JP2019112811A - Main leg installation method and anchor frame installation jig - Google Patents

Main leg installation method and anchor frame installation jig Download PDF

Info

Publication number
JP2019112811A
JP2019112811A JP2017246557A JP2017246557A JP2019112811A JP 2019112811 A JP2019112811 A JP 2019112811A JP 2017246557 A JP2017246557 A JP 2017246557A JP 2017246557 A JP2017246557 A JP 2017246557A JP 2019112811 A JP2019112811 A JP 2019112811A
Authority
JP
Japan
Prior art keywords
anchor frame
main leg
installation
foundation
jig
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2017246557A
Other languages
Japanese (ja)
Other versions
JP7059618B2 (en
Inventor
和田 収司
Shuji Wada
収司 和田
敏 松尾
Satoshi Matsuo
敏 松尾
悠介 馬場
Yusuke Baba
悠介 馬場
裕幸 武石
Hiroyuki Takeishi
裕幸 武石
洋平 澄川
Yohei Sumikawa
洋平 澄川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tokyo Electric Power Co Holdings Inc
Original Assignee
Tokyo Electric Power Co Holdings Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyo Electric Power Co Holdings Inc filed Critical Tokyo Electric Power Co Holdings Inc
Priority to JP2017246557A priority Critical patent/JP7059618B2/en
Publication of JP2019112811A publication Critical patent/JP2019112811A/en
Application granted granted Critical
Publication of JP7059618B2 publication Critical patent/JP7059618B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

To provide a main leg installation method and an anchor frame installation jig capable of greatly reducing the labor for installation work while securing high positioning accuracy when installing the main leg on a foundation using an anchor frame.SOLUTION: In a configuration of a main leg installation method according to the present invention, a foundation (a foundation pile 18) is installed in the ground, a form 30 for placing concrete of a fixing portion 70 is installed on the foundation pile 18, an anchor frame mounting jig (mounting jig 100) is installed at an upper edge of the form 30, an anchor frame 600 is supported by the anchor frame mounting jig in a suspended state, the anchor frame 600 is positioned by an anchor frame mounting jig, concrete (concrete for fixing 32) is cast in the form 30 to form the fixing portion 70, and the main leg member 40 is installed on the anchor frame 600.SELECTED DRAWING: Figure 5

Description

本発明は、鉄塔の脚部を構成する主脚材を基礎に据え付ける主脚材据付方法、およびかかる主脚材を固定されるアンカーフレームを支持するアンカーフレーム据付治具に関する。   The present invention relates to a main leg installation method for installing a main leg forming a leg of a steel tower on a foundation, and an anchor frame fixing jig for supporting an anchor frame to which the main leg is fixed.

送電鉄塔等の巨大な構造物(以下、単に鉄塔と称する)の脚部はマット型の基礎である床板基礎(マット基礎ともいう)や深礎基礎等の基礎に支持される。このとき、脚部を構成する主脚材は、一般にいかり材や支圧板等を用いて基礎に定着される。例えば特許文献1では、鉄塔を支持する脚材の周囲にいかり材を放射状に突設し、この脚材を基礎コンクリート内に埋め込んでいる。   The legs of a huge structure such as a power transmission tower (hereinafter simply referred to as a steel tower) are supported by a foundation such as a floor board foundation (also referred to as a mat foundation), which is a foundation of a mat type, or a foundation foundation. At this time, the main leg material constituting the leg portion is generally fixed to the foundation using an anchor material, a bearing plate or the like. For example, in Patent Document 1, an anchor is radially projected around a leg supporting a steel tower, and the leg is embedded in a foundation concrete.

特開2004−285721号公報JP 2004-285721 A

図9は、アンカーフレームを用いて主脚材を床板基礎(以下、単に基礎と称する)に定着する際の従来工法を説明する図である。なお、主に従来工法におけるアンカーフレームの据付について説明するため、図9では、主脚材および基礎については不図示としている。鉄塔の脚部となる主脚材を基礎に定着する際には、特許文献1に開示されているいかり材や支圧板が用いられることが一般的であるが、それら以外にもアンカーフレームを用いることもある。   FIG. 9 is a view for explaining a conventional method of fixing a main leg on a floor plate foundation (hereinafter simply referred to as a foundation) using an anchor frame. In addition, in order to mainly describe installation of the anchor frame in a conventional construction method, in FIG. 9, it is not shown about the main leg material and the foundation. In order to fix the main leg material to be the leg of a steel tower on a foundation, it is general to use the anchor material and bearing plate disclosed in Patent Document 1, but in addition to these, an anchor frame is used. Sometimes.

アンカーフレームを用いて主脚材を基礎に定着する際には、まず各脚部(一般には4本)を構成する主脚材に対してアンカーフレーム据付用の据付架台を設置する必要がある。詳細には、従来工法ではまず図9に示すように、鉄塔を建設する敷地内に基礎(全体は不図示)の配筋610を敷設する。   In order to fix the main leg to the foundation using an anchor frame, it is necessary to first install a mounting frame for installing the anchor frame on the main leg constituting each leg (generally four). Specifically, in the conventional method, first, as shown in FIG. 9, foundations (not shown) are laid on the grounds within a site where a steel tower is to be constructed.

図9に示すように、アンカーフレーム600は、ベースプレート602、アンカーボルト604およびナット606を含んで構成される。アンカーボルト604の上端は、ナット606によってベースプレート602に固定されている。従来工法では、まずアンカーフレーム600を組立用鋼材(不図示)を用いて均しコンクリート(不図示)に強固に固定する。   As shown in FIG. 9, anchor frame 600 includes base plate 602, anchor bolt 604 and nut 606. The upper end of the anchor bolt 604 is fixed to the base plate 602 by a nut 606. In the conventional method, first, the anchor frame 600 is firmly fixed to the leveling concrete (not shown) using a steel material for assembly (not shown).

次に、敷地内に据付架台620を設置する。このとき、主脚材の据付位置の精度を高めるためには、アンカーフレーム600の据付位置が正確である必要がある。このため、従来工法では、据付架台620が正確な位置に配置されるよう測量を行いながら据付架台620を設置する。   Next, the installation stand 620 is installed in the site. At this time, in order to increase the accuracy of the installation position of the main leg, the installation position of the anchor frame 600 needs to be accurate. For this reason, in the conventional construction method, the installation stand 620 is installed while performing surveying so that the installation stand 620 is disposed at an accurate position.

ここで、主脚材を支持するアンカーフレーム600や組立用鋼材(以下、これらをアンカーフレーム600と総称する)は重量が非常に重い。このため、アンカーフレーム600が据え付けられる据付架台620においても高い剛性が求められる。したがって、据付架台620の重量も非常に重くなり、据付架台620の設置作業において大変な労力が必要となる。   Here, the anchor frame 600 for supporting the main leg and the steel for assembly (hereinafter collectively referred to as the anchor frame 600) are very heavy. For this reason, high rigidity is also required in the installation stand 620 on which the anchor frame 600 is installed. Therefore, the weight of the mounting base 620 is also very heavy, and a great effort is required in the installation work of the mounting base 620.

また鉄塔のように複数の脚部を有する場合、かかる脚部を構成する複数の主脚材ごとにアンカーフレーム600を設置するため、設置作業に要する労力は莫大なものとなる。更に複数の脚部それぞれに対してアンカーフレームが配置されるため、複数のアンカーフレームを連結する据付架台620が大型化してしまう。このため、据付架台620の運搬や組立に労力がかかり、作業員の負担が大きくなってしまう。   Further, in the case of having a plurality of legs as in a steel tower, since the anchor frame 600 is installed for each of the plurality of main leg members constituting the legs, the labor required for the installation work becomes enormous. Furthermore, since the anchor frame is disposed for each of the plurality of legs, the installation rack 620 connecting the plurality of anchor frames is upsized. For this reason, labor is required for transporting and assembling the installation stand 620, and the burden on the operator is increased.

本発明は、このような課題に鑑み、アンカーフレームを用いて主脚材を基礎に据え付ける際において高い位置決め精度を確保しつつ、据付作業にかかる労力を大幅に軽減することが可能な主脚材据付方法およびアンカーフレーム据付治具を提供することを目的としている。   SUMMARY OF THE INVENTION In view of such problems, the present invention can significantly reduce the labor required for installation work while securing high positioning accuracy when installing the main leg material on a foundation using an anchor frame. It is intended to provide an installation method and an anchor frame mounting jig.

上記課題を解決するために、本発明にかかる主脚材据付方法の代表的な構成は、鉄塔の主脚材の据付方法であって、地中に基礎を設置し、基礎の上に定着部のコンクリート打設用の型枠を設置し、型枠の上縁にアンカーフレーム据付治具を設置し、アンカーフレーム据付治具にアンカーフレームを吊り下げた状態で支持させ、アンカーフレームをアンカーフレーム据付治具で位置決めし、型枠内にコンクリートを打設して定着部を形成し、アンカーフレームに主脚材を据え付けることを特徴とする。   In order to solve the above problems, a typical configuration of the main leg installation method according to the present invention is an installation method of a main leg of a steel tower, wherein a foundation is installed in the ground, and a fixing portion is installed on the foundation. Install a form for concrete placement, install an anchor frame installation jig at the upper edge of the form, support the anchor frame installation jig in a suspended state and support the anchor frame It is characterized by positioning with a jig, placing concrete in a formwork to form a fixing portion, and installing a main leg on an anchor frame.

上記構成によれば、定着部のコンクリート打設用の型枠、およびその上縁に設置されるアンカーフレーム据付治具(以下、単に据付治具と称する)を用いることにより、アンカーフレームひいては主脚材の据付を行うことができる。したがって、従来工法において用いられていた据付架台が不要となる。これにより、据付架台の運搬および組立に費やしていた労力を削減することができ、据付作業にかかる労力を大幅に軽減することができる。また据付治具によってアンカーフレームの位置決めを行うことにより、高い位置決め精度を確保することが可能である。   According to the above configuration, the anchor frame and hence the main leg can be formed by using the formwork for placing concrete in the fixing portion and the anchor frame installation jig (hereinafter simply referred to as the installation jig) installed at the upper edge thereof Installation of materials can be performed. Therefore, the installation stand used in the conventional construction method becomes unnecessary. As a result, it is possible to reduce the labor spent for transporting and assembling the installation stand, and to significantly reduce the effort for the installation work. Also, by positioning the anchor frame with the installation jig, it is possible to ensure high positioning accuracy.

上記基礎を設置する際にボルトの下端を基礎に埋め込み、アンカーフレーム据付治具に吊り下げられたアンカーフレームの下部をボルトに固定するとよい。これにより、型枠にコンクリートを打設する際の流動圧によるアンカーフレームの揺らぎを抑制することができる。   When the foundation is installed, the lower end of the bolt may be embedded in the foundation, and the lower portion of the anchor frame suspended by the anchor frame mounting jig may be fixed to the bolt. Thereby, the fluctuation of the anchor frame due to the flow pressure at the time of placing concrete in the formwork can be suppressed.

上記課題を解決するために、本発明にかかるアンカーフレーム据付治具の代表的な構成は、鉄塔の主脚材の定着部のコンクリート打設用の型枠の上端に渡される梁と、梁の中央部に接続されアンカーフレームを吊下げて支持する支持部と、を備えることを特徴とする。上述した主脚材据付方法における技術的思想に対応する構成要素やその説明は、当該アンカーフレーム据付治具にも適用可能である。   In order to solve the above problems, a typical configuration of the anchor frame mounting jig according to the present invention is a beam passed to the upper end of a concrete placing form of a fixing portion of a main leg of a steel tower, and a beam And a supporting portion connected to the central portion for suspending and supporting the anchor frame. The components corresponding to the technical idea in the main leg installation method mentioned above and the explanation thereof are applicable also to the anchor frame installation jig concerned.

上記アンカーフレーム据付治具は、梁を前記型枠に固定する連結部材を更に備え、連結部材は、円弧状の長穴が形成されたプレート状の部材であり型枠の上縁に固定される連結プレートと、長穴に挿通される連結ボルトと、を含み、梁には、長手方向に延び連結ボルトが挿通される連結穴が形成されているとよい。これにより、C型万力等の固定具を必要とすることなく、梁ひいては据付治具を型枠に容易に固定することが可能となる。   The anchor frame mounting jig further includes a connecting member for fixing the beam to the formwork, and the connecting member is a plate-like member having an arc-shaped elongated hole and is fixed to the upper edge of the formwork The beam may include a connection plate and a connection bolt inserted into the elongated hole, and the beam may be formed with a connection hole extending longitudinally and through which the connection bolt is inserted. This makes it possible to easily fix the beam and hence the installation jig to the formwork without requiring a fixing tool such as a C-type vise.

また連結プレートに円弧状の長穴が形成されていることにより、連結プレートを型枠に対して回転させることにより、据付治具に支持されているアンカーフレームの水平方向の位置、特に鉄塔の塔心に向かう方向を調整することができる。更に、梁に長手方向に延びる連結穴が形成されていることにより、梁を連結部材に対してスライド移動させることにより、据付治具に支持されているアンカーフレームの位置を調整することが可能である。   Further, by forming the arc-shaped elongated holes in the connection plate, the horizontal position of the anchor frame supported by the installation jig, in particular, the tower of the steel tower, is rotated by rotating the connection plate with respect to the mold. I can adjust the direction towards the heart. Further, by forming the connecting hole extending in the longitudinal direction in the beam, by sliding the beam relative to the connecting member, it is possible to adjust the position of the anchor frame supported by the installation jig. is there.

本発明によれば、アンカーフレームを用いて主脚材を基礎に据え付ける際において高い位置決め精度を確保しつつ、据付作業にかかる労力を大幅に軽減することが可能な主脚材据付方法およびアンカーフレーム据付治具を提供することができる。   According to the present invention, a main leg installation method and anchor frame capable of greatly reducing the labor for installation work while securing high positioning accuracy when installing the main leg on the foundation using the anchor frame An installation jig can be provided.

第1実施形態にかかる主脚材据付方法を説明する図である。It is a figure explaining the main leg material installation method concerning a 1st embodiment. 第1実施形態にかかる主脚材据付方法を説明する図である。It is a figure explaining the main leg material installation method concerning a 1st embodiment. 第1実施形態にかかる据付治具を説明する図である。It is a figure explaining the installation jig concerning a 1st embodiment. 据付治具の型枠への固定について説明する図である。It is a figure explaining fixation to a formwork of an installation jig. 図1および図2の斜視図である。Figure 3 is a perspective view of Figures 1 and 2; 型枠への据付治具の固定方法の他の例を説明する図である。It is a figure explaining the other example of the fixing method of the installation jig to a formwork. 第2実施形態にかかる主脚材据付方法を説明する図である。It is a figure explaining the main leg material installation method concerning a 2nd embodiment. 第3実施形態にかかる主脚材据付方法を説明する図である。It is a figure explaining the main leg material installation method concerning a 3rd embodiment. アンカーフレームを用いて主脚材を基礎に定着する際の従来工法を説明する図である。It is a figure explaining the conventional construction method at the time of fixing a main leg material to a foundation using an anchor frame.

以下に添付図面を参照しながら、本発明の好適な実施形態について詳細に説明する。かかる実施形態に示す寸法、材料、その他具体的な数値などは、発明の理解を容易とするための例示に過ぎず、特に断る場合を除き、本発明を限定するものではない。なお、本明細書及び図面において、実質的に同一の機能、構成を有する要素については、同一の符号を付することにより重複説明を省略し、また本発明に直接関係のない要素は図示を省略する。   Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings. The dimensions, materials, and other specific numerical values and the like shown in the embodiments are merely examples for facilitating the understanding of the invention, and the invention is not limited except as otherwise described. In the present specification and drawings, elements having substantially the same functions and configurations are denoted by the same reference numerals to omit repeated description, and elements not directly related to the present invention are not illustrated. Do.

(第1実施形態)
図1および図2は、第1実施形態にかかる主脚材据付方法を説明する図である。第1実施形態では、主脚材を据え付ける基礎として基礎杭を例示する。第1実施形態の主脚材据付方法(以下、単に据付方法と称する)では、図1(a)に示すように、まず地中を掘削することにより掘削孔10を形成する。次に、躯体鉄筋14についた不要なコンクリート(不図示)を取り除き、基礎杭18(ハッチングにて図示)が完成する。
First Embodiment
1 and 2 are diagrams for explaining the main leg installation method according to the first embodiment. In 1st Embodiment, a foundation pile is illustrated as a foundation which installs a main leg material. In the main leg installation method according to the first embodiment (hereinafter simply referred to as the installation method), as shown in FIG. 1A, the excavation hole 10 is formed by excavating the ground first. Next, unnecessary concrete (not shown) attached to the frame rebar 14 is removed, and a foundation pile 18 (shown by hatching) is completed.

続いて、図1(b)に示すように、躯体鉄筋14の周囲にフープ筋12を巻き付け、均しコンクリート20を打設する。均しコンクリート20が硬化したら、後述する定着部70のコンクリート打設用の型枠30を均しコンクリート20の上に配置する。   Subsequently, as shown in FIG. 1 (b), the hoop reinforcement 12 is wound around the rebar 14, and the leveling concrete 20 is placed. After the leveling concrete 20 is hardened, a concrete casting form 30 for the fixing unit 70 described later is placed on the leveling concrete 20.

本実施形態の据付方法の特徴として、均しコンクリート20の上に型枠30を配置したら、図1(c)に示すように、型枠30の上縁にアンカーフレーム据付治具(以下、単に据付治具100と称する)を設置する。そして、据付治具100にアンカーフレーム600を吊り下げた状態で支持させる。   As a feature of the installation method of the present embodiment, when the formwork 30 is disposed on the leveling concrete 20, as shown in FIG. 1 (c), an anchor frame installation jig (hereinafter simply referred to as an anchor frame installation jig) Install jig 100). Then, the anchor frame 600 is supported by the mounting jig 100 in a suspended state.

図3は、第1実施形態にかかる据付治具100を説明する図である。図3に示すように、本実施形態の据付治具100は、梁110および支持部120を含んで構成される。梁110は、断面がL字状のアングル材によって構成され、型枠30(図1(c)参照)の上端に渡される。本実施形態では、2つの梁110は、それらの間に設けられる第1連結部130aおよび第2連結部130bによって連結されている。支持部120は、梁110の中央部に接続され、アンカーフレーム600(図1(c)参照)を吊下げて支持する。   FIG. 3 is a view for explaining the installation jig 100 according to the first embodiment. As shown in FIG. 3, the installation jig 100 of the present embodiment is configured to include the beam 110 and the support portion 120. The beam 110 is formed of an angled member having an L-shaped cross section, and is passed to the upper end of the formwork 30 (see FIG. 1C). In the present embodiment, the two beams 110 are connected by a first connecting portion 130a and a second connecting portion 130b provided therebetween. The support portion 120 is connected to the central portion of the beam 110 and suspends and supports the anchor frame 600 (see FIG. 1C).

本実施形態では、梁110には、長手方向に延びて後述する連結ボルト230(図4参照)が挿通される連結穴112が形成されている。また第1連結部130aおよび第2連結部130bには、主脚材40(図2(c)参照)の水平方向(回転方向)の位置合わせに用いられるポンチマーク132が形成されている。なお、これらについては後に詳述する。   In the present embodiment, the beam 110 is formed with a connection hole 112 which extends in the longitudinal direction and into which a connection bolt 230 (see FIG. 4) described later is inserted. Further, punch marks 132 used for alignment in the horizontal direction (rotational direction) of the main leg member 40 (see FIG. 2C) are formed on the first connecting portion 130a and the second connecting portion 130b. These will be described in detail later.

図4は、据付治具100の型枠30への固定について説明する図である。図5は、図1(c)の斜視図である。本実施形態では、据付治具100は、図4に示す円弧状の連結部材200によって梁110が型枠30に固定される。連結部材200は、連結プレート210、固定ボルト220および連結ボルト230を含んで構成される。連結プレート210は、型枠30の上縁に固定されるプレート状の部材であり、円弧状の長穴212が形成されている。固定ボルト220は、連結プレート210を型枠30に固定するボルトである。連結ボルト230は、連結プレート210の長穴212に挿通されるボルトであり、連結プレート210と梁110とを連結する。   FIG. 4 is a view for explaining fixing of the installation jig 100 to the form 30. FIG. 5 is a perspective view of FIG. 1 (c). In the present embodiment, in the installation jig 100, the beam 110 is fixed to the formwork 30 by the arc-shaped connecting member 200 shown in FIG. The connection member 200 includes a connection plate 210, a fixing bolt 220 and a connection bolt 230. The connection plate 210 is a plate-like member fixed to the upper edge of the form 30, and an arc-shaped long hole 212 is formed. The fixing bolt 220 is a bolt for fixing the connection plate 210 to the mold 30. The connection bolt 230 is a bolt inserted into the long hole 212 of the connection plate 210, and connects the connection plate 210 and the beam 110.

型枠30に据付治具100を取り付ける際には、まず連結部材200を型枠30に取り付ける。詳細には、固定ボルト220によって連結プレート210を型枠30の上縁に固定した後に、連結プレート210上に据付治具100の梁110を載置する。その後、連結ボルト230を梁110の連結穴112および連結プレート210の長穴212に挿通し、それらを連結する。   When attaching the installation jig 100 to the formwork 30, first, the connecting member 200 is attached to the formwork 30. Specifically, after the connection plate 210 is fixed to the upper edge of the mold 30 by the fixing bolt 220, the beam 110 of the mounting jig 100 is placed on the connection plate 210. Thereafter, the connecting bolt 230 is inserted into the connecting hole 112 of the beam 110 and the elongated hole 212 of the connecting plate 210 to connect them.

上記構成によれば、連結部材200を介して据付治具100が型枠30の上縁に固定される。これにより、C型万力等の固定具を必要とすることなく、据付治具100を型枠30に固定することが可能となる。したがって、型枠30への据付治具100の取付作業を容易に行うことができる。   According to the above configuration, the installation jig 100 is fixed to the upper edge of the mold 30 through the connecting member 200. As a result, the installation jig 100 can be fixed to the formwork 30 without requiring a fixing tool such as a C-type vise. Therefore, the installation work of the installation jig 100 to the formwork 30 can be easily performed.

上述したように型枠30に固定した据付治具100の支持部120にアンカーフレームを取り付けることにより、図1(c)および図5に示すように、アンカーフレーム600は梁110に吊り下げられた状態で据付治具100に支持される。なお、後にアンカーフレーム600の位置決めを行うため、この段階では、まだ連結ボルト230は少しゆるめに手締めしておくとよい。   By attaching the anchor frame to the support portion 120 of the installation jig 100 fixed to the formwork 30 as described above, the anchor frame 600 is suspended from the beam 110 as shown in FIG. 1 (c) and FIG. 5. It is supported by the installation jig 100 in the state. In order to position the anchor frame 600 later, the connection bolt 230 may still be slightly tightened by hand at this stage.

次に、据付治具100を用いてアンカーフレーム600の位置決めを行う。アンカーフレーム600の位置決めでは、まず図2(a)に示すように、ポンチマーク132(図2参照)が所定の位置、すなわち鉄塔の塔心(不図示)を向く位置に配置されるように据付治具100の梁110を水平方向に回転させる。この作業によりポンチマーク132が所定の位置に配置されるとアンカーフレーム600の水平方向が調整される。   Next, the anchor frame 600 is positioned using the mounting jig 100. In the positioning of the anchor frame 600, first, as shown in FIG. 2A, the punch mark 132 (see FIG. 2) is installed at a predetermined position, that is, a position facing the tower center (not shown) of the steel tower. The beam 110 of the jig 100 is rotated in the horizontal direction. By this operation, when the punch mark 132 is placed at a predetermined position, the horizontal direction of the anchor frame 600 is adjusted.

このとき特に本実施形態では、連結プレート210に長穴212を設けている。これにより、連結穴112に連結ボルト230が挿通された状態で梁110を回転させることにより、長穴212の範囲内において梁110ひいてはアンカーフレーム600の位置を調整することができる。また本実施形態においては、連結ボルト230が挿通される連結穴112は長手方向に延びている。これにより、梁110を長手方向にスライドさせることで、据付治具100に支持されているアンカーフレーム600の位置を調整することが可能である。   At this time, particularly in the present embodiment, the connecting plate 210 is provided with the elongated holes 212. Thus, by rotating the beam 110 in a state where the connection bolt 230 is inserted into the connection hole 112, the position of the beam 110 and hence the anchor frame 600 can be adjusted within the range of the elongated hole 212. Further, in the present embodiment, the connection hole 112 through which the connection bolt 230 is inserted extends in the longitudinal direction. Thus, by sliding the beam 110 in the longitudinal direction, it is possible to adjust the position of the anchor frame 600 supported by the installation jig 100.

据付治具100によってアンカーフレーム600を位置決めしたら、連結ボルト230を締めて据付治具100および連結部材200を固定する。そして、図2(b)に示すように、定着用コンクリート32(ハッチングにて図示)を型枠30内に打設する。なお、好ましくは、定着用コンクリート32を打設する前にアンカーフレーム600の下部を番線134などによって躯体鉄筋14またはフープ筋12(図1参照)に固定するとよい。これにより、定着用コンクリート32を打設した際の圧力によるアンカーフレーム600の揺れを好適に防ぐことができる。   After the anchor frame 600 is positioned by the mounting jig 100, the connecting bolt 230 is tightened to fix the mounting jig 100 and the connecting member 200. Then, as shown in FIG. 2B, fixing concrete 32 (shown by hatching) is placed in the formwork 30. Preferably, the lower part of the anchor frame 600 is fixed to the reinforcing bar 14 or the hoop reinforcement 12 (see FIG. 1) by the number wire 134 or the like before placing the fixing concrete 32. Thereby, shaking of anchor frame 600 by pressure at the time of putting setting concrete 32 for fixing can be prevented suitably.

定着用コンクリート32が硬化後、据付治具100および型枠30を撤去することにより、図2(c)に示すように定着部70が形成される。定着部70が形成されたら、アンカーフレーム600への主脚材40の据付を行う。詳細には、図2(c)に示すように、アンカーフレーム600にナット42によって主脚材40を据え付ける。その後、定着部70の周囲を埋設材80によって埋設することにより、アンカーフレーム600ひいては基礎杭18への主脚材40の据付作業が完了する。   After the fixing concrete 32 is hardened, the fixing jig 70 and the formwork 30 are removed to form a fixing unit 70 as shown in FIG. 2C. After the fixing unit 70 is formed, the main leg 40 is installed on the anchor frame 600. Specifically, as shown in FIG. 2 (c), the main leg 40 is installed on the anchor frame 600 by the nut 42. Thereafter, by embedding the periphery of the fixing portion 70 with the embedding material 80, the installation work of the main leg 40 to the anchor frame 600 and the foundation pile 18 is completed.

上記説明したように、本実施形態の据付方法では、定着部70のコンクリート打設用の型枠30、およびその上縁に設置される据付治具100を用いてアンカーフレーム600ひいては主脚材40の据付を行う。したがって、従来工法において用いられていた据付架台が不要となるため、据付架台の運搬および組立に費やしていた労力を削減することができ、据付作業にかかる労力を大幅に軽減することができる。   As described above, in the installation method of the present embodiment, the anchor frame 600 and thus the main leg member 40 are formed using the form 30 for placing concrete for the fixing portion 70 and the installation jig 100 installed at the upper edge thereof. Install the Therefore, since the installation stand currently used in the conventional construction method becomes unnecessary, the effort spent for conveyance and assembly of an installation stand can be reduced, and the effort concerning installation work can be reduced significantly.

また据付治具100によってアンカーフレーム600の位置決めを行うことができるため、アンカーフレーム600を基礎杭18に据え付ける際の位置決め精度を高めることができる。更に本実施形態の据付治具100は構造が簡素であるため、治具にかかるコストを削減することができ、且つ従来の据付架台よりも大幅な軽量化を図ることが可能である。   Further, since the anchor frame 600 can be positioned by the mounting jig 100, the positioning accuracy when the anchor frame 600 is installed on the foundation pile 18 can be enhanced. Furthermore, since the installation jig 100 of the present embodiment has a simple structure, the cost for the jig can be reduced, and the weight can be significantly reduced as compared with the conventional installation stand.

図6は、型枠30への据付治具100の固定方法の他の例を説明する図である。図4に示すように、上述した実施形態では円弧状の連結部材200を用いて据付治具100を型枠30に固定する構成を例示した。これに対し、図6に示す例では、C型万力60を用いて据付治具100を型枠30に固定する。かかる構成によれば、一般に用いられているC型万力60を利用することができ、連結部材200のような専用の部品を必要とすることがない。したがって、専用の部品を作製するコストを削減し、汎用性を高めることが可能となる。   FIG. 6 is a view for explaining another example of the method of fixing the installation jig 100 to the mold 30. As shown in FIG. As shown in FIG. 4, in the embodiment described above, the configuration in which the installation jig 100 is fixed to the mold 30 using the arc-shaped connecting member 200 has been exemplified. On the other hand, in the example shown in FIG. 6, the installation jig 100 is fixed to the mold 30 using a C-type vise 60. According to such a configuration, a commonly used C-type vise 60 can be used, and a dedicated part such as the connection member 200 is not required. Therefore, the cost of producing a dedicated part can be reduced, and versatility can be improved.

なお、上記説明した第1実施形態では、一般的な基礎杭18に主脚材40を据え付ける構成を例示したが、これに限定するものではない。本実施形態の主脚材据付方法および主脚材据付治具は、深礎基礎を基礎杭とする場合にも適用することが可能である。その場合、深礎基礎を形成する際に掘削孔10の内部に設置するライナープレート(不図示)を型枠30として用いてもよい。   In addition, although the structure which installs the main leg material 40 in the general foundation pile 18 was illustrated in 1st Embodiment described above, it does not limit to this. The main leg installation method and the main leg installation jig of the present embodiment can also be applied to the case where a deep foundation is used as a foundation pile. In that case, a liner plate (not shown) installed inside the drilled hole 10 may be used as the mold 30 when forming the foundation.

(第2実施形態)
図7は、第2実施形態にかかる主脚材据付方法を説明する図である。上記説明した第1実施形態の主脚材据付方法では、定着用コンクリート32を打設する前にアンカーフレーム600の下部を番線134などによって躯体鉄筋14またはフープ筋12に固定する構成を例示した(図1および図2参照)。
Second Embodiment
FIG. 7 is a view for explaining the main leg installation method according to the second embodiment. In the main leg installation method of the first embodiment described above, the configuration in which the lower portion of the anchor frame 600 is fixed to the reinforcing bar 14 or the hoop 12 by the number wire 134 etc. is illustrated before placing the fixing concrete 32 1 and 2)).

これに対し、第2実施形態の主脚材据付方法(以下、単に据付方法と称する)では、アンカーフレーム600の下部をボルト(以下、埋込ボルト300)に固定する。なお、以下の説明では、先の実施形態で説明した構成要素については、同一の符号を付すことにより説明を省略する。   On the other hand, in the main leg installation method of the second embodiment (hereinafter, referred to simply as the installation method), the lower portion of the anchor frame 600 is fixed to a bolt (hereinafter, the embedded bolt 300). In addition, in the following description, description is abbreviate | omitted by attaching | subjecting the code | symbol same about the component demonstrated by previous embodiment.

第2実施形態の据付方法では、基礎杭18にドリル等によって埋設穴(不図示)を形成する。そして、埋設穴に埋込ボルト300を挿入し、埋設穴と埋込ボルト300との隙間とをケミカルアンカーやモルタル等によって埋める。これにより、図7(a)に示すように、主脚材40を据え付ける基礎である基礎杭18に埋込ボルト300の下端が埋め込まれた状態となる。   In the installation method of the second embodiment, a buried hole (not shown) is formed in the foundation pile 18 by a drill or the like. Then, the embedded bolt 300 is inserted into the embedded hole, and the gap between the embedded hole and the embedded bolt 300 is filled with a chemical anchor, mortar or the like. Thereby, as shown to Fig.7 (a), it will be in the state by which the lower end of the embedding bolt 300 was embedded by the foundation pile 18 which is a foundation which installs the main leg material 40. As shown in FIG.

ここで図7(a)に示すように、アンカーフレーム600は、アンカーボルト604、ならびにその上端近傍および下端近傍に配置されるベースプレート602a・602bを含んで構成される。これらのうち、アンカーボルト604の下端近傍に配置されるベースプレート602bには、埋込ボルト300よりも充分に径の大きい挿通孔608が形成されている。   Here, as shown in FIG. 7A, anchor frame 600 is configured to include anchor bolt 604, and base plates 602a and 602b disposed near the upper end and the lower end thereof. Among these, in the base plate 602 b disposed in the vicinity of the lower end of the anchor bolt 604, an insertion hole 608 having a diameter sufficiently larger than the embedded bolt 300 is formed.

更に本実施形態では、アンカーフレーム600は、支持ボルト630および固定プレート632(図7(b)参照)を更に備える。支持ボルト630は、下側のベースプレート602bに取り付けられる高さ調節が可能なボルトである。固定プレート632は、下側のベースプレート602bの上面に配置されるプレートであり、ベースプレート602bの挿通孔608の径よりも大きい幅を有する。   Furthermore, in the present embodiment, the anchor frame 600 further includes a support bolt 630 and a fixing plate 632 (see FIG. 7B). The support bolt 630 is a height adjustable bolt attached to the lower base plate 602b. The fixing plate 632 is a plate disposed on the upper surface of the lower base plate 602 b and has a width larger than the diameter of the insertion hole 608 of the base plate 602 b.

図7(a)に示す据付治具100を型枠30に固定したら、据付治具100の支持部120(図3参照)にアンカーフレーム600を取り付ける。このとき第2実施形態の据付方法では、下側のベースプレート602bの挿通孔608に埋込ボルト300が挿通されるようにアンカーフレーム600を配置する。そして、図7(b)に示すように、支持ボルト630を基礎杭18に突き当て、支持部120および支持ボルト630を調節してアンカーフレーム600の高さを調整する。調整完了後、ナット634を締めて埋込みボルト300に締結する。   Once the installation jig 100 shown in FIG. 7A is fixed to the formwork 30, the anchor frame 600 is attached to the support portion 120 (see FIG. 3) of the installation jig 100. At this time, in the installation method of the second embodiment, the anchor frame 600 is disposed so that the embedded bolt 300 is inserted into the insertion hole 608 of the lower base plate 602 b. Then, as shown in FIG. 7 (b), the support bolt 630 is abutted against the foundation pile 18, and the height of the anchor frame 600 is adjusted by adjusting the support portion 120 and the support bolt 630. After the adjustment is completed, the nut 634 is tightened and fastened to the embedding bolt 300.

上記構成によれば、据付治具100に吊り下げられたアンカーフレーム600の下部が埋込ボルト300によって基礎杭18に固定される。これにより、型枠30に定着用コンクリート32を打設した際の圧力(流動圧)によるアンカーフレーム600の揺れをより好適に防ぐことができる。   According to the above configuration, the lower part of the anchor frame 600 suspended by the mounting jig 100 is fixed to the foundation pile 18 by the embedding bolt 300. Thereby, it is possible to more preferably prevent the swing of the anchor frame 600 due to the pressure (flowing pressure) when the fixing concrete 32 is placed on the formwork 30.

また上記構成によれば、アンカーフレーム600の重量(上下のベースプレート602a・602bおよびアンカーボルト604の重量)が支持ボルト630によって支持される。したがって、アンカーフレーム600を据付治具100のみで吊り下げる場合に比して、据付治具100にかかる重量ははるかに少なくなる。このため、据付治具100に要求される剛性が低くなり、据付治具100の軽量化ひいては施工作業の効率化を図ることが可能となる。   Further, according to the above configuration, the weight of anchor frame 600 (the weight of upper and lower base plates 602 a and 602 b and anchor bolt 604) is supported by support bolt 630. Therefore, compared to the case where the anchor frame 600 is suspended only by the mounting jig 100, the weight applied to the mounting jig 100 is much smaller. For this reason, the rigidity required for the installation jig 100 is lowered, and the weight reduction of the installation jig 100 can be achieved, and the efficiency of the construction work can be improved.

(第3実施形態)
図8は、第3実施形態にかかる主脚材据付方法を説明する図である。上記説明した第1実施形態および第2実施形態の主脚材据付方法では、主脚材40を据え付ける基礎として基礎杭18を例示した。これに対し、第3実施形態の主脚材据付方法(以下、単に据付方法と称する)では、主脚材40を据え付ける基礎を床板基礎とする場合について説明する。
Third Embodiment
FIG. 8 is a view for explaining the main leg installation method according to the third embodiment. In the main leg installation method of the first embodiment and the second embodiment described above, the foundation pile 18 is illustrated as a foundation on which the main leg 40 is installed. On the other hand, in the main leg installation method of the third embodiment (hereinafter, simply referred to as the installation method), a case where the base on which the main leg 40 is installed is a floor board foundation will be described.

図8(b)に示すように、主脚材40を据え付ける基礎として床板基礎(全体は不図示)を用いる場合には、鉄塔を建設する敷地内に均しコンクリート20を打設し、その上に床板基礎用の配筋610を設置する。かかる配筋610の外側には、床板基礎用のコンクリート(不図示)を打設するための型枠612が設けられる。   As shown in FIG. 8 (b), in the case of using a floor plate foundation (the whole is not shown) as a foundation for installing the main leg member 40, leveling concrete 20 is cast in the site where the steel tower is to be constructed. The floor plate foundation reinforcement 610 is installed. On the outer side of the arrangement bars 610, there is provided a formwork 612 for placing concrete (not shown) for the floor plate foundation.

第3実施形態の据付方法では、図8(b)に示す据付治具100を、図8(a)に示すように異なる面を構成する2つの型枠612に差し渡し、C型万力60を用いて型枠612に固定する。そして、型枠612に固定した据付治具100の支持部120(図3参照)にアンカーフレーム600を取り付けることにより、アンカーフレーム600は梁110に吊り下げられた状態で据付治具100に支持される。これにより、図8(a)および(c)に示すように、据付治具100を介してアンカーフレーム600が型枠612に取り付けられる。そしてアンカーフレーム600の下部のベースプレート602bは、埋込ボルト300と支持ボルト630によって固定する。このようにして、基礎として床板基礎を採用する場合においても、上述した効果を得ることが可能である。   In the installation method of the third embodiment, the installation jig 100 shown in FIG. 8 (b) is passed over two formwork 612 constituting different surfaces as shown in FIG. 8 (a), and the C-type vise 60 is It fixes to the formwork 612 using. Then, the anchor frame 600 is supported by the mounting jig 100 in a suspended state by the beam 110 by attaching the anchor frame 600 to the support portion 120 (see FIG. 3) of the mounting jig 100 fixed to the formwork 612. Ru. As a result, as shown in FIGS. 8A and 8C, the anchor frame 600 is attached to the formwork 612 via the installation jig 100. The lower base plate 602 b of the anchor frame 600 is fixed by the embedded bolt 300 and the support bolt 630. Thus, even in the case of adopting a floor board foundation as a foundation, it is possible to obtain the above-described effects.

以上、添付図面を参照しながら本発明の好適な実施形態について説明したが、本発明は係る例に限定されないことは言うまでもない。当業者であれば、特許請求の範囲に記載された範疇内において、各種の変更例または修正例に想到し得ることは明らかであり、それらについても当然に本発明の技術的範囲に属するものと了解される。   Although the preferred embodiments of the present invention have been described above with reference to the accompanying drawings, it goes without saying that the present invention is not limited to such examples. It will be apparent to those skilled in the art that various changes or modifications can be conceived within the scope of the appended claims, and of course these also fall within the technical scope of the present invention. It is understood.

本発明は、鉄塔の脚部を構成する主脚材を基礎に据え付ける主脚材据付方法、およびかかる主脚材を固定されるアンカーフレームを支持するアンカーフレーム据付治具として利用することができる。   INDUSTRIAL APPLICABILITY The present invention can be used as a main leg installation method for installing a main leg forming a leg of a steel tower on a foundation, and an anchor frame installation jig for supporting an anchor frame to which the main leg is fixed.

10…掘削孔、12…フープ筋、14…躯体鉄筋、18…基礎杭、20…均しコンクリート、30…型枠、32…定着用コンクリート、40…主脚材、42…ナット、60…C型万力、70…定着部、80…埋設材、100…据付治具、110…梁、112…連結穴、120…支持部、130a…第1連結部、130b…第2連結部、132…ポンチマーク、134…番線、200…連結部材、210…連結プレート、212…長穴、220…固定ボルト、230…連結ボルト、300…埋込ボルト、600…アンカーフレーム、602…ベースプレート、602a…ベースプレート、602b…ベースプレート、604…アンカーボルト、606…ナット、608…挿通孔、610…配筋、612…型枠、620…据付架台、630…支持ボルト、632…固定プレート、634…ナット DESCRIPTION OF SYMBOLS 10 ... Drill hole, 12 ... Hoop muscle, 14 ... Body reinforcement, 18 ... Foundation pile, 20 ... Leveling concrete, 30 ... Formwork, 32 ... Concrete for fixation, 40 ... Main leg material, 42 ... Nut, 60 ... C Type Vise 70 Fixing portion 80 Burial material 100 Installation jig 110 Beam 112 Coupling hole 120 Supporting portion 130a First coupling portion 130b Second coupling portion 132 Punch mark 134 No. wire 200 Linking member 210 Link plate 212 Long hole 220 Fixing bolt 230 Linking bolt 300 Embedded bolt 600 Anchor frame 602 Base plate 602a Base plate , 602b: base plate, 604: anchor bolt, 606: nut, 608: insertion hole, 610: arrangement bar, 612: form frame, 620: mounting base, 630: support Belt, 632 ... fixed plate, 634 ... nut

Claims (4)

鉄塔の主脚材の据付方法であって、
地中に基礎を設置し、
前記基礎の上に定着部のコンクリート打設用の型枠を設置し、
前記型枠の上縁にアンカーフレーム据付治具を設置し、
前記アンカーフレーム据付治具にアンカーフレームを吊り下げた状態で支持させ、
前記アンカーフレームを前記アンカーフレーム据付治具で位置決めし、
前記型枠内にコンクリートを打設して前記定着部を形成し、
前記アンカーフレームに前記主脚材を据え付けることを特徴とする主脚材据付方法。
The installation method of the main leg of the steel tower,
Set the foundation in the ground,
Install a concrete casting form of the anchorage on the foundation,
Install an anchor frame mounting jig at the upper edge of the formwork,
The anchor frame is supported by the anchor frame mounting jig in a suspended state,
Positioning the anchor frame with the anchor frame mounting jig;
Concrete is cast in the form to form the fixing portion;
A method of installing a main leg, comprising: installing the main leg on the anchor frame.
前記基礎を設置する際にボルトの下端を該基礎に埋め込み、
前記アンカーフレーム据付治具に吊り下げられた前記アンカーフレームの下部を前記ボルトに固定することを特徴とする請求項1に記載の主脚材据付方法。
When installing the foundation, embed the lower end of the bolt in the foundation,
The main leg installation method according to claim 1, wherein a lower portion of the anchor frame suspended by the anchor frame mounting jig is fixed to the bolt.
鉄塔の主脚材の定着部のコンクリート打設用の型枠の上端に渡される梁と、
前記梁の中央部に接続され前記アンカーフレームを吊下げて支持する支持部と、
を備えることを特徴とするアンカーフレーム据付治具。
Beams passed to the upper end of the concrete placement form of the anchorage section of the main leg of the steel tower,
A support connected to a central portion of the beam for suspending and supporting the anchor frame;
Anchor frame installation jig characterized by including.
当該アンカーフレーム据付治具は、前記梁を前記型枠に固定する連結部材を更に備え、
前記連結部材は、
円弧状の長穴が形成されたプレート状の部材であり前記型枠の上縁に固定される連結プレートと、
前記長穴に挿通される連結ボルトと、
を含み、
前記梁には、長手方向に延び前記連結ボルトが挿通される連結穴が形成されていることを特徴とする請求項3に記載のアンカーフレーム据付治具。
The anchor frame mounting jig further includes a connecting member for fixing the beam to the mold;
The connecting member is
A plate-like member in which an arc-shaped elongated hole is formed, and a connection plate fixed to the upper edge of the mold;
A connection bolt inserted into the long hole;
Including
The anchor frame mounting jig according to claim 3, wherein the beam has a connection hole extending in the longitudinal direction and through which the connection bolt is inserted.
JP2017246557A 2017-12-22 2017-12-22 Main landing gear installation method and anchor frame installation jig Active JP7059618B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2017246557A JP7059618B2 (en) 2017-12-22 2017-12-22 Main landing gear installation method and anchor frame installation jig

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2017246557A JP7059618B2 (en) 2017-12-22 2017-12-22 Main landing gear installation method and anchor frame installation jig

Publications (2)

Publication Number Publication Date
JP2019112811A true JP2019112811A (en) 2019-07-11
JP7059618B2 JP7059618B2 (en) 2022-04-26

Family

ID=67222364

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2017246557A Active JP7059618B2 (en) 2017-12-22 2017-12-22 Main landing gear installation method and anchor frame installation jig

Country Status (1)

Country Link
JP (1) JP7059618B2 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111155550A (en) * 2020-01-21 2020-05-15 中国华冶科工集团有限公司 Rapid construction method for inclined frame of vertical shaft
CN113565125A (en) * 2021-09-01 2021-10-29 上海电力设计院有限公司 Foundation bolt positioning device suitable for power transmission tower
JP2022018840A (en) * 2020-07-16 2022-01-27 東電設計株式会社 Steel tower foundation structure and construction method of the same
JP7314352B1 (en) 2022-04-11 2023-07-25 東電設計株式会社 Tower foundation structure
JP7314367B1 (en) 2022-07-25 2023-07-25 東電設計株式会社 Expanding bottom member, steel tower foundation structure, and construction method of steel tower foundation
JP7314366B1 (en) 2022-07-25 2023-07-25 東電設計株式会社 Tower foundation structure
JP7324348B1 (en) 2022-07-25 2023-08-09 東電設計株式会社 Tower foundation structure

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6058645U (en) * 1983-09-29 1985-04-24 旭化成株式会社 Anchor for fixing column bases of buildings, etc.
JPH10317391A (en) * 1997-05-16 1998-12-02 Tohoku Electric Power Co Inc Foundation structure for steel tower and method for constructing the same
JP2005220712A (en) * 2004-02-09 2005-08-18 Ohbayashi Corp Exposed steel type pedestal structure
JP2006002415A (en) * 2004-06-17 2006-01-05 Nippon Steel Corp Anchor bolt installing method and anchor bolt installing device of steel pipe foundation pile
JP2012052389A (en) * 2010-09-03 2012-03-15 Sumikin System Buildings Corp Anchor bolt installation jig and method for constructing pile foundation by using the same
JP2016030993A (en) * 2014-07-30 2016-03-07 日栄インテック株式会社 Pile and support stand
JP2017002634A (en) * 2015-06-12 2017-01-05 菱中産業株式会社 Pile head joint structure

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6058645U (en) * 1983-09-29 1985-04-24 旭化成株式会社 Anchor for fixing column bases of buildings, etc.
JPH10317391A (en) * 1997-05-16 1998-12-02 Tohoku Electric Power Co Inc Foundation structure for steel tower and method for constructing the same
JP2005220712A (en) * 2004-02-09 2005-08-18 Ohbayashi Corp Exposed steel type pedestal structure
JP2006002415A (en) * 2004-06-17 2006-01-05 Nippon Steel Corp Anchor bolt installing method and anchor bolt installing device of steel pipe foundation pile
JP2012052389A (en) * 2010-09-03 2012-03-15 Sumikin System Buildings Corp Anchor bolt installation jig and method for constructing pile foundation by using the same
JP2016030993A (en) * 2014-07-30 2016-03-07 日栄インテック株式会社 Pile and support stand
JP2017002634A (en) * 2015-06-12 2017-01-05 菱中産業株式会社 Pile head joint structure

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111155550A (en) * 2020-01-21 2020-05-15 中国华冶科工集团有限公司 Rapid construction method for inclined frame of vertical shaft
JP2022018840A (en) * 2020-07-16 2022-01-27 東電設計株式会社 Steel tower foundation structure and construction method of the same
JP7133588B2 (en) 2020-07-16 2022-09-08 東電設計株式会社 Steel tower foundation structure and its construction method
CN113565125A (en) * 2021-09-01 2021-10-29 上海电力设计院有限公司 Foundation bolt positioning device suitable for power transmission tower
JP7314352B1 (en) 2022-04-11 2023-07-25 東電設計株式会社 Tower foundation structure
JP2023155824A (en) * 2022-04-11 2023-10-23 東電設計株式会社 Steel tower foundation structure
JP7314367B1 (en) 2022-07-25 2023-07-25 東電設計株式会社 Expanding bottom member, steel tower foundation structure, and construction method of steel tower foundation
JP7314366B1 (en) 2022-07-25 2023-07-25 東電設計株式会社 Tower foundation structure
JP7324348B1 (en) 2022-07-25 2023-08-09 東電設計株式会社 Tower foundation structure
JP2024015912A (en) * 2022-07-25 2024-02-06 東電設計株式会社 Steel tower foundation structure
JP2024015910A (en) * 2022-07-25 2024-02-06 東電設計株式会社 Steel tower foundation structure
JP2024015911A (en) * 2022-07-25 2024-02-06 東電設計株式会社 Bottom expansion member, steel tower foundation structure, and construction method of steel tower base

Also Published As

Publication number Publication date
JP7059618B2 (en) 2022-04-26

Similar Documents

Publication Publication Date Title
JP2019112811A (en) Main leg installation method and anchor frame installation jig
JP4732915B2 (en) Foundation construction method and device, and anchor bolt support device for construction
JP6635767B2 (en) How to install the main landing gear on the deep foundation
JP2005226937A (en) Construction method of geothermal heat exchange pipe unit
JP4160581B2 (en) Anchor bolt position retaining bracket and position fixing structure, and steel column construction method using the same
JP4884117B2 (en) Column and steel pipe pile positioning device and positioning method
JP3764557B2 (en) Construction method of steel plate concrete turbine mount
JP2011074632A (en) Unit structure of anchor bolt used for construction of foundation for equipment, and method of construction of foundation for equipment using the unit structure
JP2008267030A (en) Method and device for supporting anchor bolt for building structure
JP2015101823A (en) Positioning member and erection method
JP2019090266A (en) Installation method of main leg material and installation jig of main leg material
JP6257210B2 (en) Pile installation jig and pile installation method
JP2012067441A (en) Installation method for anchor bolt
JP2007002606A (en) Supporting device for anchor bolt
JP2021195834A (en) Column base anchor structure, trestle, and design method for column base anchor structure
JP2006183266A (en) Building construction of seismically isolated structure by laminated-rubber bearing
JP6127325B2 (en) Support frame for anchor ring installation of windmill tower and manufacturing method thereof
JP2015055079A (en) Anchor frame, and method for constructing anchor structure using the anchor frame
JPH09125415A (en) Foundation base for equipment devices
WO2024047878A1 (en) Anchor bolt setting jig, and anchor bolt setting method
JP7288390B2 (en) Foundation construction method and foundation
JP5766828B2 (en) Method for installing solar cell module installation stand and solar cell module installation stand
JP7219574B2 (en) Plumbing adjustment jig and plumbing adjustment method
JP6121169B2 (en) Steel column straightening method
JP7181069B2 (en) Reversed strut positioning jig

Legal Events

Date Code Title Description
RD03 Notification of appointment of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7423

Effective date: 20180413

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20201111

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20210917

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20211005

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20211117

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20220315

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20220328

R150 Certificate of patent or registration of utility model

Ref document number: 7059618

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150