JP3266588B2 JP26833299A JP26833299A JP3266588B2 JP 3266588 B2 JP3266588 B2 JP 3266588B2 JP 26833299 A JP26833299 A JP 26833299A JP 26833299 A JP26833299 A JP 26833299A JP 3266588 B2 JP3266588 B2 JP 3266588B2
Authority
JP
Japan
Prior art keywords
bolt
rock
lock bolt
male screw
screw portion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP26833299A
Other languages
Japanese (ja)
Other versions
JP2001090492A (en
Inventor
昭男 神島
Original Assignee
株式会社神島組
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社神島組 filed Critical 株式会社神島組
Priority to JP26833299A priority Critical patent/JP3266588B2/en
Publication of JP2001090492A publication Critical patent/JP2001090492A/en
Application granted granted Critical
Publication of JP3266588B2 publication Critical patent/JP3266588B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】この発明は、岩盤を補強する
ためのロックボルト施工方法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for constructing rock bolts for reinforcing rock mass.

【0002】[0002]

【従来の技術】従来より、地盤を補強する方法として、
ロックボルトを用いる方法(ロックボルト施工方法)が
数多く提案されている。それらのロックボルト施工方法
では、削孔機を用いて地盤に掘削孔を削孔形成した後、
掘削孔にロックボルトを挿入すると共にセメントミルク
やモルタルなどの固結材を注入し、固結材によってロッ
クボルトと地盤とを密着させている。そして、最後にロ
ックボルトの先端にアンカープレートを取り付け、アン
カープレートにより地盤表面を締め付けている。
2. Description of the Related Art Conventionally, as a method of reinforcing the ground,
Many methods using a lock bolt (lock bolt construction method) have been proposed. In these rock bolt construction methods, after drilling holes in the ground using a drilling machine,
A rock bolt is inserted into the drilling hole and a consolidation material such as cement milk or mortar is injected, and the rock bolt and the ground are brought into close contact with the consolidation material. Finally, an anchor plate is attached to the tip of the lock bolt, and the ground surface is tightened by the anchor plate.

【0003】[0003]

【発明が解決しようとする課題】しかしながら、従来の
ロックボルト施工方法では、ロックボルトの引き抜き耐
久性は小さかった。そこで、所望の地盤補強を達成する
ためには、地盤に数多くの掘削孔を形成し、各掘削孔に
ロックボルト施工を施す必要があった。そのことが施工
コストの増大や工期の長期化などの主要因のひとつとな
っていた。
However, with the conventional lock bolt construction method, the pull-out durability of the lock bolt was small. Therefore, in order to achieve the desired ground reinforcement, it was necessary to form a large number of excavation holes in the ground and to apply rock bolts to each excavation hole. This has been one of the main factors, such as an increase in construction cost and a prolonged construction period.

【0004】特に、地盤が岩盤で構成されている場合に
は、1つの掘削孔を形成するのにも多くの時間と労力が
必要となり、上記問題がより深刻なものとなって現れ
る。
[0004] In particular, when the ground is made of rock, a lot of time and labor is required to form one excavation hole, and the above problem becomes more serious.

【0005】この発明は上記課題に鑑みなされたもので
あり、優れた強度で岩盤を補強することができるロック
ボルト施工方法を提供することを目的とする。
[0005] The present invention has been made in view of the above problems, and has as its object to provide a rock bolt construction method capable of reinforcing a rock mass with excellent strength.

【0006】[0006]

【課題を解決するための手段】この発明にかかるロック
ボルト施工方法は、上記目的を達成するため、岩盤に掘
削孔を形成するとともに、当該掘削孔の内壁面に雌ネジ
部を刻設する第1工程と、ボルト本体の少なくとも一部
に前記雌ネジ部に対して螺合可能に雄ネジ部が刻設され
たロックボルトを準備し、前記ロックボルトの雄ネジ部
を前記雌ネジ部に螺合させながら、前記ロックボルトを
前記掘削孔に挿入する第2工程と、前記第2工程後に、
前記ボルト本体の後端に取付けたプレートにより岩盤表
面を押え付けながら、前記ロックボルトを前記岩盤に対
して緊結させる第3工程と、を備えている。
In order to achieve the above object, a method for constructing a lock bolt according to the present invention includes forming a drilling hole in a rock and engraving a female screw portion on an inner wall surface of the drilling hole. One step and at least a part of the bolt body
A male screw portion is engraved so as to be screwable with the female screw portion.
A second step of preparing the lock bolt , inserting the lock bolt into the excavation hole while screwing a male screw part of the lock bolt into the female screw part, and after the second step,
A third step of fastening the rock bolt to the rock while pressing the rock surface with a plate attached to a rear end of the bolt body.

