KR100926750B1 - Construction method for crossbeam mold - Google Patents

Construction method for crossbeam mold Download PDF

Info

Publication number
KR100926750B1
KR100926750B1 KR1020090001010A KR20090001010A KR100926750B1 KR 100926750 B1 KR100926750 B1 KR 100926750B1 KR 1020090001010 A KR1020090001010 A KR 1020090001010A KR 20090001010 A KR20090001010 A KR 20090001010A KR 100926750 B1 KR100926750 B1 KR 100926750B1
Authority
KR
South Korea
Prior art keywords
pedestal
support
support member
strut
coupling
Prior art date
Application number
KR1020090001010A
Other languages
Korean (ko)
Inventor
성진경
Original Assignee
성진경
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 성진경 filed Critical 성진경
Priority to KR1020090001010A priority Critical patent/KR100926750B1/en
Application granted granted Critical
Publication of KR100926750B1 publication Critical patent/KR100926750B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/04Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for lintels, beams, or transoms to be encased separately; Special tying or clamping means therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/16Members, e.g. consoles, for attachment to the wall to support girders, beams, or the like carrying forms or moulds for floors, lintels, or transoms

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

PURPOSE: A crossbeam mold and a construction method thereof are provided to reduce construction waste by recycling disassembled molds. CONSTITUTION: A crossbeam mold comprises a first support(110), a second support(120), a control device(130), a post, a support member(150a), a second support member(150b), a slab support member(180), a floor panel(160) and a side panel(170). The first and second supports are installed on a column(1) and separated each other. The control device adjusts an interval of the first support and the second support. A plurality of posts is arranged on the first support and the second support. The slab support member is positioned on the post. The side panel is positioned in the both ends of the floor panel and adheres closely to the post.

Description

보 거푸집 및 그 시공 방법{construction method for crossbeam mold}Beam formwork and its construction method {construction method for crossbeam mold}

본 발명은 보 거푸집 및 그 시공 방법에 관한 것이다.The present invention relates to a formwork and its construction method.

일반적으로, 거푸집은 콘크리트 구조물을 소정의 형태 및 치수로 만들기 위하여 일시 설치하는 구조물이다.In general, the formwork is a structure temporarily installed to make the concrete structure into a predetermined shape and dimensions.

이러한 거푸집은 구조물의 기둥, 바닥, 벽 등 콘크리트를 부어 만들 모양의 틀을 짠 후 콘크리트를 부어 넣고 굳은 뒤 떼어내게 된다. 떼어낸 거푸집은 해체되어 다른 거푸집을 만드는 데 사용된다. 그러나 떼어낸 거푸집의 상태가 양호하지 못하고 떼어내는 과정 중 많은 부분이 파손되었다. 이렇게 파손된 거푸집은 버려지거나 공사장 인부들의 불쏘시개 감으로 사용되고 있다.These formwork is to squeeze the shape of the frame, such as pillars, floors, walls of the structure to squeeze, and then pour the concrete, harden and remove it. Removed formwork is dismantled and used to make other formwork. However, the formwork that was removed was not in good condition and much of it was broken during the detachment process. This damaged formwork is discarded or used as a sense of fire in the construction workers.

거푸집이 버려지거나 불쏘시개로 사용되면서 자원 낭비가 심했으며 건축 폐기물이 증가하는 문제점이 발생하였다.As the formwork was discarded or used as a fire igniter, the waste of resources was severe and construction waste increased.

본 발명은 거푸집의 설치 및 해체가 간편하고, 해체된 거푸집을 재활용 함으로써 건축 폐기물의 발생을 최소화 하여 자원 절감할 수 있는 보 거푸집을 제공한 다.The present invention is easy to install and dismantle the formwork, and provides a formwork that can reduce the resources by minimizing the generation of construction waste by recycling the dismantled formwork.

본 발명의 한 실시예에 따른 보 거푸집은 서로 떨어져 있는 제1 받침대 및 제2 받침대, 상기 제1 받침대와 상기 제2 받침대의 간격을 조절하는 제어 장치, 상기 제1 받침대 및 상기 제2 받침대 위에 배열되어 있는 복수의 지주, 상기 지주 위에 위치하는 슬라브 받침 부재, 상기 제1 받침대 및 상기 제2 받침대의 상면 일부분에양측 끝이 걸쳐 있는 바닥 패널, 그리고 상기 바닥 패널 양측 끝 각각 위치하고 외측면이 상기 지주에 밀착되어 있으며 상부측이 상기 슬라브 받침 부재에 고정되어 있는 복수의 측부 패널을 포함한다.Beam formwork according to an embodiment of the present invention is arranged on the first pedestal and the second pedestal apart from each other, a control device for adjusting the distance between the first pedestal and the second pedestal, the first pedestal and the second pedestal A plurality of struts, a slab support member positioned on the struts, a bottom panel having both ends extending over portions of an upper surface of the first pedestal and the second pedestal, and both ends of the bottom panel respectively positioned on an outer side thereof. It includes a plurality of side panels in close contact with the upper side is fixed to the slab support member.

본 발명의 한 실시예에 따른 보 거푸집은 상기 제1 받침대의 일측면과 상기 제2 받침대의 일측면은 서로 마주하며, 일측이 개방되어 있으며, 타측이 상기 제1 받침대의 일측면에 결합되어 있는 제1 연결 부재, 그리고 일측의 적어도 일부분이 상기 제1 연결 부재의 개방된 일측으로 삽입되며, 타측이 상기 제2 받침대의 일측면에 결합되어 있는 제2 연결 부재를 더 포함할 수 있다.According to one embodiment of the present invention, the side of the first pedestal and the one side of the second pedestal facing each other, one side is open, the other side is coupled to one side of the first pedestal The first connection member and at least a portion of one side may be inserted into an open one side of the first connection member, and the other side may further include a second connection member coupled to one side of the second pedestal.

상기 제어 장치는 나사산이 형성된 몸통과 상기 몸통의 일측에 형성된 밀착편을 가지는 볼트 및 상기 나사산의 타측에 체결되어 있는 스토퍼를 포함하고, 상기 몸통은 상기 제1 받침대와 상기 제2 받침대를 관통하며, 상기 스토퍼는 상기 제1 받침대의 타측면과 접촉하고, 상기 밀착편은 상기 제2 받침대의 타측면과 접촉할 수 있다.The control device includes a bolt having a body formed with a thread and a close contact formed on one side of the body and a stopper fastened to the other side of the thread, wherein the body penetrates the first pedestal and the second pedestal, The stopper may contact the other side surface of the first pedestal, and the contact piece may contact the other side surface of the second pedestal.

상기 지주는 상부면이 개방되어 있으며 길이 방향을 따라 복수의 제1 지주 구멍이 형성되어 있는 제1 지주, 한쪽 끝의 적어도 일부분이 상기 제1 지주의 개방된 곳을 통하여 내부로 삽입되며 길이 방향을 따라 상기 제1 지주 구멍과 연결되는 복수의 제2 지주 구멍이 형성되어 있는 제2 지주, 그리고 상기 제1 지주 구멍과 제2 지주 구멍으로 삽입 관통되어 상기 상기 제2 지주를 제1 지주에 고정하는 지주 고정 장치를 포함한다.The pillar has an open upper surface and a first pillar having a plurality of first pillar holes formed in a longitudinal direction thereof, and at least a portion of one end thereof is inserted into the pillar through an open portion of the first pillar. Accordingly, a second support having a plurality of second support holes connected to the first support hole is inserted into the first support hole and the second support hole to fix the second support to the first support hole. And a prop holding device.

본 발명의 한 실시예에 따른 보 거푸집은 상기 제1 받침대 위에 배치되고 상기 제1 지주가 결합되어 있는 제1 지지 부재, 상기 제2 지주 위에 위치하며 상기 슬라브 받침 부재가 결합된 제2 지지 부재, 그리고 상기 제1 지지 부재 및 상기 제2 지지 부재 일측면에 형성되며, 상기 제1 지주 및 상기 제2 지주가 결합되는 복수의 결합편을 더 포함하며, 상기 제1 지지 부재 및 상기 제2 지지 부재의 면적은 상기 제1 받침대의 면적 보다 작을 수 있다.According to one embodiment of the present invention, the beam formwork is disposed on the first pedestal and has a first support member to which the first support is coupled, a second support member to be positioned on the second support and to which the slab support member is coupled. And a plurality of coupling pieces formed on one side of the first support member and the second support member, to which the first support and the second support are coupled, wherein the first support member and the second support member are provided. An area of may be smaller than an area of the first pedestal.

상기 슬라브 받침 부재는 제1 결합홈 및 제2 결합홈을 가지며, 상기 제1 결합홈 및 제2 결합홈 중 어느 하나의 결합홈에 상기 제2 지지 부재가 삽입될 수 있다.The slab receiving member may have a first coupling groove and a second coupling groove, and the second support member may be inserted into one of the coupling grooves of the first coupling groove and the second coupling groove.

본 발명의 한 실시예에 따른 보 거푸집은 상기 제1 받침대 및 상기 제2 받침대의 저면에 형성되어 있는 결합봉을 더 포함할 수 있다.Beam form according to an embodiment of the present invention may further include a coupling rod formed on the bottom surface of the first pedestal and the second pedestal.

상기 바닥 패널 및 상기 측부 패널은 금속재일 수 있다.The bottom panel and the side panel may be a metal material.

본 발명의 한 실시예에 따른 보 거푸집 시공 방법은 기설정된 길이로 형성된 기둥을 지면에 기설정된 간격으로 설치하는 단계, 제1 받침대의 제1 연결 부재와 제2 받침대의 제2 연결 부재를 연결하고, 스토퍼가 결합된 제어 장치를 상기 제1 받침대 및 상기 제2 받침대에 삽입하고, 상기 기둥의 간격에 맞추어 스토퍼의 위치를 조절하여 상기 제1 받침대와 상기 제2 받침대의 간격을 조절하는 단계, 간격 조절된 제1 받침대 및 상기 제2 받침대를 상기 기둥 위에 설치하는 단계, 상기 제1 받침대 및 상기 제2 받침대 상면 외측에 결합편이 형성된 제1 지지 부재를 각각 위치시키고, 지지 고정 장치로 제1 지지 부재를 상기 제1 받침대 및 상기 제2 받침대에 각각 고정하는 단계, 상기 제2 지지 부재 위에 제1 지주 및 제2 지주를 포함하는 지주를 위치시키며, 제1 지주를 상기 결합편에 지주 고정 장치로 고정하는 단계, 상기 제2 지주 위에 제1 지지 부재와 동일한 제2 지지 부재를 설치하는 단계, 상기 제1 받침대 및 상기 제2 받침대의 상면 내측에 바닥 패널의 양쪽 끝이 각각 걸쳐지도록 위치시키고, 하부쪽이 상기 바닥 패널 양측 끝에 위치하고 상기 지주에 밀착된 복수의 측부 패널을 위치시키는 단계, 그리고 상기 제2 지지 부재에 슬라브 받침 부재를 위치시키고, 상기 슬라브 받침 부재로 상기 측부 패널을 고정하는 단계를 포함한다.According to an embodiment of the present invention, a method of constructing a beam formwork includes installing a column having a predetermined length at a predetermined interval on a ground, connecting a first connecting member of a first pedestal and a second connecting member of a second pedestal. And inserting a stopper-coupled control device into the first pedestal and the second pedestal, and adjusting the position of the stopper according to the interval of the pillar to adjust the distance between the first pedestal and the second pedestal. Installing the adjusted first pedestal and the second pedestal on the pillar, the first support member having a coupling piece formed on the outside of the upper surface of the first pedestal and the second pedestal, respectively, and the first support member as a support fixing device Fixing the to the first pedestal and the second pedestal, respectively, positioning a pedestal including a first pedestal and a second pedestal on the second support member, the first pedestal Fixing the second support member to the coupling piece with a support fixing device, installing a second support member identical to the first support member on the second support, and both bottom panels inside the upper surface of the first pedestal and the second pedestal. Positioning the ends so as to span each other, and having a lower side positioned at both ends of the bottom panel, and a plurality of side panels in close contact with the posts, and placing a slab support member on the second support member, and placing the slab support member into the slab support member. Securing the side panel.

