WO2024047878A1 - Anchor bolt setting jig, and anchor bolt setting method - Google Patents

Anchor bolt setting jig, and anchor bolt setting method Download PDF

Info

Publication number
WO2024047878A1
WO2024047878A1 PCT/JP2022/033181 JP2022033181W WO2024047878A1 WO 2024047878 A1 WO2024047878 A1 WO 2024047878A1 JP 2022033181 W JP2022033181 W JP 2022033181W WO 2024047878 A1 WO2024047878 A1 WO 2024047878A1
Authority
WO
WIPO (PCT)
Prior art keywords
support
anchor bolt
positioning tool
foundation
formwork
Prior art date
Application number
PCT/JP2022/033181
Other languages
French (fr)
Japanese (ja)
Inventor
健太郎 兼安
岳 中村
早智 秋田
和希 市川
敏之 長田
Original Assignee
積水ハウス株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 積水ハウス株式会社 filed Critical 積水ハウス株式会社
Priority to GBGB2318811.3A priority Critical patent/GB202318811D0/en
Priority to AU2022459562A priority patent/AU2022459562A1/en
Priority to PCT/JP2022/033181 priority patent/WO2024047878A1/en
Publication of WO2024047878A1 publication Critical patent/WO2024047878A1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/41Connecting devices specially adapted for embedding in concrete or masonry
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/18Adjusting tools; Templates

Definitions

  • the present disclosure relates to an anchor bolt installation jig and an anchor bolt installation method for anchor bolts installed on the foundation of a building.
  • Anchor bolts may be installed in the foundation of a building. Anchor bolts are provided on the foundation to connect the building body and the foundation. Anchor bolts are placed in place in the foundation.
  • an extension member is attached to the head of each of a plurality of anchor bolts. Then, the anchor bolt is positioned by a positioning tool (template in the document).
  • a builder may be involved in multiple construction properties.
  • positioning tools will need to be set at each site.
  • the builder needs to prepare a plurality of sets of positioning tools in advance. Maintaining an inventory of a large number of positioning fixture sets poses an administrative burden to the builder.
  • An anchor bolt installation jig that solves the above problem is an anchor bolt installation jig that installs an anchor bolt on a foundation, and includes a support for supporting the anchor bolt, and a positioning of the support with respect to the foundation. and a positioning tool, the positioning tool being configured such that the plurality of supports are temporarily assembled to the positioning tool.
  • the positioning tool after temporarily assembling the plurality of supports to the positioning tool at predetermined positions, the positioning tool can be placed in the formwork with the plurality of supports temporarily assembled. Therefore, the plurality of supports can be fixed to the formwork in a state where the positional relationship between the plurality of supports is defined. Then, the positioning tool can be removed from the plurality of supports fixed to the formwork. Therefore, the removed positioning tool can be reused. For this reason, the inventory of anchor bolt installation jigs can be reduced.
  • the support includes a fixing part fixed to the formwork of the foundation to be constructed, and extending from the fixing part to support the anchor bolt.
  • a support part the support part has an anchor hole through which the anchor bolt is inserted, and a first engagement part in which a temporary assembly member for temporarily assembling the support tool and the positioning tool engages.
  • the positioning tool has a second engaging part with which the temporary assembly member engages, and a reference part that determines the position of the positioning tool with respect to the foundation. According to this configuration, the supporting tool can be positioned with respect to the positioning tool using the temporary assembly member.
  • the anchor hole of the support is configured to also serve as the first engaging portion.
  • the support can be configured to have a simple structure.
  • the fixing part includes a fixing body part fixed to the formwork and an edge of the fixing body part. and a connecting portion extending upward from the fixing body portion and connecting the fixed main body portion and the supporting portion. According to this configuration, a gap can be left between the upper surface of the concrete and the support part in a state where the concrete is placed in the formwork. Therefore, the upper surface of the concrete under the support part can be easily leveled with a trowel.
  • the fixing part has a temporary fixing part that is temporarily fixed to the formwork.
  • the positioning tool in which the supporting tool is temporarily assembled, is placed at a predetermined position with respect to the foundation, the supporting tool can be temporarily fixed to the formwork. Therefore, after arranging the positioning tool with the support temporarily assembled at a predetermined position, the operator can adjust the position of the support without supporting the positioning tool.
  • An anchor bolt installation method that solves the above problems is an anchor bolt installation method in which the anchor bolt is installed in the formwork of the foundation, and the method includes temporarily assembling a plurality of supports supporting the anchor bolts to a positioning tool. a second step of arranging the positioning tool in which the supports are temporarily assembled so that the plurality of supports are arranged at predetermined positions with respect to the foundation; and a second step of placing the plurality of supports on the foundation. and a fourth step of removing the positioning tool from the support tool.
  • the positioning tool can be reused after the support tool is fixed to the formwork.
  • the positioner can be taken to other sites.
  • multiple positioning tools were required to install multiple anchor bolts on the foundation, but with this technology, the positioning tools can be removed from the support immediately after the support is installed. Therefore, the number of positioning tools used at one site can be reduced.
  • the support includes a fixing part fixed to the formwork and a support part extending from the fixing part and supporting the anchor bolt.
  • the support part has an anchor hole through which the anchor bolt is inserted, and a first engagement part in which a temporary assembly member for temporarily assembling the support and the positioning tool engages, has a second engaging portion with which the temporary assembly member engages, and a reference portion that determines the position of the positioning tool with respect to the foundation.
  • the support tool can be positioned at a predetermined position with respect to the positioning tool using the temporary assembly member.
  • the inventory of anchor bolt installation jigs can be reduced.
  • FIG. 3 is a plan view of a positioning tool for an anchor bolt installation jig.
  • FIG. 3 is a plan view of a temporarily assembled positioning tool.
  • FIG. 3 is a layout diagram of a temporary assembly positioning tool with respect to a foundation.
  • FIG. 3 is a perspective view of a support with anchor bolts attached.
  • FIG. 2 is a cross-sectional view of the ground immediately before anchor bolts are placed during foundation construction.
  • FIG. 2 is a sectional view of the ground and formwork in the first step of the anchor bolt installation method.
  • FIG. 2 is a sectional view of the ground and formwork in the second step of the anchor bolt installation method.
  • FIG. 7 is a sectional view of the ground and formwork in the third step of the anchor bolt installation method. It is a sectional view of the ground and formwork when the anchor bolt is attached to the support after the fourth step of the anchor bolt installation method.
  • FIG. 2 is a cross-sectional view of the ground and formwork when concrete is poured into the formwork.
  • FIG. 7 is a perspective view of a modification of the support.
  • anchor bolt installation jig The anchor bolt installation jig 10 will be explained with reference to FIGS. 1 to 11.
  • the anchor bolt 1 is provided to the foundation 3 of the building to be constructed.
  • “with respect to the foundation 3 to be constructed” will simply be written as “with respect to the foundation 3.” Therefore, the description "with respect to the foundation 3” shown below means “with respect to the foundation 3 to be constructed.” Specifically, “with respect to the foundation 3 to be constructed” means “with respect to the reference line L of the foundation 3 to be constructed.”
  • the anchor bolt installation jig 10 is a jig for installing the anchor bolt 1 on the foundation 3 of a building.
  • the foundation 3 is composed of concrete 4 and reinforcing bars 5. Furthermore, the foundation 3 is provided with an anchor bolt 1.
  • the foundation 3 is formed by pouring concrete 4 into the formwork 2.
  • the formwork 2 is composed of frame plates 2A.
  • the frame board 2A is installed so as to surround the outer periphery of the foundation 3 to be constructed.
  • the frame board 2A is supported on the ground 7 by support rods 2C (see FIG. 6).
  • the example of the foundation 3 to which the anchor bolt installation jig 10 is applied is not limited.
  • Examples of the foundation 3 include a solid foundation and a cloth foundation.
  • the anchor bolt installation jig 10 shown in this embodiment can be suitably used for a solid foundation.
  • the formwork 2 corresponding to the rising part of the cloth foundation includes two frame plates 2A installed parallel to each other. Therefore, the anchor bolt 1 placed between the two frame plates 2A can be supported by a support member supported by the two frame plates 2A.
  • the frame board 2A is installed so as to surround the foundation 3. Therefore, the support 20 that supports the anchor bolt 1 is fixed to the frame plate 2A in a cantilevered state (see FIGS. 5 and 9).
  • the anchor bolt installation jig 10 according to this embodiment can be suitably used to arrange the support 20 supported by the frame plate 2A in a cantilevered manner at a predetermined position.
  • the anchor bolt 1 is provided so that a part of the anchor bolt 1 is exposed from the upper surface 3A of the foundation 3 (see FIG. 11). A portion 1B of the anchor bolt 1 other than the exposed portion 1A is buried in concrete 4 constituting the foundation 3. The exposed portion 1A of the anchor bolt 1 is coupled to a pillar of the building body erected on the foundation 3.
  • the anchor bolt 1 is installed along the outer periphery of the foundation 3.
  • the anchor bolts 1 are installed so as to be located inside the formwork 2 in a step after the formwork 2 of the foundation 3 is installed and before concrete 4 is poured into the formwork 2.
  • Anchor bolt installation jig 10 is used to install anchor bolt 1 at this stage. The configuration of the anchor bolt installation jig 10 will be described below.
  • the anchor bolt installation jig 10 includes a support 20 that supports the anchor bolt 1 and a positioning tool 30 (see FIG. 3).
  • a first direction D1 the direction along the formwork 2
  • a second direction D2 the direction orthogonal to the first direction D1
  • the support 20 will be explained with reference to FIG.
  • the support 20 has a fixing part 21 fixed to the formwork 2 and a support part 25.
  • the fixed part 21 has a fixed main body part 22.
  • the fixed main body part 22 is fixed to the formwork 2.
  • the fixed main body portion 22 is arranged on the upper surface 2B of the formwork 2.
  • the width of the fixed body portion 22 is equal to or shorter than the width of the formwork 2.
  • the fixed main body portion 22 has a plurality of screw holes 24.
  • the screw hole 24 is formed into a long hole.
  • the screw hole 24 extends in the second direction D2 when the fixed main body portion 22 is placed on the upper surface 2B of the formwork 2. Since the screw hole 24 is a long hole, the position of the support 20 with respect to the formwork 2 can be adjusted in the second direction D2.
  • the fixing part 21 may further include a connecting part 23.
  • the connecting portion 23 connects the fixed main body portion 22 and the support portion 25.
  • the connecting portion 23 may be omitted.
  • the support part 25 is directly connected to the fixed body part 22.
  • the fixed main body portion 22, the support portion 25, and the connecting portion 23 are integrally configured.
  • the fixed main body portion 22, the support portion 25, and the connecting portion 23 are integrally formed by sheet metal press working.
  • the connecting portion 23 extends upward from the end of the fixed main body portion 22 in the second direction D2.
  • the connecting portion 23 is provided for the following purpose.
  • the concrete 4 may be poured to the same height as the upper surface 2B of the formwork 2.
  • a connecting part 23 is provided on the support 20 so that a gap S is left between the upper surface 4A of the concrete 4 and the support part 25.
  • the height of the connecting portion 23 is set so that a trowel for leveling the concrete 4 can fit into the gap S.
  • the height H of the connecting portion 23 is also a factor that determines the height of the exposed portion 1A of the anchor bolt 1 exposed from the concrete 4.
  • the support portion 25 supports the anchor bolt 1.
  • the support portion 25 extends from the fixed portion 21 .
  • the support portion 25 extends from the upper end of the connecting portion 23 in parallel to the fixed main body portion 22.
  • the support portion 25 extends on the side opposite to the fixed main body portion 22 with respect to the connecting portion 23.
  • the support portion 25 has an anchor hole 26 through which the anchor bolt 1 is inserted.
  • the support portion 25 is provided with four anchor holes 26 and an anchor reference portion 27.
  • the four anchor holes 26 are arranged at positions equidistant from the anchor reference portion 27. Further, the four anchor holes 26 are arranged so that the shape formed by the four anchor holes 26 is a square.
  • the anchor reference portion 27 is also used as a mark indicating the reference position of the support 20.
  • the anchor reference portion 27 is used to adjust the position of the support 20 after the support 20 is fixed to the formwork 2.
  • the anchor reference portion 27 is used as a reference position for the support 20 when checking the positional deviation between the reference line L (for example, a water line) stretched over the foundation 3 and the support 20.
  • the anchor reference portion 27 is configured as a hole, a depression, or an engraved mark passing through the support portion 25 .
  • the anchor reference portion 27 is configured to have a size that can be visually observed.
  • the support portion 25 further includes a first engagement portion 28.
  • the first engaging portion 28 is a portion with which the temporary assembly member 29 engages.
  • the temporary assembly member 29 is a member for temporarily assembling the support tool 20 and the positioning tool 30.
  • the temporary assembly member 29 is, for example, a bolt 29A (see FIG. 7).
  • Another example of the temporary assembly member 29 is a wedge-shaped pin.
  • the wedge-shaped pin is also called ⁇ Shino''.
  • the first engaging portion 28 is configured as a through hole into which the bolt 29A is inserted, for example.
  • the anchor hole 26 is configured to also serve as the first engaging portion 28.
  • the positioning tool 30 will be explained with reference to FIGS. 2 and 3.
  • the positioning tool 30 is a tool for positioning the support tool 20 with respect to the foundation 3. Specifically, the positioning tool 30 positions the plurality of supports 20 with respect to a reference line L (for example, a water line) stretched during construction of the foundation 3.
  • a reference line L for example, a water line
  • the positioning tool 30 is composed of a long plate. When using the positioning tool 30, the positioning tool 30 is placed along the formwork 2.
  • the positioning tool 30 has a first end 30A extending in the longitudinal direction of the positioning tool 30.
  • the first end 30A extends in a straight line.
  • the positioning tool 30 has a first end 30A and a second end 30B opposite to the first end 30A.
  • the second end 30B extends parallel to the first end 30A.
  • the positioning tool 30 is configured such that a plurality of supports 20 are temporarily assembled at predetermined positions of the positioning tool 30.
  • the positioning tool 30 has a plurality of temporary assembly parts 31.
  • the temporary assembly portion 31 is a portion where the support 20 is temporarily assembled.
  • the plurality of temporary assembly parts 31 are provided at predetermined intervals in the longitudinal direction of the positioning tool 30. In one example, the plurality of temporary assembly parts 31 are provided at equal intervals.
  • the temporary assembly portion 31 is configured to have a size that allows the entire support portion 25 of the support tool 20 to come into contact with it.
  • the positioning tool 30 has a second engaging part 32 with which the temporary assembly member 29 engages, and a reference part 33 that determines the position of the positioning tool 30 with respect to the foundation 3.
  • the temporary assembly member 29 is the bolt 29A or a wedge-shaped pin as described above.
  • the second engaging portion 32 is configured as a through hole into which the bolt 29A is inserted.
  • the second engaging portion 32 and the reference portion 33 are provided in the temporary assembly portion 31.
  • the plurality of second engaging portions 32 are configured in the same manner as the plurality of first engaging portions 28.
  • the anchor hole 26 also serves as the first engaging portion 28.
  • the temporary assembly portion 31 is similarly provided with four second engaging portions 32.
  • the arrangement of the four second engaging portions 32 is the same as the arrangement of the four anchor holes 26 of the support 20.
  • the four second engaging parts 32 are arranged so that the shape formed by the four second engaging parts 32 is a square.
  • the support tool 20 is placed under the positioning tool 30. Specifically, the support 20 is arranged so that the support part 25 of the support 20 contacts the temporary assembly part 31 on the lower surface of the positioning tool 30. At this time, the support 20 is arranged on the positioning tool 30 so that the four first engaging parts 28 and the four second engaging parts 32 overlap each other. Then, the bolt 29A is inserted into the communication hole between the first engaging part 28 and the second engaging part 32. The support 20 is temporarily assembled to the positioning tool 30 by attaching the nut 29B to the bolt 29A and tightening the nut 29B.
  • the reference portion 33 of the positioning tool 30 is used as a reference position of the positioning tool 30.
  • the reference part 33 is used when positioning the positioning tool 30 with respect to a reference line L (for example, a water line) stretched against the foundation 3 after the positioning tool 30 is placed on the formwork 2. , is used as a reference position for the positioning tool 30.
  • a reference line L for example, a water line
  • the reference part 33 is arranged at a position equidistant from the four second engaging parts 32.
  • the reference portion 33 is configured as a through hole passing through the positioning tool 30.
  • the reference portion 33 is configured to have a size that allows the anchor reference portion 27 of the support tool 20 to be visually recognized through the through hole serving as the reference portion 33 in a state where the positioning tool 30 and the support tool 20 are temporarily assembled.
  • the positioning tool 30 may be provided with a hole 34 for weight reduction.
  • the hole 34 is provided between the two temporary assembly parts 31.
  • the positioning tool 30 may have a notch configured to cut out the second end 30B instead of the hole 34.
  • the support 20 is first temporarily assembled to the positioning tool 30.
  • the operator attaches the support 20 to a predetermined position on the formwork 2 using the positioning tool 30 on which the support 20 is temporarily assembled.
  • a reference line L (for example, a water line) is stretched to indicate the position where the anchor bolt 1 is installed.
  • the reference line L includes a first reference line L1 and a second reference line L2.
  • the second reference line L2 is drawn perpendicular to the first reference line L1.
  • the intersection P is located near the outgoing corner of the foundation 3 or near the incoming corner of the foundation 3.
  • the positioning tool 30 with the support 20 temporarily assembled is such that the reference part 33 of the positioning tool 30 overlaps the intersection P of the first reference line L1 and the second reference line L2, and The plurality of reference parts 33 on the tool 30 are arranged so as to be located on the first reference line L1. Then, the plurality of supports 20 temporarily fixed to the positioning tool 30 are arranged at predetermined positions with respect to the foundation 3.
  • the support 20 placed at a predetermined position is fixed to the frame plate 2A with screws 6. Further, the positioning tool 30 is removed from the support tool 20 fixed by the screws 6.
  • the anchor bolt 1 is attached to the support 20 fixed in this way. Since the support 20 is arranged at a predetermined position with respect to the foundation 3, the anchor bolt 1 can be placed at a predetermined position with respect to the foundation 3 simply by inserting the anchor bolt 1 into the support 20.
  • the anchor bolt installation method shows a method of installing the anchor bolt 1 in the formwork 2 of the foundation 3.
  • the anchor bolt installation method is used in the construction of foundation 3.
  • FIG. 6 shows the formwork 2 installed on the ground 7.
  • a groove 8 is provided in the ground 7.
  • the formwork 2 is installed so as to surround the foundation 3 to be constructed.
  • the formwork 2 is arranged outside the groove 8 and along the groove 8.
  • the reinforcing bars 5 are provided along the grooves 8. Further, the reinforcing bars 5 are arranged over the entire surface of the ground 7 where the foundation 3 is provided.
  • the anchor bolt installation method includes at least first to fourth steps.
  • a plurality of supports 20 are temporarily assembled into a positioning tool 30.
  • the plurality of supports 20 are arranged under the positioning tool 30 (see FIGS. 3 and 7).
  • the support 20 is arranged so that the support part 25 of the support 20 contacts the temporary assembly part 31 on the lower surface of the positioning tool 30.
  • the four first engaging parts 28 and the four second engaging parts 32 are arranged so as to overlap each other (see FIG. 3). Then, as described above, the positioning tool 30 and the support tool 20 are temporarily assembled.
  • a positioning tool 30 (hereinafter referred to as a temporarily assembled positioning tool 30X) in which the supports 20 are temporarily assembled is arranged so that the plurality of supports 20 are arranged at predetermined positions with respect to the foundation 3.
  • the temporary assembly positioning tool 30X is positioned with respect to a reference line L stretched on the ground 7 on which the foundation 3 is provided (see FIG. 4).
  • a reference line L (for example, a water line) is stretched on the ground 7 on which the foundation 3 is provided.
  • the first reference line L1 is stretched along the formwork 2 and apart from the formwork 2 by a predetermined distance in the second direction D2.
  • the second reference line L2 is perpendicular to the first reference line L1 and is stretched so as to pass through the installation reference point PX of the anchor bolt 1 located on the first reference line L1.
  • An intersection P between the first reference line L1 and the second reference line L2 overlaps with the installation reference point PX of the anchor bolt 1. If the second reference line L2 is provided at all the installation reference points PX of the anchor bolts 1, the number of reference lines L stretched on the ground 7 will be excessive, which will hinder the leveling work of the concrete 4.
  • the second reference line L2 is omitted.
  • the temporarily assembled positioning tool 30X has a reference section 33 at the end of the positioning tool 30 that overlaps the intersection P of the first reference line L1 and the second reference line L2, and a plurality of reference sections 33 on the positioning tool 30. is positioned on the first reference line L1.
  • the plurality of supports 20 temporarily assembled to the positioning tool 30 are arranged at predetermined positions with respect to the reference line L. At this time, both ends of the temporarily assembled positioning tool 30X are supported by the operator.
  • a plurality of supports 20 are fixed to the formwork 2 of the foundation 3. Specifically, in a state where the temporarily assembled positioning tool 30X is placed at a predetermined position with respect to the foundation 3, the fixing part 21 of the support 20 temporarily assembled to the positioning tool 30 is fixed to the formwork with screws 6. Fixed at 2.
  • the positioning tool 30 is removed from the support tool 20.
  • the positioning tool 30 from which the support 20 has been removed can be used for temporary assembly of other supports 20.
  • anchor bolts 1 are attached to supports 20 fixed to formwork 2. Specifically, the anchor bolt 1 is inserted into the anchor hole 26 (see FIG. 5). The anchor bolt 1 is then fixed to the support 20 by a nut 39.
  • concrete 4 is poured into the formwork 2. After this, the surface of the concrete 4 is leveled with a dragonfly or a trowel. On the surface of the concrete 4, the portion below the support 20 is leveled using a trowel.
  • the anchor bolt 1 is supported by an anchor support fixed to the formwork 2. These anchor supports are fixed where the anchor bolt 1 is installed. For this reason, when a large number of anchor bolts 1 are provided along the outer periphery of the foundation 3, it takes a lot of time to position the anchor supports.
  • the plurality of supports 20 are temporarily assembled into a temporary assembly section 31 located at a predetermined position of the positioning tool 30.
  • the positional relationship between the plurality of supports 20 is accurately defined by temporarily assembling the supports 20 to the temporary assembly section 31 of the positioning tool 30. Therefore, by arranging any one of the supports 20 temporarily assembled to the positioning tool 30 at a predetermined position on the foundation 3 and arranging the positioning tool 30 in a predetermined direction with respect to the foundation 3, other The support 20 is also placed in a predetermined position relative to the foundation 3.
  • the reference portion 33 at the end of the positioning tool 30 overlaps the intersection P of the first reference line L1 and the second reference line L2, and
  • the temporary assembly positioning tool 30X is arranged so that the portion 33 is located on the first reference line L1.
  • the plurality of supports 20 temporarily assembled to the positioning tool 30 are arranged at predetermined positions with respect to the reference line L. In this way, a plurality of supports 20 can be placed in position with respect to the foundation 3 substantially simultaneously. Thereby, the working time for positioning the support 20 can be shortened.
  • the positioning tool 30 is removed from the support tool 20 after the support tool 20 is fixed to the formwork 2. Therefore, it is possible to reuse the positioning tool 30.
  • a large number of anchor bolts 1 can be installed on the foundation 3 at one construction site by reusing one to several positioning tools 30.
  • the positioning tool 30 that has been used for one building can be taken to another site.
  • the anchor bolt installation jig 10 includes a support 20 that supports the anchor bolt 1 and a positioning tool 30 that positions the support 20 with respect to the foundation 3.
  • the positioning tool 30 is configured such that the plurality of supports 20 are temporarily assembled to the positioning tool 30.
  • the positioning tool 30 can be placed in the formwork 2 in a state where the plurality of supports 20 are temporarily assembled. Therefore, the plurality of supports 20 can be fixed to the formwork 2 in a state where the positional relationship between the plurality of supports 20 is defined. After that, the positioning tool 30 can be removed from the plurality of supports 20 fixed to the formwork 2. Therefore, the removed positioning tool 30 can be taken to another site. Since the conventional positioning tool is used as a jig to support the anchor bolt 1 until the concrete 4 of the foundation 3 hardens, the rotation rate of the positioning tool 30 cannot be increased. In this regard, according to the above configuration, the positioning tool 30 can be reused after the support tool 20 is fixed to the formwork 2. For example, the positioner 30 can be taken to another site.
  • the positioning tool 30 can be removed from the support 20 immediately. Furthermore, the positioning tool 30 can be reused even at one site. Therefore, the number of positioning tools 30 used at one site can be reduced.
  • the builder can reduce the inventory of anchor bolt installation jigs 10. In particular, the inventory of positioning tools 30 can be reduced.
  • the support part 25 of the support tool 20 has a first engagement part 28 with which the temporary assembly member 29 engages.
  • the positioning tool 30 has a second engaging portion 32 with which the temporary assembly member 29 engages. According to this configuration, the support tool 20 can be positioned with respect to the positioning tool 30 by the temporary assembly member 29.
  • the anchor hole 26 of the support 20 is configured to also serve as the first engagement portion 28. According to this configuration, the support 20 can be configured to have a simple structure.
  • the fixing part 21 of the support 20 includes a fixing main body part 22 fixed to the formwork 2 and a connecting part 23.
  • the connecting portion 23 extends upward from the edge of the fixed main body portion 22 and connects the fixed main body portion 22 and the support portion 25 .
  • a gap S can be left between the upper surface 4A of the concrete 4 and the support part 25 in a state where the concrete 4 is placed in the formwork 2 (see FIG. 11). Therefore, the upper surface 4A of the concrete 4 under the support portion 25 can be easily leveled with a trowel.
  • Anchor bolt installation method includes first to fourth steps.
  • a plurality of supports 20 that support the anchor bolt 1 are temporarily assembled into a positioning tool 30.
  • the positioning tool 30 in which the supports 20 are temporarily assembled is arranged so that the plurality of supports 20 are arranged at predetermined positions with respect to the foundation 3.
  • the plurality of supports 20 are fixed to the formwork 2 of the foundation 3.
  • the positioning tool 30 is removed from the support tool 20.
  • the positioning tool 30 can be reused.
  • the positioner 30 can be taken to another site.
  • a plurality of positioning tools 30 were required.
  • the positioning tool 30 can be removed from the supporting tool 20 immediately after the supporting tool 20 is installed, so the number of positioning tools 30 used at one site can be reduced.
  • the support part 25 of the support tool 20 has a first engagement part 28 with which the temporary assembly member 29 engages.
  • the positioning tool 30 has a second engaging portion 32 with which the temporary assembly member 29 engages. According to this configuration, the support tool 20 can be positioned at a predetermined position with respect to the positioning tool 30 by the temporary assembly member 29.
  • the embodiment described above is an example of the form that the anchor bolt installation jig 10 and the anchor bolt installation method can take, and is not intended to limit the form.
  • the anchor bolt installation jig 10 and the anchor bolt installation method may take a form different from the form illustrated in the above embodiment.
  • An example of this is a configuration in which a part of the configuration of the embodiment is replaced, changed, or omitted, or a configuration in which a new configuration is added to the embodiment. Modifications of the embodiment are shown below.
  • the fixing part 21 of the support 20 may have a temporary fixing part 50.
  • the temporary fixing part 50 is configured to be temporarily fixed to the formwork 2.
  • the temporary fixing part 50 has a temporary fixing main body part 51 and two hanging parts 52.
  • the temporary fixing body part 51 is connected to the lower surface of the fixing body part 22.
  • the two hanging portions 52 are configured such that the frame plate 2A is inserted between the two hanging portions 52.
  • the two hanging parts 52 are provided at both ends of the temporarily fixed body part 51 in the second direction D2, and extend downward. The distance between the two hanging portions 52 is shorter than the width of the frame plate 2A of the formwork 2.
  • the frame plate 2A is inserted between the two hanging parts 52 of the temporary fixing part 50.
  • the support 20 can be temporarily fixed to the formwork 2.
  • the positioning tool 30 is supported by the plurality of supports 20 temporarily fixed to the frame board 2A. Therefore, after arranging the temporarily assembled positioning tool 30X at a predetermined position, the operator can adjust the position of the support tool 20 without supporting the positioning tool 30.
  • the fixed main body portion 22, the support portion 25, and the connecting portion 23 of the support device 20 are integrally configured.
  • the support 20 may be composed of a plurality of members.
  • the fixed main body portion 22 and the connecting portion 23 are configured as one member
  • the support portion 25 is configured as a separate member from the member including the fixed main body portion 22 and the connecting portion 23.
  • the support tool 20 may be made of resin. By constructing the support 20 from resin, the weight of the support 20 can be reduced.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Electromagnetism (AREA)
  • Physics & Mathematics (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Foundations (AREA)

Abstract

This anchor bolt setting jig (10) is for setting an anchor bolt in a foundation. The anchor bolt setting jig (10) comprises: a support tool (20) which supports the anchor bolt; and a positioning tool (30) which positions the support tool (20) relative to the foundation. The positioning tool (30) is configured such that a plurality of support tools (20) are temporarily assembled on the positioning tool (30).

Description

アンカーボルト設置治具、および、アンカーボルト設置方法Anchor bolt installation jig and anchor bolt installation method
 本開示は、建築物の基礎に設置されるアンカーボルトについて、アンカーボルト設置治具、および、アンカーボルト設置方法に関する。 The present disclosure relates to an anchor bolt installation jig and an anchor bolt installation method for anchor bolts installed on the foundation of a building.
 建築物の基礎には、アンカーボルトが設けられる場合がある。アンカーボルトは、建築物本体と基礎とを結合するために基礎に設けられる。アンカーボルトは、基礎において所定の位置に設けられる。 Anchor bolts may be installed in the foundation of a building. Anchor bolts are provided on the foundation to connect the building body and the foundation. Anchor bolts are placed in place in the foundation.
 例えば、特許文献1に記載の技術では、複数のアンカーボルトそれぞれについて、アンカーボルトの頭部に延長部材を取り付ける。そして、位置決め具(同文献では、テンプレート)によって、アンカーボルトが位置決めされる。 For example, in the technique described in Patent Document 1, an extension member is attached to the head of each of a plurality of anchor bolts. Then, the anchor bolt is positioned by a positioning tool (template in the document).
特開2018-031179号公報Japanese Patent Application Publication No. 2018-031179
 ところで、建築業者が複数の建築物件に携わる場合がある。この場合において、基礎の施工が同時並行に実施されると、それぞれの現場で位置決め具のセットが必要となる。このため、建築業者は、複数の位置決め具のセットを予め用意しておく必要がある。多数の位置決め具のセットの在庫を保持することは、建築業者にとって管理上の負担となる。 By the way, a builder may be involved in multiple construction properties. In this case, if the foundation construction is carried out simultaneously, positioning tools will need to be set at each site. For this reason, the builder needs to prepare a plurality of sets of positioning tools in advance. Maintaining an inventory of a large number of positioning fixture sets poses an administrative burden to the builder.
 (1)上記課題を解決するアンカーボルト設置治具は、基礎にアンカーボルトを設置するアンカーボルト設置治具であって、前記アンカーボルトを支持する支持具と、基礎に対して前記支持具を位置決めする位置決め具とを備え、前記位置決め具は、前記位置決め具に複数の前記支持具が仮組されるように構成される。 (1) An anchor bolt installation jig that solves the above problem is an anchor bolt installation jig that installs an anchor bolt on a foundation, and includes a support for supporting the anchor bolt, and a positioning of the support with respect to the foundation. and a positioning tool, the positioning tool being configured such that the plurality of supports are temporarily assembled to the positioning tool.
 上記構成によれば、位置決め具に複数の支持具を所定位置に仮組した後、複数の支持具が仮組された状態で位置決め具を型枠に配置できる。このため、複数の支持具同士の位置関係が規定された状態で、複数の支持具を型枠に固定できる。そして、型枠に固定された複数の支持具から位置決め具を取り外すことができる。このため、取り外された位置決め具を使い回すことができる。このようなことから、アンカーボルト設置治具の在庫を削減できる。 According to the above configuration, after temporarily assembling the plurality of supports to the positioning tool at predetermined positions, the positioning tool can be placed in the formwork with the plurality of supports temporarily assembled. Therefore, the plurality of supports can be fixed to the formwork in a state where the positional relationship between the plurality of supports is defined. Then, the positioning tool can be removed from the plurality of supports fixed to the formwork. Therefore, the removed positioning tool can be reused. For this reason, the inventory of anchor bolt installation jigs can be reduced.
 (2)上記(1)に記載のアンカーボルト設置治具において、前記支持具は、構築される前記基礎の型枠に固定される固定部と、前記固定部から延びて前記アンカーボルトを支持する支持部とを有し、前記支持部は、前記アンカーボルトが挿通するアンカー孔と、前記支持具と前記位置決め具とを仮組するための仮組部材が係合する第1係合部とを有し、前記位置決め具は、前記仮組部材が係合する第2係合部と、前記基礎に対して前記位置決め具の位置を決める基準部とを有する。この構成によれば、仮組部材によって位置決め具に対して支持具を位置決めできる。 (2) In the anchor bolt installation jig according to (1) above, the support includes a fixing part fixed to the formwork of the foundation to be constructed, and extending from the fixing part to support the anchor bolt. a support part, the support part has an anchor hole through which the anchor bolt is inserted, and a first engagement part in which a temporary assembly member for temporarily assembling the support tool and the positioning tool engages. The positioning tool has a second engaging part with which the temporary assembly member engages, and a reference part that determines the position of the positioning tool with respect to the foundation. According to this configuration, the supporting tool can be positioned with respect to the positioning tool using the temporary assembly member.
 (3)上記(2)に記載のアンカーボルト設置治具において、前記支持具の前記アンカー孔は、前記第1係合部を兼ねるように構成される。この構成によれば、前記支持具をシンプルな構造に構成できる。 (3) In the anchor bolt installation jig according to (2) above, the anchor hole of the support is configured to also serve as the first engaging portion. According to this configuration, the support can be configured to have a simple structure.
 (4)上記(2)または(3)のいずれか1つに記載のアンカーボルト設置治具において、前記固定部は、前記型枠に固定される固定本体部と、前記固定本体部の端縁から上に延びて前記固定本体部と前記支持部とを連結する連結部とを備える。この構成によれば、型枠内にコンクリートを打設した状態において、コンクリートの上面と支持部との間に隙間を空けることができる。このため、支持部の下におけるコンクリートの上面をコテで均し易くできる。 (4) In the anchor bolt installation jig according to any one of (2) or (3) above, the fixing part includes a fixing body part fixed to the formwork and an edge of the fixing body part. and a connecting portion extending upward from the fixing body portion and connecting the fixed main body portion and the supporting portion. According to this configuration, a gap can be left between the upper surface of the concrete and the support part in a state where the concrete is placed in the formwork. Therefore, the upper surface of the concrete under the support part can be easily leveled with a trowel.
 (5)上記(2)~(4)のいずれか1つに記載のアンカーボルト設置治具において、前記固定部は、前記型枠に仮固定される仮固定部を有する。この構成によれば、基礎に対して、支持具が仮組された位置決め具を所定位置に配置したときに、支持具を型枠に仮固定できる。このため、支持具が仮組された位置決め具を所定位置に配置した後、作業者は、位置決め具を支持することなく、支持具の位置調整を行うことができる。 (5) In the anchor bolt installation jig according to any one of (2) to (4) above, the fixing part has a temporary fixing part that is temporarily fixed to the formwork. According to this configuration, when the positioning tool, in which the supporting tool is temporarily assembled, is placed at a predetermined position with respect to the foundation, the supporting tool can be temporarily fixed to the formwork. Therefore, after arranging the positioning tool with the support temporarily assembled at a predetermined position, the operator can adjust the position of the support without supporting the positioning tool.
 (6)上記課題を解決するアンカーボルト設置方法は、基礎の型枠にアンカーボルトを設置するアンカーボルト設置方法であって、前記アンカーボルトを支持する複数の支持具を位置決め具に仮組する第1工程と、基礎に対して所定位置に複数の前記支持具が配置されるように、前記支持具が仮組された前記位置決め具を配置する第2工程と、複数の前記支持具を前記基礎の前記型枠に固定する第3工程と、前記支持具から前記位置決め具を取り外す第4工程とを含む。 (6) An anchor bolt installation method that solves the above problems is an anchor bolt installation method in which the anchor bolt is installed in the formwork of the foundation, and the method includes temporarily assembling a plurality of supports supporting the anchor bolts to a positioning tool. a second step of arranging the positioning tool in which the supports are temporarily assembled so that the plurality of supports are arranged at predetermined positions with respect to the foundation; and a second step of placing the plurality of supports on the foundation. and a fourth step of removing the positioning tool from the support tool.
 この構成によれば、支持具を型枠に固定した後、位置決め具を使い回すことができる。例えば、位置決め具を他の現場に持って行くことができる。また、従来、基礎に複数のアンカーボルトを設置するために、複数の位置決め具が必要であったが、本技術によれば、支持具の設置後、直ぐに支持具から位置決め具を取り外すことができるため、1つの現場において使用する位置決め具の個数を削減できる。 According to this configuration, the positioning tool can be reused after the support tool is fixed to the formwork. For example, the positioner can be taken to other sites. Additionally, in the past, multiple positioning tools were required to install multiple anchor bolts on the foundation, but with this technology, the positioning tools can be removed from the support immediately after the support is installed. Therefore, the number of positioning tools used at one site can be reduced.
 (7)上記(6)に記載のアンカーボルト設置方法において、前記支持具は、前記型枠に固定される固定部と、前記固定部から延びて前記アンカーボルトを支持する支持部とを有し、前記支持部は、前記アンカーボルトが挿通するアンカー孔と、前記支持具と前記位置決め具とを仮組するための仮組部材が係合する第1係合部とを有し、前記位置決め具は、前記仮組部材が係合する第2係合部と、前記基礎に対して前記位置決め具の位置を決める基準部とを有する。この構成によれば、仮組部材によって位置決め具に対して所定位置に支持具を位置決めできる。 (7) In the anchor bolt installation method according to (6) above, the support includes a fixing part fixed to the formwork and a support part extending from the fixing part and supporting the anchor bolt. , the support part has an anchor hole through which the anchor bolt is inserted, and a first engagement part in which a temporary assembly member for temporarily assembling the support and the positioning tool engages, has a second engaging portion with which the temporary assembly member engages, and a reference portion that determines the position of the positioning tool with respect to the foundation. According to this configuration, the support tool can be positioned at a predetermined position with respect to the positioning tool using the temporary assembly member.
 本開示のアンカーボルト設置治具およびアンカーボルト設置方法によれば、アンカーボルト設置治具の在庫を削減できる。 According to the anchor bolt installation jig and anchor bolt installation method of the present disclosure, the inventory of anchor bolt installation jigs can be reduced.
アンカーボルト設置治具について、支持具の斜視図である。It is a perspective view of a support tool about an anchor bolt installation jig. アンカーボルト設置治具について、位置決め具の平面図である。FIG. 3 is a plan view of a positioning tool for an anchor bolt installation jig. 仮組の位置決め具の平面図である。FIG. 3 is a plan view of a temporarily assembled positioning tool. 基礎に対する、仮組の位置決め具の配置図である。FIG. 3 is a layout diagram of a temporary assembly positioning tool with respect to a foundation. アンカーボルトが取り付けられた支持具の斜視図である。FIG. 3 is a perspective view of a support with anchor bolts attached. 基礎の施工において、アンカーボルトが配置される直前における、地盤の断面図である。FIG. 2 is a cross-sectional view of the ground immediately before anchor bolts are placed during foundation construction. アンカーボルト設置方法の第1工程において、地盤および型枠の断面図である。FIG. 2 is a sectional view of the ground and formwork in the first step of the anchor bolt installation method. アンカーボルト設置方法の第2工程において、地盤および型枠の断面図である。FIG. 2 is a sectional view of the ground and formwork in the second step of the anchor bolt installation method. アンカーボルト設置方法の第3工程において、地盤および型枠の断面図である。FIG. 7 is a sectional view of the ground and formwork in the third step of the anchor bolt installation method. アンカーボルト設置方法の第4工程後、支持具にアンカーボルトが取り付けられたときの、地盤および型枠の断面図である。It is a sectional view of the ground and formwork when the anchor bolt is attached to the support after the fourth step of the anchor bolt installation method. 型枠内に、コンクリートが打設されたときの、地盤および型枠の断面図である。FIG. 2 is a cross-sectional view of the ground and formwork when concrete is poured into the formwork. 支持具の変形例の斜視図である。FIG. 7 is a perspective view of a modification of the support.
 <アンカーボルト設置治具>
 図1~図11を参照して、アンカーボルト設置治具10を説明する。本実施形態において、アンカーボルト1は、構築される建築物の基礎3に対して設けられる。以下の説明では、記載を簡潔にするため、「構築される基礎3に対して」を単に「基礎3に対して」と記述する。したがって、以下に示す「基礎3に対して」の記述は、「構築される基礎3に対して」を意味する。具体的には、「構築される基礎3に対して」は、「構築される基礎3における基準線Lに対して」を意味する。
<Anchor bolt installation jig>
The anchor bolt installation jig 10 will be explained with reference to FIGS. 1 to 11. In this embodiment, the anchor bolt 1 is provided to the foundation 3 of the building to be constructed. In the following description, in order to simplify the description, "with respect to the foundation 3 to be constructed" will simply be written as "with respect to the foundation 3." Therefore, the description "with respect to the foundation 3" shown below means "with respect to the foundation 3 to be constructed." Specifically, "with respect to the foundation 3 to be constructed" means "with respect to the reference line L of the foundation 3 to be constructed."
 アンカーボルト設置治具10は、建築物の基礎3にアンカーボルト1を設置するための治具である。基礎3は、コンクリート4および鉄筋5によって構成される。さらに、基礎3は、アンカーボルト1を備える。基礎3は、型枠2にコンクリート4を打設することによって形成される。ベタ基礎の場合、型枠2は、枠板2Aによって構成される。枠板2Aは、構築される基礎3の外周を囲むように設置される。枠板2Aは、地盤7に支持棒2Cによって支持される(図6参照)。 The anchor bolt installation jig 10 is a jig for installing the anchor bolt 1 on the foundation 3 of a building. The foundation 3 is composed of concrete 4 and reinforcing bars 5. Furthermore, the foundation 3 is provided with an anchor bolt 1. The foundation 3 is formed by pouring concrete 4 into the formwork 2. In the case of a solid foundation, the formwork 2 is composed of frame plates 2A. The frame board 2A is installed so as to surround the outer periphery of the foundation 3 to be constructed. The frame board 2A is supported on the ground 7 by support rods 2C (see FIG. 6).
 アンカーボルト設置治具10が適用される基礎3の例は限定されない。基礎3の例として、ベタ基礎、および、布基礎が挙げられる。本実施形態に示されるアンカーボルト設置治具10は、ベタ基礎に好適に使用できる。 The example of the foundation 3 to which the anchor bolt installation jig 10 is applied is not limited. Examples of the foundation 3 include a solid foundation and a cloth foundation. The anchor bolt installation jig 10 shown in this embodiment can be suitably used for a solid foundation.
 布基礎の立ち上がり部に対応する型枠2は、互いに平行に設置される2個の枠板2Aを備える。このため、2個の枠板2Aの間に配置されるアンカーボルト1は、2個の枠板2Aによって支持される支持部材で支持できる。これに対して、ベタ基礎の場合、基礎3を囲むように枠板2Aが設置される。このため、アンカーボルト1を支持する支持具20は、片持ち状態で枠板2Aに固定される(図5および図9参照)。このように片持ち状態で枠板2Aに支持される支持具20を所定位置に配置するために、本実施形態に係るアンカーボルト設置治具10が好適に使用できる。 The formwork 2 corresponding to the rising part of the cloth foundation includes two frame plates 2A installed parallel to each other. Therefore, the anchor bolt 1 placed between the two frame plates 2A can be supported by a support member supported by the two frame plates 2A. On the other hand, in the case of a solid foundation, the frame board 2A is installed so as to surround the foundation 3. Therefore, the support 20 that supports the anchor bolt 1 is fixed to the frame plate 2A in a cantilevered state (see FIGS. 5 and 9). The anchor bolt installation jig 10 according to this embodiment can be suitably used to arrange the support 20 supported by the frame plate 2A in a cantilevered manner at a predetermined position.
 アンカーボルト1は、アンカーボルト1の一部が基礎3の上面3Aから露出するように設けられる(図11参照)。アンカーボルト1の露出部1A以外の部分1Bは、基礎3を構成するコンクリート4に埋められる。アンカーボルト1において露出した露出部1Aは、基礎3に立てられる建築物本体の柱に結合される。 The anchor bolt 1 is provided so that a part of the anchor bolt 1 is exposed from the upper surface 3A of the foundation 3 (see FIG. 11). A portion 1B of the anchor bolt 1 other than the exposed portion 1A is buried in concrete 4 constituting the foundation 3. The exposed portion 1A of the anchor bolt 1 is coupled to a pillar of the building body erected on the foundation 3.
 一例では、アンカーボルト1は、基礎3の外周に沿って設置される。アンカーボルト1は、基礎3の型枠2が設置された後、かつ、型枠2にコンクリート4が打設される前の工程で、型枠2の内側に位置するように設置される。アンカーボルト設置治具10は、この段階におけるアンカーボルト1の設置に使用される。以下、アンカーボルト設置治具10の構成を説明する。 In one example, the anchor bolt 1 is installed along the outer periphery of the foundation 3. The anchor bolts 1 are installed so as to be located inside the formwork 2 in a step after the formwork 2 of the foundation 3 is installed and before concrete 4 is poured into the formwork 2. Anchor bolt installation jig 10 is used to install anchor bolt 1 at this stage. The configuration of the anchor bolt installation jig 10 will be described below.
 アンカーボルト設置治具10は、アンカーボルト1を支持する支持具20と、位置決め具30とを備える(図3参照)。以下の説明において、平面視において、型枠2に沿う方向を第1方向D1といい、第1方向D1に直交する方向を第2方向D2という。 The anchor bolt installation jig 10 includes a support 20 that supports the anchor bolt 1 and a positioning tool 30 (see FIG. 3). In the following description, in plan view, the direction along the formwork 2 is referred to as a first direction D1, and the direction orthogonal to the first direction D1 is referred to as a second direction D2.
 <支持具>
 図1を参照して、支持具20を説明する。支持具20は、型枠2に固定される固定部21と、支持部25とを有する。
<Support>
The support 20 will be explained with reference to FIG. The support 20 has a fixing part 21 fixed to the formwork 2 and a support part 25.
 固定部21は、固定本体部22を有する。固定本体部22は、型枠2に固定される。固定本体部22は、型枠2の上面2Bに配置される。固定本体部22の幅は、型枠2の幅と等しく、または、型枠2の幅よりも短い。固定本体部22は、複数のビス孔24を有する。ビス孔24は長孔に構成される。ビス孔24は、固定本体部22が型枠2の上面2Bに配置された状態において、第2方向D2に延びる。ビス孔24が長孔であることによって、型枠2に対して支持具20が第2方向D2に位置調整できる。 The fixed part 21 has a fixed main body part 22. The fixed main body part 22 is fixed to the formwork 2. The fixed main body portion 22 is arranged on the upper surface 2B of the formwork 2. The width of the fixed body portion 22 is equal to or shorter than the width of the formwork 2. The fixed main body portion 22 has a plurality of screw holes 24. The screw hole 24 is formed into a long hole. The screw hole 24 extends in the second direction D2 when the fixed main body portion 22 is placed on the upper surface 2B of the formwork 2. Since the screw hole 24 is a long hole, the position of the support 20 with respect to the formwork 2 can be adjusted in the second direction D2.
 固定部21は、さらに、連結部23を有してもよい。連結部23は、固定本体部22と支持部25とを連結する。連結部23は、省略されてもよい。この場合、支持部25は、固定本体部22に直接に接続される。一例では、固定本体部22と、支持部25と、連結部23とは、一体に構成される。具体的には、板金のプレス加工によって、固定本体部22と、支持部25と、連結部23とが一体に形成される。 The fixing part 21 may further include a connecting part 23. The connecting portion 23 connects the fixed main body portion 22 and the support portion 25. The connecting portion 23 may be omitted. In this case, the support part 25 is directly connected to the fixed body part 22. In one example, the fixed main body portion 22, the support portion 25, and the connecting portion 23 are integrally configured. Specifically, the fixed main body portion 22, the support portion 25, and the connecting portion 23 are integrally formed by sheet metal press working.
 連結部23は、第2方向D2における固定本体部22の端から上に延びる。連結部23は、次の目的のために設けられる。型枠2内にコンクリート4の打設時、コンクリート4を型枠2の上面2Bと同じ高さまで流し込む場合がある。このような場合のため、コンクリート4の上面4Aと支持部25との間に隙間Sが空くように、支持具20に連結部23が設けられる。隙間Sに、コンクリート4を均すコテが入るように、連結部23の高さが設定される。また、連結部23の高さHは、アンカーボルト1においてコンクリート4から露出する露出部1Aの高さを決める要素でもある。 The connecting portion 23 extends upward from the end of the fixed main body portion 22 in the second direction D2. The connecting portion 23 is provided for the following purpose. When pouring the concrete 4 into the formwork 2, the concrete 4 may be poured to the same height as the upper surface 2B of the formwork 2. For such a case, a connecting part 23 is provided on the support 20 so that a gap S is left between the upper surface 4A of the concrete 4 and the support part 25. The height of the connecting portion 23 is set so that a trowel for leveling the concrete 4 can fit into the gap S. Further, the height H of the connecting portion 23 is also a factor that determines the height of the exposed portion 1A of the anchor bolt 1 exposed from the concrete 4.
 支持部25は、アンカーボルト1を支持する。支持部25は、固定部21から延びる。具体的には、側面視において、支持部25は、連結部23の上端から固定本体部22に対して平行に延びる。平面視において、支持部25は、連結部23に対して固定本体部22と反対側に延びる。 The support portion 25 supports the anchor bolt 1. The support portion 25 extends from the fixed portion 21 . Specifically, in side view, the support portion 25 extends from the upper end of the connecting portion 23 in parallel to the fixed main body portion 22. In plan view, the support portion 25 extends on the side opposite to the fixed main body portion 22 with respect to the connecting portion 23.
 支持部25は、アンカーボルト1が挿通するアンカー孔26を有する。一例では、支持部25には、4個のアンカー孔26とアンカー基準部27とが設けられる。4個のアンカー孔26は、アンカー基準部27から等距離の位置に配置される。さらに、4個のアンカー孔26は、4個のアンカー孔26によって構成される形状が正方形となるように配置される。アンカー基準部27は、支持具20の基準位置を示すマークとしても使用される。アンカー基準部27は、型枠2に支持具20が固定された後、支持具20の位置調整において使用される。例えば、アンカー基準部27は、基礎3に対して張られる基準線L(例えば、水糸)と支持具20との位置ずれを確認するときに、支持具20の基準位置として使用される。アンカー基準部27は、支持部25を貫通する孔、窪み、または、刻印マークとして構成される。アンカー基準部27は、目視できる大きさに構成される。 The support portion 25 has an anchor hole 26 through which the anchor bolt 1 is inserted. In one example, the support portion 25 is provided with four anchor holes 26 and an anchor reference portion 27. The four anchor holes 26 are arranged at positions equidistant from the anchor reference portion 27. Further, the four anchor holes 26 are arranged so that the shape formed by the four anchor holes 26 is a square. The anchor reference portion 27 is also used as a mark indicating the reference position of the support 20. The anchor reference portion 27 is used to adjust the position of the support 20 after the support 20 is fixed to the formwork 2. For example, the anchor reference portion 27 is used as a reference position for the support 20 when checking the positional deviation between the reference line L (for example, a water line) stretched over the foundation 3 and the support 20. The anchor reference portion 27 is configured as a hole, a depression, or an engraved mark passing through the support portion 25 . The anchor reference portion 27 is configured to have a size that can be visually observed.
 支持部25は、さらに、第1係合部28を有する。第1係合部28は、仮組部材29が係合する部分である。仮組部材29は、支持具20と位置決め具30とを仮組するための部材である。仮組部材29は、例えば、ボルト29Aである(図7参照)。仮組部材29の他の例は、楔状のピンである。楔状のピンは「シノ」とも呼ばれる。第1係合部28は、例えば、ボルト29Aが挿通する貫通孔として構成される。本実施形態では、アンカー孔26が第1係合部28を兼ねるように構成される。 The support portion 25 further includes a first engagement portion 28. The first engaging portion 28 is a portion with which the temporary assembly member 29 engages. The temporary assembly member 29 is a member for temporarily assembling the support tool 20 and the positioning tool 30. The temporary assembly member 29 is, for example, a bolt 29A (see FIG. 7). Another example of the temporary assembly member 29 is a wedge-shaped pin. The wedge-shaped pin is also called ``Shino''. The first engaging portion 28 is configured as a through hole into which the bolt 29A is inserted, for example. In this embodiment, the anchor hole 26 is configured to also serve as the first engaging portion 28.
 <位置決め具>
 図2および図3を参照して、位置決め具30を説明する。位置決め具30は、基礎3に対して支持具20を位置決めするための道具である。具体的には、位置決め具30は、基礎3の施工時に張られる基準線L(例えば、水糸)に対して複数の支持具20を位置決めする。
<Positioning tool>
The positioning tool 30 will be explained with reference to FIGS. 2 and 3. The positioning tool 30 is a tool for positioning the support tool 20 with respect to the foundation 3. Specifically, the positioning tool 30 positions the plurality of supports 20 with respect to a reference line L (for example, a water line) stretched during construction of the foundation 3.
 位置決め具30は、長尺の板材によって構成される。位置決め具30の使用時、位置決め具30は型枠2に沿うように配置される。 The positioning tool 30 is composed of a long plate. When using the positioning tool 30, the positioning tool 30 is placed along the formwork 2.
 位置決め具30は、位置決め具30の長手方向に延びる第1端30Aを有する。第1端30Aは、直線に延びる。位置決め具30は、第1端30Aと反対側の第2端30Bを有する。第2端30Bは、第1端30Aと平行に延びる。 The positioning tool 30 has a first end 30A extending in the longitudinal direction of the positioning tool 30. The first end 30A extends in a straight line. The positioning tool 30 has a first end 30A and a second end 30B opposite to the first end 30A. The second end 30B extends parallel to the first end 30A.
 位置決め具30は、位置決め具30の所定位置に複数の支持具20が仮組されるように構成される。位置決め具30は、複数の仮組部31を有する。仮組部31は、支持具20が仮組される部分である。複数の仮組部31は、位置決め具30の長手方向において、所定間隔を隔てて設けられる。一例では、複数の仮組部31は、等間隔に設けられる。仮組部31は、支持具20の支持部25の全体が接触できる大きさに構成される。 The positioning tool 30 is configured such that a plurality of supports 20 are temporarily assembled at predetermined positions of the positioning tool 30. The positioning tool 30 has a plurality of temporary assembly parts 31. The temporary assembly portion 31 is a portion where the support 20 is temporarily assembled. The plurality of temporary assembly parts 31 are provided at predetermined intervals in the longitudinal direction of the positioning tool 30. In one example, the plurality of temporary assembly parts 31 are provided at equal intervals. The temporary assembly portion 31 is configured to have a size that allows the entire support portion 25 of the support tool 20 to come into contact with it.
 位置決め具30は、仮組部材29が係合する第2係合部32と、基礎3に対して位置決め具30の位置を決める基準部33とを有する。仮組部材29は、上述のようにボルト29Aまたは楔状のピンである。第2係合部32は、ボルト29Aが挿通する貫通孔として構成される。第2係合部32および基準部33は、仮組部31に設けられる。 The positioning tool 30 has a second engaging part 32 with which the temporary assembly member 29 engages, and a reference part 33 that determines the position of the positioning tool 30 with respect to the foundation 3. The temporary assembly member 29 is the bolt 29A or a wedge-shaped pin as described above. The second engaging portion 32 is configured as a through hole into which the bolt 29A is inserted. The second engaging portion 32 and the reference portion 33 are provided in the temporary assembly portion 31.
 複数の第2係合部32は、複数の第1係合部28と同じ態様に構成される。本実施形態では、アンカー孔26が第1係合部28を兼ねる。そして、支持部25には4個のアンカー孔26が設けられるため、これと同様に、仮組部31には、4個の第2係合部32が設けられる。そして、4個の第2係合部32の配置は、支持具20の4個のアンカー孔26の配置と同じ配置に構成される。具体的には、4個の第2係合部32は、4個の第2係合部32によって構成される形状が正方形となるように配置される。 The plurality of second engaging portions 32 are configured in the same manner as the plurality of first engaging portions 28. In this embodiment, the anchor hole 26 also serves as the first engaging portion 28. Since the support portion 25 is provided with four anchor holes 26, the temporary assembly portion 31 is similarly provided with four second engaging portions 32. The arrangement of the four second engaging portions 32 is the same as the arrangement of the four anchor holes 26 of the support 20. Specifically, the four second engaging parts 32 are arranged so that the shape formed by the four second engaging parts 32 is a square.
 図3に示されるように、位置決め具30と支持具20との仮組において、支持具20は、位置決め具30の下に配置される。具体的には、位置決め具30の下面において仮組部31に支持具20の支持部25が接触するように、支持具20が配置される。このとき、4個の第1係合部28と4個の第2係合部32とがそれぞれに互いに重なるように、支持具20が位置決め具30に配置される。そして、第1係合部28と第2係合部32との連通孔にボルト29Aが挿通される。ボルト29Aにナット29Bが取り付けられて、ナット29Bが締め付けられることによって、位置決め具30に支持具20が仮組される。 As shown in FIG. 3, when the positioning tool 30 and the support tool 20 are temporarily assembled, the support tool 20 is placed under the positioning tool 30. Specifically, the support 20 is arranged so that the support part 25 of the support 20 contacts the temporary assembly part 31 on the lower surface of the positioning tool 30. At this time, the support 20 is arranged on the positioning tool 30 so that the four first engaging parts 28 and the four second engaging parts 32 overlap each other. Then, the bolt 29A is inserted into the communication hole between the first engaging part 28 and the second engaging part 32. The support 20 is temporarily assembled to the positioning tool 30 by attaching the nut 29B to the bolt 29A and tightening the nut 29B.
 位置決め具30の基準部33は、位置決め具30の基準位置として使用される。具体的には、基準部33は、型枠2に位置決め具30が配置された後、基礎3に対して張られる基準線L(例えば、水糸)に対して位置決め具30を位置決めする場合に、位置決め具30の基準位置として使用される。 The reference portion 33 of the positioning tool 30 is used as a reference position of the positioning tool 30. Specifically, the reference part 33 is used when positioning the positioning tool 30 with respect to a reference line L (for example, a water line) stretched against the foundation 3 after the positioning tool 30 is placed on the formwork 2. , is used as a reference position for the positioning tool 30.
 基準部33は、4個の第2係合部32から等距離の位置に配置される。基準部33は、位置決め具30を貫通する貫通孔として構成される。基準部33は、位置決め具30と支持具20とが仮組された状態において、基準部33としての貫通孔を通して、支持具20のアンカー基準部27が視認できる大きさに構成される。 The reference part 33 is arranged at a position equidistant from the four second engaging parts 32. The reference portion 33 is configured as a through hole passing through the positioning tool 30. The reference portion 33 is configured to have a size that allows the anchor reference portion 27 of the support tool 20 to be visually recognized through the through hole serving as the reference portion 33 in a state where the positioning tool 30 and the support tool 20 are temporarily assembled.
 位置決め具30は、軽量化のための孔34が設けられてもよい。孔34は、2個の仮組部31の間に設けられる。位置決め具30は、孔34の替わりに、第2端30Bを切り欠くように構成される切り欠き部を有してもよい。 The positioning tool 30 may be provided with a hole 34 for weight reduction. The hole 34 is provided between the two temporary assembly parts 31. The positioning tool 30 may have a notch configured to cut out the second end 30B instead of the hole 34.
 図4および図5を参照して、アンカーボルト設置治具10の使い方を説明する。支持具20を型枠2に取り付ける目的で、まず、位置決め具30に支持具20が仮組される。作業者は、支持具20が仮組された位置決め具30を用いて、支持具20を型枠2の所定位置に取り付ける。 How to use the anchor bolt installation jig 10 will be explained with reference to FIGS. 4 and 5. In order to attach the support 20 to the formwork 2, the support 20 is first temporarily assembled to the positioning tool 30. The operator attaches the support 20 to a predetermined position on the formwork 2 using the positioning tool 30 on which the support 20 is temporarily assembled.
 基礎3が構築される地盤7には、アンカーボルト1を設置する位置を示すための基準線L(例えば、水糸)が張られる。基準線Lは、第1基準線L1と、第2基準線L2とを含む。第2基準線L2は、第1基準線L1に直交するように張られる。第1基準線L1と第2基準線L2とが交差する交点Pは、アンカーボルト1の設置基準点PXに重なる。交点Pは、基礎3の出隅付近、または基礎3の入隅付近に位置する。 On the ground 7 on which the foundation 3 is constructed, a reference line L (for example, a water line) is stretched to indicate the position where the anchor bolt 1 is installed. The reference line L includes a first reference line L1 and a second reference line L2. The second reference line L2 is drawn perpendicular to the first reference line L1. An intersection P where the first reference line L1 and the second reference line L2 intersect overlaps the installation reference point PX of the anchor bolt 1. The intersection P is located near the outgoing corner of the foundation 3 or near the incoming corner of the foundation 3.
 図4に示されるように、支持具20が仮組された位置決め具30は、位置決め具30の基準部33が第1基準線L1と第2基準線L2との交点Pと重なり、かつ、位置決め具30にある複数の基準部33が第1基準線L1上に位置するように、配置される。そうすると、位置決め具30に仮固定された複数の支持具20が、基礎3に対して所定位置に配置される。 As shown in FIG. 4, the positioning tool 30 with the support 20 temporarily assembled is such that the reference part 33 of the positioning tool 30 overlaps the intersection P of the first reference line L1 and the second reference line L2, and The plurality of reference parts 33 on the tool 30 are arranged so as to be located on the first reference line L1. Then, the plurality of supports 20 temporarily fixed to the positioning tool 30 are arranged at predetermined positions with respect to the foundation 3.
 図5に示されるように、所定位置に配置された支持具20は、ビス6によって枠板2Aに固定される。また、位置決め具30は、ビス6によって固定された支持具20から取り外される。アンカーボルト1は、このように固定された支持具20に取り付けられる。支持具20は、基礎3に対して所定位置に配置されているため、支持具20にアンカーボルト1を挿し込むだけで、基礎3に対してアンカーボルト1を所定位置に配置できる。 As shown in FIG. 5, the support 20 placed at a predetermined position is fixed to the frame plate 2A with screws 6. Further, the positioning tool 30 is removed from the support tool 20 fixed by the screws 6. The anchor bolt 1 is attached to the support 20 fixed in this way. Since the support 20 is arranged at a predetermined position with respect to the foundation 3, the anchor bolt 1 can be placed at a predetermined position with respect to the foundation 3 simply by inserting the anchor bolt 1 into the support 20.
 <アンカーボルト設置方法>
 図4および図6~図11を参照して、アンカーボルト設置方法を説明する。アンカーボルト設置方法は、基礎3の型枠2にアンカーボルト1を設置する方法を示す。アンカーボルト設置方法は、基礎3の施工において使用される。
<Anchor bolt installation method>
An anchor bolt installation method will be described with reference to FIG. 4 and FIGS. 6 to 11. The anchor bolt installation method shows a method of installing the anchor bolt 1 in the formwork 2 of the foundation 3. The anchor bolt installation method is used in the construction of foundation 3.
 図6は、地盤7に型枠2が設置された状態を示す。地盤7には、溝8が設けられている。型枠2は、構築される基礎3を囲むように設置される。型枠2は、溝8の外側において、溝8に沿うように配置される。鉄筋5は、溝8に沿って設けられる。また、鉄筋5は、地盤7において基礎3が設けられる面全体に配筋される。 FIG. 6 shows the formwork 2 installed on the ground 7. A groove 8 is provided in the ground 7. The formwork 2 is installed so as to surround the foundation 3 to be constructed. The formwork 2 is arranged outside the groove 8 and along the groove 8. The reinforcing bars 5 are provided along the grooves 8. Further, the reinforcing bars 5 are arranged over the entire surface of the ground 7 where the foundation 3 is provided.
 図7、図8および図9は、アンカーボルト設置方法を示す図である。アンカーボルト設置方法は、少なくとも第1工程~第4工程を含む。 7, 8, and 9 are diagrams showing the anchor bolt installation method. The anchor bolt installation method includes at least first to fourth steps.
 図7に示されるように、第1工程では、複数の支持具20を位置決め具30に仮組する。具体的には、複数の支持具20は、位置決め具30の下に配置される(図3および図7参照)。位置決め具30の下面において仮組部31に支持具20の支持部25が接触するように、支持具20が配置される。4個の第1係合部28と4個の第2係合部32とがそれぞれに互いに重なるように配置される(図3参照)。そして、上述のように、位置決め具30と支持具20とが仮組される。 As shown in FIG. 7, in the first step, a plurality of supports 20 are temporarily assembled into a positioning tool 30. Specifically, the plurality of supports 20 are arranged under the positioning tool 30 (see FIGS. 3 and 7). The support 20 is arranged so that the support part 25 of the support 20 contacts the temporary assembly part 31 on the lower surface of the positioning tool 30. The four first engaging parts 28 and the four second engaging parts 32 are arranged so as to overlap each other (see FIG. 3). Then, as described above, the positioning tool 30 and the support tool 20 are temporarily assembled.
 第2工程では、基礎3に対して所定位置に複数の支持具20が配置されるように、支持具20が仮組された位置決め具30(以下、仮組の位置決め具30X)を配置する。具体的には、基礎3が設けられる地盤7に張られた基準線Lに対して、仮組の位置決め具30Xが位置決めされる(図4参照)。 In the second step, a positioning tool 30 (hereinafter referred to as a temporarily assembled positioning tool 30X) in which the supports 20 are temporarily assembled is arranged so that the plurality of supports 20 are arranged at predetermined positions with respect to the foundation 3. Specifically, the temporary assembly positioning tool 30X is positioned with respect to a reference line L stretched on the ground 7 on which the foundation 3 is provided (see FIG. 4).
 図4に示されるように、基礎3が設けられる地盤7には、基準線L(例えば、水糸)が張られる。第1基準線L1は、第2方向D2に型枠2から所定距離だけ離れるように、かつ、型枠2に沿うように張られている。また、第2基準線L2は、第1基準線L1に直交し、かつ、第1基準線L1上にあるアンカーボルト1の設置基準点PXを通るように張られる。第1基準線L1と第2基準線L2との交点Pは、アンカーボルト1の設置基準点PXと重なる。アンカーボルト1の設置基準点PXの全てに第2基準線L2が設けると、地盤7に張られる基準線Lの数が過多になり、コンクリート4の均し作業に支障をきたすため、幾つかの第2基準線L2は省略される。 As shown in FIG. 4, a reference line L (for example, a water line) is stretched on the ground 7 on which the foundation 3 is provided. The first reference line L1 is stretched along the formwork 2 and apart from the formwork 2 by a predetermined distance in the second direction D2. Further, the second reference line L2 is perpendicular to the first reference line L1 and is stretched so as to pass through the installation reference point PX of the anchor bolt 1 located on the first reference line L1. An intersection P between the first reference line L1 and the second reference line L2 overlaps with the installation reference point PX of the anchor bolt 1. If the second reference line L2 is provided at all the installation reference points PX of the anchor bolts 1, the number of reference lines L stretched on the ground 7 will be excessive, which will hinder the leveling work of the concrete 4. The second reference line L2 is omitted.
 仮組の位置決め具30Xは、位置決め具30の端部にある基準部33が第1基準線L1と第2基準線L2との交点Pと重なり、かつ、位置決め具30にある複数の基準部33が第1基準線L1上に位置するように、配置される。これによって、位置決め具30に仮組された複数の支持具20が、基準線Lに対して所定位置に配置される。このとき、仮組の位置決め具30Xの両端は、作業者によって支持されている。 The temporarily assembled positioning tool 30X has a reference section 33 at the end of the positioning tool 30 that overlaps the intersection P of the first reference line L1 and the second reference line L2, and a plurality of reference sections 33 on the positioning tool 30. is positioned on the first reference line L1. As a result, the plurality of supports 20 temporarily assembled to the positioning tool 30 are arranged at predetermined positions with respect to the reference line L. At this time, both ends of the temporarily assembled positioning tool 30X are supported by the operator.
 図8に示されるように、第3工程において、複数の支持具20を基礎3の型枠2に固定する。具体的には、仮組の位置決め具30Xが基礎3に対して所定位置に配置された状態において、位置決め具30に仮組された状態にある支持具20の固定部21をビス6で型枠2に固定する。 As shown in FIG. 8, in the third step, a plurality of supports 20 are fixed to the formwork 2 of the foundation 3. Specifically, in a state where the temporarily assembled positioning tool 30X is placed at a predetermined position with respect to the foundation 3, the fixing part 21 of the support 20 temporarily assembled to the positioning tool 30 is fixed to the formwork with screws 6. Fixed at 2.
 図9に示されるように、第4工程では、支持具20から位置決め具30を取り外す。支持具20が取り外された位置決め具30は、他の支持具20の仮組に使用できる。 As shown in FIG. 9, in the fourth step, the positioning tool 30 is removed from the support tool 20. The positioning tool 30 from which the support 20 has been removed can be used for temporary assembly of other supports 20.
 図10に示されるように、型枠2に固定された支持具20には、アンカーボルト1が取り付けられる。具体的には、アンカー孔26にアンカーボルト1が挿通される(図5参照)。そして、アンカーボルト1は、ナット39によって支持具20に固定される。 As shown in FIG. 10, anchor bolts 1 are attached to supports 20 fixed to formwork 2. Specifically, the anchor bolt 1 is inserted into the anchor hole 26 (see FIG. 5). The anchor bolt 1 is then fixed to the support 20 by a nut 39.
 その後、図11に示されるように、アンカーボルト1の設置後、型枠2内にコンクリート4が打設される。この後、コンクリート4の表面はトンボまたはコテによって均される。コンクリート4の表面において、支持具20の下の部分はコテを使って均される。 Thereafter, as shown in FIG. 11, after the anchor bolts 1 are installed, concrete 4 is poured into the formwork 2. After this, the surface of the concrete 4 is leveled with a dragonfly or a trowel. On the surface of the concrete 4, the portion below the support 20 is leveled using a trowel.
 <実施形態の作用>
 本実施形態の作用を説明する。従来、アンカーボルト1は、型枠2に固定されるアンカー支持具によって支持されている。これらアンカー支持具は、アンカーボルト1を設置するところに固定される。このため、基礎3の外周に沿って多数のアンカーボルト1が設けられる場合、アンカー支持具の位置決めに多大な時間を要している。
<Action of the embodiment>
The operation of this embodiment will be explained. Conventionally, the anchor bolt 1 is supported by an anchor support fixed to the formwork 2. These anchor supports are fixed where the anchor bolt 1 is installed. For this reason, when a large number of anchor bolts 1 are provided along the outer periphery of the foundation 3, it takes a lot of time to position the anchor supports.
 本実施形態では、複数の支持具20は、位置決め具30の所定位置にある仮組部31に仮組される。このとき、複数の支持具20同士の位置関係は、支持具20を位置決め具30の仮組部31に仮組することによって、正確に規定される。このため、位置決め具30に仮組された何れか1つの支持具20を基礎3における所定位置に配置し、かつ、位置決め具30を基礎3に対して所定の向きに配置することによって、他の支持具20も基礎3に対して所定位置に配置される。具体的には、上述のように、位置決め具30の端部にある基準部33が第1基準線L1と第2基準線L2との交点Pと重なり、かつ、位置決め具30にある複数の基準部33が第1基準線L1上に位置するように、仮組の位置決め具30Xを配置する。これによって、位置決め具30に仮組された複数の支持具20が、基準線Lに対して所定位置に配置される。このように、基礎3に対して複数の支持具20を実質的に同時に所定位置に配置できる。これによって、支持具20の位置決め作業の作業時間を短縮できる。 In this embodiment, the plurality of supports 20 are temporarily assembled into a temporary assembly section 31 located at a predetermined position of the positioning tool 30. At this time, the positional relationship between the plurality of supports 20 is accurately defined by temporarily assembling the supports 20 to the temporary assembly section 31 of the positioning tool 30. Therefore, by arranging any one of the supports 20 temporarily assembled to the positioning tool 30 at a predetermined position on the foundation 3 and arranging the positioning tool 30 in a predetermined direction with respect to the foundation 3, other The support 20 is also placed in a predetermined position relative to the foundation 3. Specifically, as described above, the reference portion 33 at the end of the positioning tool 30 overlaps the intersection P of the first reference line L1 and the second reference line L2, and The temporary assembly positioning tool 30X is arranged so that the portion 33 is located on the first reference line L1. As a result, the plurality of supports 20 temporarily assembled to the positioning tool 30 are arranged at predetermined positions with respect to the reference line L. In this way, a plurality of supports 20 can be placed in position with respect to the foundation 3 substantially simultaneously. Thereby, the working time for positioning the support 20 can be shortened.
 加えて、位置決め具30は、支持具20が型枠2に固定された後、支持具20から取り外される。このため、位置決め具30を使い回すことが可能である。例えば、1つの建築現場において、1個~数個の位置決め具30を使い回すことによって、多数のアンカーボルト1を基礎3に対して設置できる。また、建築業者が、複数の建築物件について同時並行に施工している場合、1つの建築物件で使用し終わった位置決め具30を他の現場に持って行くことができる。 In addition, the positioning tool 30 is removed from the support tool 20 after the support tool 20 is fixed to the formwork 2. Therefore, it is possible to reuse the positioning tool 30. For example, a large number of anchor bolts 1 can be installed on the foundation 3 at one construction site by reusing one to several positioning tools 30. Further, when a builder is constructing multiple buildings at the same time, the positioning tool 30 that has been used for one building can be taken to another site.
 <本実施形態の効果>
 本実施形態の効果を説明する。
 (1)アンカーボルト設置治具10は、アンカーボルト1を支持する支持具20と、基礎3に対して支持具20を位置決めする位置決め具30とを備える。位置決め具30は、位置決め具30に複数の支持具20が仮組されるように構成される。
<Effects of this embodiment>
The effects of this embodiment will be explained.
(1) The anchor bolt installation jig 10 includes a support 20 that supports the anchor bolt 1 and a positioning tool 30 that positions the support 20 with respect to the foundation 3. The positioning tool 30 is configured such that the plurality of supports 20 are temporarily assembled to the positioning tool 30.
 上記構成によれば、位置決め具30に複数の支持具20を所定位置に仮組した後、複数の支持具20が仮組された状態で位置決め具30を型枠2に配置できる。このため、複数の支持具20同士の位置関係が規定された状態で、複数の支持具20を型枠2に固定できる。その後、型枠2に固定された複数の支持具20から位置決め具30を取り外すことができる。このため、取り外された位置決め具30を他の現場に持って行くことができる。従来の位置決め具は、基礎3のコンクリート4が固まるまでアンカーボルト1を支持する治具として使用されるため、位置決め具30の使い回しの回転率を高くできない。この点、上記構成によれば、支持具20を型枠2に固定した後、位置決め具30を使い回すことができる。例えば、位置決め具30を他の現場に持って行くことができる。 According to the above configuration, after the plurality of supports 20 are temporarily assembled to the positioning tool 30 at predetermined positions, the positioning tool 30 can be placed in the formwork 2 in a state where the plurality of supports 20 are temporarily assembled. Therefore, the plurality of supports 20 can be fixed to the formwork 2 in a state where the positional relationship between the plurality of supports 20 is defined. After that, the positioning tool 30 can be removed from the plurality of supports 20 fixed to the formwork 2. Therefore, the removed positioning tool 30 can be taken to another site. Since the conventional positioning tool is used as a jig to support the anchor bolt 1 until the concrete 4 of the foundation 3 hardens, the rotation rate of the positioning tool 30 cannot be increased. In this regard, according to the above configuration, the positioning tool 30 can be reused after the support tool 20 is fixed to the formwork 2. For example, the positioner 30 can be taken to another site.
 また、従来、基礎3に多数のアンカーボルト1を設置するために、複数の位置決め具30が必要であったが、本構成によれば、次の効果がある。支持具20の設置後、直ぐに支持具20から位置決め具30を取り外すことができる。そして、1つの現場においても、位置決め具30を使い回すことができる。このため、1つの現場において使用する位置決め具30の個数を削減できる。この点でも、建築業者は、アンカーボルト設置治具10の在庫を削減できる。特に、位置決め具30の在庫を削減できる。 Furthermore, in the past, a plurality of positioning tools 30 were required in order to install a large number of anchor bolts 1 on the foundation 3, but this configuration has the following effects. After installing the support 20, the positioning tool 30 can be removed from the support 20 immediately. Furthermore, the positioning tool 30 can be reused even at one site. Therefore, the number of positioning tools 30 used at one site can be reduced. In this respect as well, the builder can reduce the inventory of anchor bolt installation jigs 10. In particular, the inventory of positioning tools 30 can be reduced.
 (2)支持具20の支持部25は、仮組部材29が係合する第1係合部28を有する。位置決め具30は、仮組部材29が係合する第2係合部32を有する。この構成によれば、仮組部材29によって位置決め具30に対して支持具20を位置決めできる。 (2) The support part 25 of the support tool 20 has a first engagement part 28 with which the temporary assembly member 29 engages. The positioning tool 30 has a second engaging portion 32 with which the temporary assembly member 29 engages. According to this configuration, the support tool 20 can be positioned with respect to the positioning tool 30 by the temporary assembly member 29.
 (3)支持具20のアンカー孔26は、第1係合部28を兼ねるように構成される。この構成によれば、支持具20をシンプルな構造に構成できる。 (3) The anchor hole 26 of the support 20 is configured to also serve as the first engagement portion 28. According to this configuration, the support 20 can be configured to have a simple structure.
 (4)支持具20の固定部21は、型枠2に固定される固定本体部22と、連結部23とを備える。連結部23は、固定本体部22の端縁から上に延びて固定本体部22と支持部25とを連結する。この構成によれば、型枠2内にコンクリート4を打設した状態において、コンクリート4の上面4Aと支持部25との間に隙間Sを空けることができる(図11参照)。このため、支持部25の下におけるコンクリート4の上面4Aをコテで均し易くできる。 (4) The fixing part 21 of the support 20 includes a fixing main body part 22 fixed to the formwork 2 and a connecting part 23. The connecting portion 23 extends upward from the edge of the fixed main body portion 22 and connects the fixed main body portion 22 and the support portion 25 . According to this configuration, a gap S can be left between the upper surface 4A of the concrete 4 and the support part 25 in a state where the concrete 4 is placed in the formwork 2 (see FIG. 11). Therefore, the upper surface 4A of the concrete 4 under the support portion 25 can be easily leveled with a trowel.
 (5)アンカーボルト設置方法は、第1工程~第4工程を含む。第1工程では、アンカーボルト1を支持する複数の支持具20を位置決め具30に仮組する。第2工程では、基礎3に対して所定位置に複数の支持具20が配置されるように、支持具20が仮組された位置決め具30を配置する。第3工程では、複数の支持具20を基礎3の型枠2に固定する。第4工程では、支持具20から位置決め具30を取り外す。 (5) Anchor bolt installation method includes first to fourth steps. In the first step, a plurality of supports 20 that support the anchor bolt 1 are temporarily assembled into a positioning tool 30. In the second step, the positioning tool 30 in which the supports 20 are temporarily assembled is arranged so that the plurality of supports 20 are arranged at predetermined positions with respect to the foundation 3. In the third step, the plurality of supports 20 are fixed to the formwork 2 of the foundation 3. In the fourth step, the positioning tool 30 is removed from the support tool 20.
 この構成によれば、支持具20を型枠2に固定した後、位置決め具30を使い回すことができる。例えば、位置決め具30を他の現場に持って行くことができる。また、従来、基礎3に複数のアンカーボルト1を設置するために、複数の位置決め具30が必要であった。この点、本技術によれば、支持具20の設置後、直ぐに支持具20から位置決め具30を取り外すことができるため、1つの現場において使用する位置決め具30の個数を削減できる。 According to this configuration, after the support 20 is fixed to the formwork 2, the positioning tool 30 can be reused. For example, the positioner 30 can be taken to another site. Furthermore, conventionally, in order to install a plurality of anchor bolts 1 on the foundation 3, a plurality of positioning tools 30 were required. In this regard, according to the present technology, the positioning tool 30 can be removed from the supporting tool 20 immediately after the supporting tool 20 is installed, so the number of positioning tools 30 used at one site can be reduced.
 (6)アンカーボルト設置方法において、支持具20の支持部25は、仮組部材29が係合する第1係合部28を有する。位置決め具30は、仮組部材29が係合する第2係合部32を有する。この構成によれば、仮組部材29によって位置決め具30に対して所定位置に支持具20を位置決めできる。 (6) In the anchor bolt installation method, the support part 25 of the support tool 20 has a first engagement part 28 with which the temporary assembly member 29 engages. The positioning tool 30 has a second engaging portion 32 with which the temporary assembly member 29 engages. According to this configuration, the support tool 20 can be positioned at a predetermined position with respect to the positioning tool 30 by the temporary assembly member 29.
 <変形例>
 上記実施形態は、アンカーボルト設置治具10、および、アンカーボルト設置方法が取り得る形態の例示であり、その形態を制限することを意図していない。アンカーボルト設置治具10、および、アンカーボルト設置方法は、上記実施形態に例示された形態とは異なる形態を取り得る。その例は、実施形態の構成の一部を置換、変更、省略した形態、または、実施形態に新たな構成を付加した形態である。以下に実施形態の変形例を示す。
<Modified example>
The embodiment described above is an example of the form that the anchor bolt installation jig 10 and the anchor bolt installation method can take, and is not intended to limit the form. The anchor bolt installation jig 10 and the anchor bolt installation method may take a form different from the form illustrated in the above embodiment. An example of this is a configuration in which a part of the configuration of the embodiment is replaced, changed, or omitted, or a configuration in which a new configuration is added to the embodiment. Modifications of the embodiment are shown below.
 ・図12に示されるように、支持具20の固定部21は、仮固定部50を有してもよい。仮固定部50は、型枠2に仮固定されるように構成される。仮固定部50は、仮固定本体部51と、2個の下垂部52とを有する。仮固定本体部51は、固定本体部22の下面に接続される。2個の下垂部52は、2個の下垂部52の間に枠板2Aが入るように構成される。2個の下垂部52は、第2方向D2において仮固定本体部51の両端それぞれに設けられ、下方に延びる。2個の下垂部52の間隔距離は、型枠2の枠板2Aの幅よりも短い。 - As shown in FIG. 12, the fixing part 21 of the support 20 may have a temporary fixing part 50. The temporary fixing part 50 is configured to be temporarily fixed to the formwork 2. The temporary fixing part 50 has a temporary fixing main body part 51 and two hanging parts 52. The temporary fixing body part 51 is connected to the lower surface of the fixing body part 22. The two hanging portions 52 are configured such that the frame plate 2A is inserted between the two hanging portions 52. The two hanging parts 52 are provided at both ends of the temporarily fixed body part 51 in the second direction D2, and extend downward. The distance between the two hanging portions 52 is shorter than the width of the frame plate 2A of the formwork 2.
 このような支持具20によれば、基礎3に対して、仮組の位置決め具30Xが所定位置に配置するときに、仮固定部50の2個の下垂部52の間に枠板2Aを入れることによって、支持具20を型枠2に仮固定できる。そうすると、位置決め具30は、枠板2Aに仮固定された複数に支持具20によって支持される。このため、仮組の位置決め具30Xを所定位置に配置した後、作業者は、位置決め具30を支持することなく、支持具20の位置調整を行うことができる。 According to such a support 20, when the temporarily assembled positioning tool 30X is placed in a predetermined position with respect to the foundation 3, the frame plate 2A is inserted between the two hanging parts 52 of the temporary fixing part 50. By doing so, the support 20 can be temporarily fixed to the formwork 2. Then, the positioning tool 30 is supported by the plurality of supports 20 temporarily fixed to the frame board 2A. Therefore, after arranging the temporarily assembled positioning tool 30X at a predetermined position, the operator can adjust the position of the support tool 20 without supporting the positioning tool 30.
 ・上記実施形態では、支持具20の固定本体部22と支持部25と連結部23とは一体に構成される。これに対して、支持具20は、複数の部材によって構成されてもよい。例えば、固定本体部22と連結部23とが1個の部材で構成され、かつ、支持部25は、固定本体部22と連結部23とを含む部材と別部材で構成される。 - In the above embodiment, the fixed main body portion 22, the support portion 25, and the connecting portion 23 of the support device 20 are integrally configured. On the other hand, the support 20 may be composed of a plurality of members. For example, the fixed main body portion 22 and the connecting portion 23 are configured as one member, and the support portion 25 is configured as a separate member from the member including the fixed main body portion 22 and the connecting portion 23.
 ・支持具20は、樹脂によって構成されてもよい。支持具20を樹脂によって構成することによって、支持具20の軽量化を図ることができる。 - The support tool 20 may be made of resin. By constructing the support 20 from resin, the weight of the support 20 can be reduced.
 1…アンカーボルト、2…型枠、3…基礎、10…アンカーボルト設置治具、20…支持具、21…固定部、22…固定本体部、23…連結部、25…支持部、26…アンカー孔、28…第1係合部、29…仮組部材、30…位置決め具、32…第2係合部、33…基準部、50…仮固定部。 DESCRIPTION OF SYMBOLS 1...Anchor bolt, 2...Formwork, 3...Foundation, 10...Anchor bolt installation jig, 20...Supporting tool, 21...Fixing part, 22...Fixing body part, 23...Connection part, 25...Support part, 26... Anchor hole, 28...first engagement part, 29...temporary assembly member, 30...positioning tool, 32...second engagement part, 33...reference part, 50...temporary fixing part.

Claims (7)

  1.  基礎にアンカーボルトを設置するアンカーボルト設置治具であって、
     前記アンカーボルトを支持する支持具と、基礎に対して前記支持具を位置決めする位置決め具とを備え、
     前記位置決め具は、前記位置決め具に複数の前記支持具が仮組されるように構成される、
     アンカーボルト設置治具。
    An anchor bolt installation jig for installing anchor bolts on a foundation,
    comprising a support that supports the anchor bolt and a positioning tool that positions the support with respect to the foundation,
    The positioning tool is configured such that the plurality of supports are temporarily assembled to the positioning tool.
    Anchor bolt installation jig.
  2.  前記支持具は、構築される前記基礎の型枠に固定される固定部と、前記固定部から延びて前記アンカーボルトを支持する支持部とを有し、
     前記支持部は、前記アンカーボルトが挿通するアンカー孔と、前記支持具と前記位置決め具とを仮組するための仮組部材が係合する第1係合部とを有し、
     前記位置決め具は、前記仮組部材が係合する第2係合部と、前記基礎に対して前記位置決め具の位置を決める基準部とを有する、
     請求項1に記載のアンカーボルト設置治具。
    The support has a fixing part fixed to the formwork of the foundation to be constructed, and a support part extending from the fixing part and supporting the anchor bolt,
    The support part has an anchor hole through which the anchor bolt is inserted, and a first engagement part in which a temporary assembly member for temporarily assembling the support tool and the positioning tool engages,
    The positioning tool has a second engaging part with which the temporary assembly member engages, and a reference part that determines the position of the positioning tool with respect to the foundation.
    The anchor bolt installation jig according to claim 1.
  3.  前記支持具の前記アンカー孔は、前記第1係合部を兼ねるように構成される、
     請求項2に記載のアンカーボルト設置治具。
    The anchor hole of the support device is configured to also serve as the first engagement portion.
    The anchor bolt installation jig according to claim 2.
  4.  前記固定部は、前記型枠に固定される固定本体部と、前記固定本体部の端縁から上に延びて前記固定本体部と前記支持部とを連結する連結部とを備える、
     請求項2または3に記載のアンカーボルト設置治具。
    The fixing part includes a fixing body part fixed to the formwork, and a connecting part extending upward from an edge of the fixing body part and connecting the fixing body part and the support part.
    The anchor bolt installation jig according to claim 2 or 3.
  5.  前記固定部は、前記型枠に仮固定される仮固定部を有する、
     請求項2~4のいずれか一項に記載のアンカーボルト設置治具。
    The fixing part has a temporary fixing part temporarily fixed to the formwork,
    The anchor bolt installation jig according to any one of claims 2 to 4.
  6.  基礎の型枠にアンカーボルトを設置するアンカーボルト設置方法であって、
     前記アンカーボルトを支持する複数の支持具を位置決め具に仮組する第1工程と、
     基礎に対して所定位置に複数の前記支持具が配置されるように、前記支持具が仮組された前記位置決め具を配置する第2工程と、
     複数の前記支持具を前記基礎の前記型枠に固定する第3工程と、
     前記支持具から前記位置決め具を取り外す第4工程とを含む、
     アンカーボルト設置方法。
    An anchor bolt installation method for installing an anchor bolt in a foundation formwork,
    a first step of temporarily assembling a plurality of supports supporting the anchor bolt into a positioning tool;
    a second step of arranging the positioning tool in which the supporting tools are temporarily assembled so that the plurality of supporting tools are arranged at predetermined positions with respect to the foundation;
    a third step of fixing the plurality of supports to the formwork of the foundation;
    a fourth step of removing the positioning tool from the support tool;
    Anchor bolt installation method.
  7.  前記支持具は、前記型枠に固定される固定部と、前記固定部から延びて前記アンカーボルトを支持する支持部とを有し、前記支持部は、前記アンカーボルトが挿通するアンカー孔と、前記支持具と前記位置決め具とを仮組するための仮組部材が係合する第1係合部とを有し、
     前記位置決め具は、前記仮組部材が係合する第2係合部と、前記基礎に対して前記位置決め具の位置を決める基準部とを有する、
     請求項6に記載のアンカーボルト設置方法。
    The support includes a fixing part fixed to the formwork, and a support part extending from the fixing part to support the anchor bolt, and the support part has an anchor hole through which the anchor bolt is inserted; a first engaging portion with which a temporary assembly member for temporarily assembling the support tool and the positioning tool engages;
    The positioning tool has a second engaging part with which the temporary assembly member engages, and a reference part that determines the position of the positioning tool with respect to the foundation.
    The anchor bolt installation method according to claim 6.
PCT/JP2022/033181 2022-09-02 2022-09-02 Anchor bolt setting jig, and anchor bolt setting method WO2024047878A1 (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
GBGB2318811.3A GB202318811D0 (en) 2022-09-02 2022-09-02 Not published
AU2022459562A AU2022459562A1 (en) 2022-09-02 2022-09-02 Anchor bolt installing jig and anchor bolt installing method
PCT/JP2022/033181 WO2024047878A1 (en) 2022-09-02 2022-09-02 Anchor bolt setting jig, and anchor bolt setting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2022/033181 WO2024047878A1 (en) 2022-09-02 2022-09-02 Anchor bolt setting jig, and anchor bolt setting method

Publications (1)

Publication Number Publication Date
WO2024047878A1 true WO2024047878A1 (en) 2024-03-07

Family

ID=89575888

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2022/033181 WO2024047878A1 (en) 2022-09-02 2022-09-02 Anchor bolt setting jig, and anchor bolt setting method

Country Status (3)

Country Link
AU (1) AU2022459562A1 (en)
GB (1) GB202318811D0 (en)
WO (1) WO2024047878A1 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS639620Y2 (en) * 1983-03-08 1988-03-22
JPH08189189A (en) * 1995-01-09 1996-07-23 Asahi Chem Ind Co Ltd Jig for correcting upper part of form
JPH116160A (en) * 1997-06-19 1999-01-12 Sekisui House Ltd Anchor bolt positioning device for partition foundation

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS639620Y2 (en) * 1983-03-08 1988-03-22
JPH08189189A (en) * 1995-01-09 1996-07-23 Asahi Chem Ind Co Ltd Jig for correcting upper part of form
JPH116160A (en) * 1997-06-19 1999-01-12 Sekisui House Ltd Anchor bolt positioning device for partition foundation

Also Published As

Publication number Publication date
AU2022459562A1 (en) 2024-04-04
GB202318811D0 (en) 2024-01-24

Similar Documents

Publication Publication Date Title
JP4732915B2 (en) Foundation construction method and device, and anchor bolt support device for construction
JP4078367B2 (en) Cable-stayed cable fixing structure
JP7059618B2 (en) Main landing gear installation method and anchor frame installation jig
JP4459080B2 (en) Construction method of diagonal fixing part and formwork structure for diagonal fixing part
WO2024047878A1 (en) Anchor bolt setting jig, and anchor bolt setting method
KR102089758B1 (en) Formwork structure supported by column unit
JP4563879B2 (en) Anchor bolt support device
JP2021195834A (en) Column base anchor structure, trestle, and design method for column base anchor structure
JPH066861B2 (en) Construction method of Kumashindai
JP2021038614A (en) Construction method for equipment installation pedestal, equipment installation pedestal, and foundation bolt installation template
KR20070079086A (en) Method of bent construction for temporary bridge
JP7288390B2 (en) Foundation construction method and foundation
JP2015055079A (en) Anchor frame, and method for constructing anchor structure using the anchor frame
JP3329690B2 (en) Assembling device for reinforcing bars for segments
JP2670427B2 (en) Construction method of reinforced concrete columns and reinforcing bar positioning jig used for the implementation
CN219710756U (en) Cross beam with threaded sleeve
JPH01278620A (en) Installation method for anchor bolt and anchor bolt supporting device used therefor
KR102223810B1 (en) Bracket connection structure
KR20130090036A (en) Bent construction method for temporary bridge using file cap
JP2022063587A (en) Column base anchor structure, frame, and design method for column base anchor structure
JP2002348951A (en) Steel plate concrete structure
JPH0732755Y2 (en) Foundation bolt installation frame that also serves as a concrete formwork
CN117211400A (en) Positioning connection structure for modularized building
JP2796222B2 (en) Folded PC basic formwork
JP2836409B2 (en) Construction method of reinforced concrete wall using PC version

Legal Events

Date Code Title Description
ENP Entry into the national phase

Ref document number: 2022459562

Country of ref document: AU

Date of ref document: 20220902

Kind code of ref document: A

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 22957472

Country of ref document: EP

Kind code of ref document: A1