【0007】このように構成されたロックボルト施工方
法では、掘削孔の雌ネジ部と対してロックボルトの雄ネ
ジ部が螺合して岩盤に対して固定される。そのため、岩
盤に対するロックボルトの引き抜き強度が向上し、ロッ
クボルトの引き抜き耐久性もさらに向上する。また、螺
合固定した後、ボルト本体の後端に取付けたプレートに
より岩盤表面を押え付けながら、ロックボルトが岩盤に
対して緊結されて雄ネジ部が雌ネジ部に対して密着す
る。その結果、岩盤に対するロックボルトの引き抜き強
度がさらに向上し、引き抜き耐久性もさらに向上する。
なお、ロックボルトを緊結させた後、さらに雄ネジ部と
雌ネジ部が相互に螺合する螺合部に固結材を充填させて
もよく、こうすることで岩盤に対するロックボルトの引
き抜き強度および引き抜き耐久性がより一層向上する。
In the rock bolt construction method configured as described above, the male screw portion of the lock bolt is screwed with the female screw portion of the excavation hole and fixed to the rock. For this reason, the pull-out strength of the lock bolt with respect to the rock is improved, and the pull-out durability of the lock bolt is further improved. After being screwed and fixed, the rock bolt is tightened against the rock while the rock surface is pressed down by the plate attached to the rear end of the bolt body, so that the male screw portion comes into close contact with the female screw portion. As a result, the pull-out strength of the rock bolt with respect to the rock is further improved, and the pull-out durability is further improved.
After the lock bolt is tightened, the male screw part and the female screw part may be further filled with a solidifying material in a screwing part where the male screw part and the female screw part are screwed to each other. The pullout durability is further improved.

【0008】また、別のロックボルト施工方法として、
岩盤に掘削孔を形成するとともに、当該掘削孔の内壁面
に雌ネジ部を刻設する第1工程と、ボルト本体の少なく
とも一部に前記雌ネジ部に対して螺合可能に雄ネジ部が
刻設されたロックボルトを準備し、前記ロックボルトの
雄ネジ部を前記雌ネジ部に螺合させながら、前記ロック
ボルトを前記掘削孔に挿入する第2工程と、前記第2工
程後に、少なくとも前記雄ネジ部と前記雌ネジ部とが螺
合している螺合部に固結材を充填する第3工程と、前記
固結材の養生後に、前記ボルト本体の後端に取付けたプ
レートにより地盤表面を締め付ける第4工程と、を備え
ている。
[0008] Further, as another rock bolt construction method,
To form a borehole in the rock, a first step of engraving the female screw portion on the inner wall surface of the borehole, the bolt body less
A male screw part is screwed into the female screw part
A second step of preparing the engraved lock bolt , inserting the lock bolt into the excavation hole while screwing a male thread of the lock bolt to the female thread, and at least after the second step, A third step of filling a fastening material into a screwing portion where the male screw portion and the female screw portion are screwed, and after curing the fastening material, a plate attached to a rear end of the bolt body. And a fourth step of tightening the ground surface.

【0009】この施工方法では、上記施工方法と同様
に、掘削孔の雌ネジ部と対してロックボルトの雄ネジ部
が螺合して岩盤に対して固定され、岩盤に対するロック
ボルトの引き抜き強度が向上し、ロックボルトの引き抜
き耐久性も向上する。また、少なくとも螺合部に固結材
を充填することで岩盤に対するロックボルトの引き抜き
強度および引き抜き耐久性がさらに向上する。
In this construction method, similarly to the construction method described above, the male screw portion of the lock bolt is screwed into the female screw portion of the excavation hole and fixed to the rock, and the pull-out strength of the lock bolt with respect to the rock is reduced. It improves the pull-out durability of the lock bolt. Further, by filling at least the threaded portion with the solidifying material, the pull-out strength and pull-out durability of the rock bolt with respect to the rock are further improved.

【0010】なお、前記第2工程において、ロックボル
トとして、前記雄ネジ部が前記ボルト本体の先端側にお
いて径方向に拡張可能に設けられ、ネジ拡径手段によっ
て径方向に拡張されることで前記雄ネジ部が前記雌ネジ
部に向けて押圧可能となっているものを準備し、当該ロ
ックボルトの雄ネジ部を雌ネジ部に螺合させながら、当
該ロックボルトを掘削孔に挿入した後、前記雄ネジ部を
ネジ拡径手段によって径方向に拡張して前記雌ネジ部に
向けて押圧するように構成してもよい。この場合、ネジ
拡径手段による雄ネジ部の拡径によって、雄ネジ部が径
方向に移動し、雌ネジ部に向けて押圧される。その結
果、岩盤に対するロックボルトの引き抜き強度がさらに
向上し、引き抜き耐久性もさらに向上する。
In the second step , the rock bolt
The male screw part is located on the tip side of the bolt body.
Is provided so that it can be expanded in the radial direction.
The male screw is expanded in the radial direction to
A lockable bolt is prepared, and while the male screw portion of the lock bolt is screwed into the female screw portion, the lock bolt is inserted into the drill hole, and then the male screw portion is expanded. You may comprise so that it may expand in a radial direction by a diameter means and may press toward the said internal thread part. In this case, the male screw part is moved radially by the diameter expansion of the male screw part by the screw expanding means, and is pressed toward the female screw part. As a result, the pull-out strength of the rock bolt with respect to the rock is further improved, and the pull-out durability is further improved.

【0011】[0011]

【発明の実施の形態】図1および図2は、この発明にか
かるロックボルト施工方法の一の実施形態を示す図であ
る。これらの図において、符号1は補強対象となる岩盤
であり、以下の説明ではこの岩盤1に対してロックボル
ト2を施工して岩盤補強を図っている。
1 and 2 are views showing one embodiment of a method for installing a lock bolt according to the present invention. In these drawings, reference numeral 1 denotes a bedrock to be reinforced. In the following description, a rock bolt 2 is applied to the bedrock 1 to strengthen the bedrock.

【0012】まず、削孔機によって岩盤1を削孔して掘
削孔3を形成する(図1(a))。そして、削孔機の回
転駆動部43からビット41およびロッド42を抜いて
岩用タップ5に付け替えた後、タップ5を回転させなが
ら、掘削孔3に進入させて掘削孔3の内壁面に雌ネジ部
31を形成する(図1(b))。
First, a rock drill 1 is drilled by a drilling machine to form an excavation hole 3 (FIG. 1A). Then, after removing the bit 41 and the rod 42 from the rotary drive unit 43 of the drilling machine and replacing the tap 41 with the rock tap 5, the tap 5 is rotated and the drill 5 is inserted into the drill hole 3, and the female wall is formed on the inner wall surface of the drill hole 3. The screw part 31 is formed (FIG. 1B).

【0013】図3は、岩盤の掘削孔に雌ネジ部を形成す
るための岩用タップを示す図である。このタップ5は、
図3に示すように、タップ本体51の先端側にネジ部5
2が形成される一方、後端側が柄部53となって削孔機
の回転駆動部43に装着される。また、タップ本体51
の軸芯に沿って注水孔54が形成されており、外部から
圧送される水を先端側に案内し、タップ5の先端から高
圧水を吐出させることが可能となっている。さらに、タ
ップ本体51の側面には、掘削孔3内の水やずりなどを
掘削孔3の外に案内する排出溝55が形成されている。
このため、雌ネジ形成中に掘削孔3内で発生したずりは
高圧水によって排出溝55を介して掘削孔3の外に排出
され、掘削孔3内にずりが詰まることを効果的に防止す
ることができる。また、雌ネジ形成中に水を供給するこ
とでタップ5と岩盤1とを冷却してタップ5の焼付きや
熱損傷などの不具合の発生を未然に防止することができ
る。
FIG. 3 is a view showing a tap for rock for forming a female screw portion in an excavation hole of rock. This tap 5
As shown in FIG.
2 is formed, and the rear end side becomes the handle 53 and is attached to the rotary drive unit 43 of the drilling machine. In addition, the tap body 51
A water injection hole 54 is formed along the axis of the tap 5 to guide water supplied from outside to the distal end side, and to discharge high-pressure water from the distal end of the tap 5. Further, on the side surface of the tap body 51, a discharge groove 55 for guiding water, shear, etc. in the drilling hole 3 to the outside of the drilling hole 3 is formed.
For this reason, the shear generated in the drill hole 3 during the formation of the female screw is discharged to the outside of the drill hole 3 by the high-pressure water through the discharge groove 55, and effectively prevents the shear from being clogged in the drill hole 3. be able to. Further, by supplying water during the formation of the female screw, the tap 5 and the bedrock 1 are cooled, and the occurrence of problems such as seizure of the tap 5 and thermal damage can be prevented.

【0014】上記のようにして掘削孔3への雌ネジ部3
1の形成が完了すると、図4に示すロックボルト2を掘
削孔3に挿入する(図1(c))。なお、掘削孔3の深
さおよびロックボルト2のボルト本体21の長さについ
ては、予めボーリングマシーン等によって岩盤のサンプ
ルを採取し、その採取結果を分析して決定するのが望ま
しい。
As described above, the female screw portion 3
When the formation of 1 is completed, the lock bolt 2 shown in FIG. 4 is inserted into the excavation hole 3 (FIG. 1C). It is desirable that the depth of the excavation hole 3 and the length of the bolt body 21 of the lock bolt 2 be determined in advance by collecting a rock sample using a boring machine or the like and analyzing the result of the collection.

【0015】図4は、この発明にかかるロックボルトの
一の実施形態を示す図である。このロックボルト2は、
ボルト本体21と、その先端側に設けられた雄ネジ部2
2とで構成されている。この雄ネジ部22は掘削孔3の
内壁面に刻設された雌ネジ部31と螺合可能となってい
る。
FIG. 4 is a view showing one embodiment of the lock bolt according to the present invention. This lock bolt 2
Bolt body 21 and male screw portion 2 provided on the tip side
And 2. The male screw part 22 can be screwed with the female screw part 31 engraved on the inner wall surface of the drill hole 3.

