規定データ記憶手段内の上記規定データを参照して変更する変更実行手段と、
     上記変更実行手段により変更された上記項目を出力する変更項目出力手段と、
    を備えることを特徴とする建物情報提供装置。
  2.  前記グループは、前記構成材料および/または前記設備のグレードに基づいて形成されており、
     前記変更実行手段は、変更された前記項目の属する上記グレードと同じグレード内の他の項目をも変更することを特徴とする請求項1に記載の建物情報提供装置。
  3.  前記グループは、設計上関係のある前記項目をまとめたものであり、
     前記変更実行手段は、変更された前記項目と設計上関係のある他の項目をも変更することを特徴とする請求項1に記載の建物情報提供装置。
  4.  前記変更受付手段が複数の前記項目の変更を受け付ける場合、
     前記変更実行手段は、その変更された前記項目の順番に従って、その変更を受け付けた前記項目以外の他の項目を変更することを特徴とする請求項1に記載の建物情報提供装置。
  5.  前記グループデータ記憶手段は、階層に分けて前記項目を記憶し、
     前記変更実行手段は、変更を受け付けた前記項目と同一若しくはより低い階層に属する前記項目のみを変更することを特徴とする請求項1に記載の建物情報提供装置。
  6.  前記入力情報が前記建築コストを含む場合、
     前記変更受付手段によって受け付けられた変更に基づく建築コストが前記入力情報内の前記建築コストを上回るときには、
     前記変更実行手段は、その変更を実行しないことを特徴とする請求項1に記載の建物情報提供装置。
  7.  建築対象の建物に関する入力情報を受け付ける入力情報受付手段と、上記建物を建築するために項目分けされた部位、上記建物の構成材料、上記建物内の設備、上記建物を建築する土地、上記構成材料のコスト、上記設備のコストおよび上記土地のコストを少なくとも記憶する単価情報記憶手段と、上記建物の仕様、上記部位の種類およびその数量、上記構成材料の種類およびその数量、上記設備の種類およびその数量、および上記建物の建築コストを含む情報を少なくとも組み合わせたパッケージ情報を、上記入力情報の多寡によって複数のフォルダに分類して記憶するパッケージ情報記憶手段と、上記パッケージ情報記憶手段内の各情報を設計基準および/または統計にもとづき規定する規定データを記憶する規定データ記憶手段と、少なくとも上記建物の仕様、上記建物の構成材料および上記建物内の設備の項目を記憶するとともに、当該項目の内の複数の特定の項目をグループ化して記憶するグループデータ記憶手段を備えるコンピュータがその外部から上記入力情報を受け付けることにより、所定の建物設計情報を出力する建物情報提供方法であって、
     上記入力情報を受け付ける入力情報受付ステップと、
     上記入力情報の多寡に応じて、上記パッケージ情報記憶手段内のどのフォルダにアクセスするかを判断する判断ステップと、
     上記判断ステップによる判断に基づいて、上記複数のフォルダ内の特定のフォルダにアクセスすると共に、上記単価情報記憶手段および上記規定データ記憶手段にアクセスし、上記入力情報を満足する1種若しくは複数種の建物設計情報を作成する情報作成ステップと、
     上記情報作成ステップにより作成された上記建物設計情報を出力する建物設計情報出力ステップと、
     上記出力された上記建物設計情報の内の一部若しくは全部の変更を受け付ける変更受付ステップと、
     上記変更を受け付けると、上記変更に関わる上記グループ内の上記項目の情報を、少なくとも上記規定データ記憶手段内の上記規定データを参照して変更する変更実行ステップと、
     上記変更実行ステップにより変更された上記項目を出力する変更項目出力ステップと、
    を含むことを特徴とする建物情報提供方法。
  8.  コンピュータにインストールされることによって、
     コンピュータを、
     建築対象の建物に関する入力情報を受け付ける入力情報受付手段と、
     上記建物を建築するために項目分けされた部位、上記建物の構成材料、上記建物内の設備、上記建物を建築する土地、上記構成材料のコスト、上記設備のコストおよび上記土地のコストを少なくとも記憶する単価情報記憶手段と、
     上記建物の仕様、上記部位の種類およびその数量、上記構成材料の種類およびその数量、上記設備の種類およびその数量、および上記建物の建築コストを含む情報を少なくとも組み合わせたパッケージ情報を、上記入力情報の多寡によって複数のフォルダに分類して記憶するパッケージ情報記憶手段と、
     上記入力情報の多寡に応じて、上記パッケージ情報記憶手段内のどのフォルダにアクセスするかを判断する判断手段と、
     上記パッケージ情報記憶手段内の各情報を設計基準および/または統計にもとづき規定する規定データを記憶する規定データ記憶手段と、
     上記判断手段による判断に基づいて、上記複数のフォルダ内の特定のフォルダにアクセスすると共に、上記単価情報記憶手段および上記規定データ記憶手段にアクセスし、上記入力情報を満足する1種若しくは複数種の建物設計情報を作成する情報作成手段と、
     上記情報作成手段により作成された上記建物設計情報を出力する建物設計情報出力手段と、
     少なくとも上記建物の仕様、上記建物の構成材料および上記建物内の設備の項目を記憶するとともに、当該項目の内の複数の特定の項目をグループ化して記憶するグループデータ記憶手段と、
     上記出力された上記建物設計情報の内の一部若しくは全部の変更を受け付ける変更受付手段と、
     上記変更を受け付けると、上記変更に関わる上記グループ内の上記項目の情報を、少なくとも上記規定データ記憶手段内の上記規定データを参照して変更する変更実行手段と、
     上記変更実行手段により変更された上記項目を出力する変更項目出力手段を備える装置として機能させることを特徴とするコンピュータ・プログラム。
  9.  前記グループは、前記構成材料および/または前記設備のグレードに基づいて形成されており、
     前記変更実行手段は、変更された前記項目の属する上記グレードと同じグレード内の他の項目をも変更することを特徴とする請求項8に記載のコンピュータ・プログラム。
  10.  前記グループは、設計上関係のある前記項目をまとめたものであり、
     前記変更実行手段は、変更された前記項目と設計上関係のある他の項目をも変更することを特徴とする請求項8に記載のコンピュータ・プログラム。
  11.  前記変更受付手段が複数の前記項目の変更を受け付ける場合、
     前記変更実行手段は、その変更された前記項目の順番に従って、その変更を受け付けた前記項目以外の他の項目を変更することを特徴とする請求項8に記載のコンピュータ・プログラム。
  12.  前記グループデータ記憶手段は、階層に分けて前記項目を記憶し、
     前記変更実行手段は、変更を受け付けた前記項目と同一若しくはより低い階層に属する前記項目のみを変更することを特徴とする請求項8に記載のコンピュータ・プログラム。
  13.  前記入力情報が前記建築コストを含む場合、
     前記変更受付手段によって受け付けられた変更に基づく建築コストが前記入力情報内の前記建築コストを上回るときには、
     前記変更実行手段は、その変更を実行しないことを特徴とする請求項8に記載のコンピュータ・プログラム。
PCT/JP2010/000527 2010-01-29 2010-01-29 建物情報提供装置、建物情報提供方法およびコンピュータ・プログラム WO2011092740A1 (ja)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PCT/JP2010/000527 WO2011092740A1 (ja) 2010-01-29 2010-01-29 建物情報提供装置、建物情報提供方法およびコンピュータ・プログラム

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2010/000527 WO2011092740A1 (ja) 2010-01-29 2010-01-29 建物情報提供装置、建物情報提供方法およびコンピュータ・プログラム

Publications (1)

Publication Number Publication Date
WO2011092740A1 true WO2011092740A1 (ja) 2011-08-04

Family

ID=44318760

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2010/000527 WO2011092740A1 (ja) 2010-01-29 2010-01-29 建物情報提供装置、建物情報提供方法およびコンピュータ・プログラム

Country Status (1)

Country Link
WO (1) WO2011092740A1 (ja)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06110903A (ja) * 1991-09-24 1994-04-22 Ace Van:Kk 建築コストシステム
JP2001188836A (ja) * 1999-12-28 2001-07-10 Harasawa Homes Co Ltd 建物の見積りシステム
JP2002015159A (ja) * 2000-06-29 2002-01-18 Aisin Seiki Co Ltd 住宅又は住宅設備の仲介システム
JP2003345835A (ja) * 2002-05-23 2003-12-05 Kenzo Matsuo 建築見積システムおよび建築見積プログラム並びにそのプログラムを記録したコンピュータ読み取り可能な記録媒体
JP2004038274A (ja) * 2002-06-28 2004-02-05 Sekisui House Ltd 住宅シミュレーションシステム及びその方法
JP2005038170A (ja) * 2003-07-14 2005-02-10 Toto Ltd 住宅設備デザインプランの提案システム
JP2007102400A (ja) * 2005-10-03 2007-04-19 Mitsui Home Co Ltd 住宅のコンピュータ見積システムおよび住宅の見積方法
JP2009116840A (ja) * 2007-01-30 2009-05-28 Faine Collaborate Kenkyusho:Kk 建築コスト見積装置、建築コスト見積方法、および、建築コスト見積プログラム

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06110903A (ja) * 1991-09-24 1994-04-22 Ace Van:Kk 建築コストシステム
JP2001188836A (ja) * 1999-12-28 2001-07-10 Harasawa Homes Co Ltd 建物の見積りシステム
JP2002015159A (ja) * 2000-06-29 2002-01-18 Aisin Seiki Co Ltd 住宅又は住宅設備の仲介システム
JP2003345835A (ja) * 2002-05-23 2003-12-05 Kenzo Matsuo 建築見積システムおよび建築見積プログラム並びにそのプログラムを記録したコンピュータ読み取り可能な記録媒体
JP2004038274A (ja) * 2002-06-28 2004-02-05 Sekisui House Ltd 住宅シミュレーションシステム及びその方法
JP2005038170A (ja) * 2003-07-14 2005-02-10 Toto Ltd 住宅設備デザインプランの提案システム
JP2007102400A (ja) * 2005-10-03 2007-04-19 Mitsui Home Co Ltd 住宅のコンピュータ見積システムおよび住宅の見積方法
JP2009116840A (ja) * 2007-01-30 2009-05-28 Faine Collaborate Kenkyusho:Kk 建築コスト見積装置、建築コスト見積方法、および、建築コスト見積プログラム

Similar Documents

Publication Publication Date Title
Nouvel et al. CityGML-based 3D city model for energy diagnostics and urban energy policy support
JP4778528B2 (ja) 建築コスト見積装置、建築コスト見積方法、および、建築コスト見積プログラム
Ochoa et al. Decision methodology for the development of an expert system applied in an adaptable energy retrofit façade system for residential buildings
US20130262040A1 (en) Systems and methods for home energy auditing
CN110414151B (zh) 一种基于cad的住宅户型公摊面积计算方法
JP5260723B2 (ja) 情報処理装置、情報処理方法およびプログラム
Zavadskas et al. Multiple criteria decision support web‐based system for building refurbishment
JP6965624B2 (ja) 空調システム選定装置、空調システム選定方法、プログラム及び記録媒体
JP5254691B2 (ja) 建物情報提供装置、建物情報提供方法およびコンピュータ・プログラム
Chan Investigating the environmental effectiveness of Overall Thermal Transfer Value code and its implication to energy regulation development
WO2011092740A1 (ja) 建物情報提供装置、建物情報提供方法およびコンピュータ・プログラム
US11320803B2 (en) Custom assembly of 3D printed building modules
WO2021178925A1 (en) Custom assembly of 3d printed building modules
JP5330068B2 (ja) 建物改修情報提供装置、建物改修情報提供方法およびコンピュータ・プログラム
Bucking et al. Methodology for energy and economic modeling of net zero energy communities
CN113919550A (zh) 一种规划设计阶段办公建筑负荷预测方法
Zhang et al. Assessing the renovation of existing residential buildings regarding environmental efficiency
Jämsén New energy analysis process for the design of building retrofits
JP4590059B2 (ja) 建物の設計方法
Neuberg et al. Integrated life cycle simulation and assessment of buildings
JP4632884B2 (ja) 賃貸住宅情報システム
Naamandadina et al. Development of Cost Modelling Prediction Tool for Green Home: A Review
Altun et al. Application of TS 825 Turkish thermal insulation standard using BIM
Cloudt et al. Coupling simulation tools and real-time data to improve building energy performance
Echlouchi et al. Standard Energy Renovation at the Urban Scale in the Moroccan Context

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 10844513

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 10844513

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: JP