JP5187969B2 - Overhead viaduct construction equipment and construction method - Google Patents

Overhead viaduct construction equipment and construction method Download PDF

Info

Publication number
JP5187969B2
JP5187969B2 JP2009050256A JP2009050256A JP5187969B2 JP 5187969 B2 JP5187969 B2 JP 5187969B2 JP 2009050256 A JP2009050256 A JP 2009050256A JP 2009050256 A JP2009050256 A JP 2009050256A JP 5187969 B2 JP5187969 B2 JP 5187969B2
Authority
JP
Japan
Prior art keywords
construction
pile
girder
foundation
viaduct
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2009050256A
Other languages
Japanese (ja)
Other versions
JP2010203155A (en
Inventor
均 浅野
修 小林
郁 佐藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toda Corp
Original Assignee
Toda Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toda Corp filed Critical Toda Corp
Priority to JP2009050256A priority Critical patent/JP5187969B2/en
Publication of JP2010203155A publication Critical patent/JP2010203155A/en
Application granted granted Critical
Publication of JP5187969B2 publication Critical patent/JP5187969B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)
  • Bridges Or Land Bridges (AREA)

Description

本発明は、直上高架橋の施工装置及び施工方法に関し、特に、基礎工用施工装置と部材架設用施工装置とを備える直上高架橋の施工装置及び施工方法に関する。   TECHNICAL FIELD The present invention relates to a construction apparatus and construction method for a directly elevated viaduct, and particularly to a construction apparatus and construction method for a directly elevated viaduct provided with a construction apparatus for foundation work and a construction apparatus for member construction.

近年、踏切による交通渋滞の解消を図るため、鉄道の高架化が実施されており、その際の施工には、一般に仮線施工が実施されている。   In recent years, in order to eliminate traffic congestion due to railroad crossings, railways have been elevated, and temporary lines are generally used for the construction.

仮線施工による鉄道の高架化は、用地取得の長期化による事業遅延等が問題になっており、その解決方法として、直上施工の活用が期待されている。   As for the elevated railway by temporary line construction, there is a problem of business delay due to prolonged land acquisition, and as a solution to this, utilization of direct construction is expected.

ところで、このような直上施工においては、専用の直上施工装置を用いるようになっている(特許文献1参照)。   By the way, in such directly overhead construction, a dedicated overhead construction device is used (see Patent Document 1).

特開2003−291809号公報JP 2003-291809 A

このような専用の直上施工装置にあっては、ある程度の汎用性を持たせるような努力もなされているが、ブーム式クレーンの搭載が前提となるため、全体重量が大きな専用機となり、製作コスト増を招き、その活用に当たっては、コスト低減及び更なる工期短縮が求められている。   In such dedicated overhead construction equipment, efforts are made to give a certain degree of versatility, but since it is premised on the installation of a boom type crane, the total weight becomes a dedicated machine, and the production cost In order to utilize this, cost reduction and further shortening of the construction period are required.

本発明の目的は、架設ガーダー方式による汎用部材の使用を主体とした、低コストで工期短縮を実現することができる直上高架橋の施工装置及び施工方法を提供することにある。   An object of the present invention is to provide a construction apparatus and a construction method for a directly elevated viaduct that can realize a shortening of a construction period at a low cost, mainly using a general-purpose member by a construction girder system.

前記目的を達成するため、本発明の直上高架橋の施工装置は、杭構築等の下部工を行う基礎工用施工装置と、基礎工上に高架橋等の上部工を行う部材架設用施工装置とを有し、
前記各施工装置は、先行して構築される杭または杭打設用の下地工に移動可能に支持された下部ガーダーと、前記下部ガーダーに対して移動可能に支持された上部ガーダーとを有し、
前記基礎工用施工装置は、杭または杭打設用の下地工の施工を行い、
前記部材架設用施工装置は、プレキャスト部材を所定位置に載置することを特徴とする。
In order to achieve the above object, the construction apparatus for the directly elevated viaduct of the present invention includes a construction apparatus for foundation work that performs substructure work such as pile construction and a construction apparatus for member construction that performs superstructure work such as viaduct on the foundation work. Have
Each construction device has a lower girder supported movably on a pile constructed in advance or a foundation for pile driving, and an upper girder supported movably on the lower girder. ,
The construction equipment for foundation works performs the construction of piles or foundation works for pile driving,
The member erection apparatus mounts a precast member at a predetermined position.

本発明によれば、基礎工用施工装置及び部材架設用施工装置は、それぞれ下部ガーダー及び上部ガーダーを有する架設ガーダー方式による汎用部材の使用を主体としたもので、専用の装置と異なり低コストとすることができ、しかも、各施工装置は先行して構築される杭または杭打設用の下地工に支持させることで、荷重支持のための全面的な地盤改良や整地作業、横断する地下埋設物などの防護工等の必要もないため、大幅なコスト低減と工期短縮を実現することができる。   According to the present invention, the construction apparatus for foundation work and the construction apparatus for member construction are mainly used for general-purpose members by the construction girder system having the lower girder and the upper girder, respectively. In addition, each construction device is supported by a pile constructed in advance or a groundwork for pile driving, so that the entire ground improvement and leveling work for load support can be carried out, Since there is no need for protective work, etc., it is possible to achieve a significant cost reduction and shortening the construction period.

本発明においては、前記下部ガーダーは、水平曲線対応用の中折れ機構を有するものとすることができる。   In the present invention, the lower girder may have a middle folding mechanism for horizontal curves.

このような構成とすることにより、中折れ機構により既設の軌条の水平曲線に応じて容易に対応することができる。   By setting it as such a structure, it can respond | correspond easily according to the horizontal curve of the existing rail with a center bending mechanism.

本発明においては、前記下部ガーダーは、杭または杭打設用の下地工に縦断勾配対応用のジャッキを介して支持されるようにすることができる。   In the present invention, the lower girder can be supported by a pile or a foundation for pile driving through a jack for supporting a longitudinal gradient.

このような構成とすることにより、ジャッキにより既設の軌条の縦断勾配に応じて容易に対応することができる。   By setting it as such a structure, it can respond easily according to the longitudinal gradient of the existing rail with a jack.

本発明においては、前記下部ガーダーは、前記杭または杭打設用の下地工の偏心位置に支持されるようにすることができる。   In the present invention, the lower girder can be supported at an eccentric position of the pile or the foundation work for pile driving.

このような構成とすることにより、下部ガーダーが杭または杭打設用の下地工の偏心位置に支持されることで、下地工、杭の構築や高架橋等の上部工となる部材架設等に影響を与えることなく施工が可能となる。   By adopting such a structure, the lower girder is supported at the eccentric position of the pile or the foundation work for placing the pile, which affects the construction of the foundation work, the construction of the pile, the construction of the superstructure such as the viaduct, etc. Construction is possible without giving

本発明においては、前記部材架設用施工装置は、前記下部ガーダー上で前記上部ガーダーの前方部を移動可能に支持する前方移動装置と、前記上部ガーダーの後方部を構築された直上高架橋上で移動可能に支持する後方移動装置とを有するものとすることができる。   In the present invention, the member erection construction device moves on the upper girder constructed on the lower girder so that the front part of the upper girder is movably supported and the rear part of the upper girder is constructed. It is possible to have a rearward movement device that supports it.

このような構成とすることにより、後方移動装置のコンパクト化が図れるとともに、下部ガーダーを短くすることができる。   By adopting such a configuration, the rear moving device can be made compact and the lower girder can be shortened.

本発明の直上高架橋の施工方法は、杭構築等の下部工を行う基礎工用施工装置と、基礎工上に高架橋等の上部工を行う部材架設用施工装置とを用い、
前記基礎工用施工装置にて、上部工に先行して杭または杭打設用の下地工を施工する工程と、
前記先行構築された杭または杭打設用の下地工に前記基礎工用施工装置の下部ガーダーを移動可能に支持させ、この下部ガーダーに対して前記基礎工用施工装置の上部ガーダーを移動可能に支持させる工程と、
前記杭または杭打設用の下地工に前記部材架設用施工装置の下部ガーダーを移動可能に支持させ、構築された直上高架橋上で上部ガーダーを移動可能に支持させる工程と、
前記基礎工用施工装置の移動に伴い基礎工用施工装置により構築された杭上に前記部材架設用施工装置にて順次直上高架橋を構築する工程と、
を含むことを特徴とする。
The construction method of the directly elevated viaduct of the present invention uses a construction apparatus for foundation work that performs substructure such as pile construction and a construction apparatus for member construction that performs superstructure such as viaduct on the foundation work,
In the construction apparatus for foundation work, a process of constructing a pile or a foundation work for pile driving prior to the superstructure,
The lower girder of the foundation work construction device is movably supported by the preceding constructed pile or the foundation work for pile driving, and the upper girder of the foundation work construction device can be moved relative to the lower girder. A supporting step;
A step of supporting the lower girder of the construction apparatus for erection of the member to the pile or the foundation work for driving the pile, and supporting the upper girder movably on the constructed overhead viaduct;
A step of sequentially building a directly elevated viaduct on the pile constructed by the foundation construction device with the movement of the foundation construction device,
It is characterized by including.

