KR101998180B1 - Pile driver for structural walls - Google Patents
Pile driver for structural walls Download PDFInfo
- Publication number
- KR101998180B1 KR101998180B1 KR1020180149938A KR20180149938A KR101998180B1 KR 101998180 B1 KR101998180 B1 KR 101998180B1 KR 1020180149938 A KR1020180149938 A KR 1020180149938A KR 20180149938 A KR20180149938 A KR 20180149938A KR 101998180 B1 KR101998180 B1 KR 101998180B1
- Authority
- KR
- South Korea
- Prior art keywords
- chain
- excavation
- pile driver
- driver
- constructing
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/13—Foundation slots or slits; Implements for making these slots or slits
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/0038—Production methods using an auger, i.e. continuous flight type
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
Description
본 발명은 건설 장비를 저가로 얻을 수 있는 지중 연속벽 구축용 파일 드라이버에 관한 것으로, 보다 상세하게는 오거 드라이버 및 수평 굴착용 체인 굴착 장치가 설치되는 기존의 파일 드라이버 구조에 더하여, 체인굴착장치를 유도하는 유도레일장치(Inducement rail-unit), 그리고 체인굴착장치를 잡아주는 협지장치(catch-unit)를 추가로 설치하여 줌으로써, 수직 굴착과 수평 굴착으로 지중 연속벽을 굴착하는 한편, 압축 공기 공급 및 시멘트 몰탈을 타설하여 지중에 콘크리트 연속벽을 효과적으로 구축하는 등 체인 굴착 작업을 원활하게 수행하며, 유도레일장치에 설치되는 굴착체인을 아우터 유닛과 이너 유닛으로 구성하면서 이에 1∼5개의 블레이드(갈퀴)를 가지는 결합부를 결합시켜 주어서, 블레이드 마모시 이의 교체는 물론 굴착체인으로부터 블레이드가 이탈되는 것을 방지시키면서 굴착체인의 수명을 길게 유지할 수 있도록 하는 동시에, 장비의 손상에 의한 시공 중단을 방지하는 지중 연속벽 구축용 파일 드라이버에 관한 것이다.The present invention relates to a pile driver for underground continuous wall construction that can obtain construction equipment at low cost. More specifically, in addition to the existing pile driver structure in which an auger driver and a chain drilling device for horizontal drilling are installed, a chain drilling device is provided. By installing an additional guide rail unit and a catch unit to hold the chain digging device, the vertical continuous wall and the horizontal excavation excavate the continuous continuous wall, while supplying the compressed air. And cement mortar to effectively build a concrete continuous wall in the ground, so that chain excavation work can be performed smoothly, and the excavation chain installed in the guide rail device consists of an outer unit and an inner unit. By joining joints with The present invention relates to a pile driver for underground continuous wall construction that prevents construction from being damaged due to equipment damage while maintaining the life of the excavation chain while preventing the rod from falling off.
일반적으로, 지중에 연속벽을 구축하는데 무한궤도 차량이나 이동트롤리에 절단 갈퀴를 연속적으로 형성하는 체인굴착장치를 설치하여 지중에 연속벽(옹벽)을 굴착하고, 굴착되는 흙은 오물 컨베이어로 제거한 후에 지중 콘크리트 연속벽을 구축하는 건설 공사 기초 장비를 별도로 제작하여 사용하고 있어 건설공사 장비에 경제적 부담이 많았다.Generally, in order to construct a continuous wall in the ground, a chain excavation device is installed to continuously form a cutting rake in a crawler vehicle or a mobile trolley to excavate a continuous wall (retaining wall) in the ground, and the excavated soil is removed by a dirt conveyor. The construction equipment for building underground concrete continuous walls was separately manufactured and used, so the economic burden on construction equipment was high.
또한, 고층이나 저층 건축물을 시공할 때 기초를 하게 되는데, 건축물의 주변 토압에 의해 유발되는 하중을 지탱하도록 토사 방지 차단벽이 설치되면서 건축이 진행되는 것이다.In addition, when constructing a high-rise or low-rise building is the foundation, the construction is progressed while the anti-soil barrier wall is installed to support the load caused by the surrounding earth pressure of the building.
그리고, 건축물 주위로 구축되는 토사 방지 차단벽을 구축하기 위해서는 먼저 지중에 H빔을 일정간격으로 타공시킨 후에 H빔 사이를 굴착하고 토사가 흘러내리지 않게 토사 붕괴 방지용 차단목을 설치하여 토사 붕괴 방지 차단벽을 구축하고 있었으며, 근래에는 국내,외에 개시된 토사 방지 차단벽으로 지중에 콘크리트 연속 옹벽을 구축하는 장치와 방법이 상용되고 있다.And, in order to build the anti-soil barrier that is built around the building, first drill the H beam in the ground at regular intervals, then excavate between the H beams and install a block for preventing the earth and earth collapse to prevent the soil from flowing down. In recent years, a device and a method for constructing a continuous concrete retaining wall in the ground are used commercially.
상기와 같은 지중 콘크리트 연속 옹벽을 구축하는 장치로서 수압 모터에 의해 구동되는 굴착 체인이 설치되고, 굴착 체인에는 절단 톱니가 형성되는 굴착암이 설치되는 무한궤도 차량으로 지중에 연속되는 굴착 도랑을 구축하고 굴착된 도랑에 콘크리트 몰탈을 타설하여 지중 콘크리트 연속벽을 구축하는 방법도 알려져 있다.As a device for constructing the continuous underground concrete retaining wall as described above, an excavation chain driven by a hydraulic motor is installed, and an excavation groove in which the excavation arm is formed is installed in the excavation chain, where the cutting teeth are formed. It is also known to build underground concrete continuous walls by pouring concrete mortar into the excavated trench.
이러한, 지중 콘크리트 연속 옹벽을 구축하는 굴착장치의 예로, 지하 옹벽 구축을 위한 개량된 굴착 장치에 관한 것으로, 굴착선에 평행한 방향을 따라 이동이 가능한 무한 궤도 트랙상에 지지된 무한 궤도 기부 조립체와, 상기 무한 궤도 기부 조립체상에 지지되며 굴착선에 평행한 방향을 따라 그의 길이방향으로 연장된 안내레일을 가지는 플랫폼을 포함하는 이송체 조립체, 상기 이송체 조립체의 레일상을 이동하는 조정실과, 상기 조정실 측부에 지지되는 장착 슬리이브 조립체와, 상기 장착 슬리이브 조립체을 통해 하강된 굴착 자세와 상승된 이동 자세간의 이동을 위해 상기 조정실에 피벗(pivot)식으로 접속된 굴착 아암 및, 상기 굴착 아암에 의해 굴착된 토사를 수송하고, 상기 장착 슬리이브 조립체의 측부에 부착된 오물 컨베이어를 포함하여 구성된 지하 옹벽 구축을 위한 개량된 굴착 장치 및 방법(공개특허공보 제10-1988-0000655호, 이하 '선행기술 1' 이라함)이 개시되었다.An example of such an excavation device for constructing a continuous concrete retaining wall, which relates to an improved excavation device for constructing an underground retaining wall, includes: an endless track base assembly supported on a track track capable of moving along a direction parallel to the excavation line; A conveying assembly comprising a platform supported on the crawler base assembly and having a guide rail extending in a longitudinal direction thereof in a direction parallel to an excavation line, an adjusting chamber for moving on a rail of the conveying assembly; A mounting sleeve assembly supported on the side of the control chamber, an excavating arm pivotally connected to the control chamber for movement between the lowered and elevated movement positions through the mounting sleeve assembly, and by the excavating arm. Including a soil conveyor for transporting the excavated soil and attaching it to the side of the mounting sleeve assembly. An improved excavation device and method for constructing a built-in underground retaining wall (Patent Publication No. 10-1988-0000655, hereinafter referred to as 'prior art 1') has been disclosed.
상기 선행기술 1에서는 별개로 제조된 무한궤도트랙상에 레일을 구성하고, 상기 레일상에 슬리브 조립체를 설치하고, 상기 슬리브 조립체에 굴착암을 구비하는 무한궤도 트랙을 설치하여 굴착 제인에 설치된 굴착 톱니가 굴착하도록 구성한 지하 옹벽 구축을 위한 개량된 것인 바, 이 굴착 장치는 별도의 무한궤도 체인 굴착장치를 구비하는 무한궤도 트랙을 제조하여야 하고, 이의 무한궤도 트랙으로는 오거 드릴 및 해머 비트 등을 상용할 수 없어 굴착 시공시에 지중 오벽을 받쳐 주는 센터 파일공을 첨공할 때 오거 드릴을 구비한 별개의 파일 드라이버를 사용하여 천공하여야 하는 등 굴착 시공 비용이 높아지는 경제적인 문제점이 있다.In the prior art 1, the excavation tooth installed in the excavation Jane is configured by installing a rail on a separately manufactured track track, installing a sleeve assembly on the rail, and installing a track track having an excavation arm in the sleeve assembly. It is an improvement for the construction of underground retaining wall configured to be excavated, and this excavation device should manufacture a track track having a separate track chain excavator, and the track track includes auger drills and hammer bits. There is an economic problem in that the excavation construction costs are high, such as the use of a separate pile driver with an auger drill when attaching the center pile hole that supports the underground wall during excavation construction because it is not commercially available.
특히, 상기의 선행기술 1은 깊이가 깊은 지중 굴착벽을 굴착하기전에 무한궤도 체인을 깊이가 깊은 곳까지 무한궤도 체인을 집어 넣을 수 있는 굴착 작업은 진행할 수 없으며, 무한궤도 굴착장치로 깊게 굴착하기 위한 준비에 많은 시간이 소요되어 지중벽 굴착에 시간과 비용이 많이 소요되는 경제적인 문제점이 있었다.In particular, the prior art 1 can not proceed with the excavation operation that can insert the caterpillar chain to the depth of the deep track chain before excavating the deep underground underground excavation wall, deep excavation with a crawler excavator It took a lot of time to prepare for this, and there was an economic problem that required time and cost to excavate underground walls.
한편, 또 다른 지붕 연속벽 형성용 굴착장치로서, 지중에서 연속벽으로 형성되도록 하기 위해 지면상에서 가동하는 이동트롤리와, 상기 이동트롤리 위에 구성된 상부 프레임, 길이로 가변하고 수직으로 신장하며 이동트롤리의 상부 프레임 일측에 제공된 수직으로 가동하는 안내 기둥, 상기 안내 기둥의 상하단부에서 안내 기둥상에 회전가능하게 제공된 체인 스프로켓, 상기 안내 기둥의 상단부에 상기 체인 스프로켓의 일단 후방에 회전 가능하게 제공된 체인 스프로켓, 그리고 하나 이상의 체인 스프로켓의 회전에 의해 구동되도록 체인 스프로켓 주위에 대하여 신장하고 엔들리스 체인 버키트형 컷터를 형성하도록 엔들리스 체인을 따라 적당한 간격으로 다수의 굴삭 장치 버키트를 갖는 엔들리스 체인을 포함하는 지중 연속벽 형성용 굴삭장치(공개특허공보 제10-1993-0002619호, 이하 '선행기술 2' 이라함)가 개시되었다.On the other hand, as another excavating device for forming a continuous wall of the roof, a mobile trolley moving on the ground to be formed as a continuous wall in the ground, and an upper frame configured on the mobile trolley, variable in length and extending vertically, the top of the mobile trolley A vertically movable guide pillar provided on one side of the frame, a chain sprocket rotatably provided on the guide pillar at upper and lower ends of the guide pillar, a chain sprocket rotatably provided at one end of the chain sprocket at an upper end of the guide pillar, and Underground including an endless chain having a plurality of excavator bukits at appropriate intervals along the endless chain to extend around the chain sprocket to be driven by the rotation of one or more chain sprockets and to form an endless chain bucketed cutter. Excavator for continuous wall formation Patent Publication No. 10-1993-0002619, hereinafter referred to as "prior art 2").
상기 선행기술 2에 설명하는 2개의 레일 위에 설치되는 이동트롤리에 엔드레스 체인형의 굴착장치는 이미 공지된 기술에 불과한 것이 명백하고, 이동트롤리가 이동될 수 있는 레일을 지면에 연속적으로 깔아야 하는 등 작업이 불편할 뿐 아니라, 레일을 일일이 지면에 까는 작업에 의해 지중 연속벽 굴착 작업이 비능률적이고 비용이 높아지며, 시간이 오래 걸리는 문제점이 있었다.Excavation device of the endless chain type to the mobile trolley installed on the two rails described in the prior art 2 is only known in the art, it is necessary to continuously install a rail on the ground to which the mobile trolley can be moved. In addition to this inconvenience, the continuous continuous wall excavation work is inefficient, high cost, and takes a long time by the rails to the ground one by one.
특히, 상기 선행기술 2에서도 깊이가 깊은 지중 굴착벽을 굴착하기 전에 무한궤도체인을 깊이가 깊은 곳까지 무한궤도체인을 집어 넣을 수 있는 굴착공을 굴착할 수 없는 문제점이 있는 것이다.In particular, even in the prior art 2 there is a problem that can not excavate the excavation hole that can insert the endless track chain to the depth of the deep track chain before excavating the deep underground drilling wall.
또 다른 지중 연속벽을 건설하는 굴삭장치로는 지상 주행차로 부터 연장되어 있고 일단부가 주행차의 일측으로부터 외측으로 돌출한 일단부를 갖는 부움과, 이 부움의 상기 일단부에 탈착 가능하게 고정되는 연장 가능한 안내 포스트와, 이 안내 포스트의 상부에 설치된 체인구동휘일과 안내 포스트의 하부에 있는 체인 스프로켓의 둘레에 연장하여 있는 무한 체인, 이 무한 체인상에 교대로 배열되어 무한 체인 커터를 형성하는 다수의 커터 비트와 다수의 교반 바, 그리고 안내 포스트에 설치되어 유체 공급원과 연결될 수 있고 다수의 노즐이 분기하는 분출관으로 구성되는 것을 특징으로 하는 지중 연속벽을 건설하는 굴삭장치(공개특허공보 제10-1993-0021890호, 이하 '선행기술 3' 이라함)가 개시되고 있다.Excavator for constructing another underground continuous wall includes a buoy extending from the ground traveling vehicle and having one end protruding outward from one side of the traveling vehicle, and an extensible fixed detachably fixed to the one end of the buoy. A guide post, a chain drive wheel provided at the top of the guide post and an endless chain extending around the chain sprocket at the bottom of the guide post, a plurality of cutters alternately arranged on the endless chain to form an endless chain cutter. Excavation device for constructing a continuous underground wall, characterized in that the bit is provided with a plurality of stirring bars, and a guide post can be connected to the fluid source, the nozzle consists of a plurality of nozzles branching (Public Patent Publication No. 10-1993 -0021890, hereinafter referred to as 'prior art 3').
그러나, 상기의 선행기술 3에서도 무한궤도차량에 무한 체인 커터를 형성하는 무한체인을 무한궤도 차량에 설치하여 지중에 연속벽을 굴착하게 된 것이나, 무한궤도 차량만으로는 지중에 깊은 굴착벽을 형성하기에는 역부족이며, 깊이가 깊은 지중 굴착벽을 굴착하기 전에 무한궤도 체인을 깊이가 깊은 곳까지 무한궤도 체인을 집어 넣을 수 있는 굴착공을 굴착할 수 없는 문제점이 있다.However, even in the above prior art 3, an endless chain that forms an endless chain cutter in an endless track vehicle is installed in the endless track vehicle to excavate a continuous wall in the underground, but the endless track alone is insufficient to form a deep excavation wall in the ground. There is a problem in that the excavation hole for inserting the caterpillar chain into the caterpillar chain can be inserted into the caterpillar chain.
그러므로, 무한궤도 굴착장치로 깊게 굴착함에 많은 시간이 소요되어 지중벽굴착에 시간과 비용이 많이 소요되는 경제적인 문제점을 가질 수 밖에 없다.Therefore, it takes a lot of time to excavate deeply with a crawler excavator, and it is inevitable to have economic problems that require time and cost to excavate underground walls.
또 다른, 지중 연속벽용 굴삭장치로서, 레일상에서 이동 가능하며 레일중 하나에 설치된 랙크와 맞물림하는 하나 이상의 스프로켓과, 스프로켓을 구동하는 스프로켓 구동수단을 갖는 이동트롤리와, 이 이동트롤리상에 배치되는 프레임으로 하부를 중심으로 상기 프레임에 대해 경사질 수 있는 경사 프레임을 갖는 상부 프레임과, 에링에 대해 거의 수직한 방향으로 슬라이딩 가능하게 경사 프레임상에 설치되며 체인구동휘일을 갖는 새들과, 체인구동휘일 밑에 위치하여 경사프레임에 대해 상하방향으로 이동 가능하며 하단부에 체인 스프로켓이 회전 가능하게 연결된 연장 가능한 안내 포스트와, 체인 스프로켓과 새들상의 체인구동휘일의 둘레에 연장하여 있는 무한 체인과, 무한 체인상에 교대로 배치되어 무한체인 커터를 형성하는 다수의 커터비트와, 다수의 교반 바, 그리고 무한체인을 구동하는 체인구동수단으로 구성되는 것을 특징으로 하는 지중 연속벽용 굴삭장치 및 지반에 드릴장치로 소정 깊이의 구멍을 파는 단계와, 굴삭 장치의 무한체인 커터를 구멍안으로 삽입하는 단계와, 그리고 굴삭 구멍에 시멘트벽을 형성하는 동안 무한체인 커터에 의해 소정의 방향으로 지반을 굴삭하는 단계로 구성되는 것을 특징으로 하는 제 1 항에 따른 굴삭장치를 사용하는 지중 연속벽 공법(공개특허공보 제10-1993-0021891호, 이하 '선행기술 4' 이라함)가 개시되고 있다. Further, an underground continuous wall excavating apparatus, comprising: at least one sprocket movable on a rail and engaged with a rack installed on one of the rails, a moving trolley having sprocket driving means for driving the sprocket, and a frame disposed on the moving trolley; And an upper frame having an inclined frame that can be inclined with respect to the frame about a lower portion thereof, a saddle which is installed on an inclined frame so as to be slidable in a direction substantially perpendicular to the edge and has a chain driving wheel, Extendable guiding posts which are movable up and down relative to the inclined frame and rotatably connected at the lower end of the chain sprocket, endless chains extending around the chain drive wheels on the chain sprockets and saddles, alternately on the endless chains Cutter ratios arranged to form an endless chain cutter And digging a hole of a predetermined depth with a drilling device in the ground continuous wall, characterized in that it consists of a plurality of stirring bars, and a chain driving means for driving the endless chain, and the endless chain cutter of the excavator. Inserting into the hole, and excavating the ground in a predetermined direction by an endless chain cutter during the formation of the cement wall in the excavation hole, the underground continuous using the excavator according to claim 1 The wall method (Publication Patent Publication No. 10-1993-0021891, hereinafter referred to as "prior art 4") is disclosed.
그런데, 이 공법에서 지반에 드릴장치로 소정 깊이의 구멍을 파는 단계는 기술적 측면에서 볼 때 무한궤도체인 굴착장치를 집어 넣는 구멍을 오거 드릴로 굴착하는 공정이 이미 파일을 항타하기 전에 오거 드릴로 굴착공을 굴착하는 공법으로부터 널리 알려져 있었고, 또한 무한궤도 체인굴착장치는 여러 선행기술들에 의해 공지되어 있을 뿐 아니라, 굴착암을 연장하는 굴착 아암의 절단 깊이를 변화시키도록 조절될 수 있고 굴착 아암은 각각 상,하 한 쌍의 스프로켓을 지지하는 굴착 아암틀을 갖추고 있으며 스프로켓에 대하여 분절난 굴착 체인이 연장되어 있다 라는 기술에 의해 이미 너리 알려져 있다. 그러므로 상기 선행기술 4에서 무한궤도체인 굴착장치를 집어 넣을 굴착공을 천공한다는 것은 오거드릴장치가 없어 별개의 천공장치로 구멍을 천공한다고 보아야 할 것이다.However, in this method, the step of digging holes of a predetermined depth in the ground with a drill device is technically excavated with an auger drill before the process of digging a hole with an auger drill into which an excavator, which is an endless track, is inserted. Well known from the process of digging the ball, the caterpillar chain digging device is not only known by several prior arts but also can be adjusted to vary the cutting depth of the digging arm extending the digging arm and the digging arm is It is already well known by the technology that it has an excavation arm, each supporting a pair of upper and lower sprockets, and a segmented excavation chain is extended to the sprocket. Therefore, in the prior art 4 to drill the excavation hole to insert the endless track drilling device will have to be seen as a perforation hole with a separate drilling device because there is no auger drill device.
상기와 같은 종전의 지중벽 구축용 체인식 굴착장치 및 공법들은 이동트롤리에 레일을 구성하고 체인굴착장치를 이동하면서 지중벽을 굴착하거나, 지중에 레일을 깔고 이동 롤를 전진하면서 지중벽을 굴착하게 되어 지면에 레일을 까는 작업을 계속적으로 실시하여야 하는 작업성의 불편함, 그리고 작업의 진전도가 떨어지는 문제점이 있는 것이고, 또한 최초에 지중벽을 굴착하기 전에 무한궤도 체인굴착장치로 지중을 굴착하기 전에 지중에 체인굴착장치를 끼워 넣는 굴착공을 천공할때, 상기의 시공방법으로 보아 별도의 오거드릴장치를 구비한 파일 드라이버로 체인굴착장치를 끼워 넣는 굴착공을 굴착한 후, 지중벽 체인굴착장치를 끼워넣는 것으로서 이는 지중벽굴착장비 이외에 별개의 수직굴착공을 천공하는 파일 드라이버가 필요하게 되어 지중벽 굴착 시공이 늦어지게 되고, 장비의 동원 등으로 굴착 비용이 증가되는 문제점이 있으며, 또한 무한궤도 체인굴착장비를 구비한 무한궤도트랙 또는 굴착장비를 설치한 무한트랙의 경우에는 체인굴착장비의 굴착 깊이에 의한 저항력에 따라 무한궤도트랙 및 무한트랙의 지탱력으로는 굴착장비의 상대력을 지지할 수 없어 임의 방향의 전환 굴착이 불가능한 것이다.Previously, the chain type excavation device and construction methods for underground wall construction are to excavate the ground wall while constructing the rail on the mobile trolley and move the chain excavation device, or to excavate the ground wall while laying the rail on the ground and advancing the moving roll. There is a problem in that workability to continuously carry railing work on the ground, and the progress of the work fall, and also before the ground excavation with the tracked chain digging device before the first excavation of the ground wall When drilling the excavation hole for inserting the chain excavation device into the hole, excavate the excavation hole for inserting the chain excavation device with a pile driver equipped with a separate auger drill device according to the above construction method, and then install the underground wall chain excavation device. In addition to the underground wall excavation equipment, this requires a pile driver to drill a separate vertical excavation hole. Heavy wall excavation construction is delayed, and the excavation cost is increased due to the mobilization of equipment. Also, in the case of the endless track equipped with the endless track chain excavation equipment or the endless track with the excavating equipment, the excavation of the chain excavation equipment According to the resistance by depth, the endless tracks and the endless tracks cannot support the relative force of the excavating equipment, and thus, conversion excavation in any direction is impossible.
상기에서 드러나고 있는 문제점들인 지중 연속 옹벽을 굴착하는 동시에 오거드릴장비를 장착하여 굴착 장비를 굴착 깊이로 집어 넣을 수 있게 하는 굴착 장비가 요구되며, 굴착 비용이 저렴하게 시공되는 장비가 요구되고, 저렴하게 시공되는 장비가 요구되고 있는 실정이다.Excavation equipment is required to excavate the continuous continuous retaining wall, which is a problem exhibited above, and at the same time to be equipped with auger drill equipment, so that the drilling equipment can be inserted into the excavation depth, and equipment that is cheaply constructed for excavation cost is required and inexpensively. The equipment to be constructed is required.
공개특허공보 제10-1988-0000655호(공개일 1988.03.28.)Publication No. 10-1988-0000655 (published March 28, 1988)
공개특허공보 제10-1993-0002619호(공개일 1993.02.23.)Publication No. 10-1993-0002619 (published February 23, 1993)
공개특허공보 제10-1993-0021890호(공개일 1993.11.23.)Publication No. 10-1993-0021890 (published November 23, 1993)
공개특허공보 제10-1993-0021891호(공개일 1993.11.23.)Publication No. 10-1993-0021891 (published November 23, 1993)
본 발명은 상기와 같은 문제점들을 개선하기 위한 것으로, 건설기초 장비를 저가로 얻을 수 있도록, 에어 해머 및 오거 드라이버 등의 기능을 갖는 기존의 파일 드라이버에 체인굴착장치를 유도하는 유도레일장치와, 상기의 체인굴착장치를 잡아주도록 대향되게 좌우의 협지장치를 설치한 파일 드라이버를 구성하여, 수직 굴착과 체인굴착장치로 지중 연속벽을 굴착하며, 압축된 압축공기 공급 및 시멘트 몰탈을 타설하여 지중 콘크리트 연속벽을 효과적으로 구축하면서 H빔 삽입을 통해 지중에 콘크리트 연속벽(옹벽)을 견고하고 신속하게 구축하고, 기존의 파일 드라이버를 이용하여 수평 굴착장비의 제작 비용을 낮추어 경제적으로 건설장비를 갖출 수 있으며, 수직 굴착과 수평 굴착의 작업은 물론, 체인굴착장치에 공압분사장치를 부가하여 체인 굴착을 보완하고, 시공 능력도 높이면서 공기를 단축시킬 수 있도록 하는 지중 연속벽 구축용 파일 드라이버를 제공하려는데 그 목적이 있는 것이다.The present invention is to improve the problems as described above, induction rail device for inducing a chain digging device to the existing pile driver having functions such as air hammer and auger driver, so as to obtain a low cost of construction foundation equipment, and Composed of pile driver with right and left clamping device to hold chain digging device, excavating underground continuous wall with vertical excavation and chain digging device, continuous compressed underground concrete by supplying compressed compressed air and cement mortar By constructing walls effectively, H-beam inserts can be used to build a concrete continuous wall (retaining wall) in the ground firmly and quickly, and to build construction equipment economically by lowering the manufacturing cost of horizontal drilling equipment using existing pile drivers. In addition to vertical and horizontal excavation work, chain excavation is added to the chain excavation device. The aim is to provide a pile driver for underground continuous wall construction that complements the installation and improves construction capacity and shortens the air.
본 발명의 다른 목적으로는, 체인굴착장치를 잡아주는 협지장치를 파일 드라이버에 설치된 리더 지지구의 상부에 대향되게 좌우에 설치하여, 리더에 굴착장치를 매달고 오거 드릴 기구로 굴착한 수직 굴착공에 체인굴착장치를 삽입시키고 리더 하단까지 내린 다음 굴착장치를 협지장치에 끼워 볼트 등의 결착구로 고정시키면서 수평굴착이 이루어질 수 있도록 함으로써, 체인굴착장치를 시공 장소가 좁은 경우에도 안전하게 지중 굴착이 가능한 지중 연속벽 구축용 파일 드라이버를 제공하려는 것이다.In another object of the present invention, the clamping device for holding the chain drilling device is installed on the left and right opposite to the upper part of the leader support installed in the pile driver, the chain is suspended in the vertical drilling hole suspended by the drilling device on the leader and drilled by the auger drill mechanism. Insert the excavation device and lower it to the bottom of the leader, and then insert the excavation device into the clamping device so that horizontal excavation can be performed while fixing it with a fastener such as a bolt, so that the underground continuous wall can be safely excavated even when the construction site is narrow. We want to provide a build file driver.
본 발명의 또 다른 목적으로는, 유도레일장치에 설치되는 체인굴착장치를 굴착 깊이에 따라 다수개의 프레임으로 연결 구성하여, 체인굴착장치의 길이를 조정할 수 있도록 하고, 유도레일장치에 설치되는 굴착체인을 아우터 유닛과 이너 유닛으로 구성하면서 이에 1∼5개의 블레이드를 가지는 결합부를 결합시켜, 블레이드 마모시 이의 교체는 물론 굴착체인으로부터 블레이드가 이탈되는 것을 방지시키면서 굴착체인의 수명을 길게 하고, 장비의 손상에 의한 시공 중단을 방지하는 지중 연속벽 구축용 파일 드라이버를 제공하려는 것이다.In still another object of the present invention, the chain excavation device installed in the induction rail device is connected to a plurality of frames according to the excavation depth, so that the length of the chain excavation device can be adjusted, and the excavation body installed in the induction rail device By combining the outer unit and the inner unit with a coupling part having 1 to 5 blades, the replacement of the blade when worn, as well as preventing the blade from falling out of the excavation chain to prolong the life of the excavation chain, damage to the equipment It is to provide a file driver for underground continuous wall construction that prevents construction interruption.
본 발명의 또 다른 목적으로는, 굴착하는 과정에서 지중에 토사를 주입할 수 있도록 함으로써 지반 개량의 효과를 기대할 수 있는 지중 연속벽 구축용 파일 드라이버를 제공하려는 것이다.Another object of the present invention is to provide a pile driver for underground continuous wall construction which can expect the effect of ground improvement by allowing soil to be injected into the ground during the excavation process.
본 발명의 또 다른 목적으로는, 체인굴착장치의 경사도를 측정함으로써 더욱 정밀한 굴착이 가능한 지중 연속벽 구축용 파일 드라이버를 제공하려는 것이다.Still another object of the present invention is to provide a pile driver for underground continuous wall construction that can be more precisely excavated by measuring the inclination of the chain digging device.
상기 목적들을 달성하기 위한 본 발명의 지중 연속벽 구축용 파일 드라이버는, 에어 해머 및 오거 드릴 장비를 구비하는 파일 드라이버의 리더를 따라 승강 동작이 가능한 레일유도장치; 상기 레일유도장치의 홈레일을 따라 횡으로 왕복 이동하게 전면으로 결합시킨 횡이동반체; 상기 레일유도장치의 전면에 설치되면서 상기 레일유도장치에 횡으로 왕복 이동하게 설치되는 상기 횡이동반체와 같이 횡으로 왕복 이동하게 설치되는 것으로, 체인 드라이버내에 설치되는 스프로킷과 체인굴착암의 말단에 설치되는 회전륜의 주위를 이동하면서 지중을 굴착하는 무한궤도의 굴착체인을 포함하는 체인굴착장치; 및, 상기 체인굴착장치를 협지하면서 상호 대향되게 파일 드라이버의 전면 좌우에 설치되는 협지장치; 를 포함하고, 상기 파일 드라이버에 설치되는 상기 리더 상단의 톱세이브에 설치된 풀리 및 로프들에 의해 상기 레일유도장치를 상승 또는 하강시키되, 상기 굴착체인은 서로 번갈아가며 배치되어 결합축에 의하여 결합하는 아우터(Outer) 유닛과 이너(Inner) 유닛을 포함하고, 상기 아우터 유닛에는 적어도 하나 이상의 블레이드를 가지는 결합부를 결합 구성하는 것이다.The pile driver for underground continuous wall construction of the present invention for achieving the above objects, the rail guide device capable of lifting operation along the leader of the pile driver having an air hammer and auger drill equipment; A transverse moving body coupled to the front surface to reciprocate horizontally along the groove rail of the rail guide device; It is installed on the front of the rail guide device and is installed to reciprocate horizontally, such as the transverse mover is installed in the rail guide device reciprocally transversely, at the end of the sprocket and chain drilling arm installed in the chain driver A chain excavation apparatus including an excavated chain having an orbital track that excavates the ground while moving around the rotating wheel to be installed; And a gripping device installed on the front left and right of the pile driver so as to be opposed to each other while sandwiching the chain excavator. It includes, and the rail induction device is raised or lowered by the pulleys and ropes installed on the top save of the top of the leader installed in the pile driver, the excavating chains are alternately arranged to be coupled by the coupling shaft outer (Outer) unit and an inner (Inner) unit, the outer unit is configured to combine the coupling portion having at least one blade.
또한, 상기 아우터 유닛은 양단부가 상기 결합축에 결합하는 본체부와, 상기 본체부의 측면에 결합하는 확장부를 포함하는 것이다.In addition, the outer unit includes a main body portion coupled to both ends of the coupling shaft, and an expansion portion coupled to the side of the main body portion.
또한, 상기 결합부는 상기 아우터 유닛의 상기 확장부를 감싸는 형태로 상기 굴착체인에 결합되는 것이다.In addition, the coupling portion is to be coupled to the excavating chain in the form of surrounding the expansion of the outer unit.
또한, 상기 확장부는 상기 본체부의 양쪽에 각각 한 쌍이 마련되는 것이다.In addition, the expansion portion is provided with a pair on each side of the main body portion.
또한, 상기 확장부는 직육면체 형태이며, 상기 결합부는 상기 확장부 중 상기 본체부와 인접한 한 쌍의 면을 감싸면서 결합하는 것이다.In addition, the expansion portion is in the form of a rectangular parallelepiped, and the coupling portion is coupled to surround the pair of surfaces adjacent to the body portion of the expansion portion.
또한, 상기 아우터 유닛과 이너 유닛은 각각 한 쌍씩 번갈아가며 배치되고, 상기 결합부의 양단부는 한 쌍의 아우터 유닛에 포함된 결합부 중 가장 외곽부에 배치된 확장부에 각각 결합하는 것이다.In addition, the outer unit and the inner unit are alternately arranged in pairs, respectively, and both ends of the coupling part are coupled to the extension parts disposed at the outermost parts of the coupling parts included in the pair of outer units, respectively.
또한, 상기 아우터 유닛은 볼트 및 너트를 이용하여 상기 체인굴착장치의 프레임에 결합되는 것이다.In addition, the outer unit is to be coupled to the frame of the chain drilling device using a bolt and nut.
또한, 상기 프레임에는 상기 체인굴착장치에 의한 굴착이 이루어질 때 상기 체인굴착장치의 연직 경사도를 측정하기 위한 경사도 측정유닛; 을 더 포함하는 것이다.In addition, the frame includes an inclination measuring unit for measuring the vertical inclination of the chain when the excavation by the chain drilling device is made; It is to include more.
또한, 상기 체인굴착장치에 의해 굴착되는 지중에 골재를 투입하기 위한 골재 투입 유닛을 더 포함하고, 상기 골재 투입 유닛은 이동유닛에 의하여 상기 체인굴착장치가 이동할 때 상기 체인굴착장치의 진행방향상 전방에 마련되며, 상기 이동유닛에는 격자 형상의 강재로 구성되는 지지프레임을 더 포함하여, 상기 골재 투입 유닛은 상기 지지프레임에 결합하는 것이다.The apparatus further includes an aggregate input unit for inputting aggregate into the ground excavated by the chain excavator, wherein the aggregate input unit is forward in the traveling direction of the chain excavator when the chain excavator moves by a moving unit. Is provided in, the moving unit further comprises a support frame consisting of a steel plate of the grid-like, the aggregate input unit is to be coupled to the support frame.
또한, 상기 체인굴착장치는, 체인 드라이버와 다수개의 프레임을 볼트 및 너트의 조립에 의해 일정길이로 연장되는 체인굴착암; 상기 체인 드라이버에서 하단의 상기 체인굴착암까지 설치되는 압축공기 공급관과 시멘트몰탈 공급관 및 물공급관; 및, 상기 체인굴착암을 조립으로 구성하는 프레임; 을 더 포함하는 것이다.In addition, the chain drilling device, a chain drilling arm extending a predetermined length by the assembly of the chain driver and the plurality of frames bolts and nuts; A compressed air supply pipe, a cement mortar supply pipe, and a water supply pipe installed from the chain driver to the lower chain excavation arm; And a frame configured to assemble the chain drilling arm. It is to include more.
또한, 상기 레일유도장치는, 종방향의 3등분하여 너트와 볼트로 분리 및 조립이 가능하게 설치되는 중앙분할체와 복수의 측면분할체; 상횡빔과 하횡빔에 형성되는 홈레일; 좌측종빔과 우측종빔에 각각으로 상,하부에 대향적이거나 엇갈리게 설치되는 다단의 유압실린더; 상기 리더의 리더봉을 감싸 잡게 설치되는 파일드라이버의 리더를 따라 상승 또는 하강되도록 후면에 설치되는 한 쌍의 켓취유니트; 를 포함하는 것이다.In addition, the rail guide device is divided into three in the longitudinal direction, the central splitter and a plurality of side dividers are installed to be separated and assembled by nuts and bolts; Groove rails formed on the upper and lower beams; Multi-stage hydraulic cylinders installed on the upper and lower sides of the left longitudinal beam and the right longitudinal beam, respectively; A pair of kit taking units installed on a rear side of the reader to be raised or lowered along the leader of the pile driver installed to surround the leader rod of the leader; It will include.
또한, 상기 횡이동반체는, 상기 레일유도장치의 상횡빔과 하횡빔에 각각 형성되는 상기 홈레일상에 안치되는 것으로, 상기 레일유도장치에 설치되는 상기 유압실린더에 의해 왕복 이동이 원활하게 가이드하는 다수개의 롤을 상하단에 각각 설치한 것이다.In addition, the transverse moving body is placed on the groove rails respectively formed in the upper and lower beams of the rail induction apparatus, and the reciprocating movement is smoothly guided by the hydraulic cylinder installed in the rail induction apparatus. A plurality of rolls are installed at the upper and lower ends, respectively.
또한, 상기 횡이동반체에는, 상기 횡이동반체의 전면에 대향되게 좌우에 설치되는 상기 켓취유니트와, 상기 켓취유니트에 의해 감싸여지게 하는 한 쌍의 결착봉을 구성하고, 상기 체인굴착장치는 상기 켓취유니트와 상기 결착봉에 의해 상기 횡이동반체의 전면에 설치되면서 다단을 이루는 상기 유압실린더에 의해 상기 횡이동반체와 같이 상기 레일유도장치에서 횡으로 왕복 이동하도록 구성하는 것이다.In addition, the lateral moving body, the chain taking unit is installed on the left and right opposite to the front surface of the lateral moving body and a pair of binding rods to be wrapped by the ket taking unit, the chain drilling device It is configured to reciprocate horizontally in the rail induction apparatus like the transverse carrier by the hydraulic cylinder constituting the multi-stage while being installed on the front of the transverse carrier by the ket taking unit and the binding rod.
또한, 상기 체인굴착암의 굴착 깊이에 따라 구축하는 프레임을 플렌지를 구비하는 구형관체로 구성하고, 상기 프레임 내부에 구형관체의 길이와 유사한 압축공기 공급관과 시멘트몰탈 공급관 및 물 공급관을 호스로 구성하며, 상기 호스로 구성되는 압축공기 공급관과 시멘트몰탈 공급관 및 물 공공급의 양단에는 설치된 나사 및 유니어조인트를 상호 연결하여 상기 체인굴착암의 말단부까지 압축공기 공급관과 시멘트몰탈 공급관 및 물 공급관이 연장되게 구성하는 것이다.In addition, the frame to be constructed according to the excavation depth of the chain drilling arm is composed of a spherical tube having a flange, the compressed air supply pipe and cement mortar supply pipe and water supply pipe similar to the length of the spherical pipe in the frame is composed of a hose Compression air supply pipe composed of the hose and the cement mortar supply pipe and the both ends of the water public class interconnected screws and uni-joints are installed so that the compressed air supply pipe and cement mortar supply pipe and water supply pipe to the end of the chain drilling arm To construct.
또한, 상기 협지장치에는 상기 협지장치에서 연장되며 상기 체인굴착장치를 직접적으로 잡아주는 협지판을 더 포함하고, 상기 협지판 사이에 상기 체인굴착장치가 놓여지면서 볼트로 결합되면서, 상기 체인굴착장치는 상기 파일 드라이버에 설치되는 리더 상단의 톱세이브에 설치된 풀리와 로프들에 의해 상승 또는 하강이 이루어지도록 구성되는 것이다.In addition, the gripping device further includes a gripping plate extending from the gripping device to directly hold the chain drilling device, and coupled to the bolt while the chain drilling device is placed between the gripping plates, and the chain drilling device is It is configured to be raised or lowered by pulleys and ropes installed on the top save of the leader installed on the pile driver.
이와 같이, 본 발명은 건설공사 기초장비를 저가로 얻을 수 있게 기존의 파일 드라이버에 레일유도장치 및 체인굴착장치와 협지장치를 구성한 것이고, 이를 통해 지중에 연속 옹벽을 굴착하는 동시에 공압 및 시멘트 몰탈을 타설하여 지중에 콘크리트 연속벽을 구축하면서 H빔으로 보강하여 견고한 지중 콘크리트 연속벽을 간편하게 시공함으로써 지하 공간의 시공 기간을 줄이고, 지반 침하를 예방하는 효과가 있으며, 또한 기존의 파일 드라이버를 이용하여 수직 굴착은 물론 지중 콘크리트 연속벽도 구축할 수 있는 등 건설 장비를 저가의 비용으로 얻을 수 있는 경제적인 효과가 높은 것이다.As described above, the present invention is to construct a rail guide device, a chain digging device and a clamping device to the existing pile driver so that the basic construction equipment can be obtained at a low cost. By constructing concrete continuous wall in the ground and reinforcing it with H beam, it is easy to construct a solid underground concrete continuous wall to reduce the construction period of the underground space and to prevent ground subsidence. In addition to the excavation as well as the construction of underground concrete continuous walls, it is economically effective to obtain construction equipment at low cost.
또한, 본 발명은 블레이드 마모시 이의 교체는 물론 굴착체인으로부터 블레이드가 이탈되는 것을 방지시키면서 굴착체인의 수명을 길게 하고, 장비의 손상에 의한 시공 중단을 방지하는 한편, 굴착하는 과정에서 지중에 토사 주입을 통해 지반 개량 효과, 그리고 체인굴착장치의 경사도 측정을 통해 더욱 정밀한 굴착이 가능한 효과를 기대할 수 있는 것이다.In addition, the present invention extends the life of the excavation chain while preventing blade replacement from the excavation chain as well as replacing it when the blade wears, prevents construction interruptions due to damage to the equipment, while injecting soil in the ground during the excavation process Through the ground improvement effect, and through the measurement of the slope of the chain excavator can be expected to effect more precise excavation.
본 발명의 효과들은 이상에서 언급한 효과들로 제한되지 않으며, 언급되지 않은 또 다른 효과들은 청구범위의 기재로부터 당업자에게 명확하게 이해될 수 있을 것이다.The effects of the present invention are not limited to the above-mentioned effects, and other effects not mentioned will be clearly understood by those skilled in the art from the description of the claims.
도 1은 본 발명의 실시예로 유도레일장치를 구비한 지중 연속벽 구축용 파일드라이버의 전체 예시도.
도 2는 본 발명의 실시예로 유도레일장치를 구비한 지중 연속벽 구축용 파일드라이버의 측면 예시도.
도 3은 본 발명의 실시예로 체인굴착장치가 설치된 유도레일장치의 정면도.
도 4는 본 발명의 실시예로 체인굴착장치가 설치된 유도레일장치의 횡단면 예시도.
도 5는 본 발명의 실시예로 체인굴착장치가 설치된 유도레일장치의 횡단면 부분 확대 단면 예시도.
도 6은 본 발명의 실시예로 유도레일장치의 분리상태 전체 예시도.
도 7은 본 발명의 실시예로 유도레일장치에 설치되는 체인굴착장치의 왕복 오작상태를 표시한 체인굴착장치의 예시도.
도 8은 도 7의 평면상태를 표시한 평면 예시도.
도 9는 도 7에 도시된 체인굴착장치를 이용하여 경계부분을 굴착하고 지중 연속벽을 시공하는 방법을 간략하게 설명하기 위한 도면.
도 10은 본 발명의 실시예로 유도레일장치에 설치되는 체인굴착장치의 왕복작용을 예시한 다른 예시도.
도 11은 본 발명의 실시예로 체인굴착장치를 구성하는 프레임의 연결 상태를 표시한 확대 단면 예시도.
도 12는 본 발명의 실시예로 체인굴착장치의 체인드라이버부분의 확대 단면예시도.
도 13은 본 발명의 실시예로 체인굴착장치의 체인드라이버부분의 측면 예시도.
도 14는 본 발명의 실시예로 무한궤도 굴착체인 하단부의 확대도.
도 15는 본 발명의 실시예로 무한궤도 굴착체인에 대한 분해 사시도.
도 16는 도 15에 대한 평면도.
도 17은 도 15에 도시된 확대부의 전단면적을 설명하기 위한 도면.
도 18은 본 발명의 실시예로 체인굴착장치에 경사도 측정유닛과 골재 투입 유닛이 적용된 상태를 보인 개략 사시도.
도 19는 본 발명 파일드라이버의 오거드라이버로 수직굴착하는 예시도.
도 20은 본 발명의 유도레일장치와 체일굴착장치를 설치한 파일드라이버로 지중을 수평굴착하는 상태를 표시한 정면 예시도.
도 21은 본 발명중 파일드라이버에 구비된 협지장치에 고정되는 체인굴착 장치로 전후진하면서 지중을 수평굴착하는 상태를 표시한 정면 예시도.
도 22는 도 21의 측면 예시도.1 is an exemplary view showing a pile driver for constructing a continuous underground wall having an induction rail device according to an exemplary embodiment of the present invention.
Figure 2 is an exemplary view of the side of the pile driver for underground continuous wall construction with an induction rail device in an embodiment of the present invention.
Figure 3 is a front view of the guide rail device installed chain digging device in an embodiment of the present invention.
Figure 4 is an exemplary cross-sectional view of the induction rail device is installed chain digging device in an embodiment of the present invention.
Figure 5 is an exemplary cross-sectional enlarged cross-sectional view of the guide rail device installed chain digging device in an embodiment of the present invention.
Figure 6 is an exemplary view of the separation state of the guide rail device in an embodiment of the present invention.
Figure 7 is an illustration of a chain drilling apparatus showing a reciprocating malfunction state of the chain drilling equipment installed in the guide rail device in an embodiment of the present invention.
8 is an exemplary plan view showing the planar state of FIG.
FIG. 9 is a view for briefly explaining a method of excavating a boundary portion and constructing a continuous underground wall using the chain drilling apparatus shown in FIG. 7; FIG.
Figure 10 is another exemplary view illustrating a reciprocating action of the chain excavation device installed in the guide rail device in an embodiment of the present invention.
Figure 11 is an enlarged cross-sectional view showing a connection state of the frame constituting the chain drilling device in an embodiment of the present invention.
Figure 12 is an enlarged cross-sectional view of the chain driver portion of the chain drilling rig in an embodiment of the present invention.
Figure 13 is an exemplary view of the side of the chain driver portion of the chain drilling rig in an embodiment of the present invention.
Figure 14 is an enlarged view of the lower end of the caterpillar excavator in an embodiment of the present invention.
15 is an exploded perspective view of the caterpillar excavation chain in an embodiment of the present invention.
16 is a plan view of FIG. 15.
17 is a view for explaining the shear area of the enlarged portion shown in FIG.
18 is a schematic perspective view showing a state in which the inclination measuring unit and the aggregate input unit is applied to the chain excavation device in an embodiment of the present invention.
19 is an exemplary view of vertical drilling with an auger driver of the pile driver of the present invention.
20 is an exemplary front view showing a state of horizontal excavation of the ground with a pile driver provided with an induction rail device and a chain excavation device of the present invention.
21 is an exemplary front view showing a state of horizontal excavation of the ground while moving back and forth with the chain digging device fixed to the clamping device provided in the pile driver in the present invention.
22 is a side view of FIG. 21.
이하, 첨부된 도면을 참조하여 본 발명의 실시예를 설명하기로 한다.Hereinafter, embodiments of the present invention will be described with reference to the accompanying drawings.
도 1은 본 발명의 실시예로 유도레일장치를 구비한 지중 연속벽 구축용 파일 드라이버의 전체 예시도를 도시한 것으로, 이는 수직 굴착공에 체인굴착장치의 굴착체인을 삽입하는 상태를 도시한 것이고, 도 2는 본 발명의 실시예로 유도레일장치를 구비한 지중 연속벽 구축용 파일 드라이버의 측면 예시도로서 이는 수직 굴착공에 체인굴착장치의 굴착체인을 삽입하기전 상태를 도시하고 있는 것이다.1 is a view showing the entire example of the pile driver for underground continuous wall construction provided with an induction rail device in an embodiment of the present invention, which shows a state of inserting the excavation chain of the chain excavator in a vertical excavation hole 2 is a side view of a pile driver for constructing a continuous underground wall having an induction rail device according to an embodiment of the present invention, which illustrates a state before inserting an excavation chain of a chain excavation device into a vertical excavation hole.
첨부된 도 1 및 도 2에서와 같이, 기존 파일드라이버(100)의 리더(110)에 설치되는 오거 드라이버의 오거 드릴로 수직 굴착할 수 있어 필요시에 수직 굴착공을 천공할 수 있게 되는 것이다.As shown in FIG. 1 and FIG. 2, the auger drill of the auger driver installed in the
이러한, 파일 드라이버(100)를 구성하는 리더(110)에 유도레일장치(200)를 설치한다.The
상기와 같이, 파일 드라이버(100)의 리더(110)에 설치되는 상기 유도레일장치(200)는 종방향으로 3등분하여 조립이 가능한 조립분할체로 구성되며, 상기와 같은 조립분할체로 구성되는 상기 유도레일장치(200)에 횡이동반체(300)를 설치하는 것이다.As described above, the
그리고, 상기 유도레일장치(200) 전면에 설치되는 상기 횡이동반체(300)의 전면에 체인굴착장치(400)을 설치한다.Then, the
도 3은 본 발명의 실시예로 체인굴착장치가 설치된 유도레일장치의 정면도를 도시한 것으로서, 첨부된 도 1 및 도 2에서 설명한 바와같이 파일 드라이버(100)의 리더(110)에 설치되는 유도레일장치(200)는 종방향으로 3등분하는 조립이 가능한 중앙 분할체(220)와, 복수로 이루어지는 좌측 및 우측 분할체(230, 240)로 구성되며, 이렇게 분할되는 중앙 분할체(220)와 좌측 및 우측 분할체(230, 240)의 조립방법은 볼트(221)와 너트(222)로 조립하거나 분리할 수 있는 것이나, 기존에 실시되고 있는 다른 조립부재나 방법을 이용하여 조립 또는 분리가 수월한 부품이 개발될 경우도 가능할 것이다.3 is a front view of the induction rail apparatus in which the chain drilling apparatus is installed according to an embodiment of the present invention, and the induction rail installed in the
그리고, 상기 파일 드라이버(100)의 리더(110)에 설치되는 유도레일장치(200)는 유도레일장치(200)의 후면에 리더(110)의 리더봉(120)을 감싸잡는 대향되게 좌우의 켓취유니트(210)를 볼트(211)의 조임으로 설치하여, 상기 리더(110)를 따라 상기 유도레일장치(200)가 상승 또는 하강되도록 구성하였다.In addition, the
그리고, 상기 유도레일장치(200)를 구성하는 상횡빔(250)과 하횡빔(260)의 내측으로 홈레일(251, 261)을 형성하여, 상기 횡이동반체(300)의 상하단에 설치한 다수개의 롤(320)을 상기 홈레일(251, 261)에 안치시켜, 상기 홈레일(251, 261)상에서 왕복 이동되도록 하여 상기 횡이동반체(300)의 이동 동작이 원활해지도록 하는 거이다.In addition, groove rails 251 and 261 are formed inside the upper and
또한, 상기 유도레일장치(200)의 좌측종빔(270)과 우측종빔(280)에 상하로 유압실린더(290)를 복수개로 대향되게 설치하거나, 또는 엇갈리게 설치하여 상기 횡이동반체(300)를 양측에서 교대로 밀어주도록 설치하였다.In addition, a plurality of
첨부된 도 4는 본 발명의 실시예로 체인굴착장치가 설치된 유도레일장치의 횡단면 예시도이며, 도 5는 본 발명의 실시예로 체인굴착장치가 설치된 유도레일장치의 횡단면 부분 확대 단면 예시도를 도시한 것으로서, 상기 유도레일장치(200)의 전면에 설치된 상기 횡이동반체(300)의 전면으로 체인굴착장치(400)를 설치하는 구성은 첨부된 도 5에서와 같이 체인굴착장치(400)의 이면에 나란히 설치되는 한 쌍의 결착봉(401)을 설치하고, 또 체인굴착장치(400)와 면접되는 횡이동반체(300)의 전면에 대향되는 좌우의 켓취유니트(310)를 설치하여, 상기 체인굴착장치(400)의 결착봉(416)을 감싸도록 결합시켜, 상기 체인굴착장치(300)가 횡이동반체(200)의 전면에서 체인굴착장치(300)가 짧은 거리의 상하 이동이 가능하게 결합될 수 있는 것이다.4 is a cross-sectional view illustrating an induction rail device provided with a chain drilling device according to an embodiment of the present invention, and FIG. 5 is an enlarged cross-sectional view illustrating a cross section of an induction rail device provided with a chain drilling device according to an embodiment of the present invention. As shown, the configuration of installing the
또한, 첨부된 도 3에서 설명한 바와같이, 상기 횡이동반체(300)의 상하단에 설치한 다수개의 롤(320)이 안치되는 홈레일(261)이 형성되어, 상기 횡이동반체(300)의 왕복 이동이 원활하게 이루어지도록 하였다.In addition, as described with reference to FIG. 3, a
첨부된 도 6은 본 발명의 실시예로 유도레일장치의 분리상태 전체 예시도로서, 상기 설명되는 첨부된 도 3에서 설명한 바와같이 유도레일장치(200)를 종방향의 3등분으로 조립 분해되는 중앙 분할체(220)와 좌측 분할체(230) 및 우측 분할체(240)로 구성하여, 상기 유도레일장치(200)에 설치되는 횡이동반체(300)에 설치된 체인굴착장치(400)을 사용하지 않거나 다른 시공 장소를 이동할 때 중앙 분할체(220)에서 횡이동반체(300)와 체인굴착장치(400)는 그대로 놓고, 상기 체인굴착장치(400)의 하부 연결되는 무한궤도 굴착체인(460)을 분리하며, 상기 중앙 분할체(220)의 앙측에 설치되는 좌측 분할체(230)와 우측 분할체(240)도 분리한 후에 중앙 분할체(220)와 결합된 파일드라이버(100)를 간단하게 이송 차량에 적재하여 수송할 수 있게 하는 것이다.6 is a diagram illustrating an entire separation state of the induction rail device according to the embodiment of the present invention, as described in the accompanying FIG. 3 described above. Composed of a
이때, 상기와 같이 중앙 분할체(220)에서 분리되어진 좌측 분할체(230)와 우측 분할체(240)에는 각각 유압 실린더(290)가 설치된 상태이므로 시공장소로 이동시킨 후에는 중앙 분할체(220)의 양측에 좌측 분할체(230)와 우측 분할체(240)를 결합하여 상기 유도레일장치(200)를 재사용할 수 있게 조립한다.At this time, since the
또한, 상기 중앙 분할체(220)의 양측에 설치되는 좌측 및 우측 분할체(230, 240)의 조립은 볼트(221)와 너트(222)로 조립 및 분리가 용이하도록 하였다.In addition, the assembly of the left and
첨부된 도 7은 본 발명의 실시예로 유도레일장치에 설치되는 체인굴착장치의 전후진 상태를 표시한 체인굴착장치의 예시도이고, 도 8은 도 7의 체인굴착장치의 전후진상태를 표시한 평면 예시도를 도시한 것으로서, 첨부된 도 3에서 설명한 바와같이, 파일 드라이버(100)의 리더(110)에 설치되는 유도레일장치(200)는 종방향의 3등분하는 조립이 가능한 조립분할체로 구성되며, 유도레일장치(200)를 구성하는 상횡빔(250)과 하횡빔(260)에 각각 홈레일(251, 261)을 형성하여, 상기 홈레일(251, 261) 위를 횡으로 왕복 이동하는 횡이동반체(300)의 전면에 설치되는 상기 체인굴착장치(300)도 상기 유도레일장치(300)에서 상기 횡이동반체(300)와 같이 전후진의 왕복 이동이 가능하게 된다.FIG. 7 is an exemplary view of a chain excavator showing a forward and backward state of a chain excavator installed in an induction rail device according to an embodiment of the present invention, and FIG. 8 is a diagram showing a forward and backward state of the chain excavator of FIG. 7. As illustrated in FIG. 3, the
그리고, 상기 횡이동반체(300)의 상하단에 각각 설치된 다수개의 롤(320)에 의해 상기 횡이동반체(300)의 전후진 왕복 이동이 원활하고 유연해지는 것이다. 특히, 상술한 바와 같이 조립분할체로 구성되는 상기 유도레일장치(200)에서 횡으로 이동하는 상기 횡이동반체(300)는 유도레일장치(200)의 좌측종빔(270)과 우측종빔(280)에 대향 또는 엇갈리게 고정 설치되는 다단의 유압실린더(290)에 의해 횡이동반체(300)와 같이 체인굴착장치(400)가 다단을 이루는 상기 유압실린더(290) 사이에서 왕복 이동하도록 하였다.In addition, the plurality of
다시말해, 좌측상하의 유압실린더(290)가 신장되면 대향 위치에 설치된 우측상하의 유압실린더(290)는 수축하게 되어, 상기 횡이동반체(300) 및 체인굴착장치(400)가 우측으로 이동하였다가 반대로 좌측으로 이동하게 되는 작동을 실선으로 표시한 횡이동반체(300) 및 체인굴착장치(400)가 우측방향으로 전진하여 끝에 도달하면, 반대로 우측상하의 유압실린더(290)는 신장되고 동시에 좌측상하의 유압실린더(290)는 수축하여 가상선으로 표시된 횡이동반체(300) 및 체인굴착장치(400)와 같이 좌측방향으로 후진하게 되는 왕복 이동에 의해, 상기 횡이동반체(300)와 같이 체인굴착장치(400)도 반복 운동함에 따라 상기 횡이동반체(300)와 같이 체인굴착장치(400)가 연속적으로 전후진 작동되도록 하였다.In other words, when the upper and lower
이때, 상기와 같이 유도레일장치(200)에 설치된 횡이동반체(300) 및 체인굴착장치(400)가 실선으로 표시한 바와같이 우측으로 전진 이동하면, 파일 드라이버(100)의 리더(110) 상단의 톱세이브에 설치된 풀리 및 로프들에 의해 레일유도장치(200)를 약간 끌어 올린 후 횡이동반체(300) 및 체인굴착장치(400)가 전진 이동한 거리만큼 상기 파일 드라이버(100)를 전진 이동시키고, 다시 레일유도장치(200)를 하강시켜 안착시키는 작업을 연속적으로 실시(예; 애벌레의 전진 동작과 유사함)하여 상기 체인굴착장치(400)에 설치되는 무한궤도 굴착체인(460)으로 지중에 연속벽을 굴착할 수 있는 것이다.At this time, when the transverse moving
또한, 상기 체인굴착장치(400)의 전후진 왕복 이동거리는 유도레일장치(200) 폭과, 다단을 이루는 상기 유압실린더(290)의 행정 거리를 확장시켜 전후진 왕복 이동거리를 확장할 수 있는 것이고, 또한 이후 다단 유압실린더(290)의 행정거리가 길어지는 다단 유압실린더(290)를 사용하여 실시할 수 있는 것이다.In addition, the forward and backward reciprocating movement distance of the
상기와 같이, 체인굴착장치(400)를 유도레일장치(200)에 설치하여 상기 체인굴착장치(400)로 지중을 굴착할 때 파일 드라이버(100)의 리드(110)에 미치는 반사작용을 유도체일장치(200)가 흡수하여, 상기 파일 드라이버(100) 및 리드(110)에 가해지는 무리한 힘을 해소하게 되면서, 상기 파일 드라이버(100) 및 리드(110)가 쓰러짐을 예방할 수 있는 것이다.As described above, when the
여기서, 본 발명의 실시예는, 첨부된 도 9의 (a)에서와 같이 이동유닛(130)이 지중벽 형성을 위한 모서리 부위로 진입하는 경우, 상기 이동유닛(130)에서 다단을 이루는 유압실린더(290)에 의해 체인굴착장치(400)는 첨부된 도 9의 (b)에서와 같이 전,후진의 수평 이동이 가능하게 되므로, 상기 체인굴착장치(400)가 경계선에 닿아 더 이상 수평 이동을 진행할 수 없더라도 상기 체인굴착장치(400)를 경계방향으로 이동시키면서 굴착과 지중벽 형성 작업을 진행할 수 있으며, 이를 통해 건축 대지선 또는 인접 구조물과의 간섭으로 인하여 시공이 어려운 부분, 즉 첨부된 도 9의 (c)에 표시된 'P' 부분에 대한 굴착과 지중 연속벽 시공이 가능할 수 있는 것이다.Here, the embodiment of the present invention, when the moving
첨부된 도 10은 본 발명의 실시예로 유도레일장치에 설치되는 체인굴착장치의 왕복작용을 예시한 다른 예시도를 도시한 것으로서, 첨부된 도 7에서 설명한 바와 같이 유도레일장치(200)에 설치된 횡이동반체(300)와 체인굴착장치(400)가 실선으로 표시한 바와 같이 우측으로 전진 이동하게 되면, 파일 드라이버(100)의 리더(110) 상단의 톱세이브에 통상적으로 설치되어진 풀리 및 로프들에 의해 레일유도장치(200)를 약간 끌어 올린 후 횡이동반체(300)와 체인굴착장치(400)가 전진 이동한 거리만큼 파일드라이버(100)를 전진시키고, 다시 레일유도장치(200)를 하강시켜 안착시키는 작업을 연속적으로 실시함으로써, 상기 체인굴착장치(400)에 설치되는 무한궤도 굴착체인(460)으로 지중 연속벽을 굴착할 수 있는 것이다.10 is a diagram illustrating another exemplified reciprocating action of the chain excavation device installed in the induction rail device according to the embodiment of the present invention, and is installed in the
이렇게, 상기 레일유도장치(200)의 좌측종빔(270)과 우측종빔(280)에 고정 설치되는 복수개의 다단 유압실린더(290)를 상호 엇갈리게 상기 횡이동반체(300)의 후면에 설치하여, 상기 횡이동반체(300)와 같이 체인굴착장치(400)가 우측으로 이동하였다가 반대로 좌측으로 이동하게 되는 작동을 실선으로 표시한 횡이동반체(300)와 체인굴착장치(400)가 우측방향으로 전진하여 끝에 도달하면, 반대로 우측상하의 다단 유압실린더(290)는 신장되고, 동시에 좌측상하의 다단 유압실린더(290)는 수축하여 가상선으로 표시된 횡이동반체(300)와 체인굴착장치(400)와 같이 좌측방향으로 후진하게 되는 왕복 이동에 의해 상기 횡이동반체(300)와 체인굴착장치(400)도 계속적으로 반복 이동하게 됨으로써, 상기 횡이동반체(300)와 체인굴착장치(400)가 점진적으로 전후진 왕복 이동하는 다단 유압실린더(290)의 행정거리를 최대로 이용할 수도 있다.Thus, a plurality of multi-stage
상기 체인굴착장치(400)는 유도레일장치(200)에서 횡으로 왕복 이동하는 횡이동반체(300)에 결합되어 있어 리더(110) 상단의 톱세이브에 설치된 풀리 및 로프들에 의해 유도레일장치(200) 및 횡이동반체(300)와 같이 상승과 하강을 임의로 조정할 수 있는 것이다.The
상기 체인굴착장치(400)는 체인 드라이버(410)와 다수개의 프레임(420)을 연결하여 체인굴착암(430)을 구성하고, 상기 체인드라이버(410)내에 설치되는 스프로킷과 체인굴착암(430)의 말단에 설치되는 회전륜(450)의 주위에 무한궤도의 굴착체인(460)이 설치되어, 상기 체인드라이버(410)에 설치된 유압모터(미도시)에 의해 굴착체인(460)을 구동하게 되는 것이다.The
따라서, 상기 체인굴착장치(400)는 상단에 체인 드라이버(410)와, 체인드라이버(410)의 하부로 필요에 따라 일정길이를 갖는 다수개의 프레임(420)을 볼트(415) 및 너트(416)로 조립하여 필요한 길이로 연장 구성하게 되는데, 지중 연속굴착 깊이에 따라 굴착체인(460)의 길이를 상기의 방법으로 구성하여 체인굴착암(430)을 구성하고, 상기 굴착체인(460)을 설치하여 지중을 굴착하게 되는 것이다.Therefore, the
그리고, 상기 체인굴착장치(400)의 체인 드라이버(410)에서 하단의 체인굴착암(430)까지 압축공기 공급관(412), 시멘트몰탈 공급관(413), 물 공급관(414)을 설치하여 굴착할 때, 상기 압축공기 공급관(412)으로 압축공기를 분사시켜 굴착을 돕게 되고, 굴착된 지중 연속벽에 시멘트몰탈 공급관(413)으로 시멘트 몰탈을 타설하여 콘크리트 옹벽(지중 연속벽)을 구축하게 되며, 상기 물 공급관(414)으로 물을 공급하여 시멘트 몰탈의 반죽을 돕게 되는 것이다.And, when installing and drilling compressed
첨부된 도 11은 본 발명의 실시예로 체인굴착장치를 구성하는 프레임의 연결 상태를 표시한 확대 단면 예시도를 도시한 것으로서, 첨부된 도 1에서 설명한 바와 같이 체인 드라이버(410)에서 연장되는 체인굴착암(430)을 구성하는 구형 관체형의 프레임(420)도 볼트(415)와 너트(416)로 조립하여 구성하고, 이러한 프레임(420)의 길이방향으로 양면에 체인굴착암(430)이 이동을 용이하도록 체인 레일(421)을 구성하고, 상기 프레임(420)의 플렌지(417)를 맞대고 볼트(418)와 너트(419)로 조립하여 체인굴착암(430)을 구성하며, 내부에는 압축공기 공급관(412), 시멘트몰탈 공급관(413), 물 공급관(414)을 설치하고, 각각의 압축공기 공급관(412), 시멘트몰탈 공급관(413), 물 공급관(414)의 양단부에 유니언 조인트(417)와 나사선(418)을 결합시켜, 상기 압축공기 공급관(412), 시멘트몰탈 공급관(413), 물 공급관(414)들을 체인굴착암(430)의 말단까지 연장한다.Attached Figure 11 shows an enlarged cross-sectional view showing a connection state of the frame constituting the chain drilling apparatus in an embodiment of the present invention, a chain extending from the
첨부된 도 12는 본 발명의 실시예로 체인굴착장치의 체인드라이버부분에 대한 확대 단면 예시도를 도시한 것으로서, 상기 체인굴착장치(400) 중에서 체인 드라이버(410)의 내부에는 유압모터(미도시)가 축설된 스프로킷(440)이 설치되어 굴착체인(460)을 구동시키고, 상기 체인 드라이버(410) 상부에는 로프가 설치되는 풀리(411)가 설치되어 승강하게 되는 것이며, 또한 체인 드라이버(410)에는 압축공기 공급관(412)과 시멘트몰탈 공급관(413) 및 물 공급관(414)을 설치하여, 상기 체인굴착암(430)의 하단으로 공급하게 구성하였고, 상기 압축공기 공급관(412)을 통해 지중 굴착면에 압축 공기를 분사시켜 굴착을 돕게 하고, 물 공급관(414)을 통해 시멘트 반죽물의 반죽 농도를 조절하게 되는 것이다.12 is an enlarged cross-sectional view of the chain driver portion of the chain excavator as an embodiment of the present invention, a hydraulic motor (not shown) in the
그리고, 상기 체인 드라이버(210)의 하부로 필요에 따라 연장하여 굴착체인(460)의 길이는 프레임(420)을 연장하여 조정하게 되는 것으로, 일정길이로 구성되는 프레임(420)을 상호 대접하고 볼트(415)와 너트(416)로 고정시켜 굴착체인(460)의 길이를 연장하고, 반대로 길이를 짧게 구성할 때에는 프레임(420)을 결함시킨 볼트(415)와 너트(416)를 풀어서 결합되는 프레임(420)들의 길이를 짧게 조정하여 수평 굴착을 시공하는 것이다.In addition, the length of the
첨부된 도 13은 본 발명의 실시예로 체인굴착장치의 체인드라이버 부분의 측면 예시도를 도시한 것으로서, 첨부된 도 1에서 설명한 바와 같이, 상기 유도레일장치(200)는 리더(110)의 리더봉(120)을 감싸 잡는 대향되는 좌우의 켓취유니트(210)를 볼트(211)로 고정 설치하여 리더(110)를 감싸도록 한 후 유도레일장치(200)를 설치하고, 이렇게 설치된 유도레일장치(200)에 결합된 횡이동반체(300)에 켓취유니트(310)에 의해 전면으로 설치되는 체인굴착장치(400)에는 압축공기 공급관(412) 및 지중 연속 굴착 공간으로 시멘트 몰탈을 타설하는 시멘트몰탈 공급관(413)과 물 공급관(414)이 설치되어 필요에 따라 사용되며, 또한 상기 체인 드라이버(410) 상부에는 로프가 설치되는 풀리(411)가 설치되어 상승 또는 하강되게 구성하였다.13 is a side view of the chain driver portion of the chain drilling apparatus according to the embodiment of the present invention. As described in FIG. 1, the
첨부된 도 14는 본 발명의 실시예로 체인굴착장치의 무한궤도체인 하단부의 확대도를 도시한 것으로서, 상기 체인굴착장치(400)에서 구성되는 체인굴착암(430)은 다수개가 연결된 프레임(420)의 말단에 연결 구성하고, 상기 체인굴착암(430)의 말단 회전륜(450)의 하부로 상기 압축공기 공급관(412)과 시멘트몰탈 공급관(413) 및 물 공급관(414)의 말단이 도출되어 압축공기 공급관(412)으로는 압축공기가 분사되고, 시멘트몰탈 공급관(413)으로는 시멘트 몰탈이 타설하게 되며, 또한 물 공급관(414)으로 물을 공급하여 굴착을 돕고 시멘트 몰탈의 반죽 농도를 조절할 수 있게 되는 것이다.Attached Figure 14 shows an enlarged view of the lower end portion of the endless track of the chain drilling apparatus as an embodiment of the present invention, the
첨부된 도 15는 본 발명의 실시예로 체인굴착장치의 무한궤도 굴착체인에 대한 분해 사시도이고, 도 16은 도 15에 대한 평면도를 도시한 것으로, 무한궤도를 구성하는 굴착체인(460)은 서로 번갈아가며 배치되어 회전축(463)에 의하여 결합하는 아우터(Outer) 유닛(461)과 이너(Inner) 유닛(462)을 포함하고, 상기 아우터 유닛(461)에는 굴착시에 지층을 깍아주는 적어도 하나 이상의 블레이드(464a)를 가지는 결합부(464)를 결합 구성한 것이다.15 is an exploded perspective view of the caterpillar excavation chain of the chain drilling device according to an embodiment of the present invention, Figure 16 is a plan view of Figure 15, the excavating
여기서, 상기 블레이드(464a)는 상기 결합부(464)에 횡으로 배열되는 것으로, 이는 굴착층의 강도에 따라 그 개수가 선택적으로 배열될 수 있으며, 그 배열 개수는 1∼5개 범위내에서 결정되는 것이다.In this case, the
이때, 상기 굴착체인(460)이 구동하여 지층을 깍아줄 때 지층을 순차적으로 깍아 주게 되므로, 상기 굴착체인(460)에 최대 적은 힘으로 굴착되어 굴착체인(460)을 구동시키는 동력을 절약할 수 있도록 하였다.At this time, when the
한편, 상기 아우터 유닛(461)은 상대적으로 외부 쪽에 배치되는 무한궤도의 일부로서 본체부(461a)와 확장부(461b)를 포함하는데, 상기 본체부(461a)는 양단부가 상기 회전축(463)에 결합하고 있고, 상기 확장부(461b)는 상기 본체부(461a)의 양측면에 결합하는 구성으로서 본 실시예에서는 직육면체 형상이다.On the other hand, the
여기서, 도 17의 (a)에 도시된 상기 확장부(461b)는 평면이 직사각형 형태의 직육면체로 구성될 수도 있고, 도 17의 (b)에 도시된 확장부(461b)는 평면이 사다리꼴 형태인 직육면체로 구성될 수도 있다.Here, the
그리고, 상기 이너 유닛(462)은 상대적으로 안쪽에 배치되는 무한궤도의 일부 구성이다.In addition, the
상기 회전축(463)은 핀 형태로 구성될 수 있으며, 상기 아우터 유닛(461)과 이너 유닛(462)을 힌지 결합하는 구성이다.The
여기서, 첨부된 도 15 내지 도 17에 도시된 아우터 유닛(461)과 이너 유닛(462)은 직육면체 형상의 판이 조합된 형상으로 도시되어 있지만 이는 도시 상의 편의를 위한 것이며, 상기 아우터 유닛(461)과 이너 유닛(462)의 형상은 얼마든지 변경 가능하고 그러한 변경은 본 발명의 기술적 사상에 포함되는 것이다.Here, although the
한편, 상기 결합부(464)는 무한궤도 굴착체인(460)에 결합하는 부분으로서 본 실시예에서는 상기 아우터 유닛(461)의 확장부(461b)를 감싸는 형태로 결합하며 볼트(460a)와 너트(미도시)에 의해 아우터 유닛(461)에 결합하도록 함으로써 블레이드(464a)에 손상이 생겼을때 쉽게 교체할 수 있도록 하였다.On the other hand, the
이때, 상기 결합부(464)와 확장부(461b)의 결합을 보다 상세하게 설명하면 첨부된 도 15 및 도 16에 도시된 바와 같이 확장부(461b) 중 본체부(461a)에 인접한 한 쌍의 면을 감싸는 형태로 결합하되, 두 개의 아우터 유닛(461)에 배치되는 네 개의 확장부(461b) 중 가장 바깥에 위치하는 두 개의 확장부(461b)를 전술한 형태로 감싸면서 결합하는데, 이러한 구성을 취할 경우 상대적으로 아우터 유닛(461)과 결합부(464)의 결합이 용이하기 때문이다. 물론 지하의 상황이 큰 전단력에 대해 버텨야 하는 경우 결합부(464)가 4개의 확장부(461b) 모두를 감싸는 형태로 결합할 수도 있다.In this case, the coupling of the
즉, 굴착체인은 볼트와 너트에 의해 결합력이 의존되는데, 굴착체인이 지중에서 움직이는 과정에서 발생하는 전단력을 볼트가 전부 지탱해야 했고 그 과정에서 볼트에 전단 파괴가 발생하여 굴착체인이 굴착체인장치로부터 이탈하는 문제가 발생하였던 것이다.In other words, the coupling chain is dependent on the coupling force by the bolt and nut, and the bolt must support all the shear forces generated during the movement of the drilling chain in the ground. There was a problem of departure.
이에따라, 본 발명의 실시예에서는, 굴착체인(460)을 이루는 아우터 유닛(461)을 결합부(464)가 감싸는 형태를 유지하게 되므로, 전단 저항 면적이 넓어지는 효과가 발생하고 면적이 넓어짐으로 인하여 압력이 줄게 되고 따라서 더 큰 전단력을 지탱할 수 있는 효과를 기대할 수 있어 굴착체인(460)으로부터 블레이드(464a)가 이탈되는 것을 방지시킬 수 있는 것이다.Accordingly, in the embodiment of the present invention, the
여기서, 상기 블레이드(464a)는 상기 굴착체인(460)이가 구동됨에 따라 지중에서 함께 움직이면서 땅을 굴착하는 구성으로서 도시된 형태 외에도 다양한 형태로 구체화될 수 있으며 그러한 변형은 본 발명의 기술적 사상에 포함되는 변형으로 보아야 한다.Here, the
한편, 상기 굴착체인(460)은 프레임(420)에 의해 지지되는 것으로, 상기 프레임(420)은 상기 아우터 유닛(461) 및 이너 유닛(462), 그리고 상기 결합부(464)를 지지하고 이들 구성을 고정하는 기능도 아울러 수행한다.Meanwhile, the
이때, 첨부된 도 18에서와 같이, 상기 프레임(420)에는 경사도 측정유닛(800)이 설치될 수 있으며, 상기 경사도 측정유닛(800)은 상기 굴착체인(460)에 의해 굴착이 진행될 때, 상기 굴착체인(460), 더욱 상세하게는 프레임(420)의 연직 경사도를 측정하는 구성이며, 상기 경사도 측정유닛(800)으로는 시중에서 구할 수 있는 경사도 센서를 활용할 수 있다. 표시상의 편의를 위하여 센서 위치는 굴착체인(460)을 지지하는 프레임(420)의 외부에 설치된 것으로서 표시하였지만 센서 위치는 지반과 접촉하지 않는 부위(프레임의 안쪽 면 등)에 설치하는 것이 바람직하며, 도면에는 하나만 표시하였지만 여러 개의 센서를 설치하여 측정의 정확도를 높일 수도 있다.At this time, as shown in Figure 18, the
한편, 상기 경사도 측정유닛(800)을 프레임(420)에 설치하면, 상기 굴착체인(460)의 경사도를 측정할 수 있게 됨으로써, 상기 굴착체인(460)의 경사도를 보정 하면서 굴착을 할 수 있게 된다.On the other hand, if the
즉, 상기 굴착체인(460)이 지면과 수직일 때 가장 깊은 깊이로 굴착할 수 있으나, 가장 넓은 면적이 지반과 접하게 되므로 가장 큰 응력이 프레임(420)에 작용한다. 굴착해야 할 깊이와 지반에 의한 응력을 고려하여 가장 효율적인 경사도를 결정하고 굴착수단이 결정된 경사도를 유지하면서 굴착을 할 수 있도록 하는 것은 매우 중요한데 상기 경사도 측정유닛(800)에 의하여 보다 효율적으로 굴착이 가능하도록 하는 것이다.That is, when the
또한, 첨부된 도 18에 도시된 바와 같이, 상기 체인굴착장치(400)에 의해 굴착되는 지중(600)에 골재를 투입하기 위한 골재 투입 유닛(900)을 더 포함할 수 있으며, 상기 골재 투입 유닛(900)은 이동유닛(130)에 의하여 상기 체인굴착장치(400)가 이동할 때 상기 체인굴착장치(400)의 진행방향상 전방에 마련되는 것으로서, 상기 이동유닛(130)에는 격자 형상의 강재로 구성되는 지지프레임(301)을 더 포함하여, 상기 골재 투입 유닛(900)은 상기 지지프레임(301)에 결합될 수 있는 것이다.In addition, as shown in FIG. 18, an
이때, 첨부된 도 18에 도시된 바와같이, 화살표가 이동유닛(130)의 진행방향이며, 도면상 체인굴착장치(400)의 진행방향상 전방인 오르쪽에 골재 투입 유닛(900)이 마련되는 것이며, 상기 골재 투입 유닛(900)으로는 호퍼를 사용할 수 있으며, 토사로는 공사장 주변의 산토를 사용함으로써 토사 공급에 필요한 비용을 줄일 수 있도록 하는 것이 바람직하다.At this time, as shown in Figure 18, the arrow is the moving direction of the moving
여기서, 상기에서 설명하는 호퍼는 지지프레임(301)에 간단히 설치할 수 있는 구성이며 설치 비용 역시 비교적 저렴하므로 장치의 경제성을 고려할 때 매우 효율적으로 구성될 수 있다.Here, the hopper described above is a configuration that can be simply installed on the support frame 301 and the installation cost is also relatively low, so it can be configured very efficiently considering the economics of the device.
따라서, 상기 골재 투입 유닛(900)에 의해 체인굴착장치(400)의 전방에 토사를 투입하면(체인굴착장치(400)의 이동방향 상 전방에 위치한 바닥면(GL) 위에 토사를 뿌려 놓는 것을 투입이라고 표현하였다), 상기 체인굴착장치(400)가 굴착하는 과정에서 투입된 토사가 굴착되는 토양과 경화재와 함께 혼합되어 지중벽의 강도가 상승하는 효과가 있다.Therefore, when the soil is injected into the front of the
즉, 상기 경화재를 콘크리트로 사용하는 경우 투입하기도 힘들고 시멘트 믹스에 비하여 비용이 상승하게 되는데, 상기 골재 투입 유닛(900)에 의하여 주변 산토를 골재로 사용할 수 있도록 함으로써 비용을 줄이면서도 형성되는 지중벽의 강도를 증가시킬 수 있는 효과를 기대할 수 있게 되는 것이다.That is, when the hardener is used as concrete, it is difficult to add and the cost is increased compared to the cement mix. The
첨부된 도 19는 본 발명의 실시예로 파일 드라이버의 오거 드라이버로 수직 굴착하는 예시도를 도시한 것이며, 본 발명의 지중 연속벽 굴착장치로 지중 연속벽을 굴착하기에 앞서 오거 드라이버(700)를 구동하여 지중(600)에 오거 드릴(710)로 수직 굴착하여 수직 굴착 공간을 형성하여 체인굴착장치(400)를 용이하게 들어가게 함으로써, 상기 체인굴착장치(400)로 직접 수직 굴착공을 굴착하는 것에 비하여 작업성이 높아지며, 굴착 능력을 높여 시공비를 절약하는 경제적인 효과를 얻을 수 있는 것이다.19 is a view illustrating vertical excavation with an auger driver of a pile driver in an embodiment of the present invention, and prior to excavating the underground continuous wall with the underground continuous wall excavation apparatus of the present invention, the
첨부된 도 20은 본 발명의 실시예로 유도레일장치와 체일굴착장치를 설치한 파일 드라이버로 지중을 수평 굴착하는 상태를 표시한 정면 예시도를 도시한 것으로, 첨부된 도 19에서 설명한 바와같이 상기 오거 드릴로 굴착된 수직굴착공간에다 체인굴착장치의 체인굴착암(430)을 박고 체인 드라이버(410)를 가동시켜 수평 굴착을 하는 것이다.20 is a front exemplified view showing a state of horizontal excavation of the ground with a pile driver installed with an induction rail device and a chain excavation device according to an embodiment of the present invention, as described with reference to FIG. In the vertical excavation space excavated by the auger drill, the
상기와 같이 체인 드라이버(410)가 가동되면, 무한궤도의 굴착체인(460)이 회전하게 되고, 이에 따라 결합부(464)에 결합되어진 블레이드(464a)가 지층(600)을 깍아주는 지중에 수평 연속벽을 굴착하게 된다.When the
이와 같이. 블레이드(464a)가 지층을 깍아내면서 마찰에 의해 상기 블레이드캡(464a)이 마모되어 굴착 능력이 낮아지게 되면, 마모된 상기 블레이드(464a)를 교체한다.like this. When the
이렇게, 마모된 블레이드(464a)를 현장에서 교체하고 계속적으로 굴착 시공을 할 수 있어, 상기 블레이드(464a)의 손상으로 인한 굴착 시공 중단의 문제점을 해결할 수 있게 되면서, 굴착 작업의 중단으로 인한 공기의 연장과 비용 증가도 예방하는 경제적인 효과를 얻게 된다.Thus, it is possible to replace the worn
그리고, 상기와 같이 무한궤도의 굴착체인(460)으로 수평적으로 지중 연속벽을 형성하는 굴착 작업이 진행되는 동시에, 체인굴착장치(400)의 체인굴착암(430)에 설치되는 압축공기 공급관(412)으로 압축공기가 공급되어 체인굴착장치로 굴착되는 흙을 불어 주어 흙덩어리를 부수고, 한편으로는 시멘트몰탈 공급관(413)을 통하여 시멘트몰탈이 수평굴착공간으로 공급되면서 굴착된 흙과 혼합되어지는 콘크리트 몰탈이 수평굴착 공간을 채워주게 되며, 동시에 빔(610)을 삽입하여 견고한 지중연속벽을 신속히 구축할 수 있는 효과를 얻게 되는 것이다.In addition, the excavation work to form a horizontal continuous wall horizontally with the endless
첨부된 도 21은 본 발명의 실시예로 파일드라이버에 구비된 협지장치에 설치되는 체인굴착장치로 전,후진하면서 지중을 수평굴착하는 상태를 표시한 정면 예시도이고, 첨부된 도 22는 도 21의 측면 예시도로서, 본 발명의 파일 드라이버(100) 전면부에 대향되게 좌우로 구성되는 협지장치(500)를 설치하며, 상기 협지장치(500)는 대향되는 한 쌍의 협지판(510)으로 구성하여, 상기 체인굴착장치(400)를 대향으로 구성된 협지판(510) 사이에 끼우고 볼트(520)로 결합하여, 상기 파일 드라이버(100)의 전면에 설치하여 수평굴착을 시공할 수 있도록 한 것이다.Attached FIG. 21 is an exemplary front view showing a state of horizontal excavation of the ground while moving forward and backward with a chain excavator installed in a clamping device provided in a pile driver according to an embodiment of the present invention, and FIG. As an exemplary view of the side, the
이때, 상기 파일 드라이버(100)의 유도레일장치(200)에서 체인굴착암(430) 및 굴착체인(460)이 결합된 체인굴착장치(400)만을 분리하여, 상기 협지판(510)에 볼트(520)로 결합하여 사용한다.At this time, the
상기와 같이 파일 드라이버(100)의 전면에 체인굴착장치(400)만을 설치하고 굴착 시공하는 경우는 시공 현장이 협소하여 첨부된 도 20에서와 같이 파일 드라이버(100)의 유도레일장치(200)에 설치된 상태의 체인굴착장치(400)로는 굴착 시공할 수 없는 협소한 장소, 즉 재건축하는 건물의 지하 기초 공사의 경우에 땅의 면적이나 폭이 좁아 상기 레일유동장치(200)에 설치한 체인굴착장치(400)로 굴착 시공하기 곤란한 협소한 시공 장소로 파일 드라이버(100)를 전진 및 후진할 수 있는 정도의 지면이 확보되는 경우에, 상기 협지장치(500)에 체인굴착장치(400)를 설치하고 파일 드라이버(100)로 지중(600)에 연속벽을 굴착하면서 콘크리트 몰탈을 타설하여 콘크리트 지중 연속벽을 구축할 수 있는 것이다.As described above, when only the
이때에도, 첨부된 도 19에서 설명한 바와 같이 파일 드라이버(700)로 수직굴착공간을 형성한 후 파일드라이버(100)의 리더(110) 상단의 톱세이브에 설치된 풀리 및 로프들을 이용하여 체인굴착장치(400)를 상부로 들어 올리고, 상기 체인굴착장치(400)의 굴착체인(460)이 설치된 굴착암을 수직굴착공에 삽입하고서 톱세이브에 설치된 풀리 및 로프를 하강시켜, 상기 체인굴착장치(400)를 굴착 공간에 완전히 넣은 후에 체인굴착장치(400)로 수평 굴착을 하게 되는 것이다.In this case, as described with reference to FIG. 19, a vertical excavation space is formed by the
따라서, 여기에서도 콘크리트 몰탈을 타설하고 빔(610)을 박아주어 견고한 지중 콘크리트 연속 옹벽을 신속하게 구축하는 효과를 얻게 된다.Therefore, here, too, concrete mortar is poured and the
상기 설명과 같이 본 발명의 실시예는 오거드라이버를 구비하는 기존의 파일드라이버에 레일유도장치 및 체인굴착장치와 협지장치 등을 설치하여 사용이 간편하고 기능도 다양한 저가의 건설기초장비를 얻을 수 있는 것이다.As described above, the embodiment of the present invention provides a low cost construction basic equipment that is easy to use and has various functions by installing a rail induction device and a chain digging device and a gripping device in an existing pile driver having an auger driver. will be.
이상에서 본 발명의 유도레일장치와 협지장치를 구비한 지중 연속벽 구축용파일드라이버에 대한 기술사상을 첨부도면과 함께 서술하였지만, 이는 본 발명의 바람직한 실시예를 예시적으로 설명한 것이지 본 발명을 한정하는 것은 아니다.Although the technical idea of the underground continuous wall construction pile driver including the guide rail device and the clamping device of the present invention has been described with the accompanying drawings, this is illustrative of the preferred embodiment of the present invention and the present invention is limited. It is not.
따라서, 본 발명은 상술한 특정의 실시예에 한정되지 아니하며, 청구범위에서 청구하는 본 발명의 요지를 벗어남이 없이 당해 발명이 속하는 기술분야에서 통상의 지식을 가진 자라면 누구든지 다양한 변형 실시가 가능한 것은 물론이고, 그와같은 변경은 청구범위 기재의 범위내에 있게 된다.Therefore, the present invention is not limited to the above-described specific embodiments, and various modifications can be made by those skilled in the art without departing from the gist of the present invention as claimed in the claims. Of course, such changes will fall within the scope of the claims.
100; 파일드라이버 110; 리더
120; 리더봉 130; 이동유닛
131; 지지프레임 200; 레일유도장치
210; 켓취유니트 220; 중앙분할체
221,415,520; 볼트 222,416; 너트
230; 좌측분할체 240; 우측분할체
250; 상횡빔 260; 하횡빔
251,261; 홈레일 270; 좌측종빔
280; 우측종빔 290; 다단유압실린더
300; 횡이동반체 310; 케취유니트
320; 롤 400; 체인굴착장치
410; 체인드라이버 401; 결착봉
411; 풀리 412; 압축공기 공급관
413; 시멘트몰탈 공급관 414; 물공급관
417; 유니언조인트 418; 나사
419; 프렌지 420; 프레임
421; 체인레일 430; 체인굴착암
440; 스프로킷 450; 회전륜
460; 굴착체인 461; 아우터 유닛
461a; 본체부 461b; 확장부
462; 이너 유닛 463; 회전축
464; 결합부 464a; 블레이드
500; 협지장치 510; 협지판
600; 지중 610; H빔
700; 오거드라이버 710; 오거드릴
800; 경사도 측정유닛 900; 골재 공급 유닛100;
120;
131;
210;
221,415,520; Bolts 222,416; nut
230;
250;
251,261;
280; Right
300;
320;
410;
411;
413; Cement
417;
419;
421;
440;
460; 461 excavator; Outer unit
461a;
462;
464; Coupling
500; Clamping
600;
700;
800;
Claims (15)
상기 레일유도장치의 홈레일을 따라 횡으로 왕복 이동하게 전면으로 결합시킨 횡이동반체;
상기 레일유도장치의 전면에 설치되면서 상기 레일유도장치에 횡으로 왕복 이동하게 설치되는 상기 횡이동반체와 같이 횡으로 왕복 이동하게 설치되는 것으로, 체인 드라이버내에 설치되는 스프로킷과 체인굴착암의 말단에 설치되는 회전륜의 주위를 이동하면서 지중을 굴착하는 무한궤도의 굴착체인을 포함하는 체인굴착장치; 및,
상기 체인굴착장치를 협지하면서 상호 대향되게 파일 드라이버의 전면 좌우에 설치되는 협지장치; 를 포함하고,
상기 파일 드라이버에 설치되는 상기 리더 상단의 톱세이브에 설치된 풀리 및 로프들에 의해 상기 레일유도장치를 상승 또는 하강시키되,
상기 굴착체인은 서로 번갈아가며 배치되어 결합축에 의하여 결합하는 아우터(Outer) 유닛과 이너(Inner) 유닛을 포함하고 있고, 상기 아우터 유닛에는 적어도 하나 이상의 블레이드를 가지는 결합부를 결합 구성되며,
상기 아우터 유닛은 양단부가 상기 결합축에 결합하는 본체부와, 상기 본체부의 측면에 결합하는 확장부를 구비하는 것을 특징으로 하는 지중 연속벽 구축용 파일 드라이버.A rail guide device capable of lifting and lowering along a leader of a pile driver having an air hammer and auger drill equipment;
A transverse moving body coupled to the front surface to reciprocate horizontally along the groove rail of the rail guide device;
It is installed on the front of the rail guide device and is installed to reciprocate horizontally, such as the transverse mover is installed in the rail guide device reciprocally transversely, at the end of the sprocket and chain drilling arm installed in the chain driver A chain excavation apparatus including an excavated chain having an orbital track that excavates the ground while moving around the rotating wheel to be installed; And,
A gripping device which is installed on the front left and right of the pile driver so as to be opposed to each other while sandwiching the chain excavator; Including,
The rail induction device is raised or lowered by pulleys and ropes installed on the top save of the top of the leader installed in the pile driver,
The excavation chain includes an outer unit and an inner unit which are alternately arranged to be coupled to each other by a coupling shaft, and the coupling unit has a coupling portion having at least one blade.
And the outer unit includes a main body portion at both ends coupled to the coupling shaft, and an extension portion coupled to the side surface of the main body portion.
상기 결합부는 상기 아우터 유닛의 상기 확장부를 감싸는 형태로 상기 굴착체인에 결합하는 것을 특징으로 하는 지중 연속벽 구축용 파일 드라이버.The method of claim 1,
The coupling part is a pile driver for underground continuous wall construction, characterized in that coupled to the excavating chain in a form surrounding the expansion unit of the outer unit.
상기 확장부는 상기 본체부의 양쪽에 각각 한 쌍으로 구성하는 것을 특징으로 하는 지중 연속벽 구축용 파일 드라이버.The method of claim 3, wherein
And the extension part constitutes a pair on each side of the main body part.
