JPS606437B2 - Pit drilling equipment - Google Patents

Pit drilling equipment

Info

Publication number
JPS606437B2
JPS606437B2 JP7995680A JP7995680A JPS606437B2 JP S606437 B2 JPS606437 B2 JP S606437B2 JP 7995680 A JP7995680 A JP 7995680A JP 7995680 A JP7995680 A JP 7995680A JP S606437 B2 JPS606437 B2 JP S606437B2
Authority
JP
Japan
Prior art keywords
excavation
guide pipe
excavator
bucket
skin plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP7995680A
Other languages
Japanese (ja)
Other versions
JPS576095A (en
Inventor
研次 今田
敏夫 佐久間
敏行 菊池
忠 真下
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Zosen Corp
Nippon Koei Co Ltd
Tokyo Electric Power Co Holdings Inc
Original Assignee
Tokyo Electric Power Co Inc
Hitachi Zosen Corp
Nippon Koei Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyo Electric Power Co Inc, Hitachi Zosen Corp, Nippon Koei Co Ltd filed Critical Tokyo Electric Power Co Inc
Priority to JP7995680A priority Critical patent/JPS606437B2/en
Publication of JPS576095A publication Critical patent/JPS576095A/en
Publication of JPS606437B2 publication Critical patent/JPS606437B2/en
Expired legal-status Critical Current

Links

Landscapes

  • Earth Drilling (AREA)

Description

【発明の詳細な説明】 本発明は山岳地帯等で鉄塔等を構築する際、基礎掘削を
能率良く容易に行なえるようにすることを目的とする竪
孔掘削装置に関するものである。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a pit excavation device for the purpose of efficiently and easily excavating foundations when constructing steel towers or the like in mountainous areas.

従来の工法は人力作業の占める割合が多く、この分野で
の機械化は遅れていた。その理由として、■ 山岳奥地
であるため機械足場が悪く、掘削施工に合った重機を投
入するためには小型化、軽量化、組立分解を容易にしな
ければならない等驚かしい面があること。
Conventional construction methods involve a large proportion of manual labor, and mechanization in this field has lagged behind. The reasons for this are: - The location is deep in the mountains, so there is poor mechanical footing, and in order to use heavy machinery suitable for excavation work, it has to be smaller, lighter, and easier to assemble and disassemble, which is surprising.

■ これらの機材を陸送では無理な場合があり、空輸す
る場合が多い。■ 作業日数が限られてしまう。
■ In some cases, it is impossible to transport these equipment by land, so they are often transported by air. ■ The number of working days is limited.

■ 機械損料に見合う安い機械装置の開発が必要である
■ It is necessary to develop inexpensive mechanical devices that are commensurate with machine losses.

等があげられ、問題点が多い。etc., and there are many problems.

従って従来は表士の掘削(粘土、シルト)は小型のショ
ベルを用いて行ない、ショベルのアームが届かなくなる
と孔の中に人間が入って人力掘削をしたり、又岩盤が出
れば小型のコンクリートプレーカを用いて人力掘削を行
なっているのが現状である。
Therefore, in the past, excavation (clay, silt) was carried out using a small shovel, and when the shovel arm could no longer reach, a person entered the hole and excavated manually, and if bedrock came out, a small concrete excavator was used. Currently, excavation is carried out manually using a breaker.

