JP2548577B2 - Method and apparatus for assembling outer mold in non-segment shield method - Google Patents

Method and apparatus for assembling outer mold in non-segment shield method

Info

Publication number
JP2548577B2
JP2548577B2 JP62220913A JP22091387A JP2548577B2 JP 2548577 B2 JP2548577 B2 JP 2548577B2 JP 62220913 A JP62220913 A JP 62220913A JP 22091387 A JP22091387 A JP 22091387A JP 2548577 B2 JP2548577 B2 JP 2548577B2
Authority
JP
Japan
Prior art keywords
formwork
mold
iron plate
outer frame
segment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP62220913A
Other languages
Japanese (ja)
Other versions
JPS6462598A (en
Inventor
英樹 萩原
光秋 渡辺
徹 後藤
高志 久原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Construction Co Ltd
Original Assignee
Shimizu Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Construction Co Ltd filed Critical Shimizu Construction Co Ltd
Priority to JP62220913A priority Critical patent/JP2548577B2/en
Publication of JPS6462598A publication Critical patent/JPS6462598A/en
Application granted granted Critical
Publication of JP2548577B2 publication Critical patent/JP2548577B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Description

【発明の詳細な説明】 「産業上の利用分野」 シールド機の掘進によって地中に形成した坑の壁面を
セグメントを使用することなく覆工してトンネルの建設
を行うノン・セグメント・シールド工法に用いる外型枠
の組立方法及びその装置に関する。
[Detailed Description of the Invention] "Industrial field of application" A non-segment shield method for constructing tunnels by lining the wall of a mine formed in the ground by excavating a shield machine without using segments. BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of assembling an outer mold to be used and its apparatus.

「従来の技術」 先に、本発明の出願人は、第11図ないし第13図に示す
ような、セグメントを用いることなくシールド機によっ
て掘削した坑の壁面の覆工を行うノン・セグメント・シ
ールド工法(特願昭60−295378号)を提供した。
"Prior Art" The applicant of the present invention has previously proposed that a non-segment shield for lining a wall of a mine excavated by a shield machine without using a segment as shown in Figs. 11 to 13. The construction method (Japanese Patent Application No. 60-295378) was provided.

この工法を第11図ないし第13図を用いて説明すると、
図中符号1はシールド機であり、シールド機1によって
掘進した坑の壁面Hには、周方向に複数に分割されかつ
軸方向(坑の掘進方向)に所定幅を有する内型枠2と外
型枠3とが組み立てられている。内型枠2と外型枠3の
組み立て方としては、外型枠3の周縁部にボルト4によ
ってゴム製の止水板5を配設し、ついで該外型枠3の内
側面に固定されたスペーサー6の先端部を内型枠2の外
側面に当接させるとともに、外型枠3の内側面に固定さ
れたシーボルト7の先端部を内型枠2の内側に突出さ
せ、そこにナットを螺着させることにより一体化して合
成型枠とする。そして、一体化された合成型枠をエレク
タ8を用いて周方向に順次配置するとともに、互いにボ
ルト締めによって筒状に組み立て、次いで、この内・外
型枠が坑の掘削方向に沿って所定数だけ連設された後、
前記内型枠2と外型枠3との間にコンクリートCを打設
してコンクリートライニングRを施し、このコンクリー
トライニングRが固化した部分が所定の長さに達した
際、このコンクリートライニングRの内側に連設された
内型枠2のうち後方の内型枠2を、順次外型枠3からエ
レクタ9を用いて分離させて解体した後、それを新たに
掘削した坑の壁面Hに組み立てる内型枠として転用する
ことにより地中にトンネルを構築するものである。
This method will be described with reference to FIGS. 11 to 13.
In the figure, reference numeral 1 is a shield machine, and a wall surface H of a mine that is excavated by the shield machine 1 is divided into a plurality of parts in the circumferential direction and an inner formwork 2 having a predetermined width in the axial direction (the digging direction of the mine) and the outside. The formwork 3 is assembled. As a method of assembling the inner mold form 2 and the outer mold form 3, a rubber water stop plate 5 is arranged by a bolt 4 on the peripheral portion of the outer mold form 3 and then fixed to the inner surface of the outer mold form 3. The tip of the spacer 6 is brought into contact with the outer surface of the inner formwork 2, and the tip of the seabolt 7 fixed to the inner surface of the outer formwork 3 is projected to the inner side of the inner formwork 2, and the nut is placed there. Are screwed together to form a composite form. Then, the integrated composite formwork is sequentially arranged in the circumferential direction by using the erector 8, and is assembled in a tubular shape by bolting each other, and then the inner and outer formwork are arranged in a predetermined number along the digging direction of the pit. Only after being lined up
Concrete C is cast between the inner mold 2 and the outer mold 3 to give a concrete lining R, and when the solidified portion of the concrete lining R reaches a predetermined length, the concrete lining R Out of the inner molds 2 connected to the inside, the rear inner mold 2 is sequentially separated from the outer mold 3 by using the erector 9, and then disassembled, and then assembled on the wall H of the newly excavated mine. By diverting it as an inner formwork, a tunnel is built underground.

したがって、この工法においては、一次覆工でコンク
リートライニングを施してトンネルを完成させ、その固
化したコンクリートライニングによって地山から受ける
土水圧等の長期荷重を支持するとともに、シールド機が
推進する際のジャッキ推力(短期荷重)をも受け持つも
のであるので、コンクリート内に埋設される外型枠は安
価なものとなり、覆工材としての高価なセグメントを不
要とするとともに、二次覆工としてのコンクリートライ
ニングをも不要とし、工期の短縮や、工費の大幅削減を
実現することができるものである。
Therefore, in this construction method, the concrete lining is applied by the primary lining to complete the tunnel, and the solidified concrete lining supports long-term loads such as soil water pressure received from the ground and jacks used when the shield machine propels. Since it is also responsible for thrust (short-term load), the outer formwork embedded in concrete is inexpensive, eliminating the need for expensive segments as lining material and lining concrete for secondary lining. It is possible to shorten the construction period and significantly reduce the construction cost by eliminating the need for

「発明が解決しようとする問題点」 ところが、前記従来のノン・セグメント・シールド工
法における型枠の組立方法においては、つぎに挙げるよ
うな改善すべき点が生じてきた。
"Problems to be Solved by the Invention" However, in the conventional method of assembling a mold in the non-segment shield construction method, the following points to be improved have arisen.

(i) シールド機のテール部において、内型枠と外型
枠とを一体とした合成型枠を、エレクタを用いて環状に
組み立てるとともに、該合成型枠の内部に鉄筋等を配筋
するようにしたものであるが、このような型枠の組立作
業をさらに効率良く行い、工期の短縮を図ること。
(I) In the tail part of the shield machine, a synthetic form in which the inner formwork and the outer formwork are integrated is assembled in an annular shape using an erector, and reinforcing bars and the like are arranged inside the synthetic formwork. However, the work of assembling such a formwork should be done more efficiently to shorten the construction period.

(ii) 外型枠に円弧状に形成された一枚板の鉄板を用
いるようにしているが、さらにその製作費を低減させる
必要があること。
(Ii) The outer mold is made of a single iron plate formed in an arc shape, but it is necessary to further reduce the manufacturing cost.

(iii) 地山からの地下水に対する止水対策をより安
価に、かつ完全なものとすること。
(Iii) Make the measures to stop the groundwater from the ground less expensive and complete.

本発明は、前記問題点に鑑みてなされたもので、シー
ルド機のテール部における型枠の組立作業及び鉄筋の配
筋作業等の効率化を図るとともに、外型枠の製作費の低
減や、止水対策の効率化及びその施工費の低減を図り、
従来のものよりさらに施工期間の短縮、施工費の低減を
実現することのできるノン・セグメント・シールド工法
における外型枠の組立方法及びその装置を提供すること
を目的としている。
The present invention has been made in view of the above problems, while improving the efficiency of the work of assembling the mold in the tail portion of the shield machine and the work of arranging the reinforcing bars, and reducing the manufacturing cost of the outer mold, To improve the efficiency of waterproofing measures and reduce the construction cost,
An object of the present invention is to provide an outer formwork assembling method and an apparatus therefor in a non-segment shield construction method capable of realizing a shorter construction period and a lower construction cost than conventional ones.

「問題点を解決するための手段」 前記問題点を解決するために、本発明の方法は、ま
ず、外型枠を引き込み装置によってシールド機のテール
部のスキンプレートの内周面に沿って周方向へ送り込み
つつ、溶接装置により順次継ぎ足して環状に形成した
後、シールド機を所定距離推進させることにより、前記
環状の外型枠をテール部の後方へ位置させ、この部分に
おいて前記外型枠の内側に内型枠を組み立てるようにし
ており、また、本発明の装置は、周方向に沿って複数に
分割されかつ軸方向に所定幅を有する外型枠を、シール
ド機のテール部のスキンプレートに沿って周方向に送り
込む引き込み装置と、前記スキンプレートに沿って引き
込まれる外型枠を円形状に保持するためのスプレッダー
装置と、前記スキンプレートに沿って引き込まれる外型
枠を順次軸方向に溶接して接続することにより環状に形
成するための軸方向溶接装置と、前記環状に形成された
外型枠と既設の外型枠とを周方向に溶接して接続するた
めの周方向溶接装置とを備えたものとなっている。
[Means for Solving the Problems] In order to solve the above problems, in the method of the present invention, first, the outer form is drawn along the inner peripheral surface of the skin plate of the tail part of the shield machine by the retracting device. While feeding in the direction, after being sequentially added by a welding device to form an annular shape, the shield machine is propelled by a predetermined distance to position the annular outer formwork behind the tail part, and at this part, the outer formwork The inner formwork is assembled inside, and the device of the present invention uses an outer formwork divided into a plurality of parts along the circumferential direction and having a predetermined width in the axial direction, and a skin plate of the tail part of the shield machine. Along the skin plate, a spreader device for holding the outer frame drawn along the skin plate in a circular shape, and a spreader device along the skin plate. Axial welding device for forming an annular shape by sequentially welding and connecting outer molds to be formed, and welding the annular outer mold and the existing outer mold in the circumferential direction. And a circumferential welding device for connecting the two.

この発明の場合、前記外型枠を0.6mm程度の薄板鉄板
で形成したり、薄板鉄板と、その表面に貼り合わされた
薄板波鉄板とによって形成したり、薄板鉄板の表面に薄
板波鉄板を貼り合わせ、さらに薄板波鉄板の表面に帯板
を設けた構成としたりすることが望ましい。
In the case of this invention, the outer form is formed of a thin iron plate of about 0.6 mm, or formed by a thin iron plate and a thin corrugated iron plate pasted on the surface thereof, or a thin corrugated iron plate is pasted on the surface of the thin iron plate. In addition, it is desirable that a band plate is provided on the surface of the thin corrugated iron plate.

「作用」 本発明では、スキンプレートのテール部の前部におい
て、外型枠を環状に組み立てた後、シールド機を所定距
離推進させることにより前記環状の外型枠をテール部の
後部に位置させ、ついで前記外型枠の内側に内型枠を環
状に組み立てるようにしているため、外型枠と内型枠と
の組み立て作業を同時に並行して行うことができるとと
もに、内型枠を組み立てる前に外型枠の内側に鉄筋の配
筋作業等を行うことができる。また、外型枠は溶接によ
って互いに接続されるため、外型枠は隙間無く接続され
ることとなり完ぺきな止水対策を施すことができる。ま
た、外型枠に薄板波鉄板を用いることにより、外型枠は
大幅に軽量化されるとともに製作費を低減することがで
きる。
[Operation] In the present invention, in the front part of the tail part of the skin plate, after the outer form is assembled in an annular shape, the shield machine is propelled for a predetermined distance to position the outer form of the annular form in the rear part of the tail part. Since the inner formwork is then assembled into a ring inside the outer formwork, the outer formwork and the inner formwork can be simultaneously assembled at the same time, and before the inner formwork is assembled. In addition, it is possible to perform work such as reinforcing bar reinforcement inside the outer formwork. In addition, since the outer molds are connected to each other by welding, the outer molds are connected without any gap, so that perfect water-stopping measures can be taken. Further, by using a thin corrugated iron plate for the outer mold, the outer mold can be significantly reduced in weight and the manufacturing cost can be reduced.

「実施例」 以下、本発明を図面を参照しながら説明する。第1図
ないし第10図は、本発明の一実施例を示すものであり、
ノン・セグメント・シールド工法における外型枠の組立
方法及びその装置を示すものである。これらの図におい
て、前記従来の技術に示した構成要素と同一の要素につ
いては、同一符号を付してその説明を省略する。
[Examples] Hereinafter, the present invention will be described with reference to the drawings. 1 to 10 show an embodiment of the present invention,
It shows a method and apparatus for assembling an outer mold in the non-segment shield construction method. In these figures, the same components as those shown in the above-mentioned conventional technique are designated by the same reference numerals and the description thereof will be omitted.

第1図中符号1は地山G内を掘進するシールド機であ
る。シールド機1はスキンプレート10の先端部に設けら
れたカッタ装置11によって地山Gを掘削するとともに、
坑の壁面Hに沿って組み立てられた内型枠2に反力をと
ってシールドジャッキ13を伸縮させることにより地山G
内を推進するようになっており、シールド機1のカッタ
装置11によって掘削された地山Gの土砂は、スクリュウ
コンベア14によって地上へ排出されるようになってい
る。そして、シールド機1のテール部のスキンプレート
10内には型枠を組み立てるためのエレクタ15がエレクタ
支持リング16によって回転自在に支持されており、エレ
クタ15の前方には外型枠(以下、単に「外枠」という)
3を組み立てるための作業空間Aが、またエレクタ15が
配設された付近には内型枠(以下、単に「内枠」とい
う)2を組み立てるための作業空間Bが設けられてい
る。
Reference numeral 1 in FIG. 1 is a shield machine for excavating in the natural ground G. The shield machine 1 excavates the natural ground G by the cutter device 11 provided at the tip of the skin plate 10, and
A reaction force is applied to the inner formwork 2 assembled along the wall surface H of the mine, and the shield jack 13 is expanded / contracted so that the ground G
The earth and sand excavated by the cutter device 11 of the shield machine 1 are discharged to the ground by the screw conveyor 14. And the skin plate of the tail part of the shield machine 1
An erector 15 for assembling a mold is rotatably supported in the inside of 10 by an erector support ring 16, and an outer mold (hereinafter simply referred to as “outer frame”) is provided in front of the erector 15.
A work space A for assembling 3 and a work space B for assembling an inner mold (hereinafter simply referred to as “inner frame”) 2 are provided in the vicinity of the erector 15.

作業空間Aには、第2図に示すように、筒状に形成さ
れたスキンプレート10の内周面に沿ってシールドジャッ
キ13,13,・・・が環状に配設されており、スキンプレー
ト10と前記シールドジャッキ13との間の適宜の位置(本
実施例においては、第2図中紙面に対して右斜め上)に
は所定形状の外枠3を、テール部のスキンプレート10に
沿って周方向に送り込むための引き込み装置19が設けら
れている。また、引き込み装置19の僅か上方には、該引
き込み装置19によってスキンプレート10の内側に沿って
順次引き込まれる外枠3,3,・・・を、その軸方向に移動
しながらシーム溶接を施して互いに接続し、環状の外枠
を形成するための軸方向溶接装置20が配設されている。
そして、スキンプレート10とシールドジャッキ13との間
には、前記引き込み装置19によって送り込まれ、かつ軸
方向溶接装置20によって環状に形成される外枠3を円環
状に保持するためのスプレッダー装置21が環状に配設さ
れている。また、作業空間Aと作業空間Bとの中間付近
には前記スプレッダー装置21の回りに環状に形成されて
保持された外枠3を、既設の外枠3に接続するための周
方向溶接装置22が配設されており、この周方向溶接装置
22は、第3図に示すように、エレクタ支持リング16の外
周部に設けられた複数個の回転フレームローラ23,23,・
・・と、この回転フレームローラ23,23,・・・に内周面
を摺動させながら回転する回転フレーム24と、この回転
フレーム24に設けられた図示しない溶接機とによって構
成されたものとなっている。
In the work space A, as shown in FIG. 2, shield jacks 13, 13, ... Are arranged in an annular shape along the inner peripheral surface of a skin plate 10 formed in a tubular shape. An outer frame 3 having a predetermined shape is provided at an appropriate position (in the present embodiment, diagonally to the upper right with respect to the paper surface in FIG. 2) between the shield jack 13 and the shield jack 13 along the skin plate 10 of the tail portion. A retracting device 19 is provided for feeding in the circumferential direction. Further, just above the retracting device 19, the outer frames 3, 3, ... Which are sequentially retracted along the inside of the skin plate 10 by the retracting device 19 are seam welded while moving in the axial direction. An axial welding device 20 is provided for connecting to each other and forming an annular outer frame.
A spreader device 21 is provided between the skin plate 10 and the shield jack 13 for holding the outer frame 3 which is fed by the retracting device 19 and is formed annularly by the axial welding device 20 in an annular shape. It is arranged annularly. Further, in the vicinity of the middle of the work space A and the work space B, a circumferential welding device 22 for connecting the outer frame 3 formed and held in an annular shape around the spreader device 21 to the existing outer frame 3 This circumferential welding device is equipped with
As shown in FIG. 3, reference numeral 22 denotes a plurality of rotary frame rollers 23, 23 ,.
.. and a rotary frame 24 that rotates while sliding the inner peripheral surface of the rotary frame rollers 23, 23, ..., And a welding machine (not shown) provided on the rotary frame 24 Has become.

ここで、第4図、第5図を用いて本実施例に用いる外
枠について説明する。
Here, the outer frame used in this embodiment will be described with reference to FIGS. 4 and 5.

まず、第1の外枠は、掘削する地山が自立するような
場所に適用するものであり、第11図に示す従来の形状、
すなわち、坑の周方向に適宜の枚数に分割されるととも
に、軸方向(即ち、坑の掘進方向)に所定の幅を有する
外枠を0.6mm程度の薄板鉄板で形成したものである。次
に、第2の外枠3も、掘削する地山の自立するような場
所に原則的に用いるものであり、第4図(a),(b)
に示すように、所定形状の薄板鉄板3aの表面に、該薄板
鉄板3aより一周り小さく形成された薄板波鉄板3bを貼り
合わせたものであり、薄板鉄板3aの外周縁には隣接する
外枠のと重ね代部3cが設けられている。さらに、第5図
(a),(b)は、第3の外枠3′であり、前記第2の
外枠3と同様に、薄板鉄板3′aの表面に薄板波鉄板
3′bを固定し、この薄板波鉄板3′bの表面に、さら
に帯板3′dを固定することにより剛性を高めるように
したものである。また、3′cは重ね代部分である。
First, the first outer frame is applied to a place where the ground to be excavated is self-supporting, and has the conventional shape shown in FIG.
That is, the outer frame is divided into an appropriate number in the circumferential direction of the pit and has a predetermined width in the axial direction (that is, the digging direction of the pit), which is formed of a thin iron plate of about 0.6 mm. Next, the second outer frame 3 is also basically used in a place where the ground to be excavated is self-sustaining, and is shown in FIGS. 4 (a) and 4 (b).
As shown in Fig. 3, the surface of the thin iron plate 3a having a predetermined shape is a thin corrugated iron plate 3b formed one size smaller than the thin iron plate 3a, and the outer frame adjacent to the outer peripheral edge of the thin iron plate 3a. Noto and the overlap margin portion 3c are provided. Further, FIGS. 5A and 5B show a third outer frame 3 ', and like the second outer frame 3, a thin corrugated iron plate 3'b is provided on the surface of the thin iron plate 3'a. This is fixed, and the band plate 3'd is further fixed to the surface of the thin corrugated iron plate 3'b to enhance the rigidity. Further, 3'c is an overlap margin portion.

つぎに前記のように構成された本実施例の外型枠の組
立装置の作用について、その組立方法とともに説明す
る。
Next, the operation of the apparatus for assembling the outer mold of the present embodiment configured as described above will be described together with the assembling method thereof.

まず、第1図,第2図に示すように、シールド機のテ
ール部の作業空間Aにおいて、所定形状に形成された外
型枠3を引き込み装置19によってスキンプレート10の周
方向に沿って送り込みながら、スプレッダー装置21によ
って保持する。なお、地山Gの状況により、第1,第2,第
3の外型枠を使い別けることとする。そして、一枚目の
外型枠3が完全に送り込まれると、二枚目の外型枠3を
引き込み装置19にセットするとともに、その先端部を前
記一枚目のスキンプレート10の後端部に軸方向溶接装置
20を軸方向に移動させながら溶接して接続した後、前記
引き込み装置19によってさらに周方向へ送り込むように
する。以下、同様にして所定の枚数の外型枠3を、引き
込み装置19によって送り込みながら、スプレッダー装置
21により保持して、環状に形成する。そして、順次送り
込まれた外枠3がスプレッダー装置21によってスキンプ
レート10の内側で環状に形成された後には、この外枠3
を既設の外枠3の側端部に、前記周方向溶接装置22によ
って溶接固定する。周方向溶接装置22は、回転フレーム
24を回転フレームローラ23の回りに回転させることによ
って、それに取り付けられた溶接装置によって溶接固定
するようになっている。前記、スプレッダー装置21に保
持された外枠3と既設の外枠3とを周方向に溶接した後
には、最後に残された外枠3の両端部を軸方向溶接装置
20によって溶接し、完全な環状の外枠3とする。
First, as shown in FIGS. 1 and 2, in the working space A of the tail portion of the shield machine, the outer formwork 3 having a predetermined shape is fed by the retraction device 19 along the circumferential direction of the skin plate 10. While holding by the spreader device 21. It should be noted that the first, second, and third outer molds can be used differently depending on the situation of the natural ground G. Then, when the first outer mold 3 is completely fed, the second outer mold 3 is set in the retracting device 19 and the leading end of the second outer mold 3 is set at the rear end of the first skin plate 10. Axial welding equipment
After the 20 is connected by welding while moving in the axial direction, it is further fed in the circumferential direction by the retracting device 19. Similarly, a predetermined number of outer molds 3 are fed by the retracting device 19 while the spreader device
It is held by 21 and formed into an annular shape. Then, after the outer frame 3 that has been sequentially fed is formed into an annular shape inside the skin plate 10 by the spreader device 21, the outer frame 3 is
Is welded and fixed to the side end of the existing outer frame 3 by the circumferential welding device 22. The circumferential welding device 22 is a rotary frame.
By rotating 24 around the rotary frame roller 23, it is welded and fixed by the welding device attached to it. After welding the outer frame 3 held by the spreader device 21 and the existing outer frame 3 in the circumferential direction, both ends of the last outer frame 3 are axially welded.
Weld with 20 to form a complete annular outer frame 3.

このようにして、作業空間Aにおいて、外枠3が環状
に形成されて、既設の外枠3と接続された後には、シー
ルド機1を所定の距離だけ進ませることにより、前記環
状に形成された外枠3がスキンプレート10の作業空間B
の位置に来るようにする。その際、環状に形成された外
枠3は、第8図に示すように、エレクター支持リング16
に取り付けられたローラー25によって所定の円形を保持
しつつ作業空間Bへ移動されることとなる。外枠3が作
業空間Bに位置すると、その内側から既設の外枠3との
周方向の接続部分に沿って軽量型鋼(本実施例において
は、リップ溝型鋼を用いる)26を配設するとともに、外
枠3の内側に鉄筋等を配筋する。そして、外枠3の内側
に鉄筋等が配筋された後には、さらにその内側にエレク
ター15によって内枠2,2,・・・を順次環状に組み立てて
いく。そして、内枠2と外枠3とは、連結部材27によっ
て連結する。連結部材27は、第6図に示すように、外枠
3の内側に周方向に固定された軽量型鋼26の内側に座金
27aを固定し、この座金27aに穿設された貫通孔にシーボ
ルト27bを挿通させるとともに、座金27aの両側からナッ
ト27cによって固定し、さらに、シーボルト27bの他端部
を内枠2のスキンプレート2aに取り付けられたコーン状
の台座27dに着脱自在に螺着させるようにしたものであ
る。なお、環状に組み立てられる内枠2は、第9図、第
10図に示すように、内枠2のフランジ部2bを隣接させる
とともに、該フランジ部2b,2bに穿設された貫通孔にT
字状に形成された接続金具28を装着し、この接続金具28
の先端部に形成された係止孔に楔材29を打ち込むことに
より、互いに固定されるようなっている。そして、外枠
3に作用する土水圧に対しては、短期的には軽量型鋼26
から連結部材27を介して内枠2によって受けるようにし
ている。
In this way, in the work space A, the outer frame 3 is formed in an annular shape, and after being connected to the existing outer frame 3, the shield machine 1 is advanced by a predetermined distance to form the annular shape. The outer frame 3 is the work space B of the skin plate 10.
Position. At that time, as shown in FIG. 8, the outer frame 3 formed in an annular shape has the erector support ring 16
It is moved to the work space B while maintaining a predetermined circle by the roller 25 attached to the. When the outer frame 3 is located in the work space B, lightweight steel (a lip grooved steel is used in the present embodiment) 26 is arranged from the inner side of the outer space 3 along the circumferential connection with the existing outer frame 3. Reinforcing bars are arranged inside the outer frame 3. Then, after the reinforcing bars and the like are arranged inside the outer frame 3, the inner frames 2, 2, ... Are sequentially assembled inside the outer frame 3 by the erector 15. Then, the inner frame 2 and the outer frame 3 are connected by the connecting member 27. As shown in FIG. 6, the connecting member 27 is a washer on the inside of the lightweight steel 26 that is circumferentially fixed to the inside of the outer frame 3.
27a is fixed, the sea bolt 27b is inserted into the through hole formed in the washer 27a, and the nuts 27c are fixed from both sides of the washer 27a. Further, the other end of the sea bolt 27b is fixed to the skin plate 2a of the inner frame 2. It is adapted to be detachably screwed to a cone-shaped pedestal 27d attached to. The inner frame 2 assembled in a ring shape is shown in FIG.
As shown in FIG. 10, the flange portions 2b of the inner frame 2 are adjacent to each other, and the through holes formed in the flange portions 2b, 2b are provided with T-shaped holes.
Attach the connecting bracket 28 that is formed in a letter shape.
The wedge members 29 are driven into the locking holes formed at the tips of the two so as to be fixed to each other. And, for the soil water pressure acting on the outer frame 3, in the short term, the lightweight steel 26
Is received by the inner frame 2 via the connecting member 27.

このようにして、外枠3と内枠2とをトンネルの周方
向に環状に組み立てた後には、さらに、前記と同様の工
程によって外枠3と内枠2とを複数リング(本実施例に
おいては、4リングで1打設区間とする)組み立て、つ
いで、第7図に示すように、内枠2と外枠3との間に妻
枠30をリング状に組み付けることにより、コンクリート
Cの打設空間Sを形成する。前記妻枠30は、本実施例に
おいては、円弧状に形成されたベニヤ板の内縁部を内枠
2の端面にボルト等によって固定するとともに、ベニヤ
板の外縁部を止め金具31によって、軽量型鋼26に固定す
るようにしたものである。止め金具31は、先端部に形成
された係止部31aを軽量型鋼26に係止された後、基端部
をベニヤ板の外縁部に形成された貫通孔に挿通させた
後、その基端部にナット32を螺着させるようにしたもの
である。
In this way, after the outer frame 3 and the inner frame 2 are annularly assembled in the circumferential direction of the tunnel, a plurality of rings of the outer frame 3 and the inner frame 2 (in the present embodiment, are further subjected to the same steps as described above. Is assembled with 4 rings), and then, as shown in FIG. 7, by mounting the end frame 30 between the inner frame 2 and the outer frame 3 in a ring shape, the concrete C is placed. An installation space S is formed. In the present embodiment, the end frame 30 has a circular arc-shaped veneer plate whose inner edge is fixed to the end face of the inner frame 2 by a bolt or the like, and the outer edge of the veneer plate is fixed to the lightweight steel 26 by a fastener 31. It is designed to be fixed. The stopper 31 has the locking portion 31a formed at the tip end locked to the lightweight steel 26, and then the base end portion is inserted into the through hole formed in the outer edge portion of the veneer plate, and then the base end portion. The nut 32 is screwed onto the.

このようにして、前記外枠3と内枠2との間にコンク
リート打設空間Sが形成されると、その内部に内枠2の
所定の場所からコンクリートCを打設してコンクリート
ライニングRを施す。
In this way, when the concrete placing space S is formed between the outer frame 3 and the inner frame 2, concrete C is placed inside the inner frame 2 from a predetermined position to form the concrete lining R. Give.

以下同様にして、前記工程を順次繰り返すことによ
り、掘削した坑の壁面にコンクリートライニングの覆工
を行う。このようにして、順次覆工が行なわれるに従
い、第13図に示すように、コンクリート打設区間aの後
方にはコンクリートが硬化していない状態の未固結コン
クリート区間bが、さらにその後方にはコンクリートが
完全に硬化した状態の固結コンクリート区間cが逐次完
成してく。固結コンクリート区間cには、外枠3と掘削
した坑の壁面との間に、内枠2の所定の場所に設けられ
た注入孔から裏込めグラウトを注入する。
In the same manner, the above steps are sequentially repeated to cover the wall of the excavated mine with concrete lining. In this way, as the lining is sequentially performed, as shown in FIG. 13, an unconsolidated concrete section b in which the concrete is not hardened is further behind the concrete pouring section a. The solidified concrete section c in which the concrete is completely hardened is successively completed. Backfill grout is injected into the solidified concrete section c from an injection hole provided at a predetermined location of the inner frame 2 between the outer frame 3 and the wall surface of the excavated mine.

この固結コンクリート区間cにおいては、コンクリー
トライニングRの強度発現により、コンクリートライニ
ングRが地盤Gから受ける長期的な諸荷重を受け持つと
ともに、内枠との間に働く摩擦力により、シールド機の
推進時に作用する短期的なジャッキ推力を受け持つこと
となる。しかし、未固結コンクリート区間bにおいて
は、コンクリートが完全に硬化していないため、ジャッ
キ推力に対して、内枠2とコンクリートライニングRと
の間に摩擦力が働くことなく、この部分の内枠2は後方
の固結区間へジャッキ推力を伝達するだけとなる。
In this solidified concrete section c, the concrete lining R bears long-term loads received from the ground G due to the strength development of the concrete lining R, and at the time of propulsion of the shield machine due to the frictional force acting between the concrete lining R and the inner frame. It will be responsible for the short-term jack thrust that acts. However, in the unconsolidated concrete section b, since the concrete is not completely hardened, a frictional force does not act between the inner frame 2 and the concrete lining R against the jack thrust, and the inner frame of this portion does not act. No. 2 only transmits the jack thrust to the rear consolidation section.

つぎに、前記のようにして完成した、固結コンクリー
ト区間cが所定の長さ(本実施例においては、建設され
た環状の外枠及び内枠が少なくとも8個分に相当する場
合)に達したことを確認した後には、固結コンクリート
区間cより後方の型枠解体区間dの内枠を最後部から逐
次解体していく。なお、内枠2はコーン状の台座27dに
螺着されたシーボルト27bを介して外枠3に固定されて
いが、内枠2のスキンプレート2aに螺着されたコーン状
の台座27dを内枠2のスキンプレート2aから抜き取るこ
とにより、外枠3との連結状態を容易に解除することが
できる。そして、解体した内枠2はシールド機1のテー
ル部の作業区間Bにおいて、新たに組み立てる内枠とし
て転用する。
Next, the solidified concrete section c completed as described above reaches a predetermined length (in the present embodiment, when the constructed annular outer frame and inner frame correspond to at least eight). After confirming this, the inner frame of the mold dismantling section d behind the solidified concrete section c is sequentially dismantled from the last part. The inner frame 2 is fixed to the outer frame 3 via the sea bolt 27b screwed to the cone-shaped pedestal 27d, but the cone-shaped pedestal 27d screwed to the skin plate 2a of the inner frame 2 is used as the inner frame. The connection state with the outer frame 3 can be easily released by pulling out the second skin plate 2a. Then, the disassembled inner frame 2 is diverted as an inner frame to be newly assembled in the working section B of the tail portion of the shield machine 1.

なお、前記固結コンクリート区間cは、内枠2とコン
クリートライニングRとの間に、ジャッキ推力を支持す
るだけの摩擦力を発生させるのに必要な長さであればよ
い。
The solidified concrete section c may have a length required to generate a frictional force between the inner frame 2 and the concrete lining R to support the jack thrust.

したがって、この工法においては、一次覆工で坑の壁
面HにコンクリートライニングRを施してトンネルを完
成させ、その固化したコンクリートライニングRによっ
て地山Gから受ける土水圧等の長期荷重を支持するとと
もに、シールド機が推進する際のジャッキ推力(短期荷
重)をも受け持つものであるので、コンクリートC内に
埋設される外枠3は安価なものとなり、覆工材としての
高価なセグメントを不要とするとともに、二次覆工とし
てのコンクリートライニングをも不要とし、工期の短縮
や、工費の大幅削減を実現することができるものであ
る。
Therefore, in this construction method, a concrete lining R is applied to the wall surface H of the mine by the primary lining to complete the tunnel, and the solidified concrete lining R supports long-term loads such as soil water pressure received from the natural ground G, and Since it also handles the jack thrust (short-term load) when the shield machine propels, the outer frame 3 embedded in the concrete C becomes inexpensive, and an expensive segment as a lining material is not required. By eliminating the need for concrete lining as a secondary lining, the construction period can be shortened and the construction cost can be significantly reduced.

さらに、本実施例においては、シールド機1のテール
部の前部、即ち作業空間Aにおいて、外枠を引き込み装
置19によって引き込んだ後、スプレッダー装置21により
環状に保持することにより組み立て、ついでシールド機
1を所定距離推進させることにより環状の外枠3をテー
ル部の後部、即ち作業空間Bに位置させ、さらに前記外
枠3の内側に軽量型鋼26や鉄筋等を配設した後、その内
側に内枠2を環状に組み立てるようにしているため、外
枠3の組み立て作業が迅速かつ確実に行えるとともに、
外枠3と内枠2との組み立て作業を並行して行うことが
でき、さらに内枠2を組み立てる前に軽量型鋼26の取り
付けや、鉄筋の背筋作業(ラップ処理等)を行うことが
できることとなり、施工時間の大幅な短縮を実現するこ
とができる。また、外枠3は軸方向溶接装置や周方向溶
接装置等によって互いに接続されるため、各外枠3は隙
間無く接続されることとなり、完全な止水効果を有した
ものとなる。また、外枠3に薄板波鉄板を用いるように
しているため、外枠3は従来の鉄板を円弧状に形成した
ものに比べて、大幅に軽量化されるとともに、さらに製
作費を低減することができる。
Further, in this embodiment, in the front part of the tail portion of the shield machine 1, that is, in the working space A, the outer frame is retracted by the retracting device 19 and then held in an annular shape by the spreader device 21 to be assembled, and then the shield machine is assembled. The annular outer frame 3 is positioned at the rear part of the tail portion, that is, in the working space B by propelling 1 for a predetermined distance, and the lightweight steel 26 and the reinforcing bar are arranged inside the outer frame 3, Since the inner frame 2 is assembled in a ring shape, the outer frame 3 can be assembled quickly and reliably, and
Assembling work of the outer frame 3 and the inner frame 2 can be performed in parallel, and before the inner frame 2 is assembled, the lightweight steel 26 can be attached and the spine work of the reinforcing bar (lap processing, etc.) can be performed. The construction time can be greatly reduced. Further, since the outer frames 3 are connected to each other by an axial welding device, a circumferential welding device, or the like, the outer frames 3 are connected without a gap, which has a complete water-stop effect. Further, since the thin corrugated iron plate is used for the outer frame 3, the outer frame 3 is significantly lighter than the conventional iron plate formed in an arc shape, and the manufacturing cost is further reduced. You can

「発明の効果」 上述したように、この発明は外型枠をシールド機のテ
ール部のスキンプレートに沿って周方向に送り込む引き
込み装置と、送り込まれた外型枠を円形状に保持するた
めのスプレッダー装置と、送り込まれた外枠を環状に形
成するための軸方向溶接装置及び既設の外型枠と接続す
るための周方向溶接装置とを備えたものであるので、繁
雑な型枠のボルト止め作業等がなくなり、外型枠の組み
立てを迅速かつ確実に行うことができるとともに、外型
枠は溶接によって隙間なく接続されることとなり、完全
な止水効果を有したものとなり、従来のようにゴム製の
シール材が不要となり、その分コストの低減を図ること
ができる。また、テール部の前部において、外枠を環状
に組み立てた後、シールド機を所定距離推進させること
により、前記環状の外型枠をテール部の後部に位置さ
せ、ついで前記外型枠の内側に内型枠を環状に組み立て
るようにしているため、外型枠と内型枠との組み立て作
業を同時に並行して行うことができるとともに、内型枠
を組み立てる前に外枠の内側に鉄筋の配筋作業等を行う
ことができることとなり、施工時間を大幅に短縮するこ
とができる。また、外型枠に薄板波鉄板を用いるように
すれば、外型枠は大幅にさらに軽量化されるとともに製
作費の低減を実現することができるという優れた効果を
奏する。
"Effects of the Invention" As described above, the present invention provides a retracting device for feeding an outer mold in the circumferential direction along a skin plate of a tail portion of a shield machine, and a circular outer shape for holding the fed outer mold. Since the spreader device, the axial welding device for forming the fed outer frame into an annular shape, and the circumferential welding device for connecting with the existing outer formwork are provided, the bolts of the complicated formwork are provided. Stopping work is eliminated, and the outer formwork can be assembled quickly and reliably, and the outer formwork is connected without gaps by welding, resulting in a complete waterproofing effect. Further, a rubber sealing material is unnecessary, and the cost can be reduced accordingly. Further, at the front part of the tail part, after the outer frame is assembled in an annular shape, the shield machine is propelled for a predetermined distance to position the outer mold part of the annular shape at the rear part of the tail part, and then the inner part of the outer mold part. Since the inner formwork is assembled in a ring shape, the outer formwork and the inner formwork can be assembled at the same time in parallel, and before the inner formwork is assembled, the rebar inside the outer form As a result, it is possible to perform work such as arranging, and it is possible to greatly reduce the construction time. Further, if a thin corrugated iron plate is used for the outer mold, the outer mold can be significantly reduced in weight and the manufacturing cost can be reduced.

【図面の簡単な説明】[Brief description of drawings]

第1図ないし第10図は、本発明の一実施例を示すもので
あり、第1図はノン・セグメント・シールド工法におけ
る外型枠の組立装置を備えたシールド機の側断面図、第
2図は第1図のII−II断面を示すものであり作業空間A
のシールド機の横断面図、第3図は第1図のIII−III断
面を示すものであり作業空間Bのシールド機の横断面
図、第4図は本発明の第2の外型枠を示し、第4図
(a)は薄板鉄板に薄板波鉄板を貼り合わせた外型枠の
平面図、第4図(b)はその側面図、第5図は第3の外
型枠を示し、第5図(a)は薄板鉄板と薄板波鉄板と帯
板とを貼り合わせた外型枠の平面図、第5図(b)はそ
の側面図、第6図は内枠と外枠との連結状態を示すため
の型枠の側断面図、第7図は内型枠と外型枠との間に妻
枠を設けた状態を示す型枠の側断面図、第8図は外型枠
を環状に形成した後、シールド機を所定距離推進させて
該環状の外型枠をテール部の作業空間Bへ位置させる状
態を示すための説明図、第9図は連結部材によって接続
された内型枠のフランジ部の側断面図、第10図は連結部
材によって接続された内型枠のフランジ部の平面図、第
11図ないし第13図は従来の技術を示すものであり、第11
図は連結部材によって連結された状態の外型枠と内型枠
の側面図、第12図は第11図のXII−XII断面であり外型枠
の平面図、第13図はノン・セグメント・シールド工法に
より建設されているトンネルの側断面図である。 1……シールド機、H……坑の壁面、2……内型枠(内
枠)、3,3′……外型枠(外枠)、3a,3′a……薄板鉄
板、3b,3′b……薄板波鉄板、3d,3′d……帯板、C…
…コンクリート、R……コンクリートライニング、19…
…引き込み装置、20……軸方向溶接装置、21……スプレ
ッダー装置、22……周方向溶接装置、27……連結部材。
1 to 10 show an embodiment of the present invention. FIG. 1 is a side sectional view of a shield machine provided with an outer formwork assembling apparatus in the non-segment shield construction method, and FIG. The drawing shows the section II-II of Fig. 1 and the working space A
3 is a cross-sectional view of the shield machine of FIG. 1, and FIG. 3 is a cross-sectional view of the shield machine in the working space B, showing the cross section III-III of FIG. 1, and FIG. 4 is the second outer form of the present invention. Fig. 4 (a) is a plan view of an outer mold in which a thin corrugated iron plate is attached to a thin iron plate, Fig. 4 (b) is a side view thereof, and Fig. 5 shows a third outer mold. Fig. 5 (a) is a plan view of an outer formwork in which a thin iron plate, a thin corrugated iron plate, and a strip plate are bonded together, Fig. 5 (b) is a side view thereof, and Fig. 6 shows an inner frame and an outer frame. FIG. 7 is a side sectional view of the mold for showing a connected state, FIG. 7 is a side sectional view of the mold showing a state in which a gable frame is provided between the inner mold and the outer mold, and FIG. 8 is an outer mold. FIG. 9 is an explanatory view showing a state in which the shield machine is propelled by a predetermined distance and the annular outer frame is positioned in the working space B of the tail portion after forming the annular shape, and FIG. Formwork flange Cross-sectional side view, FIG. 10 is a plan view of a flange portion of the inner mold which are connected by a connecting member, the
11 to 13 show a conventional technique.
The figure shows a side view of the outer mold and the inner mold in a state of being connected by a connecting member, FIG. 12 is a cross-sectional view of the outer mold, which is a cross section taken along line XII-XII of FIG. 11, and FIG. It is a side sectional view of a tunnel constructed by a shield construction method. 1 ... Shielding machine, H ... pit wall, 2 ... Inner mold (inner frame), 3,3 '... Outer mold (outer frame), 3a, 3'a ... Thin iron plate, 3b, 3'b ... thin corrugated iron plate, 3d, 3'd ... strip plate, C ...
… Concrete, R… Concrete lining, 19…
… Retracting device, 20 …… Axial welding device, 21 …… Spreader device, 22 …… Circular welding device, 27 …… Coupling member.

Claims (5)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】掘進するシールド機の後部に形成された坑
の壁面に沿って、周方向へ複数に分割された所定幅を有
する内型枠と外型枠を連結部材で一体化しつつ筒状に組
み立てた後、この内型枠と外型枠との間にコンクリート
を打設してコンクリートライニングを施すとともに、こ
のコンクリートライニングが固化した後には前記内型枠
を新たに掘削した坑の壁面に組み立てる内型枠として再
使用しながら地中にトンネルを構築するノン・セグメン
ト・シールド工法において、まず、前記外型枠を引き込
み装置によってシールド機のテール部のスキンプレート
の内周面に沿って周方向へ送り込みつつ、溶接装置によ
り順次継ぎ足して環状に形成した後、前記シールド機を
所定距離推進させることにより、前記環状の外型枠をテ
ール部の後方へ位置させ、この部分において前記外型枠
の内側に内型枠を組み立てることを特徴とするノン・セ
グメント・シールド工法における外型枠の組立方法。
1. A cylindrical shape in which an inner mold and an outer mold having a predetermined width divided in a circumferential direction along a wall surface of a mine formed at a rear portion of a shield machine for excavating are integrated by a connecting member. After assembling to, the concrete lining is placed by placing concrete between the inner formwork and the outer formwork, and after the concrete lining is solidified, the inner formwork is applied to the wall of the newly excavated mine. In the non-segment shield construction method of constructing a tunnel in the ground while reusing it as an inner formwork to be assembled, first, the outer formwork is drawn along the inner peripheral surface of the skin plate of the tail part of the shield machine by the retracting device. While being fed in the direction, the welding machine sequentially added the pieces to form an annular shape, and then the shield machine was propelled for a predetermined distance to move the annular outer frame to the rear of the tail portion. Is allowed, the assembly method of the outer frame in the non-segment shield method characterized by assembling the inner mold in this portion inside the outer frame.
【請求項2】周方向に沿って複数に分割されかつ軸方向
に所定幅を有する外型枠を、シールド機のテール部のス
キンプレートに沿って周方向に送り込む引き込み装置
と、前記スキンプレートに沿って引き込まれる外型枠を
円形状に保持するためのスプレッダー装置と、前記スキ
ンプレートに沿って引き込まれる外型枠を順次軸方向に
溶接して接続することにより環状に形成するための軸方
向溶接装置と、前記環状に形成された外型枠と既設の外
型枠とを周方向に溶接して接続するための周方向溶接装
置とを備えたことを特徴とするノン・セグメント・シー
ルド工法における外型枠の組立装置。
2. A retraction device for feeding an outer formwork, which is divided into a plurality of pieces along the circumferential direction and has a predetermined width in the axial direction, in the circumferential direction along the skin plate of the tail portion of the shield machine, and to the skin plate. An axial direction for forming an annular shape by sequentially welding and connecting the spreader device for holding the outer formwork drawn along along with the circular form, and the outer formwork drawn along the skin plate in order. A non-segment shield construction method comprising: a welding device; and a circumferential welding device for circumferentially welding and connecting the annular outer mold and the existing outer mold. External formwork assembly equipment.
【請求項3】前記外型枠が0.6mm程度の薄板鉄板で形成
されていることを特徴とする特許請求の範囲第2項記載
のノン・セグメント・シールド工法における外型枠の組
立装置。
3. An apparatus for assembling an outer mold in a non-segment shield construction method according to claim 2, wherein the outer mold is formed of a thin iron plate of about 0.6 mm.
【請求項4】前記外型枠が薄板鉄板と、その表面に貼り
合わされた薄板波鉄板とによって形成されたことを特徴
とする特許請求の範囲第2項記載のノン・セグメント・
シールド工法における外型枠の組立装置。
4. The non-segment segment according to claim 2, wherein the outer frame is formed by a thin iron plate and a thin corrugated iron plate bonded to the surface of the thin iron plate.
Assembling device for outer formwork in shield method.
【請求項5】前記外型枠が薄板鉄板の表面に薄板波鉄板
を貼り合わせ、さらに薄板波鉄板の表面に帯板を設けた
構成とされたことを特徴とする特許請求の範囲第2項記
載のノン・セグメント・シールド工法における外型枠の
組立装置。
5. The outer mold has a structure in which a thin corrugated iron plate is attached to the surface of the thin corrugated iron plate, and a strip plate is further provided on the surface of the thin corrugated iron plate. External formwork assembling device in the described non-segment shield construction method.
JP62220913A 1987-09-03 1987-09-03 Method and apparatus for assembling outer mold in non-segment shield method Expired - Lifetime JP2548577B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP62220913A JP2548577B2 (en) 1987-09-03 1987-09-03 Method and apparatus for assembling outer mold in non-segment shield method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP62220913A JP2548577B2 (en) 1987-09-03 1987-09-03 Method and apparatus for assembling outer mold in non-segment shield method

Publications (2)

Publication Number Publication Date
JPS6462598A JPS6462598A (en) 1989-03-09
JP2548577B2 true JP2548577B2 (en) 1996-10-30

Family

ID=16758499

Family Applications (1)

Application Number Title Priority Date Filing Date
JP62220913A Expired - Lifetime JP2548577B2 (en) 1987-09-03 1987-09-03 Method and apparatus for assembling outer mold in non-segment shield method

Country Status (1)

Country Link
JP (1) JP2548577B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110714786A (en) * 2019-10-28 2020-01-21 郑州大学 High polymer grouting method for shield tunnel and shield tunnel

Also Published As

Publication number Publication date
JPS6462598A (en) 1989-03-09

Similar Documents

Publication Publication Date Title
JP2897667B2 (en) Subway station structure and construction method
JP2548577B2 (en) Method and apparatus for assembling outer mold in non-segment shield method
JP2593284B2 (en) Tunnel lining structure and construction method
JPS62153499A (en) Formwork assembling and overhauling device
JP2873503B2 (en) Ground support system in tunnel excavation
JPH0361000B2 (en)
JPH0493498A (en) Concrete placing device for covering tunnel
JP2639447B2 (en) Underground joining equipment and underground joining method for shield tunnel
JPH05311995A (en) Construction method of tunnel structure using cornice steel plate
JPH0696958B2 (en) Construction method and mold form of seal lining in non-segment shield construction method
JP2691473B2 (en) Tunnel lining Concrete continuous pouring method
JP2691472B2 (en) Tunnel lining concrete continuous pouring equipment
JPS587800B2 (en) tunnel construction equipment
JPH0786317B2 (en) The method of lining curved parts with a shield machine
JPH0718320B2 (en) Method and device for receiving propulsion jack reaction force of shield machine
JP2501072Y2 (en) Shield pressure machine for shield machine
JPH0536599B2 (en)
JPH02289799A (en) Self-traveling lining formwork device
JPH0696949B2 (en) Construction method of rectangular section tunnel and shield machine used for it
JP2001020656A (en) Tunnel boring method in inferior ground
JPH0519436Y2 (en)
JPH0730677B2 (en) In-situ lining method for shield tunnel and its lining equipment
JP2630330B2 (en) Shrinkable segment and shrinkable segment ring
JPS63197800A (en) Inner formwork overhauling device in method of non-segment-shield construction
JPH0791952B2 (en) Formwork equipment for tunnel lining