본 발명의 한 실시예에 따르면, 제1 받침대와 제2 받침대를 고정하는 제어 장치에 결합된 스토퍼의 위치에 따라 제1 받침대와 제2 받침대의 간편하게 조절할 수 있으며, 제어 장치 해제로 거푸집을 간편하게 해체할 수 있다. 따라서 작업자의 작업성이 향상되며 거푸집의 설치 해체 시간을 단축할 수 있다.According to an embodiment of the present invention, the first pedestal and the second pedestal can be easily adjusted according to the position of the stopper coupled to the control device for fixing the first pedestal and the second pedestal, and the control device is released to easily dismantle the formwork. can do. Therefore, the workability of the worker is improved and the installation and dismantling time of the formwork can be shortened.

본 발명의 한 실시예에 따르면, 바닥 패널과 측부 패널을 반복적으로 사용할 수 있어 자재비용을 절감할 수 있다. 따라서, 건축 폐기물의 발생을 최소화할 수 있다.According to one embodiment of the present invention, the floor panel and the side panel can be used repeatedly, thereby reducing the material cost. Therefore, the generation of construction waste can be minimized.

이하, 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자가 용이하게 실시할 수 있도록 본 발명의 실시예에 대하여 첨부한 도면을 참고로 하여 상세히 설명한다. 그러나 본 발명은 여러 가지 상이한 형태로 구현될 수 있으며 여기에서 설명하는 실시예에 한정되지 않는다. 명세서 전체를 통하여 유사한 부분에 대해서는 동일한 도면 부호를 붙였다.Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings so that those skilled in the art may easily implement the present invention. As those skilled in the art would realize, the described embodiments may be modified in various different ways, all without departing from the spirit or scope of the present invention. Like parts are designated by like reference numerals throughout the specification.

그러면 본 발명의 한 실시예에 따른 보 거푸집에 대하여 도 1 내지 도 3를 참고하여 설명한다.Next, a formwork according to an embodiment of the present invention will be described with reference to FIGS. 1 to 3.

도 1는 본 발명의 한 실시예에 따른 보 거푸집의 설치 상태도이고, 도 2는 도 1에 도시한 보 거푸집을 나타낸 분해 사시도이며, 도 3는 도 2에 도시한 보 거푸집의 일부가 조립 상태를 나타낸 사시도이다.1 is an installation state of the beam formwork according to an embodiment of the present invention, Figure 2 is an exploded perspective view showing the formwork shown in Figure 1, Figure 3 is a part of the formwork shown in Figure 2 is assembled It is a perspective view shown.

도 1 내지 도 3을 참고하면, 본 실시예에 따른 보 거푸집(10)은 제1 받침대(110), 제2 받침대(120), 제어 장치(130), 지주(150), 제1 지지 부재(150a), 제2 지지 부재(150b), 슬라브 받침 부재(180), 바닥 패널(160), 그리고 측부 패널(170)을 포함한다. 제1 받침대(110)와 제2 받침대(120)는 기둥(1)위에 설치되어 있다.1 to 3, the beam formwork 10 according to the present embodiment includes a first pedestal 110, a second pedestal 120, a control device 130, a support 150, and a first support member ( 150a), a second support member 150b, a slab support member 180, a bottom panel 160, and a side panel 170. The first pedestal 110 and the second pedestal 120 are installed on the pillar (1).

기둥(1)은 기설정된 길이로 형성되어 있으며, 길이를 조절 할 수 있다. 기둥(1)은 시공 현장의 바닥면에 배열된다.The pillar 1 is formed to a predetermined length, it can adjust the length. The pillar 1 is arranged at the bottom of the construction site.

기둥(1) 위에는 제1 받침대(110)와 제2 받침대(120)가 설치되어 있으며, 제1 받침대(110)와 제2 받침대(120)의 저면에는 기둥(1)과 연결된 결합봉(114,124)이 형성되어 있다. 제1 받침대(110)와 제2 받침대(120)는 기설정된 길이로 형성되어 있으며, 제1 받침대(110) 및 제2 받침대(120)는 금속재로 만들어질 수 있다. 따라서 부식되는 것을 예방할 수 있다.The first pedestal 110 and the second pedestal 120 are installed on the pillar 1, and coupling rods 114 and 124 connected to the pillar 1 on the bottom of the first pedestal 110 and the second pedestal 120. Is formed. The first pedestal 110 and the second pedestal 120 is formed to a predetermined length, the first pedestal 110 and the second pedestal 120 may be made of a metal material. Therefore, corrosion can be prevented.

제1 받침대(110)의 일측면에는 일측이 개방된 복수의 제1 연결 부재(113)가 결합되어 있다. 제1 받침대(110)는 복수의 제1 수평 구멍(111)과 복수의 제1 수직 구멍(112)을 갖는다. 제1 수평 구멍(111)과 제2 수직 구멍(122)은 떨어져 있다. 제1 수평 구멍(111)은 제1 받침대(110)의 좌우 방향으로 뚫려 있으며, 제1 수직 구멍(112)은 제1 받침대(110)의 상하 방향으로 뚫려 있다. One side of the first pedestal 110 is coupled to the plurality of first connection members 113, one side of which is open. The first pedestal 110 has a plurality of first horizontal holes 111 and a plurality of first vertical holes 112. The first horizontal hole 111 and the second vertical hole 122 are separated. The first horizontal hole 111 is drilled in the left and right directions of the first pedestal 110, and the first vertical hole 112 is drilled in the vertical direction of the first pedestal 110.

