JP2768280B2 - Bridge construction method - Google Patents

Bridge construction method

Info

Publication number
JP2768280B2
JP2768280B2 JP6271367A JP27136794A JP2768280B2 JP 2768280 B2 JP2768280 B2 JP 2768280B2 JP 6271367 A JP6271367 A JP 6271367A JP 27136794 A JP27136794 A JP 27136794A JP 2768280 B2 JP2768280 B2 JP 2768280B2
Authority
JP
Japan
Prior art keywords
girder
block
bridge
span
erection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP6271367A
Other languages
Japanese (ja)
Other versions
JPH08134844A (en
Inventor
松生 鶴岡
和之 阿部
喜久夫 小関
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP6271367A priority Critical patent/JP2768280B2/en
Publication of JPH08134844A publication Critical patent/JPH08134844A/en
Application granted granted Critical
Publication of JP2768280B2 publication Critical patent/JP2768280B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本願発明は、工場またはヤードで
製作された橋桁ブロックを1径間分ごと架設ガーダー上
に載せて架設するサポート方式のスパンバイスパンプレ
キャストブロック工法による橋梁の架設方法の改良に関
するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an improvement of a bridge erection method by a support type span-by-span precast block method in which a bridge girder block manufactured in a factory or a yard is mounted on an erection girder for every span. It is about.

【0002】[0002]

【従来の技術】プレキャストブロック工法は、工場ある
いは製作ヤードで橋軸方向または橋軸直角方向に分割し
て構造物を製作し、架設現場に搬入し、プレストレスを
導入して一体構造物に作り上げる工法であり、橋梁の施
工等に用いられている。
2. Description of the Related Art In a precast block method, a structure is manufactured in a factory or a manufacturing yard by dividing the structure in a bridge axis direction or a direction perpendicular to the bridge axis, carried into an erection site, and subjected to prestress to form an integrated structure. It is a construction method and is used for construction of bridges.

【0003】プレキャストブロック工法を橋梁の架設に
適用した場合の利点としては、以下のようなものが挙げ
られる。
The advantages of applying the precast block method to the construction of a bridge include the following.

【0004】 プレキャストブロックを下部工の施工
中に製作し、ストックできるので、製作工程と架設工程
を別々に設定でき、工期が大幅に短縮できる。
Since the precast block can be manufactured and stocked during the construction of the substructure, the manufacturing process and the erection process can be set separately, and the construction period can be greatly reduced.

【0005】 プレキャストブロックの製作は、工場
または製作ヤードでの繰り返し作業となり、品質の安定
した構造物を造ることができる。また、機械化施工を行
うことで合理化、省力化が可能である。
[0005] The production of a precast block is a repetitive operation in a factory or a production yard, and a structure with stable quality can be produced. In addition, rationalization and labor saving can be achieved by performing mechanized construction.

【0006】 ストックヤードでブロックを保管する
ことにより、架設後の乾燥収縮、クリープによる変形が
小さくなる。
[0006] Storing the blocks in the stockyard reduces drying shrinkage and creep deformation after erection.

【0007】上述の点からして、プレキャストブロック
工法は、PC橋工事の分野で最も急速施工、省力化施工
が期待できる工法であるが、そのためにはブロックの製
作では型枠設備等の自動化、ブロックの架設では架設機
械の大型化を前提とし、大規模な橋梁工事において有利
な工法となる。
[0007] In view of the above points, the precast block method is a method that can be expected to be the most rapid and labor-saving construction in the field of PC bridge construction. The block erection is premised on the enlargement of the erection machine, which is an advantageous method for large-scale bridge construction.

【0008】なお、プレストレスの導入に関し、諸外国
では外ケーブルを使用する例が多く、それにより施工
性、経済性の向上が図られている。
[0008] Regarding the introduction of pre-stress, there are many cases where external cables are used in foreign countries, thereby improving workability and economic efficiency.

【0009】また、プレキャストブロック工法の代表的
な架設方法としては、工場またはヤードで製作された1
径間分のブロックを架設ガーダー上に運搬して、所定の
位置決め後、接合し、プレストレスを与えながら1径間
ずつ架設して行くスパンバイスパン工法と、橋脚を中心
にバランスを取り、左右交互または同時にブロックを接
合してプレストレスを与えながら張り出して行く片持ち
架設工法があり、前者は支間40〜60m、後者は支間
60〜100m程度のPC桁橋に適している。
[0009] As a typical method of erection of the precast block method, one of the methods used in a factory or a yard.
The span-by-span method, in which the blocks for the spans are transported onto the erection girder, and after predetermined positioning, joined and erected one span at a time while applying prestress, balance the bridge pier, There is a cantilever erection method in which blocks are joined alternately or simultaneously to project while applying prestress, and the former is suitable for a PC girder bridge with a span of 40 to 60 m, and the latter for a span of about 60 to 100 m.