近年送電コストの低下、省エネルギー等の目的により水
力発電の超高圧送電が考えられ、山岳に多数の鉄塔基礎
を施工する必要性が高まっており、本発明は鉄塔等の基
礎を能率良く掘削できる掘削装置を提供せんとするもの
である。以下本発明を実施の一例を示す図面に基づいて
説明する。先ず施工順序について第亀図〜第20図に基
づき説明する。先ず第1図に示すように草木等の伐採を
行なって斜面1を整地する。次に第2図に示すように人
力又は小型パワーショベルで基礎掘削に必要な面積を斜
面から切り出す。務土は棚2で止め「平地3を有効に作
る。この平地3に第3図に示すように門型クレーンの基
礎4を施工する。次にこの基礎4上に第4図及び第5図
に示すように門型クレーン5を据え付ける。門型クレー
ン5は小型で分解組立が容易な構造のものを用い、グラ
ブバケット6用ホイスト?及び作業用ホイスト8を持っ
ている。この門型クレーン5の据え付けはパワーショベ
ルを用いたり或いは他のクレーンの助けを借りて行なう
。次にに第6図及び第7図に示すように門型クレーン5
にガイドパイプ位置決め装置9を取り付ける。この場合
前記作業用ホィスト8を用いて、掘削予定孔の位置に掘
削機の中心が容易に出せる目的のために掘削機取付用と
してガイドパイプ位置決め装置9を門型クレーン5の脚
材1Q‘こ位置決め固定する。次に第8図及び第9図に
示すように作業用ホィスト8を用いて掘削機11を前記
ガイドパイプ位置決め装置9の中で組み立てる。その後
この掘削機亀1によって第10図に示すように掘削を開
始する。表土は粘土、シルト質が多いため、掘削掻き寄
せバケット12の作動により表士を掘削する。掘削掻き
寄せバケット12は油圧モータ〔後述する〕により駆動
される旋回台翼4に取り付けられているため、掘削機1
亀のスキンプレート15内部を掘削することができる。
掘削土砂はグラブバケット6により掘削機11の外に運
ばれ、ホツパー16及びコンベア17を介して排出され
る。掘削が進むにつれて第11図に示すように掘削機1
1が地中に降下していく。ここで掘削深さ‘こ応じて掘
削機11にガイドパイプ19を足していくが、掘削孔の
曲がりを早期に見いだすため、又掘削孔への降下力不足
、掘削機の自由落下を防止するためにガイドパイプ固定
装置20及びガイドパイプ上下動装置21を前記門型ク
レーン5内に設けておく。又掘削孔の壁面が崩れるのを
防止するためにラィナ−プレート22を掘削孔の内部で
組み立ててゆき、ライナープレート22と掘削孔との間
の隙間に掘削士砂を用いてグラウト注入して隙間をつめ
る。この場合水で土砂を練りモノーポンプ等を用し、圧
送するか「或いはセメントモルタルを注入させても良い
。尚第亀1図に示すように掘削時において必要に応じて
プレー力軍覇を用いて掘削孔の内面を打撃する。このと
き掘削掻き寄せバケット亀2は第】1図に示すように折
り返しておく。掘削が進んで孔が深くなると、基礎支持
用岩盤が出てくる。このようになると前記掘削掻き寄せ
バケット竃2では作業ができず、前記プレー力18と前
記掘削掻き寄せバケット亀2部に着脱自在に設けられる
ドリフ夕23の併用による砕岩作業を行なう。そこで第
軍2図に示すように先ずドリフタ23により孔底及び側
壁等に多数の孔24を穿孔する。そしてプレー力18を
用い、孔24と24の中間部を打撃すれば岩盤に多数の
クラックを入れたのと同じ状態となるため、岩盤は容易
に砕者される。上記のようにドリフタ23による穿孔、
プレー力18による砕岩で能率が上がらないときは前記
ドリフタ23によって明けられた孔2亀1こ第亀3図に
示すようにダイナマイト等の発破材25を充填して岩盤
にクラックを入れたり、発破により岩盤を吹き飛ばした
りする。このときガイドパイプ固定装置28及びガイド
パイプ上下動装置21により掘削機1亀をスキンプレー
ト亀5と分離して引き上げ、発破時の掘削機1竃の破損
を防止している。目的とする掘削径で掘削深さ迄到達す
ると、第14図に示すように掘削機11を再び下降させ
て掘削孔26の底を拡底する。これで竪孔状掘削孔26
の掘削作業は完了し「ガイドパイプ上下動装置2川こよ
り掘削機11を上限迄引き上げた後、掘削機11を第1
5図に示すようにチェンブロック13で吊り下げた状態
でガイドパイプ19、ガイドパイプ固定装置20、ガイ
ドパイプ上下動装置21を分解する。その後第16図に
示すようにスキンプレート貴5が掘削孔26内に残るよ
うにして掘削機亀1を前記チェンブロック13により吊
り上げた後掘削機亀1を横移動させ「地上の木台上にお
く。その後第17図に示すようにスキンプレート15を
分解してこれを作業用ホィスト8により地上に引き上げ
る。この場合掘削孔26の底部には岩盤があるめ、スキ
ンプレート15を分解しても孔墜の擬破は生じない。し
かしどうしても賭破が生じる場合はスキンプレート15
を支保材の一部として用い、埋め込んでおくこともある
。次に第18図に示すように作業用ホィスト8を用いて
掘削孔26の底部に鉄筋を下し、掘削孔26内に鉄遼筋
27を組み立てていく。その後第19図に示すように鉄
筋27の固定、該鉄筋27にし、対する鉄塔部材28の
固定が完了すれば掘削孔26内にモルタル29を注入打
談する。モルタル29の量が増えるに従い、、ライナー
プレート22を分解し地上に回収する。そして最終的に
第20図に示すようにモルタル29を充分に打設し、表
土を元の状態にして鉄塔基礎が完成されるのである。次
に第21図〜第33図に基づき要部の詳細について説明
する。
In recent years, with the aim of reducing power transmission costs and saving energy, ultra-high voltage transmission of hydroelectric power generation has been considered, and the need to construct numerous steel tower foundations in mountains has increased. The aim is to provide the equipment. The present invention will be described below based on drawings showing an example of implementation. First, the construction order will be explained based on Figs. 20 to 20. First, as shown in FIG. 1, the slope 1 is leveled by cutting down vegetation and the like. Next, as shown in Figure 2, the area required for foundation excavation is cut out from the slope by hand or with a small power shovel. The work soil is stopped on shelves 2 to effectively create a level area 3. On this level area 3, construct the foundation 4 for the gate type crane as shown in Figure 3. Next, on this foundation 4, as shown in Figures 4 and 5. Install the gantry crane 5 as shown in .The gantry crane 5 is small and has a structure that is easy to disassemble and assemble, and has a hoist for the grab bucket 6 and a work hoist 8. The installation is carried out using a power shovel or with the help of another crane.Then, as shown in Figures 6 and 7, a gantry crane 5 is installed.
Attach the guide pipe positioning device 9 to. In this case, the work hoist 8 is used to attach the guide pipe positioning device 9 to the leg member 1Q' of the portal crane 5 for the purpose of easily positioning the center of the excavator at the position of the planned drilling hole. Position and fix. Next, as shown in FIGS. 8 and 9, the excavator 11 is assembled in the guide pipe positioning device 9 using the working hoist 8. Thereafter, the excavator turtle 1 starts excavating as shown in FIG. Since the topsoil is mostly clay and silt, the topsoil is excavated by operating the excavation and raking bucket 12. Since the excavation scraping bucket 12 is attached to the rotating table wing 4 driven by a hydraulic motor (described later), the excavator 1
The inside of the turtle skin plate 15 can be excavated.
The excavated earth and sand is carried out of the excavator 11 by a grab bucket 6 and discharged via a hopper 16 and a conveyor 17. As the excavation progresses, the excavator 1
1 descends into the ground. Here, a guide pipe 19 is added to the excavator 11 according to the excavation depth, but in order to detect bends in the excavation hole early, and to prevent insufficient descending force into the excavation hole and free fall of the excavator. A guide pipe fixing device 20 and a guide pipe vertical movement device 21 are provided inside the gate type crane 5. In order to prevent the wall of the borehole from collapsing, the liner plate 22 is assembled inside the borehole, and the gap between the liner plate 22 and the borehole is filled with grout using excavator's sand. Fill it up. In this case, the earth and sand may be mixed with water and pumped using a mono pump, etc., or cement mortar may be injected.As shown in Fig. The inner surface of the excavation hole is struck. At this time, the excavation scraping bucket turtle 2 is turned back as shown in Figure 1. As the excavation progresses and the hole becomes deeper, the foundation supporting rock will come out. In this case, the excavation and raking bucket pit 2 cannot be used for rock crushing work, and the rock crushing work is carried out using a combination of the playing force 18 and the drift bar 23 that is detachably installed on the excavation and raking bucket part 2. As shown, first, a large number of holes 24 are drilled in the bottom and side walls of the hole using the drifter 23. Then, if the playing force 18 is used to hit the middle part of the holes 24 and 24, it is the same as making a large number of cracks in the rock. As a result, the rock is easily crushed.As described above, the drilling by the drifter 23,
If the efficiency cannot be improved by crushing the rock by the playing force 18, the hole opened by the drifter 23 may be filled with a blasting material 25 such as dynamite to create cracks in the bedrock or blasting. It blows away the bedrock. At this time, the guide pipe fixing device 28 and the guide pipe vertical movement device 21 separate the excavator 1 torsion from the skin plate tortoise 5 and pull it up, thereby preventing damage to the excavator 1 tortoise during blasting. When the target excavation diameter reaches the excavation depth, the excavator 11 is lowered again to widen the bottom of the excavation hole 26, as shown in FIG. This completes the vertical drilling hole 26.
After the excavation work is completed and the excavator 11 is raised to the upper limit from the guide pipe vertical movement device 2, the excavator 11 is moved to the first
As shown in FIG. 5, the guide pipe 19, guide pipe fixing device 20, and guide pipe vertical movement device 21 are disassembled while suspended by the chain block 13. Thereafter, as shown in FIG. 16, the excavator tortoise 1 is lifted by the chain block 13 so that the skin plate 5 remains in the excavation hole 26, and then the excavator tortoise 1 is moved laterally and placed on a wooden stand on the ground. Thereafter, as shown in FIG. A false hole failure will not occur.However, if a gamble failure does occur, use skin plate 15.
It is sometimes used as part of the shoring material and embedded. Next, as shown in FIG. 18, the work hoist 8 is used to lower the reinforcing bars to the bottom of the excavated hole 26, and the reinforcing bars 27 are assembled inside the excavated hole 26. Thereafter, as shown in FIG. 19, when the reinforcing bars 27 are fixed, the reinforcing bars 27 are fixed, and the steel tower member 28 is fixed thereto, mortar 29 is injected into the excavated hole 26. As the amount of mortar 29 increases, the liner plate 22 is disassembled and recovered on the ground. Finally, as shown in Fig. 20, mortar 29 is sufficiently poured to restore the topsoil to its original condition and the tower foundation is completed. Next, details of the main parts will be explained based on FIGS. 21 to 33.

先ず全体構成を示す第21図〜第23図について説明す
ると、30は前記旋回台14を鉛直軸芯の周りで旋回可
能に駆動する油圧モータ、31‘ま旋回台14を回転可
能に受ける軸受、32は前記掘削掻き寄せバケット12
及びプレー力18を内蔵する装置、33はこれらを運転
するために掘削機11に取り付けられた運転操作室であ
る。この運転操作室33は防音室とし、地上から換気用
空気が入り、室内には粉塵が入らない構造となっている
。ところで門型クレーン5上のグラブバケット用ホイス
ト7にはグラブバケット6を昇降させるウインチ34を
備え、前記ガイドパイプ19内でグラブバケット6を昇
降させ得るようになっても、る。次に第24図〜第26
図に基づき前記掘削機11について説明すると共に第2
7図〜第31図に基づき前記掘削掻き寄せバケット12
及びプレー力18を内蔵する装置32について説明する
First, referring to FIGS. 21 to 23 showing the overall configuration, 30 is a hydraulic motor that drives the swivel base 14 so as to be able to rotate around the vertical axis, 31' is a bearing that rotatably receives the swivel base 14, 32 is the excavation raking bucket 12
and a device containing the play force 18, and 33 is an operation control room attached to the excavator 11 for operating these devices. This operation room 33 is a soundproof room, and has a structure in which ventilation air enters from the ground and dust does not enter the room. By the way, even if the grab bucket hoist 7 on the portal crane 5 is equipped with a winch 34 for raising and lowering the grab bucket 6, the grab bucket 6 can be raised and lowered within the guide pipe 19. Next, Figures 24 to 26
The excavator 11 will be explained based on the figure, and the second
The excavation raking bucket 12 based on FIGS. 7 to 31
and the device 32 incorporating the playing force 18 will be described.

掘削羽口であるスキンプレート15は端面にフランジを
有しており、分解組立てが容易にできるようになってい
て、必要に応じて円筒形スキンプレートを長くしたり短
かくしたりすることができるものである。掘削時におい
ては掘削機11の本体側とスキンプレート15とは、掘
削機11に設けた油圧シリンダ装置35によって上下位
置決めピン36をスキンプレート15の上下2つの孔3
7a,37bの内上側の孔37aに挿入して一体とされ
る。前記内蔵装置32は旋回台14に油圧シリンダ装置
38によりに水平方向に移動可能に設けられたブラケツ
ト39に水平軸40を以つて枢支され、揺動用の油圧シ
リンダ装置41により水平軸40の回りで揺動されるよ
うになっている。42は前記掘削掻き寄せバケット12
を突出させるために前記内蔵装置32に設けた突出用の
油圧シリンダ装置である。
The skin plate 15, which is the excavation tuyere, has a flange on the end face, so that it can be easily disassembled and reassembled, and the cylindrical skin plate can be lengthened or shortened as necessary. It is. During excavation, the main body of the excavator 11 and the skin plate 15 are connected to the upper and lower holes 3 of the skin plate 15 by using a hydraulic cylinder device 35 provided on the excavator 11 to move the upper and lower positioning pins 36 into the upper and lower holes 3 of the skin plate 15.
It is inserted into the hole 37a on the inner upper side of 7a, 37b and integrated. The built-in device 32 is pivotally supported by a horizontal axis 40 on a bracket 39 provided on the swivel base 14 so as to be movable in the horizontal direction by a hydraulic cylinder device 38, and rotated around the horizontal axis 40 by a hydraulic cylinder device 41 for swinging. It is designed to be swung by. 42 is the excavation raking bucket 12
This is an ejection hydraulic cylinder device provided in the built-in device 32 to eject the.

これらの油圧シリンダ装置38,41,42の駆動によ
り前記掘削掻き寄せバケット12は第24図A〜E等で
示すような動作を行ない土砂を掘削して掻き寄せること
ができる。この掘削掻き寄せ運転は前記油圧モータ30
によって旋回台14を鉛直軸芯の周りで回転させること
によりスキンプレート15の羽口の全周にて行なうこと
ができる。このようにして掘削掻き寄せられた土砂は前
記ガイドパイプ19内を下降してきたグラブバケット6
により排出される。掘削が進むにつれてガイドパイプ1
9はガイドパイプ上下動装置21により下方に押し下げ
られて全ての掘削装置が下降する。この操作が何回か繰
り返されガイドパイプ19を継ぎ足し乍ら目的とする掘
削深さ迄掘削する。しかし下部になれば岩盤が露出する
ため、掘削掻き寄せバケット12を油圧ハイロータ43
によって90度内側に旋回させると共に前記内蔵装置3
2にプレーカサポ−ト44を以つて取り付けられている
プレー力18を油圧シリンダ装置45により第31図F
→G迄突出させる。このとき前記掘削掻き寄せバケット
12を前述のように90度旋回させることによりプレー
力18は掘削掻き寄せバケット12に干渉されずに下方
に突出することができる。これは運転者の操作ミスを防
止することにもなる。このようにプレー力18が突出し
て岩盤を破砕し、掘削を進めて目的とする掘削深さに到
達したならば舷底作業に入る。このときはスキンプレー
ト15を分解しても岩盤によって地山の崩壊はないもの
と考えられるため、作業性を考えてスキンプレート15
をフランジ部で以つて適宜分解して地上に引き上げ、拡
底作業を行ない易くする。この砿底作業は前記掘削掻き
寄せバケット12又はプレー力18を斜めに向けて全周
に亘つて行なうのであり、その前に前記上下位置決めピ
ン36をスキンプレート15の上側の孔37aから抜く
と共にガイドパイプ上下動装置21により掘削機11を
僅か下降させ、上下位置決めピン36をスキンプレート
】5の下側の孔37bに挿入しておくものである。とこ
ろで前記第13図で述べた発破時において前記上下位置
決めピン36をスキンプレート15の孔37aから引き
抜くと掘削機構とスキンプレート15とは分離されるた
め、ガイドパイプ】9をガイドパイプ上下動装置21‘
こより引き上げて発破時の掘削機構の破損を防止するこ
とができ。&6は油圧ユニットである。次に第32図及
び第33図に基づきガイドパイプ位置決め装橿9につい
て詳細に述べる。
By driving these hydraulic cylinder devices 38, 41, and 42, the excavation and raking bucket 12 can perform operations as shown in FIGS. This excavation and scraping operation is carried out by the hydraulic motor 30.
By rotating the swivel table 14 around the vertical axis, the rotation can be performed around the entire periphery of the tuyere of the skin plate 15. The earth and sand thus excavated and scooped up are sent to the grab bucket 6 which has descended inside the guide pipe 19.
It is discharged by As the excavation progresses, guide pipe 1
9 is pushed down by the guide pipe vertical movement device 21, and all the excavating equipment descends. This operation is repeated several times and the guide pipe 19 is added until the target excavation depth is reached. However, at the bottom, the rock is exposed, so the excavation and scraping bucket 12 is moved to the hydraulic high rotor 43.
The built-in device 3 is rotated 90 degrees inward by
The play force 18 attached to the player support 44 is applied to the play force 18 by a hydraulic cylinder device 45 as shown in FIG. 31F.
→Protrude to G. At this time, by rotating the excavating and raking bucket 12 by 90 degrees as described above, the playing force 18 can be projected downward without being interfered with by the excavating and raking bucket 12. This also prevents the driver from making operational mistakes. In this way, the playing force 18 is applied to crush the rock, and when the excavation progresses and the target excavation depth is reached, the bottom work begins. At this time, it is considered that the ground will not collapse due to the bedrock even if the skin plate 15 is disassembled, so in consideration of workability, the skin plate 15
The flange section is used to properly disassemble it and lift it above the ground, making it easier to carry out the bottom-expanding work. This drilling work is carried out over the entire circumference with the excavation and scraping bucket 12 or the play force 18 directed diagonally.Before that, the vertical positioning pin 36 is removed from the upper hole 37a of the skin plate 15 and the guide is removed. The excavator 11 is lowered slightly by the pipe vertical movement device 21, and the vertical positioning pin 36 is inserted into the hole 37b on the lower side of the skin plate 5. By the way, when the vertical positioning pin 36 is pulled out from the hole 37a of the skin plate 15 during the blasting described in FIG. '
This can prevent damage to the excavation mechanism during blasting. &6 is a hydraulic unit. Next, the guide pipe positioning device 9 will be described in detail based on FIGS. 32 and 33.

このガイドパイプ位贋決め装置9は前記門型クレーン5
の隣材亀Qを利用して取り付けるれる位置決め用取付具
4蟹と、前記ガイドパイプ固定装置20及びガイドパイ
プ上下動装置21とから機成されている。前記位置決め
用取付臭年7は門型クレーン5の胸村亀0を基準にして
組み立てられ高さ調整ねじ亀8により高さ調整される。
この位置決め用取付具47には位置決め用バー亀費が掘
削機亀翼の外型寸法よりも10〜2物駁程大き目になる
ように取り付けられる。斯かる状態で前記第8図及び第
9図で述べたように掘削機軍曹を組み立てる。そして前
記第11図で述べたように掘削が進むにつれてガイドパ
イプ19を順次足していく。このとき前記ガイドパイプ
固定装置28及びガイドパイプ上下動装置2亀を用いる
。ところでこのガイドパイプ固定装置28及びガイドパ
イプ上下動装置21はガイドパイプ量9の継ぎ足し用と
しては勿論のこと、前記発破時における掘削機構の引き
上げ用として使用するものでtガイドパイプ固定装置2
川ま図面に示すように円筒状ガイドパイプ19の外側の
リブに上下に複数段形成した功込み部50・・・・・・
に鉄入するクランプ金具蚤亀……,52…・・・を前記
切込み部58……に対応するように且つ上下2段に夫々
複数個づつ有しており「各クランプ金具51,52には
油圧シリンダ装置53,54が設けられている。掘削機
構を引き上げるときは先ず上側の油圧シリンダ装置53
によってクランプ金具51でガイドパイプ19のクラン
プを行なう。次にガイドパイプ上下動装置2軍の油圧シ
リンダ装置55によって「下段のクランプ金具52及び
油圧シリンダ装置54を取り付けてある昇降台56を下
限迄下降させ、その後下側の油圧シリンダ装置54によ
ってクランプ金具62でガイドパイプ19のクランプを
行なう。その後前記上側の油圧シリンダ装置53を戻し
クランプ金具51をガイドパイプ19から外す。斯る状
態でガイドパイプ上下動装置21の油圧シリンダ装置5
5を上昇して上限で停止させ、その後前記上側の油圧シ
リンダ装圏53によってクランプ金具51でガイドパイ
プ19のクランプを行ない、その後下欄の油圧シリンダ
装置54を戻してクランプ金具6傘をガイドパイプ亀9
から外す。この動作を額次繰り返すことによりガイドパ
イプ量9は確実に上昇する。以上の説明は発破時におけ
る掘削機構引き上げ時の動作説明であるが「掘削が進む
につれてガイドパイプ竃9を豚次継ぎ足していくときは
前記引き上げ時とは逆の動作を行なえば良い。
This guide pipe positioning device 9 is connected to the gantry crane 5.
The guide pipe fixing device 20 and the guide pipe vertical movement device 21 are provided. The positioning mounting bracket 7 is assembled based on the gantry 0 of the gate type crane 5, and its height is adjusted by a height adjusting screw 8.
This positioning fixture 47 is attached to the positioning bar so that the length of the positioning bar is 10 to 2 times larger than the outer dimension of the excavator turtle wing. In this state, the excavator sergeant is assembled as described in FIGS. 8 and 9 above. As described in FIG. 11, guide pipes 19 are added one after another as the excavation progresses. At this time, the guide pipe fixing device 28 and the guide pipe vertical movement device 2 are used. By the way, the guide pipe fixing device 28 and the guide pipe vertical movement device 21 are used not only to add the guide pipe amount 9 but also to pull up the excavation mechanism during blasting.
As shown in the drawing, the ribs on the outside of the cylindrical guide pipe 19 have a plurality of vertically formed grooves 50.
A plurality of clamp fittings 51, 52, etc., which are inserted with iron into the clamp fittings 51, 52, are provided in two stages, upper and lower, corresponding to the notches 58..., respectively. Hydraulic cylinder devices 53 and 54 are provided.When pulling up the excavation mechanism, first the upper hydraulic cylinder device 53 is
The guide pipe 19 is clamped by the clamp fitting 51. Next, the hydraulic cylinder device 55 of the second guide pipe vertical movement device lowers the lifting platform 56 to which the lower clamp fitting 52 and the hydraulic cylinder device 54 are attached to the lower limit, and then the lower hydraulic cylinder device 54 lowers the clamp fitting 62, the guide pipe 19 is clamped. Then, the upper hydraulic cylinder device 53 is returned and the clamp fitting 51 is removed from the guide pipe 19. In this state, the hydraulic cylinder device 5 of the guide pipe vertical movement device 21 is clamped.
5 is raised and stopped at the upper limit, and then the guide pipe 19 is clamped by the clamp fitting 51 using the upper hydraulic cylinder fitting 53, and then the lower hydraulic cylinder device 54 is returned and the clamp fitting 6 is attached to the guide pipe. Turtle 9
Remove from. By repeating this operation every time, the guide pipe amount 9 will surely increase. The above explanation is an explanation of the operation when pulling up the excavation mechanism during blasting, but when adding more guide pipes 9 as the excavation progresses, it is sufficient to perform the operation opposite to the operation when raising the excavation mechanism.

このとき掘削綴喜1全体が押し下げられることになる。
又これは「掘削機1亀だけの自重では下がらなくなった
ときや「スキンプレート貴5の外面に土庄や摩擦力が作
用したとき、油圧力でこれらに打ち勝ち乍ら押し下げる
ことが可能になる。このときの押し下げ反力を考えて門
型クレーン5の自重、門型クレーン客の基礎4の固定力
が設定されており、押し下げ反力によって門型クレーン
5は浮き上がるようなことはない。本発明竪孔掘削装置
は以上述べたように実施し得るものであり、周囲を囲む
スキンプレート内において掘削掻き寄せバケット及び打
撃用プレー力を内蔵した内蔵装置を鉛直軸芯の周りで旋
回可能な旋回台の下側にシリンダ装置によって水平軸芯
の周りで揺動可能に設け「前記バケット及びプレー力を
突出させるシリンダ装置を設け、前記内蔵装置は穿孔用
ドリフタを着脱可能に構成し〜前記旋回台を旋回可能に
設けた掘削機構側とスキンプレート側とを連結切り離し
可能に構成し「更に前記掘削機構の上端に継ぎ足し可能
に設けられるガイドパイプの上端外側をクランプすると
共にガイドパイプを上下動させる手段を掘削予定孔の位
置の地上に設けて前記ガイドパイプの上下動により掘削
機構を上下動させ得るように構成したことを特徴とする
ため「前記バケットによって土砂の掘削を行なえると共
に岩盤の砕岩を前記ドリフタ及びプレー力によって行な
える。
At this time, the entire excavator 1 is pushed down.
This also means that when the excavator can no longer be lowered by its own weight, or when friction or friction forces act on the outer surface of the skin plate, it becomes possible to overcome these forces and push it down using hydraulic pressure. The dead weight of the gantry crane 5 and the fixing force of the foundation 4 of the gantry crane customer are set in consideration of the push-down reaction force when the gantry crane 5 is pushed down, and the gantry crane 5 will not be lifted up by the push-down reaction force. The hole-drilling device can be implemented as described above, and consists of a swivel base that can rotate around a vertical axis a built-in device containing a drilling and raking bucket and a striking play force within the surrounding skin plate. A cylinder device is provided on the lower side so as to be swingable around a horizontal axis by a cylinder device, and a cylinder device is provided to project the bucket and the playing force, and the built-in device is configured to detachably attach a drilling drifter to turn the swivel table. The excavation mechanism side and the skin plate side are configured so that they can be connected and separated; The invention is characterized in that it is arranged on the ground at the location of the planned hole and is configured so that the excavation mechanism can be moved up and down by the up and down movement of the guide pipe. And it can be done by playing power.