제2 받침대(120)의 일측면에는 제1 연결 부재(113)의 개방된 일측으로 삽입되는 복수의 제2 연결 부재(123)가 형성되어 있다. 제2 받침대(120)에는 복수의 제2 수평 구멍(121)과 복수의 제2 수직 구멍(122)이 형성되어 있다. 제2 수평 구멍(121)과 제2 수직 구멍(122)은 떨어져 있다. 제2 수평 구멍(121)은 제2 받침대(120)의 좌우 방향으로 뚫려 있으며, 제2 수직 구멍(122)은 제2 받침대(120)의 상하 방향으로 뚫려 있다. 제2 수평 구멍(121)과 제1 수평 구멍(111)은 마주 한다. One side surface of the second pedestal 120 is formed with a plurality of second connection members 123 inserted into one open side of the first connection member 113. A plurality of second horizontal holes 121 and a plurality of second vertical holes 122 are formed in the second pedestal 120. The second horizontal hole 121 and the second vertical hole 122 are separated. The second horizontal hole 121 is drilled in the left and right directions of the second pedestal 120, and the second vertical hole 122 is drilled in the vertical direction of the second pedestal 120. The second horizontal hole 121 and the first horizontal hole 111 face each other.

다음으로, 도 4를 참조하여 제1 받침대와 제2 받침대의 결합 상태를 설명한다.Next, the coupling state of the first pedestal and the second pedestal will be described with reference to FIG. 4.

도 4은 도 3에 도시한 IV-IV 선을 따라 보 거푸집을 자른 단면도이다.FIG. 4 is a cross-sectional view of the beam formwork taken along the line IV-IV shown in FIG. 3.

도 4를 참조 하면, 제1 받침대(110)와 제2 받침대(120)는 제어 장치(130)로 고정된다.Referring to FIG. 4, the first pedestal 110 and the second pedestal 120 are fixed to the control device 130.

제어 장치(130)는 볼트(133), 그리고 스토퍼(133)를 포함한다.The control device 130 includes a bolt 133 and a stopper 133.

볼트(133)는 나사산이 형성된 몸통을 갖는다. 볼트(133)는 제1 수평 구멍(111) 및 제2 수평 구멍(121)을 관통한다. 볼트(133)의 일측에는 밀착편(131)이 형성되어 있다. 볼트(133)의 타측에는 스토퍼(133)가 체결되어 있다. 스토퍼(133)는 제1 받침대(110)의 타측면에 접촉하고 있다. 밀착편(131)은 제2 받침대(120)의 타측면에 접촉하고 있다. 스토퍼(132)의 위치에 따라 제1 받침대(110)와 제2 받침대(120)의 간격이 조절 된다. 스토퍼(132)와 밀착편(131)에 의하여 제1 받침대(110)와 제2 받침대(120)의 간격은 더 이상 벌어지지 않는다.The bolt 133 has a threaded body. The bolt 133 penetrates through the first horizontal hole 111 and the second horizontal hole 121. One side of the bolt 133 is in close contact with the 131 is formed. The stopper 133 is fastened to the other side of the bolt 133. The stopper 133 is in contact with the other side of the first pedestal 110. The contact piece 131 is in contact with the other side surface of the second pedestal 120. The interval between the first pedestal 110 and the second pedestal 120 is adjusted according to the position of the stopper 132. The gap between the first pedestal 110 and the second pedestal 120 no longer opens due to the stopper 132 and the close contact piece 131.

제1 받침대(110) 및 제2 받침대(120)의 상면 외측에는 제1 지지 부재(150a)가 각각 위치한다. 그러나 제1 지지 부재(150a)는 생략될 수 있다. 제1 지지 부재(150a)에는 제1 수직 구멍(112)과 연결된 복수의 결합 구멍(151)이 형성되어 있다. 제1 받침대(110)와 제1 지지 부재(150a)는 제1 수직 구멍(112)과 결합 구멍(151)으로 삽입되는 지지 고정 장치(152)로 결합 고정되어 있다. 제1 지지 부재(150a)는 제1 받침대(110)의 길이와 실질적으로 동일하나 그 면적은 작다. 이에 따라 제1 받침대(110) 및 제2 받침대(120)의 상면 내측에는 제1 지지 부재(150a)가 위치하지 않는다. 제1 받침대(110) 및 제2 받침대(120) 내측에는 바닥 패널(160)의 양쪽 끝이 위치한다. 바닥 패널(160)의 양쪽 끝 측면은 제1 지지 부재(150a)에 접촉되어 있다. 이에 따라 제1 받침대(110) 및 제2 받침대(120)는 바닥 패널(160)에 의하여 내측으로 이동할 수 없고, 밀착편(131)과 스토퍼(132)에 의하여 외측으로 이동할 수 없다.The first support member 150a is positioned outside the upper surfaces of the first pedestal 110 and the second pedestal 120, respectively. However, the first support member 150a may be omitted. A plurality of coupling holes 151 connected to the first vertical hole 112 are formed in the first supporting member 150a. The first pedestal 110 and the first support member 150a are fixedly fixed by the support fixing device 152 inserted into the first vertical hole 112 and the engagement hole 151. The first support member 150a is substantially the same as the length of the first pedestal 110 but its area is small. Accordingly, the first support member 150a is not positioned inside the upper surfaces of the first pedestal 110 and the second pedestal 120. Both ends of the bottom panel 160 are positioned inside the first pedestal 110 and the second pedestal 120. Both end sides of the bottom panel 160 are in contact with the first support member 150a. Accordingly, the first pedestal 110 and the second pedestal 120 cannot move inward by the bottom panel 160, and cannot move outward by the close contact piece 131 and the stopper 132.

다음으로, 도 5를 참조하여 제1 받침대와 제1 지지 부재의 결합 상태, 제1 지지 부재와 지주의 결합상태에 대하여 설명한다.Next, with reference to FIG. 5, the engagement state of a 1st base and a 1st support member, and the engagement state of a 1st support member and a support | pillar are demonstrated.

도 5는 도 4에 도시한 V-V 선을 따라 보 거푸집을 자른 단면도이다.FIG. 5 is a cross-sectional view of the beam formwork taken along the line V-V shown in FIG. 4.

도 5를 참조 하면, 지지 고정 장치(152)는 볼트 너트 따위로 형성되어 있다. 볼트 너트 따위로 형성된 지지 고정 장치(152)는 생략 될 수 있으며, 지지 고정 장치(152)가 생략된 경우 제1 받침대(110)와 제1 지지 부재(150a)는 용접 방식으로 결합될 수 있다.Referring to Figure 5, the support fixing device 152 is formed such as a bolt nut. The support fixing device 152 formed such as a bolt nut may be omitted, and when the support fixing device 152 is omitted, the first pedestal 110 and the first supporting member 150a may be coupled by welding.

볼트가 제1 수직 구멍(112)과 결합 구멍(151)으로 삽입되어 제1 받침대(110)와 제1 지지 부재(150a)를 결합된다.The bolt is inserted into the first vertical hole 112 and the coupling hole 151 to couple the first pedestal 110 and the first support member 150a.

제2 받침대(120)와 제1 지지 부재(150a)의 결합 방식은 제1 받침대(110)의 결합방식과 실질적으로 동일하다. The coupling method of the second pedestal 120 and the first support member 150a is substantially the same as that of the first pedestal 110.

제1 지지 부재(150a)의 일측면에는 2개 1조로 이루어진 한 쌍의 결합편(153)이 복수 형성되어 있으며, 결합편(153)에는 결합 고정 장치(155)가 삽입되는 체결 구멍(154)이 형성되어 있다.On one side of the first support member 150a, a pair of coupling pieces 153 made up of two pairs is formed, and a coupling hole 154 into which the coupling fixing device 155 is inserted is provided in the coupling piece 153. Is formed.

한 쌍의 결합편(153)에는 결합 고정 장치(155)가 관통하는 지주(150)가 결합되어 있으며, 지주(150)는 제1 지주(141) 및 제2 지주(142)를 포함한다.A pair of coupling pieces 153 is coupled to the strut 150 through which the coupling fixing device 155 penetrates, and the strut 150 includes a first strut 141 and a second strut 142.

제1 지주(141)는 상부면이 개방되어 있으며 길이방향을 따라 복수의 제1 지주 구멍(141a)이 형성되어 있다. 제1 지주(141)는 결합편(153) 사이에 위치하며 체결 구멍(154)으로 삽입된 결합 고정 장치(155)로 결합편(153)에 고정되어 있다.An upper surface of the first support 141 is open and a plurality of first support holes 141a are formed along the longitudinal direction. The first support 141 is positioned between the coupling pieces 153 and is fixed to the coupling piece 153 by a coupling fixing device 155 inserted into the coupling hole 154.

제2 지주(142)는 적어도 일부분이 제1 지주(141)의 개방된 곳을 통하여 그 내부로 삽입되어 있다. 제2 지주(142)에는 길이 방향을 따라 제1 지주 구멍(141a)과 연결되는 복수의 제2 지주 구멍(142a)이 형성되어 있다. 제1 지주(141)에 제2 지주(142)가 삽입되는 정도에 따라 지주(150)의 길이는 조절된다. 도 5에서 나타낸 바와 같이, 제1 지주 구멍(141a)과 제2 지주 구멍(142a)으로 삽입된 지주 고정 장치(143)에 의하여 제1 지주(141)에 제2 지주(142)가 고정된다.The second support 142 is inserted into the at least a portion of the second support 141 through an opening of the first support 141. The second support 142 is formed with a plurality of second support holes 142a connected to the first support holes 141a along the longitudinal direction. The length of the support 150 is adjusted according to the degree to which the second support 142 is inserted into the first support 141. As shown in FIG. 5, the second support 142 is fixed to the first support 141 by the support fixing device 143 inserted into the first support hole 141a and the second support hole 142a.

제2 지주(142) 위에는 제2 지지 부재(150b)가 위치한다. 제2 지지 부재(150b)에는 제1 지지 부재(150a)와 동일한다. 즉, 일측면에는 2개 1조로 이루어진 한 쌍의 결합편(153)이 다수 형성되어 있다. 제2 지지 부재(150b)의 결합편(153)은 제1 지지 부재(150a)의 결합편(153)과 마주한다.The second support member 150b is positioned on the second support 142. The second support member 150b is the same as the first support member 150a. That is, a pair of coupling pieces 153 consisting of two pairs is formed on one side. The engaging piece 153 of the second supporting member 150b faces the engaging piece 153 of the first supporting member 150a.

제2 지지 부재(150b)는 체결 구멍(154)과 제2 지주 구멍(142a)을 관통하는 결합 고정 장치(155)로 제2 지주(142)에 고정된다.The second support member 150b is fixed to the second support 142 by a coupling fixing device 155 passing through the fastening hole 154 and the second support hole 142a.

도 4를 다시 참조하면, 제1 받침대(110)와 제2 받침대(120)의 상면 내측에 양쪽 끝이 걸쳐 있는 바닥 패널(160)의 양쪽 끝에 지주(150)에 밀착된 측부 패널(170)이 위치한다. 바닥 패널(160)과 측부 패널(170)의 결합으로 콘크리트가 타설될 수 있는 보 형성 공간(200)을 형성하게 된다. 바닥 패널(160)과 측부 패널(170)은 금속재로 만들어질 수 있다.Referring to FIG. 4 again, the side panel 170 which is in close contact with the support 150 at both ends of the bottom panel 160 having both ends extending inside the upper surfaces of the first pedestal 110 and the second pedestal 120 is provided. Located. The bottom panel 160 and the side panel 170 are combined to form a beam forming space 200 in which concrete can be poured. The bottom panel 160 and the side panel 170 may be made of metal.

제1 지지 부재(150a)및 제2 지지 부재(150b)가 생략된 경우 바닥 패널(160)의 양쪽 끝은 지주(140)에 밀착될 수 있다.When the first support member 150a and the second support member 150b are omitted, both ends of the bottom panel 160 may be in close contact with the support 140.

제2 지지 부재(150b) 위에는 측부 패널(170)을 고정하기 위한 슬라브 받침 부재(180)가 결합되어 있다. 슬라브 받침 부재(180)는 다수 구부러져 제1 결합 홈(181)과 제2 결합홈(182)을 갖는다.The slab support member 180 for fixing the side panel 170 is coupled to the second support member 150b. The slab receiving member 180 is bent a plurality and has a first coupling groove 181 and a second coupling groove 182.