【0016】一方、ボルト本体21は中空管となってお
り、その中央内部に固結材を供給するための案内孔21
1を有している。また、雄ネジ部22の先端側には掘削
孔3の底側に向けて固結材を吐出するための先端吐出口
212が設けられる一方、雄ネジ部22の後端側にはボ
ルト本体21の略中央部から掘削孔3内に固結材を吐出
するための中央吐出口213が設けられている。このた
め、後述するように雄ネジ部22が雌ネジ部31と螺合
して掘削孔3が先端側と後端側の2つの空間に分かれて
も固結材を両空間に確実に充填可能となっている。
On the other hand, the bolt body 21 is a hollow tube, and a guide hole 21 for supplying a solidifying material to the center thereof.
One. A distal end discharge port 212 for discharging the consolidated material toward the bottom side of the excavation hole 3 is provided at a distal end side of the male screw section 22, while a bolt body 21 is provided at a rear end side of the male screw section 22. A central discharge port 213 for discharging the consolidated material into the excavation hole 3 from substantially the center of the hole is provided. For this reason, even if the male screw part 22 is screwed with the female screw part 31 and the excavation hole 3 is divided into two spaces on the front end side and the rear end side as described later, the solidification material can be reliably filled in both spaces. It has become.

【0017】なお、同図中の符号23はボルト本体21
の略中央部に設けられたリブであり、また符号24はボ
ルト本体21の後端(同図中の上方端)に刻設されたネ
ジ部である。
The reference numeral 23 in FIG.
Are provided at substantially the center of the bolt, and reference numeral 24 is a threaded portion formed at the rear end (upper end in the figure) of the bolt body 21.

【0018】図1に戻って、ロックボルト施工方法につ
いて説明を続ける。上記のように構成されたロックボル
ト2の雄ネジ部22を掘削孔3の雌ネジ部31に螺合さ
せながら、ロックボルト2を掘削孔3に挿入すると、同
図(c)に示すように、ロックボルト2の最先端部が掘
削孔3の底部と当接して係止される。このように、本実
施形態では、ボルト本体21に設けられた雄ネジ部22
を掘削孔3の雌ネジ部31と螺合させて岩盤1に対して
固定しているため、岩盤1に対するロックボルト2の引
き抜き強度が向上し、ロックボルト2の引き抜き耐久性
も向上されている。
Returning to FIG. 1, the description of the method of applying the lock bolt will be continued. When the lock bolt 2 is inserted into the drill hole 3 while the male screw portion 22 of the lock bolt 2 configured as described above is screwed into the female screw portion 31 of the drill hole 3, as shown in FIG. , The leading end of the lock bolt 2 comes into contact with the bottom of the drill hole 3 and is locked. As described above, in the present embodiment, the male screw portion 22 provided on the bolt body 21 is provided.
Is screwed into the female screw portion 31 of the excavation hole 3 and fixed to the rock 1, so that the pull-out strength of the lock bolt 2 with respect to the rock 1 is improved, and the pull-out durability of the lock bolt 2 is also improved. .

【0019】次に、図2に移ってロックボルト施工方法
についての説明を続ける。上記のようにして掘削孔3へ
のロックボルト2の螺合固定が完了すると、同図(a)
に示すように、岩盤表面側でボルト本体21にアンカー
プレート6を取付ける。そして、アンカープレート6に
より岩盤表面を押え付けながら、ボルト本体21の後端
(同図の上側)に刻設されたネジ部24にナット25を
締結してロックボルト2を岩盤1に対して緊結させる。
これによって、雄ネジ部22が雌ネジ部31に対して密
着し、その結果、岩盤1に対するロックボルト2の引き
抜き強度がさらに向上し、引き抜き耐久性もさらに向上
する。
Next, turning to FIG. 2, the description of the method of applying the lock bolt will be continued. When the screwing of the lock bolt 2 to the excavation hole 3 is completed as described above, FIG.
As shown in (1), the anchor plate 6 is attached to the bolt body 21 on the rock surface side. Then, while pressing the rock surface with the anchor plate 6, a nut 25 is fastened to a screw portion 24 engraved on the rear end (upper side in the figure) of the bolt body 21, and the lock bolt 2 is tightened to the rock 1. Let it.
As a result, the male screw portion 22 comes into close contact with the female screw portion 31, and as a result, the pull-out strength of the lock bolt 2 with respect to the bedrock 1 is further improved, and the pull-out durability is further improved.

【0020】最後に、ボルト本体21の案内孔211を
介して掘削孔3に固結材7を充填し、支持抵抗を高めて
引き抜き強度および引き抜き耐久性をさらに向上させて
いる。なお、この実施形態では、固結材7として2種類
のものを併用している。すなわち、雄ネジ部22および
雌ネジ部31が相互に螺合する螺合部(定着部)に対し
て樹脂系接着剤からなる定着用固結材71を充填する一
方、それより岩盤表面側には、モルタル、セメントミル
クやグラウト等の閉塞用固結材72を用いている。この
ように、定着部に樹脂系接着剤を定着用固結材71とし
て用いることで、モルタル、セメントミルクやグラウト
等を用いる場合に比べて、引き抜き強度および引き抜き
耐久性を向上させることができる。しかも、引き抜き強
度や引き抜き耐久性の向上に対してあまり寄与しない閉
塞部においては、安価なモルタルなどを用いることでト
ータルコストを低減させることが可能となる。
Finally, the solidification material 7 is filled in the excavation hole 3 through the guide hole 211 of the bolt body 21 to increase the support resistance to further improve the pull-out strength and the pull-out durability. In this embodiment, two types of the consolidating material 7 are used in combination. That is, the screwing portion (fixing portion) in which the male screw portion 22 and the female screw portion 31 are screwed with each other is filled with the fixing solidifying material 71 made of a resin-based adhesive, and the rocking surface 71 is located on the rock surface side. Uses a closing solidifying material 72 such as mortar, cement milk or grout. As described above, by using the resin adhesive as the fixing material 71 for fixing in the fixing portion, the pull-out strength and the pull-out durability can be improved as compared with the case where mortar, cement milk, grout or the like is used. In addition, in a closed portion that does not significantly contribute to the improvement of the pull-out strength and the pull-out durability, it is possible to reduce the total cost by using an inexpensive mortar or the like.

【0021】図5は、この発明にかかるロックボルトの
他の実施形態を示す図であり、同図(a)は側面図であ
り、同図(b)はロックボルト2の雄ネジ部22を先端
側から見た平面図である。なお、同図(b)では、雄ネ
ジ部22の構造理解を助けるために、セリ矢26を省略
した状態で図示されている。このロックボルト2が先の
実施形態と相違する点は、雄ネジ部22がボルト本体2
1の先端側において径方向に拡張可能に設けられてお
り、図6に示すセリ矢26(ネジ拡径手段)によって径
方向に拡張されることで雄ネジ部22が雌ネジ部に向け
て押圧されるように構成されている点である。なお、そ
れ以外の構成はほぼ同一である。したがって、以下にお
いて、同一構成については、同一符号を付して構成に関
する説明を省略する。
FIG. 5 is a view showing another embodiment of the lock bolt according to the present invention. FIG. 5 (a) is a side view, and FIG. 5 (b) shows the male screw portion 22 of the lock bolt 2. It is the top view seen from the tip side. In FIG. 2B, in order to facilitate understanding of the structure of the male screw portion 22, the screw thread 26 is omitted. The difference between this lock bolt 2 and the previous embodiment is that the male screw portion 22 is
1 is provided so as to be able to expand in the radial direction on the distal end side, and is expanded in the radial direction by a serrated arrow 26 (screw expanding means) shown in FIG. 6 so that the male screw portion 22 is pressed toward the female screw portion. This is the point that is configured. The other configuration is almost the same. Therefore, hereinafter, the same components are denoted by the same reference numerals, and the description of the configurations will be omitted.

【0022】この実施形態では、図5に示すように、こ
のボルト本体21の先端に設けられた雄ネジ部22は、
スリット221によって4つの雄ネジ分割片222に分
割され、これらの雄ネジ分割片222が先端吐出口21
2を中心として放射状に配置されている。このため、雄
ネジ分割片222は径方向に拡張移動可能となってい
る。なお、雄ネジ部22の分割個数は「4」に限定され
るものではなく、セリ矢26(ビット拡径手段)によっ
て径方向に拡張移動可能に構成されておれば、分割数お
よび形態などは任意である。
In this embodiment, as shown in FIG. 5, a male screw portion 22 provided at the tip of the bolt body 21 is
It is divided into four male screw split pieces 222 by the slit 221, and these male screw split pieces 222
2 are arranged radially. For this reason, the male screw split piece 222 can be expanded and moved in the radial direction. Note that the number of divisions of the male screw portion 22 is not limited to “4”, and the number of divisions and the form can be changed as long as the male screw portion 22 is configured to be able to expand and move in the radial direction by a serrated arrow 26 (bit expanding means). Optional.

【0023】また、セリ矢26は上記のように雄ネジ部
22を拡径するビット拡径手段として機能するものであ
り、この実施形態では、図6に示す略円錐形状に仕上げ
られている。そして、セリ矢26の先端部261が雄ネ
ジ部22の中央下部に挿入されている。したがって、先
の実施形態における掘削孔3へのロックボルト2の螺合
固定工程(図1(c))と同様にして、ロックボルト2
の雄ネジ部22を掘削孔3の雌ネジ部31に螺合させな
がら、ロックボルト2を掘削孔3に挿入していくと、ま
ずセリ矢26の底部が掘削孔3の底部と当接する。さら
に、ロックボルト2を挿入していくと、セリ矢26の先
端部261が雄ネジ部22の中央部に入り込み雄ネジ部
22を径方向に拡径する。なお、ビット拡径手段として
は、セリ矢26以外に従来より周知の方法によって雄ネ
ジ部22を拡径するように構成してもよい。
The serrated arrow 26 functions as a bit expanding means for expanding the male screw portion 22 as described above, and in this embodiment, it is finished in a substantially conical shape shown in FIG. Then, the tip 261 of the spike arrow 26 is inserted into the lower center of the male screw portion 22. Therefore, in the same manner as in the step of screwing the lock bolt 2 into the excavation hole 3 in the previous embodiment (FIG. 1C), the lock bolt 2
When the lock bolt 2 is inserted into the drilling hole 3 while screwing the male screw portion 22 of the drilling hole 3 into the female screw portion 31 of the drilling hole 3, first, the bottom of the spike arrow 26 comes into contact with the bottom of the drilling hole 3. Further, as the lock bolt 2 is inserted, the tip 261 of the spike arrow 26 enters the center of the male screw portion 22 and expands the male screw portion 22 in the radial direction. The bit diameter expanding means may be configured to expand the diameter of the male screw portion 22 by a conventionally known method other than the serrated arrow 26.

【0024】このように、この実施形態では、セリ矢2
6によって雄ネジ部22が径方向に拡径される。つま
り、分割された雄ネジ分割片222が径方向に移動し、
雌ネジ部31に向けて押圧される。その結果、岩盤1に
対するロックボルト2の引き抜き強度がさらに向上し、
引き抜き耐久性もさらに向上する。
As described above, in this embodiment, the seri arrow 2
6, the male screw portion 22 is radially expanded. That is, the divided male screw divided piece 222 moves in the radial direction,
It is pressed toward the female screw portion 31. As a result, the pull-out strength of the rock bolt 2 with respect to the bedrock 1 is further improved,
The pullout durability is further improved.

【0025】なお、本発明は上記した実施形態に限定さ
れるものではなく、その趣旨を逸脱しない限りにおいて
上述したもの以外に種々の変更を行うことが可能であ
る。例えば、掘削孔3に充填する固結材として2種類の
固結材を用いているが、1種類、あるいは3種類以上の
固結材を用いてもよい。また、掘削孔3全体に固結材を
充填するようにしてもよい。ただし、固結材による引き
抜き強度の増大を図る上では、少なくとも定着部(螺合
部)に充填するのが望ましい。
The present invention is not limited to the above-described embodiment, and various modifications other than those described above can be made without departing from the gist of the present invention. For example, two types of consolidated materials are used as the consolidated material to be filled in the excavation hole 3, but one type, or three or more types of consolidated materials may be used. Alternatively, the entire excavation hole 3 may be filled with a consolidated material. However, in order to increase the pull-out strength by the consolidated material, it is desirable to fill at least the fixing portion (screw portion).

【0026】また、上記実施形態では、固結材の充填に
先立って、ロックボルト2を岩盤1に対して緊結してい
るが、固結材の充填および養生を行った後で、アンカー
プレート6により岩盤表面を締め付けるようにしてもよ
い。すなわち、岩盤表面側でボルト本体21にアンカー
プレート6を取付けた後、アンカープレート6により岩
盤表面を押え付けながら、ボルト本体21のネジ部24
にナット25を締結してもよい。
In the above embodiment, the lock bolt 2 is tightened against the bedrock 1 before filling the solidified material. However, after the solidified material is filled and cured, the anchor plate 6 is fixed. The surface of the bedrock may be tightened. That is, after attaching the anchor plate 6 to the bolt body 21 on the rock surface side, the screw portion 24 of the bolt body 21 is pressed while the anchor plate 6 presses the rock surface.
May be fastened with a nut 25.

【0027】また、上記実施形態では、雄ネジ部22を
ボルト本体21の先端に形成しているが、雄ネジ部の形
成位置は先端に限定されるものではなく、任意の位置に
形成することができる。また、雄ネジ部22をボルト本
体21全体に形成してもよい。
Further, in the above embodiment, the male screw portion 22 is formed at the tip of the bolt body 21, but the formation position of the male screw portion is not limited to the tip, and may be formed at any position. Can be. Further, the male screw portion 22 may be formed on the entire bolt body 21.

【0028】[0028]

【発明の効果】以上のように、この発明によれば、ボル
ト本体に設けられた雄ネジ部を掘削孔の雌ネジ部と螺合
させて岩盤に対して固定しているので、岩盤に対するロ
ックボルトの引き抜き強度を向上させ、ロックボルトの
引き抜き耐久性を向上させることができる。
As described above, according to the present invention, since the male screw portion provided on the bolt body is screwed into the female screw portion of the drilling hole and fixed to the rock, the lock to the rock can be obtained. The pull-out strength of the bolt can be improved, and the pull-out durability of the lock bolt can be improved.

【0029】また、螺合固定した後、ボルト本体の後端
に取付けたプレートにより岩盤表面を押え付けながら、
ロックボルトを岩盤に対して緊結することで雄ネジ部を
雌ネジ部に対して密着しているので、岩盤に対するロッ
クボルトの引き抜き強度をさらに向上させ、ロックボル
トの引き抜き耐久性をさらに向上させることができる。
After screwing and fixing, the rock surface is pressed down by a plate attached to the rear end of the bolt body.
Since the male screw part is in close contact with the female screw part by tightening the lock bolt to the rock, the pull-out strength of the rock bolt with respect to the rock is further improved, and the pull-out durability of the lock bolt is further improved. Can be.

【0030】また、少なくとも螺合部に固結材を充填す
るように構成しているので、岩盤に対するロックボルト
の引き抜き強度および引き抜き耐久性をさらに向上させ
ることができる。
Further, since the solidified material is filled at least in the threaded portion, the pull-out strength and pull-out durability of the rock bolt with respect to the rock can be further improved.

【0031】さらに、雄ネジ部を径方向に拡張可能に構
成し、ネジ拡径手段によって雄ネジ部を径方向に拡張す
ると、拡径された雄ネジ部が径方向に移動し、雌ネジ部
に向けて押圧される。その結果、岩盤に対するロックボ
ルトの引き抜き強度をさらに向上させ、引き抜き耐久性
をさらに向上させることができる。
Further, when the male screw portion is configured to be radially expandable and the male screw portion is radially expanded by the screw expanding means, the expanded male screw portion moves in the radial direction, and the female screw portion is expanded. Pressed toward. As a result, the pull-out strength of the rock bolt with respect to the rock can be further improved, and the pull-out durability can be further improved.

【図面の簡単な説明】[Brief description of the drawings]

【図1】この発明にかかるロックボルト施工方法の一の
実施形態を示す図である。
FIG. 1 is a view showing one embodiment of a lock bolt construction method according to the present invention.

【図2】この発明にかかるロックボルト施工方法の一の
実施形態を示す図である。
FIG. 2 is a view showing one embodiment of a lock bolt construction method according to the present invention.

【図3】岩盤の掘削孔に雌ネジ部を形成するための岩用
タップを示す図である。
FIG. 3 is a view showing a tap for rock for forming a female screw portion in an excavation hole of rock.

【図4】この発明にかかるロックボルトの一の実施形態
を示す図である。
FIG. 4 is a view showing one embodiment of a lock bolt according to the present invention.

【図5】この発明にかかるロックボルトの他の実施形態
を示す図である。
FIG. 5 is a view showing another embodiment of the lock bolt according to the present invention.

【図6】セリ矢の斜視図である。FIG. 6 is a perspective view of a serrated arrow.

【符号の説明】[Explanation of symbols]

1…岩盤 2…ロックボルト 3…掘削孔 6…アンカープレート 7…固結材 21…ボルト本体 22…雄ネジ部 26…セリ矢(ビット拡径手段) 31…雌ネジ部 71…定着用固結材 72…閉塞用固結材 222…雄ネジ分割片 DESCRIPTION OF SYMBOLS 1 ... Rock rock 2 ... Lock bolt 3 ... Drilling hole 6 ... Anchor plate 7 ... Solidification material 21 ... Bolt main body 22 ... Male screw part 26 ... Seri arrow (bit expanding means) 31 ... Female screw part 71 ... Solidification for fixing Material 72: Closure material for closing 222: Male thread split piece

Claims (3)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 岩盤に掘削孔を形成するとともに、当該
掘削孔の内壁面に雌ネジ部を刻設する第1工程と、ボルト本体の少なくとも一部に前記雌ネジ部に対して螺
合可能に雄ネジ部が刻設されたロックボルトを準備し、
前記 ロックボルトの雄ネジ部を前記雌ネジ部に螺合させ
ながら、前記ロックボルトを前記掘削孔に挿入する第2
工程と、 前記第2工程後に、前記ボルト本体の後端に取付けたプ
レートにより岩盤表面を押え付けながら、前記ロックボ
ルトを前記岩盤に対して緊結させる第3工程と、 を備えたことを特徴とするロックボルト施工方法。
1. A to form a borehole in the rock, screw: a first step of engraving the female screw portion on the inner wall surface of the borehole, at least a portion of the bolt body with respect to the female screw portion
Prepare a lock bolt with a male screw part engraved as possible
While screwing the male screw portion of the lock bolt to the female threaded portion, a second inserting the locking bolt into the drilled hole
And a third step of, after the second step, tightening the lock bolt to the rock while pressing the rock surface with a plate attached to a rear end of the bolt body. Rock bolt construction method.
【請求項2】 岩盤に掘削孔を形成するとともに、当該
掘削孔の内壁面に雌ネジ部を刻設する第1工程と、ボルト本体の少なくとも一部に前記雌ネジ部に対して螺
合可能に雄ネジ部が刻設されたロックボルトを準備し、
前記 ロックボルトの雄ネジ部を前記雌ネジ部に螺合させ
ながら、前記ロックボルトを前記掘削孔に挿入する第2
工程と、 前記第2工程後に、少なくとも前記雄ネジ部と前記雌ネ
ジ部とが螺合している螺合部に固結材を充填する第3工
程と、 前記固結材の養生後に、前記ボルト本体の後端に取付け
たプレートにより地盤表面を締め付ける第4工程と、 を備えたことを特徴とするロックボルト施工方法。
2. A first step of forming an excavation hole in the rock and engraving an internal thread portion on an inner wall surface of the excavation hole, and at least a part of the bolt body is screwed with respect to the internal thread portion.
Prepare a lock bolt with a male screw part engraved as possible
While screwing the male screw portion of the lock bolt to the female threaded portion, a second inserting the locking bolt into the drilled hole
After the second step, at least a third step of filling a threaded portion at which the male screw portion and the female screw portion are screwed with a solidifying material, and after curing the solidified material, A fourth step of tightening the ground surface with a plate attached to the rear end of the bolt body.
【請求項3】 前記第2工程は、前記ロックボルトとして、前記雄ネジ部が前記ボルト本
体の先端側において径方向に拡張可能に設けられ、ネジ
拡径手段によって径方向に拡張されることで前記雄ネジ
部が前記雌ネジ部に向けて押圧可能となっているものを
準備する第1サブ工程と、 前記ロックボルトの雄ネジ部を前記雌ネジ部に螺合させ
ながら、前記ロックボルトを前記掘削孔に挿入する第2
サブ工程と、 前記掘削孔に挿入された前記雄ネジ部を前記ネジ拡径手
段によって径方向に拡張して前記雌ネジ部に向けて押圧
する第3サブ工程とを備えている請求項1または2記載
のロックボルト施工方法。
3. The method according to claim 2, wherein in the second step, as the lock bolt, the male screw portion is formed of the bolt.
It is provided to be expandable in the radial direction on the distal side of the body,
The male screw is expanded in the radial direction by a diameter expanding means.
A first sub-step of preparing a part which can be pressed toward the female screw part; and screwing the lock bolt into the excavation hole while screwing a male screw part of the lock bolt into the female screw part. The second to insert into
And sub-step, the third claim and a sub-step for pressing the male threaded portion which is inserted into the drilled hole in the female screw portion to expand radially by the screw diameter means 1 or 2. The method for constructing a lock bolt according to 2 .
JP26833299A 1999-09-22 1999-09-22 Rock bolt construction method Expired - Lifetime JP3266588B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP26833299A JP3266588B2 (en) 1999-09-22 1999-09-22 Rock bolt construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP26833299A JP3266588B2 (en) 1999-09-22 1999-09-22 Rock bolt construction method