상기 확장부는 직육면체 형태이며, 상기 결합부는 상기 확장부 중 상기 본체부와 인접한 한 쌍의 면을 감싸면서 결합하는 것을 특징으로 하는 지중 연속벽 구축용 파일 드라이버.The method of claim 4, wherein
The expansion portion is a rectangular parallelepiped, the coupling portion is a pile driver for underground continuous wall construction, characterized in that coupled to surround the pair of surfaces adjacent to the main body portion of the expansion portion.
상기 아우터 유닛과 이너 유닛은 각각 한 쌍씩 번갈아가며 배치되고, 상기 결합부의 양단부는 한 쌍의 아우터 유닛에 포함된 결합부 중 가장 외곽부에 배치된 확장부에 각각 결합하는 것을 특징으로 하는 지중 연속벽 구축용 파일 드라이버.The method of claim 5,
The outer unit and the inner unit are alternately arranged in pairs, respectively, and both ends of the coupling portion are coupled to the underground continuous wall, characterized in that respectively coupled to the expansion portion disposed on the outermost portion of the coupling portion included in the pair of outer units Build file driver.
상기 아우터 유닛은 볼트 및 너트를 이용하여 상기 체인굴착장치의 프레임에 결합하는 것을 특징으로 하는 지중 연속벽 구축용 파일 드라이버.The method of claim 6,
The outer unit is a pile driver for underground continuous wall construction, characterized in that coupled to the frame of the chain drilling equipment using a bolt and nut.
상기 프레임에는 상기 체인굴착장치에 의한 굴착이 이루어질 때 상기 체인굴착장치의 연직 경사도를 측정하기 위한 경사도 측정유닛을 형성하는 것을 특징으로 하는 지중 연속벽 구축용 파일 드라이버.The method of claim 7, wherein
And a slope measuring unit for measuring the vertical slope of the chain excavator when the excavator is excavated by the chain excavator.
상기 체인굴착장치에 의해 굴착되는 지중에 골재를 투입하기 위한 골재 투입 유닛을 더 포함하고,
상기 골재 투입 유닛은 이동유닛에 의하여 상기 체인굴착장치가 이동할 때 상기 체인굴착장치의 진행방향상 전방에 마련되며,
상기 이동유닛에는 격자 형상의 강재로 구성되는 지지프레임을 더 포함하여, 상기 골재 투입 유닛은 상기 지지프레임에 결합하는 것을 특징으로 하는 지중 연속벽 구축용 파일 드라이버.The method of claim 1,
Aggregate input unit for injecting aggregate into the ground excavated by the chain drilling device further comprises,
The aggregate input unit is provided in the forward direction of the chain drilling device when the chain drilling device is moved by a moving unit,
The moving unit further comprises a support frame composed of a steel plate of the grid-like, the aggregate input unit is pile pile building driver, characterized in that coupled to the support frame.
상기 체인굴착장치는,
체인 드라이버와 다수개의 프레임을 볼트 및 너트의 조립에 의해 일정길이로 연장되는 체인굴착암;
상기 체인 드라이버에서 하단의 상기 체인굴착암까지 설치되는 압축공기 공급관과 시멘트몰탈 공급관 및 물공급관; 및,
상기 체인굴착암을 조립으로 구성하는 프레임; 을 더 포함하는 것을 특징으로 하는 지중 연속벽 구축용 파일 드라이버.The method of claim 1,
The chain excavation device,
A chain digging arm extending the chain driver and the plurality of frames to a predetermined length by assembling bolts and nuts;
A compressed air supply pipe, a cement mortar supply pipe, and a water supply pipe installed from the chain driver to the lower chain excavation arm; And,
A frame configured to assemble the chain drilling arm; File driver for underground continuous wall construction, characterized in that it further comprises.
상기 레일유도장치는,
종방향의 3등분하여 너트와 볼트로 분리 및 조립이 가능하게 설치되는 중앙분할체와 복수의 측면분할체;
상횡빔과 하횡빔에 형성되는 홈레일;
좌측종빔과 우측종빔에 각각으로 상,하부에 대향적이거나 엇갈리게 설치되는 다단의 유압실린더; 및,
상기 리더의 리더봉을 감싸 잡게 설치되는 파일드라이버의 리더를 따라 상승 또는 하강되도록 후면에 설치되는 한 쌍의 켓취유니트; 를 포함하는 것을 특징으로 하는 지중 연속벽 구축용 파일 드라이버.The method of claim 1,
The rail guide device,
A central divider and a plurality of side dividers, each of which is divided into three parts in a longitudinal direction and is separable and assembled by nuts and bolts;
Groove rails formed on the upper and lower beams;
Multi-stage hydraulic cylinders installed on the upper and lower sides of the left longitudinal beam and the right longitudinal beam, respectively; And,
A pair of kit taking units installed on a rear side of the reader to be raised or lowered along the leader of the pile driver installed to surround the leader rod of the leader; File driver for underground continuous wall construction comprising a.
상기 횡이동반체는,
상기 레일유도장치의 상횡빔과 하횡빔에 각각 형성되는 상기 홈레일상에 안치되는 것으로, 상기 레일유도장치에 설치되는 상기 유압실린더에 의해 왕복 이동이 원활하게 가이드하는 다수개의 롤을 상하단에 각각 설치하는 것을 특징으로 하는 지중 연속벽 구축용 파일 드라이버.The method of claim 11,
The transverse moving body,
It is settled on the groove rails respectively formed in the upper and lower beams of the rail induction apparatus, respectively, and the plurality of rolls for smoothly reciprocating movement are guided by the hydraulic cylinders installed in the rail induction apparatus, respectively. File driver for underground continuous wall construction, characterized in that.
상기 횡이동반체에는,
상기 횡이동반체의 전면에 대향되게 좌우에 설치되는 상기 켓취유니트와, 상기 켓취유니트에 의해 감싸여지게 하는 한 쌍의 결착봉을 구성하고,
상기 체인굴착장치는 상기 켓취유니트와 상기 결착봉에 의해 상기 횡이동반체의 전면에 설치되면서 다단을 이루는 상기 유압실린더에 의해 상기 횡이동반체와 같이 상기 레일유도장치에서 횡으로 왕복 이동하도록 구성하는 것을 특징으로 하는 지중 연속벽 구축용 파일 드라이버.The method of claim 12,
In the transverse carrier,
And a pair of binding rods configured to be enclosed by the ket taking unit installed on the left and right opposite to the front surface of the transverse moving body and the ket taking unit,
The chain digging device is configured to reciprocate horizontally in the rail induction device like the transverse moving body by the hydraulic cylinder forming a multi-stage while being installed on the front of the transverse moving body by the ket taking unit and the binding rod. A file driver for underground continuous wall construction.
상기 체인굴착암의 굴착 깊이에 따라 구축하는 프레임을 플렌지를 구비하는 구형관체로 구성하고,
상기 프레임 내부에 구형관체의 길이와 유사한 압축공기 공급관과 시멘트몰탈 공급관 및 물 공급관을 호스로 구성하며,
상기 호스로 구성되는 압축공기 공급관과 시멘트몰탈 공급관 및 물 공공급의 양단에는 설치된 나사 및 유니어조인트를 상호 연결하여 상기 체인굴착암의 말단부까지 압축공기 공급관과 시멘트몰탈 공급관 및 물 공급관이 연장되게 구성하는 것을 특징으로 하는 지중 연속벽 구축용 파일 드라이버.The method of claim 13,
The frame constructed according to the excavation depth of the chain drilling arm is composed of a spherical tube having a flange,
The compressed air supply pipe and the cement mortar supply pipe and water supply pipe similar to the length of the spherical pipe inside the frame is composed of a hose,
Compressed air supply pipe composed of the hose and the cement mortar supply pipe and both ends of the water public-grade screw and uni-joint are installed to interconnect the compressed air supply pipe and cement mortar supply pipe and water supply pipe to the end of the chain drilling arm A file driver for underground continuous wall construction.
상기 협지장치에는 상기 협지장치에서 연장되며 상기 체인굴착장치를 직접적으로 잡아주는 협지판을 더 포함하고,
상기 협지판 사이에 상기 체인굴착장치가 놓여지면서 볼트로 결합되면서, 상기 체인굴착장치는 상기 파일 드라이버에 설치되는 리더 상단의 톱세이브에 설치된 풀리와 로프들에 의해 상승 또는 하강이 이루어지도록 구성하는 것을 특징으로 하는 지중 연속벽 구축용 파일 드라이버.The method of claim 14,
The gripping device further includes a gripping plate extending from the gripping device and holding the chain digging device directly.
While the chain excavator is placed between the sandwich plates while being coupled with a bolt, the chain excavator is configured to be raised or lowered by pulleys and ropes installed on the top save of the top of the leader installed in the pile driver. File driver for underground continuous wall construction characterized in.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020180149938A KR101998180B1 (en) | 2018-11-28 | 2018-11-28 | Pile driver for structural walls |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020180149938A KR101998180B1 (en) | 2018-11-28 | 2018-11-28 | Pile driver for structural walls |
Publications (1)
Publication Number | Publication Date |
---|---|
KR101998180B1 true KR101998180B1 (en) | 2019-09-27 |
Family
ID=68096768
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020180149938A KR101998180B1 (en) | 2018-11-28 | 2018-11-28 | Pile driver for structural walls |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR101998180B1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20220073392A (en) | 2020-11-26 | 2022-06-03 | 한미기초기술 주식회사 | Chain excavation device with the function of preventing sagging of the excavation chain |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR880000655B1 (en) | 1984-03-29 | 1988-04-20 | 가부시기 가이샤 도시바 | Method for producing nitridesilicons |
KR930002619A (en) | 1991-07-10 | 1993-02-23 | 기다나까 마사히로 | Excavator for underground continuous wall formation |
KR930021890A (en) | 1992-04-01 | 1993-11-23 | 기따나까 마사히로 | Excavator for underground continuous wall and construction method using the device |
KR930021891A (en) | 1992-04-01 | 1993-11-23 | 기따나까 마하시로 | Excavator for self-continuous wall and underground continuous wall method |
JP3673800B2 (en) * | 1996-07-26 | 2005-07-20 | コベルコクレーン株式会社 | Ground improvement method and apparatus |
KR20060122047A (en) * | 2005-05-25 | 2006-11-30 | 기묘중건설 주식회사 | Pile driver for structural walls having inducement rail-unit & catch-unit |
-
2018
- 2018-11-28 KR KR1020180149938A patent/KR101998180B1/en active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR880000655B1 (en) | 1984-03-29 | 1988-04-20 | 가부시기 가이샤 도시바 | Method for producing nitridesilicons |
KR930002619A (en) | 1991-07-10 | 1993-02-23 | 기다나까 마사히로 | Excavator for underground continuous wall formation |
KR930021890A (en) | 1992-04-01 | 1993-11-23 | 기따나까 마사히로 | Excavator for underground continuous wall and construction method using the device |
KR930021891A (en) | 1992-04-01 | 1993-11-23 | 기따나까 마하시로 | Excavator for self-continuous wall and underground continuous wall method |
JP3673800B2 (en) * | 1996-07-26 | 2005-07-20 | コベルコクレーン株式会社 | Ground improvement method and apparatus |
KR20060122047A (en) * | 2005-05-25 | 2006-11-30 | 기묘중건설 주식회사 | Pile driver for structural walls having inducement rail-unit & catch-unit |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20220073392A (en) | 2020-11-26 | 2022-06-03 | 한미기초기술 주식회사 | Chain excavation device with the function of preventing sagging of the excavation chain |
KR102502301B1 (en) * | 2020-11-26 | 2023-02-23 | 한미기초기술 주식회사 | Chain excavation device with the function of preventing sagging of the excavation chain |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2525188B2 (en) | Excavator | |
US5244315A (en) | Excavator for constructing underground continuous wall and underground continuous wall construction method | |
US5349765A (en) | Excavator for constructing underground continuous wall and construction method using the excavator | |
US5257471A (en) | Excavator for forming underground continuous wall | |
KR100688620B1 (en) | Pile driver for structural walls having inducement rail-unit ? catch-unit | |
KR101998180B1 (en) | Pile driver for structural walls | |
US20170268219A1 (en) | Underground-structure construction method | |
US6925736B2 (en) | In situ mixing apparatus and methods for creating underground wall | |
KR101018889B1 (en) | Construction method for non-excavation type under-pass tunel using horizontal drilling machine | |
WO2018133742A1 (en) | Groove cutting apparatus used for underground wall construction, and construction method therefor | |
KR200392277Y1 (en) | Pile driver for structural walls having inducement rail-unit & catch-unit | |
KR20130061377A (en) | Structure of retaining wall and construction method for installing underground structures | |
KR102171437B1 (en) | Construction method of panel for pedestrian block | |
US6267191B1 (en) | Self advancing mining sled | |
KR101886969B1 (en) | Ground excavating able to be attached general excavator | |
CN114607389A (en) | Improved double-side-wall pilot tunnel construction method for urban super-large-section shallow-buried station | |
CN113863311A (en) | Construction method for rapid hole forming of anti-slide pile rotary drilling rig and self-soil-taking edger | |
JP2023544796A (en) | Earthmoving machinery and methods for removing soil | |
KR200340716Y1 (en) | Crawler-crane having a auger-drill and a chain-excavator | |
KR100579714B1 (en) | Pile driver for underground retaining wall | |
RU2783828C1 (en) | Device for strengthening earth structures | |
KR20060001953A (en) | Device of excavation and mixing | |
JP2000008369A (en) | Earth retaining wall forming method in pit excavating construction method | |
CN216765976U (en) | Sinking construction device for cast-in-place underground building | |
KR100955689B1 (en) | The unit metal tubing constructing system of Soil taking out system for the railroad track and the road underground driveway |