제1 결합홈(181)은 제2 지지 부재(150a)의 외부 둘레를 감싸고 있다. 제1 결합홈(181)의 일측면과 제1 지지 부재(150b)의 일측면 사이에 측부 패널(170)의 상부측 부분이 위치한다. 제2 결합홈(182)에는 슬라브 받침 부재(180)를 고정하기 위한 횡목이 위치한다.The first coupling groove 181 surrounds the outer circumference of the second support member 150a. An upper side portion of the side panel 170 is positioned between one side of the first coupling groove 181 and one side of the first support member 150b. The second coupling groove 182 is positioned with a lateral wood for fixing the slab support member 180.

이와 같이 설치된 상태에서 보 형성 공간(200)에 콘트리트를 부어 보를 형성할 수 있다.Concrete can be formed by pouring concrete into the beam forming space 200 in the installed state.

이상에서 본 발명의 바람직한 실시예에 대하여 상세하게 설명하였지만 본 발명의 권리범위는 이에 한정되는 것은 아니고 다음의 청구범위에서 정의하고 있는 본 발명의 기본 개념을 이용한 당업자의 여러 변형 및 개량 형태 또한 본 발명의 권리범위에 속하는 것이다. Although the preferred embodiments of the present invention have been described in detail above, the scope of the present invention is not limited thereto, and various modifications and improvements of those skilled in the art using the basic concepts of the present invention defined in the following claims are also provided. It belongs to the scope of rights.

도 1는 본 발명의 한 실시예에 따른 보 거푸집의 설치 상태도.1 is an installation state of the formwork according to an embodiment of the present invention.

도 2는 도 1에 도시한 보 거푸집을 나타낸 분해 사시도.FIG. 2 is an exploded perspective view showing the beam formwork shown in FIG. 1. FIG.

도 3는 도 2에 도시한 보 거푸집의 일부가 조립 상태를 나타낸 사시도.Figure 3 is a perspective view showing a part of the formwork as shown in Figure 2 assembled.

도 4은 도 3에 도시한 IV-IV 선을 따라 보 거푸집을 자른 단면도.4 is a cross-sectional view of the beam formwork taken along the IV-IV line shown in FIG.

도 5는 도 4에 도시한 V-V 선을 따라 보 거푸집을 자른 단면도.5 is a cross-sectional view of the beam formwork taken along the line V-V shown in FIG.

* 도면의 주요 부분에 대한 부호의 설명 *Explanation of symbols on the main parts of the drawings

10: 보 거푸집 110: 제1 받침대 10: formwork 110: first pedestal

111: 제1 수평 구멍 112: 제1 수직 구멍 111: first horizontal hole 112: first vertical hole

113: 제1 연결 부재 114, 124: 결합봉113: first connecting member 114, 124: coupling rod

120: 제2 받침대 121: 제2 수평 구멍 120: second pedestal 121: second horizontal hole

122: 제2 수직 구멍 123: 제2 연결 부재122: second vertical hole 123: second connecting member

130: 제어 장치 131: 밀착편 130: control unit 131: close contact

132: 스토퍼 133: 볼트132: stopper 133: bolt

140: 지주 141: 제1 지주140: shore 141: first shore

141a: 제1 지주 구멍 142: 제2 지주141a: first post hole 142: second post

142a: 제2 지주 구멍 143: 지주 고정 장치 142a: second post hole 143: post fixing device

150a: 제1 지지 부재 150b: 제2 지지 부재150a: first support member 150b: second support member

151: 결합 구멍 152: 지지 고정 장치151: coupling hole 152: support fixing device

153: 결합편 154: 체결 구멍153: engaging piece 154: fastening hole

155: 결합 고정 장치 160: 바닥 패널155: coupling fixing device 160: floor panel

170: 측부 패널 180: 슬라브 받침 부재170: side panel 180: slab support member

181: 제1 결합홈 182: 제2 결합홈181: first coupling groove 182: second coupling groove

200: 타설 공간 1: 기둥200: pouring space 1: pillar

2: 슬라브 패널2: slab panel

Claims (9)

제1 받침대,First pedestal, 상기 제1 받침대의 일측면과 그 일측면이 마주하며 떨어져 있는 제2 받침대,A second pedestal facing one side of the first pedestal and facing away from each other, 일측이 개방되어 있으며, 타측이 상기 제1 받침대의 일측면에 결합되어 있는 제1 연결 부재,A first connection member having one side open and the other side coupled to one side of the first pedestal, 일측의 적어도 일부분이 상기 제1 연결 부재의 개방된 일측으로 삽입되며, 타측이 상기 제2 받침대의 일측면에 결합되어 있는 제2 연결 부재,At least a portion of one side is inserted into the open one side of the first connecting member, the other side is coupled to the second side of the second pedestal member, 상기 제1 연결 부재 및 상기 제2 연결 부재를 관통하여 상기 제1 받침대와 상기 제2 받침대의 간격을 조절하는 제어 장치,A control device for adjusting a distance between the first pedestal and the second pedestal through the first connection member and the second connection member; 상기 제1 받침대 및 상기 제2 받침대 위에 배열되어 있는 복수의 지주,A plurality of struts arranged on the first pedestal and the second pedestal, 상기 지주 위에 위치하는 슬라브 받침 부재,A slab support member positioned on the support, 상기 제1 받침대 및 상기 제2 받침대의 상면 일부분에 양측 끝이 걸쳐 있는 바닥 패널, 그리고A bottom panel having both ends of the upper surface portion of the first pedestal and the second pedestal, and 상기 바닥 패널 양측 끝 각각 위치하고 외측면이 상기 지주에 밀착되어 있으며 상부측이 상기 슬라브 받침 부재에 고정되어 있는 복수의 측부 패널A plurality of side panels positioned at both ends of the bottom panel and having an outer surface closely attached to the support and an upper side fixed to the slab support member; 을 포함하는 보 거푸집.Bo dies containing. 삭제delete 제1항에서,In claim 1, 상기 제어 장치는The control device 나사산이 형성된 몸통과, 상기 몸통의 일측에 형성된 밀착편을 가지는 볼트 및 A bolt having a body formed with a thread, and the close contact formed on one side of the body and 상기 나사산의 타측에 체결되어 있는 스토퍼Stoppers fastened to the other side of the thread 를 포함하고,Including, 상기 몸통은 상기 제1 받침대, 상기 제1 연결 부재, 상기 제2 연결부재, 그리고상기 제2 받침대에 삽입되어 상기 밀착편은 상기 제2 받침대의 타측면에 접촉되고, 상기 스토퍼는 상기 제1 받침대의 타측면에 접촉하는The body is inserted into the first pedestal, the first connection member, the second connection member, and the second pedestal so that the close contact with the other side of the second pedestal, the stopper is the first pedestal In contact with the other side of the 보 거푸집.Bo dies. 제1항에서,In claim 1, 상기 지주는The prop is 상부면이 개방되어 있으며 길이 방향을 따라 복수의 제1 지주 구멍이 형성되어 있는 제1 지주,A first support having an upper surface open and having a plurality of first support holes formed in a longitudinal direction thereof; 한쪽 끝의 적어도 일부분이 상기 제1 지주의 개방된 곳을 통하여 내부로 삽입되며 길이 방향을 따라 상기 제1 지주 구멍과 연결되는 복수의 제2 지주 구멍이 형성되어 있는 제2 지주, 그리고A second post having at least a portion of one end inserted therein through the opening of the first post and having a plurality of second posts formed in the longitudinal direction and connected to the first posts; 상기 제1 지주 구멍과 제2 지주 구멍으로 삽입 관통되어 상기 상기 제2 지주를 제1 지주에 고정하는 지주 고정 장치A strut fixing device inserted into the first strut hole and the second strut hole to fix the second strut to the first strut. 를 포함하는 Containing 보 거푸집.Bo dies. 제4항에서,In claim 4, 상기 제1 받침대 위에 배치되고 상기 제1 지주가 결합되어 있는 제1 지지 부재,A first support member disposed on the first pedestal and to which the first support is coupled; 상기 제2 지주 위에 위치하며 상기 슬라브 받침 부재가 결합된 제2 지지 부재, 그리고A second support member positioned on the second support and coupled with the slab support member; 상기 제1 지지 부재 및 상기 제2 지지 부재 일측면에 형성되며, 상기 제1 지주 및 상기 제2 지주가 결합되는 복수의 결합편A plurality of coupling pieces formed on one side of the first support member and the second support member and to which the first support and the second support are coupled; 을 더 포함하며,More, 상기 제1 지지 부재 및 상기 제2 지지 부재의 면적은 상기 제1 받침대의 면적 보다 작은An area of the first support member and the second support member is smaller than that of the first pedestal. 보 거푸집.Bo dies. 제5항에서,In claim 5, 상기 슬라브 받침 부재는 제1 결합홈 및 제2 결합홈을 가지며,The slab receiving member has a first coupling groove and a second coupling groove, 상기 제1 결합홈 및 제2 결합홈 중 어느 하나의 결합홈에 상기 제2 지지 부재가 삽입되는The second support member is inserted into one of the coupling grooves of the first coupling groove and the second coupling groove. 보 거푸집.Bo dies. 제1항에서,In claim 1, 상기 제1 받침대 및 상기 제2 받침대의 저면에 형성되어 있는 결합봉을 더 포함하는 보 거푸집.The beam formwork further comprises a coupling rod formed on the bottom surface of the first pedestal and the second pedestal. 제1항에서,In claim 1, 상기 바닥 패널 및 상기 측부 패널은 금속재인 보 거푸집.The bottom panel and the side panel is a metal formwork. 기설정된 길이로 형성된 기둥을 지면에 기설정된 간격으로 설치하는 단계,Installing pillars having a predetermined length on the ground at predetermined intervals; 제1 받침대의 제1 연결 부재와 제2 받침대의 제2 연결 부재를 연결하고, 스토퍼가 결합된 제어 장치를 상기 제1 받침대 및 상기 제2 받침대에 삽입하고, 상기 기둥의 간격에 맞추어 스토퍼의 위치를 조절하여 상기 제1 받침대와 상기 제2 받침대의 간격을 조절하는 단계,Connecting the first connecting member of the first pedestal and the second connecting member of the second pedestal, inserting the control device coupled with the stopper to the first pedestal and the second pedestal, the position of the stopper in accordance with the interval of the pillar Adjusting an interval between the first pedestal and the second pedestal, 간격 조절된 제1 받침대 및 상기 제2 받침대를 상기 기둥 위에 설치하는 단계,Installing the spaced first pedestal and the second pedestal on the pillar, 상기 제1 받침대 및 상기 제2 받침대 상면 외측에 결합편이 형성된 제1 지지 부재를 각각 위치시키고, 지지 고정 장치로 제1 지지 부재를 상기 제1 받침대 및 상기 제2 받침대에 각각 고정하는 단계,Positioning a first support member having a coupling piece formed on an outer surface of the first pedestal and the second pedestal, respectively, and fixing the first support member to the first pedestal and the second pedestal with a support fixing device, respectively; 상기 제2 지지 부재 위에 제1 지주 및 제2 지주를 포함하는 지주를 위치시키며, 제1 지주를 상기 결합편에 지주 고정 장치로 고정하는 단계,Positioning a strut including a first strut and a second strut on the second support member, and fixing the first strut to the joining piece with a strut fixing device, 상기 제2 지주 위에 제1 지지 부재와 동일한 제2 지지 부재를 설치하는 단계, Installing a second support member identical to the first support member on the second support, 상기 제1 받침대 및 상기 제2 받침대의 상면 내측에 바닥 패널의 양쪽 끝이 각각 걸쳐지도록 위치시키고, 하부쪽이 상기 바닥 패널 양측 끝에 위치하고 상기 지주에 밀착된 복수의 측부 패널을 위치시키는 단계, 그리고Positioning both ends of the bottom panel on the inner side of the upper surface of the first pedestal and the second pedestal, respectively, and positioning a plurality of side panels at lower ends of the bottom panel at both ends and in close contact with the posts; 상기 제2 지지 부재에 슬라브 받침 부재를 위치시키고, 상기 슬라브 받침 부재로 상기 측부 패널을 고정하는 단계Positioning a slab support member on the second support member and fixing the side panel with the slab support member; 를 포함하는 보 거푸집 시공 방법.Bo formwork construction method comprising a.
KR1020090001010A 2009-01-07 2009-01-07 Construction method for crossbeam mold KR100926750B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020090001010A KR100926750B1 (en) 2009-01-07 2009-01-07 Construction method for crossbeam mold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020090001010A KR100926750B1 (en) 2009-01-07 2009-01-07 Construction method for crossbeam mold

Publications (1)

Publication Number Publication Date
KR100926750B1 true KR100926750B1 (en) 2009-11-16

Family

ID=41605035

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020090001010A KR100926750B1 (en) 2009-01-07 2009-01-07 Construction method for crossbeam mold

Country Status (1)

Country Link
KR (1) KR100926750B1 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101735777B1 (en) * 2015-08-06 2017-05-15 삼성물산(주) Temporary construction system using support beam bracket intergrated
KR101795777B1 (en) * 2016-04-12 2017-11-08 (주)동은에프앤씨 Supporting Device for Form
KR200486454Y1 (en) * 2017-09-22 2018-05-21 승주건설 주식회사 A form reinforcement for concrete beam
KR20190008054A (en) * 2017-07-14 2019-01-23 서보산업 주식회사 An assembly type supporting beam mold, and method for constructing this same
WO2019106032A1 (en) * 2017-11-30 2019-06-06 LÖLFING, Christopher Support device for the construction industry
KR102269140B1 (en) 2020-12-04 2021-06-25 한국건설기술연구원 Support Structure for Construction of RC Beam Mold, And Method for Construction of RC Beam
KR102269128B1 (en) 2020-12-04 2021-06-25 한국건설기술연구원 Support Structure for Transportation And Construction RC Beam Mold, And Method for Transportation And Construction RC Beam Mold

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0198858U (en) * 1987-12-23 1989-07-03
KR950027728U (en) * 1994-03-31 1995-10-18 손원선 Prefabricated Formwork for Forming Concrete Beams
KR200415593Y1 (en) 2006-02-21 2006-05-03 춘 수 오 mold supporter for concrete beam
KR200441933Y1 (en) * 2008-07-10 2008-09-22 김필규 Supporting device for beam mold

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0198858U (en) * 1987-12-23 1989-07-03
KR950027728U (en) * 1994-03-31 1995-10-18 손원선 Prefabricated Formwork for Forming Concrete Beams
KR200415593Y1 (en) 2006-02-21 2006-05-03 춘 수 오 mold supporter for concrete beam
KR200441933Y1 (en) * 2008-07-10 2008-09-22 김필규 Supporting device for beam mold

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101735777B1 (en) * 2015-08-06 2017-05-15 삼성물산(주) Temporary construction system using support beam bracket intergrated
KR101795777B1 (en) * 2016-04-12 2017-11-08 (주)동은에프앤씨 Supporting Device for Form
KR20190008054A (en) * 2017-07-14 2019-01-23 서보산업 주식회사 An assembly type supporting beam mold, and method for constructing this same
KR102038061B1 (en) * 2017-07-14 2019-10-30 서보산업 주식회사 An assembly type supporting beam mold, and method for constructing this same
KR200486454Y1 (en) * 2017-09-22 2018-05-21 승주건설 주식회사 A form reinforcement for concrete beam
WO2019106032A1 (en) * 2017-11-30 2019-06-06 LÖLFING, Christopher Support device for the construction industry
KR102269140B1 (en) 2020-12-04 2021-06-25 한국건설기술연구원 Support Structure for Construction of RC Beam Mold, And Method for Construction of RC Beam
KR102269128B1 (en) 2020-12-04 2021-06-25 한국건설기술연구원 Support Structure for Transportation And Construction RC Beam Mold, And Method for Transportation And Construction RC Beam Mold

Similar Documents

Publication Publication Date Title
KR100926750B1 (en) Construction method for crossbeam mold
KR101962853B1 (en) Joint for Precast Beam and Columns
KR102178763B1 (en) Connecting joint structure and connecting method of reinforced concrete column and installaion system of reinforced concrete column
KR101990065B1 (en) Joint of PC column using steel block
KR101124820B1 (en) Combination Structure
JP3839921B2 (en) Scaffolding plate support frame, method for attaching and removing the same, and method for constructing a reinforced concrete wall body using the same
KR101642484B1 (en) Multi corner tie bracket
KR100778139B1 (en) Frame for length adjustment in horizontal prop of mold
KR20190108739A (en) Safety handrail for beam table form
KR20070073022A (en) Concrete mold for slab and construction method of slab using the same
KR101554093B1 (en) Reinforcing structure using hinged brace
CN210396103U (en) Connecting piece for shear wall template system, external wall panel and shear wall template system
KR100402030B1 (en) Concrete form for src slim floor
KR101381660B1 (en) Space keep goods for mold
KR101108283B1 (en) Supporting apparatus for beam mold and supporting system using the same
KR100583773B1 (en) supporter for form of concrete structure
KR100840279B1 (en) Suspension hanger for slab form
CN113431240B (en) Floor slab for building and construction method thereof
KR200367615Y1 (en) a head for vertical adjaustment unit with connected a matrix
JP7365518B1 (en) Panel support material and formwork structure using it
KR200405440Y1 (en) Panel supporter for concrete slab
KR102437398B1 (en) Easy-to-install integrated slab euroform system
KR102249476B1 (en) Support frame connected to strut for mold
KR102198600B1 (en) Slab mold support device
KR100579448B1 (en) Steel mould side reinforcement apparatus for building execution

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant