US6853921B2
(en)
|
1999-07-20 |
2005-02-08 |
Halliburton Energy Services, Inc. |
System and method for real time reservoir management
|
FR2842321B1
(fr)
*
|
2002-07-11 |
2008-12-05 |
Inst Francais Du Petrole |
Methode pour contraindre un champ de permeabilite heterogene representant un reservoir souterrain par des donnees dynamiques
|
US7899657B2
(en)
*
|
2003-01-24 |
2011-03-01 |
Rockwell Automoation Technologies, Inc. |
Modeling in-situ reservoirs with derivative constraints
|
US7584165B2
(en)
|
2003-01-30 |
2009-09-01 |
Landmark Graphics Corporation |
Support apparatus, method and system for real time operations and maintenance
|
FR2851670B1
(fr)
|
2003-02-21 |
2005-07-01 |
Inst Francais Du Petrole |
Methode pour elaborer plus rapidement un modele stochastique representatif d'un reservoir heterogene souterrain, contraint par des donnees statiques et dynamiques incertaines
|
WO2004076816A1
(en)
*
|
2003-02-27 |
2004-09-10 |
Schlumberger Surenco Sa |
Estimation of formation characteristics in wells
|
US6823297B2
(en)
*
|
2003-03-06 |
2004-11-23 |
Chevron U.S.A. Inc. |
Multi-scale finite-volume method for use in subsurface flow simulation
|
US7496488B2
(en)
*
|
2003-03-06 |
2009-02-24 |
Schlumberger Technology Company |
Multi-scale finite-volume method for use in subsurface flow simulation
|
FR2852710B1
(fr)
*
|
2003-03-18 |
2005-04-29 |
Inst Francais Du Petrole |
Methode pour former rapidement un modele stochastique representatif de la distribution d'une grandeur physique dans un milieu heterogene par une selection appropriee de realisations geostatistiques
|
US7876705B2
(en)
*
|
2003-06-25 |
2011-01-25 |
Schlumberger Technology Corporation |
Method and apparatus and program storage device for generating a workflow in response to a user objective and generating software modules in response to the workflow and executing the software modules to produce a product
|
FR2857764B1
(fr)
*
|
2003-07-18 |
2005-08-26 |
Inst Francais Du Petrole |
Methode de deformation graduelle d'un modele booleen de simulation d'un milieu heterogene, contraint par des donnees dynamiques
|
US7584086B2
(en)
|
2003-09-30 |
2009-09-01 |
Exxonmobil Upstream Research Company |
Characterizing connectivity in reservoir models using paths of least resistance
|
US7725302B2
(en)
*
|
2003-12-02 |
2010-05-25 |
Schlumberger Technology Corporation |
Method and system and program storage device for generating an SWPM-MDT workflow in response to a user objective and executing the workflow to produce a reservoir response model
|
CA2543801C
(en)
*
|
2004-01-30 |
2014-03-04 |
Exxonmobil Upstream Research Company |
Reservoir model building methods
|
CN1898640A
(zh)
*
|
2004-01-30 |
2007-01-17 |
埃克森美孚上游研究公司 |
储层评价方法
|
US7277795B2
(en)
*
|
2004-04-07 |
2007-10-02 |
New England Research, Inc. |
Method for estimating pore structure of porous materials and its application to determining physical properties of the materials
|
FR2869116B1
(fr)
*
|
2004-04-14 |
2006-06-09 |
Inst Francais Du Petrole |
Methode pour construire un modele geomecanique d'une zone souterraine destine a etre couple a un modele de reservoir
|
US7672818B2
(en)
|
2004-06-07 |
2010-03-02 |
Exxonmobil Upstream Research Company |
Method for solving implicit reservoir simulation matrix equation
|
US20060015310A1
(en)
*
|
2004-07-19 |
2006-01-19 |
Schlumberger Technology Corporation |
Method for simulation modeling of well fracturing
|
US7636671B2
(en)
*
|
2004-08-30 |
2009-12-22 |
Halliburton Energy Services, Inc. |
Determining, pricing, and/or providing well servicing treatments and data processing systems therefor
|
FR2875305B1
(fr)
*
|
2004-09-16 |
2006-10-27 |
Inst Francais Du Petrole |
Methode pour generer un modele de reservoir sur maillage flexible
|
US7516056B2
(en)
*
|
2005-04-26 |
2009-04-07 |
Schlumberger Technology Corporation |
Apparatus, method and system for improved reservoir simulation using a multiplicative overlapping Schwarz preconditioning for adaptive implicit linear systems
|
FR2890453B1
(fr)
*
|
2005-09-05 |
2007-10-19 |
Inst Francais Du Petrole |
Methode pour mettre a jour un modele geologique de reservoir a l'aide de donnees dynamiques
|
EP1999492A4
(en)
|
2006-01-20 |
2011-05-18 |
Landmark Graphics Corp |
DYNAMIC PRODUCTION MANAGEMENT SYSTEM
|
US7254091B1
(en)
*
|
2006-06-08 |
2007-08-07 |
Bhp Billiton Innovation Pty Ltd. |
Method for estimating and/or reducing uncertainty in reservoir models of potential petroleum reservoirs
|
WO2007149766A2
(en)
*
|
2006-06-18 |
2007-12-27 |
Chevron U.S.A. Inc. |
Reservoir simulation using a multi-scale finite volume including black oil modeling
|
RU2428739C2
(ru)
|
2006-07-07 |
2011-09-10 |
Эксонмобил Апстрим Рисерч Компани |
Укрупнение сетки для моделей коллекторов путем повторного использования расчетов потока, полученных на основе геологических моделей
|
US7933758B2
(en)
*
|
2006-12-05 |
2011-04-26 |
Conocophillips Company |
Method and apparatus for geomodel uplayering
|
WO2008103986A1
(en)
*
|
2007-02-25 |
2008-08-28 |
Chevron U.S.A., Inc. |
Method and system for creating upscaled reservoir models
|
FR2914434B1
(fr)
*
|
2007-03-30 |
2009-05-22 |
Inst Francais Du Petrole |
Methode de calage d'historique d'un modele geologique par modification graduelle des proportions des facies lithologiques
|
FR2920816B1
(fr)
*
|
2007-09-06 |
2010-02-26 |
Inst Francais Du Petrole |
Methode pour mettre a jour un modele geologique a l'aide de donnees dynamiques et d'essais de puits
|
FR2923930B1
(fr)
*
|
2007-11-19 |
2009-11-20 |
Inst Francais Du Petrole |
Methode de modelisation d'un milieu geologique poreux traverse par un reseau de fractures.
|
WO2009075945A1
(en)
|
2007-12-13 |
2009-06-18 |
Exxonmobil Upstream Research Company |
Parallel adaptive data partitioning on a reservoir simulation using an unstructured grid
|
US8744817B2
(en)
*
|
2007-12-21 |
2014-06-03 |
Schlumberger Technology Corporation |
Method for upscaling a reservoir model using deep reading measurements
|
US8738341B2
(en)
*
|
2007-12-21 |
2014-05-27 |
Schlumberger Technology Corporation |
Method for reservoir characterization and monitoring including deep reading quad combo measurements
|
US8184502B2
(en)
*
|
2008-02-28 |
2012-05-22 |
Exxonmobil Upstream Research Company |
Rock physics model for simulating seismic response in layered fractured rocks
|
US8494777B2
(en)
*
|
2008-04-09 |
2013-07-23 |
Schlumberger Technology Corporation |
Continuous microseismic mapping for real-time 3D event detection and location
|
CN102007459B
(zh)
*
|
2008-04-17 |
2015-01-07 |
埃克森美孚上游研究公司 |
用于储层开发计划的鲁棒性基于优化的决策支持工具
|
BRPI0909446A2
(pt)
*
|
2008-04-18 |
2015-12-22 |
Exxonmobil Upstream Res Co |
métodos para planejamento do desenvolvimento de reservatório, para suporte à decisão considerando o desenvolvimento de recurso petrolíferos, para otimização do planejamento de desenvolvimento, e para produção de hidrocarbonetos.
|
US8775361B2
(en)
*
|
2008-04-21 |
2014-07-08 |
Exxonmobil Upstream Research Company |
Stochastic programming-based decision support tool for reservoir development planning
|
EA201071318A1
(ru)
*
|
2008-05-16 |
2011-06-30 |
ШЕВРОН Ю. Эс. Эй. ИНК. |
Многомасштабный способ для многофазного потока в пористых средах
|
US8095349B2
(en)
*
|
2008-05-30 |
2012-01-10 |
Kelkar And Associates, Inc. |
Dynamic updating of simulation models
|
EP2310972A2
(en)
*
|
2008-07-03 |
2011-04-20 |
Chevron U.S.A. Inc. |
Multi-scale finite volume method for reservoir simulation
|
MX2011003802A
(es)
*
|
2008-10-09 |
2011-11-01 |
Chevron Usa Inc |
Metodo iterativo multi-escala para el flujo en medios porosos.
|
CN102246060B
(zh)
*
|
2008-12-16 |
2014-07-30 |
埃克森美孚上游研究公司 |
用于优化油气层开发和管理的***和方法
|
WO2010116236A2
(en)
*
|
2009-04-08 |
2010-10-14 |
Schlumberger Technology B.V. |
Methods and systems for microseismic mapping
|
US20100312535A1
(en)
*
|
2009-06-08 |
2010-12-09 |
Chevron U.S.A. Inc. |
Upscaling of flow and transport parameters for simulation of fluid flow in subsurface reservoirs
|
BR112012010094A2
(pt)
*
|
2009-10-28 |
2016-05-31 |
Chevron Usa Inc |
método de volume finito em multiescala para uso na simulação de um modelo geológico de escala fina de um reservatório de subsuperfície, sistema para uso em simulação de um modelo geológico de escala fina de um reservatório de subsuperfície, e, software
|
CA2776487C
(en)
|
2009-11-12 |
2017-02-14 |
Exxonmobil Upstream Research Company |
Method and apparatus for generating a three-dimentional simulation grid for a reservoir model
|
WO2011062794A1
(en)
*
|
2009-11-18 |
2011-05-26 |
Conocophillips Company |
Attribute importance measure for parametric multivariate modeling
|
US8355872B2
(en)
*
|
2009-11-19 |
2013-01-15 |
Chevron U.S.A. Inc. |
System and method for reservoir analysis background
|
FR2953039B1
(fr)
*
|
2009-11-26 |
2012-01-13 |
Inst Francais Du Petrole |
Methode d'exploitation d'un gisement petrolier par reconstruction de modele de reservoir
|
US9703006B2
(en)
|
2010-02-12 |
2017-07-11 |
Exxonmobil Upstream Research Company |
Method and system for creating history matched simulation models
|
US8775142B2
(en)
|
2010-05-14 |
2014-07-08 |
Conocophillips Company |
Stochastic downscaling algorithm and applications to geological model downscaling
|
RU2013110283A
(ru)
|
2010-08-09 |
2014-09-20 |
Конокофиллипс Компани |
Способ ремасштабирования с укрупнением ячеек пласта-коллектора с сохраненной проводимостью
|
US9542508B2
(en)
|
2010-10-29 |
2017-01-10 |
Schlumberger Technology Corporation |
Model based inversion of seismic response for determining formation properties
|
US9488047B2
(en)
*
|
2011-04-04 |
2016-11-08 |
Conocophillips Company |
Reservoir calibration parameterization method
|
US9753180B2
(en)
*
|
2012-03-28 |
2017-09-05 |
Exxonmobil Upstream Research Company |
Method for multiphase flow upscaling
|
FR2992448B1
(fr)
*
|
2012-06-26 |
2014-06-27 |
IFP Energies Nouvelles |
Procede d'exploitation d'un reservoir geologique a partir d'un modele de reservoir cale au moyen d'un parametrage multi-echelles
|
FR2993310B1
(fr)
*
|
2012-07-13 |
2014-08-29 |
IFP Energies Nouvelles |
Procede d'exploitation d'un reservoir geologique a partir d'un modele de reservoir cale par le calcul d'une loi analytique de distribution conditionnelle de parametres incertains du modele
|
FR2994315B1
(fr)
*
|
2012-08-06 |
2014-08-29 |
Total Sa |
Procede de determination de trajectoires de chenaux
|
AU2012397811B2
(en)
*
|
2012-12-31 |
2017-04-13 |
Halliburton Energy Services, Inc. |
Measurement correction apparatus, methods, and systems
|
FR3005988B1
(fr)
*
|
2013-05-21 |
2015-05-15 |
IFP Energies Nouvelles |
Procede d'exploitation d'un milieu fracture a partir d'un modele de reservoir cale pour des puits choisis au moyen d'un modele de transmissivite equivalente
|
US10048403B2
(en)
|
2013-06-20 |
2018-08-14 |
Exxonmobil Upstream Research Company |
Method and system for generation of upscaled mechanical stratigraphy from petrophysical measurements
|
US10208577B2
(en)
*
|
2013-10-09 |
2019-02-19 |
Chevron U.S.A. Inc. |
Method for efficient dynamic gridding
|
CN104747141B
(zh)
*
|
2015-02-14 |
2017-03-08 |
中国石油天然气股份有限公司 |
一种牙刷状油藏分层开采模型的建立方法及设备
|
US10599788B2
(en)
|
2015-12-30 |
2020-03-24 |
International Business Machines Corporation |
Predicting target characteristic data
|
US11307322B2
(en)
*
|
2016-09-19 |
2022-04-19 |
Halliburton Energy Services, Inc. |
Mixed inversion using a coarse layer model
|
US11119239B2
(en)
|
2017-01-13 |
2021-09-14 |
Baker Hughes Holdings Llc |
Measuring petrophysical properties of an earth formation by regularized direct inversion of electromagnetic signals
|
CN112580181A
(zh)
*
|
2019-09-29 |
2021-03-30 |
中国石油化工股份有限公司 |
一种基于梯度混合搜索算法的随机反演方法及反演***
|
CN111706318B
(zh)
*
|
2020-05-26 |
2023-08-22 |
中国石油天然气集团有限公司 |
一种确定低渗储层剩余油分布状况的方法
|