KR20240054853A - Bracket structure having a vertical assembly is movably disposed - Google Patents

Bracket structure having a vertical assembly is movably disposed Download PDF

Info

Publication number
KR20240054853A
KR20240054853A KR1020230036586A KR20230036586A KR20240054853A KR 20240054853 A KR20240054853 A KR 20240054853A KR 1020230036586 A KR1020230036586 A KR 1020230036586A KR 20230036586 A KR20230036586 A KR 20230036586A KR 20240054853 A KR20240054853 A KR 20240054853A
Authority
KR
South Korea
Prior art keywords
vertical
frame
support
base
upper frame
Prior art date
Application number
KR1020230036586A
Other languages
Korean (ko)
Inventor
김상희
김진혁
Original Assignee
(주)대우강건
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)대우강건 filed Critical (주)대우강건
Priority to KR1020230036586A priority Critical patent/KR20240054853A/en
Publication of KR20240054853A publication Critical patent/KR20240054853A/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/12Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

본 발명은 제 2 수직어셈블리가 어퍼프레임의 길이 방향으로 이동되어 고정될 수 있기 때문에, 다양한 크기의 교량 또는 교각에 설치 가능하고, 시공 시 구비해야 하는 까치발 구조체의 개수를 대폭 절감시키 수 있는 특징이 있다. The present invention can be installed on bridges or piers of various sizes because the second vertical assembly can be moved and fixed in the longitudinal direction of the upper frame, and has the feature of significantly reducing the number of tiptoe structures that must be provided during construction. there is.

Description

수직어셈블리가 이동가능하게 설치된 까치발 구조체{Bracket structure having a vertical assembly is movably disposed}Bracket structure having a vertical assembly is movably disposed}

본 발명은 교량 또는 교각의 난간에 슬래브를 설치하기 위한 까치발 구조체에 관한 것이다.The present invention relates to a tiptoe structure for installing a slab on a railing of a bridge or pier.

일반적으로 교량의 가설은, 교각 등과 같은 상부구조물을 세우고 그 상부에 길이방향으로 형강재를 일정간격으로 배열하며 형강재 사이에 이음판을 재치시키고 그 위에 슬래브를 타설한 후, 양측에 돌출되는 난간부의 슬래브 타설을 위하여 별도의 거푸집을 설치하고 슬래브를 형성시켜 난간이 구성되도록 하는 단계에 의해 이루어진다.In general, the construction of a bridge involves erecting a superstructure such as a pier, arranging section steel members at regular intervals in the longitudinal direction on the top, placing joint plates between the section steel members, and pouring a slab on top of the section steel members. In order to pour the slab of the gantry, a separate form is installed and the slab is formed to form a handrail.

도 1을 참조하면, 종래의 까치발 구조체는, PC빔으로 교량을 시공할 때에는 교각(2) 위에 PC빔 등과 같은 상부구조물(1)을 안착시킨 상태에서 교각(2)의 하단측부에 끼워지는 직각 삼각형 구조를 가지는 받침대(3)가 설치된다. Referring to FIG. 1, the conventional tiptoe structure is a right angle inserted into the lower side of the pier (2) with the upper structure (1), such as a PC beam, seated on the pier (2) when constructing a bridge with PC beam. A pedestal 3 having a triangular structure is installed.

그리고 상부구조물(1)의 상단측부에 설치되는 슬래브나 난간용 거푸집(4)의 하부에 수평지지대(5)가 설치되며, 받침대(3)로부터 수평지지대(5) 사이에 복수개의 수직지지대(6)가 설치된 상태에서, 거푸집(4)에 콘크리트(C)가 타설된다. And a horizontal support (5) is installed at the lower part of the slab or railing form (4) installed on the upper side of the superstructure (1), and a plurality of vertical supports (6) are provided between the support (3) and the horizontal support (5). ) is installed, concrete (C) is poured into the form (4).

여기서, 상부구조물(1)에는 응력의 분산을 위한 헌치(hunch; H)가 설계 적용되기 때문에, 종래의 까치발 구조체는, 교각(2) 부분에 설치되는 받침대(3)에 상측에 수직으로 수직지지대(6)가 설치되고, 상기 수직지지대(6)가 수평지지대(5)를 지지하도록 구성한다. Here, since the superstructure (1) is designed with a hunch (H) for dispersing stress, the conventional tiptoe structure has a vertical support perpendicular to the upper side of the pedestal (3) installed on the pier (2). (6) is installed, and the vertical support (6) is configured to support the horizontal support (5).

그래서 종래의 까치발 구조체는, 헌치(H) 부분을 회피하여 많은 수의 지지대들이 서로 결합되어야 하기 때문에, 조립 및 해체에 많은 시간과 비용이 소요되는 문제점이 있었다.Therefore, the conventional tiptoe structure had a problem in that it took a lot of time and money to assemble and dismantle because a large number of supports had to be coupled to each other to avoid the haunch (H) portion.

대한민국 등록실용신안 20-0247460호Republic of Korea Registered Utility Model No. 20-0247460 대한민국 등록실용신안 20-0461116호Republic of Korea Registered Utility Model No. 20-0461116 대한민국 공개특허 10-2003-0000991호Republic of Korea Patent Publication No. 10-2003-0000991

본 발명은 상기와 같은 종래의 문제점을 해결하기 위해 안출된 것으로서, 교량설치를 위한 까치발 구조체를 제공하는데 목적이 있다.The present invention was developed to solve the above-described conventional problems, and its purpose is to provide a tiptoe structure for bridge installation.

본 발명은, 교각 또는 교각의 평판구조물(10) 상측에 배치되는 어퍼프레임(110); 상기 어퍼프레임(110)에 결합되어 상하 방향으로 배치되고, 상기 평판구조물(10)의 측면에 밀착되는 제 1 수직어셈블리(1200); 상기 어퍼프레임(110) 및 제 1 수직어셈블리(1200)을 연결하는 경사프레임(130); 상기 경사프레임(130) 또는 제 1 수직어셈블리(1200)에 결합되고, 상기 평판구조물(10)의 저면에 밀착되는 로어프레임(140); 상기 어퍼프레임(110)의 내측단(111) 및 외측단(112) 사이에 위치되어 상기 어퍼프레임(110)의 길이 방향을 따라 이동가능하게 배치되는 제 2 수직어셈블리(2200); 상기 제 1 수직어셈블리(1200)의 길이 방향을 따라 상하 방향으로 이동 가능하게 배치되는 제 1 서포트프레임(310); 상기 제 1 서포트프레임(310)이 상하 방향으로 관통하게 배치되고, 상기 제 1 서포트프레임(310)과 나사결합되며, 상기 제 1 수직어셈블리(1200)의 상단에 지지되는 제 1 서포트부재(410); 상기 제 2 수직어셈블리(2200)의 길이 방향을 따라 상하 방향으로 이동 가능하게 배치되는 제 2 서포트프레임(320); 상기 제 2 서포트프레임(320)이 상하 방향으로 관통하게 배치되고, 상기 제 2 서포트프레임(320)과 나사결합되며, 상기 제 2 수직어셈블리(2200)의 상단에 지지되는 제 2 서포트부재(420);를 포함하고, 상기 제 1 수직어셈블리(1200)는, 상기 어퍼프레임(110)을 감싸게 거치되는 제 1 수직베이스(1250); 상기 제 1 수직베이스(1250)의 일측에 결합되고 상하 방향으로 길게 연장되는 제 1-1 수직프레임(1210); 상기 제 1 수직베이스(1250)의 타측에 결합되고, 상하 방향으로 길게 연장되는 제 1-2 수직프레임(1220);을 포함하고, 상기 제 2 수직어셈블리(2200)는, 상기 어퍼프레임(110)을 감싸게 거치되는 제 2 수직베이스(2250); 상기 제 2 수직베이스(2250)의 일측에 결합되고 상하 방향으로 길게 연장되는 제 2-1 수직프레임(2210); 상기 제 2 수직베이스(2250)의 타측에 결합되고, 상하 방향으로 길게 연장되는 제 2-2 수직프레임(2220); 상기 제 2 수직베이스(2250)를 관통하여 상기 어퍼프레임(110)과 체결결합되는 수직체결부재(2260);를 포함하고, 상기 제 2 수직베이스(2250)는, 상기 어퍼프레임(110)의 상측면을 감싸게 배치되는 어퍼베이스(2255); 상기 어퍼베이스(2255)의 일단에서 하측으로 절곡되어 형성되는 제 2-1 사이드베이스(2251); 상기 어퍼베이스(2255)의 타단에서 하측으로 절곡되어 형성되는 제 2-2 사이드베이스(2252); 상기 제 2-1 사이드베이스(2251)를 관통하는 제 2-1 사이드체결홀(2253)과, 상기 제 2-2 사이드베이스(2252)를 관통하는 제 2-2 사이드체결홀(2254)를 포함하고, 상기 제 2-1 사이드체결홀(2253) 및 제 2-2 사이드체결홀(2254)이 일렬로 마주보게 배치되며, 상기 까치발 구조체는, 상기 어퍼프레임(110)의 일측면을 관통하게 형성되고, 상기 어퍼프레임(110)의 길이 방향을 따라 길게 연장되게 형성된 제 1 슬릿(113); 및 상기 어퍼프레임(110)의 타측면을 관통하게 형성되고, 상기 어퍼프레임(110)의 길이 방향을 따라 길게 연장되게 형성된 제 2 슬릿(114);을 더 포함하고, 상기 제 1 슬릿(113) 및 제 2 슬릿(114)이 서로 마주보게 배치되며, 상기 수직체결부재(2260)는 볼트(2262) 및 너트(2264)를 포함하고, 상기 볼트(2262)가 상기 제 2-1 사이드체결홀(2253), 제 1 슬릿(113), 제 2 슬릿(114) 및 제 2-2 사이드체결홀(2254)를 관통하게 배치되고, 상기 너트(2264)가 관통된 볼트(2262)에 체결결합되어 상기 제 2 수직어셈블리(2200)를 상기 어퍼프레임(110)에 고정되고, 상기 어퍼프레임(110)의 내측단(111) 측을 상기 평판구조물(10)에 가압하여 고정하는 밀착부재(150);를 더 포함하며, 상기 제 1-1 수직프레임(1210) 및 제 1-2 수직프레임(1220)의 내부에 형성되고, 길이 방향을 따라 길게 형성된 제 1 수직중공(215); 상기 제 2-1 수직프레임(2210) 및 상기 제 2-2 수직프레임(2220)의 내부에 형성되고, 길이 방향을 따라 길게 형성된 제 2 수직중공(225);을 더 포함하고, 상기 제 1 서포트프레임(310)은, 상하 방향으로 길게 연장되어 형성되고, 상기 제 1 수직중공(215)에 삽입되는 제 1 서포트바(312); 상기 제 1 서포트바(312)의 상단에 되고, 콘크리트 슬래브의 하중을 지지하는 수평지지대(5)가 배치되는 제 1 서포트부(314);를 포함하고, 상기 제 1 서포트부재(410)는, 상기 제 1 서포트바(312)가 관통되는 제 1 서포트바디(412); 상기 제 1 서포트바디(412)의 외측면에서 더 외측으로 돌출된 제 1 서포트핸들(414); 상기 제 1 서포트바디(412)를 관통하게 형성되고, 상기 제 1 서포트바(312)가 관통되는 제 1 서포트관통홀(415); 상기 제 1 서포트관통홀(415)에 형성된 제 1 홀나사산(411);을 포함하고, 상기 제 1 서포트바(312)는 원기둥형태로 형성되고, 외주면에 제 1 서포트나사산(311)이 형성되고, 상기 제 1 서포트나사산(311) 및 제 1 홀나사산(411)이 치합되는 까치발 구조체를 제공한다. The present invention includes an upper frame 110 disposed on the upper side of a pier or a flat structure 10 of a pier; A first vertical assembly 1200 coupled to the upper frame 110 and disposed in the vertical direction and in close contact with the side of the flat structure 10; An inclined frame 130 connecting the upper frame 110 and the first vertical assembly 1200; A lower frame 140 coupled to the inclined frame 130 or the first vertical assembly 1200 and in close contact with the bottom of the flat structure 10; A second vertical assembly 2200 located between the inner end 111 and the outer end 112 of the upper frame 110 and movable along the longitudinal direction of the upper frame 110; A first support frame 310 arranged to be movable in the vertical direction along the longitudinal direction of the first vertical assembly 1200; A first support member 410 is disposed to penetrate the first support frame 310 in the vertical direction, is screwed to the first support frame 310, and is supported on the top of the first vertical assembly 1200. ; a second support frame 320 arranged to be movable in the vertical direction along the longitudinal direction of the second vertical assembly 2200; A second support member 420 is disposed to penetrate the second support frame 320 in the vertical direction, is screwed to the second support frame 320, and is supported on the top of the second vertical assembly 2200. ; and the first vertical assembly 1200 includes a first vertical base 1250 mounted to surround the upper frame 110; A 1-1 vertical frame 1210 coupled to one side of the first vertical base 1250 and extending long in the vertical direction; A 1-2 vertical frame 1220 is coupled to the other side of the first vertical base 1250 and extends long in the vertical direction, and the second vertical assembly 2200 includes the upper frame 110. A second vertical base (2250) mounted to surround the; A 2-1 vertical frame (2210) coupled to one side of the second vertical base (2250) and extending long in the vertical direction; A 2-2 vertical frame (2220) coupled to the other side of the second vertical base (2250) and extending long in the vertical direction; It includes a vertical fastening member 2260 that penetrates the second vertical base 2250 and is fastened to the upper frame 110, wherein the second vertical base 2250 is located on the upper frame 110. An upper base (2255) arranged to surround the side; A 2-1 side base 2251 formed by bending downward from one end of the upper base 2255; A 2-2 side base 2252 formed by bending downward from the other end of the upper base 2255; It includes a 2-1 side fastening hole 2253 penetrating the 2-1 side base 2251, and a 2-2 side fastening hole 2254 penetrating the 2-2 side base 2252. And, the 2-1 side fastening hole 2253 and the 2-2 side fastening hole 2254 are arranged to face each other in a row, and the tiptoe structure is formed to penetrate one side of the upper frame 110. and a first slit 113 formed to extend long along the longitudinal direction of the upper frame 110; And a second slit 114 formed to penetrate the other side of the upper frame 110 and extend long along the longitudinal direction of the upper frame 110, wherein the first slit 113 and second slits 114 are arranged to face each other, and the vertical fastening member 2260 includes a bolt 2262 and a nut 2264, and the bolt 2262 is connected to the 2-1 side fastening hole ( 2253), is disposed to penetrate the first slit 113, the second slit 114, and the 2-2 side fastening hole 2254, and the nut 2264 is fastened to the through bolt 2262 to An adhesion member 150 that is fixed to the second vertical assembly 2200 to the upper frame 110 and presses and secures the inner end 111 of the upper frame 110 to the flat structure 10. It further includes: a first vertical hollow 215 formed inside the first vertical frame 1210 and the first vertical frame 1220 and extending along the longitudinal direction; It is formed inside the 2-1 vertical frame 2210 and the 2-2 vertical frame 2220, and further includes a second vertical hollow 225 formed long along the longitudinal direction, and the first support The frame 310 includes a first support bar 312 that extends vertically and is inserted into the first vertical hollow 215; It includes a first support part 314, which is located at the top of the first support bar 312 and has a horizontal support 5 supporting the load of the concrete slab, and the first support member 410 includes, a first support body 412 through which the first support bar 312 passes; a first support handle 414 protruding further outward from the outer surface of the first support body 412; a first support through hole 415 formed to penetrate the first support body 412 and through which the first support bar 312 passes; It includes a first hole thread 411 formed in the first support through hole 415, and the first support bar 312 is formed in a cylindrical shape, and a first support thread 311 is formed on the outer peripheral surface. , providing a tiptoe structure in which the first support thread 311 and the first hole thread 411 are engaged.

첫째, 본 발명은 제 1 서포트프레임 및 제 2 서포트프레임의 높낮이를 조절할 수 있기 때문에, 헌치(H) 부분을 회피할 수 있고 설치부품의 수를 대폭 절감할 수 있는 장점이 있다. First, since the present invention can adjust the height of the first support frame and the second support frame, the haunch (H) part can be avoided and the number of installation parts can be greatly reduced.

둘째, 본 발명은 서포트부재가 서포트프레임과 치합된 상태에서 어퍼프레임에 지지되기 때문에, 슬래브의 하중을 효과적으로 분산/지지할 수 있는 장점이 있다.Second, the present invention has the advantage of being able to effectively distribute/support the load of the slab because the support member is supported on the upper frame while being engaged with the support frame.

셋째, 본 발명은 제 1 수직베이스를 기준으로 제 1-1 수직프레임 및 제 1-2 수직프레임이 대칭되게 배치되기 때문에, 콘크리트 슬래브의 하중을 보다 견고하게 지지할 수 있을 뿐만 아니라 하중에 의한 편심을 최소화할 수 있는 장점이 있다.Third, in the present invention, since the 1-1 vertical frame and the 1-2 vertical frame are arranged symmetrically with respect to the first vertical base, not only can the load of the concrete slab be more firmly supported, but also the eccentricity caused by the load can be reduced. It has the advantage of being able to minimize .

넷째, 본 발명은 교량 또는 교각의 설계에 따라 서포트부재 및 서포트프레임의 개수를 증가시킬 수 있고, 이를 통해 교량 또는 교각의 크기가 달라지더라도 더 폭넓게 사용될 수 있으며, 시공 시 구비해야 하는 까치발 구조체의 개수를 대폭 절감시키 수 있는 장점이 있다.Fourth, the present invention can increase the number of support members and support frames according to the design of the bridge or pier, which allows it to be used more widely even if the size of the bridge or pier is different, and can be used more broadly even if the size of the bridge or pier is different. It has the advantage of significantly reducing the number of devices.

다섯째, 본 발명은 제 2 수직어셈블리가 어퍼프레임의 길이 방향으로 이동되어 고정될 수 있기 때문에, 다양한 크기의 교량 또는 교각에 설치 가능하고, 시공 시 구비해야 하는 까치발 구조체의 개수를 대폭 절감시키 수 있는 장점이 있다. Fifth, in the present invention, because the second vertical assembly can be moved and fixed in the longitudinal direction of the upper frame, it can be installed on bridges or piers of various sizes and can significantly reduce the number of tiptoe structures that must be provided during construction. There is an advantage.

도 1은 종래기술에 따른 까치발 구조체의 정면도이다.
도 2는 본 발명의 제 1 실시예에 따른 까치발 구조체의 정면도이다.
도 3은 도 2의 A-A를 따라 절단된 단면도이다.
도 4는 본 발명의 제 1 실시예에 따른 까치발 구조체의 설치 예시 1도이다.
도 5는 본 발명의 제 1 실시예에 따른 까치발 구조체의 설치 예시 2도이다.
도 6은 본 발명의 제 1 실시예에 따른 까치발 구조체의 설치 예시 3도이다.
도 7은 본 발명의 제 2 실시예에 따른 까치발 구조체의 정면도이다.
도 8은 도 7에 도시된 제 1 수직어셈블리의 일부 사시도이다.
도 9는 도 7에 도시된 제 2 수직어셈블리의 일부 사시도이다.
Figure 1 is a front view of a tiptoe structure according to the prior art.
Figure 2 is a front view of the tiptoe structure according to the first embodiment of the present invention.
Figure 3 is a cross-sectional view taken along AA of Figure 2.
Figure 4 is a diagram 1 of an example of installation of the tiptoe structure according to the first embodiment of the present invention.
Figure 5 is a second example of installation of the tiptoe structure according to the first embodiment of the present invention.
Figure 6 is a third illustration of an installation example of a tiptoe structure according to the first embodiment of the present invention.
Figure 7 is a front view of the tiptoe structure according to the second embodiment of the present invention.
FIG. 8 is a partial perspective view of the first vertical assembly shown in FIG. 7.
FIG. 9 is a partial perspective view of the second vertical assembly shown in FIG. 7.

아래에서는 첨부한 도면을 참조하여 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자가 용이하게 실시할 수 있도록 본 발명의 실시예를 상세히 설명한다. 그러나 본 발명은 여러 가지 상이한 형태로 구현될 수 있으며 여기에서 설명하는 실시예에 한정되지 않는다. 그리고 도면에서 본 발명을 명확하게 설명하기 위해서 설명과 관계없는 부분은 생략하였으며, 명세서 전체를 통하여 유사한 부분에 대해서는 유사한 도면 부호를 붙였다. Below, with reference to the attached drawings, embodiments of the present invention will be described in detail so that those skilled in the art can easily implement the present invention. However, the present invention may be implemented in many different forms and is not limited to the embodiments described herein. In order to clearly explain the present invention in the drawings, parts unrelated to the description are omitted, and similar parts are given similar reference numerals throughout the specification.

본 발명 명세서 전체에서, 어떤 부분이 어떤 구성요소를 "포함" 한다고 할 때, 이는 특별히 반대되는 기재가 없는 한 다른 구성요소를 제외하는 것이 아니라 다른 구성 요소를 더 포함할 수 있는 것을 의미한다.Throughout the present specification, when a part is said to “include” a certain element, this means that it may further include other elements rather than excluding other elements, unless specifically stated to the contrary.

도 2는 본 발명의 제 1 실시예에 따른 까치발 구조체의 정면도이고, 도 3은 도 2의 A-A를 따라 절단된 단면도이고, 도 4는 본 발명의 제 1 실시예에 따른 까치발 구조체의 설치 예시 1도이고, 도 5는 본 발명의 제 1 실시예에 따른 까치발 구조체의 설치 예시 2도이고, 도 6은 본 발명의 제 1 실시예에 따른 까치발 구조체의 설치 예시 3도이다. Figure 2 is a front view of the tiptoe structure according to the first embodiment of the present invention, Figure 3 is a cross-sectional view cut along A-A of Figure 2, and Figure 4 is an installation example 1 of the tiptoe structure according to the first embodiment of the present invention. Figure 5 is a second example of installation of the tiptoe structure according to the first embodiment of the present invention, and Figure 6 is a diagram 3 of an example of installation of the tiptoe structure according to the first embodiment of the present invention.

본 실시예에 따른 까치발 구조체는 교량 또는 교각 설치에 사용된다.The tiptoe structure according to this embodiment is used for bridge or pier installation.

본 실시예에 따른 까치발 구조체는, 교각 또는 교각의 평판구조물(10) 상측에 배치되는 어퍼프레임(110)과, 상기 어퍼프레임(110)에 결합되어 상하 방향으로 배치되고, 상기 평판구조물(10)의 측면에 밀착되는 제 1 수직프레임(210)과, 상기 어퍼프레임(110) 및 제 1 수직프레임(210)을 연결하는 경사프레임(130)과, 상기 경사프레임(130) 또는 제 1 수직프레임(210)에 결합되고, 상기 평판구조물(10)의 저면에 밀착되는 로어프레임(140)과, 상기 어퍼프레임(110)의 내측단(111) 및 외측단(112) 사이에 결합되어 상하 방향으로 배치되는 제 2 수직프레임(220)과, 상기 제 1 수직프레임(210)의 길이 방향을 따라 상하 방향으로 이동 가능하게 배치되는 제 1 서포트프레임(310)과, 상기 제 1 서포트프레임(310)이 상하 방향으로 관통하게 배치되고, 상기 제 1 서포트프레임(310)과 나사결합되며, 상기 제 1 수직프레임(210)의 상단에 지지되는 제 1 서포트부재(410)와, 상기 제 2 수직프레임(220)의 길이 방향을 따라 상하 방향으로 이동 가능하게 배치되는 제 2 서포트프레임(320)과, 상기 제 2 서포트프레임(320)이 상하 방향으로 관통하게 배치되고, 상기 제 2 서포트프레임(320)과 나사결합되며, 상기 제 2 수직프레임(220)의 상단에 지지되는 제 2 서포트부재(420)를 포함한다. The tiptoe structure according to this embodiment includes an upper frame 110 disposed on the upper side of a pier or a flat structure 10 of a pier, and is coupled to the upper frame 110 and disposed in the vertical direction, and the flat structure 10 A first vertical frame 210 in close contact with the side of, an inclined frame 130 connecting the upper frame 110 and the first vertical frame 210, and the inclined frame 130 or the first vertical frame ( 210) and is coupled between the lower frame 140, which is in close contact with the bottom of the flat structure 10, and the inner end 111 and the outer end 112 of the upper frame 110, and is arranged in the vertical direction. A second vertical frame 220, a first support frame 310 arranged to be movable in the vertical direction along the longitudinal direction of the first vertical frame 210, and the first support frame 310 are vertically positioned A first support member 410 arranged to penetrate in the direction, screwed to the first support frame 310, and supported on the top of the first vertical frame 210, and the second vertical frame 220 A second support frame 320 is arranged to be movable in the vertical direction along the longitudinal direction, and the second support frame 320 is arranged to penetrate in the vertical direction, and is screwed to the second support frame 320. It includes a second support member 420 supported on the top of the second vertical frame 220.

본 실시예에서는 까치발 구조체가 평판구조물(10)의 우측에 설치되는 것을 예로 들어 설명하고, 좌측에 설치되는 경우 반대방향으로 이해해야 할 것이다. In this embodiment, the case where the tiptoe structure is installed on the right side of the flat structure 10 is explained as an example, and when it is installed on the left side, it should be understood in the opposite direction.

상기 어퍼프레임(110)은 수평하게 배치되고, 내측단(111)이 상기 평판구조물(10)의 상측에 배치되고, 외측단(112)이 공중에 배치된다. 상기 어퍼프레임(110)은 내부가 빈 각 관 또는 파이프 형태로 형성될 수 있다. The upper frame 110 is arranged horizontally, the inner end 111 is placed on the upper side of the flat structure 10, and the outer end 112 is placed in the air. The upper frame 110 may be formed in the shape of a tube or pipe with an empty interior.

상기 어퍼프레임(110)의 외측단(112)에서 상측으로 돌출된 어퍼돌출부(115)가 배치된다. An upper protrusion 115 protruding upward from the outer end 112 of the upper frame 110 is disposed.

본 실시예에 따른 까치발 구조체는 상기 어퍼프레임(110)의 내측단(111) 측을 상기 평판구조물(10)에 가압하여 고정하는 밀착부재(150)를 더 포함한다. The tiptoe structure according to this embodiment further includes an adhesion member 150 that presses and secures the inner end 111 of the upper frame 110 to the flat structure 10.

상기 밀착부재(150)를 평판구조물(10)에 고정하기 위해, 상기 어퍼프레임(110)의 내측단(111) 측에 어퍼고정브래킷(116)이 배치된다.In order to fix the adhesion member 150 to the flat structure 10, an upper fixing bracket 116 is disposed on the inner end 111 of the upper frame 110.

상기 어퍼고정브래킷(116)은 상하 방향으로 관통된 브래킷홀(117)이 형성되고, 상기 밀착부재(150)가 상기 브래킷홀(117)을 관통하게 배치된다. The upper fixing bracket 116 is formed with a bracket hole 117 penetrating in the vertical direction, and the adhesion member 150 is disposed to penetrate the bracket hole 117.

상기 어퍼고정브래킷(116)이 상기 어퍼프레임(110)의 측면에 결합된다. The upper fixing bracket 116 is coupled to the side of the upper frame 110.

본 실시예에서 상기 어퍼고정브래킷(116)이 도면을 기준으로 정면 측에 배치된다. In this embodiment, the upper fixing bracket 116 is disposed on the front side based on the drawing.

상기 브래킷홀(117)의 내주면에 나사산이 형성되고, 상기 밀착부재(150)와 나사결합된다.A thread is formed on the inner peripheral surface of the bracket hole 117, and is screwed together with the close contact member 150.

상기 밀착부재(150)는, 상기 브래킷홀(117)을 관통하게 배치되고, 상기 어퍼고정브래킷(116)의 나사산과 나사결합되는 밀착관통부(152)와, 상기 밀착관통부(152)의 하단에 결합되고, 상기 평판구조물(10)의 상측면에 밀착되는 밀착부(154)를 포함한다. The close contact member 150 is disposed to penetrate the bracket hole 117, and includes a close contact penetration part 152 that is screwed to the thread of the upper fixing bracket 116, and a lower end of the close contact penetration part 152. It is coupled to and includes a close contact portion 154 that is in close contact with the upper side of the flat structure 10.

상기 밀착관통부(152)는 외주면에 나사산이 형성된 원기둥형태로 형성된다.The close penetration portion 152 is formed in a cylindrical shape with threads formed on the outer peripheral surface.

상기 밀착관통부(152)의 상단은 자유단을 형성한다. The upper end of the close penetration portion 152 forms a free end.

상기 밀착부(154)가 상기 평판구조물(10)의 상측면에 밀착되어 상기 어퍼프레임(110)을 통해 전달된 하중을 지지한다.The close contact portion 154 is in close contact with the upper side of the flat structure 10 and supports the load transmitted through the upper frame 110.

상기 밀착부(154)가 상기 어퍼프레임(110)을 평판구조물(10)과 이격시킨다. The close contact portion 154 separates the upper frame 110 from the flat structure 10.

상기 밀착부재(150)를 회전시켜 상기 어퍼프레임(110) 및 평판구조물(10)의 이격간격을 조절할 수 있다. The separation distance between the upper frame 110 and the flat structure 10 can be adjusted by rotating the adhesion member 150.

상기 어퍼고정브래킷(116)의 높이가 상기 어퍼프레임(110)의 높이와 같게 형성되고, 상기 어퍼고정브래킷(116)이 최대로 하강되어도 상기 어퍼프레임(110)의 하단이 상기 밀착부(154)에 지지되기 때문에, 상기 평판구조물(10)과 직접 접촉되는 것을 차단하고, 이격거리를 최소한으로 형성시킬 수 있다. The height of the upper fixing bracket 116 is formed to be the same as the height of the upper frame 110, and even when the upper fixing bracket 116 is lowered to the maximum, the lower end of the upper frame 110 is in contact with the contact portion 154. Since it is supported, direct contact with the flat structure 10 can be prevented and the separation distance can be minimized.

본 실시예에서 어퍼프레임(110), 경사프레임(130) 및 로어프레임(140)이 사각형 형태의 각 관으로 형성되고, 이를 통해 용접 결합 시, 접촉면적 및 용접길이를 충분히 확보할 수 있다. In this embodiment, the upper frame 110, the inclined frame 130, and the lower frame 140 are formed of square tubes, and through this, when welding together, a sufficient contact area and welding length can be secured.

상기 경사프레임(130)은 상하 방향에 대해 경사지게 배치된다.The inclined frame 130 is arranged to be inclined in the vertical direction.

상기 경사프레임(130)은 상측단(131)이 상기 어퍼프레임(110)에 결합되어 상기 평판구조물(10) 외측의 허공에 배치되고, 하측단(132)이 상기 평판구조물(10)과 가깝게 배치된다.The inclined frame 130 has its upper end 131 coupled to the upper frame 110 and disposed in the air outside the flat structure 10, and its lower end 132 is disposed close to the flat structure 10. do.

상기 경사프레임(130) 및 어퍼프레임(110)이 일렬로 배치되고, 탑뷰로 볼 때, 상기 경사프레임(130)이 어퍼프레임(110)에 의해 가려진다.The inclined frame 130 and the upper frame 110 are arranged in a row, and when viewed from the top, the inclined frame 130 is obscured by the upper frame 110.

본 실시예에서 상기 경사프레임(130)의 하측단(132)이 상기 평판구조물(10) 아래까지 연장되게 배치된다.In this embodiment, the lower end 132 of the inclined frame 130 is arranged to extend below the flat structure 10.

상기 로어프레임(140)은 상기 평판구조물(10)의 하측면에 밀착되고, 상기 평판구조물(10)의 하측면에 지지된다.The lower frame 140 is in close contact with the lower side of the flat structure 10 and is supported on the lower side of the flat structure 10.

상기 로어프레임(140)의 내측단(141)이 자유단 형태로 상기 평판구조물(10) 하측면에 밀착되고, 외측단(142)이 상기 경사프레임(130) 또는 제 1 수직프레임(210) 중 어느 하나에 용접 결합된다.The inner end 141 of the lower frame 140 is in close contact with the lower side of the flat structure 10 in the form of a free end, and the outer end 142 is one of the inclined frame 130 or the first vertical frame 210. It is joined by welding to either one.

본 실시예에서 상기 로어프레임(140)의 외측단(142)이 상기 경사프레임(130)에 결합된다. 상기 로어프레임(140) 및 경사프레임(130)이 동일 평면상에 배치된다. In this embodiment, the outer end 142 of the lower frame 140 is coupled to the inclined frame 130. The lower frame 140 and the inclined frame 130 are disposed on the same plane.

그래서 상기 어퍼프레임(110), 경사프레임(130) 및 로어프레임(140)이 일렬로 배치되고, 탑뷰로 볼 때, 상기 경사프레임(130) 및 로어프레임(140)이 어퍼프레임(110)에 의해 가려진다.Therefore, the upper frame 110, the inclined frame 130, and the lower frame 140 are arranged in a row, and when viewed from the top, the inclined frame 130 and the lower frame 140 are separated by the upper frame 110. It is covered.

상기 어퍼프레임(110), 경사프레임(130) 및 로어프레임(140)을 상하 방향으로 일렬 배치하여 전후 방향으로의 휨변형을 최소화할 수 있다. By arranging the upper frame 110, the inclined frame 130, and the lower frame 140 in a vertical direction, bending deformation in the front-back direction can be minimized.

본 실시예에서 상기 로어프레임(140)이 사각 각관으로 형성된다. In this embodiment, the lower frame 140 is formed as a square tube.

본 실시예에서 상기 로어프레임(140)의 외측단(142)이 상기 경사프레임(130)의 상측면을 관통하여 상기 경사프레임(130) 내부로 삽입된 후, 접촉된 면이 용접결합된다.In this embodiment, the outer end 142 of the lower frame 140 penetrates the upper side of the inclined frame 130 and is inserted into the inclined frame 130, and then the contacted surfaces are welded.

이와 같은 구조를 통해 상기 로어프레임(140) 및 경사프레임(130)의 결합력을 향상시키고, 휨변형을 최소화할 수 있다. Through this structure, the coupling force between the lower frame 140 and the inclined frame 130 can be improved and bending deformation can be minimized.

상기 제 1 수직프레임(210) 및 제 2 수직프레임(220)이 평행하게 배치된다. The first vertical frame 210 and the second vertical frame 220 are arranged in parallel.

본 실시예에서 상기 제 1 수직프레임(210) 및 제 2 수직프레임(220)이 상기 어퍼프레임(110)과 직교하게 배치된다.In this embodiment, the first vertical frame 210 and the second vertical frame 220 are arranged perpendicular to the upper frame 110.

상기 제 1 수직프레임(210) 및 제 2 수직프레임(220)이 상기 어퍼프레임(110)의 전방 또는 후방에 배치될 수 있고, 본 실시예에서 전방에 배치된다.The first vertical frame 210 and the second vertical frame 220 may be placed in front or behind the upper frame 110, and in this embodiment, they are placed in the front.

상기 제 1 수직프레임(210) 및 제 2 수직프레임(220)과 어퍼프레임(110)이 용접결합된다.The first vertical frame 210, the second vertical frame 220, and the upper frame 110 are welded.

상기 제 1 수직프레임(210) 및 제 2 수직프레임(220)은 내부가 빈 파이프 또는 각관 형태로 형성될 수 있고, 본 실시예에서 상기 어퍼프레임(110)과의 용접결합이 용이하도록 사각 각관으로 형성된다. The first vertical frame 210 and the second vertical frame 220 may be formed in the form of pipes or square pipes with an empty interior, and in this embodiment, are formed as square pipes to facilitate welding with the upper frame 110. is formed

상기 제 1 수직프레임(210)의 내부에 형성된 빈 공간을 제 1 수직중공(215)라 하고, 상기 제 2 수직프레임(220)의 내부에 형성된 빈 공간을 제 2 수직중공(225)라 정의한다. The empty space formed inside the first vertical frame 210 is defined as the first vertical hollow 215, and the empty space formed inside the second vertical frame 220 is defined as the second vertical hollow 225. .

상기 제 1 수직프레임(210)의 상측단(211)이 상기 어퍼프레임(110)에 결합되고, 하측단(212)이 경사프레임(130)에 결합된다.The upper end 211 of the first vertical frame 210 is coupled to the upper frame 110, and the lower end 212 is coupled to the inclined frame 130.

상기 제 1 수직프레임(210)의 좌측면이 상기 평판구조물(10)의 우측면에 밀착되어 지지될 수 있다. The left side of the first vertical frame 210 may be supported in close contact with the right side of the flat structure 10.

그리고 상기 제 2 수직프레임(220)의 상측단(221)이 상기 어퍼프레임(110)에 결합되고, 하측단(222)이 경사프레임(130)에 결합된다.And the upper end 221 of the second vertical frame 220 is coupled to the upper frame 110, and the lower end 222 is coupled to the inclined frame 130.

본 실시예에서 상기 제 2 수직프레임(220)이 어퍼프레임(110)의 좌우 중간에 배치되기 때문에, 상기 제 2 수직프레임(220)의 길이가 상기 제 1 수직프레임(210)의 길이보다 짧게 형성된다.In this embodiment, because the second vertical frame 220 is disposed in the middle of the left and right sides of the upper frame 110, the length of the second vertical frame 220 is shorter than the length of the first vertical frame 210. do.

상기 제 1 서포트프레임(310)은 상기 제 1 수직프레임(210)의 제 1 수직중공(215)에 삽입되어 상하 방향으로 이동될 수 있다.The first support frame 310 may be inserted into the first vertical hollow 215 of the first vertical frame 210 and moved in the vertical direction.

상기 제 1 서포트프레임(310)은, 상하 방향으로 길게 연장되어 형성되고, 상기 제 1 수직중공(215)에 삽입되는 제 1 서포트바(312)와, 상기 제 1 서포트바(312)의 상단에 되고, 콘크리트 슬래브의 하중을 지지하는 수평지지대(5)가 배치되는 제 1 서포트부(314)를 포함한다. The first support frame 310 is formed to extend long in the vertical direction, and includes a first support bar 312 inserted into the first vertical hollow 215, and an upper end of the first support bar 312. It includes a first support portion 314 on which a horizontal support 5 supporting the load of the concrete slab is disposed.

상기 제 1 서포트바(312)는 원기둥형태로 형성되고, 외주면에 제 1 서포트나사산(311)이 형성되고, 상기 제 1 서포트나사산(311)이 제 1 서포트부재(410)와 나사결합되며, 상기 제 1 서포트프레임(310)에 가해지는 하중이 상기 제 1 서포트부재(410)에 지지된다. The first support bar 312 is formed in a cylindrical shape, and a first support thread 311 is formed on the outer peripheral surface, and the first support thread 311 is screwed with the first support member 410, The load applied to the first support frame 310 is supported by the first support member 410.

상기 제 1 서포트부(314)는 상측으로 개구된 "∪" 형상으로 형성되고, 내측에 제 1 지지대삽입홈(313)이 형성되며, 상기 제 1 지지대삽입홈(313)에 수평지지대(5)가 상측에 삽입되어 거치된다. The first support portion 314 is formed in a “∪” shape that opens upward, and a first support insertion groove 313 is formed on the inside, and a horizontal support 5 is formed in the first support insertion groove 313. is inserted and mounted on the upper side.

상기 제 1 서포트바(312)가 최하측으로 이동될 경우, 상기 제 1 서포트부(314)의 저면이 상기 제 1 서포트부재(410)의 상측과 접촉되어 지지될 수 있다. When the first support bar 312 is moved to the lowest side, the bottom of the first support part 314 may be supported by contacting the upper side of the first support member 410.

상기 제 1 서포트부재(410)는, 상기 제 1 서포트바(312)가 관통되는 제 1 서포트바디(412)와, 상기 제 1 서포트바디(412)의 외측면에서 더 외측으로 돌출된 제 1 서포트핸들(414)과, 상기 제 1 서포트바디(412)를 관통하게 형성되고, 상기 제 1 서포트바(312)가 관통되는 제 1 서포트관통홀(415)과, 상기 제 1 서포트관통홀(415)에 형성되고, 상기 제 1 서포트나사산(311)과 치합되는 제 1 홀나사산(411)을 포함한다. The first support member 410 includes a first support body 412 through which the first support bar 312 passes, and a first support that protrudes further outward from the outer surface of the first support body 412. A handle 414, a first support through-hole 415 formed to penetrate the first support body 412 and through which the first support bar 312 passes, and the first support through-hole 415 and includes a first hole screw thread 411 engaged with the first support screw thread 311.

작업자는 상기 제 1 서포트핸들(414)을 잡아 회전시킴으로써, 상기 제 1 서포트부재(410)를 회전시킬 수 있고, 이를 통해 상기 제 1 서포트프레임(310)의 높낮이를 조절할 수 있다.The operator can rotate the first support member 410 by holding and rotating the first support handle 414, and thereby adjust the height of the first support frame 310.

본 실시예에서 상기 제 1 서포트핸들(414)은 제 1 서포트바디(412)에서 양측으로 돌출되게 배치되고, 작업자는 양손으로 상기 제 1 서포트핸들(414)을 잡아 회전시킬 수 있다. 2개의 제 1 서포트핸들(414)을 구분할 경우, 제 1-1 서포트핸들 및 제 1-2 서포트핸들이라 한다. In this embodiment, the first support handle 414 is disposed to protrude from both sides of the first support body 412, and the worker can rotate the first support handle 414 by holding it with both hands. When distinguishing between the two first support handles 414, they are referred to as a 1-1 support handle and a 1-2 support handle.

상기 제 1 서포트바디(412)는 링형상으로 형성되고, 상기 제 1 서포트관통홀(415)이 내측에 배치된다.The first support body 412 is formed in a ring shape, and the first support through hole 415 is disposed inside.

본 실시예에서 상기 제 1 수직프레임(210)의 상측단(211)이 상기 어퍼프레임(110)의 상측면과 같은 높이로 배치된다. In this embodiment, the upper end 211 of the first vertical frame 210 is disposed at the same height as the upper side of the upper frame 110.

상기 제 1 서포트바디(412)의 직경이 상기 제 1 수직프레임(210)의 단면 폭보다 크게 형성되기 때문에, 상기 1 서포트바디(412)가 상기 제 1 수직프레임(210)의 상측단(211)에 거치되어 지지될 수 있다. Since the diameter of the first support body 412 is formed to be larger than the cross-sectional width of the first vertical frame 210, the first support body 412 is positioned at the upper end 211 of the first vertical frame 210. It can be mounted and supported on.

또한, 상기 제 1 서포트바디(412)의 저면이 상기 제 1 수직프레임(210)의 상측단(211)에 지지될 경우, 상기 제 1 수직프레임(210)의 상측단(211) 및 상기 어퍼프레임(110)의 상측면에 동시에 거치되어 하중을 분산시킬 수 있다. In addition, when the bottom of the first support body 412 is supported by the upper end 211 of the first vertical frame 210, the upper end 211 of the first vertical frame 210 and the upper frame It can be mounted simultaneously on the upper side of (110) to distribute the load.

상기 제 2 서포트프레임(320)은 상기 제 2 수직프레임(220)의 제 2 수직중공(225)에 삽입되어 상하 방향으로 이동될 수 있다.The second support frame 320 may be inserted into the second vertical hollow 225 of the second vertical frame 220 and moved in the vertical direction.

상기 제 2 서포트프레임(320)은, 상하 방향으로 길게 연장되어 형성되고, 상기 제 2 수직중공(225)에 삽입되는 제 2 서포트바(322)와, 상기 제 2 서포트바(322)의 상단에 되고, 콘크리트 슬래브의 하중을 지지하는 수평지지대(5)가 배치되는 제 2 서포트부(324)를 포함한다. The second support frame 320 is formed to extend long in the vertical direction, and includes a second support bar 322 inserted into the second vertical hollow 225, and an upper end of the second support bar 322. and includes a second support portion 324 on which a horizontal support 5 supporting the load of the concrete slab is disposed.

상기 제 2 서포트바(322)는 원기둥형태로 형성되고, 외주면에 제 2 서포트나사산(321)이 형성되고, 상기 제 2 서포트나사산(321)이 제 2 서포트부재(420)와 나사결합되며, 상기 제 2 서포트프레임(320)에 가해지는 하중이 상기 제 2 서포트부재(420)에 지지된다. The second support bar 322 is formed in a cylindrical shape, and a second support thread 321 is formed on the outer peripheral surface. The second support thread 321 is screwed to the second support member 420, and the second support thread 321 is screwed to the second support member 420. The load applied to the second support frame 320 is supported by the second support member 420.

상기 제 2 서포트부(324)는 상측으로 개구된 "∪" 형상으로 형성되고, 내측에 제 2 지지대삽입홈(323)이 형성되며, 상기 제 2 지지대삽입홈(323)에 수평지지대(5)가 상측에 삽입되어 거치된다. The second support portion 324 is formed in a “∪” shape opening upward, and a second support insertion groove 323 is formed on the inside, and a horizontal support 5 is formed in the second support insertion groove 323. is inserted and mounted on the upper side.

상기 제 2 서포트바(322)가 최하측으로 이동될 경우, 상기 제 2 서포트부(324)의 저면이 상기 제 2 서포트부재(420)의 상측과 접촉되어 지지될 수 있다. When the second support bar 322 is moved to the lowest side, the bottom of the second support part 324 may be supported by contacting the upper side of the second support member 420.

상기 제 2 서포트부재(420)는, 상기 제 2 서포트바(322)가 관통되는 제 2 서포트바디(422)와, 상기 제 2 서포트바디(422)의 외측면에서 더 외측으로 돌출된 제 2 서포트핸들(424)과, 상기 제 2 서포트바디(422)를 관통하게 형성되고, 상기 제 2 서포트바(322)가 관통되는 제 2 서포트관통홀(425)과, 상기 제 2 서포트관통홀(425)에 형성되고, 상기 제 2 서포트나사산(321)과 치합되는 제 2 홀나사산(421)을 포함한다. The second support member 420 includes a second support body 422 through which the second support bar 322 penetrates, and a second support protruding further outward from the outer surface of the second support body 422. A handle 424, a second support through-hole 425 formed to penetrate the second support body 422 and through which the second support bar 322 passes, and the second support through-hole 425 and includes a second hole thread 421 engaged with the second support thread 321.

작업자는 상기 제 2 서포트핸들(424)을 잡아 회전시킴으로써, 상기 제 2 서포트부재(420)를 회전시킬 수 있고, 이를 통해 상기 제 2 서포트프레임(320)의 높낮이를 조절할 수 있다.The operator can rotate the second support member 420 by holding and rotating the second support handle 424, and thereby adjust the height of the second support frame 320.

본 실시예에서 2개의 제 2 서포트핸들(424)을 구분할 경우, 제 2-1 서포트핸들 및 제 2-2 서포트핸들이라 한다. In this embodiment, when the two second support handles 424 are distinguished, they are referred to as a 2-1 support handle and a 2-2 support handle.

상기 제 2 서포트바디(422)는 링형상으로 형성되고, 상기 제 2 서포트관통홀(425)이 내측에 배치된다.The second support body 422 is formed in a ring shape, and the second support through hole 425 is disposed inside.

본 실시예에서 상기 제 2 수직프레임(220)의 상측단(221)이 상기 어퍼프레임(110)의 상측면과 같은 높이로 배치된다. In this embodiment, the upper end 221 of the second vertical frame 220 is disposed at the same height as the upper side of the upper frame 110.

상기 제 2 서포트바디(422)의 직경이 상기 제 2 수직프레임(220)의 단면 폭보다 크게 형성되기 때문에, 상기 제 2 서포트바디(422)가 상기 제 2 수직프레임(220)의 상측단(221)에 거치되어 지지될 수 있다. Since the diameter of the second support body 422 is formed to be larger than the cross-sectional width of the second vertical frame 220, the second support body 422 is positioned at the upper end 221 of the second vertical frame 220. ) can be mounted and supported.

또한, 상기 제 2 서포트바디(422)의 저면이 상기 제 2 수직프레임(220)의 상측단(221)에 지지될 경우, 상기 제 2 수직프레임(220)의 상측단(221) 및 상기 어퍼프레임(110)의 상측면에 동시에 거치되어 하중을 분산시킬 수 있다. In addition, when the bottom of the second support body 422 is supported by the upper end 221 of the second vertical frame 220, the upper end 221 of the second vertical frame 220 and the upper frame It can be mounted simultaneously on the upper side of (110) to distribute the load.

도 7은 본 발명의 제 2 실시예에 따른 까치발 구조체의 정면도이고, 도 8은 도 7에 도시된 제 1 수직어셈블리의 일부 사시도이고, 도 9는 도 7에 도시된 제 2 수직어셈블리의 일부 사시도이다. Figure 7 is a front view of the tiptoe structure according to the second embodiment of the present invention, Figure 8 is a partial perspective view of the first vertical assembly shown in Figure 7, and Figure 9 is a partial perspective view of the second vertical assembly shown in Figure 7. am.

본 실시예에 따른 까치발 구조체는, 교각 또는 교각의 평판구조물(10) 상측에 배치되는 어퍼프레임(110)과, 상기 어퍼프레임(110)에 결합되어 상하 방향으로 배치되고, 상기 평판구조물(10)의 측면에 밀착되는 제 1 수직어셈블리(1200)과, 상기 어퍼프레임(110) 및 제 1 수직어셈블리(1200)을 연결하는 경사프레임(130)과, 상기 경사프레임(130) 또는 제 1 수직어셈블리(1200)에 결합되고, 상기 평판구조물(10)의 저면에 밀착되는 로어프레임(140)과, 상기 어퍼프레임(110)의 내측단(111) 및 외측단(112) 사이에 위치되어 상기 어퍼프레임(110)의 길이 방향을 따라 이동가능하게 배치되는 제 2 수직어셈블리(2200)과, 상기 제 1 수직어셈블리(1200)의 길이 방향을 따라 상하 방향으로 이동 가능하게 배치되는 제 1 서포트프레임(310)과, 상기 제 1 서포트프레임(310)이 상하 방향으로 관통하게 배치되고, 상기 제 1 서포트프레임(310)과 나사결합되며, 상기 제 1 수직프레임(210)의 상단에 지지되는 제 1 서포트부재(410)와, 상기 제 2 수직어셈블리(2200)의 길이 방향을 따라 상하 방향으로 이동 가능하게 배치되는 제 2 서포트프레임(320)과, 상기 제 2 서포트프레임(320)이 상하 방향으로 관통하게 배치되고, 상기 제 2 서포트프레임(320)과 나사결합되며, 상기 제 2 수직프레임(220)의 상단에 지지되는 제 2 서포트부재(420)를 포함한다. The tiptoe structure according to this embodiment includes an upper frame 110 disposed on the upper side of a pier or a flat structure 10 of a pier, and is coupled to the upper frame 110 and disposed in the vertical direction, and the flat structure 10 A first vertical assembly 1200 in close contact with the side of, an inclined frame 130 connecting the upper frame 110 and the first vertical assembly 1200, and the inclined frame 130 or the first vertical assembly ( 1200) and is located between the lower frame 140, which is in close contact with the bottom of the flat structure 10, and the inner end 111 and the outer end 112 of the upper frame 110, forming the upper frame ( A second vertical assembly 2200 movably disposed along the longitudinal direction of the first vertical assembly 110, and a first support frame 310 movable up and down along the longitudinal direction of the first vertical assembly 1200. , a first support member 410 that is disposed to penetrate the first support frame 310 in the vertical direction, is screwed to the first support frame 310, and is supported on the upper end of the first vertical frame 210. ) and a second support frame 320 arranged to be movable in the vertical direction along the longitudinal direction of the second vertical assembly 2200, and the second support frame 320 is arranged to penetrate in the vertical direction, It is screw-coupled with the second support frame 320 and includes a second support member 420 supported on the top of the second vertical frame 220.

본 실시예에서 상기 제 1 수직어셈블리(1200) 및 제 2 수직어셈블리(2200)의 구성이 동일하다. In this embodiment, the first vertical assembly 1200 and the second vertical assembly 2200 have the same configuration.

상기 제 1 수직어셈블리(1200)는, 상기 어퍼프레임(110)을 감싸게 거치되는 제 1 수직베이스(1250)와, 상기 제 1 수직베이스(1250)의 일측(본 실시예에서 전방)에 결합되고 상하 방향으로 길게 연장되는 제 1-1 수직프레임(1210)과, 상기 제 1 수직베이스(1250)의 타측(본 실시예에서 후방)에 결합되고, 상하 방향으로 길게 연장되는 제 1-2 수직프레임(1220)을 포함한다. The first vertical assembly 1200 is coupled to a first vertical base 1250 mounted to surround the upper frame 110, and one side (front in this embodiment) of the first vertical base 1250 and is positioned up and down. A 1-1 vertical frame 1210 extending long in the direction and a 1-2 vertical frame coupled to the other side (rear in this embodiment) of the first vertical base 1250 and extending long in the vertical direction ( 1220).

상기 제 1-1 수직프레임(1210) 및 제 1-2 수직프레임(1220)의 구조가 상기 제 1 실시예의 제 1 수직프레임(210) 구조와 동일하기 때문에 상세한 설명을 생략한다. Since the structures of the 1-1 vertical frame 1210 and the 1-2 vertical frame 1220 are the same as the structure of the first vertical frame 210 of the first embodiment, detailed descriptions are omitted.

상기 제 1 수직베이스(1250)는, 상기 어퍼프레임(110)의 상측면을 감싸게 배치되는 어퍼베이스(1255)와, 상기 어퍼베이스(1255)의 일단(본 실시예에서 전단)에서 하측으로 절곡되어 형성되는 제 1-1 사이드베이스(1251)와, 상기 어퍼베이스(1255)의 타단(본 실시예에서 후단)에서 하측으로 절곡되어 형성되는 제 1-2 사이드베이스(1252)를 포함한다. The first vertical base 1250 has an upper base 1255 disposed to surround the upper side of the upper frame 110, and is bent downward at one end (front end in this embodiment) of the upper base 1255. It includes a 1-1 side base 1251 formed and a 1-2 side base 1252 formed by bending downward from the other end (rear end in this embodiment) of the upper base 1255.

상기 제 1-1 사이드베이스(1251)가 상기 어퍼프레임(110)의 전면을 감싸게 배치되고, 상기 제 1-2 사이드베이스(1252)가 상기 어퍼프레임(110)의 후면을 감싸게 배치된다.The 1-1 side base 1251 is arranged to surround the front of the upper frame 110, and the 1-2 side base 1252 is arranged to surround the rear of the upper frame 110.

본 실시예에서 상기 제 1 수직베이스(1250)는 하측으로 개구된 "∩"형상으로 형성된다.In this embodiment, the first vertical base 1250 is formed in a “∩” shape with a downward opening.

본 실시예에서 상기 제 1 수직베이스(1250)의 길이(L)가 상기 제 1-1 수직프레임(1210) 및 제 1-2 수직프레임(1220)의 폭(W) 보다 길게 형성된다. In this embodiment, the length (L) of the first vertical base 1250 is formed to be longer than the width (W) of the 1-1 vertical frame 1210 and the 1-2 vertical frame 1220.

상기 제 1 수직베이스(1250)는 상기 제 1-1 사이드베이스(1251)를 관통하는 제 1-1 사이드체결홀(1253)과, 상기 제 1-2 사이드베이스(1252)를 관통하는 제 1-2 사이드체결홀(1254)를 더 포함하고, The first vertical base 1250 has a 1-1 side fastening hole 1253 penetrating the 1-1 side base 1251, and a 1-1 side fastening hole 1253 penetrating the 1-2 side base 1252. It further includes 2 side fastening holes (1254),

상기 제 1-1 사이드체결홀(1253) 및 제 1-2 사이드체결홀(1254)이 일렬로 마주보게 배치된다. The 1-1 side fastening hole 1253 and the 1-2 side fastening hole 1254 are arranged to face each other in a row.

상기 제 1-1 수직프레임(1210)이 상기 제 1-1 사이드베이스(1251)에 용접결합되고, 상기 제 1-2 수직프레임(1220)이 상기 제 1-2 사이드베이스(1252)에 용접결합된다. The 1-1 vertical frame 1210 is welded to the 1-1 side base 1251, and the 1-2 vertical frame 1220 is welded to the 1-2 side base 1252. do.

본 실시예에서 상기 제 1 수직베이스(1250)를 기준으로 상기 제 1-1 수직프레임(1210) 및 제 1-2 수직프레임(1220)이 대칭되게 배치되기 때문에, 콘크리트 슬래브의 하중을 보다 견고하게 지지할 수 있을 뿐만 아니라 하중에 의한 편심을 최소화할 수 있는 특징이 있다. In this embodiment, since the 1-1 vertical frame 1210 and the 1-2 vertical frame 1220 are arranged symmetrically with respect to the first vertical base 1250, the load of the concrete slab can be more firmly applied. It has the feature of not only providing support but also minimizing eccentricity due to load.

상기 제 1-1 수직프레임(1210) 및 제 1-2 수직프레임(1220)의 상측단(1211)(1221)이 상기 제 1 수직베이스(1250)의 상측면과 같은 높이로 배치된다.The upper ends 1211 and 1221 of the 1-1 vertical frame 1210 and the 1-2 vertical frame 1220 are disposed at the same height as the upper surface of the first vertical base 1250.

상기 제 1-1 수직프레임(1210) 및 제 1-2 수직프레임(1220)에 각각 삽입되어 설치될 수 있도록, 상기 제 1 서포트프레임(310) 및 제 1 서포트부재(410)가 각각 2개 배치될 수 있다. Two first support frames 310 and two first support members 410 are arranged so that they can be inserted and installed into the 1-1 vertical frame 1210 and the 1-2 vertical frame 1220, respectively. It can be.

슬래브의 하중이 작을 경우, 1개만 배치되어도 무방하다.If the load on the slab is small, it is okay to place only one slab.

본 실시예에 따른 까치발 구조체는 슬래브의 하중에 따라 제 1 서포트프레임(310) 및 제 1 서포트부재(410)의 개수를 조정할 수 있고, 이를 통해 교량 또는 교각의 크기가 달라지더라도 더 폭넓게 사용될 수 있으며, 시공 시 구비해야 하는 까치발 구조체의 개수를 대폭 절감시키 수 있는 특징이 있다. The tiptoe structure according to this embodiment can adjust the number of the first support frame 310 and the first support member 410 depending on the load of the slab, and through this, it can be used more widely even if the size of the bridge or pier is different. It has the feature of significantly reducing the number of tiptoe structures that must be provided during construction.

상기 제 2 수직어셈블리(2200)는 상기 어퍼프레임(110)의 길이 방향을 따라 이동가능하게 배치될 수 있기 때문에, 상기 어퍼프레임(110)의 내측단(111) 및 외측단(112) 사이 중 어딘가에 위치될 수 있다.Since the second vertical assembly 2200 can be movably arranged along the longitudinal direction of the upper frame 110, it is located somewhere between the inner end 111 and the outer end 112 of the upper frame 110. can be located

상기 제 2 수직어셈블리(2200)를 길이 방향으로 이동시키기 위해, 상기 어퍼프레임(110)의 길이 방향을 따라 제 1 슬릿(113) 및 제 2 슬릿(114)이 형성된다.In order to move the second vertical assembly 2200 in the longitudinal direction, a first slit 113 and a second slit 114 are formed along the longitudinal direction of the upper frame 110.

본 실시예에서 상기 제 1 슬릿(113)이 전면을 관통하게 형성되고, 길이 방향을 따라 연장되며, 상기 제 2 슬릿(114)이 후면을 관통하게 형성되고, 길이 방향으로 연장된다. In this embodiment, the first slit 113 is formed through the front surface and extends in the longitudinal direction, and the second slit 114 is formed through the rear surface and extends in the longitudinal direction.

상기 제 1 슬릿(113) 및 제 2 슬릿(114)이 서로 마주보게 배치된다.The first slit 113 and the second slit 114 are arranged to face each other.

상기 제 2 수직어셈블리(2200)는, 상기 어퍼프레임(110)을 감싸게 거치되는 제 2 수직베이스(2250)와, 상기 제 2 수직베이스(2250)의 일측(본 실시예에서 전방)에 결합되고 상하 방향으로 길게 연장되는 제 2-1 수직프레임(2210)과, 상기 제 2 수직베이스(2250)의 타측(본 실시예에서 후방)에 결합되고, 상하 방향으로 길게 연장되는 제 2-2 수직프레임(2220)과, 상기 제 2 수직베이스(2250)를 관통하여 상기 어퍼프레임(110)과 체결결합되는 수직체결부재(2260)를 포함한다. The second vertical assembly 2200 is coupled to a second vertical base 2250 mounted to surround the upper frame 110, and one side (front in this embodiment) of the second vertical base 2250 and is positioned up and down. A 2-1 vertical frame 2210 extending long in the direction and a 2-2 vertical frame coupled to the other side (rear in this embodiment) of the second vertical base 2250 and extending long in the vertical direction ( 2220) and a vertical fastening member 2260 that penetrates the second vertical base 2250 and is fastened to the upper frame 110.

상기 제 2 수직베이스(2250), 제 2-1 수직프레임(2210) 및 제 2-2 수직프레임(2220)의 구조가 상기 제 1 수직베이스(2150), 제 1-1 수직프레임(1210) 및 제 1-2 수직프레임(1220)의 구조와 동일하다. The structures of the second vertical base 2250, the 2-1 vertical frame 2210, and the 2-2 vertical frame 2220 are the same as the first vertical base 2150, the 1-1 vertical frame 1210, and The structure is the same as that of the 1-2 vertical frame 1220.

상기 제 2 수직베이스(2250)는, 상기 어퍼프레임(110)의 상측면을 감싸게 배치되는 어퍼베이스(2255)와, 상기 어퍼베이스(2255)의 일단(본 실시예에서 전단)에서 하측으로 절곡되어 형성되는 제 2-1 사이드베이스(2251)와, 상기 어퍼베이스(2255)의 타단(본 실시예에서 후단)에서 하측으로 절곡되어 형성되는 제 2-2 사이드베이스(2252)를 포함한다. The second vertical base 2250 has an upper base 2255 disposed to surround the upper side of the upper frame 110, and is bent downward at one end (front end in this embodiment) of the upper base 2255. It includes a 2-1 side base 2251 formed and a 2-2 side base 2252 formed by bending downward from the other end (rear end in this embodiment) of the upper base 2255.

상기 제 2-1 사이드베이스(2251)가 상기 어퍼프레임(110)의 전면을 감싸게 배치되고, 상기 제 2-2 사이드베이스(2252)가 상기 어퍼프레임(110)의 후면을 감싸게 배치된다.The 2-1 side base 2251 is arranged to surround the front of the upper frame 110, and the 2-2 side base 2252 is arranged to surround the rear of the upper frame 110.

본 실시예에서 상기 제 2 수직베이스(2250)는 하측으로 개구된 "∩"형상으로 형성된다.In this embodiment, the second vertical base 2250 is formed in a “∩” shape with a downward opening.

상기 제 2 수직베이스(2250)는 상기 제 2-1 사이드베이스(2251)를 관통하는 제 2-1 사이드체결홀(2253)과, 상기 제 2-2 사이드베이스(2252)를 관통하는 제 2-2 사이드체결홀(2254)를 더 포함하고, The second vertical base 2250 has a 2-1 side fastening hole 2253 penetrating the 2-1 side base 2251, and a 2-1 side fastening hole 2253 penetrating the 2-2 side base 2252. It further includes 2 side fastening holes (2254),

상기 제 2-1 사이드체결홀(2253) 및 제 2-2 사이드체결홀(2254)이 일렬로 마주보게 배치된다. The 2-1 side fastening hole 2253 and the 2-2 side fastening hole 2254 are arranged to face each other in a row.

본 실시예에서 상기 수직체결부재(2260)는 볼트(2262) 및 너트(2264)가 사용된다.In this embodiment, the vertical fastening member 2260 uses a bolt 2262 and a nut 2264.

상기 볼트(2262)가 상기 제 2-1 사이드체결홀(2253), 제 1 슬릿(113), 제 2 슬릿(114) 및 제 2-2 사이드체결홀(2254)를 관통하게 배치되고, 상기 너트(2264)가 관통된 볼트(2262)에 체결결합되어 상기 제 2 수직어셈블리(2200)를 어퍼프레임(110)에 고정시킬 수 있다. The bolt 2262 is disposed to penetrate the 2-1 side fastening hole 2253, the first slit 113, the second slit 114, and the 2-2 side fastening hole 2254, and the nut (2264) is fastened to the through bolt (2262) to fix the second vertical assembly (2200) to the upper frame (110).

본 실시예에서 상기 제 2 수직베이스(2250)를 기준으로 상기 제 2-1 수직프레임(2210) 및 제 2-2 수직프레임(2220)이 대칭되게 배치되기 때문에, 콘크리트 슬래브의 하중을 보다 견고하게 지지할 수 있을 뿐만 아니라 하중에 의한 편심을 최소화할 수 있는 특징이 있다. In this embodiment, since the 2-1 vertical frame 2210 and the 2-2 vertical frame 2220 are arranged symmetrically with respect to the second vertical base 2250, the load of the concrete slab can be more firmly applied. It has the feature of being able to not only provide support but also minimize eccentricity due to load.

상기 제 2-1 수직프레임(2210) 및 제 2-2 수직프레임(1220)의 상측단(2211)(2221)이 상기 제 2 수직베이스(2250)의 상측면과 같은 높이로 배치된다.The upper ends 2211 and 2221 of the 2-1 vertical frame 2210 and the 2-2 vertical frame 1220 are disposed at the same height as the upper surface of the second vertical base 2250.

상기 제 2-1 수직프레임(2210) 및 제 2-2 수직프레임(2220)에 각각 삽입되어 설치될 수 있도록, 상기 제 1 서포트프레임(310) 및 제 1 서포트부재(410)이 각각 2개 배치될 수 있다. Two first support frames 310 and two first support members 410 are arranged so that they can be inserted and installed into the 2-1 vertical frame 2210 and the 2-2 vertical frame 2220, respectively. It can be.

본 실시예에 따른 까치발 구조체는 제 2 수직어셈블리(2200)가 어퍼프레임(110)의 길이 방향으로 이동되어 고정될 수 있기 때문에, 다양한 크기의 교량 또는 교각에 설치가능한 특징이 있고, 시공 시 구비해야 하는 까치발 구조체의 개수를 대폭 절감시키 수 있는 특징이 있다. The tiptoe structure according to this embodiment has the feature that it can be installed on bridges or piers of various sizes because the second vertical assembly 2200 can be moved and fixed in the longitudinal direction of the upper frame 110, and must be provided during construction. It has the feature of significantly reducing the number of tiptoe structures.

이하 나머지 구성은 상기 제 1 실시예와 유사하기 때문에 상세한 설명을 생략한다. Hereinafter, since the remaining configuration is similar to the first embodiment, detailed description will be omitted.

본 발명의 상세한 설명에서는 구체적인 실시 예에 관해 설명하였으나, 본 발명의 범위에서 벗어나지 않는 한도 내에서 여러 가지 변형이 가능함은 물론이다. 그러므로 본 발명의 범위는 설명된 실시 예에 국한되어 정해져서는 아니 되며 후술하는 특허청구의 범위뿐만 아니라 이 특허청구의 범위와 균등한 것들에 의해 정해져야 한다.In the detailed description of the present invention, specific embodiments have been described, but of course, various modifications are possible without departing from the scope of the present invention. Therefore, the scope of the present invention should not be limited to the described embodiments, but should be determined not only by the scope of the patent claims described later, but also by the scope of this patent claim and equivalents.

Claims (1)

까치발 구조체에 있어서,
교각 또는 교각의 평판구조물(10) 상측에 배치되는 어퍼프레임(110);
상기 어퍼프레임(110)에 결합되어 상하 방향으로 배치되고, 상기 평판구조물(10)의 측면에 밀착되는 제 1 수직어셈블리(1200);
상기 어퍼프레임(110) 및 제 1 수직어셈블리(1200)을 연결하는 경사프레임(130);
상기 경사프레임(130) 또는 제 1 수직어셈블리(1200)에 결합되고, 상기 평판구조물(10)의 저면에 밀착되는 로어프레임(140);
상기 어퍼프레임(110)의 내측단(111) 및 외측단(112) 사이에 위치되어 상기 어퍼프레임(110)의 길이 방향을 따라 이동가능하게 배치되는 제 2 수직어셈블리(2200);
상기 제 1 수직어셈블리(1200)의 길이 방향을 따라 상하 방향으로 이동 가능하게 배치되는 제 1 서포트프레임(310);
상기 제 1 서포트프레임(310)이 상하 방향으로 관통하게 배치되고, 상기 제 1 서포트프레임(310)과 나사결합되며, 상기 제 1 수직어셈블리(1200)의 상단에 지지되는 제 1 서포트부재(410);
상기 제 2 수직어셈블리(2200)의 길이 방향을 따라 상하 방향으로 이동 가능하게 배치되는 제 2 서포트프레임(320);
상기 제 2 서포트프레임(320)이 상하 방향으로 관통하게 배치되고, 상기 제 2 서포트프레임(320)과 나사결합되며, 상기 제 2 수직어셈블리(2200)의 상단에 지지되는 제 2 서포트부재(420);를 포함하고,
상기 제 1 수직어셈블리(1200)는,
상기 어퍼프레임(110)을 감싸게 거치되는 제 1 수직베이스(1250); 상기 제 1 수직베이스(1250)의 일측에 결합되고 상하 방향으로 길게 연장되는 제 1-1 수직프레임(1210); 상기 제 1 수직베이스(1250)의 타측에 결합되고, 상하 방향으로 길게 연장되는 제 1-2 수직프레임(1220);을 포함하고,
상기 제 2 수직어셈블리(2200)는,
상기 어퍼프레임(110)을 감싸게 거치되는 제 2 수직베이스(2250); 상기 제 2 수직베이스(2250)의 일측에 결합되고 상하 방향으로 길게 연장되는 제 2-1 수직프레임(2210); 상기 제 2 수직베이스(2250)의 타측에 결합되고, 상하 방향으로 길게 연장되는 제 2-2 수직프레임(2220); 상기 제 2 수직베이스(2250)를 관통하여 상기 어퍼프레임(110)과 체결결합되는 수직체결부재(2260);를 포함하고,
상기 제 2 수직베이스(2250)는,
상기 어퍼프레임(110)의 상측면을 감싸게 배치되는 어퍼베이스(2255); 상기 어퍼베이스(2255)의 일단에서 하측으로 절곡되어 형성되는 제 2-1 사이드베이스(2251); 상기 어퍼베이스(2255)의 타단에서 하측으로 절곡되어 형성되는 제 2-2 사이드베이스(2252); 상기 제 2-1 사이드베이스(2251)를 관통하는 제 2-1 사이드체결홀(2253)과, 상기 제 2-2 사이드베이스(2252)를 관통하는 제 2-2 사이드체결홀(2254)를 포함하고, 상기 제 2-1 사이드체결홀(2253) 및 제 2-2 사이드체결홀(2254)이 일렬로 마주보게 배치되며,
상기 까치발 구조체는,
상기 어퍼프레임(110)의 일측면을 관통하게 형성되고, 상기 어퍼프레임(110)의 길이 방향을 따라 길게 연장되게 형성된 제 1 슬릿(113); 및 상기 어퍼프레임(110)의 타측면을 관통하게 형성되고, 상기 어퍼프레임(110)의 길이 방향을 따라 길게 연장되게 형성된 제 2 슬릿(114);을 더 포함하고,
상기 제 1 슬릿(113) 및 제 2 슬릿(114)이 서로 마주보게 배치되며,
상기 수직체결부재(2260)는 볼트(2262) 및 너트(2264)를 포함하고,
상기 볼트(2262)가 상기 제 2-1 사이드체결홀(2253), 제 1 슬릿(113), 제 2 슬릿(114) 및 제 2-2 사이드체결홀(2254)를 관통하게 배치되고, 상기 너트(2264)가 관통된 볼트(2262)에 체결결합되어 상기 제 2 수직어셈블리(2200)를 상기 어퍼프레임(110)에 고정되고,
상기 어퍼프레임(110)의 내측단(111) 측을 상기 평판구조물(10)에 가압하여 고정하는 밀착부재(150);를 더 포함하며,
상기 제 1-1 수직프레임(1210) 및 제 1-2 수직프레임(1220)의 내부에 형성되고, 길이 방향을 따라 길게 형성된 제 1 수직중공(215); 상기 제 2-1 수직프레임(2210) 및 상기 제 2-2 수직프레임(2220)의 내부에 형성되고, 길이 방향을 따라 길게 형성된 제 2 수직중공(225);을 더 포함하고,
상기 제 1 서포트프레임(310)은,
상하 방향으로 길게 연장되어 형성되고, 상기 제 1 수직중공(215)에 삽입되는 제 1 서포트바(312);
상기 제 1 서포트바(312)의 상단에 되고, 콘크리트 슬래브의 하중을 지지하는 수평지지대(5)가 배치되는 제 1 서포트부(314);를 포함하고,
상기 제 1 서포트부재(410)는,
상기 제 1 서포트바(312)가 관통되는 제 1 서포트바디(412);
상기 제 1 서포트바디(412)의 외측면에서 더 외측으로 돌출된 제 1 서포트핸들(414);
상기 제 1 서포트바디(412)를 관통하게 형성되고, 상기 제 1 서포트바(312)가 관통되는 제 1 서포트관통홀(415);
상기 제 1 서포트관통홀(415)에 형성된 제 1 홀나사산(411);을 포함하고,
상기 제 1 서포트바(312)는 원기둥형태로 형성되고, 외주면에 제 1 서포트나사산(311)이 형성되고,
상기 제 1 서포트나사산(311) 및 제 1 홀나사산(411)이 치합되는 까치발 구조체.
In the tiptoe structure,
An upper frame 110 disposed on the pier or the flat structure 10 of the pier;
A first vertical assembly 1200 coupled to the upper frame 110 and disposed in the vertical direction and in close contact with the side of the flat structure 10;
An inclined frame 130 connecting the upper frame 110 and the first vertical assembly 1200;
A lower frame 140 coupled to the inclined frame 130 or the first vertical assembly 1200 and in close contact with the bottom of the flat structure 10;
A second vertical assembly 2200 located between the inner end 111 and the outer end 112 of the upper frame 110 and movable along the longitudinal direction of the upper frame 110;
A first support frame 310 arranged to be movable in the vertical direction along the longitudinal direction of the first vertical assembly 1200;
A first support member 410 is disposed to penetrate the first support frame 310 in the vertical direction, is screwed to the first support frame 310, and is supported on the top of the first vertical assembly 1200. ;
a second support frame 320 arranged to be movable in the vertical direction along the longitudinal direction of the second vertical assembly 2200;
A second support member 420 is disposed to penetrate the second support frame 320 in the vertical direction, is screwed to the second support frame 320, and is supported on the top of the second vertical assembly 2200. Contains ;,
The first vertical assembly 1200,
A first vertical base 1250 mounted to surround the upper frame 110; A 1-1 vertical frame (1210) coupled to one side of the first vertical base (1250) and extending long in the vertical direction; It includes a 1-2 vertical frame (1220) coupled to the other side of the first vertical base (1250) and extending long in the vertical direction,
The second vertical assembly 2200,
A second vertical base 2250 mounted to surround the upper frame 110; A 2-1 vertical frame (2210) coupled to one side of the second vertical base (2250) and extending long in the vertical direction; A 2-2 vertical frame (2220) coupled to the other side of the second vertical base (2250) and extending long in the vertical direction; It includes a vertical fastening member 2260 that penetrates the second vertical base 2250 and is fastened to the upper frame 110,
The second vertical base 2250,
An upper base 2255 disposed to surround the upper side of the upper frame 110; A 2-1 side base 2251 formed by bending downward from one end of the upper base 2255; A 2-2 side base 2252 formed by bending downward from the other end of the upper base 2255; It includes a 2-1 side fastening hole 2253 penetrating the 2-1 side base 2251, and a 2-2 side fastening hole 2254 penetrating the 2-2 side base 2252. And, the 2-1 side fastening hole 2253 and the 2-2 side fastening hole 2254 are arranged to face each other in a row,
The tiptoe structure is,
A first slit 113 formed to penetrate one side of the upper frame 110 and extend long along the longitudinal direction of the upper frame 110; And a second slit 114 formed to penetrate the other side of the upper frame 110 and extend long along the longitudinal direction of the upper frame 110,
The first slit 113 and the second slit 114 are arranged to face each other,
The vertical fastening member 2260 includes a bolt 2262 and a nut 2264,
The bolt 2262 is disposed to penetrate the 2-1 side fastening hole 2253, the first slit 113, the second slit 114, and the 2-2 side fastening hole 2254, and the nut (2264) is fastened to the through bolt 2262 to secure the second vertical assembly 2200 to the upper frame 110,
It further includes an adhesion member 150 that presses and secures the inner end 111 of the upper frame 110 to the flat structure 10,
A first vertical hollow 215 formed inside the first vertical frame 1210 and the first vertical frame 1220 and extending along the longitudinal direction; It is formed inside the 2-1 vertical frame 2210 and the 2-2 vertical frame 2220, and further includes a second vertical hollow 225 formed long along the longitudinal direction,
The first support frame 310 is,
A first support bar 312 that extends vertically and is inserted into the first vertical hollow 215;
It includes a first support portion 314 located at the top of the first support bar 312 and on which a horizontal support 5 supporting the load of the concrete slab is disposed,
The first support member 410 is,
a first support body 412 through which the first support bar 312 passes;
a first support handle 414 protruding further outward from the outer surface of the first support body 412;
a first support through hole 415 formed to penetrate the first support body 412 and through which the first support bar 312 passes;
It includes a first hole thread 411 formed in the first support through hole 415,
The first support bar 312 is formed in a cylindrical shape, and a first support thread 311 is formed on the outer peripheral surface,
A tiptoe structure in which the first support thread 311 and the first hole thread 411 are engaged.
KR1020230036586A 2022-10-19 2023-03-21 Bracket structure having a vertical assembly is movably disposed KR20240054853A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020230036586A KR20240054853A (en) 2022-10-19 2023-03-21 Bracket structure having a vertical assembly is movably disposed

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR1020220134572A KR102513956B1 (en) 2022-10-19 2022-10-19 Bracket structure for bridge construction
KR1020230036586A KR20240054853A (en) 2022-10-19 2023-03-21 Bracket structure having a vertical assembly is movably disposed

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
KR1020220134572A Division KR102513956B1 (en) 2022-10-19 2022-10-19 Bracket structure for bridge construction

Publications (1)

Publication Number Publication Date
KR20240054853A true KR20240054853A (en) 2024-04-26

Family

ID=85799772

Family Applications (2)

Application Number Title Priority Date Filing Date
KR1020220134572A KR102513956B1 (en) 2022-10-19 2022-10-19 Bracket structure for bridge construction
KR1020230036586A KR20240054853A (en) 2022-10-19 2023-03-21 Bracket structure having a vertical assembly is movably disposed

Family Applications Before (1)

Application Number Title Priority Date Filing Date
KR1020220134572A KR102513956B1 (en) 2022-10-19 2022-10-19 Bracket structure for bridge construction

Country Status (1)

Country Link
KR (2) KR102513956B1 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200247460Y1 (en) 2001-06-28 2001-10-17 동국엔지니어링 주식회사 Furnishing device of the bracket for a bridge construction
KR20030000991A (en) 2001-06-28 2003-01-06 동국엔지니어링 주식회사 Furnishing device of the bracket for a bridge construction
KR200461116Y1 (en) 2009-03-12 2012-06-22 홍양선 Mounting bracket for construction materialslighting device

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200226626Y1 (en) * 2000-12-26 2001-06-15 주식회사제일설치 Bracket for Supporting Flooring Slab Form of Bridge
KR100734185B1 (en) * 2007-03-27 2007-07-02 (주) 태성산업 Uphold rod which has an angle control function an slab panel for bridge
KR100978502B1 (en) * 2009-02-16 2010-08-27 김홍언 Supporting apparatus for slab form of bridge
KR20110010248A (en) * 2009-07-24 2011-02-01 지남용 Multi u-head bracket apparatus for bridge construction
KR101616012B1 (en) * 2015-07-13 2016-05-13 주식회사 태성엠앤씨 Uphold rod which has an angle control function an Slab Panel for Bridge

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200247460Y1 (en) 2001-06-28 2001-10-17 동국엔지니어링 주식회사 Furnishing device of the bracket for a bridge construction
KR20030000991A (en) 2001-06-28 2003-01-06 동국엔지니어링 주식회사 Furnishing device of the bracket for a bridge construction
KR200461116Y1 (en) 2009-03-12 2012-06-22 홍양선 Mounting bracket for construction materialslighting device

Also Published As

Publication number Publication date
KR102513956B1 (en) 2023-03-27

Similar Documents

Publication Publication Date Title
JP6068840B2 (en) Seismic reinforcement structure for column beam structures
KR100926750B1 (en) Construction method for crossbeam mold
KR101556232B1 (en) Hybird U-Head Jack with support
KR101766810B1 (en) the rigid connection structure between precast concrete column and precast concrete beam using the permanent bracket installing precast concrete column
JP2019002175A (en) Panel device for cover member in scaffolding
KR20240054853A (en) Bracket structure having a vertical assembly is movably disposed
KR101570677B1 (en) Hybird U-Head Jack
KR101766808B1 (en) the rigid connection structure between precast concrete column and precast concrete beam using the permanent bracket installing precast concrete column
KR102122889B1 (en) Pre-fabricated column with angle-type reinforcing bar
KR101482979B1 (en) Steel concrete composite beam with cap plate and structure system thereof
CN213925887U (en) Upright post steel bar assembled jig frame
KR20170044240A (en) the rigid connection structure between precast concrete column and precast concrete beam using the permanent bracket installing precast concrete column
KR20160133151A (en) Variable anchors
KR101720103B1 (en) Composite beam for construction frame
KR102148932B1 (en) Structural reinforcement column
KR101308581B1 (en) Fixing apparatus for pillar form
KR20220059515A (en) Structure of installation of working scaffold in the boiler furnace
JP5827183B2 (en) Ceiling reinforcement structure and connection bracket
KR101931662B1 (en) Connecting clamp and truss device for reinforcing support with the same
JP3919443B2 (en) Formwork support mechanism for concrete floor slabs
JPH07102788A (en) Temporary safety handrail
KR20190091791A (en) Jointing Apparatus for preventing earthquake
KR102635664B1 (en) Combined Structure of Long-term Steel Frame for Column Free Space
JP4440687B2 (en) Column bolt anchor bolt support device
KR102298130B1 (en) Steel beam end reinforcement system