JP2020002563A - Deck slab construction method - Google Patents

Deck slab construction method Download PDF

Info

Publication number
JP2020002563A
JP2020002563A JP2018120809A JP2018120809A JP2020002563A JP 2020002563 A JP2020002563 A JP 2020002563A JP 2018120809 A JP2018120809 A JP 2018120809A JP 2018120809 A JP2018120809 A JP 2018120809A JP 2020002563 A JP2020002563 A JP 2020002563A
Authority
JP
Japan
Prior art keywords
floor slab
rail
slab
erection
installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2018120809A
Other languages
Japanese (ja)
Other versions
JP7042706B2 (en
JP2020002563A5 (en
Inventor
恵史 三室
Keiji Mimuro
恵史 三室
茂 齋藤
Shigeru Saito
茂 齋藤
田島 新一
Shinichi Tajima
新一 田島
克哉 小林
Katsuya Kobayashi
克哉 小林
達貴 藤本
Tatsuki Fujimoto
達貴 藤本
良至 亀井
Yoshiyuki Kamei
良至 亀井
宏之 山中
Hiroyuki Yamanaka
宏之 山中
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP2018120809A priority Critical patent/JP7042706B2/en
Publication of JP2020002563A publication Critical patent/JP2020002563A/en
Publication of JP2020002563A5 publication Critical patent/JP2020002563A5/ja
Application granted granted Critical
Publication of JP7042706B2 publication Critical patent/JP7042706B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

To run an erection machine without applying the load of the erection machine on already erected deck slabs when the deck slabs are erected from near side and sequentially erected while moving forward.SOLUTION: At least above installed deck slabs 2A, 2B, rails 5 (5A, 5B) are built while a main girder 1 is made to support with no load applied on the deck slabs. The rails 5 are supported by a support leg 6 via the support leg 6 provided on the main girder 1 between adjacent front and rear deck slabs 2, and supported by a receiving beam 7 extending in a direction orthogonal to the main girder 1. An erection machine 10 which transports slabs 2C for erection moves forward on the rails 5 and installs the deck slabs 2C at deck slab installation positions X adjacent to the latest installed deck slabs 2B. Thereafter, the erection machine 10 moves backward on the rails 5 to receive the deck slabs for erection.SELECTED DRAWING: Figure 1

Description

本発明は、橋梁における床版の架設方法、すなわち、橋軸方向に延びる主桁上にその延在方向に並べて鉄筋入りプレキャストコンクリート製の床版を設置する方法に関する。   The present invention relates to a method of erection of a floor slab in a bridge, that is, a method of arranging precast concrete slabs with reinforcing bars side by side in a direction of extension on a main girder extending in a bridge axis direction.

床版を架設する方法としては、特許文献1に示されているように、(1)床版を先方から架設し、順次手前側へ後退しつつ架設する方法と、(2)床版を手前側から架設し、順次先方へ前進しつつ架設する方法とがある。いずれの方法を採るかは現場の状況などによる。   As shown in Patent Literature 1, as a method of erection of the floor slab, (1) a method of erection of the slab from the front side, and a method of erection while retreating sequentially to the near side; There is a method of erection from the side and erection while sequentially moving forward. Which method to use depends on the situation at the site.

特開2003−074018号公報JP 2003-074018 A

後者の方法、すなわち、床版を手前側から架設し、順次先方へ前進しつつ架設する方法を採る場合、設置用の床版を運搬する架設機は、設置済みの床版上を走行、すなわち、設置済みの床版上に敷設したレール上を走行することになる。   When the latter method, that is, the method of erection of the floor slab from the near side and sequentially erection while moving forward, the erection machine that transports the slab for installation travels on the installed slab, that is, , And travel on rails laid on the installed floor slab.

しかしながら、設置直後の床版は、未完成状態である。一般に、鉄筋入りプレキャストコンクリート製の床版は、床版間に予め定められた隙間をあけて設置し、この隙間には、両床版から鉄筋(定着用の継手)が突出している。従って、この隙間に間詰めコンクリート(モルタル)を打設することで、完成する。
このため、床版の設置直後に、未完成状態の床版に架設機の荷重をかけることが好ましくない場合がある。
However, the floor slab immediately after installation is in an unfinished state. Generally, a precast concrete slab containing a reinforcing bar is installed with a predetermined gap between the slabs, and reinforcing bars (fixing joints) protrude from both slabs in this gap. Therefore, it is completed by placing concrete (mortar) between the gaps.
For this reason, it may not be preferable to apply the load of the erection machine to the unfinished slab immediately after the installation of the slab.

本発明は、このような実状に鑑みてなされたもので、床版を手前側から架設し、順次先方へ前進しつつ架設する方法を採る場合に、設置済みの床版に架設機の荷重をかけることなく、架設機を走行させることができる、床版架設方法を提供することを課題とする。   The present invention has been made in view of such circumstances, and when adopting a method of erection of a floor slab from the near side and advancing sequentially to the front, the load of the erection machine is applied to the installed floor slab. An object of the present invention is to provide a floor slab erection method capable of running an erection machine without hanging.

上記の課題を解決するために、本発明は、主桁上にその延在方向に並べて床版を設置する床版架設方法であって、
少なくとも、設置済みの床版の上方に、前記設置済みの床版に荷重をかけることなく、前記主桁に支持させて、レールを敷設し、
設置用の床版を運搬する架設機を前記レール上を前進移動させて、最新に設置された床版に隣接する床版設置位置に、前記運搬した床版を設置し、
床版設置後に、前記架設機を設置用の床版の受取りのために前記レール上を後退移動させることを特徴とする。
In order to solve the above-described problems, the present invention is a floor slab erection method for arranging floor slabs on a main girder in an extending direction thereof,
At least, above the installed floor slab, without applying a load to the installed floor slab, supported by the main girder, laying a rail,
By moving the erection machine that transports the slab for installation forward on the rail, at the slab installation position adjacent to the most recently installed slab, installing the transported slab,
After the floor slab is installed, the erection machine is moved backward on the rail for receiving the installation slab.

本発明によれば、主桁に直接支持させて、設置済みの床版から浮かせて、レールを敷設することで、設置済みの床版に荷重をかけることなく、架設機を走行させることができるという効果が得られる。   According to the present invention, by directly supporting the main girder, floating from the installed floor slab, and laying the rail, the erection machine can be run without applying a load to the installed floor slab. The effect is obtained.

本発明に係る床版架設方法の第1実施形態のステップ1〜4を示す図The figure which shows steps 1-4 of 1st Embodiment of the floor slab installation method which concerns on this invention. 同上第1実施形態のステップ5〜7を示す図Diagram showing steps 5 to 7 of the first embodiment 図1のA矢視図に相当する正面図1. A front view corresponding to the view in the direction of arrow A in FIG. 図3のB矢視図に相当する平面図FIG. 3 is a plan view corresponding to the view on arrow B in FIG. 3. 第1実施形態のステップ3の変形例を示す図The figure which shows the modification of step 3 of 1st Embodiment. 本発明に係る床版架設方法の第2実施形態のステップ1〜4を示す図The figure which shows steps 1-4 of 2nd Embodiment of the floor slab installation method which concerns on this invention. 同上第2実施形態のステップ5〜8を示す図Diagram showing steps 5 to 8 of the second embodiment 本発明に係る床版架設方法の第3実施形態のステップ1〜4を示す図The figure which shows steps 1-4 of 3rd Embodiment of the floor slab installation method which concerns on this invention. 同上第3実施形態のステップ5〜7を示す図Diagram showing steps 5 to 7 of the third embodiment. 図8のA矢視図に相当する正面図FIG. 8 is a front view corresponding to the view in the direction of arrow A in FIG. 図10のB矢視図に相当する平面図Plan view corresponding to the view on arrow B in FIG.

以下、本発明の実施の形態について、詳細に説明する。
図1は本発明に係る床版架設方法の第1実施形態のステップ1〜4を示し、図2は同上第1実施形態のステップ5〜7を示している。
Hereinafter, embodiments of the present invention will be described in detail.
FIG. 1 shows steps 1 to 4 of the first embodiment of the floor slab erection method according to the present invention, and FIG. 2 shows steps 5 to 7 of the first embodiment.

尚、図1及び図2中の「[1]STEP1」〜「[1]STEP7」は、第1実施形態のステップ1〜7であることを示している。同様に、後述する図6及び図7中の「[2]STEP1」〜「[2]STEP8」は、第2実施形態のステップ1〜8であることを示し、後述する図8及び図9中の「[3]STEP1」〜「[3]STEP7」は、第3実施形態のステップ1〜7であることを示している。   Note that “[1] STEP1” to “[1] STEP7” in FIG. 1 and FIG. 2 indicate steps 1 to 7 in the first embodiment. Similarly, “[2] STEP1” to “[2] STEP8” in FIGS. 6 and 7 to be described later indicate steps 1 to 8 in the second embodiment, and FIG. “[3] STEP1” to “[3] STEP7” indicate that steps 1 to 7 of the third embodiment are performed.

また、図3は図1(その[1]STEP1)のA矢視図に相当する正面図、図4は図3のB矢視図に相当する平面図である。   FIG. 3 is a front view corresponding to the view on arrow A of FIG. 1 ([1] STEP 1 thereof), and FIG. 4 is a plan view corresponding to the view on arrow B of FIG.

橋梁の主桁(橋桁)1は、H形鋼などにより構成されて橋軸方向に延在している。主桁1はまた、図3及び図4からわかるように、本実施形態では、4列構成である。   The main girder (bridge girder) 1 of the bridge is made of H-section steel or the like and extends in the bridge axis direction. As can be seen from FIGS. 3 and 4, the main girder 1 has a four-row configuration in the present embodiment.

床版2(2A、2B、2C、・・・)は、架設機10により1枚ずつ運搬され、主桁1の上に、主桁1の延在方向に並べられて、設置され、これにより路面を構成する。尚、床版2については、設置順に2A、2B、2C、・・・と記してある。   The floor slabs 2 (2A, 2B, 2C,...) Are transported one by one by the erection machine 10, are arranged on the main girder 1 in the extending direction of the main girder 1, and are installed. Configure the road surface. In addition, about the floor slab 2, it is described as 2A, 2B, 2C, ... in order of installation.

図1では、床版設置の施工方向は左から右方向であり、左側には、主桁1の上に設置済みの床版2A、2Bがあり、次に設置する床版2C(架設機10により運搬された設置用の床版2C)は、最新に設置された床版2Bに隣接する床版設置位置Xに設置されることになる。尚、架設機10が施工方向に進むことを前進といい、施工方向と反対方向に移動することを後退という。   In FIG. 1, the installation direction of floor slab installation is from left to right. On the left side, there are floor slabs 2A and 2B already installed on the main girder 1, and the next floor slab 2C (installation machine 10C) Is installed at the floor slab installation position X adjacent to the latest installed slab 2B. Note that moving the erection machine 10 in the construction direction is referred to as forward movement, and moving in the direction opposite to the construction direction is referred to as retreat.

本実施形態において、床版2(2A、2B、2C、・・・)は、鉄筋入りプレキャストコンクリート製であり、その短辺を橋軸方向に沿わせ、長辺を橋軸直角方向に沿わせて、設置する。床版2の橋軸方向(前後方向)の長さは例えば略2m、橋軸直角方向(橋幅方向)の長さは例えば略10mである。   In the present embodiment, the floor slabs 2 (2A, 2B, 2C,...) Are made of precast concrete with a reinforcing bar, and the short sides thereof extend along the bridge axis direction and the long sides extend along the bridge axis perpendicular direction. And install. The length of the floor slab 2 in the bridge axis direction (front-back direction) is, for example, approximately 2 m, and the length in the direction perpendicular to the bridge axis (bridge width direction) is, for example, approximately 10 m.

橋軸方向(前後方向)に隣り合う床版2(例えば2Aと2B)は、30〜40cm程度の隙間(s)をあけて設置される。各床版2からは、この隙間に向かって、鉄筋(定着用の継手)20が突出している。尚、この隙間には、床版2の設置後に、間詰めコンクリート(モルタル)が打設される。   Floor slabs 2 (for example, 2A and 2B) adjacent in the bridge axis direction (front-back direction) are installed with a gap (s) of about 30 to 40 cm. Reinforcing bars (fixing joints) 20 project from each floor slab 2 toward this gap. In addition, after the floor slab 2 is installed, the space-filled concrete (mortar) is poured into this gap.

架設機10は、左側図外の床版置き場から、1枚ずつ、設置用の床版2(例えば2C)をホイストクレーン等により吊り上げて運搬するもので、前後の脚にそれぞれ車輪11、12を有し、レール5(5A、5B、・・・)上を走行する。   The erection machine 10 lifts and transports a floor slab 2 (for example, 2C) for installation one by one from a floor slab storage area (not shown) on the left side by a hoist crane or the like. Wheels 11 and 12 are respectively attached to front and rear legs. And run on rails 5 (5A, 5B, ...).

レール5は、基本的には、床版2の配設ピッチと同じ長さに分割されている標準レール5A、5B、・・・をつなぎ合わせて使用する。従って、レール5についても、床版2A、2B、・・・に対応させて、5A、5B、・・・と記してある。   Basically, the rails 5 are used by connecting standard rails 5A, 5B,... Divided into the same length as the arrangement pitch of the floor slab 2. Therefore, the rails 5 are also described as 5A, 5B,... Corresponding to the floor slabs 2A, 2B,.

レール5はまた、少なくとも、設置済みの床版2の上方に、床版2に荷重をかけることなく、主桁1に支持させて、敷設される。特に本実施形態では、レール5は、床版2の設置に先行して、設置済みの床版2の上方から、床版設置位置Xを超える前方の位置まで予め敷設される。   The rail 5 is also laid at least above the installed floor slab 2 and supported by the main girder 1 without applying a load to the floor slab 2. In particular, in this embodiment, the rail 5 is laid before the installation of the floor slab 2 from above the installed floor slab 2 to a position in front of the floor slab installation position X in advance.

レール5の支持構造について詳しく説明する。
各レール5(5A、5B、・・・)は、主桁1に支持脚(束)6及び受梁7を介して支持される。
The support structure of the rail 5 will be described in detail.
Each of the rails 5 (5A, 5B,...) Is supported by the main beam 1 via support legs (bundles) 6 and receiving beams 7.

支持脚6は、鋼材製の短い柱(束)であり、隣接する前後の床版2(例えば2Aと2B)間に位置させて、主桁1上に配置され、ボルト、クランプあるいはブルマン(登録商標)などで、取外し可能に固定される。   The supporting legs 6 are short columns (bundles) made of steel, and are disposed on the main girder 1 between adjacent front and rear floor slabs 2 (for example, 2A and 2B), and are provided with bolts, clamps, or Bullman (registered). (Trademark) or the like so as to be removable.

従って、支持脚6は、橋軸方向に床版2の配設ピッチと同ピッチで配設される。また、主桁1は図3及び図4に示されるように複数列設けられるので、支持脚6は橋軸直角方向に複数配置される。また、隣接する床版2間の隙間には各床版2から突出する鉄筋(定着用の継手)20が存在するが、当該鉄筋20は主桁1上には存在しない。   Therefore, the support legs 6 are arranged at the same pitch as the arrangement pitch of the floor slabs 2 in the bridge axis direction. Further, since the main girder 1 is provided in a plurality of rows as shown in FIGS. 3 and 4, a plurality of support legs 6 are arranged in a direction perpendicular to the bridge axis. In addition, a reinforcing bar (fixing joint) 20 protruding from each floor slab 2 exists in a gap between the adjacent floor slabs 2, but the reinforcing bar 20 does not exist on the main girder 1.

受梁7は、例えばH形鋼で、橋軸直角方向に延在するように配置され、橋軸直角方向に複数配置される支持脚6の上に載せて固定される。従って、受梁7も、橋軸方向に床版2の配設ピッチと同ピッチで配設される。   The receiving beam 7 is made of, for example, an H-shaped steel and is disposed so as to extend in a direction perpendicular to the bridge axis, and is mounted and fixed on a plurality of support legs 6 arranged in a direction perpendicular to the bridge axis. Therefore, the receiving beams 7 are also arranged at the same pitch as the arrangement pitch of the floor slabs 2 in the bridge axis direction.

実際の取り扱いでは、1本の受梁7と、その下面側の本例では4個の支持脚(束)6とは、予め一体化しておき、一体物(支持脚6付きの受梁7)として取り扱う。これによって、主桁1に対する支持脚6の着脱のみで、現場での受梁7の取付け・取外しが可能となる。   In actual handling, one receiving beam 7 and, in this example, four support legs (bundles) 6 on its lower surface side are integrated beforehand, and are integrated (the receiving beam 7 with the supporting legs 6). Treated as This makes it possible to attach / detach the receiving beam 7 at the site only by attaching / detaching the support leg 6 to / from the main girder 1.

ここにおいて、各レール5(5A、5B、・・・)は、その両端を橋軸方向(前後方向)に隣り合う受梁7に載せ架けて固定する。これにより、複数のレール5(5A,5B、・・・)がつなぎ合わされる。   Here, each of the rails 5 (5A, 5B,...) Is fixed by placing both ends thereof on a receiving beam 7 adjacent in the bridge axis direction (front-back direction). Thereby, the plurality of rails 5 (5A, 5B,...) Are connected.

従って、レール5は、隣接する前後の床版2間において主桁1上に配置した支持脚(束)6を介し、支持脚6により支持されて主桁1と直交する方向に延びる受梁7により(受梁7を枕木として)支持される。   Accordingly, the rail 5 is supported by the support legs 6 via the support legs (bundles) 6 disposed on the main girder 1 between the adjacent front and rear floor slabs 2 and extends in a direction orthogonal to the main girder 1. (With the receiving beam 7 as a sleeper).

レール5は、既に述べたように、床版2の配設ピッチと同じ長さに分割されている標準レール5A、5B、・・・をつなぎ合わせて使用することを基本とするが、床版設置位置Xの前後の受梁7(及び支持脚6)の配設ピッチは、床版設置作業を可能とするため、正規のピッチ(床版2の配設ピッチ)より大きくする。   As described above, the rails 5 are basically formed by connecting standard rails 5A, 5B,... Divided into the same length as the arrangement pitch of the floor slab 2, The arrangement pitch of the receiving beams 7 (and the support legs 6) before and after the installation position X is set larger than the regular pitch (the arrangement pitch of the floor slab 2) in order to enable floor slab installation work.

従って、架設機10を床版設置位置Xの上方を通過させる際は、床版設置位置Xの上方のレールとして、標準レールより長い仮レールRL、又は、標準レールと組み合わせて、標準レールより短い仮レールRSを使用する。
例えば、標準レールの長さを1915mm、標準レールより長い仮レールRLの長さを2500mmとすると、標準レールより短い仮レールRSの長さは、2500−1915= 585mmとなる。
Therefore, when passing the erection machine 10 above the floor slab installation position X, as the rail above the floor slab installation position X, the temporary rail RL longer than the standard rail or in combination with the standard rail is shorter than the standard rail. Use the temporary rail RS.
For example, when the length of the standard rail is 1915 mm and the length of the temporary rail RL longer than the standard rail is 2500 mm, the length of the temporary rail RS shorter than the standard rail is 2500-1915 = 585 mm.

また、レールとして、鋼材に代えて、アルミ材を使用すると、重量を略1/3に抑え、作業効率を改善することができる。   Further, when an aluminum material is used instead of a steel material as the rail, the weight can be reduced to approximately 1/3 and the work efficiency can be improved.

次に図1及び図2をステップ順に参照して床版架設方法の第1実施形態について説明する。   Next, a first embodiment of a floor slab erection method will be described with reference to FIGS. 1 and 2 in the order of steps.

ステップ1の作業開始前の状態について説明する。
床版設置位置Xより左側には、主桁1上に床版2(2A、2B)が設置済みである。そして、主桁1上に、隣接する前後の床版2間(各床版2の前後)に位置させて、支持脚6付きの受梁7が配置され、前後の受梁7によって、各レール5(5A、5B)が支持されている。
The state before the start of the work in step 1 will be described.
The floor slab 2 (2A, 2B) has been installed on the main girder 1 on the left side of the floor slab installation position X. And, on the main girder 1, receiving beams 7 with supporting legs 6 are arranged between adjacent front and rear floor slabs 2 (before and after each floor slab 2). 5 (5A, 5B) are supported.

床版設置位置Xより右側には、床版2はないが、主桁1上に、床版2の配設ピッチと同ピッチで、支持脚6付きの受梁7が配置され、前後の受梁7によりレール5(5D、5E)が支持されている。   On the right side of the floor slab installation position X, there is no floor slab 2, but on the main girder 1, the receiving beams 7 with the support legs 6 are arranged at the same pitch as the arrangement pitch of the floor slab 2. The rail 5 (5D, 5E) is supported by the beam 7.

床版設置位置Xには、床版2の設置のため、床版2の配設ピッチより長いピッチで、支持脚6付きの受梁7が配置されている。従って、床版設置位置Xでは、前後の受梁7により標準レールより長い仮レールRL(ステップ1では点線示)が支持されている。   At the floor slab installation position X, the receiving beam 7 with the support leg 6 is arranged at a pitch longer than the arrangement pitch of the floor slab 2 for installing the floor slab 2. Therefore, at the floor slab installation position X, the temporary rail RL (shown by a dotted line in Step 1) longer than the standard rail is supported by the front and rear receiving beams 7.

設置用の床版2を運搬する架設機10は、レール5上を左から右方向に移動して、前側車輪11が床版設置位置Xの仮レールRL上を通過した後、床版設置位置Xより右側のレール5D上に載っている。後側車輪12は床版設置位置Xより左側のレール5B上に載っている。従って、架設機10は、床版設置位置Xを跨いでいる。   The erection machine 10 that conveys the floor slab 2 for installation moves from left to right on the rail 5, and after the front wheels 11 pass over the temporary rail RL at the floor slab installation position X, the slab installation position It is on rail 5D on the right side of X. The rear wheel 12 rests on the rail 5B on the left side of the floor slab installation position X. Therefore, the erection machine 10 straddles the floor slab installation position X.

ステップ1では、上記の状態、すなわち、架設機10が床版設置位置Xを跨いでいる状態から、床版設置位置X上方の仮レールRLを、点線示のように、人力で撤去する。架設機10からの床版2Cの吊り下ろしの邪魔になるからである。   In step 1, the temporary rail RL above the floor slab installation position X is manually removed from the above state, that is, the state where the erection machine 10 straddles the floor slab installation position X, as indicated by the dotted line. This is because it hinders the hanging of the floor slab 2C from the erection machine 10.

ステップ2では、架設機10から設置用の床版2Cを降下させる。前後の受梁7のスパンは標準より長いので、前後の受梁7と干渉することなく、床版2Cを降下させることができる。   In Step 2, the floor slab 2C for installation is lowered from the erection machine 10. Since the span of the front and rear receiving beams 7 is longer than the standard, the floor slab 2C can be lowered without interfering with the front and rear receiving beams 7.

ステップ3では、架設機10のホイストクレーンにより吊り下げたまま、床版2Cを図の左側の正規の位置(設置済みの床版2Bに対し正規のピッチとなる位置)へスライドさせる。   In Step 3, the floor slab 2C is slid to a regular position on the left side of the drawing (a position having a regular pitch with respect to the installed floor slab 2B) while being suspended by the hoist crane of the erection machine 10.

ステップ4では、今回設置した床版2Cの前側に、今回設置した床版2の後側の支持脚6付きの受梁7に対し、正規のピッチとなる位置に、支持脚6付きの受梁7を人力で設置する。
そして、今回設置した床版2Cの前後の受梁7に支持させて、レール(標準レール)5Cを人力で設置し、今回設置した床版2Cの前側の受梁7ともう1つ前側の受梁7とに支持させて、標準レールより短い仮レールRSを人力で設置する。
In step 4, the receiving beam with the supporting leg 6 is positioned at the regular pitch with respect to the receiving beam 7 with the supporting leg 6 on the rear side of the currently installed floor slab 2C. 7 is installed manually.
Then, the rail (standard rail) 5C is manually installed by being supported by the front and rear receiving beams 7 of the floor slab 2C installed this time, and the front receiving beam 7 and another front receiving beam of the floor slab 2C installed this time are installed. A temporary rail RS shorter than the standard rail is installed manually by being supported by the beam 7.

ステップ5では、架設機10を、次に設置する床版2Dの受取りのため、図の左側へ後退移動させる。
そして、架設機10の後退移動後、次の床版設置位置Xの上方の短い仮レールRSと標準レール5Dとを点線示のように人力で撤去し、更に、これらを支えていた支持脚6付きの受梁7を点線示のように人力で撤去する。
In step 5, the erection machine 10 is moved backward to the left in the drawing to receive the floor slab 2D to be installed next.
Then, after the retreating movement of the erection machine 10, the short temporary rail RS and the standard rail 5D above the next floor slab installation position X are manually removed as shown by the dotted line, and the supporting legs 6 supporting these are further removed. The attached receiving beam 7 is manually removed as shown by the dotted line.

ステップ6では、次の床版設置位置Xの上方に、前後の受梁7により支持させて、標準レールより長い仮レールRLを人力で設置する。架設機10側では次に設置する床版2Dを受取る。   In step 6, a temporary rail RL longer than the standard rail is manually installed above the next floor slab installation position X while being supported by the front and rear receiving beams 7. The erection machine 10 receives the floor slab 2D to be installed next.

ステップ7では、次に設置する床版2Dを受取った架設機10をレール5A、5B、5C上を前進移動させ、前側車輪11は仮レールRLを通過させてレール5E上に載せ、後側車輪12はレール5C上に載せる。これにより、架設機10は次の床版設置位置Xを跨ぐことになる。
以降は、ステップ1に戻り、仮レールRLの撤去から、床版架設作業を繰り返す。
In step 7, the erection machine 10 that has received the floor slab 2D to be installed next is moved forward on the rails 5A, 5B, and 5C, and the front wheels 11 pass through the temporary rails RL and are mounted on the rails 5E. 12 is placed on the rail 5C. Thereby, the erection machine 10 straddles the next floor slab installation position X.
Thereafter, the process returns to Step 1 and the floor slab erection work is repeated from the removal of the temporary rail RL.

本実施形態によれば、少なくとも、設置済みの床版2A、2Bの上方に、当該床版2A、Bに荷重をかけることなく、主桁1に支持させて、レール5A、5Bを敷設し、設置用の床版2Cを運搬する架設機10を前記レール5A、5B上を前進移動させて、最新に設置された床版2Bに隣接する床版設置位置Xに、前記運搬した床版2Cを設置し、床版設置後に、架設機10を設置用の床版2Dの受取りのために前記レール5A、5B上を後退移動させることを特徴とする。これにより、主桁1に直接支持させて、設置済みの床版2A、2Bから浮かせて、レール5A、5Bを敷設することで、設置済みの床版2A、2Bに荷重をかけることなく、架設機10を走行させることができる。   According to the present embodiment, at least above the installed floor slabs 2A and 2B, the rails 5A and 5B are laid by being supported by the main girder 1 without applying a load to the floor slabs 2A and B, The erection machine 10 that transports the floor slab 2C for installation is moved forward on the rails 5A and 5B, and the transported floor slab 2C is moved to the floor slab installation position X adjacent to the floor slab 2B that was most recently installed. After installation and floor slab installation, the erection machine 10 is moved backward on the rails 5A and 5B to receive the installation floor slab 2D. Thus, by directly supporting the main girder 1 and floating from the installed floor slabs 2A and 2B and laying the rails 5A and 5B, the erection can be performed without applying a load to the installed floor slabs 2A and 2B. The machine 10 can be run.

また、本実施形態によれば、レール5は、隣接する前後の床版2間において主桁1上に配置した支持脚(束)6を介し、この支持脚6により支持されて主桁1と直交する方向に延びる受梁7により支持することを特徴とする。これにより、床版2に荷重をかけることなく、レール5を確実に支持することができる。   Further, according to the present embodiment, the rail 5 is supported by the support legs 6 via the support legs (bundles) 6 disposed on the main girder 1 between the adjacent front and rear floor slabs 2, and is connected to the main girder 1. It is characterized in that it is supported by a receiving beam 7 extending in a direction perpendicular to the direction. Thereby, the rail 5 can be reliably supported without applying a load to the floor slab 2.

また、本実施形態によれば、床版設置時に、床版2は正規の床版設置位置より前方へ吊り下ろした後、後方へスライドさせて、正規の床版設置位置に設置することを特徴とする。これにより、受梁7の存在にかかわらず、床版2を正しく設置することができる。   Further, according to the present embodiment, at the time of installing the floor slab, the floor slab 2 is hung forward from the regular floor slab installation position, and then slid backward to be installed at the normal floor slab installation position. And Thereby, the floor slab 2 can be correctly installed regardless of the existence of the receiving beam 7.

また、本実施形態によれば、レール5は、床版2の設置に先行して、設置済みの床版2A、2Bの上方から、床版設置位置Xを超える位置まで敷設し、前記架設機10は、床版設置時に、床版設置位置Xを跨いで、床版設置位置Xの前後のレール5B、5D上に位置し、床版設置位置Xのレール(RL)を取外してから、主桁11上に床版2Cを設置し、床版設置後に、レール(5C+RS)を復旧してから、前記架設機10を後退移動させることを特徴とする。これにより、レールの敷設を先行した状態での、床版の設置を効率良く行うことができる。   Further, according to the present embodiment, prior to the installation of the floor slab 2, the rail 5 is laid from above the installed floor slabs 2A and 2B to a position exceeding the floor slab installation position X, and 10 is located on the rails 5B and 5D in front of and behind the floor slab installation position X across the floor slab installation position X at the time of floor slab installation, and after removing the rail (RL) at the floor slab installation position X, The floor slab 2C is installed on the girder 11, and after the floor slab is installed, the rail (5C + RS) is restored, and then the erection machine 10 is moved backward. This makes it possible to efficiently install the floor slab in a state where the rail is laid first.

次に上記第1実施形態の変形例について図5により説明する。
図5は第1実施形態のステップ3の変形例である。
Next, a modification of the first embodiment will be described with reference to FIG.
FIG. 5 is a modified example of Step 3 of the first embodiment.

第1実施形態のステップ3では、架設機10を位置固定した状態で、ホイストクレーンにより床版2Cを後側へスライドさせる。
これに対し、図5の変形例では、架設機10自体を後退させることで、床版2Cを後側へスライドさせる。
In step 3 of the first embodiment, the floor slab 2C is slid rearward by the hoist crane with the erection machine 10 fixed in position.
On the other hand, in the modification of FIG. 5, the floor slab 2C is slid rearward by retracting the erection machine 10 itself.

このため、架設機10の後退移動に先立って、レール5Dの後端部を支持している支持脚6付きの受梁7の後側に、支持脚6付きの受梁7を設置し、これに支持させて、標準レールより短い仮レールRSを設置する。従って、架設機10を、床版2Cをスライドさせる分、後退移動させると、架設機10の前側車輪11が仮レールRS上に載るようになる。これにより、架設機10の後退移動が可能となる。   Therefore, prior to the retreat movement of the erection machine 10, the receiving beam 7 with the supporting leg 6 is installed behind the receiving beam 7 with the supporting leg 6 supporting the rear end of the rail 5D. And a temporary rail RS shorter than the standard rail is installed. Therefore, when the erection machine 10 is moved backward by an amount corresponding to the sliding of the floor slab 2C, the front wheels 11 of the erection machine 10 come to rest on the temporary rail RS. As a result, the erection machine 10 can be moved backward.

次に本発明の第2実施形態について図6及び図7により説明する。尚、第2実施形態において、第1実施形態と対応する要素には同一符号を付して説明を簡略化する。   Next, a second embodiment of the present invention will be described with reference to FIGS. Note that, in the second embodiment, the same reference numerals are given to the elements corresponding to those in the first embodiment, and the description will be simplified.

図6は本発明に係る床版架設方法の第2実施形態のステップ1〜4を示し、図8は同上第2実施形態のステップ5〜8を示している。   FIG. 6 shows steps 1 to 4 of the second embodiment of the floor slab erection method according to the present invention, and FIG. 8 shows steps 5 to 8 of the second embodiment.

第2実施形態では、架設機10によりレールの移し替え作業を行うことを特徴としている。
従って、本実施形態では、架設機10は、左側図外の床版置き場から、1枚ずつ、設置用の床版2(例えば2C)をホイストクレーン等により吊り上げて運搬すると共に、前回の床版設置作業時に仮レールと置き換える形で一時的に回収したレール(例えば5C)を吊り上げた状態で、床版2の受取りと運搬を行っている。
The second embodiment is characterized in that a rail transfer operation is performed by the erection machine 10.
Therefore, in this embodiment, the erection machine 10 lifts and transports the installation slabs 2 (for example, 2C) one by one from a floor slab storage area (not shown in the figure on the left side) using a hoist crane or the like, and also transmits the previous slabs. The floor slab 2 is received and transported in a state where the temporarily collected rails (for example, 5C) are lifted in a manner to replace the temporary rails during the installation work.

次に図6及び図7をステップ順に参照して、床版架設方法の第2実施形態について説明する。   Next, a second embodiment of the floor slab erection method will be described with reference to FIGS. 6 and 7 in the order of steps.

ステップ1では、架設機10が床版設置位置Xを跨いでいる状態から、床版設置位置X上方の仮レールRLを、点線示のように、人力で撤去する。架設機10からの床版2Cの吊り下ろしの邪魔になるからである。   In Step 1, from the state where the erection machine 10 straddles the floor slab installation position X, the temporary rail RL above the floor slab installation position X is manually removed as shown by a dotted line. This is because it hinders the hanging of the floor slab 2C from the erection machine 10.

ステップ2では、架設機10から設置用の床版2Cを降下させる。前後の受梁7のスパンは標準より長いので、前後の受梁7と干渉することなく、床版2Cを降下させることができる。   In Step 2, the floor slab 2C for installation is lowered from the erection machine 10. Since the span of the front and rear receiving beams 7 is longer than the standard, the floor slab 2C can be lowered without interfering with the front and rear receiving beams 7.

ステップ3では、架設機10のホイストクレーンにより吊り下げたまま、床版2Cを図の左側の正規の位置(設置済みの床版2Bに対し正規のピッチとなる位置)へスライドさせる。   In Step 3, the floor slab 2C is slid to a regular position on the left side of the drawing (a position having a regular pitch with respect to the installed floor slab 2B) while being suspended by the hoist crane of the erection machine 10.

ステップ4では、今回設置した床版2Cの前側に、今回設置した床版2の後側の支持脚6付きの受梁7に対し、正規のピッチとなる位置に、支持脚6付きの受梁7を人力で設置する。
その後、架設機10から設置用のレール(標準レール)5Cを降下させる。これにより、レール5Cを、今回設置した床版2Cの前後の受梁7に支持させて、設置する。
In step 4, the receiving beam with the supporting leg 6 is positioned at the regular pitch with respect to the receiving beam 7 with the supporting leg 6 on the rear side of the currently installed floor slab 2C. 7 is installed manually.
Thereafter, the installation rail (standard rail) 5C is lowered from the erection machine 10. As a result, the rail 5C is installed while being supported by the receiving beams 7 before and after the floor slab 2C installed this time.

ステップ5では、架設機10を前進移動させて、前側車輪11をレール5E上に載せ、後側車輪12をレール5C上に載せて、架設機10が次の床版設置位置Xの上方にあるレール5Dを跨ぐようにする。   In step 5, the erection machine 10 is moved forward, the front wheels 11 are mounted on the rails 5E, and the rear wheels 12 are mounted on the rails 5C. The erection machine 10 is located above the next floor slab installation position X. Straddle the rail 5D.

ステップ6では、架設機10のホイストクレーンにより吊り上げて、レール5Dを点線示のように撤去する。次いで、レール5Dの後端部を支持していた支持脚6付きの受梁7を人力で点線示のように撤去する。   In step 6, the elevator 5 is lifted by the hoist crane, and the rail 5D is removed as shown by the dotted line. Next, the receiving beam 7 with the supporting leg 6 supporting the rear end of the rail 5D is manually removed as shown by the dotted line.

ステップ7では、次の床版設置位置Xの前後の受梁7に支持させる形で、標準レールより長い仮レールRLを人力で設置する。架設機10の後退移動を可能にするためである。   In step 7, a temporary rail RL longer than the standard rail is manually installed so as to be supported by the receiving beams 7 before and after the next floor slab installation position X. This is to allow the erection machine 10 to retreat.

ステップ8では、架設機10は、レール5Dを吊り上げ保持したまま、後退移動して、左側図外の床版置き場から次に設置する床版2Dを受取り、受取り後、前進移動して、次の床版設置位置Xに戻る。
以降は、ステップ1に戻り、仮レールRLの撤去から、床版架設作業を繰り返す。
In step 8, the erection machine 10 moves backward while lifting and holding the rail 5D, receives the floor slab 2D to be next installed from the floor slab storage area (not shown) on the left side, moves forward after receiving the slab 2D, and moves forward. Return to the floor slab installation position X.
Thereafter, the process returns to Step 1 and the floor slab erection work is repeated from the removal of the temporary rail RL.

次に本発明の第3実施形態について図8〜図11により説明する。尚、第3実施形態においても、第1実施形態と対応する要素には同一符号を付して説明を簡略化する。   Next, a third embodiment of the present invention will be described with reference to FIGS. In the third embodiment as well, elements corresponding to those in the first embodiment are denoted by the same reference numerals, and the description is simplified.

図8は本発明に係る床版架設方法の第3実施形態のステップ1〜4を示し、図9は同上第3実施形態のステップ5〜7を示している。
また、図10は図8(その[3]STEP1)のA矢視図に相当する正面図、図11は図10のB矢視図に相当する平面図である。
FIG. 8 shows steps 1 to 4 of the third embodiment of the floor slab erection method according to the present invention, and FIG. 9 shows steps 5 to 7 of the third embodiment.
10 is a front view corresponding to an arrow A view of FIG. 8 ([3] STEP 1 thereof), and FIG. 11 is a plan view corresponding to an arrow B view of FIG.

第1実施形態及び第2実施形態では、レール5(5A、5B、・・・)、及び、支持脚6付きの受梁7については、架設機10による床版の設置より先行して、床版の架設機10とは別の架設機を用いて、あるいは、人力で、設置することを前提としている。   In the first embodiment and the second embodiment, the rail 5 (5A, 5B,...) And the receiving beam 7 with the support leg 6 are placed on the floor before the installation of the floor slab by the erection machine 10. It is assumed that the installation is performed using an installation machine different from the plate installation machine 10 or manually.

これに対し、第3実施形態では、架設機10により、床版2と共に、支持脚6付きの受梁7と、レール5とを運搬し、床版2の設置を行いつつ、支持脚6付きの受梁7の設置と、レール5の設置とを行うようにしている。   On the other hand, in the third embodiment, the erection machine 10 transports the receiving beam 7 with the support legs 6 and the rail 5 together with the floor slab 2 and installs the floor slab 2 while installing the floor slab 2. The installation of the receiving beam 7 and the installation of the rail 5 are performed.

第3実施形態において、架設機10は、左側図外の床版置き場から、1枚ずつ、設置用の床版2(例えば2D)をホイストクレーン等により吊り上げて運搬するもので、前後の脚にそれぞれ車輪11、12を有し、レール5(5A、5B、5C、・・・)上を走行する。
架設機10はまた、前側車輪11より前方に補助脚と共に昇降可能な補助車輪13を有し、補助車輪13は主桁1上を走行可能である。前側車輪11についても前側の脚と共に昇降可能としてある。
In the third embodiment, the erection machine 10 lifts and transports a slab 2 (for example, 2D) for installation by a hoist crane or the like one by one from a floor slab storage area (not shown) on the left side. It has wheels 11 and 12, respectively, and runs on rails 5 (5A, 5B, 5C, ...).
The erection machine 10 also has auxiliary wheels 13 that can move up and down together with auxiliary legs ahead of the front wheels 11, and the auxiliary wheels 13 can run on the main girder 1. The front wheels 11 can be moved up and down together with the front legs.

レール5については、全て、床版2の配設ピッチと同じ長さに分割されている標準レール5A、5B、5C、・・・をつなぎ合わせて使用する。従って、標準レール以外の仮レールは使用しない。
レール5の支持構造については、第1実施形態及び第2実施形態と同じで、設置済みの床版2に荷重をかけることはない。
For the rails 5, all the standard rails 5A, 5B, 5C,..., Which are divided into the same length as the arrangement pitch of the floor slab 2, are used. Therefore, no temporary rail other than the standard rail is used.
The support structure of the rail 5 is the same as in the first and second embodiments, and does not apply a load to the installed floor slab 2.

次に図8及び図9をステップ順に参照して、床版架設方法の第3実施形態について説明する。   Next, a third embodiment of a floor slab erection method will be described with reference to FIGS. 8 and 9 in the order of steps.

ステップ1の作業開始前の状態について説明する。
床版設置位置Xより左側には、主桁1上に床版2(2A、2B、2C)が設置済みである。そして、主桁1上に、隣接する前後の床版2間(各床版2の前後)に位置させて、支持脚6付きの受梁7が配置され、前後の受梁7によりレール5(5A、5B、5C)が支持されている。
The state before the start of the work in step 1 will be described.
On the left side of the floor slab installation position X, floor slabs 2 (2A, 2B, 2C) have been installed on the main girder 1. And, on the main girder 1, the receiving beam 7 with the support leg 6 is disposed between the adjacent front and rear floor slabs 2 (before and after each floor slab 2), and the rail 5 ( 5A, 5B, 5C) are supported.

ステップ1では、架設機10は、左側図外の床版等の置き場から、設置用の床版2D、レール5D、及び、支持脚6付きの受梁7を受取り、これらをホイストクレーン等により吊り上げて運搬する。
そして、架設機10は、レール5A、5B、5C上を走行し、前側車輪11がレール5C上に、後側車輪12がレール5B上に位置する。このとき、前側車輪11より前方の補助車輪13は、レール5Cの先端より前側で、主桁1の上方に位置している。
In Step 1, the erection machine 10 receives the floor slab 2D for installation, the rail 5D, and the receiving beam 7 with the support leg 6 from a storage place of the floor slab, etc., which is not shown on the left side, and lifts them with a hoist crane or the like. To transport.
Then, the erection machine 10 travels on the rails 5A, 5B, and 5C, and the front wheel 11 is located on the rail 5C, and the rear wheel 12 is located on the rail 5B. At this time, the auxiliary wheel 13 ahead of the front wheel 11 is located above the main girder 1 on the front side of the tip of the rail 5C.

ステップ2では、前側の補助車輪13を支持している脚部を伸長させて、前側の補助車輪13を降下させ、主桁1上に接地させる。補助車輪13の接地後、前側車輪11を支持している脚部と共に、前側車輪11を上昇させて格納する。これにより、架設機10は、前側の補助車輪13と後側車輪12とで支持される。   In step 2, the leg supporting the front auxiliary wheel 13 is extended, the front auxiliary wheel 13 is lowered, and the main girder 1 is grounded. After the auxiliary wheels 13 touch the ground, the front wheels 11 are raised and stored together with the legs supporting the front wheels 11. Thereby, the erection machine 10 is supported by the front auxiliary wheels 13 and the rear wheels 12.

ステップ3では、架設機10を前進させる。すなわち、前側の補助車輪13を主桁1上を走行させ、後側車輪12をレール5B、5C上を走行させる。これにより、架設機10は床版設置位置Xを跨ぐ。   In step 3, the erection machine 10 is advanced. That is, the front auxiliary wheel 13 is made to travel on the main girder 1, and the rear wheel 12 is made to travel on the rails 5B and 5C. Thereby, the erection machine 10 straddles the floor slab installation position X.

ステップ4では、架設機10から設置用の床版2Dを降下させる。このとき、設置済みのレール5Cの前端部を支持している受梁7と干渉しないように、正規の設置位置よりやや前方に降下させる。   In Step 4, the floor slab 2D for installation is lowered from the erection machine 10. At this time, the rail 5C is lowered slightly forward from the regular installation position so as not to interfere with the receiving beam 7 supporting the front end of the installed rail 5C.

ステップ5では、架設機10のホイストクレーンにより吊り下げたまま、床版2Dを図の左側の正規の位置(設置済みの床版2Cに対し正規のピッチとなる位置)へスライドさせる。これにより、床版2Dが正規の位置に設置される。   In step 5, the floor slab 2D is slid to a regular position on the left side of the drawing (a position having a regular pitch with respect to the installed floor slab 2C) while being suspended by the hoist crane of the erection machine 10. As a result, the floor slab 2D is installed at a regular position.

ステップ6では、今回設置された床版2Dの前側に、架設機10から支持脚6付きの受梁7を降下させて、主桁1に支持させることで、受梁7を設置する。
そして、今回設置された床版2Dの前後の受梁7により支持させるように、架設機10からレール5Dを降下させて、レール5Dを設置する。
In Step 6, the receiving beam 7 with the supporting legs 6 is lowered from the erection machine 10 and is supported by the main girder 1 on the front side of the floor slab 2D installed this time, so that the receiving beam 7 is installed.
Then, the rail 5D is lowered from the erection machine 10 so as to be supported by the front and rear receiving beams 7 of the floor slab 2D installed this time, and the rail 5D is installed.

ステップ7では、架設機10の前側車輪11が今回設置したレール5Dの上方にくる位置まで、架設機10を後退させる。
次いで、前側車輪11を支持している脚部を伸長させて、前側車輪11を降下させ、レール5D上に接地させる。前側車輪11の接地後、前側の補助車輪13を支持している脚部と共に、前側の補助車輪13を上昇させて格納する。これにより、架設機10は、前側車輪11と後側車輪12とで支持される。
次いで、架設機10を後退させる。すなわち、前後の車輪11、12をレール5D、5C、5B、5A上を走行させる。これにより、架設機10は、左側図外の置き場へ、次に設置する床版、レール、及び、支持脚付きの受梁を受取りに行く。
以降は、ステップ1に戻り、床版架設作業を繰り返す。
In step 7, the erection machine 10 is retracted to a position where the front wheels 11 of the erection machine 10 are located above the rail 5D installed this time.
Next, the leg supporting the front wheel 11 is extended, and the front wheel 11 is lowered to contact the rail 5D. After the front wheels 11 touch the ground, the front auxiliary wheels 13 are raised and stored together with the legs supporting the front auxiliary wheels 13. Thereby, the erection machine 10 is supported by the front wheels 11 and the rear wheels 12.
Next, the erection machine 10 is retracted. That is, the front and rear wheels 11, 12 run on the rails 5D, 5C, 5B, 5A. Thereby, the erection machine 10 goes to a place other than the figure on the left side to receive a floor slab, a rail, and a receiving beam with supporting legs to be installed next.
Thereafter, the process returns to step 1 and the floor slab erection work is repeated.

本実施形態によれば、レール5は、床版2の設置に合わせて、設置済みの床版2の上方にのみ敷設し、架設機10は、レール5上を走行する前側車輪11及び後側車輪12と、前側車輪11より前方に昇降可能に設けられて主桁上を走行可能な前側補助車輪13とを備え、架設機10は、床版設置時に、前側補助車輪13を主桁1上に載せ、後側車輪12をレール5上に載せて、床版設置位置Xを跨ぐことを特徴とする。これにより、床版の設置の設置とレールの設置とを同時進行させることができる。   According to the present embodiment, the rail 5 is laid only above the installed floor slab 2 in accordance with the installation of the floor slab 2, and the erection machine 10 is configured so that the front wheels 11 and the rear The erection machine 10 includes a wheel 12 and a front auxiliary wheel 13 that is provided so as to be able to ascend and descend forward of the front wheel 11 and can run on the main girder. And the rear wheel 12 is placed on the rail 5 and straddles the floor slab installation position X. Accordingly, the installation of the floor slab and the installation of the rail can be performed simultaneously.

尚、図示の実施形態はあくまで本発明を例示するものであり、本発明は、説明した実施形態により直接的に示されるものに加え、特許請求の範囲内で当業者によりなされる各種の改良・変更を包含するものであることは言うまでもない。   It should be noted that the illustrated embodiments are merely examples of the present invention, and that the present invention includes various improvements and modifications made by those skilled in the art within the scope of the claims, in addition to those directly shown by the described embodiments. It goes without saying that the change is included.

1 主桁
2(2A、2B、2C、・・・) 床版
5(5A,5B、・・・) レール
6 支持脚(束)
7 受梁
10 架設機
11、12 車輪
13 補助車輪
1 Main girder 2 (2A, 2B, 2C, ...) Floor slab 5 (5A, 5B, ...) Rail 6 Support leg (bundle)
7 receiving beam 10 erection machine 11, 12 wheel 13 auxiliary wheel

Claims (5)

主桁上にその延在方向に並べて床版を設置する床版架設方法であって、
少なくとも、設置済みの床版の上方に、前記設置済みの床版に荷重をかけることなく、前記主桁に支持させて、レールを敷設し、
設置用の床版を運搬する架設機を前記レール上を前進移動させて、最新に設置された床版に隣接する床版設置位置に、前記運搬した床版を設置し、
床版設置後に、前記架設機を設置用の床版の受取りのために前記レール上を後退移動させることを特徴とする、床版架設方法。
A floor slab erection method of laying a floor slab on a main girder in the direction of its extension,
At least, above the installed floor slab, without applying a load to the installed floor slab, supported by the main girder, laying a rail,
By moving the erection machine that transports the slab for installation forward on the rail, at the slab installation position adjacent to the most recently installed slab, installing the transported slab,
A floor slab erection method, wherein after the slab is installed, the erection machine is moved backward on the rail to receive the slab for installation.
前記レールは、隣接する床版間において前記主桁上に配置した支持脚を介し、前記支持脚により支持されて前記主桁と直交する方向に延びる受梁により支持することを特徴とする、請求項1記載の床版架設方法。   The said rail is supported by the said support leg via the support leg arrange | positioned on the said main girder between adjacent slabs, and is supported by the receiving beam extended in the direction orthogonal to the said main girder. Item 4. The floor slab erection method according to Item 1. 床版設置時に、床版は正規の床版設置位置より前方へ吊り下ろした後、後方へスライドさせて、正規の床版設置位置に設置することを特徴とする、請求項2記載の床版架設方法。   3. The floor slab according to claim 2, wherein the floor slab is hanged forward from the regular slab installation position and then slid rearward to be installed at the regular slab installation position. Construction method. 前記レールは、床版の設置に先行して、設置済みの床版の上方から、床版設置位置を超える位置まで敷設し、
前記架設機は、床版設置時に、床版設置位置を跨いで、床版設置位置の前後のレール上に位置し、
床版設置位置のレールを取外してから、前記主桁上に床版を設置し、
床版設置後に、レールを復旧してから、前記架設機を後退移動させることを特徴とする、請求項1〜請求項3のいずれか1つに記載の床版架設方法。
Prior to installation of the floor slab, the rail is laid from above the installed floor slab to a position exceeding the floor slab installation position,
The erection machine, at the time of floor slab installation, straddling the floor slab installation position, located on the rails before and after the floor slab installation position,
After removing the rail at the floor slab installation position, install the floor slab on the main girder,
The floor slab erection method according to any one of claims 1 to 3, wherein the erection machine is moved backward after the rail is restored after the slab is installed.
前記レールは、床版の設置に合わせて、設置済みの床版の上方にのみ敷設し、
前記架設機は、レール上を走行する前側車輪及び後側車輪と、前記前側車輪より前方に昇降可能に設けられて前記主桁上を走行可能な前側補助車輪とを備え、
前記架設機は、床版設置時に、前記前側補助車輪を前記主桁上に載せ、前記後側車輪を前記レール上に載せて、床版設置位置を跨ぐことを特徴とする、請求項1〜請求項3のいずれか1つに記載の床版架設方法。
The rail is laid only above the installed floor slab according to the installation of the floor slab,
The erection machine includes a front wheel and a rear wheel that travel on rails, and a front auxiliary wheel that is provided so as to be able to ascend and descend forward of the front wheel and that can travel on the main girder,
The erection machine, at the time of floor slab installation, put the front auxiliary wheel on the main girder, put the rear wheel on the rail, straddling the floor slab installation position, characterized in that, The floor slab erection method according to claim 1.
JP2018120809A 2018-06-26 2018-06-26 Deck erection method Active JP7042706B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2018120809A JP7042706B2 (en) 2018-06-26 2018-06-26 Deck erection method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2018120809A JP7042706B2 (en) 2018-06-26 2018-06-26 Deck erection method

Publications (3)

Publication Number Publication Date
JP2020002563A true JP2020002563A (en) 2020-01-09
JP2020002563A5 JP2020002563A5 (en) 2020-04-09
JP7042706B2 JP7042706B2 (en) 2022-03-28

Family

ID=69099267

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2018120809A Active JP7042706B2 (en) 2018-06-26 2018-06-26 Deck erection method

Country Status (1)

Country Link
JP (1) JP7042706B2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111236076A (en) * 2020-01-22 2020-06-05 中铁大桥局第七工程有限公司 Method for mounting bridge deck of cross-channel steel concrete composite beam
JP2022030042A (en) * 2020-08-06 2022-02-18 東急建設株式会社 Precast concrete floor slab and construction method thereof
JP2023027341A (en) * 2020-08-06 2023-03-01 東急建設株式会社 Precast concrete floor slab and construction method for the same
JP7409952B2 (en) 2020-04-24 2024-01-09 清水建設株式会社 Viaduct construction method and viaduct construction equipment

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06346697A (en) * 1993-06-07 1994-12-20 Mitsubishi Heavy Ind Ltd Shield excavator-transporting and installing device
JPH1082298A (en) * 1996-09-10 1998-03-31 Kumagai Gumi Co Ltd Vibration proofing subway tunnel construction device and construction method thereof
JPH10148097A (en) * 1996-11-19 1998-06-02 Ishikawajima Harima Heavy Ind Co Ltd Segment delivery device
JP2000248512A (en) * 1999-03-02 2000-09-12 Kawaju Koji Kk Supporting method for rail for movable form of small main grider bridge
JP2001090027A (en) * 1999-09-28 2001-04-03 Nkk Corp Travelling rail bearing device for form truck
JP2003074018A (en) * 2001-08-31 2003-03-12 Ps Mitsubishi Construction Co Ltd Installation method and device for large-scale pc floor slab
JP2004263449A (en) * 2003-03-03 2004-09-24 Noda Jidosha Kogyosho:Kk Pc floor slab laying device and pc floor slab laying method using the pc floor slab laying device
JP2008248605A (en) * 2007-03-30 2008-10-16 Ihi Corp Mount with rail and its laying method
JP2011174241A (en) * 2010-02-23 2011-09-08 Hokuto Tekko:Kk Method for laying floor slab onto bridge girder
US8555442B2 (en) * 2010-05-19 2013-10-15 Beijing Wowjoint Machinery Co. Transportation and erection integrated machine with displacement platforms and methods for erecting bridge using the same
JP2015169029A (en) * 2014-03-10 2015-09-28 株式会社巴コーポレーション Laying method of bridge floor plate and its device
JP2017186852A (en) * 2016-04-08 2017-10-12 本清鋼材株式会社 Floor slab, bearing, intermediate wall, connection part mold, and floor slab erection crane

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06346697A (en) * 1993-06-07 1994-12-20 Mitsubishi Heavy Ind Ltd Shield excavator-transporting and installing device
JPH1082298A (en) * 1996-09-10 1998-03-31 Kumagai Gumi Co Ltd Vibration proofing subway tunnel construction device and construction method thereof
JPH10148097A (en) * 1996-11-19 1998-06-02 Ishikawajima Harima Heavy Ind Co Ltd Segment delivery device
JP2000248512A (en) * 1999-03-02 2000-09-12 Kawaju Koji Kk Supporting method for rail for movable form of small main grider bridge
JP2001090027A (en) * 1999-09-28 2001-04-03 Nkk Corp Travelling rail bearing device for form truck
JP2003074018A (en) * 2001-08-31 2003-03-12 Ps Mitsubishi Construction Co Ltd Installation method and device for large-scale pc floor slab
JP2004263449A (en) * 2003-03-03 2004-09-24 Noda Jidosha Kogyosho:Kk Pc floor slab laying device and pc floor slab laying method using the pc floor slab laying device
JP2008248605A (en) * 2007-03-30 2008-10-16 Ihi Corp Mount with rail and its laying method
JP2011174241A (en) * 2010-02-23 2011-09-08 Hokuto Tekko:Kk Method for laying floor slab onto bridge girder
US8555442B2 (en) * 2010-05-19 2013-10-15 Beijing Wowjoint Machinery Co. Transportation and erection integrated machine with displacement platforms and methods for erecting bridge using the same
JP2015169029A (en) * 2014-03-10 2015-09-28 株式会社巴コーポレーション Laying method of bridge floor plate and its device
JP2017186852A (en) * 2016-04-08 2017-10-12 本清鋼材株式会社 Floor slab, bearing, intermediate wall, connection part mold, and floor slab erection crane

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111236076A (en) * 2020-01-22 2020-06-05 中铁大桥局第七工程有限公司 Method for mounting bridge deck of cross-channel steel concrete composite beam
JP7409952B2 (en) 2020-04-24 2024-01-09 清水建設株式会社 Viaduct construction method and viaduct construction equipment
JP2022030042A (en) * 2020-08-06 2022-02-18 東急建設株式会社 Precast concrete floor slab and construction method thereof
JP2023027341A (en) * 2020-08-06 2023-03-01 東急建設株式会社 Precast concrete floor slab and construction method for the same
JP7264854B2 (en) 2020-08-06 2023-04-25 東急建設株式会社 Precast concrete floor slab and its construction method
JP7312308B2 (en) 2020-08-06 2023-07-20 東急建設株式会社 Precast concrete floor slab and its construction method

Also Published As

Publication number Publication date
JP7042706B2 (en) 2022-03-28

Similar Documents

Publication Publication Date Title
JP7042706B2 (en) Deck erection method
JP3946342B2 (en) Bridge erection device
JP5671373B2 (en) Bridge removal method and new construction method
JP4414906B2 (en) Bridge girder construction and removal method and bridge girder construction equipment
JP5507383B2 (en) Heavy load erection machine and heavy load erection method
JP2018100564A (en) Device and method of floor slab rebuilding
JP2006265884A (en) Method of removing existing pier of viaduct
JP5477898B2 (en) Construction equipment and construction method for foundation work of directly elevated viaduct
JP5184248B2 (en) Construction method of level crossing
CN107447681A (en) A kind of precast plate girder erection method
JP4361775B2 (en) Bridge erection method and bridge erection device
JP4559370B2 (en) Girder erection method by erection gutter from the side of bridge
JP2024074895A (en) Deck replacement method
CN214939324U (en) Rail device suitable for construction of laminated beam floor
JPH08165613A (en) Erection method of bridge beam
JP4143442B2 (en) PC floor slab erection device and PC floor slab erection method using the device
JP6172636B2 (en) Scaffolding system
JP7008437B2 (en) PCa floor slab transportation and installation jig for forklift trucks and PCa floor slab transportation and installation method using it
JP7042696B2 (en) Deck erection method
JP2018204303A (en) Reinforced cage positioning system
JP2010203155A (en) Device and method for constructing viaduct right above
JP2020122359A (en) Floor slab erection system, additional floor slab installation method, and floor slab removing method
JP2006028733A (en) Launching erection method for bridge girder
JPH08134844A (en) Erection method of bridge
JP2010007243A (en) Railroad girder movement and installation equipment, railroad girder movement and installation method, and railroad girder removal method

Legal Events

Date Code Title Description
A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20200226

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20201228

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20211126

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20211207

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20220202

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20220215

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20220315

R150 Certificate of patent or registration of utility model

Ref document number: 7042706

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150