Publications (2)

Publication Number Publication Date
JP2001090492A JP2001090492A (en) 2001-04-03
JP3266588B2 true JP3266588B2 (en) 2002-03-18

Family

ID=17457083

Family Applications (1)

Application Number Title Priority Date Filing Date
JP26833299A Expired - Lifetime JP3266588B2 (en) 1999-09-22 1999-09-22 Rock bolt construction method

Country Status (1)

Country Link
JP (1) JP3266588B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008133682A (en) * 2006-11-29 2008-06-12 Nishi Nippon Spc Kk Construction method of banking structure

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102231375B1 (en) * 2019-05-08 2021-03-23 이우열 Stud super bolt

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008133682A (en) * 2006-11-29 2008-06-12 Nishi Nippon Spc Kk Construction method of banking structure

Also Published As

Publication number Publication date
JP2001090492A (en) 2001-04-03

Similar Documents

Publication Publication Date Title
JP4288331B2 (en) Rock bolt and supporting method using the same
US3359742A (en) Method and apparatus for securing anchorage in loose and compact ground
JPH0913511A (en) Engaging method of back-cut anchor
US5348424A (en) Reinforcing block for excavation work and method of construction thereof
JP3266588B2 (en) Rock bolt construction method
JP2001090067A (en) Rock bolt and rock-bolt execution method
JP4603652B2 (en) The consolidation method of natural ground
EP0843788B1 (en) Securing component and method of anchoring it
KR102379212B1 (en) anchor bolt
JP2004137760A (en) Construction method of double pipe digging lock bolt making use of boring rod
JP3921657B2 (en) Construction method of large-diameter rock bolt anchors for ground reinforcement
JPS622120B2 (en)
JP3851590B2 (en) Preceding ground mountain consolidation method using self-drilling bolt and FRP bolt
JP2001311399A (en) Fixing device for bar-like member to rock, rock bolt using this device, and hoisting device for rock
WO1996021087A1 (en) Rod for an anchor inserted by drilling and injection grouting
KR100710443B1 (en) Pipe and Compaction Grouting : PCG
WO2001057363A1 (en) Injection anchor
JPH07268877A (en) Method for reinforcing excavation slope
JP3333478B2 (en) Construction method of concrete structure
KR20050031075A (en) Method reinforcing the ground with armatures having multiple projections in surface
JPS6215359Y2 (en)
CN2469167Y (en) Densed drilling bits for making densed piles for consolidation of railway foundation
KR200374104Y1 (en) Pipe and Compaction Grouting : PCG
JP3182586B2 (en) Construction method of soil cement composite pile
KR100396393B1 (en) Pile driving-in method using screw type pile with conical end

Legal Events

Date Code Title Description
TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20011218

R150 Certificate of patent or registration of utility model

Ref document number: 3266588

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090111

Year of fee payment: 7

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100111

Year of fee payment: 8

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100111

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110111

Year of fee payment: 9

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120111

Year of fee payment: 10

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120111

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130111

Year of fee payment: 11

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140111

Year of fee payment: 12

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term