しかもこれらバケット、ドリフタ、プレー力は鉛直軸芯
の周りで旋回可能であるため、広範囲に亘つて能率良く
容易に掘削できる。又本発明によれば前述のように掘削
機構側とスキンプレート側とは切り離し可能に構成され
ているため、、発破時における掘削機構の上昇並びに掘
削作業完了時における掘削孔内からの掘削機構の除去を
容易に行なうことができる。更に本発明は前記ガイドパ
イプによって掘削機構の上下動が行なわれるため、例え
ばワイヤ等で掘削機構を吊り下げてウィンチの動作で掘
削機構を上下動させる場合に比べて、掘削機構の上下動
を安定良く行なうことができる。
Furthermore, since the bucket, drifter, and play force can be rotated around the vertical axis, it is possible to excavate over a wide range efficiently and easily. Further, according to the present invention, as described above, the excavation mechanism side and the skin plate side are configured to be separable, so that the excavation mechanism can be raised during blasting and the excavation mechanism can be removed from the borehole when the excavation work is completed. Removal can be carried out easily. Furthermore, in the present invention, the vertical movement of the excavating mechanism is performed by the guide pipe, so the vertical movement of the excavating mechanism is stabilized, compared to, for example, a case where the excavating mechanism is suspended by a wire or the like and the excavating mechanism is moved up and down by the operation of a winch. can do well.

【図面の簡単な説明】[Brief explanation of the drawing]

図面は本発明の実施の一例を示すもので、第1図〜第2
0図は基礎掘削の施工順序を示す説明図、第21図は全
体の拡大縦断正面図、第22図は同拡大縦断側面図、第
23図は同拡大平面図、第24図は掘削機構要部の拡大
縦断正面図、第25図は同拡大縦断側面図、第26図は
同拡大平面図、第27図は掘削掻き寄せバケット及びプ
レー力内蔵装置の正面図、第28図は同側面図、第29
図は同平面図、第30図は第28図の×−×矢視図、第
31図は第29図のY−Y矢視図、第32図はガイドパ
イプ位置決め装置の一部切欠正面図、第33図は同平面
図である。 5……門型クレーン、6……グラブバケット、7,8・
・・・・・ホィスト、9…・・・ガイドパイプ位置決め
装置、11・・・・・・掘削機、12・・・・・・掘削
掻き寄せバケット、13……チェンブロツク、14……
旋回台、15……スキンプレート、18…・・・プレー
力、19……ガイドパイプ、20……ガイドパイプ固定
装置、21・…・・ガイドパイプ上下動装涜、22……
ライナープレート、23……ドリフタ、24・・・・・
・孔「 26・・・・・・掘削孔、30・・…・油圧モ
ータ、32・…・・内蔵装置、35・・・・・・油圧シ
リンダ装置、36・・・・・・上下位置決めピン〜 3
7a,37b・・・・・・孔、38…・・・油圧シリン
ダ装置、40…・・・水平藤、41,42…・・・・・
・油圧シリンダ装置、43……油圧ハイロータ、45…
…油圧シリンダ装置、47・・・・・・位置決め用取付
具、50・・・・・・切込み部、51,52…・・・ク
ランプ金具、53〜55・・・・・・油圧シリンダ装置
、56・・…・昇降台。 第1図第2図 第3図 第4図 第5図 第6図 第7図 第8図 第9図 第10図 第11図 第12図 第13図 第14図 第15図 第16図 第付図 第j8図 第19図 第20図 第21図 第2図 第23図 第24図 第25図 第26図 第27図 第28図 第数図 第30図 第31図 第32図 第雛図
The drawings show an example of the implementation of the present invention, and FIGS.
Figure 0 is an explanatory diagram showing the construction order of foundation excavation, Figure 21 is an enlarged longitudinal front view of the whole, Figure 22 is an enlarged longitudinal side view, Figure 23 is an enlarged plan view, and Figure 24 shows the main parts of the excavation mechanism. Fig. 25 is an enlarged longitudinal sectional side view of the same, Fig. 26 is an enlarged plan view of the same, Fig. 27 is a front view of the excavation raking bucket and device with built-in play force, and Fig. 28 is a side view of the same. , 29th
The figure is a plan view of the same, FIG. 30 is a view taken along the arrows X-X of FIG. 28, FIG. 31 is a view taken along the Y-Y arrow of FIG. , FIG. 33 is a plan view of the same. 5...Portal crane, 6...Grab bucket, 7,8・
... Hoist, 9 ... Guide pipe positioning device, 11 ... Excavator, 12 ... Excavation scraping bucket, 13 ... Chain block, 14 ...
Swivel base, 15...Skin plate, 18...Playing force, 19...Guide pipe, 20...Guide pipe fixing device, 21...Guide pipe vertical movement device, 22...
Liner plate, 23... Drifter, 24...
・Hole 26...Drilling hole, 30...Hydraulic motor, 32...Built-in device, 35...Hydraulic cylinder device, 36...Vertical positioning pin ~ 3
7a, 37b... Hole, 38... Hydraulic cylinder device, 40... Horizontal wisteria, 41, 42......
・Hydraulic cylinder device, 43...Hydraulic high rotor, 45...
... Hydraulic cylinder device, 47... Positioning fixture, 50... Notch, 51, 52... Clamp fitting, 53-55... Hydraulic cylinder device, 56... Lifting platform. Figure 1 Figure 2 Figure 3 Figure 4 Figure 5 Figure 6 Figure 7 Figure 8 Figure 9 Figure 10 Figure 11 Figure 12 Figure 13 Figure 14 Figure 15 Figure 16 Figure 1 Fig. j8 Fig. 19 Fig. 20 Fig. 21 Fig. 2 Fig. 23 Fig. 24 Fig. 25 Fig. 26 Fig. 27 Fig. 28 Fig. Number Fig. 30 Fig. 31 Fig. 32 Fig.

Claims (1)

【特許請求の範囲】[Claims] 1 周囲を囲むスキンプレート内において掘削掻き寄せ
バケツト及び打撃用ブレーカを内蔵した装置を鉛直軸芯
の周りで旋回可能な旋回台の下側にシリンダ装置によっ
て水平軸芯の周りで揺動可能に設け、前記バケツト及び
ブレーカを突出させるシリンダ装置を設け、前記内蔵装
置は穿孔用ドリフタを着脱可能に構成し、前記旋回台を
旋回可能に設けた掘削機構側とスキンプレート側とを連
結切り離し可能に構成し、更に前記掘削機構の上端に継
ぎ足し可能に設けられるガイドパイプの上端外側をクラ
ンプすると共にガイドパイプを上下動させる手段を掘削
予定孔の位置の地上に設けて前記ガイドパイプの上下動
により掘削機構を上下動させ得るように構成した竪孔掘
削装置。
1 Inside the surrounding skin plate, a device containing a built-in excavation raking bucket and a striking breaker is installed under a swivel table that can rotate around a vertical axis so that it can swing around a horizontal axis using a cylinder device. , a cylinder device for protruding the bucket and the breaker is provided, the built-in device is configured to allow a drilling drifter to be detachably attached, and the excavation mechanism side and the skin plate side, in which the swivel table is rotatably provided, are configured to be connectable and disconnectable. Furthermore, a means for clamping the outer side of the upper end of a guide pipe that is removably provided at the upper end of the excavation mechanism and for moving the guide pipe up and down is provided on the ground at the position of the planned hole to be excavated, so that the excavation mechanism is moved by the up and down movement of the guide pipe. A pit drilling device configured to be able to move up and down.
JP7995680A 1980-06-12 1980-06-12 Pit drilling equipment Expired JPS606437B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP7995680A JPS606437B2 (en) 1980-06-12 1980-06-12 Pit drilling equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7995680A JPS606437B2 (en) 1980-06-12 1980-06-12 Pit drilling equipment

Publications (2)

Publication Number Publication Date
JPS576095A JPS576095A (en) 1982-01-12
JPS606437B2 true JPS606437B2 (en) 1985-02-18

Family

ID=13704752

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7995680A Expired JPS606437B2 (en) 1980-06-12 1980-06-12 Pit drilling equipment

Country Status (1)

Country Link
JP (1) JPS606437B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58153894A (en) * 1982-03-04 1983-09-13 株式会社安田製作所 Apparatus for boring shaft hole
JPS60168898A (en) * 1984-02-10 1985-09-02 光技建工業株式会社 Production of vertical pit

Also Published As

Publication number Publication date
JPS576095A (en) 1982-01-12

Similar Documents

Publication Publication Date Title
CN106088064B (en) A kind of construction method of the axle cement mixing pile drilling tool of hard stratum precrushing three
US3250075A (en) Method of retaining wall construction and anchoring
US4834582A (en) Methods for underpinning unstable structures
JP2019148070A (en) Construction method of underground structure
CN115478543B (en) Artificial hole digging pile foundation pit supporting structure and construction method
JP4478348B2 (en) Steel pipe pile driving method and apparatus
KR20080112453A (en) A ground improvement method of construction
KR100255423B1 (en) Method and apparatus of pipe for foundation construction
JPH07145616A (en) Cast-in-place concrete piling method
JP3451275B2 (en) Deep foundation excavator
JPS606437B2 (en) Pit drilling equipment
US11788249B2 (en) Cutting tool adapter and method of underpinning structures using cutting tool adapter for soil mixing
JP2002294704A (en) Center deviation preventing device for precast pile and center deviation preventing work method for precast pile
JPH03257215A (en) Pile constructing method
JPH0534475B2 (en)
JPS5943639B2 (en) Pit drilling machine
JP2004218378A (en) Removing method for existing pile
JPH0941857A (en) Pile hole drilling method
JPS6027357B2 (en) Pit drilling machine
JPS5945071B2 (en) Foundation excavation method for steel towers, etc.
RU2263787C1 (en) Method for deep tunnel opening and repairing
JPH09125405A (en) Deep foundation for inclined tower leg
JP3350761B2 (en) Shaft excavation equipment and excavation method using the same
JPH0133637B2 (en)
JP2000178972A (en) Positioning construction method for permanent structural column