【0010】[0010]

【発明が解決しようとする課題】本願発明が対象とする
スパンバイスパンプレキャストブロック工法では、架設
ガーダーによるブロックの支持方法に関し、ブロックを
架設ガーダー上に載せて架設するサポート方式と、ブロ
ックを架設ガーダーに吊り下げて架設するハンガー方式
があり、前者は支点上の主桁(柱頭部)をプレキャスト
ブロックとする場合、後者は支点上の主桁を場所打ちす
る場合に適している。
The span-by-span precast block construction method to which the present invention is directed relates to a method of supporting a block by an installation girder, a support system for mounting the block on the installation girder, and a method for mounting the block on the installation girder. There is a hanger type in which the main girder (cap) on the fulcrum is a precast block, and the latter is suitable when the main girder on the fulcrum is cast in place.

【0011】このうち、サポート方式のスパンバイスパ
ンプレキャストブロック工法の場合は、例えば1径間分
の橋桁ブロックを、架設完了した橋桁上の橋型クレーン
等の揚重装置により先方のブロックから順次架設ガーダ
ー上のブロック移動台車に搭載し、ブロック移動台車を
連結しながら移動台車送り装置により前方へ送り出し、
最後部のブロック搭載後、順次ブロックを接合して単径
間の施工を完了し、架設ガーダーを1径間ずつ送り出し
ながら、橋桁ブロックを1径間ずつ架設するといった手
順で架設作業が行われることになる。
Among them, in the case of the support type span-by-span precast block method, for example, a bridge girder block for one span is sequentially erected from the preceding block by a lifting device such as a bridge type crane on the bridge girder which has been completed. It is mounted on the block moving cart on the girder, and sent forward by the moving cart feeder while connecting the block moving cart,
After the last block is mounted, the blocks will be joined in sequence to complete the construction of the single span, and the bridge girder block will be erected one span at a time while sending out the construction girder one span at a time. become.

【0012】その場合、ブロック移動台車は架設ガーダ
ーに載せたまま、架設ガーダーとともに次径間に送り出
すことができるが、次径間の橋桁ブロックの架設を開始
するためには、架設ガーダー上の移動台車送り装置によ
る移動台車送り出し位置のブロック移動台車以外は、移
動台車送り装置より後方に格納しておく必要がある。
In this case, the block moving cart can be sent out to the next span together with the erection girder while being mounted on the erection girder. However, in order to start erection of the bridge girder block of the next span, the movement on the erection girder is required. The blocks other than the block moving trolley at the position where the trolley is fed by the trolley feeder must be stored behind the mobile trolley feeder.

【0013】これに対し、架設ガーダーの後方に張り出
し部分を設け、その張り出し部分をブロック移動台車の
格納庫として利用することが可能であるが、1径間のブ
ロック架設に必要な台数を全て架設ガーダーの後部に納
めるとすると、架設ガーダーの後方への張り出し部分が
非常に長くなり、架設ガーダーの重量が増す他、架設ガ
ーダー全体の長さが長くなることから、曲線部がある場
合等には施工が困難になることが考えられる。
On the other hand, it is possible to provide an overhanging portion behind the construction girder and use the overhanging portion as a storage for the block moving cart. If it is to be stored in the rear part, the overhanging part of the construction girder will be very long, which will increase the weight of the construction girder and increase the length of the construction girder. Can be difficult.

【0014】本願発明はこのようなサポート方式のスパ
ンバイスパンプレキャストブロック工法による橋梁の架
設方法において、ブロック移動台車の格納方法を工夫す
ることで、経済性および施工性の向上を図ったものであ
る。
The present invention is intended to improve economy and workability by devising a method of storing a block moving trolley in such a bridge erection method using a support type span-by-span precast block method. .

【0015】[0015]

【課題を解決するための手段】本願発明は、工場または
ヤードで製作された1径間分の橋桁ブロックを、架設完
了した橋桁上の揚重装置により先方のブロックから順次
架設ガーダー上のブロック移動台車に搭載し、ブロック
移動台車を連結しながら移動台車送り装置により前方へ
送り出し、最後部のブロック搭載後、順次ブロックを接
合して単径間の施工を完了し、架設ガーダーを1径間ず
つ送り出しながら、橋桁ブロックを1径間ずつ架設する
サポート方式のスパンバイスパンプレキャストブロック
工法による橋梁の架設方法において、架設ガーダー上の
ブロック移動台車のうち、架設ガーダー上の移動台車送
り装置による移動台車送り出し位置およびその後方に格
納可能な範囲の台数を残して、他のブロック移動台車を
吊り装置により橋桁上に移動しておき、ブロックの架設
に際し橋桁上に仮保管したブロック移動台車を、吊り装
置で順次架設ガーダー上に戻しながらブロックの搭載お
よびブロック移動台車の送り出しを行うようにするもの
である。
SUMMARY OF THE INVENTION According to the present invention, a bridge girder block for one span manufactured at a factory or a yard is moved by a lifting device on the bridge girder which has been completed, sequentially from a block on the other side to a block on an installation girder. It is mounted on a trolley, sent forward by a trolley feeder while connecting the block trolley, and after mounting the last block, the blocks are sequentially joined to complete the construction of a single span, and the erection girder is spanned by one span In a bridge erection method using a span-by-span precast block method of a support method in which a bridge girder block is erected one span at a time while being sent out, of a block trolley on the erection girder, a moving trolley feeding device on a erection girder. The other block moving trolleys are suspended by a lifting device, leaving the position and the number of units that can be stored behind it. Leave moved upward, and is to the temporary storage block movable carriage on the bridge girder upon erection of the block, performs feeding of the mounting and block movable carrier block while returning on sequential erection girder with hanging device.

【0016】1径間のブロック架設に必要な台数を全て
架設ガーダーの後部に納めるとすると、架設ガーダーの
後方への張り出し部分が非常に長くなるが、本願発明の
架設方法では、吊り装置で橋桁上に移動したブロック移
動台車の分だけ、架設ガーダーの後方への張り出し長を
短くすることができる。
If all the units required for erection of a block of one span are accommodated in the rear part of the erection girder, the projecting portion of the erection girder becomes very long. The overhang length of the erection girder can be shortened by an amount corresponding to the block moving trolley moved upward.

【0017】ブロックをブロック移動台車に搭載するた
めの揚重装置としては、既設の橋桁上に設置できる橋型
クレーン等が適している。また、ブロック移動台車を橋
桁と架設ガーダーとの間で移動させるための吊り装置と
してはホイスト等が適しており、橋型クレーンの両側に
併設することができる。
As a lifting device for mounting the block on the block moving trolley, a bridge type crane or the like which can be installed on an existing bridge girder is suitable. A hoist or the like is suitable as a suspending device for moving the block moving trolley between the bridge girder and the erection girder, and can be provided on both sides of the bridge type crane.

【0018】[0018]

【実施例】以下、図示した具体的な実施例について説明
する。
BRIEF DESCRIPTION OF THE DRAWINGS FIG.

【0019】図1は、本願発明の対象となるサポート方
式のスパンバイスパンプレキャストブロック工法におけ
る施工および機械構成の概要を示したものである。ま
た、図4および図5は橋型クレーン14によるブロック
3の移動台車21上への搭載の様子の詳細を、図6およ
び図7は橋脚1柱頭部のガーダー送り出し装置12部分
の詳細を示したものである。
FIG. 1 shows an outline of a construction and a machine configuration in a support type span-by-span precast block method to which the present invention is applied. 4 and 5 show details of how the bridge 3 is mounted on the movable trolley 21 by the bridge-type crane 14, and FIGS. 6 and 7 show details of the girder delivery device 12 at one pillar of the pier. Things.

【0020】なお、以下に述べる実施例はあくまで一実
施例であり、本願発明は実施例に限定されるものではな
い。
The embodiments described below are merely examples, and the present invention is not limited to the embodiments.

【0021】(1) 本実施例における施工方針は以下の通
りである。
(1) The construction policy in this embodiment is as follows.

【0022】 施工支間は、40〜60m程度とす
る。
The construction span is about 40 to 60 m.

【0023】 ブロック3単体の重量は100t程度
までとする。
The weight of the block 3 alone is limited to about 100 t.

【0024】 架設可能なブロック3単位長さ当たり
の重量は、30t/mを標準とする。
The standard weight of the erectable block 3 per unit length is 30 t / m.

【0025】 架設ガーダー11は、手延桁方式にて
単スパンごとに架設し、移動する。
The erection girder 11 is erected and moved for each single span by a hand-rolled girder method.

【0026】 架設ガーダー11は、ガーダー受支柱
4上のガーダー送り出し装置12により支持され、平行
かつ横断勾配、縦断勾配に合わせ設置する。
The erection girder 11 is supported by a girder delivery device 12 on the girder receiving support 4, and is installed in parallel, in accordance with a transverse gradient and a vertical gradient.

【0027】 ブロック3は、ブロック製作ヤードか
ら架設地点まで、架設完了した橋桁2上をトレーラー2
4またはレール走行式の自動搬送車を用いて運搬する。
The block 3 is a trailer 2 on the bridge girder 2 that has been completed from the block manufacturing yard to the erection point.
4 or using a rail-traveling automatic carrier.

【0028】 ガーダー受支柱4、ガーダー送り出し
装置12の設置、撤去工事は、地上から移動式クレーン
13により施工する。
The installation and removal of the girder support column 4 and the girder delivery device 12 are performed by a mobile crane 13 from the ground.

【0029】(2) 本実施例における機械構成は以下の通
りである。
(2) The mechanical configuration of this embodiment is as follows.

【0030】 架設ガーダー11 2径間をまたぐ2本の桁11aで構成され、先端部は、
平面線形に対応するため幅を狭くしている。架設ガーダ
ー11後部は、ブロック移動台車格納庫として使用す
る。
The erection girder 11 is composed of two girders 11a straddling two spans,
The width is reduced to correspond to the horizontal alignment. The rear part of the erection girder 11 is used as a block moving trolley hangar.

【0031】 橋型クレーン14 ブロック3を搬送車より吊り上げ、ブロック移動台車2
1に載せるためのクレーンで、橋軸方向に横行・走行が
可能である。
The bridge crane 14 lifts the block 3 from the carrier, and moves the block moving trolley 2
This crane can be mounted on 1 and can traverse and run in the bridge axis direction.

【0032】 移動台車設置格納ホイスト15 橋型クレーン14の両側に張り出して2基設置され、主
にブロック移動台車21の格納および架設ガーダー11
上へブロック移動台車21を搭載するために使用され
る。
The movable hoist 15 is installed on both sides of the bridge crane 14 so as to protrude therefrom.
It is used to mount the block moving trolley 21 upward.

【0033】 ブロック移動台車21 架設ガーダー11上面のレール上をブロック3を搭載し
て移動する台車であり、前後、左右、上下の微調整が可
能である。
Block moving trolley 21 A trolley that mounts and moves the block 3 on a rail on the upper surface of the erection girder 11, and allows fine adjustment in front and rear, left and right, and up and down.

【0034】 移動台車送り装置22 ブロック移動台車21を順次送り出す装置で、橋型クレ
ーン14下部の架設ガーダー11上に設置されている。
Mobile cart feeder 22 This is a device for sequentially sending out the block carts 21 and is installed on the erection girder 11 below the bridge type crane 14.

【0035】 その他 ガーダー受支柱4、ガーダー送り出し装置12(ガーダ
ー水平移動装置、位置決め調整機能付き)、移動足場2
3、屋根装置31等がある。
Others: girder receiving support 4, girder delivery device 12 (girder horizontal movement device, with positioning adjustment function), moving scaffold 2
3, the roof device 31 and the like.

【0036】(3) 本実施例におけるブロック3の架設作
業は、以下のように行う。
(3) The work of erection of the block 3 in this embodiment is performed as follows.

【0037】最も標準的な架設手順は、先頭のブロック
3aから橋型クレーン14を用いて順次ブロック移動台
車21に搭載し、移動台車送り装置22により所定の位
置間隔(ブロック3等間隔)で移動させ、最後部(最も
手前側)のブロック3bの搭載完了後、順次接合位置ま
で引き戻す。
The most standard erection procedure is as follows. From the first block 3a, the bridge type crane 14 is used to sequentially mount the blocks on the block moving trolley 21 and move the trolley at a predetermined position interval (block 3 equal intervals) by the moving trolley feeder 22. Then, after the mounting of the rearmost (frontmost) block 3b is completed, the block 3b is sequentially pulled back to the joining position.

【0038】移動台車21は、連結器により等間隔に調
整され、かつ上下、左右、前後のブロック位置決め微調
整装置を装備している。
The movable trolley 21 is adjusted at equal intervals by a coupler, and is equipped with a fine positioning device for vertical, horizontal, and vertical block positioning.

【0039】ブロック3は、移動足場23上から接着剤
を塗布した後、移動台車送り装置22、引き寄せ鋼棒に
より順次引き寄せながら接合する。
After the block 3 is coated with an adhesive from the moving scaffold 23, the blocks 3 are joined while being sequentially drawn by the moving carriage feeding device 22 and the drawing steel bar.

【0040】外ケーブルの敷設完了後、間詰め部の打
設、緊張を行い、単径間の施工を完了する。
After the completion of the laying of the outer cable, the filling portion is laid and tensioned to complete the single-span work.

【0041】拡幅部の単位長さ当たりブロック重量が標
準を越える場合は、中間に仮設ベントを設け対応する。
When the block weight per unit length of the widened portion exceeds the standard, a temporary vent is provided in the middle to cope with it.

【0042】柱頭部の施工は、架設手順が異なるがプレ
キャスト、現場打ち双方の施工法で架設可能である。背
割れ部分や間詰め部の位置が異なる場合でも、移動台車
送り装置22の設置位置を移動させる(送り装置のジャ
ッキ22a(図4参照)を使用し移動する)ことにより
対応する。
Although the construction procedure of the column capital is different, it can be constructed by both precast and on-site construction methods. Even in the case where the positions of the back cracking portion and the filling portion are different, it is dealt with by moving the installation position of the movable trolley feeding device 22 (moving using the jack 22a (see FIG. 4) of the feeding device).

【0043】プレキャストブロック3の養生を目的とし
て、架設ガーダー11上の施工スパン全長に渡りジャバ
ラ式屋根装置31(架設ガーダー外側に敷設されたレー
ル上を移動する)を装備している。
For the purpose of curing the precast block 3, a bellows-type roof device 31 (moving on a rail laid outside the erection girder) is provided over the entire construction span on the erection girder 11.

【0044】(4) 本実施例における架設ガーダー11の
移動は、以下のように行う。
(4) The movement of the erection girder 11 in this embodiment is performed as follows.

【0045】単径間の緊張完了後、移動台車21の調整
ジャッキをブロック3から解放し、ガーダー送り出し装
置12の固定ジャッキ12aを解放して送り出しローラ
ー12bに架設ガーダーをあずける(図6参照)。
After the completion of the tensioning for the single diameter, the adjusting jack of the movable carriage 21 is released from the block 3, the fixed jack 12a of the girder delivery device 12 is released, and the bridge girder is placed on the delivery roller 12b (see FIG. 6).

【0046】移動台車21は、移動台車送り装置22に
より連結された状態で最も間隔を狭くしておく。あらか
じめ前方の橋脚1にはガーダー受支柱4、ガーダー送り
出し装置12を移動式クレーン13により設置してお
く。
The distance between the movable carts 21 is minimized in a state where the movable carts 21 are connected by the movable cart feeder 22. A girder support column 4 and a girder delivery device 12 are previously installed on a front pier 1 by a mobile crane 13.

【0047】架設ガーダー11の左右の桁11aをガー
ダー送り出し装置12により同時に手延べ桁方式により
送り出す。平面線形の半径のきつい径間については送り
出し途中で水平移動調整を行う。
The girders 11 on the left and right sides of the erection girder 11 are simultaneously sent out by the girder feeder 12 by the hand girder method. Horizontal movement adjustment is performed during the feeding of the tight span of the radius of the horizontal alignment.

【0048】送り出し完了後、上下、左右、前後の調整
を行い、架設ガーダー11を固定する。
After the delivery is completed, the up, down, left, right, front and rear adjustments are made, and the erection girder 11 is fixed.

【0049】橋型クレーン14は、橋桁1上の搬送台車
用のレールおよび橋型クレーン14のレールユニットを
自力で敷設しながら所定の位置まで移動する。
The bridge crane 14 moves to a predetermined position while laying the rail for the carriage on the bridge girder 1 and the rail unit of the bridge crane 14 by itself.

【0050】架設ガーダー11上に存置した移動台車2
1を移動台車送り装置22により引き寄せながら、橋型
クレーン14に併設した移動台車設置格納ホイスト15
により格納仮置きする。
The mobile trolley 2 placed on the erection girder 11
1 while being pulled by the moving carriage feeding device 22, the moving carriage installation and storage hoist 15 attached to the bridge crane 14.
Is temporarily stored.

【0051】移動足場23を張り出し、ブロック3架設
準備を完了する。
The movable scaffold 23 is overhanged, and the preparation for erection of the block 3 is completed.

【0052】(5) 次に、本実施例における施工手順を、
図2(a) 〜(d) および図3(e) 〜(h)に基づいて説明す
る。
(5) Next, the construction procedure in this embodiment is as follows:
2 (a) to 2 (d) and FIGS. 3 (e) to 3 (h).

【0053】 プレキャストブロック3の送り出し
(図2(a) 参照) 橋型クレーン14により吊り上げられたブロック3を、
架設ガーダー11上のブロック移動台車21上に搭載す
る。ブロック3を搭載した移動台車21は、前後、左
右、上下の仮調整を行い移動台車送り装置22により前
方へ送り出す。
Delivery of the precast block 3 (see FIG. 2A) The block 3 lifted by the bridge crane 14 is
It is mounted on a block moving cart 21 on the construction girder 11. The mobile trolley 21 on which the block 3 is mounted is provisionally adjusted forward, backward, left and right, and up and down, and is sent forward by the mobile trolley feeder 22.

【0054】 プレキャストブロック3の接合(図2
(b) 参照) 移動台車21は、順次等間隔に調整連結され、ブロック
3を搭載し、前方へ移動する。径間の必要数のブロック
3を搭載し、送り出しを完了する。その後、手前側から
単ブロック毎接着剤を塗布し、移動台車送り装置22お
よび引寄せ鋼棒を用いて接合する。
Joining of the precast block 3 (FIG. 2
(See (b).) The movable trolleys 21 are sequentially adjusted and connected at equal intervals, mounted with the blocks 3, and moved forward. The required number of blocks 3 are mounted on the span, and the feeding is completed. Thereafter, an adhesive is applied to each single block from the near side, and joined using the moving carriage feeding device 22 and the pulling steel bar.

【0055】 外ケーブルの敷設、緊張(図2(c) 参
照) 間詰め部分のコンクリート打設後、外ケーブルの敷設、
緊張を行い、径間の施工を完了する。移動台車21の間
隔を最短にし、移動足場23(図3(c) 参照)の引き込
みを行い、架設ガーダー11をガーダー送り出し装置1
2上にあずけ、移動の準備を完了する。前方の橋脚1で
は、事前に移動式クレーン13を用いてガーダー受支柱
4、ガーダー送り出し装置12を設置しておく。
Laying of outer cable, tension (see FIG. 2 (c)) After placing concrete in the filling portion, laying of outer cable,
Tension is applied to complete span construction. The distance between the movable carts 21 is minimized, the movable scaffold 23 (see FIG. 3 (c)) is retracted, and the erection girder 11 is moved to the girder delivery device 1.
2 and complete the preparation for moving. In the front pier 1, the girder support column 4 and the girder delivery device 12 are installed in advance by using the movable crane 13.

【0056】 架設ガーダー11の送り出し(図2
(d) 参照) 橋型クレーン14をそのままにし、左右の架設ガーダー
11を同時にガーダー送り出し装置12により手延べ桁
方式により送り出す。橋梁の線形によっては、送り出し
途中で橋桁1と干渉しないように横移動を行う。
Delivery of the erection girder 11 (FIG. 2)
(See (d)) The bridge-type crane 14 is left as it is, and the left and right erection girder 11 are simultaneously sent out by the girder sending-out device 12 by the hand girder method. Depending on the alignment of the bridge, the bridge is moved laterally so as not to interfere with the bridge girder 1 during the delivery.

【0057】 架設ガーダー11の位置決め固定(図
2(e) 参照) 架設ガーダー11の送り出し完了後、縦断勾配、横断勾
配、線形に合わせ、架設ガーダー11を微調整(前後、
左右、上下)し、架設ガーダー11を支える固定ジャッ
キ12a(油圧スクリュージャッキ(図6参照))によ
り橋脚1上に固定する。
Positioning and fixing of the erection girder 11 (see FIG. 2 (e)) After the completion of the erection girder 11, fine adjustment of the erection girder 11 (front and rear,
Then, it is fixed on the pier 1 by a fixing jack 12a (hydraulic screw jack (see FIG. 6)) that supports the erection girder 11.

【0058】 橋型クレーン14の移動、設置(図3
(f) 参照) 架設ガーダー11固定後、橋型クレーン14を前方架設
地点まで移動させる。この際、橋型クレーン14の走行
レールを橋型クレーン14自力で前方に盛りかえる。所
定の位置まで移動した後、橋型クレーン14を位置決め
し、固定する。施工完了した径間の橋脚1に設置された
ガーダー受支柱4およびガーダー送り出し装置12は、
地上より移動式クレーン13等を用いて撤去する。
Movement and installation of the bridge type crane 14 (FIG. 3)
(Refer to (f).) After fixing the erection girder 11, move the bridge crane 14 to the front erection point. At this time, the traveling rail of the bridge crane 14 is forwarded by the bridge crane 14 by itself. After moving to a predetermined position, the bridge type crane 14 is positioned and fixed. The girder support column 4 and the girder delivery device 12 installed on the bridge pier 1 where the construction is completed,
It is removed from the ground using a mobile crane 13 or the like.

【0059】 移動台車21の格納、架設準備(図3
(g) 参照) 橋型クレーン14を所定の位置に設置し、架設ガーダー
11上に搭載されたままになっている移動台車21を架
設開始に必要な台数(架設ガーダー11に格納可能な台
数)のみを残し、橋型クレーン14に併設されている移
動台車設置格納ホイスト15により橋桁2上の格納場所
に仮保管する。
Storing the movable carriage 21 and preparing for erection (FIG. 3
(Refer to (g).) The bridge crane 14 is installed at a predetermined position, and the number of the mobile trolleys 21 that are still mounted on the erection girder 11 is required for the erection start (the number that can be stored in the erection girder 11). Only the bridge cranes 14 are temporarily stored in the storage location on the bridge girder 2 by the movable trolley installation storage hoist 15 attached to the bridge type crane 14.

【0060】 ブロック3の運搬、架設開始(図3
(h) 参照) 前方のブロック3aから橋型クレーン14により移動台
車21上に搭載し、架設を開始する。
[0060] Transporting and erection of block 3 (Fig. 3
(See (h).) The bridge 3a is mounted on the movable trolley 21 from the front block 3a, and the erection is started.

【0061】[0061]

【発明の効果】本願発明は、サポート方式のスパンバイ
スパンプレキャストブロック工法による橋梁の架設方法
において、単径間のブロック架設作業開始前のブロック
移動台車格納状態に関し、ブロック移動台車を全て架設
ガーダー上に残すのではなく、その一部を吊り装置で橋
桁上に移動しておくことで、その分だけ架設ガーダーの
後方への張り出し長を短くすることができる。
The present invention relates to a bridge erection method using a support type span-by-span precast block method, which relates to a storage state of a block moving trolley before the start of a single-diameter block erection work. By moving a part of the girder on the bridge girder with a lifting device instead of leaving it on the bridge girder, it is possible to shorten the overhang length of the girder rearward.

【0062】また、架設ガーダー全体の長さが短くなる
ことで曲線施工等も容易となり、架設ガーダー全体の重
量も軽減されるため、施工性が向上する。
Further, since the length of the entire construction girder is shortened, curve construction and the like are facilitated, and the weight of the entire construction girder is reduced, so that the workability is improved.

【図面の簡単な説明】[Brief description of the drawings]

【図1】 本願発明の対象となるサポート方式のスパン
バイスパンプレキャストブロック工法の概要を示したも
ので、(a) は架設中の橋梁の側面図、(b) はC−C線断
面図、(c) はD−D線断面図、(d) はE−E線断面図で
ある。
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 shows an outline of a span-by-span precast block construction method of a support system which is an object of the present invention, wherein (a) is a side view of a bridge being erected, (b) is a cross-sectional view taken along line CC, (c) is a sectional view taken along line DD, and (d) is a sectional view taken along line EE.

【図2】 (a) 〜(d) は本願発明の対象となるサポート
方式のスパンバイスパンプレキャストブロック工法の一
実施例における施工手順を示す側面図である。
2 (a) to 2 (d) are side views showing a construction procedure in an embodiment of a support type span-by-span precast block construction method which is an object of the present invention.

【図3】 (e) 〜(h) は図2(d) に続く施工手順を示す
側面図である。
3 (e) to 3 (h) are side views showing a construction procedure following FIG. 2 (d).

【図4】 橋型クレーンによるブロックの移動台車上へ
の搭載の様子を示す側面図である。
FIG. 4 is a side view showing a state in which a block is mounted on a movable trolley by a bridge-type crane.

【図5】 図4に対応する橋軸直角方向の断面図であ
る。
FIG. 5 is a cross-sectional view in a direction perpendicular to the bridge axis corresponding to FIG.

【図6】 橋脚柱頭部のガーダー送り出し装置の側面図
である。
FIG. 6 is a side view of a girder sending-out device for a pier column head.

【図7】 図6に対応する橋軸直角方向の断面図であ
る。
FIG. 7 is a sectional view in a direction perpendicular to the bridge axis corresponding to FIG. 6;

【符号の説明】[Explanation of symbols]

1…橋脚、2…橋桁、3…ブロック、4…ガーダー受支
柱、11…架設ガーダー、12…ガーダー送り出し装
置、13…移動式クレーン、14…橋型クレーン、15
…移動台車設置格納ホイスト、21…ブロック移動台
車、22…移動台車送り装置、23…移動足場、24…
トレーラー、31…屋根装置
DESCRIPTION OF SYMBOLS 1 ... Bridge pier, 2 ... Bridge girder, 3 ... Block, 4 ... Girder support strut, 11 ... Construction girder, 12 ... Girder delivery device, 13 ... Mobile crane, 14 ... Bridge crane, 15
… Moving trolley installation storage hoist, 21… block moving trolley, 22… moving trolley feeder, 23… moving scaffold, 24…
Trailer, 31 ... Roofing equipment

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 工場またはヤードで製作された1径間分
の橋桁ブロックを、架設完了した橋桁上の揚重装置によ
り先方のブロックから順次架設ガーダー上のブロック移
動台車に搭載し、ブロック移動台車を連結しながら移動
台車送り装置により前方へ送り出し、最後部のブロック
搭載後、順次ブロックを接合して単径間の施工を完了
し、架設ガーダーを1径間ずつ送り出しながら、橋桁ブ
ロックを1径間ずつ架設するサポート方式のスパンバイ
スパンプレキャストブロック工法による橋梁の架設方法
において、架設ガーダー上のブロック移動台車のうち、
架設ガーダー上の移動台車送り装置による移動台車送り
出し位置およびその後方に格納可能な範囲の台数を残し
て、他のブロック移動台車を吊り装置により橋桁上に移
動しておき、ブロックの架設に際し橋桁上に仮保管した
前記ブロック移動台車を、前記吊り装置で順次架設ガー
ダー上に戻しながらブロックの搭載およびブロック移動
台車の送り出しを行うことを特徴とする橋梁の架設方
法。
1. A bridge girder block for one span manufactured in a factory or a yard is sequentially mounted on a block moving dolly on an erecting girder by a lifting device on the bridge girder that has been completely installed, starting from a block on the other side. After the last block is mounted, the blocks are joined one after the other to complete the construction for a single span, and the bridge girder block is sent one span while the construction girders are sent out one span at a time. In the bridge erection method by the span-by-span precast block construction method of the support system that is erected at intervals, among the block moving carts on the erection girder,
The other carriages are moved on the bridge girder by the suspension device, leaving the movable carriage delivery position on the construction girder by the movable carriage sending device and the number of stowable units behind it. Mounting the block and sending out the block moving trolley while sequentially returning the block moving trolley temporarily stored on the erection girder with the suspension device.
【請求項2】 前記揚重装置は橋型クレーンであり、前
記吊り装置は橋型クレーンの両側に併設したホイストで
ある請求項1記載の橋梁の架設方法。
2. The method according to claim 1, wherein the lifting device is a bridge crane, and the lifting device is a hoist provided on both sides of the bridge crane.
JP6271367A 1994-11-04 1994-11-04 Bridge construction method Expired - Fee Related JP2768280B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP6271367A JP2768280B2 (en) 1994-11-04 1994-11-04 Bridge construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP6271367A JP2768280B2 (en) 1994-11-04 1994-11-04 Bridge construction method

Publications (2)

Publication Number Publication Date
JPH08134844A JPH08134844A (en) 1996-05-28
JP2768280B2 true JP2768280B2 (en) 1998-06-25

Family

ID=17499088

Family Applications (1)

Application Number Title Priority Date Filing Date
JP6271367A Expired - Fee Related JP2768280B2 (en) 1994-11-04 1994-11-04 Bridge construction method

Country Status (1)

Country Link
JP (1) JP2768280B2 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5187969B2 (en) * 2009-03-04 2013-04-24 戸田建設株式会社 Overhead viaduct construction equipment and construction method
CN102071641B (en) * 2010-12-02 2015-11-25 秦皇岛天业通联重工股份有限公司 Cement beam packs bridge machine cloth supporting leg type integration of transporting and building Bridge Erector and bridge formation engineering method thereof
CN103194980A (en) * 2013-04-19 2013-07-10 郑州新大方重工科技有限公司 Wheeltrack type girder transport vehicle overall pack bridge girder erection machine line-switching or between-bridge transfer mechanism
JP7042696B2 (en) * 2018-06-07 2022-03-28 鹿島建設株式会社 Deck erection method
CN110409316A (en) * 2019-08-15 2019-11-05 中交路桥华南工程有限公司 End bay closure construction method
CN113802461B (en) * 2021-09-27 2024-03-19 中铁广州工程局集团有限公司 Steel box girder erection method

Also Published As

Publication number Publication date
JPH08134844A (en) 1996-05-28

Similar Documents

Publication Publication Date Title
JP3946342B2 (en) Bridge erection device
JPS6024247B2 (en) Equipment for cantilevering a multi-span bridge structure made of reinforced concrete or prestressed concrete into sections.
CN102505708A (en) Construction method of tunnel at oversized cross section open cut area in track traffic
JP4403051B2 (en) Corrugated steel web bridge construction method
JP2894226B2 (en) Bridge construction method
CN104831632B (en) A kind of bridge cable tower entablature and sill construction method
JP2768283B2 (en) Bridge construction method
JP2768280B2 (en) Bridge construction method
JP2020002563A (en) Deck slab construction method
JP4361775B2 (en) Bridge erection method and bridge erection device
JP2768282B2 (en) Bridge construction method
JP2001146716A (en) Erection method for bridge beam
CN202185966U (en) Novel hydraulic internal mold for U-shaped beam
JP2539150B2 (en) Bridge erection equipment
JPH0959932A (en) Construction method of column head of overhanging erection girder bridge
JP2768279B2 (en) Construction girder for precast block method
CN110745707B (en) Lifting device for dismantling fabricated support of concrete cast-in-place beam close to railway side
JP2768281B2 (en) Bridge construction method
JP2552997B2 (en) Bridge girder construction method and its equipment
CN215854681U (en) Truss hanging track device
CN217733799U (en) Steel-concrete composite beam cable-stayed bridge construction system
JPH05195513A (en) Lining work car for arch bridge
CN217896262U (en) Pier assembled steel bar ligature bed-jig
JP3042677B2 (en) Reinforcing bar arrangement device and method
JPH09316828A (en) Method for moving election girder

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 19980310

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees