KR100579714B1 - Pile driver for underground retaining wall - Google Patents

Pile driver for underground retaining wall Download PDF

Info

Publication number
KR100579714B1
KR100579714B1 KR1020030055765A KR20030055765A KR100579714B1 KR 100579714 B1 KR100579714 B1 KR 100579714B1 KR 1020030055765 A KR1020030055765 A KR 1020030055765A KR 20030055765 A KR20030055765 A KR 20030055765A KR 100579714 B1 KR100579714 B1 KR 100579714B1
Authority
KR
South Korea
Prior art keywords
chain
excavation
retaining wall
underground
driver
Prior art date
Application number
KR1020030055765A
Other languages
Korean (ko)
Other versions
KR20050018366A (en
Inventor
김봉학
Original Assignee
기묘중건설 주식회사
김봉학
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 기묘중건설 주식회사, 김봉학 filed Critical 기묘중건설 주식회사
Priority to KR1020030055765A priority Critical patent/KR100579714B1/en
Publication of KR20050018366A publication Critical patent/KR20050018366A/en
Application granted granted Critical
Publication of KR100579714B1 publication Critical patent/KR100579714B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/04Directional drilling
    • E21B7/046Directional drilling horizontal drilling
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F5/00Dredgers or soil-shifting machines for special purposes
    • E02F5/16Machines for digging other holes in the soil
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B11/00Other drilling tools
    • E21B11/06Other drilling tools with driven cutting chains or similarly driven tools
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B3/00Rotary drilling
    • E21B3/02Surface drives for rotary drilling

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mechanical Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)
  • Earth Drilling (AREA)

Abstract

본 발명은 지하옹벽 구축용 파일드라이버에 관한 것으로, 이는 기존의 오거드라이버를 구비한 파일드라이버에 수평굴착용 체인굴착장치를 병설하여 저가의 비용으로 수평굴착장치를 제작할 수 있어 경제성이 높고 상기의 오거드릴장비로 굴착된 수직굴착공부터 수평굴착하여 지하(지중)에 형성되는 수평굴착공간에 시멘트몰탈을 타설 및 충진하는 동시에 H빔을 삽입하여 견고한 콘크리트옹벽을 축조할 수 있는 이중의 용도를 갖는 지하옹벽 구축용 파일드라이버(일명;크롤러크레인)를 제공함에 있다.The present invention relates to a pile driver for building a basement retaining wall, which may be installed with a horizontal drilling rig for a horizontal drilling rig in a pile driver provided with an existing auger driver, thereby manufacturing a horizontal drilling rig at a low cost, and thus the auger described above. The underground has the dual purpose to build a solid concrete retaining wall by inserting H beams while placing and filling cement mortar in the horizontal excavation space formed in the underground (underground) by horizontal excavation from the vertical excavation hole excavated with the drill equipment. To provide a pile driver for building retaining wall (aka crawler crane).

일반적으로 지중에 연속옹벽을 구축하는데 무한궤도차량이나 이동 트롤리에 절단굴착갈퀴를 연속적으로 형성하는 체인굴착장치를 설치하여 지중에 연속 옹벽(도랑)을 굴착하고 굴착되는 흙은 오물컨베어로 제거한 후에 지중콘크리트 연속 옹벽을 축조하고 있다.In general, the continuous retaining wall is constructed in the underground, and the chain excavation device is formed continuously in the tracked vehicle or the moving trolley to excavate the continuous retaining wall (ditch) in the ground, and the excavated soil is removed by dirt conveyor. A concrete continuous retaining wall is constructed.

본 발명을 구현할 수 있도록, 기존의 오거드라이버가 설치된 파일드라이버에 굴착갈퀴가 설치된 무한궤도체인으로 구성되는 체인굴착장치(200)를 병설하여 파일드라이버(100)에 설치된 오거드릴(120)로 수직굴착과 더불어 수평으로 굴착하여 지하에 연속적으로 형성되는 수평굴착공간을 시멘트몰탈로 충진하는 동시에 H빔을 삽입하여 견고한 콘크리트옹벽을 구축할 수 있게 하여, 기존의 파일드라이버에 체인굴착장치만을 설치하여 간단하게 제작할 수 있고, 따라서 제작비용도 절감되며 재건축건물을 시공할 때 굴착된 지하공간 주변의 붕괴도 예방할 수 있는 실용성과 경제성을 높일 수 있는 지하옹벽 구축용 파일드라이버에 그 특징이 있다.In order to implement the present invention, a vertical excavation with an auger drill 120 installed in the pile driver 100 by installing a chain digging device 200 consisting of an endless track chain installed with an excavation rake in a pile driver installed with an existing auger driver In addition, the horizontal excavation space, which is continuously excavated horizontally, is filled with cement mortar, and at the same time, the H-beam can be inserted to build a solid concrete retaining wall. It can be manufactured, and thus, the manufacturing cost is reduced, and the pile driver for underground retaining wall construction can increase the practicality and economical efficiency to prevent the collapse around the excavated underground space when constructing the reconstruction.

또한, 상기의 체인굴착장치(200)는 무한궤도체인에 설치되는 굴착갈퀴의 배열을 체인브래키트 마다 횡으로 1개 내지 4개의 굴착갈퀴를 배설하여 굴착능력의 증폭과 동력소모를 절감하여 공사비용을 낮출 수 있으며, 특히 굴착갈퀴에는 이를 감싸주는 갈퀴캡(265)을 설치하여 마모되는 갈퀴캡만을 교체할 수 있게 하여 무한궤도의 굴착체인의 수명을 연장하는 동시에 장비의 손상에 의한 시공 중단 등을 예방할 수 있는 지하옹벽 구축용 파일드라이버에 있다.In addition, the chain excavation device 200 by arranging the excavation rakes installed in the endless track chain per chain bracket kits by one to four excavation rakes to reduce the construction cost by amplifying the excavation capacity and reducing power consumption In particular, by installing a rake cap 265 that surrounds the excavating rake, it is possible to replace only the rake cap that is worn, thereby extending the life of the caterpillar chain of the caterpillar at the same time to stop construction due to damage to the equipment It is located in the pile driver for the construction of the underground retaining wall.

파일드라이버, 오거드라이버, 체인굴착장치, 체인프레임, 굴착갈퀴, 갈퀴캡 Pile Driver, Auger Driver, Chain Excavator, Chain Frame, Excavator Rake, Rake Cap

Description

지하옹벽 구축용 파일드라이버{Pile driver for underground retaining wall}Pile driver for underground retaining wall}

도 1은 본 발명을 구현한 지중 연속벽 구축용 파일드라이버의 전체도1 is an overall view of a pile driver for constructing underground continuous walls embodying the present invention

도 2는 도 1의 측면예시도Figure 2 is a side view of Figure 1

도 3은 본 발명중 체인굴착장치의 예시도Figure 3 is an illustration of the chain drilling equipment of the present invention

도 4는 본 발명중 체인굴착장치의 체인드라이버부위 단면예시도Figure 4 is an exemplary cross-sectional view of the chain driver portion of the chain drilling equipment of the present invention

도 5는 본 발명중 체인굴착장치중 체인드라이버부위의 측면도Figure 5 is a side view of the chain driver portion of the chain drilling device of the present invention

도 6은 본 발명중 체인굴착장치의 하단 체인굴착암 부위의 단면도Figure 6 is a cross-sectional view of the lower chain drilling arm portion of the chain drilling device of the present invention

도 7은 본 발명의 체인굴착장치중 일부굴착체인의 정면도7 is a front view of a part of the excavation chain of the chain drilling device of the present invention

도 8은 본 발명의 체인굴착장치중 굴착체인의 분해사시도Figure 8 is an exploded perspective view of the excavation chain of the chain excavation device of the present invention

도 9는 도 8의 체인굴착장치중 굴착굴착갈퀴의 분해사시도9 is an exploded perspective view of an excavation rake in the chain drilling device of FIG.

도 10은 본 발명에 의한 오거드릴로 지중에 수직굴착하는 예시도10 is an exemplary view of vertical drilling in the ground with an auger drill according to the present invention

도 11은 본 발명의 파일드라이버로 콘크리트옹벽을 구축하는 예시도11 is an exemplary view of building a concrete retaining wall with a pile driver of the present invention

* 도면의 주요부분에 대한 부호의 설명       * Explanation of symbols for main parts of the drawings

100; 파일드라이버 110; 리더 100; File driver 110; leader

111; 리더레일 120; 오거드라이버 111; Leader rail 120; Auger Driver

130; 오거드릴 200; 체인굴착장치 130; Auger drill 200; Chain Excavator

210; 체인드라이버 211; 도르래 210; Chain driver 211; Pulley

212; 압축공기공급관 213; 시멘트몰탈공급관 212; Compressed air supply pipe 213; Cement Mortar Supply Pipe

214; 괘지부재 215; 볼트너트214; Hanging member 215; Bolt Nut

220; 체인프레임 230; 체인굴착암 220; Chain frame 230; Chain digging

240; 구동치차 250; 스프로킷휠 240; Drive gear 250; Sprocket wheel

260; 굴착체인 261; 굴착갈퀴 260; Excavation 261; Excavation Rake

262; 체인브래키트 263; 체인링크 262; Chain bracket 263; Chain link

264; 연결핀 265; 갈퀴캡 264; Connecting pin 265; Pitchfork cap

266; 핀 300; 지층 266; Pin 300; bed

310; 수직굴착부 320; 수평굴착공간 310; Vertical excavator 320; Horizontal excavation space

330; 콘크리트옹벽 340; H빔330; Concrete retaining wall 340; H beam

본 발명은 기존의 오거드릴장비를 구비한 파일드라이버에 수평굴착용 체인굴착장치를 병설하여 저가의 비용으로 지하옹벽 구축용 체인굴착장치를 제작할 수 있어 경제성이 높고, 상기의 오거드라이버로 굴착된 수직굴착공부터 수평굴착하여 지하(지중)에 형성되는 수평굴착공간에 시멘트몰탈을 타설 충진하는 동시에 H빔을 삽입하여 지하에 견고한 콘크리트옹벽을 축조하는 동시에 건축물을 시공할 때 굴착된 지하공간주변에서 발생되는 토압에 의한 토사의 붕괴를 방지할 수 있는 지중 연속옹벽을 구축하는 지하옹벽 구축용 파일드라이버(일명;크롤러크레인)를 제공함에 있다.
고층이나 저층의 건축물을 시공할 때, 특히 재건축을 하기 위해 기초를 할 때, 건축물 지하를 굴착하고 지하부터 건축물을 시공하는데, 이때 굴착된 지하공간주변의 토압이 발생되어 토사가 지하공간 측으로 유입되지 않도록 토사방지 차단벽을 설치하여 시공을 하고 있다.
그러나, 차단벽이 견고하지 못하여 주변 주택의 지반이 변형되거나 건물의 붕괴우려도 배제하지 못하고 있는 실정이다.
The present invention can provide a chain digging device for horizontal excavation to a pile driver equipped with a conventional auger drilling equipment to produce a chain digging device for building a base retaining wall at low cost, high economical, vertical excavated with the above auger driver Cement mortar is filled and filled into the horizontal excavation space formed from the excavation hole horizontally, and H beam is inserted to build a solid concrete retaining wall in the basement. The present invention provides a pile driver (aka crawler crane) for building an underground retaining wall to build underground continuous retaining walls that can prevent the collapse of the soil due to earth pressure.
When constructing a high-rise or low-rise building, especially when building a foundation for reconstruction, excavate the basement of the building and construct the building from the basement. At this time, the earth pressure around the excavated underground space is generated, so that the earth and sand do not flow into the underground space. Install the anti-soil barrier to prevent installation.
However, the barriers are not strong, so even if the ground of the surrounding house is deformed or collapse of the building is not excluded.

삭제delete

일반적으로 건축물 주위로 구축되는 토사방지 차단벽을 구축하기 위하여는 먼저 지하에 H빔을 일정간격으로 때려 박은 뒤에 H빔들 사이를 굴착된 토사가 흘러내리지 않게 토사붕괴 방지용 차단판(목)을 설치하여 토사붕괴를 방지하는 차단벽을 구축하고 있다.In general, in order to construct the anti-earthquake barrier wall that is built around the building, first, by striking the H-beams at a certain interval in the basement, the earth-and- earth-break prevention barriers (neck) are installed so that the excavated soil between the H-beams does not flow down. A barrier is being built to prevent earth and sand collapse.

근래에는 상기의 토사방지 차단벽으로 지중콘크리트 연속옹벽을 구축하는 방법과 장치들이 제안되어 시행되고 있다.Recently, methods and apparatuses for constructing underground concrete continuous retaining walls using the anti-soil barriers have been proposed and implemented.

상기와 같은 지하콘크리트 연속옹벽을 구축하는 장치로서 수압모우터에 의해 구동되는 굴착체인이 설치되고 굴착체인에는 절단톱니가 형성되는 굴착암이 설치되는 무한궤도 차량으로 지중에 연속되는 굴착도랑을 구축하고 굴착된 도랑에 콘크리트옹벽을 타설하여 지중콘크리트 연속벽을 구축하는 방법도 알려져 있다.As an apparatus for constructing the continuous concrete retaining wall as described above, an excavation chain driven by a hydraulic motor is installed, and an excavating chain is provided with excavation arms in which excavation arms are formed with cutting teeth. It is also known to build underground concrete continuous walls by placing concrete retaining walls in excavated trenches.

이러한, 지중콘크리트 연속옹벽을 구축하는 굴착장치의 예로서, 지중 연속벽을 구축할 굴착선에 평행한 방향을 따라서 이동이 가능한 무한 궤도 트랙 상에 지지된 무한 궤도 기부 조립체와; 상기 무한 궤도 기부 조립체 상에 지지되며, 굴착선에 평행한 방향을 따라서 그의 길이방향으로 연장된 안내 리더레일을 가지는 플랫홈을 포함하는 이송체 조립체와; 상기 이송체 조립체의 리더레일 상을 이동하는 조정실과; 상기 조정실의 측부에 지지되는 장착 슬리이브 조립체와, 상기 장착 슬리이브 조립체을 통하여 하강된 굴착 자세와 상승된 이동자세간의 이동을 위하여 상기 조정실에 피버트식으로 접속된 굴착 아암 및, 상기 굴착 아암에 의하여 굴착된 토사를 수송하고, 상기 장착 슬리이브 조립체의 측부에 부착된 오물 컨베어를 포함하여 구성된 것을 특징으로 하는 지하 옹벽 구축을 위한 개량된 굴착장치(공개특허공보 제10-1988-0000655호)가 개시된 바 있고,
또한, 지중콘크리트 연속옹벽을 구축하는 굴착장치의 예로서, 수압모우터와 한쌍의 스프로켓 이 설치된 굴착아암 에다 흙을 긁어내는 절단톱니(굴착갈퀴)가 일정간격으로 형성되는 굴착체인으로 도랑을 형성하는 굴착장비와, 굴착된 흙을 배토하는 오물컨베어와,상기의 굴착도랑에 콘크리트를 채우는 무한궤도차량의 지항 옹벽 구축을 위한 개량된 굴착장치 및 방법(공개특허공보 제10-1988-0000655호)가 개시고 있으며,
An example of such an excavation device for constructing a continuous concrete continuous retaining wall includes: an endless track base assembly supported on an endless track capable of moving along a direction parallel to the excavation line for constructing the underground continuous wall; A conveyer assembly supported on the caterpillar base assembly and comprising a platform having a guide leader rail extending longitudinally thereof along a direction parallel to the excavation line; An adjusting chamber moving on the leader rail of the conveying assembly; A mounting sleeve assembly supported on the side of the adjustment chamber, an excavation arm pivotally connected to the adjustment chamber for movement between a lowered excavation posture and an elevated movement posture through the mounting sleeve assembly, and by the excavation arm. An improved excavation device (Publication Publication No. 10-1988-0000655) for transporting excavated earth and sand, comprising a dirt conveyor attached to the side of the mounting sleeve assembly, is disclosed. Bar,
In addition, as an example of an excavation device for constructing a continuous concrete retaining wall, the excavation chain is provided with a hydraulic motor and a pair of sprockets, and an excavation chain in which a cutting tooth (excavation rake) scraping soil is formed at regular intervals to form a ditch. Excavation equipment, soil contaminant for excavating excavated soil, and improved excavation device and method for constructing a retaining wall of a tracked vehicle for filling concrete in the excavation trench (Publication Patent Publication No. 10-1988-0000655) I am starting it,

그리고, 이동 트롤리와, 상기 트롤리 위에 구성된 상부체인프레임, 길이로 가변하고 수직으로 신장하며 트롤리의 상부 체인프레임의 일측에 제공된 수직으로 가동하는 안내기둥과, 상기 안내기둥의 상·하단부에서 안내 기둥 상에 회전가능하게 제공된 체인 스프로켓과, 상기 안내기둥의 상단부에 상기 체인 스프로켓의 일단 후방에 회전가능하게 제공된 체인 스프로켓과, 하나 이상의 체인 스프로켓의 회전에 의해 구동되도록 체인 스프로켓 주위에 대하여 신장하고 엔들리스 체인 버키트형 컷터를 형성하도록 엔들리스 체인을 따라 적당한 간격으로 다수의 굴삭장치 버키트를 갖는 엔트리체인을 포함하는 지중 연속벽 형성용 굴삭장치(공개특허공보 제10-1993-0002619호)와도 개시되고 있다.And a moving trolley, an upper chain frame configured on the trolley, a vertically movable guide pillar that is variable in length and extends vertically and provided on one side of the upper chain frame of the trolley, and on the upper and lower ends of the guide pillar. Chain sprockets rotatably provided on the chain sprocket, chain sprockets rotatably provided at one end of the chain sprocket at the upper end of the guide pillar, and extended around the chain sprockets and driven by rotation of one or more chain sprockets and endless chains. Also disclosed is an underground continuous wall forming excavator including an entry chain having a plurality of excavator buckets at appropriate intervals along the endless chain to form a bucket-shaped cutter (Public Publication No. 10-1993-0002619). have.

또, 지반보강을 위해 굴삭시공되는 지수벽을 시공하기 위한 지수벽 굴삭기에 있어서, 동력발생수단인 공지의 모터와 상기 모터의 동력을 분리하여 제l,2중공측, 별도로 각각 구동시키는 기어장치부와 상기 제2중공축으로 부터 동력을 전달받아 지수벽의 벽면에 해당하는 장홈을 굴삭하는 체인굴삭기구들로 구성되는 벽면 굴삭장치부와 상기 제1,2중공축으로 부터 전달받아 지수벽의 원기둥에 해당하는 홀을 굴삭하는 천공장치부와로 이루어짐을 특징으로 하는 지수벽 굴삭기(공개특허공보 제10-1994-0000686호)도 개시되고 있다.In addition, in an index wall excavator for constructing an exponential wall excavated for ground reinforcement, a gear device unit for driving a known motor, which is a power generating means, and the power of the motor to separate and drive the first and second hollow sides, respectively, And a wall excavation device portion composed of chain excavating mechanisms for receiving power from the second hollow shaft and digging a long groove corresponding to the wall surface of the exponential wall and receiving the cylinder from the first and second hollow shafts. Also disclosed is an exponential wall excavator (Publication Patent Publication No. 10-1994-0000686) comprising a punching device portion for digging a corresponding hole.

또한, 하부주행체와, 상부선회체와, 상기 상부선회체의 전방과 후방에 전방과 후방 양측이결합되는 제1링크, 일단이 상기 제1링크의 전방 일단에 대해 소정 각도 범위내에서 요동가능하도록 결합되는 제2링크, 상기 제2링크의 타단에 대해 회동가능하도록 결합되는 버킷휠, 상기 버킷휠의 외주면을 따라 적어도 하나 이상 버킷, 상기 제1링크의 길이방향을 따라 설치된 제1컨베이어 및 상기 제2링크의 길이방향을 따라 설치된 제2컨베이어를 구비하는 무한궤도차량의 컨베이어식 굴삭장비(공개특허공보 제10-1997-0075135호)등에의 해 지하에 지중 연속벽을 축조하는 장비로서, 절단톱니등 을 구비한 체인굴착기를 사용하는 것은 이미 알려진 기술에 있는 것입니다.Further, a lower linking body, an upper swinging body, a first link having both front and rear sides coupled to the front and rear of the upper swinging body, and one end of which is swingable within a predetermined angle range with respect to the front end of the first link. A second link coupled to the second link, a bucket wheel coupled to the other end of the second link, at least one bucket along an outer circumferential surface of the bucket wheel, a first conveyor installed along a longitudinal direction of the first link, and the Equipment for constructing underground continuous walls underground by conveyor type excavator excavating equipment (Publication Patent Publication No. 10-1997-0075135) and the like having a second conveyor installed along the longitudinal direction of the second link. The use of chain excavators with toothed teeth is already known.

그러나, 상기와 같이 절단톱니등을 구비한 체인굴착장치를 무한궤도차량, 트롤리 차량등 설치하여 굴착장비전용으로 제작하여 지하옹벽 구축용으로만 사용되고 있어 제작비에 대하여 이용성이 적어 경제성이 낮은 문제점이 있으며, 이러한 종전의 굴착장비들은 굴착시공상에 있어서도 무한궤도차량에 의해 운행에는 지장이 없겠으나, 굴착동작에서 일차 직선으로 굴착하다가 직각으로 방향을 바꿀 때에는 굴착체인장치의 장비규모에 따라 굴착상태를 진행하면서 방향을 전환할 수 없어 굴착작업을 중단한 후 체인굴착장치가 이동하는 리더레일(링크)을 걷어서 다시 굴착방향으로 설치하고 굴착작업을 다시 시공하게 되는 번거로움과 시공중단에 따른 공기도 길어지고 비용도 높게 책정되는 등의 문제점이 있는 것이다.However, as the above-mentioned chain excavation device equipped with cutting teeth and the like is installed only for excavation equipment by installing on tracked vehicles and trolley cars, it is used only for the construction of underground retaining walls. These conventional excavation equipments will not interfere with the operation of the tracked vehicle even during the construction of the excavation construction, but when excavating in a straight line in the excavation operation and changing the direction at right angles, the excavation state will be operated according to the equipment size of the excavating chain apparatus. After stopping the excavation work because the direction cannot be changed, the leader rail (link) that the chain excavation device moves is installed and installed again in the excavation direction, and the air due to the interruption of construction becomes longer. There are problems such as high cost.

본 발명은 오거드릴장비를 구비한 기존의 파일드라이버를 이용하며, 여기에 체인굴착장치를 병설하는 제작만으로 지하옹벽 구축용 파일드라이버를 제작할 수 있어, 종전에 별도로 체인굴착용 궤도차량 또는 트롤리 차량으로 제작하던 것에 비하여, 저가의 비용으로 지하 연속옹벽 축조용 파일드라이버를 제작완성할 수 있어 1차로 경제성이 높고, 또 상기의 오거드라이버로 굴착시킨 수직굴착공으로부터 수평굴착을 실행하여 지하에 형성되는 수평굴착공간에 시멘트몰탈을 타설하여 충진하는 동시에 H빔을 삽입하여 견고한 콘크리트옹벽을 연속적으로 구축하여 주변의 토압에 의한 토사붕괴를 방지하고 지하에 콘크리트옹벽을 연속적으로 구축할 수 있는 지하옹벽 구축용 파일드라이버를 제공함에 있다. The present invention uses the existing pile driver equipped with auger drill equipment, and can produce a pile driver for the construction of the underground retaining wall only by installing a chain digging device, so as a separate track excavation track or trolley vehicle Compared to the production process, the pile driver for underground continuous retaining wall construction can be manufactured at low cost, and the economy is firstly high, and the horizontal is formed underground by performing horizontal excavation from the vertical excavation hole excavated with the above auger driver. Filling and excavating cement mortar in the excavation space at the same time inserting the H beam to build a solid concrete retaining wall continuously to prevent earth and earth collapse by surrounding earth pressure and to build a concrete retaining wall continuously underground In providing a driver.

본 발명의 목적은 체인굴착장치를 회전동력부와 선택적 길이로 조립구성하는 체인프레임를 연결구성하고, 이러한 회전동력부와 체인브래키트에 무한궤도로 이루어지는 굴착체인를 설치하여 상기의 굴착체인은 흙을 굴착하는 굴착갈퀴가 구성되는 체인브래키트를 핀으로 연결하여 구성하며, 상기의 굴착갈퀴의 배열을 체인브래키트 마다 횡으로 1개 내지 4개의 굴착굴착갈퀴를 배설하여 빠른 굴착과 동력소모를 절감하여 공사비용을 낮출 수 있으며, 특히 굴착굴착갈퀴에는 굴착굴착갈퀴를 감싸주는 갈퀴캡을 설치하여 마모되는 갈퀴캡만을 교체할 수 있게 하여 무한궤도의 수명을 연장할 수 있을 뿐만 아니라, 장비의 손상에 의한 시공중단도 방지할 수 있게 함에 있다.An object of the present invention is to connect the chain frame assembling the chain excavating device with the rotational power unit and the optional length, and to install the excavation chain consisting of endless tracks in the rotational power unit and the chain bracket, the excavation chain is excavating soil It is configured by connecting the chain bracket which constitutes the excavation rake with a pin, and the arrangement of the excavation rakes by disposing one to four excavation excavation rakes horizontally for each chain excavation to reduce the rapid excavation and power consumption. The cost can be lowered, especially in the excavation rake to install a rake cap that surrounds the excavation rake to replace only the worn rake cap to extend the life of the caterpillar, construction by damage to the equipment It also helps to prevent interruptions.

본 발명의 다른 목적은 체인굴착장치에 공압공급관과 시멘트몰탈 공급관을 설치하여 굴착되는 굴착토를 분산시키는 동시에 굴착공간부에 시멘트몰탈을 분사하여 굴착토에 혼합시킨 혼합시멘트몰탈과 균일하게 혼합시키어 지하굴착공간에 충진하여 연속적인 콘크리트옹벽을 구축함에 있다.Another object of the present invention is to install a pneumatic supply pipe and a cement mortar supply pipe in the chain excavation device to disperse the excavated excavated soil at the same time and to mix the cement cement mortar uniformly mixed with the excavated soil in the excavation space uniformly underground It is to build continuous concrete retaining wall by filling in excavation space.

본 발명은 기존의 오거드릴장비를 구비한 파일드라이버의 기존의 리더에서 상승하강 되도록 수평굴착용 체인굴착장치를 병설하여 기존의 오거드라이버로 수직굴착공을 천공하는 동시에 지하에 형성되는 수평굴착공간에 시멘트몰탈을 타설하여 굴착토와 혼합하여 충진하는 동시에 H빔을 삽입하는 공정으로 신속하고 견고한 콘크리트 연속옹벽을 축조함으로써, 건물을 건축할 때에 굴착되는 지하공간주변의 토압에 의한 토사붕괴를 방지할 수 있는 지하에 연속옹벽을 축조하는 지하옹벽 구축용 파일드라이버에 있다The present invention is installed in the horizontal drilling space formed in the ground at the same time while drilling a vertical drilling hole with a conventional auger driver by installing a horizontal drilling chain drilling device to descend from the existing leader of the pile driver equipped with the existing auger drill equipment The process of inserting and filling cement mortar and mixing with the excavated soil and inserting the H beam to build a fast and solid concrete continuous retaining wall prevents the earth and sand collapse due to earth pressure around the underground space excavated when building the building. It is in pile driver for building underground retaining wall in basement

이하 본 발명을 첨부된 도면에 의해 상세히 설명하면 다음과 같다.Hereinafter, the present invention will be described in detail with reference to the accompanying drawings.

도 1은 본 발명을 구현한 지중 연속벽 구축용 파일드라이버의 전체도이고, 도 2는 측면 예시도로서, 오거드라이버(120)가 설치되어 있는 기존의 파일드라이버(100)의 리더(110)에다 리더(110)의 레일(111)을 감싸고 상승하강 하도록 체인굴착장치(200)를 설치하며, 기존의 오거드라이버(120)로는 수직굴착공을 천공하고 상기의 체인굴착장치(200)로는 지하에 수평굴착을 할 수 있는 수평굴착기능을 저가의 비용으로 제작하여 지하에 수평굴착과 더불어 지하콘크리트옹벽을 구축 할 수 있게 하였다.
이렇게, 상기의 리더(110)에 설치되는 체인굴착장치(200)의 상단에 도르래(211)를 설치하여 상기의 리더(110)상단에 설치되어진 톱세이브의 도르래에 의해 감겼다 풀렸다 하는 로프에 연결시켜 체인굴착장치(200)도 상승 및 하강작동을 하게 하였다.
FIG. 1 is an overall view of a pile driver for constructing a continuous underground wall according to the present invention, and FIG. 2 is a side view illustrating the reader 110 of an existing pile driver 100 in which an auger driver 120 is installed. The chain excavation device 200 is installed to cover the rails 111 of the leader 110 and ascend and descend. The conventional auger driver 120 drills a vertical excavation hole and the chain excavation device 200 is horizontally underground. The horizontal excavation function that can excavate is manufactured at low cost, so that the underground concrete retaining wall can be built in addition to the horizontal excavation underground.
Thus, the pulley 211 is installed on the upper end of the chain digging device 200 installed in the leader 110 is connected to the rope wound and unwound by the pulley of the top save installed on the leader 110 above. The chain digging device 200 also made the rise and fall operation.

상기의 체인굴착장치(200)는 체인드라이버(210)의 하부로 지하굴착깊이에 맞도록 선택적인 개수의 프레임(220)이 볼트너트로 연결되어 지고 이렇게 체인드라이버의 하부로 연결되어진 프레임(220)의 말단에 체인굴착암(230)에는 스프로킷휠(250)이 설치되며, 상기의 체인드라이버(210)와 체인프레임(220) 및 체인굴착암(230)의 스프로킷휠(250) 등을 경유하는 무한궤도의 굴착체인(260)이 설치되어 체인드라이버(210)의 회전에 의해 체인드라이버, 체인프레임, 체인굴착암 들의 궤도를 따라 이동(회동)하면서 굴착체인(260)에 선택적인 개수로 설치되어진 굴착갈퀴(261)가 지하층을 깎아(굴착)주게 된다.The chain digging device 200 has a frame 220 of a selective number of frames 220 connected to the bottom of the chain driver 210 to fit the depth of the underground excavation to the bolt driver, and thus connected to the lower part of the chain driver. The sprocket wheel 250 is installed on the chain excavation arm 230 at the end of the chain driver 210 and the chain frame 220 and the infinite through the sprocket wheel 250 of the chain excavation arm 230, etc. Excavation chain 260 of the track is installed and moved along the track of the chain driver, chain frame, chain drilling arms by the rotation of the chain driver 210, the excavation chain is installed in an optional number of excavation chain 260 Rake 261 is to crush (dig) the basement.

도 3은 본 발명중 체인굴착장치의 예시도로서, 상기와 같이 기존의 파일드라이버(100)에 병설한 체인굴착장치(200)는 상단에 체인드라이버(210)가 설치되고 상기의 체인드라이버(210)의 하부로는 굴착깊이에 맞도록 선택적인 개수의 체인프레임(220)을 연장하여 굴착깊이(길이)를 조정구성하며, 최말단부에는 체인굴착암(230)을 연결 설치한다.
그리고, 체인드라이버(210)와 연결되어 지는 체인프레임(220) 및 체인굴착암에 설치된 스프로킷휠(250)들을 경유하는 무한궤도의 굴착체인(260)은 체인드라이버(210)의 구동치차(240)의 회전에 따라 굴착체인(260)이 이동(회전이동)하면서 지하층을 굴착하게 구성되어 있다.
Figure 3 is an exemplary view of the chain excavation device in the present invention, the chain excavation device 200 installed in the existing pile driver 100 as described above, the chain driver 210 is installed on the top of the chain driver 210 The lower portion of the) to extend the optional number of chain frames 220 to fit the drilling depth to adjust the drilling depth (length), and install the chain drilling arm 230 is connected to the end.
In addition, the crawler chain 260 of the caterpillar through the chain frame 220 connected to the chain driver 210 and the sprocket wheels 250 installed on the chain drilling arm is driven by the drive gear 240 of the chain driver 210. According to the rotation of the excavation chain 260 is configured to excavate the basement while moving (rotational movement).

도 4는 본 발명중 체인굴착장치의 체인드라이버의 부위의 단면예시도 이고, 도 5 는 본 발명중 체인굴착장치중 체인드라이버 부위의 측면도로서, 상기의 체인굴착장치(200)는 구동치차(240)를 구비한 체인드라이버(210)와, 이에 선택적인 개수로 연결되어진 체인프래임(220) 및 체인굴착암(230)으로 구성되는 것은 상술한바 있고, 상술한 바와 같이 상기의 체인드라이버(210) 내에 설치된 스프로킷(240), 체인프레임(22O), 체인굴착암의 말단에 설치된 스프로킷휠(250) 등을 경유하도록 무한궤도의 굴착체인(260)을 설치하여 상기의 체인드라이버(210)에 설치된 유압모터(도시생략)에 의해 구동치차(240)가 회전되고 이에 따라 무한궤도의 굴착체인(260)이 체인프레임들과 체인굴착암의 궤도를 따라 이동하면서 지하층을 수평으로 굴착하게 된다.
또, 상기의 체인드라이버(210)의 이면부에는 괘지부재(214)를 구성하여 상기의 리더(110)를 구성하는 리더레일(111)을 감싸게 설치하여 체인굴착장치의 체인드라이버(210)가 리더(110)의 리더레일(111)을 따라 상승작동 또는 하강작동을 한다.
이때, 체인굴착장치(200)을 상승 또는 하강작동은 별도의 장치가 없이도 기존의 파일드라이버(100)에 설치되고 있는 오거드라이버(120)을 승강구동하는 유압모터(도시생략)에 의해 구동되는 로프(도르래 포함)에 구동하게 되는 것이다.
그리고, 상기의 체인드라이버(210)의 상단에 호스(도시생략)에 연결되는 압축공기 공급관(212)와 시멘트몰탈 공급관(213)이 체인프레임(220)들을 관통하여 하단에 체인굴착암까지 연설되어 굴착시에 압축공기를 분사하여 굴착되는 굴착토를 분산시키게 하며, 상기의 시멘트몰탈 공급관(213)으로는 시멘트몰탈을 공급타설되게 하여 지하에 형성되는 굴착공간에 시멘트몰탈 타설과 동시에 굴착토와 혼합되는 혼합몰탈을 상기의 수평굴착공간부에 충진시키게 한다.
Figure 4 is a cross-sectional view of a portion of the chain driver of the chain drilling device of the present invention, Figure 5 is a side view of the chain driver portion of the chain drilling device of the present invention, the chain drilling device 200 is a drive gear 240 The chain driver 210 having a) and the chain frame 220 and the chain excavation arm 230 connected to an optional number thereof have been described above. As described above, the chain driver 210 may be formed in the chain driver 210. A hydraulic motor installed in the chain driver 210 by installing an endless track excavation chain 260 through the installed sprocket 240, the chain frame 22O, and the sprocket wheel 250 installed at the end of the chain drilling arm. The drive gear 240 is rotated by (not shown), and thus the excavation chain 260 of the caterpillar moves along the track of the chain frames and the chain drilling arm to excavate the basement horizontally.
In addition, the back surface of the chain driver 210 constitutes a ruler member 214 to surround the leader rail 111 constituting the leader 110, so that the chain driver 210 of the chain digging device is a leader. Along the leader rail 111 of 110 to perform the rising operation or descending operation.
At this time, the lifting or lowering operation of the chain excavator 200 is driven by a hydraulic motor (not shown) to lift and drive the auger driver 120 installed in the existing pile driver 100 without a separate device. To pulleys (including pulleys).
Then, the compressed air supply pipe 212 and the cement mortar supply pipe 213 connected to the hose (not shown) on the upper end of the chain driver 210 is passed through the chain frame 220 to the chain drilling arm at the bottom When the excavation is sprayed with compressed air to disperse the excavated excavated soil, the cement mortar supply pipe 213 is to supply the cement mortar is poured into the cement space in the excavation space formed in the basement and mixed with the excavated soil at the same time The mixed mortar is filled in the horizontal excavation space.

도 6은 본 발명중 체인굴착장치의 하단 체인굴착암 부위의 단면도로서, 상기의 체인굴착장치(200)의 체인드라이버(210)와 다수의 체인프레임(220)과 볼트너트(215)로 연결되며 이의 첨단부에는 체인굴착암(230)에는 무한궤도의 굴착체인(260)이 회전 경유하는 스프로킷휠(250)이 설치되고 상기의 스프로킷휠의 하단부로 압축공기 공급관(212)과 시멘트몰탈 공급관(213)의 끝이 설치되고 있어 압축공기 공급관(212)으로는 압축공기가 분사되고 시멘트몰탈 공급관(213)으로는 시멘트몰탈이 타설하여 지하에 콘크리트연속옹벽을 축조할 수 있는 것이다.6 is a cross-sectional view of the lower chain drilling arm portion of the chain drilling apparatus of the present invention, the chain driver 210 of the chain drilling device 200 and a plurality of chain frame 220 and the bolt nut 215 is connected At its tip, the chain excavation arm 230 is provided with a sprocket wheel 250 through which the crawler chain 260 of the caterpillar is rotated. The compressed air supply pipe 212 and the cement mortar supply pipe 213 are provided at the lower end of the sprocket wheel. ) Is installed so that compressed air is injected into the compressed air supply pipe 212 and cement mortar is poured into the cement mortar supply pipe 213 to build a continuous concrete retaining wall underground.

도 7은 본 발명의 체인굴착장치중 일부굴착체인의 정면도로서, 상기의 체인굴착장치(100)중 무한궤도의 굴착체인(260)은 지하를 굴착할 때 지하(지중)층을 깎아주는 굴착갈퀴(261)들을 횡으로 1개 배열, 다음에는 2개 배열, 그 다음에는 3개배열 또는 4개들로 반복적으로 연속배열 하며, 이러한 무한궤도의 굴착체인(260)이 이동하면서 상기의 굴착갈퀴(261)가 지층(300)을 깎아(굴착)줄 때 지층을 1개의 굴착갈퀴(261)가 깎아주고 다음의 2개의 굴착갈퀴(261)가 깎아주고 그 다음에는 3~4개의 굴착갈퀴(261)가 깎아주는 순으로 깎아주게 하여 굴착갈퀴(261)들에 무리한 힘이 작용하지 않게 하여 전체적으로 굴착체인(260)을 구동시키는 동력소모가 절약되어 굴착시공비를 절약할 수 있는 경제적인 효과가 있다.7 is a front view of a part of the chain excavating chain of the present invention, the excavating chain 260 of the trackless track excavation device 100 of the chain excavation device to excavate the underground (underground) layer when excavating the underground (261) horizontally arranged in one array, then two arrays, then three arrays or four iteratively repeatedly arranged, the excavating rake (261) of the crawler chain 260 of this crawler ) When the ground layer 300 is cut (excavated), one excavation rake 261 is shaved, the next two excavation rakes 261 are shaved, and then three to four excavation rakes 261 are By shaving in order to shave in order not to force the excavation rake (261) to force the driving force of the excavation chain 260 as a whole, there is an economic effect that can save the excavation construction costs.

도 8은 본 발명의 체인굴착장치중 굴착체인의 분해사시도이며, 도 9 는 도 8 의 체인굴착장치중 굴착갈퀴의 분해사시도로서, 상기의 굴착체인(260)은 체인브래키트(262)에는 1개 내지 3개 이상의 굴착갈퀴(261)가 일체로 구성되고, 상기의 체인브래키트(262)와 일체로 구성된 체인링크(263)와 다음의 체인링크(263)들을 연결핀(264)으로 연결하여 무한궤도의 굴착체인(260)을 구성하였다.
이때, 상기의 체인브래키트(262)에 일체로 구성된 각각의 굴착갈퀴(261)에다 갈퀴캡(265)을 덮어씌우고 고정핀(266)으로 갈퀴캡(265)을 고정시킨다.
8 is an exploded perspective view of the excavation chain of the chain drilling device of the present invention, Figure 9 is an exploded perspective view of the excavation rake of the chain drilling device of Figure 8, the excavating chain 260 is 1 in the chain bracket 262 Three to three or more excavating rakes 261 are integrally formed, and the chain link 263 and the following chain links 263 integrally formed with the chain bracket 262 are connected by connecting pins 264. An endless track excavation chain 260 was constructed.
At this time, the rake cap 265 is covered with each of the excavating rakes 261 integrally formed on the chain bracket 262 and the rake cap 265 is fixed with the fixing pin 266.

그리고, 상기의 체인브래키트(262)에 구성된 굴착갈퀴(261)에다 갈퀴캡(265)을 덮어씌워서 굴착갈퀴(261)로 지층(하)을 깎을 때, 즉 굴착할 때 갈퀴캡(265)이 마모 되도록 하여 갈퀴캡(265)이 마모되면 갈퀴캡(265)만을 교체할 수 있게 하여 짧은 시간 내에 교체를 끝내고 굴착작업을 계속할 수 있고, 또한 굴착갈퀴(261)의 사용수명도 길게 하는 동시에 종전에 굴착갈퀴(261)가 직접적으로 지층을 굴착함에 따라 굴착갈퀴(261)가 마모되면 굴착체인의 전체를 교체하는 교체작업과 이에 따른 굴착작업도 중단시간이 갈어지던 문제점도 예방할 수 있어 굴착시공이 신속하고 원활하게 수행되어 공기와 비용을 절감하는 경제적인 가치가 높은 것이다.Then, by covering the rake cap 265 on the excavating rake 261 formed in the chain bracket 262, when cutting the ground layer (bottom) with the excavating rake 261, that is, when excavating the rake cap 265 When the rake cap 265 is worn out, only the rake cap 265 can be replaced so that the replacement of the rake cap 265 can be completed within a short time, and the excavation work can be continued. As the excavation rake 261 directly excavates the strata, when the excavation rake 261 is worn out, the replacement work of replacing the entire excavation chain and subsequent excavation work can be prevented, so that the downtime can be prevented. It is economically valuable to save air and money by being done smoothly and smoothly.

도 10은 본 발명중 오거드릴장비로 수지공을 천공하는 굴착예시도로서, 상기의 파일드라이버(100)에 설치되어 있는 기존의 오거드라이버(120)의 오거드릴(130)을 회동시켜서 굴착시발점의 지하(300)에다 수직굴착공(310)을 천공한 후에 상기의 체인굴착장치(200)의 굴착체인(260)이 삽입시키어 수평굴착을 한다.
이때, 상기의 수직굴착공(310)은 굴착체인(260)이 삽입될 수 있게 폭(구경)과 깊이의 수직굴착공(310)을 지하(300)에 천공하고 굴착체인(260)으로 수평굴착을 시작한다.
상기와 같이 본 발명은 기존의 오거드라이버를 사용하여 지하(300)에 수직굴착공(310)을 천공하고 체인굴착장치(200)로 수평굴착시공을 할 수 있게 함으로써, 종전의 수평굴착장비로는 수직굴착공을 시공할 수 없어 별도의 수직굴착장비를 사용하여 시공하는데 따는 시간과 비용이 추가될 뿐 아니라, 시공작업이 번거로운 문제점도 해결할 수 있는 효과가 있는 것이다.
10 is an exemplary view of drilling the resin hole with the auger drill equipment of the present invention, by rotating the auger drill 130 of the existing auger driver 120 installed in the pile driver 100 of the starting point of excavation After drilling the vertical excavation hole 310 in the basement 300, the excavation chain 260 of the chain excavation device 200 is inserted to perform horizontal excavation.
At this time, the vertical excavation hole 310 drills a vertical excavation hole 310 having a width (diameter) and depth in the basement 300 so that the excavation chain 260 can be inserted and horizontal excavation with the excavation chain 260. To start.
As described above, the present invention perforates the vertical excavation hole 310 in the basement 300 by using an existing auger driver, and enables horizontal excavation construction with the chain excavation device 200, as a conventional horizontal excavation equipment. Since the vertical excavation hole can not be installed, the time and cost of constructing using a separate vertical excavation equipment is added, and the construction work can be troublesome.

삭제delete

도 11은 본 발명의 파일드라이버로 콘크리트옹벽을 구축하는 예시도로서, 상기에서와 같이 오거드라이버(120)의 오거드릴130)로 지하(300)에 수직으로 천공한 수직굴착공(310)에 상기의 체인굴착장치(200)의 첨단부를 구성하고 있는 체인굴착암(230)을 삽입하고 체인드라이버(210)에 설치된 유압(공압)모터(도시생략)를 구동시켜 굴착체인(260)으로 지하에 콘크리트옹벽(330)을 설치할 수 있는 수평굴착을 실행한다.11 is an exemplary view of building a concrete retaining wall with a pile driver of the present invention, the auger drill 130 of the auger driver 120 as described above in the vertical excavation hole 310 perforated perpendicular to the basement 300 Insert the chain excavation arm 230 constituting the tip of the chain drilling device 200 and drive the hydraulic (pneumatic) motor (not shown) installed in the chain driver 210 concrete in the basement with the excavation chain 260 The horizontal excavation to install the retaining wall 330 is performed.

삭제delete

이때, 상기의 체인드라이버(210)의 스프로킷(240)이 회전하고 이의 스프로킷(240)에 치합되어진 무한궤도의 굴착체인(260)이 회전이동 하면서 굴착갈퀴(261)가 지하(300)층의 벽부위를 긁어가면서 굴착작용을 하게 된다.
또한, 상기의 체인굴착장치(200)를 구성하는 굴착체인(260)이 수평굴착을 시작하게 되면 파일드라이버(100)를 굴착진행 방향으로 이동시켜 가면서 계속적으로 수평굴착을 실시하게 되는 것이다.
At this time, while the sprocket 240 of the chain driver 210 is rotated and the excavating chain 260 of the caterpillar, which is engaged with the sprocket 240, is rotated, the excavation rake 261 is a wall of the underground 300 layer. Scraping the site will be excavating.
In addition, when the excavation chain 260 constituting the chain excavation device 200 starts horizontal excavation, horizontal excavation is continuously performed while moving the pile driver 100 in the excavation progress direction.

삭제delete

삭제delete

그리고, 상기와 같이 무한궤도의 굴착체인(260)으로 수평적으로 지하(300)에 콘크리트옹벽이 구축될 수 있는 수평공간(320)을 진행방향으로 형성하는 동시에 상기의 체인굴착장치(200)의 첨단부를 이루는 체인굴착암(230)에 설치되고 있는 공압공급관(212)으로 공압이 분사되어 굴착되는 굴착토(흙)덩어리를 부수게 되며 또한 체인굴착암(230)에 설치된 시멘트몰탈 공급관(213)을 통하여 시멘트몰탈을 타설하여 상기의 굴착토와 혼합되게 하여 굴착토가 혼합된 시멘트몰탈이 상기의 수평굴착공간(320)에 충진되어 콘크리트옹벽(330)이 연속적으로 구축되는 것이다.
이때, 상기의 굴착체인(260)에 형성되어 있는 굴착갈퀴(261)들은 전방측에서는 흙을 깎아주는 동시에 후방측에서는 시멘트몰탈과 굴착토(흙)를 골고루 섞어주는 역할도 겸할 수 있는 것이다.
그리고, 상기에서와 같이 굴착공간부(320)에 굴착토가 혼합된 시멘트몰탈이 충진되면 시멘트몰탈이 경화되기 전에 일정간격으로 H밤(340)을 타공하여 수직으로 설치하여 굴착토가 혼합된 시멘트몰탈로 구축되는 견고한 콘크리트옹벽(330)을 지하(300)에 구축하게 된다.
As described above, the horizontal excavation chain 260 of the caterpillar track 260 horizontally to form a concrete retaining wall in the basement 300 in the advancing direction and at the same time of the chain drilling device 200 Pneumatic pressure is injected into the pneumatic supply pipe 212 installed in the chain drilling arm 230 forming the tip portion to break up the excavated excavated soil (dirt) and also cement mortar supply pipe 213 installed in the chain drilling arm 230 Cement mortar is poured through to be mixed with the above excavated soil and the cement mortar mixed with the excavated soil is filled in the horizontal excavation space 320 is to build the concrete retaining wall 330 continuously.
At this time, the excavation rakes 261 formed in the excavation chain 260 may also serve to mix the cement mortar and the excavation soil (soil) evenly at the rear side while cutting the soil at the front side.
When the cement mortar in which the excavated soil is mixed is filled in the excavation space 320 as described above, the cement is mixed with the excavated soil by perforating the H chest 340 at a predetermined interval before the cement mortar is cured. Solid concrete retaining wall 330 is built in the mortar is built in the basement (300).

이와 같이 본 발명은 기존의 파일드라이버에다 체인굴착장치를 병설하여 제작이 간단하여 제작비용도 절감되며 수직굴착과 동시에 수평굴착시공도 겸할 수 있는 지하옹벽 구축용 파일드라이버를 이용하여 건축물을 건축하기 전에 건축물지하주변에 견고하고 안전성이 높은 지하콘크리트옹벽을 구축한 후에 지하공간을 굴착할 수 있게 함으로써, 안전사고예방과 시공기간 및 비용도 절감되는 경제적 이익이 높은 효과를 얻는 동시에 종전에는 건물을 건축할 때 건물위치에 지하공간을 확보하기 위하여 굴착할 때 굴착되는 지하공간 주변의 토암에 의해 붕괴되는 것을 방지하도록 굴착시공과 동시에 토사방호벽을 설치하여 시행하고 있으나 토사방호벽의 부실로 주변토압에 의해 붕괴사고의 민원과 분쟁이 발생되는 등의 문제점도 해소할 수 있는 것이다.As described above, the present invention is simple to manufacture by installing a chain digging device in addition to the existing pile driver, thereby reducing manufacturing costs, and before constructing a building using a pile driver for building a underground retaining wall that can also serve as a vertical excavation and a horizontal excavation construction. By constructing the underground concrete retaining wall around the building's basement, it is possible to excavate the underground space, thereby preventing the safety accidents and reducing the construction period and cost. In order to secure the underground space at the building location, the excavation construction and the earth and sand barriers are installed to prevent the collapse of the soil around the excavated underground space. Can solve problems such as complaints and disputes The.

본 발명은 오거드라이버가 설치되고 있는 기존의 파일드라이버에다 체인굴착식의 체인굴착장치만을 병설하여 간단하고 저가의 비용으로 제작할 수 있는 경제성이 높은 동시에 수직굴착시공 및 수평굴착에 의한 지하 콘크리트옹벽도 시공구축할 수 있는 효과를 얻게 되는 것이다.
또한, 본 발명중 체인굴착장치를 구성하는 굴착체인에 형성되는 굴착갈퀴의 배열을 횡으로 1개 배열, 2개 배열, 3개 배열 구성하여 동력소비도 절약하는 동시에 상기의 굴착갈퀴들에 갈퀴캡을 씌워 굴착갈퀴의 직접적인 마모에 의해 굴착체인을 교체하는 고비용과 교체로 인하여 장시간의 시공중단 등의 문제점도 해결하게 되는 시공성 및 안전성과 경제적성이 높은 유익한 발명이다.
In the present invention, the existing pile driver installed with the auger driver is installed in addition to the chain excavation type chain digging device, which is simple and inexpensive to manufacture. Also, the underground concrete retaining wall is constructed by vertical excavation and horizontal excavation. You will get the effect you can build.
In addition, the arrangement of the excavation rakes formed in the excavation chain constituting the chain drilling device in the present invention by arranging one arrangement, two arrangements, three arrangements in the horizontal direction to save power consumption and at the same time the rake caps on the excavation rakes It is a profitable invention having high construction properties, safety and economical efficiency, which solves problems such as long-term construction interruption due to the high cost and replacement of the excavation chain by the direct wear of the excavation rake by covering it.

Claims (5)

오거드라이버를 구비하며 리더(110)가 설치된 기존의 파일드라이버(100)에 있어서,In the existing pile driver 100 having an auger driver and the reader 110 is installed, 지하(흙)층을 깎아주는 단수개 또는 다수개의 굴착갈퀴(261)들이 등간격으로 설치된 무한궤도의 굴착체인(260)으로 구성되고;The single or multiple excavating rakes 261 for shaving the underground (soil) layer are composed of an excavation chain 260 of an endless track installed at equal intervals; 상기의 리더(110)상단의 설치된 톱세이브 및 도르래에 의해 감겼다 풀렸다 하는 기존의 로프에 연결시켜 상승 및 하강되게 설치되며;Connected to the existing rope which is wound and unwound by the installed top save and pulley on the top of the leader 110 and is installed to be raised and lowered; 상기의 리더(110)를 감싸고 상승하강 되고 공압분사 및 세멘트몰탈을 타설하는 수평굴착기능의 체인굴착장치(200)를 병설하여 구성하는 지하옹벽 구축용 파일드라이버.A pile driver for constructing an underground retaining wall, which is formed by enclosing the leader 110 and descending the chain 110 and installing a chain excavation apparatus 200 having a horizontal excavation function for pouring pneumatic injection and cement mortar. 제 1 항에 있어서,The method of claim 1, 상기의 체인굴착장치(200)는 유압모우터(도시생략)굴착체인(260)을 회전(구동)시키는 구동치차(240)로 구성되는 체인드라이버(210);The chain drilling device 200 is a chain driver 210 consisting of a drive gear 240 for rotating (driving) a hydraulic motor (not shown) drilling chain 260; 상기의 체인드라이버와 선택적인 개수가 볼트너트로 연결되는 체인프레임(220);A chain frame 220 in which an optional number of the chain drivers is connected to the bolt nut; 상기의 체인프레임과 볼트너트로 연결되어 첨단에 설치되는 체인굴착암(230)으로 구성되며;It is composed of a chain drilling arm 230 is connected to the chain frame and the bolt nut is installed on the tip; 상기의 구동치차(240), 체인프레임(220), 체인굴착암(230) 등을 관통하여 설치되는 공압공급관(212) 및 세멘트몰탈공급관(213)이 설치되어 구성되는 체인굴착장치를 구비한 지하옹벽 구축용 파일드라이버.Underground with a chain excavation device which is formed by the pneumatic supply pipe 212 and the cement mortar supply pipe 213 installed through the drive gear 240, the chain frame 220, the chain drilling arm 230, etc. Pile driver for retaining wall construction. 제 1 항에 있어서,The method of claim 1, 상기의 체인굴착장치중의 굴착체인(260)은 체인브래키트(262)와 1개 내지 3개 이상의 굴착갈퀴(261)가 일체로 구성되고; 상기의 체인브래키트(262)와 일체로 구성된 체인링크(263)와 다음의 체인링크(263)들을 연결핀(264)으로 연결하여 무한궤도의 굴착체인(260)을 구성하며;The excavation chain 260 of the chain excavation device is composed of a chain bracket 262 and one to three or more excavation rakes 261 integrally; The chain link 263 integrally formed with the chain bracket 262 and the next chain link 263 are connected to each other by a connecting pin 264 to form an excavating chain 260 of an endless track; 상기의 굴착갈퀴(261)에는 갈퀴캡(265)을 씌우고 고정핀(262)으로 고정시켜 굴착체인을 구성하는 지하옹벽 구축용 파일드라이버.The excavation rake (261) is covered with a rake cap 265 and fixed with a fixing pin (262) to form a pile retainer wall construction pile driver. 삭제delete 삭제delete
KR1020030055765A 2003-08-12 2003-08-12 Pile driver for underground retaining wall KR100579714B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020030055765A KR100579714B1 (en) 2003-08-12 2003-08-12 Pile driver for underground retaining wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020030055765A KR100579714B1 (en) 2003-08-12 2003-08-12 Pile driver for underground retaining wall

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR20-2003-0028333U Division KR200340716Y1 (en) 2003-09-03 2003-09-03 Crawler-crane having a auger-drill and a chain-excavator

Publications (2)

Publication Number Publication Date
KR20050018366A KR20050018366A (en) 2005-02-23
KR100579714B1 true KR100579714B1 (en) 2006-05-17

Family

ID=37227928

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020030055765A KR100579714B1 (en) 2003-08-12 2003-08-12 Pile driver for underground retaining wall

Country Status (1)

Country Link
KR (1) KR100579714B1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU2007245082B2 (en) * 2006-03-27 2010-07-15 The Charles Machine Works, Inc. Auger for use with trenching assembly

Also Published As

Publication number Publication date
KR20050018366A (en) 2005-02-23

Similar Documents

Publication Publication Date Title
KR100209103B1 (en) Excavator for forming underground continuous wall
JP2525188B2 (en) Excavator
US5349765A (en) Excavator for constructing underground continuous wall and construction method using the excavator
EP0563472B1 (en) Excavator and methods of use thereof
JP4566098B2 (en) Ground improvement device
AU2012244112A1 (en) Excavation devices and methods
US6925736B2 (en) In situ mixing apparatus and methods for creating underground wall
WO2018133742A1 (en) Groove cutting apparatus used for underground wall construction, and construction method therefor
KR100688620B1 (en) Pile driver for structural walls having inducement rail-unit ? catch-unit
CN207047833U (en) A kind of groover for subterranean wall construction
CN104452804A (en) Full-face stirring and cutting wall construction machine
JPH07173835A (en) Excavator for underground continuous wall
KR100579714B1 (en) Pile driver for underground retaining wall
KR20130061377A (en) Structure of retaining wall and construction method for installing underground structures
KR101998180B1 (en) Pile driver for structural walls
KR200340716Y1 (en) Crawler-crane having a auger-drill and a chain-excavator
KR200392277Y1 (en) Pile driver for structural walls having inducement rail-unit & catch-unit
KR101886969B1 (en) Ground excavating able to be attached general excavator
KR100953324B1 (en) Walking style pile driver using electric for underground etaining wall
JP3043502B2 (en) Drilling hole formation method for thin film wall construction
JP2000008369A (en) Earth retaining wall forming method in pit excavating construction method
JP3043501B2 (en) Drilling hole forming method and forming apparatus for thin film wall formation
JP3688379B2 (en) Underground continuous wall excavator
JP3484597B2 (en) Slope rock drill
JPH07229146A (en) Continuous excavator

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20120604

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20131108

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20181108

Year of fee payment: 13

LAPS Lapse due to unpaid annual fee