本発明によれば、基礎工用施工装置及び部材架設用施工装置は、それぞれ下部ガーダー及び上部ガーダーを有する架設ガーダー方式による汎用部材の使用を主体としたもので、専用の装置と異なり低コストとすることができ、しかも、各施工装置は先行して構築される杭または杭打設用の下地工に支持させることで、荷重支持のための全面的な地盤改良や整地作業、横断する地下埋設物などの防護工等の必要もないため、大幅なコスト低減と工期短縮を実現することができる。   According to the present invention, the construction apparatus for foundation work and the construction apparatus for member construction are mainly used for general-purpose members by the construction girder system having the lower girder and the upper girder, respectively. In addition, each construction device is supported by a pile constructed in advance or a groundwork for pile driving, so that the entire ground improvement and leveling work for load support can be carried out, Since there is no need for protective work, etc., it is possible to achieve a significant cost reduction and shortening the construction period.

また、基礎工用施工装置で先行構築した杭または杭打設用の下地工に下部ガーダーを支持させ、杭が構築された状態で後続の部材架設用施工装置により直上高架橋を構築することができ、一連の施工作業を効率よく行うことができる。   In addition, the lower girder can be supported by the pile constructed in advance by the construction equipment for foundation work or the groundwork for pile driving, and the directly elevated viaduct can be constructed by the construction equipment for the subsequent member construction with the pile constructed. A series of construction work can be performed efficiently.

本発明の一実施の形態にかかる直上高架橋の施工装置を示す概略側面図である。It is a schematic side view which shows the construction apparatus of the directly overhead viaduct concerning one embodiment of this invention. 図1の直上高架橋の施工装置の平面図である。It is a top view of the construction apparatus of the direct overhead viaduct of FIG. 下部ガーダー支持状態を示す部分拡大側面図である。It is a partial expanded side view which shows a lower girder support state. 図3の矢視IV方向から見た側面図である。It is the side view seen from the arrow IV direction of FIG. 下部ガーダーの連結部における中折れ機構の状態を示す拡大平面図である。It is an enlarged plan view which shows the state of the middle folding mechanism in the connection part of a lower girder. 図5の矢視VI方向から見た側面図である。It is the side view seen from the arrow VI direction of FIG. 同図(A)〜(E)は、それぞれ基礎工の施工から高架橋の施工に至る工程を示す側面図である。FIGS. 9A to 9E are side views showing processes from foundation work to viaduct construction.

以下、本発明の実施の形態について、図面を参照して説明する。   Hereinafter, embodiments of the present invention will be described with reference to the drawings.

図1〜図5は、本発明の一実施の形態にかかる直上高架橋の施工装置を示す図である。   1-5 is a figure which shows the construction apparatus of the directly elevated viaduct concerning one embodiment of this invention.

図1は、本実施の形態にかかる直上高架橋の施工装置を示す概略側面図、図2は図1の直上高架橋の施工装置の平面図である。   FIG. 1 is a schematic side view showing a construction apparatus for a directly elevated viaduct according to the present embodiment, and FIG. 2 is a plan view of the construction apparatus for a directly elevated viaduct in FIG.

この直上高架橋の施工装置10は、既設の軌条12の直上に高架橋14を構築するもので、基礎工用施工装置16と、部材架設用施工装置18とを有し、各施工装置16及び18はそれぞれ下部ガーダー20、21及び上部ガーダー22、23を有している。   This construction device 10 for the directly elevated viaduct is for constructing the viaduct 14 directly above the existing rail 12, and has a construction device 16 for foundation work and a construction device 18 for member construction. Each has lower girders 20, 21 and upper girders 22, 23.

基礎工用施工装置16は、杭構築等の下部工を行うもので、下部ガーダー20と、上部ガーダー22とは汎用部材で形成されている。   The construction apparatus 16 for foundation work performs substructure such as pile construction, and the lower girder 20 and the upper girder 22 are formed of general-purpose members.

下部ガーダー20は、先行して構築される杭24または杭24打設用の下地工であるスタンドパイプ26に移動可能に支持されるようになっている。   The lower girder 20 is movably supported by a pile 24 that is constructed in advance or a stand pipe 26 that is a foundation work for driving the pile 24.

具体的には、基礎工は、既存の軌条12の外側位置に全周回転式圧入機等を設置し、杭打設用のスタンドパイプ26を建て込み、杭削孔機にて削孔を行い、杭24を構築し、さらにフーチングを構築して形成されるようになっている。   Specifically, the foundation work installs an all-round rotary press-fitting machine, etc., at the outer position of the existing rail 12, builds a stand pipe 26 for pile driving, and drills with a pile drilling machine. The pile 24 is constructed, and the footing is constructed.

下部ガーダー20は、図3及び図4に示すように、杭24またはスタンドパイプ26にブラケット28を取り付け、このブラケット28にジャッキ30を介して移動用ローラ32を支持させ、この移動用ローラ32が下部ガーダー20の下面側に取り付けたレール25と係合し、移動用ローラ32の駆動により軌条12に沿って移動可能に支持されるようになっている。   As shown in FIGS. 3 and 4, the lower girder 20 has a bracket 28 attached to the pile 24 or the stand pipe 26, and supports a moving roller 32 via a jack 30 on the bracket 28. It engages with a rail 25 attached to the lower surface side of the lower girder 20 and is supported so as to be movable along the rail 12 by driving a moving roller 32.

この場合、下部ガーダー20は、杭24または杭打設用スタンドパイプ26等に対して偏心した位置に支持され、下地工、杭の構築や高架橋等の上部工となる部材架設等に影響を与えることなく施工が可能となる。   In this case, the lower girder 20 is supported at an eccentric position with respect to the pile 24 or the pile placing stand pipe 26 and the like, and affects the construction of the base work, the construction of the pile, the construction of the superstructure such as the viaduct, and the like. Construction becomes possible without.

また、下部ガーダー20は、ジャッキ30を介して支持されることで、このジャッキ30を既設の軌条12の縦断勾配に対応するものとして用い、ジャッキ30により既設の軌条12の縦断勾配に応じて容易に対応することができるようになっている。   Further, the lower girder 20 is supported via the jack 30 so that the jack 30 can be used corresponding to the longitudinal gradient of the existing rail 12, and the jack 30 can be easily adapted to the vertical gradient of the existing rail 12. It can be adapted to.

さらに、下部ガーダー20は、図5、図6に示すように、複数本のガーダー部材34を連結して形成されるようになっており、各ガーダー部材34間には両側に少なくとも一対の水平曲線対応用の中折れ機構としての中折れジャッキ36が設けられ、この中折れジャッキ36の調整により、既設の軌条12の水平曲線に応じて下部ガーダー20を容易に対応させることができるようになっている。   Further, as shown in FIGS. 5 and 6, the lower girder 20 is formed by connecting a plurality of girder members 34, and at least a pair of horizontal curves on both sides between the girder members 34. A middle folding jack 36 is provided as a middle folding mechanism for handling. By adjusting the middle folding jack 36, the lower girder 20 can be easily adapted to the horizontal curve of the existing rail 12. Yes.

上部ガーダー22は、複数の移動装置38、39により下部ガーダー20の上方に下部ガーダー20に沿って支持された状態となっており、移動装置38、39の下端に配設された移動用ローラ40が下部ガーダー20の上面側に設けたレール27と係合し、移動用ローラ40の駆動により下部ガーダー20上で移動可能にされている。   The upper girder 22 is in a state of being supported along the lower girder 20 above the lower girder 20 by a plurality of moving devices 38, 39, and a moving roller 40 disposed at the lower ends of the moving devices 38, 39. Is engaged with a rail 27 provided on the upper surface side of the lower girder 20 and is movable on the lower girder 20 by driving the moving roller 40.

この上部ガーダー22は、移動装置38、39の幅方向で移動可能にされており、この上部ガーダー22上に削孔機、杭打ち機等の基礎工装置42が搭載されている。   The upper girder 22 is movable in the width direction of the moving devices 38 and 39, and a foundation work device 42 such as a drilling machine or a pile driving machine is mounted on the upper girder 22.

なお、基礎工用施工装置16においては、移動装置38が前方移動装置、移動装置39が後方移動装置を構成することとなる。   In the foundation construction apparatus 16, the moving device 38 constitutes a forward moving device, and the moving device 39 constitutes a backward moving device.

部材架設用施工装置18は、基礎工上に高架橋14等の上部工を行うもので、下部ガーダー21と、上部ガーダー23とは基礎工用施工装置16の場合と同様に、汎用部材にて形成されている。   The member erection construction device 18 performs an upper work such as a viaduct 14 on the foundation work, and the lower girder 21 and the upper girder 23 are formed of general-purpose members as in the case of the foundation work construction device 16. Has been.

下部ガーダー21は、基礎工用施工装置16の下部ガーダー20と同様に図3及び図4に示す構成となっており、詳細説明は省略する。   The lower girder 21 has the configuration shown in FIGS. 3 and 4 as in the case of the lower girder 20 of the construction apparatus 16 for foundation work, and detailed description thereof is omitted.

上部ガーダー23は、前方移動装置である移動装置39及び後方移動装置44により下部ガーダー21の上方に下部ガーダー21に沿って移動可能に支持されている。   The upper girder 23 is supported so as to be movable along the lower girder 21 above the lower girder 21 by a moving device 39 and a backward moving device 44 which are forward moving devices.

前方移動装置である移動装置39は、基礎工用施工装置16の後方移動装置兼用となっており、その詳細については、図3〜図6に示すとおりで、詳細説明は省略する。   The moving device 39, which is a forward moving device, is also used as a backward moving device for the construction apparatus 16 for foundation work, and the details thereof are as shown in FIGS.

後方移動装置44は、背の低い移動装置からなり、上部ガーダー23の後方部を支持している。   The backward moving device 44 is a short moving device and supports the rear portion of the upper girder 23.

後部移動装置44の下端部には、図示せぬが、移動用ローラが設けられ、この移動用ローラが構築された直上の高架橋14の上面に配設されたレールに係合し、移動用ローラの駆動により軌条12に沿って移動可能にされている。   Although not shown, a moving roller is provided at the lower end of the rear moving device 44, and the moving roller engages with a rail disposed on the upper surface of the viaduct 14 just above the moving roller. It can be moved along the rail 12 by driving.

また、上部ガーダー23は、前方部及び後方部が移動装置39及び後方移動装置44に支持された状態で、幅方向に移動可能にされるとともに、前後方向で移動可能にされた天井クレーン装置46を搭載し、プレキャスト部材である高架橋14の橋脚48、橋梁50等を搬送、組み立て可能にされている。   In addition, the upper girder 23 is movable in the width direction with the front and rear portions supported by the moving device 39 and the rear moving device 44, and is also movable in the front-rear direction. The bridge pier 48 and the bridge 50 of the viaduct 14 which are precast members can be transported and assembled.

なお、この実施の形態では、プレキャスト部材としてフルプレキャスト部材を用い更なる工期の短縮化を図っている。   In this embodiment, a full precast member is used as the precast member to further shorten the work period.

次に、このような直上高架橋の施工装置10を用いた直上高架橋の施工方法について、図7(A)〜(E)を参照しつつ説明する。   Next, the construction method of the direct overhead viaduct using the construction apparatus 10 for direct overhead viaduct will be described with reference to FIGS. 7 (A) to (E).

まず、図7(A)に示すように、既存の軌条12の外側位置に全周回転式圧入機52を設置し、杭打設用のスタンドパイプ26を建て込み、スタンドパイプ26位置に杭削孔機にて削孔を行い、杭24、フーチング54を構築し、これらの工程を複数個所、例えば5箇所で行い、複数の杭24またはスタンドパイプ26にブラケット28及びジャッキ30を取り付け、ジャッキ30に移動用ローラ32を取り付ける。   First, as shown in FIG. 7A, an all-round rotary press-fitting machine 52 is installed at an outer position of the existing rail 12, a pile pipe stand pipe 26 is built, and pile cutting is performed at the stand pipe 26 position. Drilling is performed with a drilling machine, the pile 24 and the footing 54 are constructed, these processes are performed at a plurality of places, for example, five places, the brackets 28 and the jacks 30 are attached to the plurality of piles 24 or the stand pipe 26, and the jack 30 The moving roller 32 is attached to the.

この状態で、基礎工用施工装置16及び部材架設用施工装置18の下部ガーダー20、21のレール25を移動用ローラ32に係合させて、下部ガーダー20、21を支持させ、下部ガーダー20、21上に移動装置38、39を移動可能に支持させ、その上に上部ガーダー22を支持させる。   In this state, the lower girder 20 and 21 of the foundation work construction device 16 and the member erection construction device 18 are engaged with the moving roller 32 to support the lower girder 20 and 21. The moving devices 38 and 39 are movably supported on 21 and the upper girder 22 is supported thereon.

上部ガーダー22上には、基礎工装置42等を搭載しておく。   On the upper girder 22, a foundation work device 42 and the like are mounted.

次いで、さらに前方位置にスタンドパイプ26の建て込み及び基礎工装置42を用いた杭24、フーチング54等の構築を行いつつ、下部ガーダー20、21を前進させ、後方の杭24上に橋脚48、橋梁50、床版58の組み立てを行い、構築した高架橋14上にレールを敷設して後方移動装置44を移動可能に支持させる。   Next, the lower girder 20, 21 is advanced while the stake 24 and the footing 54 are constructed using the stand pipe 26 and the foundation work device 42 in the forward position, and the pier 48, The bridge 50 and the floor slab 58 are assembled, and rails are laid on the constructed viaduct 14 so that the backward movement device 44 is movably supported.

そして、移動装置39及び後方移動装置44上に部材架設用施工装置18の上部ガーダー23を支持させる。   Then, the upper girder 23 of the member erection apparatus 18 is supported on the moving device 39 and the backward moving device 44.

上部ガーダー23上には、天井クレーン装置46等を搭載しておく。   On the upper girder 23, an overhead crane device 46 and the like are mounted.

次いで、前方のスタンドパイプ26の建て込み、杭24の構築作業とともに、上部ガーダー23上の天井クレーン装置46を用いて後方の橋脚48、橋梁50等の組み立てを行う。   Next, assembling of the rear pier 48, the bridge 50, and the like is performed using the overhead crane device 46 on the upper girder 23 together with the construction of the front stand pipe 26 and the pile 24.

次に、図7(B)に示すように、天井クレーン装置46を用いて、床版58等の組み立てを行う。   Next, as shown in FIG. 7B, the floor slab 58 and the like are assembled by using the overhead crane device 46.

次いで、図7(C)に示すように、構築した高架橋14の床版58上にレールを敷設して、次の橋脚48上に橋梁50等を組み立てていく。   Next, as shown in FIG. 7C, rails are laid on the floor slab 58 of the constructed viaduct 14, and the bridge 50 and the like are assembled on the next pier 48.

次に、図7(D)に示すように、橋梁50を組み立てた隣の杭24上に橋脚48を組み立てて、次の高架橋14の組み立ての準備を行う。   Next, as shown in FIG. 7D, a bridge pier 48 is assembled on the adjacent pile 24 where the bridge 50 is assembled, and preparation for assembling the next viaduct 14 is performed.

次の高架橋14の組み立て準備が整った状態で、図7(E)に示すように、移動装置38、39及び後方移動装置44により、各下部ガーダー20,21及び上部ガーダー22、23を前方に1スパン分移動させて、次のスタンドパイプ26の建て込み及び高架橋14の組み立ての準備を行い、これを繰り返して高架橋14を構築していくようになっている。   When the next viaduct 14 is ready for assembly, as shown in FIG. 7E, the lower girders 20, 21 and the upper girders 22, 23 are moved forward by the moving devices 38, 39 and the rear moving device 44. It is moved by one span to prepare for the next stand pipe 26 and the assembly of the viaduct 14, and this is repeated to construct the viaduct 14.

なお、軌条12の縦断勾配及び水平曲折に対しては、図3〜図6に示すジャッキ30及び中折れジャッキ36の調節にて対応していくようになっている。   In addition, it respond | corresponds with the adjustment of the jack 30 and the middle folding jack 36 which are shown in FIGS.

このように、本実施の形態にかかる直上高架橋の施工装置10を用いる場合には、基礎工用施工装置16及び部材架設用施工装置18は、それぞれ下部ガーダー20,21及び上部ガーダー22、23を有する汎用性のある低コストのものとすることができ、しかも、各施工装置16、18は先行して構築される杭24または杭打設用のスタンドパイプ26に支持させることで、荷重支持のための全面的な地盤改良や整地作業、横断する地下埋設物などの防護工等の必要もないため、大幅なコスト低減と工期短縮を実現することができる。   Thus, when using the construction apparatus 10 for the directly elevated viaduct according to the present embodiment, the construction apparatus 16 for foundation work and the construction apparatus 18 for member construction are provided with the lower girders 20, 21 and the upper girders 22, 23, respectively. In addition, each construction device 16, 18 is supported by a pile 24 or a pile pipe stand 26 that is constructed in advance, thereby supporting load support. Therefore, there is no need for complete ground improvement, leveling work, and protective work such as underground buried objects to be traversed, so that significant cost reduction and shortening of the construction period can be realized.

また、基礎工用施工装置16で先行構築した杭24または杭打設用のスタンドパイプ26に下部ガーダー20、21を支持させ、杭24が構築された状態で後続の部材架設用施工装置18により直上の高架橋14を構築することができ、一連の施工作業を効率よく行うことができることとなる。   Further, the lower girder 20, 21 is supported by the pile 24 or the pile placing stand pipe 26 that has been previously constructed by the foundation construction apparatus 16, and the pile 24 is constructed by the subsequent member construction construction apparatus 18. The directly overpass 14 can be constructed, and a series of construction work can be performed efficiently.

本発明は、前記実施の形態に限定されるものではなく、本発明の要旨の範囲内において種々の形態に変形可能である。   The present invention is not limited to the above-described embodiment, and can be modified into various forms within the scope of the gist of the present invention.

例えば、前記実施の形態では、基礎工用施工装置及び部材架設用施工装置の下部ガーダーを別体とし、基礎工用施工装置の後方側の移動装置と、部材架設用施工装置の前方移動装置とを兼用として部材架設用施工装置の下部レール上に支持させているが、各下部ガーダーを一体として形成してもよく、あるいは、一方で基礎工用施工装置の下部ガーダーにその上方の上部ガーダーを支持させる移動装置を支持させ、他方で部材架設用施工装置の下部ガーダーにその上方の上部ガーダーを支持させる前方移動装置を支持させて、基礎工用施工装置及び部材架設用施工装置をそれぞれ独立したものとすることも可能である。   For example, in the above-described embodiment, the lower girder of the foundation work construction device and the member erection construction device is separated, the rear side movement device of the foundation work construction device, and the front movement device of the member erection construction device; Are supported on the lower rail of the construction equipment for erection of members, but each lower girder may be integrally formed, or on the other hand, the upper girder above the lower girder of the construction equipment for foundation work Supporting the moving device to be supported, and supporting the front moving device to support the upper girder above the lower girder of the member erection construction device, and the foundation construction device and the member erection construction device became independent. It is also possible.

10 直上高架橋の施工装置
14 高架橋
16 基礎工用施工装置
18 部材架設用施工装置
20、21 下部ガーダー
22、23 上部ガーダー
24 杭
26 スタンドパイプ
30 ジャッキ
32、40 移動用ローラー
36 中折れジャッキ
38、39 移動装置
44 後方移動装置
48 橋脚
50 橋梁
58 床版
DESCRIPTION OF SYMBOLS 10 Overhead viaduct construction equipment 14 Viaduct 16 Foundation construction equipment 18 Member erection construction equipment 20, 21 Lower girder 22, 23 Upper girder 24 Pile 26 Stand pipe 30 Jack 32, 40 Moving roller 36 Folding jack 38, 39 Moving device 44 Backward moving device 48 Bridge pier 50 Bridge 58 Floor slab

Claims (6)

杭構築等の下部工を行う基礎工用施工装置と、基礎工上に高架橋等の上部工を行う部材架設用施工装置とを有し、
前記各施工装置は、先行して構築される杭または杭打設用の下地工に移動可能に支持された下部ガーダーと、前記下部ガーダーに対して移動可能に支持された上部ガーダーとを有し、
前記基礎工用施工装置は、杭または杭打設用の下地工の施工を行い、
前記部材架設用施工装置は、プレキャスト部材を所定位置に載置することを特徴とする直上高架橋の施工装置。
It has a construction device for foundation work that performs substructure such as pile construction, and a construction device for member construction that performs superstructure such as viaduct on the foundation work,
Each construction device has a lower girder supported movably on a pile constructed in advance or a foundation for pile driving, and an upper girder supported movably on the lower girder. ,
The construction equipment for foundation works performs the construction of piles or foundation works for pile driving,
The member erection apparatus places a precast member at a predetermined position, and is a direct overhead viaduct construction apparatus.
請求項1において、
前記下部ガーダーは、水平曲線対応用の中折れ機構を有することを特徴とする直上高架橋の施工装置。
In claim 1,
The upper girder construction apparatus, wherein the lower girder has a middle folding mechanism for horizontal curves.
請求項1または2において、
前記下部ガーダーは、杭または杭打設用の下地工に縦断勾配対応用のジャッキを介して支持されていることを特徴とする直上高架橋の施工装置。
In claim 1 or 2,
The upper girder construction apparatus, wherein the lower girder is supported by a pile or a foundation for pile driving through a jack for dealing with a longitudinal gradient.
請求項1〜3のいずれかにおいて、
前記下部ガーダーは、前記杭または杭打設用の下地工の偏心位置に支持されることを特徴とする直上高架橋の施工装置。
In any one of Claims 1-3,
The upper girder construction apparatus characterized in that the lower girder is supported at an eccentric position of the pile or the foundation work for driving the pile.
請求項1〜4のいずれかにおいて、
前記部材架設用施工装置は、前記下部ガーダー上で前記上部ガーダーの前方部を移動可能に支持する前方移動装置と、前記上部ガーダーの後方部を構築された直上高架橋上で移動可能に支持する後方移動装置とを有することを特徴とする直上高架橋の施工装置。
In any one of Claims 1-4,
The construction apparatus for member erection includes a forward moving device that supports the front part of the upper girder so as to be movable on the lower girder, and a rear side that supports the rear part of the upper girder so as to be movable on a directly elevated viaduct. A construction apparatus for a directly elevated viaduct comprising a moving device.
杭構築等の下部工を行う基礎工用施工装置と、基礎工上に高架橋等の上部工を行う部材架設用施工装置とを用い、
前記基礎工用施工装置にて、上部工に先行して杭または杭打設用の下地工を施工する工程と、
前記先行構築された杭または杭打設用の下地工に前記基礎工用施工装置の下部ガーダーを移動可能に支持させ、この下部ガーダーに対して前記基礎工用施工装置の上部ガーダーを移動可能に支持させる工程と、
前記杭または杭打設用の下地工に前記部材架設用施工装置の下部ガーダーを移動可能に支持させ、構築された直上高架橋上で上部ガーダーを移動可能に支持させる工程と、
前記基礎工用施工装置の移動に伴い基礎工用施工装置により構築された杭上に前記部材架設用施工装置にて順次直上高架橋を構築する工程と、
を含むことを特徴とする直上高架橋の施工方法。
Using construction equipment for foundation work that performs substructure such as pile construction and construction equipment for member construction that performs superstructure such as viaduct on foundation work,
In the construction apparatus for foundation work, a process of constructing a pile or a foundation work for pile driving prior to the superstructure,
The lower girder of the foundation work construction device is movably supported by the preceding constructed pile or the foundation work for pile driving, and the upper girder of the foundation work construction device can be moved relative to the lower girder. A supporting step;
A step of supporting the lower girder of the construction apparatus for erection of the member to the pile or the foundation work for driving the pile, and supporting the upper girder movably on the constructed overhead viaduct;
A step of sequentially building a directly elevated viaduct on the pile constructed by the foundation construction device with the movement of the foundation construction device,
A method for constructing a directly elevated viaduct.
JP2009050256A 2009-03-04 2009-03-04 Overhead viaduct construction equipment and construction method Active JP5187969B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2009050256A JP5187969B2 (en) 2009-03-04 2009-03-04 Overhead viaduct construction equipment and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2009050256A JP5187969B2 (en) 2009-03-04 2009-03-04 Overhead viaduct construction equipment and construction method

Publications (2)

Publication Number Publication Date
JP2010203155A JP2010203155A (en) 2010-09-16
JP5187969B2 true JP5187969B2 (en) 2013-04-24

Family

ID=42964905

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2009050256A Active JP5187969B2 (en) 2009-03-04 2009-03-04 Overhead viaduct construction equipment and construction method

Country Status (1)

Country Link
JP (1) JP5187969B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108385531A (en) * 2018-03-01 2018-08-10 成都佰人佰思科技有限公司 A kind of road and bridge combined type construction method

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012202076A (en) * 2011-03-24 2012-10-22 Toda Constr Co Ltd Construction device of overhead viaduct and construction method of overhead viaduct
CN104532868B (en) * 2014-12-11 2016-01-06 西南交通大学 High abrupt change shape sloped region bridge anchor pull-type high cap pile group basis construction method
CN114481833A (en) * 2021-12-07 2022-05-13 保利长大工程有限公司 Construction method of bridge girder erection machine

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5028737B1 (en) * 1970-10-07 1975-09-18
JPS5141772B2 (en) * 1972-07-07 1976-11-11
JPS532255B2 (en) * 1974-11-05 1978-01-26
JP2768280B2 (en) * 1994-11-04 1998-06-25 鹿島建設株式会社 Bridge construction method
JP2894226B2 (en) * 1994-12-13 1999-05-24 鹿島建設株式会社 Bridge construction method
JP2003291809A (en) * 2002-04-08 2003-10-15 Keihin Electric Express Railway Co Ltd Device for just above high lift work

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108385531A (en) * 2018-03-01 2018-08-10 成都佰人佰思科技有限公司 A kind of road and bridge combined type construction method

Also Published As

Publication number Publication date
JP2010203155A (en) 2010-09-16

Similar Documents

Publication Publication Date Title
JP4414906B2 (en) Bridge girder construction and removal method and bridge girder construction equipment
JP2012202076A (en) Construction device of overhead viaduct and construction method of overhead viaduct
JP4504910B2 (en) Dolly and method of erection of temporary pier using it
JP5807253B2 (en) Telescopic scaffold structure and suspension scaffold installation method using the same
JP5477898B2 (en) Construction equipment and construction method for foundation work of directly elevated viaduct
CN105568866A (en) Incremental launching construction method for large-span steel box girder spanning constructed road
JP2008115628A (en) Construction method for elevated structure
JP5184248B2 (en) Construction method of level crossing
JP5187969B2 (en) Overhead viaduct construction equipment and construction method
JP6247496B2 (en) Steel structure construction method
KR101040731B1 (en) Movable temporary structure for constructing composite covering arch structure
JP4474444B2 (en) Delivery cart
JP2006028881A (en) Self-propelled pc floor slab erecting machine and pc floor slab erecting method
JP4559370B2 (en) Girder erection method by erection gutter from the side of bridge
JP5260709B2 (en) Bridge girder delivery method
JP2011202406A (en) Method of assembling and disassembling movable working device for bridge
KR100495730B1 (en) A working device for assembly tunnel soundproofed wall
JP4980257B2 (en) Construction method for column head construction, method for constructing mobile work vehicle using part thereof, and method for extending bridge
JP4474445B2 (en) Delivery method
JP2009121145A (en) Overhanging erection machine and overhang erection method
JP3905099B2 (en) Hand girder delivery construction method for bridge girder
JP3827674B2 (en) Construction method for structures straddling railway tracks
JP4519588B2 (en) Three-dimensional intersection construction method
JP2002155501A (en) Construction method for space detour
JP3682247B2 (en) Construction method of elevated traffic route

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20111118

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20121226

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20130116

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20130121

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20160201

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 5187969

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250