JP2023155824A - Steel tower foundation structure - Google Patents

Steel tower foundation structure Download PDF

Info

Publication number
JP2023155824A
JP2023155824A JP2022065406A JP2022065406A JP2023155824A JP 2023155824 A JP2023155824 A JP 2023155824A JP 2022065406 A JP2022065406 A JP 2022065406A JP 2022065406 A JP2022065406 A JP 2022065406A JP 2023155824 A JP2023155824 A JP 2023155824A
Authority
JP
Japan
Prior art keywords
column
viewed
column body
extending direction
steel tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2022065406A
Other languages
Japanese (ja)
Other versions
JP7314352B1 (en
Inventor
亜理 岩本
Ari Iwamoto
成 田邉
Shigeru Tanabe
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tokyo Electric Power Services Co Ltd
Original Assignee
Tokyo Electric Power Services Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyo Electric Power Services Co Ltd filed Critical Tokyo Electric Power Services Co Ltd
Priority to JP2022065406A priority Critical patent/JP7314352B1/en
Application granted granted Critical
Publication of JP7314352B1 publication Critical patent/JP7314352B1/en
Publication of JP2023155824A publication Critical patent/JP2023155824A/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction

Landscapes

  • Foundations (AREA)

Abstract

To provide a steel tower foundation structure capable of reducing a construction time required to construct a column body and making it easier to transport materials that make up a column body while ensuring a weight of a column body that makes up a part of a foundation of a steel tower.SOLUTION: A steel tower 10 comprises a precast concrete column body fastening portion 56 and a precast concrete lower column body portion 60, which constitute a part of a column body 34.SELECTED DRAWING: Figure 1

Description

特許法第30条第2項適用申請有り 令和3年12月16日、令和3年12月21日 令和4年01月19日、令和4年01月27日 プレキャスト化した逆T字型基礎の耐力確認試験見学会にて公開Patent Act Article 30, Paragraph 2 application filed December 16, 2021, December 21, 2021 January 19, 2021, January 27, 2020 Precast inverted T Published at the strength confirmation test tour of letter-shaped foundations

本発明は、鉄塔基礎構造に関する。 The present invention relates to a steel tower foundation structure.

下記特許文献1には、鉄塔基礎構造に関する発明が記載されている。この鉄塔基礎構造では、鉄塔の脚材を支持する基礎が、床板及び柱体を含んで構成されている。 Patent Document 1 listed below describes an invention related to a steel tower foundation structure. In this steel tower foundation structure, the foundation that supports the legs of the steel tower includes a floor plate and a column.

特開2022-18840号公報JP2022-18840A

ところで、鉄塔には、鉄塔に懸架された電線等に起因する引き抜き荷重が作用することが考えられる。そして、この引き抜き荷重を支持するのにあたって、脚材と一体的に設けられた床板及び柱体の重量は、大きい方が好ましい。また、施工時間の短縮の観点からは、床板及び柱体にプレキャストコンクリートを用いることが好ましい。 By the way, it is conceivable that a pull-out load due to electric wires or the like suspended on the steel tower may act on the steel tower. In order to support this pull-out load, it is preferable that the weight of the floorboard and column that are integrally provided with the leg members be large. Furthermore, from the viewpoint of shortening construction time, it is preferable to use precast concrete for the floorboards and columns.

しかしながら、鉄塔を山岳地等に建設する場合、運搬可能な材料の重量に制限があるため、床板及び柱体に用いることができるプレキャストコンクリートの重量もまた制限されることとなる。 However, when constructing a steel tower in a mountainous area, there is a limit to the weight of materials that can be transported, so the weight of precast concrete that can be used for floor plates and columns is also limited.

この点、上記特許文献1に係る先行技術では、床板をプレキャストコンクリート製の複数の部材で構成することで、床板の重量を確保しつつ、床板の構築に必要な施工時間を短縮し、さらに床板を構成する材料の運搬を容易なものとしている。 In this regard, in the prior art according to Patent Document 1, the floorboard is constructed from a plurality of members made of precast concrete, thereby ensuring the weight of the floorboard, shortening the construction time required for constructing the floorboard, and This makes it easy to transport the materials that make up the system.

一方で、上記特許文献1では、柱体の構成については詳しく説明されていないため、柱体の重量を確保しつつ、柱体の構築に必要な施工時間を短縮し、さらに柱体を構成する材料の運搬を容易にするという点については改善の余地がある。 On the other hand, since Patent Document 1 does not explain the structure of the column in detail, it is possible to shorten the construction time necessary for constructing the column while ensuring the weight of the column, and further construct the column. There is room for improvement in terms of facilitating the transportation of materials.

本発明は上記事実を考慮し、鉄塔の基礎部の一部を構成する柱体の重量を確保しつつ、柱体の構築に必要な施工時間を短縮し、さらに柱体を構成する材料の運搬を容易なものとすることができる鉄塔基礎構造を提供することが目的である。 Taking the above facts into consideration, the present invention reduces the construction time necessary for constructing the columns while ensuring the weight of the columns that constitute a part of the base of the steel tower, and furthermore, transports the materials that make up the columns. The purpose is to provide a steel tower foundation structure that can facilitate the

第1の態様に係る鉄塔基礎構造は、鉄塔の鉄骨脚部の一部を構成する脚材における当該鉄塔の高さ方向下側の部分を当該高さ方向から見て内周面で囲むように配置されて当該脚材を保持する床板と、前記床板上に配置され、当該高さ方向から見て前記内周面に沿う筒状とされると共に前記脚材の延在方向と直交するように設けられた支持面を備えたプレキャストコンクリート製の柱体定着部と、一部が前記柱体定着部に埋め込まれると共に、当該柱体定着部から前記高さ方向上側に前記延在方向に沿うように延出された上側延出部と、当該柱体定着部から当該高さ方向下側に延出されて当該高さ方向から見て前記内周面の内側に配置された下側延出部と、を含む複数の柱体定着筋と、前記支持面上に前記延在方向に沿うように配置され、当該延在方向から見て当該脚材を囲む円筒状とされると共に、前記上側延出部を挿通可能な複数の定着筋挿通孔部が形成されたプレキャストコンクリート製の下側柱体部と、前記床板の前記内周面側、前記柱体定着部の前記脚材側及び前記下側柱体部の当該脚材側にコンクリートが充填されることで構成され、前記下側延出部が埋め込まれた接続部と、を有している。 The steel tower foundation structure according to the first aspect is such that the lower part in the height direction of the steel tower in the leg material constituting a part of the steel frame leg of the steel tower is surrounded by an inner circumferential surface when viewed from the height direction. a floor plate arranged to hold the leg; and a floor plate arranged on the floor plate, having a cylindrical shape along the inner circumferential surface when viewed from the height direction, and perpendicular to the extending direction of the leg. a column fixing section made of precast concrete having a supporting surface provided therein; and a column fixing section made of precast concrete that is partially embedded in the column fixing section and extending upward in the height direction from the column fixing section along the extending direction. an upper extending portion extending from the column fixing portion to the lower side in the height direction and a lower extending portion extending from the column fixing portion downward in the height direction and disposed inside the inner circumferential surface when viewed from the height direction. and a plurality of column fixing bars arranged on the support surface along the extending direction, having a cylindrical shape surrounding the leg member when viewed from the extending direction, and having a plurality of column fixing bars including the upper extending member. a lower column part made of precast concrete in which a plurality of fixing bar insertion holes through which the protrusion can be inserted are formed; the inner peripheral surface side of the floor plate; the leg side of the column fixing part; A connecting portion is formed by filling the leg material side of the side column body with concrete, and the lower extending portion is embedded.

第1の態様に係る構造物の鉄塔基礎構造によれば、床板を備えており、この床板は、鉄塔の鉄骨脚部の一部を構成する脚材における鉄塔の高さ方向(以下、単に高さ方向と称する)下側の部分を、その内周面で囲むように配置されており、脚材を保持している。 According to the steel tower foundation structure of the structure according to the first aspect, the floor plate is provided, and the floor plate is arranged in the height direction of the steel tower (hereinafter simply referred to as height It is arranged so that its inner peripheral surface surrounds the lower part (referred to as the horizontal direction), and holds the leg material.

ところで、脚材に作用する引き抜き荷重を支持するのにあたって、脚材と一体的に設けられる柱体の重量は、大きい方が好ましい。また、施工時間の短縮の観点からは、柱体にプレキャストコンクリートを用いることが好ましい。一方で、鉄塔を山岳地等に建設する場合、運搬可能な材料の重量に制限があるため、柱体に用いることができるプレキャストコンクリートの重量もまた制限されることとなる。 By the way, in order to support the pull-out load acting on the leg member, it is preferable that the weight of the column provided integrally with the leg member is large. Furthermore, from the viewpoint of shortening construction time, it is preferable to use precast concrete for the columns. On the other hand, when constructing a steel tower in a mountainous area, etc., there is a limit to the weight of materials that can be transported, so the weight of precast concrete that can be used for the column body is also limited.

ここで、本態様では、プレキャストコンクリート製の柱体定着部と、プレキャストコンクリート製の下側柱体部とを備えており、これらで柱体の一部を構成することができる。 Here, in this aspect, a column fixing part made of precast concrete and a lower column part made of precast concrete are provided, and these can constitute a part of the column.

詳しくは、柱体定着部は、床板上に配置されており、高さ方向から見て床板の内周面に沿う筒状とされている。この柱体定着部には、複数の柱体定着筋の一部が埋め込まれており、この柱体定着筋は、柱体定着部から高さ方向上側に脚材の延在方向(以下、単に延在方向と称する)に沿うように延出された上側延出部と、柱体定着部から高さ方向下側に延出されて高さ方向から見て床板の内周面の内側に配置された下側延出部とを含んで構成されている。 Specifically, the column fixing section is disposed on the floorboard and has a cylindrical shape that extends along the inner circumferential surface of the floorboard when viewed from the height direction. A part of a plurality of column fixing bars is embedded in this column fixing part, and the column fixing bars extend upward in the height direction from the column fixing part in the extending direction of the leg members (hereinafter simply referred to as The upper extension part extends along the extension direction (referred to as the "extension direction"), and the upper extension part extends downward in the height direction from the column anchoring part and is arranged inside the inner circumferential surface of the floorboard when viewed from the height direction. and a lower extending portion.

また、柱体定着部には、延在方向と直交するように支持面が設けられており、この支持面上には、下側柱体部が配置されている。 Further, the columnar fixing section is provided with a support surface perpendicular to the extending direction, and the lower columnar section is arranged on this support surface.

下側柱体部は、延在方向に沿うように配置されると共に、延在方向から見て脚材を囲む円筒状とされている。また、下側柱体部には、柱体定着筋の上側延出部を挿通可能な複数の定着筋挿通孔部が形成されており、下側柱体部を設置するときに上側延出部を定着筋挿通孔部に挿通させることで、下側柱体部の位置決めを行うことができる。そして、定着筋挿通孔部にモルタルやコンクリートを充填することで、柱体定着部と下側柱体部とを接続することができる。 The lower column body portion is arranged along the extending direction and has a cylindrical shape surrounding the leg member when viewed from the extending direction. In addition, a plurality of anchoring bar insertion holes are formed in the lower column body part, through which the upper extension part of the column body anchoring bar can be inserted. By inserting the anchor into the anchor insertion hole, the lower column body can be positioned. Then, by filling the anchoring bar insertion hole with mortar or concrete, the column anchoring section and the lower column section can be connected.

また、床板の内周面側、柱体定着部の脚材側及び下側柱体部の脚材側にコンクリートが充填されることで、柱体定着筋の下側延出部が埋め込まれた接続部が構成されている。そして、接続部によって、脚材、柱体定着部及び下側柱体部が一体化されることで、柱体の一部が構成される。 In addition, by filling the inner peripheral surface of the floorboard, the leg side of the column anchorage, and the leg side of the lower column, the lower extension of the column anchorage was embedded. A connection is configured. Then, a part of the column is formed by integrating the leg member, the column fixing section, and the lower column body through the connection part.

このように、本態様では、柱体を構成する部材を分割して運搬することができ、その結果、鉄塔を山岳地等に建設する場合であっても、柱体の重量を確保することができる。 In this way, in this embodiment, the members constituting the column can be divided and transported, and as a result, even when the steel tower is constructed in a mountainous area, the weight of the column can be maintained. can.

第2の態様に係る鉄塔基礎構造は、鉄塔の鉄骨脚部の一部を構成する脚材における当該鉄塔の高さ方向下側の部分を当該高さ方向から見て囲むように配置されて当該脚材を保持する床板と、前記床板から前記高さ方向上側に前記脚材の延在方向に沿うように延出された上側延出部と、当該上側延出部から当該高さ方向下側に延出されて当該床板に埋め込まれた下側延出部と、を含む複数の柱体定着筋と、前記床板上に前記延在方向に沿うように配置され、当該延在方向から見て当該脚材を囲む筒状とされると共に、前記上側延出部を挿通可能な複数の定着筋挿通孔部が形成されたプレキャストコンクリート製の下側柱体部と、前記床板側及び前記下側柱体部の前記脚材側にコンクリートが充填されることで構成された接続部と、を有している。 The steel tower foundation structure according to the second aspect is arranged so as to surround the lower part of the steel tower in the height direction of the steel tower, in the leg material constituting a part of the steel frame leg of the steel tower, when viewed from the height direction. a floor plate that holds a leg; an upper extension that extends from the floor plate upward in the height direction along the extending direction of the leg; and a lower side in the height direction from the upper extension. a plurality of column fixing reinforcements including a lower extension extending from the floor plate and embedded in the floor plate; a lower column made of precast concrete that has a cylindrical shape that surrounds the leg material and has a plurality of fixing bar insertion holes through which the upper extension can be inserted; and the floor plate side and the lower side. and a connecting portion configured by filling the leg material side of the column portion with concrete.

第2の態様に係る鉄塔基礎構造によれば、床板を備えており、この床板は、鉄塔の鉄骨脚部の一部を構成する脚材における高さ方向下側の部分を囲むように配置されており、脚材を保持している。そして、床板には、複数の柱体定着筋の一部が埋め込まれている。 According to the steel tower foundation structure according to the second aspect, the floor plate is provided, and the floor plate is arranged so as to surround the lower part in the height direction of the leg material that constitutes a part of the steel frame leg of the steel tower. and retains the leg material. Parts of the plurality of column fixing bars are embedded in the floorboard.

詳しくは、柱体定着筋は、上側延出部と下側延出部とを含んで構成されている。そして、上側延出部は、床板から高さ方向上側に延在方向に沿うように延出されており、下側延出部は、上側延出部から高さ方向下側に延出されると共に、床板に埋め込まれている。 Specifically, the columnar anchoring reinforcement includes an upper extending portion and a lower extending portion. The upper extension part extends upward in the height direction from the floor plate along the extension direction, and the lower extension part extends downward in the height direction from the upper extension part. , embedded in the floorboard.

ここで、本態様では、床板上にプレキャストコンクリート製の下側柱体部が配置されており、この下側柱体部で柱体の一部を構成することができる。 Here, in this aspect, a lower column made of precast concrete is arranged on the floorboard, and this lower column can constitute a part of the column.

詳しくは、下側柱体部は、延在方向に沿うように配置されると共に、延在方向から見て脚材を囲む円筒状とされている。また、下側柱体部には、柱体定着筋の上側延出部を挿通可能な複数の定着筋挿通孔部が形成されており、下側柱体部を設置するときに上側延出部を定着筋挿通孔部に挿通させることで、下側柱体部の位置決めを行うことができる。そして、定着筋挿通孔部にモルタルやコンクリートを充填することで、床板と下側柱体部とを接続することができる。 Specifically, the lower column body portion is arranged along the extending direction and has a cylindrical shape surrounding the leg member when viewed from the extending direction. In addition, a plurality of anchoring bar insertion holes are formed in the lower column body part, through which the upper extension part of the column body anchoring bar can be inserted. By inserting the anchor into the anchor insertion hole, the lower column body can be positioned. Then, by filling the fixing bar insertion hole with mortar or concrete, the floor plate and the lower column body can be connected.

また、床板側及び下側柱体部の脚材側にコンクリートが充填されることで、接続部が構成されている。そして、接続部によって、脚材及び下側柱体部が一体化されることで、柱体の一部が構成される。 Further, the connecting portion is formed by filling the floor plate side and the leg material side of the lower column body with concrete. A portion of the column is formed by integrating the leg member and the lower column body through the connection portion.

このように、本態様では、柱体を構成する部材を床板を構成する部材とは別に運搬することができ、その結果、鉄塔を山岳地等に建設する場合であっても、柱体の重量を確保することができる。 In this way, in this aspect, the members that make up the columns can be transported separately from the members that make up the floorboards, and as a result, even when constructing a steel tower in a mountainous area, the weight of the columns can be reduced. can be ensured.

第3の態様に係る鉄塔基礎構造は、第2の態様に係る鉄塔基礎構造において、前記下側柱体部から前記高さ方向上側に前記延在方向に沿うように延出されると共に、当該延在方向から見て前記定着筋挿通孔部よりも当該下側柱体部の内周側に配置された複数の第1接続筋と、前記下側柱体部の上面上に前記延在方向に沿うように配置され、前記延在方向から見て前記脚材を囲む円筒状とされると共に、前記第1接続筋を挿通可能な複数の第1接続筋挿通孔部が形成されたプレキャストコンクリート製の中間柱体部と、前記中間柱体部から前記高さ方向上側に前記延在方向に沿うように延出されると共に、当該延在方向から見て前記第1接続筋挿通孔部よりも当該中間柱体部の内周側に配置された複数の第2接続筋と、前記中間柱体部の上面上に前記延在方向に沿うように配置され、前記延在方向から見て前記脚材を囲む円筒状とされると共に、前記第2接続筋を挿通可能な複数の第2接続筋挿通孔部が形成されたプレキャストコンクリート製の上側柱体部と、をさらに有している。 The steel tower foundation structure according to a third aspect is the steel tower foundation structure according to the second aspect, which extends from the lower column part upward in the height direction along the extension direction. a plurality of first connection bars disposed on the inner circumferential side of the lower column body section relative to the fixing bar insertion hole section when viewed from the direction of extension; Made of precast concrete, the tube is arranged along the same line and has a cylindrical shape surrounding the leg material when viewed from the extending direction, and is formed with a plurality of first connecting reinforcement insertion holes through which the first connecting reinforcement can be inserted. and an intermediate column extending upwardly from the intermediate column in the height direction along the extension direction, and further extending from the first connecting bar insertion hole when viewed from the extension direction. a plurality of second connecting bars disposed on the inner peripheral side of the intermediate column body; and a plurality of second connecting bars disposed on the upper surface of the intermediate column body along the extending direction, and the leg member as viewed from the extending direction. The column further includes an upper column body made of precast concrete, which has a cylindrical shape surrounding the column, and is formed with a plurality of second connecting reinforcement insertion holes through which the second connecting reinforcement can be inserted.

第3の態様に係る鉄塔基礎構造によれば、複数の第1接続筋が、下側柱体部から高さ方向上側に延在方向に沿うように延出されている。そして、これらの第1接続筋は、延在方向から見て下側柱体部に設けられた定着筋挿通孔部よりも当該下側柱体部の内周側に配置されている。 According to the steel tower foundation structure according to the third aspect, the plurality of first connection reinforcements extend upward in the height direction from the lower column portion along the extension direction. These first connection bars are arranged closer to the inner circumferential side of the lower column body than the fixing bar insertion hole provided in the lower column body when viewed from the extending direction.

一方、下側柱体部の上面上には、プレキャストコンクリート製の中間柱体部が配置されている。この中間柱体部は、延在方向から見て脚材を囲む円筒状とされており、延在方向に沿うように配置されている。そして、中間柱体部には、第1接続筋を挿通可能な複数の第1接続筋挿通孔部が形成されている。 On the other hand, an intermediate column made of precast concrete is arranged on the upper surface of the lower column. The intermediate column body has a cylindrical shape surrounding the leg member when viewed from the extending direction, and is arranged along the extending direction. A plurality of first connecting rod insertion holes through which the first connecting rods can be inserted are formed in the intermediate column body part.

これにより、中間柱体部を下側柱体部上に設置するときに第1接続筋を第1接続筋挿通孔部に挿通させることで、中間柱体部の位置決めを行うことができる。そして、第1接続筋挿通孔部にモルタルやコンクリートを充填することで、中間柱体部と下側柱体部とを接続することができる。 Thereby, when installing the intermediate column body on the lower column body part, the intermediate column body part can be positioned by inserting the first connection bar into the first connection bar insertion hole. Then, by filling the first connecting reinforcement insertion hole with mortar or concrete, the intermediate column body part and the lower column body part can be connected.

また、中間柱体部からは、複数の第2接続筋が、高さ方向上側に延在方向に沿うように延出されている。そして、これらの第2接続筋は、延在方向から見て中間柱体部に設けられた第1接続筋挿通孔部よりも当該中間柱体部の内周側に配置されている。 Moreover, a plurality of second connection bars extend upward in the height direction along the extension direction from the intermediate column body portion. These second connecting bars are arranged closer to the inner circumferential side of the intermediate column body than the first connecting bar insertion hole provided in the intermediate column body when viewed from the extending direction.

一方、中間柱体部の上面上には、プレキャストコンクリート製の上側柱体部が配置されている。この上側柱体部は、延在方向から見て脚材を囲む円筒状とされており、延在方向に沿うように配置されている。そして、上側柱体部には、第2接続筋を挿通可能な複数の第2接続筋挿通孔部が形成されている。 On the other hand, an upper column made of precast concrete is arranged on the upper surface of the intermediate column. This upper column body part has a cylindrical shape surrounding the leg member when viewed from the extending direction, and is arranged along the extending direction. A plurality of second connecting rod insertion holes through which the second connecting rods can be inserted are formed in the upper column body part.

これにより、上側柱体部を中間柱体部上に設置するときに第2接続筋を第2接続筋挿通孔部に挿通させることで、上側柱体部の位置決めを行うことができる。そして、第2接続筋挿通孔部にモルタルやコンクリートを充填することで、上側柱体部と中間柱体部とを接続することができる。 Thereby, when installing the upper column body on the intermediate column body, the upper column body can be positioned by inserting the second connecting bar into the second connecting bar insertion hole. Then, by filling the second connection bar insertion hole with mortar or concrete, the upper column part and the intermediate column part can be connected.

このように、本態様では、下側柱体部上に、上側柱体部及び中間柱体部が設置されることで柱体が構成される。このため、本態様では、柱体の大きさに応じて柱体を構成する部材の分割数を設定し、当該部材の重量が大きくなることを抑制することができる。 In this manner, in this aspect, the column is configured by installing the upper column and the intermediate column on the lower column. Therefore, in this aspect, it is possible to set the number of divisions of the member constituting the column according to the size of the column, and to suppress an increase in the weight of the member.

第4の態様に係る鉄塔基礎構造は、第3の態様に係る鉄塔基礎構造において、前記定着筋挿通孔部は、前記延在方向から見て前記中間柱体部の外周に沿うように配置されると共に、一部が当該中間柱体部で覆われている。 In the steel tower foundation structure according to a fourth aspect, in the steel tower foundation structure according to the third aspect, the anchoring bar insertion hole portion is arranged along the outer periphery of the intermediate column body portion when viewed from the extending direction. and is partially covered by the intermediate column body.

第4の態様に係る鉄塔基礎構造によれば、下側柱体部に設けられた定着筋挿通孔部が、延在方向から見て中間柱体部の外周に沿うように配置されると共に、定着筋挿通孔部の一部が中間柱体部で覆われている。このため、定着筋挿通孔部へのモルタルやコンクリートの充填が中間柱体部で阻害されることを抑制しつつ、中間柱体部の外径を確保することができる。 According to the steel tower foundation structure according to the fourth aspect, the anchoring bar insertion hole provided in the lower column body is arranged along the outer periphery of the intermediate column body when viewed from the extending direction, and A part of the anchoring bar insertion hole is covered by the intermediate column body part. Therefore, it is possible to ensure the outer diameter of the intermediate column body while suppressing the filling of mortar or concrete into the fixing bar insertion hole portion from being obstructed by the intermediate column body.

第5の態様に係る鉄塔基礎構造は、第4の態様に係る鉄塔基礎構造において、前記第1接続筋挿通孔部は、前記延在方向から見て前記上側柱体部の外周に沿うように配置されると共に、一部が当該上側柱体部で覆われている。 In the steel tower foundation structure according to a fifth aspect, in the steel tower foundation structure according to the fourth aspect, the first connection bar insertion hole portion is arranged along the outer periphery of the upper column body portion when viewed from the extension direction. and is partially covered by the upper column body.

第5の態様に係る鉄塔基礎構造によれば、中間柱体部に設けられた第1接続筋挿通孔部が、延在方向から見て上側柱体部の外周に沿うように配置されると共に、第1接続筋挿通孔部の一部が上側柱体部で覆われている。このため、第1接続筋挿通孔部へのモルタルやコンクリートの充填が上側柱体部で阻害されることを抑制しつつ、上側柱体部の外径を確保することができる。 According to the steel tower foundation structure according to the fifth aspect, the first connecting reinforcement insertion hole provided in the intermediate column body is arranged along the outer periphery of the upper column body when viewed from the extending direction, and , a portion of the first connecting reinforcement insertion hole is covered by the upper column body. For this reason, it is possible to ensure the outer diameter of the upper column body while suppressing the filling of mortar or concrete into the first connecting reinforcement insertion hole portion from being obstructed by the upper column body.

第6の態様に係る鉄塔基礎構造は、第3の態様~第5の態様の何れか1態様に係る鉄塔基礎構造において、前記下側柱体部の外周側に埋め込まれると共に前記延在方向から見て前記複数の定着筋挿通孔部を囲むようにかつ軸方向を当該延在方向とされた状態で配置された第1螺旋筋と、前記中間柱体部の外周側に埋め込まれると共に前記延在方向から見て前記複数の第1接続筋挿通孔部を囲むようにかつ軸方向を当該延在方向とされた状態で配置された第2螺旋筋と、前記上側柱体部の外周側に埋め込まれると共に前記延在方向から見て前記複数の第2接続筋挿通孔部を囲むようにかつ軸方向を当該延在方向とされた状態で配置された第3螺旋筋と、をさらに有している。 In the steel tower foundation structure according to any one of the third to fifth aspects, the steel tower foundation structure according to the sixth aspect is embedded in the outer circumferential side of the lower column body part and from the extending direction. a first spiral reinforcement arranged so as to surround the plurality of anchorage reinforcement insertion holes and with the axial direction as the extension direction; a second spiral reinforcement arranged so as to surround the plurality of first connection reinforcement insertion holes when viewed from the direction in which the reinforcements extend, and a second spiral reinforcement arranged with the axial direction as the extension direction; It further includes a third spiral muscle that is embedded and arranged so as to surround the plurality of second connecting muscle insertion holes when viewed from the extending direction and with the axial direction as the extending direction. ing.

第6の態様に係る鉄塔基礎構造によれば、下側柱体部の外周側に第1螺旋筋が埋め込まれており、この第1螺旋筋は、延在方向から見て下側柱体部に設けられた複数の定着筋挿通孔部を囲むようにかつ軸方向を延在方向とされた状態で配置されている。このため、下側柱体部に発生する曲げモーメントに対する下側柱体部の剛性を確保することができる。 According to the steel tower foundation structure according to the sixth aspect, the first spiral reinforcement is embedded in the outer peripheral side of the lower column body, and the first spiral reinforcement is visible in the lower column body when viewed from the extending direction. The fixing bar is arranged so as to surround a plurality of fixing bar insertion holes provided in the fixing bar and with the axial direction as the extending direction. Therefore, the rigidity of the lower column body against the bending moment generated in the lower column body can be ensured.

また、本態様では、中間柱体部の外周側に第2螺旋筋が埋め込まれており、この第2螺旋筋は、延在方向から見て中間柱体部に設けられた複数の第1接続筋挿通孔部を囲むようにかつ軸方向を延在方向とされた状態で配置されている。このため、中間柱体部に発生する曲げモーメントに対する中間柱体部の剛性を確保することができる。 Further, in this aspect, the second spiral reinforcement is embedded in the outer peripheral side of the intermediate column, and the second spiral reinforcement is connected to the plurality of first connections provided in the intermediate column when viewed from the extending direction. It is arranged so as to surround the muscle insertion hole and extend in the axial direction. Therefore, the rigidity of the intermediate column body against the bending moment generated in the intermediate column body can be ensured.

さらに、本態様では、上側柱体部の外周側に第3旋筋が埋め込まれており、この第3螺旋筋は、延在方向から見て上側柱体部に設けられた複数の第2接続筋挿通孔部を囲むようにかつ軸方向を延在方向とされた状態で配置されている。このため、上側柱体部に発生する曲げモーメントに対する上側柱体部の剛性を確保することができる。 Furthermore, in this aspect, the third spiral muscle is embedded in the outer peripheral side of the upper column body, and this third spiral muscle is connected to the plurality of second connections provided in the upper column body when viewed from the extending direction. It is arranged so as to surround the muscle insertion hole and extend in the axial direction. Therefore, the rigidity of the upper column body against the bending moment generated in the upper column body can be ensured.

第7の態様に係る鉄塔基礎構造は、第6の態様に係る鉄塔基礎構造において、前記下側柱体部における前記第1螺旋筋の外周側に埋め込まれると共に前記延在方向から見て円環状とされた補強筋をさらに有している。 In the steel tower foundation structure according to the sixth aspect, the steel tower foundation structure according to a seventh aspect is embedded in the outer peripheral side of the first spiral reinforcement in the lower column body part and has an annular shape when viewed from the extending direction. It further has reinforcing bars.

第7の態様に係る鉄塔基礎構造によれば、下側柱体部における第1螺旋筋の外周側に、延在方向から見て円環状とされた補強筋が埋め込まれており、この補強筋によって、下側柱体部に発生する曲げモーメントに対する下側柱体部の剛性をより高めることができる。 According to the steel tower foundation structure according to the seventh aspect, a reinforcing bar having an annular shape when viewed from the extending direction is embedded in the outer peripheral side of the first spiral bar in the lower column body part, and this reinforcing bar Accordingly, the rigidity of the lower column body against the bending moment generated in the lower column body can be further increased.

以上説明したように、本発明に係る鉄塔基礎構造は、鉄塔の基礎部の一部を構成する柱体の重量を確保しつつ、柱体の構築に必要な施工時間を短縮し、さらに柱体を構成する材料の運搬を容易なものとすることができるという優れた効果を有する。 As explained above, the steel tower foundation structure according to the present invention secures the weight of the columns that constitute a part of the foundation of the steel tower, shortens the construction time required for constructing the columns, and furthermore It has the excellent effect of making it easier to transport the materials that make up the material.

本実施形態に係る鉄塔基礎構造が適用された基礎の構成を模式的に示す斜視図である。FIG. 1 is a perspective view schematically showing the configuration of a foundation to which a steel tower foundation structure according to the present embodiment is applied. 実施形態に係る鉄塔基礎構造が適用された基礎の定着ピースの構成を模式的に示す斜視図である。FIG. 2 is a perspective view schematically showing the configuration of a fixing piece of a foundation to which a steel tower foundation structure according to an embodiment is applied. 本実施形態に係る鉄塔基礎構造が適用された基礎の柱体の構成を模式的に示す平面図である。FIG. 2 is a plan view schematically showing the structure of a column of a foundation to which the steel tower foundation structure according to the present embodiment is applied. 本実施形態に係る鉄塔基礎構造が適用された基礎の下側ピースの構成を模式的に示す平面図である。FIG. 2 is a plan view schematically showing the configuration of a lower piece of a foundation to which the steel tower foundation structure according to the present embodiment is applied. 本実施形態に係る鉄塔基礎構造が適用された基礎の下側ピースの構成を模式的に示す側面図である。FIG. 2 is a side view schematically showing the configuration of a lower piece of a foundation to which the steel tower foundation structure according to the present embodiment is applied. 本実施形態に係る鉄塔基礎構造が適用された基礎の下側ピースに埋め込まれた配筋の構成を模式的に示す断面図である。FIG. 2 is a cross-sectional view schematically showing the configuration of reinforcement embedded in the lower piece of the foundation to which the steel tower foundation structure according to the present embodiment is applied. 本実施形態に係る鉄塔基礎構造が適用された基礎の中間ピースの構成を模式的に示す平面図である。FIG. 2 is a plan view schematically showing the configuration of an intermediate piece of a foundation to which the steel tower foundation structure according to the present embodiment is applied. 本実施形態に係る鉄塔基礎構造が適用された基礎の中間ピースの構成を模式的に示す側面図である。FIG. 2 is a side view schematically showing the configuration of an intermediate piece of a foundation to which the steel tower foundation structure according to the present embodiment is applied. 本実施形態に係る鉄塔基礎構造が適用された基礎の中間ピースに埋め込まれた配筋の構成を模式的に示す断面図である。FIG. 2 is a cross-sectional view schematically showing the configuration of reinforcement embedded in an intermediate piece of a foundation to which the steel tower foundation structure according to the present embodiment is applied. 本実施形態に係る鉄塔基礎構造が適用された基礎の上側ピースの構成を模式的に示す平面図である。FIG. 2 is a plan view schematically showing the configuration of the upper piece of the foundation to which the steel tower foundation structure according to the present embodiment is applied. 本実施形態に係る鉄塔基礎構造が適用された基礎の上側ピースに埋め込まれた配筋の構成を模式的に示す断面図である。FIG. 2 is a cross-sectional view schematically showing the configuration of reinforcement embedded in the upper piece of the foundation to which the steel tower foundation structure according to the present embodiment is applied. 本実施形態に係る鉄塔基礎構造が適用された基礎の構成を模式的に示す断面図である。FIG. 1 is a cross-sectional view schematically showing the configuration of a foundation to which a steel tower foundation structure according to the present embodiment is applied. 本実施形態に係る鉄塔基礎構造が適用された鉄塔の構成を模式的に示す側面図である。FIG. 1 is a side view schematically showing the configuration of a steel tower to which the steel tower foundation structure according to the present embodiment is applied. 本実施形態の変形例に係る鉄塔基礎構造が適用された基礎の床板周辺の構成を模式的に示す側面図である。FIG. 3 is a side view schematically showing a configuration around a floor plate of a foundation to which a steel tower foundation structure according to a modification of the present embodiment is applied. 本実施形態の変形例に係る鉄塔基礎構造が適用された基礎の下側ピースの構成を模式的に示す側面図である。It is a side view which shows typically the structure of the lower piece of the foundation to which the steel tower foundation structure based on the modification of this embodiment is applied.

以下、図1~図13を用いて、本発明に係る鉄塔基礎構造の実施形態の一例について説明する。 An example of an embodiment of a steel tower foundation structure according to the present invention will be described below with reference to FIGS. 1 to 13.

図13に示されるように、本実施形態に係る鉄塔基礎構造が適用された「鉄塔10」は、山岳地に建設されていると共に、複数の主柱材12、複数の水平材14、複数の斜材16及び主柱材12と斜材16とに架け渡された複数の主柱材用補助材18を含んで構成されており、4本の「鉄骨脚部20」を備えている。そして、それぞれの鉄骨脚部20に対して基礎部22が設けられている。なお、以下では、特にことわりのない限り、鉄塔10の高さ方向を単に高さ方向と称することとする。 As shown in FIG. 13, a "steel tower 10" to which the steel tower foundation structure according to the present embodiment is applied is constructed in a mountainous area, and has a plurality of main pillar members 12, a plurality of horizontal members 14, a plurality of It is configured to include a diagonal member 16 and a plurality of auxiliary members 18 for main pillar members that span between the main pillar member 12 and the diagonal member 16, and is provided with four "steel frame legs 20." A base portion 22 is provided for each steel leg portion 20. Note that hereinafter, unless otherwise specified, the height direction of the steel tower 10 will be simply referred to as the height direction.

図12に示されるように、基礎部22は、鉄骨脚部20の一部を構成する「脚材24」を地盤26に対して支持すると共に、内側ピース28、「床板30」、床板螺旋筋32、柱体34及び「接続部36(図1参照)」を含んで構成されている。 As shown in FIG. 12, the foundation part 22 supports the "leg material 24" that constitutes a part of the steel frame leg part 20 against the ground 26, and also supports the inner piece 28, the "floor plate 30", and the floor plate spiral reinforcement. 32, a column 34, and a "connection part 36 (see FIG. 1)".

脚材24は、図1にも示されるように、山形鋼で構成された本体部38と、本体部38の下端部に設けられると共に平型鋼で構成された図示しない基部とが、溶接等による図示しない接合部で接合されることでその主な部分が構成されている。 As shown in FIG. 1, the leg member 24 has a main body 38 made of angle iron and a base (not shown) provided at the lower end of the main body 38 and made of flat steel by welding or the like. The main parts are joined by joints not shown.

より詳しくは、本体部38は、高さ方向下側の部分が内側ピース28に埋設されており、高さ方向上側の部分が内側ピース28から露出されて鉄塔10の頂部に向かって延びている。つまり、脚材24(本体部38)の延在方向は、高さ方向に対して傾いている。なお、以下では、特にことわりのない限り、脚材24の延在方向を単に延在方向と称することとする。 More specifically, the lower part of the main body part 38 in the height direction is buried in the inner piece 28, and the upper part in the height direction is exposed from the inner piece 28 and extends toward the top of the steel tower 10. . That is, the extending direction of the leg member 24 (main body portion 38) is inclined with respect to the height direction. Note that, hereinafter, unless otherwise specified, the extending direction of the leg member 24 will be simply referred to as the extending direction.

なお、本体部38には、延在方向に沿って山形鋼で構成された図示しない複数の支圧板が取り付けられている。また、脚材24の基部における高さ方向下側には、図示しない平板状の支持板部が配置されており、この支持板部は、地盤26上に設置されている。 Note that a plurality of bearing plates (not shown) made of angle iron are attached to the main body part 38 along the extending direction. Further, a flat support plate (not shown) is disposed on the lower side in the height direction at the base of the leg member 24, and this support plate is installed on the ground 26.

一方、内側ピース28は、脚材24の高さ方向下側の端部と一体的に設けられている。この内側ピース28は、プレキャストコンクリート製とされており、高さ方向に延在する角柱状に構成されている。そして、内側ピース28の外周側には、床板螺旋筋32が配置されている。なお、鉄塔10の仕様等に応じて脚材24に内側ピース28を設けないような構成も採り得る。 On the other hand, the inner piece 28 is provided integrally with the lower end of the leg member 24 in the height direction. This inner piece 28 is made of precast concrete and has a prismatic shape extending in the height direction. A floor plate spiral muscle 32 is arranged on the outer peripheral side of the inner piece 28. Note that, depending on the specifications of the steel tower 10, etc., a configuration in which the inner piece 28 is not provided on the leg member 24 may also be adopted.

床板螺旋筋32は、異形棒鋼で構成されており、高さ方向から見て円環状とされると共に、軸方向を高さ方向とされた螺旋状とされている。なお、床板螺旋筋32は、丸鋼で構成されていてもよい。 The floor plate spiral reinforcement 32 is made of a deformed steel bar, has an annular shape when viewed from the height direction, and has a spiral shape with the axial direction as the height direction. Note that the floor plate spiral reinforcement 32 may be made of round steel.

床板30は、図1にも示されるように、全体では、高さ方向から見て中央部に円形の貫通部40が形成された円盤状とされており、貫通部40の内側には、内側ピース28及び床板螺旋筋32が配置されている。つまり、床板30は、高さ方向から見て、その「内周面30A」で脚材24の高さ方向下側の部分を囲むように配置されている。 As shown in FIG. 1, the floorboard 30 has a disk shape as a whole with a circular penetration part 40 formed in the center when viewed from the height direction. Piece 28 and floor plate spiral reinforcement 32 are arranged. That is, the floorboard 30 is arranged so that its "inner circumferential surface 30A" surrounds the lower part of the leg member 24 in the height direction when viewed from the height direction.

この床板30は、その高さ方向上側の部分を構成する複数の上側床板ブロック42と、その高さ方向下側の部分を構成する複数の下側床板ブロック44とを含んで構成されている。なお、上側床板ブロック42及び下側床板ブロック44は、何れもプレキャストコンクリート製とされている。 This floorboard 30 is configured to include a plurality of upper floorboard blocks 42 forming an upper part in the height direction and a plurality of lower floorboard blocks 44 forming a lower part in the height direction. Note that both the upper floor plate block 42 and the lower floor plate block 44 are made of precast concrete.

詳しくは、上側床板ブロック42は、床板螺旋筋32における高さ方向上側の部分の外周側に床板螺旋筋32の周方向に沿うように連なって配置されており、隣接する上側床板ブロック42は、互いに当接された状態となっている。また、上側床板ブロック42には、異形棒鋼で構成された上側補強筋46が設けられており、この上側補強筋46には、床板螺旋筋32の高さ方向上側の部分が係止されている。 Specifically, the upper floorboard blocks 42 are arranged in a row along the circumferential direction of the floorboard spiral reinforcements 32 on the outer circumferential side of the upper part of the floorboard spiral reinforcements 32 in the height direction, and the adjacent upper floorboard blocks 42 are They are in contact with each other. Further, the upper floor plate block 42 is provided with an upper reinforcing bar 46 made of a deformed steel bar, and the upper part of the floor plate spiral bar 32 in the height direction is locked to this upper reinforcing bar 46. .

一方、下側床板ブロック44は、床板螺旋筋32における高さ方向下側の部分の外周側に床板螺旋筋32の周方向に沿うように連なって配置されており、隣接する下側床板ブロック44は、互いに当接された状態となっている。また、下側床板ブロック44には、異形棒鋼で構成された下側補強筋47が設けられており、この下側補強筋47には、床板螺旋筋32の高さ方向下側の部分が係止されている。 On the other hand, the lower floor plate blocks 44 are arranged in a row along the circumferential direction of the floor plate spiral reinforcement 32 on the outer circumferential side of the lower part of the floor plate spiral reinforcement 32 in the height direction, and the adjacent lower floor plate blocks 44 are in contact with each other. Further, the lower floor plate block 44 is provided with a lower reinforcing bar 47 made of a deformed steel bar, and the lower part of the floor plate spiral bar 32 in the height direction is engaged with this lower reinforcing bar 47. It has been stopped.

ここで、本実施形態では、図1に示されるように、延在方向に延在する柱体34が、その主な部分をプレキャストコンクリートで構成された複数の部品、すなわち定着ピース48、下側ピース50、中間ピース52及び上側ピース54で構成されている点に特徴がある。以下、これらの部品の構成について詳細に説明することとする。 Here, in this embodiment, as shown in FIG. 1, the pillar body 34 extending in the extending direction has a plurality of parts made of precast concrete, including the anchoring piece 48 and the lower part. It is characterized by being composed of a piece 50, an intermediate piece 52, and an upper piece 54. The configuration of these parts will be explained in detail below.

定着ピース48は、図2に示されるように、「柱体定着部56」と、複数の「柱体定着筋58」とを含んで構成されている。柱体定着部56は、プレキャストコンクリート製とされると共に、床板30の高さ方向上側に配置されている。 As shown in FIG. 2, the fixing piece 48 is configured to include a "column fixing section 56" and a plurality of "column fixing bars 58." The column fixing section 56 is made of precast concrete and is arranged above the floorboard 30 in the height direction.

この柱体定着部56は、高さ方向から見て、その内周が床板30の内周面30Aに沿う円形とされると共に延在方向から見て外径がD1の筒状又はリング状に形成されている。そして、柱体定着部56の下面56Aは、上側床板ブロック42の上面42Aに当接された水平面とされており、柱体定着部56の支持面としての「上面56B」は、延在方向に対して直交している。 The columnar fixing portion 56 has a circular inner circumference along the inner circumferential surface 30A of the floorboard 30 when viewed from the height direction, and has a cylindrical or ring shape having an outer diameter of D1 when viewed from the extending direction. It is formed. The lower surface 56A of the columnar fixing section 56 is a horizontal surface that comes into contact with the upper surface 42A of the upper floor plate block 42, and the "upper surface 56B" as a supporting surface of the columnar fixing section 56 extends in the extending direction. It is orthogonal to

一方、柱体定着筋58は、異形棒鋼で構成されており、その一部が柱体定着部56に埋め込まれると共に、柱体定着部56の周方向に互いに対して間隔をあけて配置されている。この柱体定着筋58は、柱体定着部56の高さ方向上側に延在方向に沿うように延出された「上側延出部58A」と、柱体定着部56の高さ方向下側に延出された「下側延出部58B」とを含んで構成されている。そして、上側延出部58Aは、延在方向から見て直径D2の円周上に配置されている。 On the other hand, the column fixing bars 58 are made of deformed steel bars, a part of which is embedded in the column fixing section 56, and arranged at intervals from each other in the circumferential direction of the column fixing section 56. There is. The column fixing bars 58 include an "upper extending section 58A" extending along the extension direction above the column fixing section 56 in the height direction, and an "upper extending section 58A" extending along the extending direction below the column fixing section 56 in the height direction. It is configured to include a "lower extension part 58B" extending from the bottom. The upper extending portion 58A is disposed on a circumference having a diameter D2 when viewed from the extending direction.

そして、上側延出部58Aには、後述するように、下側ピース50が取り付けられている。一方、下側延出部58Bは、床板螺旋筋32の内周側に配置されると共に(図12参照)、後述するように、接続部36に埋め込まれている。 A lower piece 50 is attached to the upper extending portion 58A, as will be described later. On the other hand, the lower extending portion 58B is disposed on the inner peripheral side of the floor plate spiral reinforcement 32 (see FIG. 12), and is embedded in the connecting portion 36 as described later.

図4~図6に示されるように、下側ピース50は、「下側柱体部60」と、複数の第1接続筋としての「接続筋62」と、第1螺旋筋としての「螺旋筋64」と、一対の「補強筋66」とを含んで構成されている。 As shown in FIGS. 4 to 6, the lower piece 50 includes a "lower column part 60", "connection bars 62" as a plurality of first connection bars, and "spiral" as a first spiral bar. The reinforcing bar 64 includes a reinforcing bar 64 and a pair of reinforcing bar 66.

下側柱体部60は、プレキャストコンクリート製とされており、柱体定着部56の上面56B上に延在方向に沿うように配置されている(図1参照)。詳しくは、下側柱体部60は、図3にも示されるように、延在方向から見て、脚材24を囲む円筒状とされており、その外径がD1とされると共にその延在方向の長さがL1とされている。 The lower column part 60 is made of precast concrete, and is arranged on the upper surface 56B of the column fixing part 56 along the extending direction (see FIG. 1). Specifically, as shown in FIG. 3, the lower columnar body part 60 has a cylindrical shape surrounding the leg member 24 when viewed from the extending direction, and has an outer diameter of D1 and a length of its extension. The length in the current direction is L1.

この下側柱体部60には、柱体定着筋58の上側延出部58Aを挿通可能な定着筋挿通孔部としての「挿通孔部68」が、複数(柱体定着筋58の本数と同じ数)形成されている。そして、これらの挿通孔部68は、その中心が、延在方向から見て下側柱体部60の中心を中心とするD1よりも小さい直径D2の円周上に位置するように当該円周方向に所定の間隔で配置されている。 This lower column body part 60 has a plurality of "insertion hole parts 68" (the number of column fixing bars 58 and the same number) are formed. These insertion holes 68 are arranged around the circumference such that the center thereof is located on the circumference having a diameter D2 smaller than D1 and centered on the center of the lower column body 60 when viewed from the extending direction. are arranged at predetermined intervals in the direction.

接続筋62は、異形棒鋼で構成されており、その一部が下側柱体部60に埋め込まれると共に、下側柱体部60から高さ方向上側に延在方向に沿うように延出されている。これらの接続筋62は、延在方向から見て下側柱体部60の中心を中心とするD2よりも小さい直径D3の円周に沿って所定の間隔で配置されている。 The connecting reinforcement 62 is made of a deformed steel bar, and a part thereof is embedded in the lower column body part 60 and extends from the lower column body part 60 upward in the height direction along the extension direction. ing. These connecting bars 62 are arranged at predetermined intervals along a circumference having a diameter D3 smaller than D2 and centered on the center of the lower column body 60 when viewed from the extending direction.

螺旋筋64は、異形棒鋼で構成されており、延在方向から見て円環状とされると共に、軸方向を延在方向とされた螺旋状とされている。この螺旋筋64は、下側柱体部60の外周側に埋め込まれると共に延在方向から見て複数の挿通孔部68を囲むように配置されている。また、本実施形態では、一例として螺旋筋64の巻き数が、15に設定されている。なお、螺旋筋64は、丸鋼で構成されていてもよい。 The spiral reinforcement 64 is made of a deformed steel bar, has an annular shape when viewed from the extending direction, and has a spiral shape with the axial direction as the extending direction. The spiral muscle 64 is embedded in the outer peripheral side of the lower column body part 60 and is arranged so as to surround the plurality of insertion holes 68 when viewed from the extending direction. Further, in this embodiment, the number of turns of the spiral muscle 64 is set to 15, as an example. Note that the spiral reinforcement 64 may be made of round steel.

補強筋66は、螺旋筋64よりも太い異形棒鋼で構成されており、延在方向から見て円環状に曲げられると共に、その端部同士が溶接等による図示しない接合部で接合されている。この補強筋66は、下側柱体部60の延在方向一方側の端部と他方側の端部とのそれぞれにおいて、下側柱体部60における螺旋筋64の外周側に埋め込まれている。なお、補強筋66は、丸鋼で構成されていてもよい。 The reinforcing bar 66 is made of a deformed steel bar that is thicker than the spiral bar 64, and is bent into an annular shape when viewed from the extending direction, and its ends are joined by welding or the like at a joint (not shown). This reinforcing bar 66 is embedded in the outer peripheral side of the spiral bar 64 in the lower column body 60 at one end and the other end in the extending direction of the lower column body 60. . Note that the reinforcing bars 66 may be made of round steel.

図7~図9に示されるように、中間ピース52は、「中間柱体部70」と、複数の第2接続筋としての「接続筋72」と、第2螺旋筋としての「螺旋筋74」とを含んで構成されている。 As shown in FIGS. 7 to 9, the intermediate piece 52 includes an "intermediate column body part 70," "connection bars 72" as a plurality of second connection bars, and "spiral bars 74" as second spiral bars. ”.

中間柱体部70は、プレキャストコンクリート製とされており、下側柱体部60の「上面60A」上に延在方向に沿うように配置されている。詳しくは、中間柱体部70は、延在方向から見て、脚材24を囲む円筒状とされており、その外径がD2とされると共にその延在方向の長さがL1よりも長いL2とされている。 The intermediate column body part 70 is made of precast concrete, and is arranged on the "upper surface 60A" of the lower column body part 60 along the extending direction. Specifically, the intermediate column body part 70 has a cylindrical shape surrounding the leg member 24 when viewed from the extending direction, and has an outer diameter of D2 and a length longer than L1 in the extending direction. It is considered L2.

この中間柱体部70には、接続筋62を挿通可能な第1接続筋挿通孔部としての「挿通孔部76」が、複数(接続筋62の本数と同じ数)形成されている。そして、これらの挿通孔部76は、その中心が、延在方向から見て中間柱体部70の中心を中心とする直径がD2よりも小さいD3の円周上に位置するように当該円周方向に所定の間隔で配置されている。 A plurality of "insertion holes 76" (the same number as the number of connecting bars 62) are formed in the intermediate column body part 70 as first connecting bar insertion holes into which the connecting bars 62 can be inserted. These insertion holes 76 are arranged around the circumference such that their centers are located on the circumference D3, which is centered on the center of the intermediate column body 70 and whose diameter is smaller than D2 when viewed from the extending direction. are arranged at predetermined intervals in the direction.

接続筋72は、異形棒鋼で構成されており、その一部が中間柱体部70に埋め込まれると共に、中間柱体部70から高さ方向上側に延在方向に沿うように延出されている。これらの接続筋72は、延在方向から見て中間柱体部70の中心を中心とする直径がD3よりも小さいD4の円周に沿って所定の間隔で配置されている。 The connecting reinforcement 72 is made of a deformed steel bar, and a part thereof is embedded in the intermediate column body part 70 and extends from the intermediate column body part 70 upward in the height direction along the extension direction. . These connecting bars 72 are arranged at predetermined intervals along the circumference of D4, which is centered on the center of the intermediate columnar body part 70 and whose diameter is smaller than D3 when viewed from the extending direction.

螺旋筋74は、異形棒鋼で構成されており、延在方向から見て円環状とされると共に、軸方向を延在方向とされた螺旋状とされている。この螺旋筋74は、中間柱体部70の外周側に埋め込まれると共に延在方向から見て複数の挿通孔部76を囲むように配置されている。また、本実施形態では、一例として螺旋筋74の巻き数が、螺旋筋64の巻き数と同じ15に設定されている。つまり、螺旋筋の配筋密度を比較すると、下側ピース50の方が、中間ピース52よりも高くなっている。なお、螺旋筋74は、丸鋼で構成されていてもよい。 The spiral reinforcement 74 is made of a deformed steel bar, has an annular shape when viewed from the extending direction, and has a spiral shape with the axial direction as the extending direction. The spiral muscle 74 is embedded in the outer peripheral side of the intermediate column body part 70 and is arranged so as to surround the plurality of insertion holes 76 when viewed from the extending direction. Further, in this embodiment, the number of turns of the spiral muscle 74 is set to 15, which is the same as the number of turns of the spiral muscle 64, as an example. That is, when comparing the reinforcement density of the spiral reinforcement, the lower piece 50 is higher than the intermediate piece 52. Note that the spiral reinforcement 74 may be made of round steel.

図10及び図11に示されるように、上側ピース54は、「上側柱体部78」と、第3螺旋筋としての「螺旋筋80」とを含んで構成されている。 As shown in FIGS. 10 and 11, the upper piece 54 includes an "upper column body part 78" and a "spiral muscle 80" as a third spiral muscle.

上側柱体部78は、プレキャストコンクリート製とされており、中間柱体部70の「上面70A」上に延在方向に沿うように配置されている。詳しくは、上側柱体部78は、延在方向から見て、脚材24を囲む円筒状とされており、その外径がD3とされると共にその延在方向の長さがL1よりも長いL3とされている。 The upper column body part 78 is made of precast concrete, and is arranged on the "upper surface 70A" of the intermediate column body part 70 along the extending direction. Specifically, the upper column body part 78 has a cylindrical shape surrounding the leg member 24 when viewed from the extending direction, and has an outer diameter of D3 and a length longer than L1 in the extending direction. It is considered to be L3.

この上側柱体部78には、接続筋72を挿通可能な第2接続筋挿通孔部としての「挿通孔部82」が、複数(接続筋72の本数と同じ数)形成されている。そして、これらの挿通孔部82は、その中心が、延在方向から見て上側柱体部78の中心を中心とする直径がD3よりも小さいD4の円周上に位置するように当該円周方向に所定の間隔で配置されている。 A plurality of "insertion holes 82" (the same number as the number of connecting rods 72) are formed in the upper column body portion 78 as second connecting rod insertion holes into which the connecting rods 72 can be inserted. These insertion holes 82 are arranged around the circumference such that the center thereof is located on the circumference D4, which is centered on the center of the upper column body 78 and whose diameter is smaller than D3 when viewed from the extending direction. are arranged at predetermined intervals in the direction.

螺旋筋80は、異形棒鋼で構成されており、延在方向から見て円環状とされると共に、軸方向を延在方向とされた螺旋状とされている。この螺旋筋80は、上側柱体部78の外周側に埋め込まれると共に延在方向から見て複数の挿通孔部82を囲むように配置されている。また、本実施形態では、一例として螺旋筋80の巻き数が、螺旋筋74の巻き数と同じ15に設定されている。つまり、螺旋筋の配筋密度を比較すると、下側ピース50の方が、上側ピース54よりも高くなっている。なお、螺旋筋80は、丸鋼で構成されていてもよい。 The spiral reinforcement 80 is made of a deformed steel bar, has an annular shape when viewed from the extending direction, and has a spiral shape with the axial direction as the extending direction. The spiral muscle 80 is embedded in the outer peripheral side of the upper column body part 78 and is arranged so as to surround the plurality of insertion holes 82 when viewed from the extending direction. Further, in this embodiment, the number of turns of the spiral muscle 80 is set to 15, which is the same as the number of turns of the spiral muscle 74, as an example. That is, when comparing the reinforcement density of the spiral reinforcement, the lower piece 50 is higher than the upper piece 54. Note that the spiral reinforcement 80 may be made of round steel.

このように構成された定着ピース48、下側ピース50、中間ピース52及び上側ピース54は、図3に示されるように、延在方向に積み重ねられている。詳しくは、下側ピース50は、上側延出部58Aが挿通孔部68に挿通された状態で、柱体定着部56の上面56B上に配置されており、中間ピース52は、接続筋62が挿通孔部76に挿通された状態で、下側柱体部60の上面60A上に配置されており、上側ピース54は、接続筋72が挿通孔部82に挿通された状態で、中間柱体部70の上面70A上に配置されている。 The fixing piece 48, lower piece 50, intermediate piece 52, and upper piece 54 configured in this way are stacked in the extending direction, as shown in FIG. Specifically, the lower piece 50 is disposed on the upper surface 56B of the column fixing part 56 with the upper extension part 58A inserted into the insertion hole part 68, and the intermediate piece 52 is arranged on the upper surface 56B of the column fixing part 56. The upper piece 54 is placed on the upper surface 60A of the lower column body 60 in a state where it is inserted into the insertion hole 76, and the upper piece 54 is placed on the intermediate column body with the connection bar 72 inserted into the insertion hole 82. It is arranged on the upper surface 70A of the section 70.

そして、上記のように定着ピース48、下側ピース50、中間ピース52及び上側ピース54が積み重ねられた状態において、下側柱体部60の挿通孔部68が延在方向から見て中間柱体部70の外周に沿うように配置されると共に、一部が中間柱体部70で覆われた状態となっており、中間柱体部70の挿通孔部76が延在方向から見て上側柱体部78の外周に沿うように配置されると共に、一部が上側柱体部78で覆われた状態となっている。 When the fixing piece 48, the lower piece 50, the intermediate piece 52, and the upper piece 54 are stacked as described above, the insertion hole 68 of the lower column 60 is inserted into the intermediate column when viewed from the extending direction. It is arranged along the outer periphery of the section 70 and is partially covered by the intermediate column section 70, so that the insertion hole section 76 of the intermediate column section 70 is located at the upper column when viewed from the extending direction. It is arranged along the outer periphery of the body portion 78 and is partially covered by the upper column body portion 78 .

また、下側柱体部60の挿通孔部68、中間柱体部70の挿通孔部76及び上側柱体部78の挿通孔部82には、モルタルやコンクリートが充填されている。 Furthermore, the insertion hole 68 of the lower column 60, the insertion hole 76 of the intermediate column 70, and the insertion hole 82 of the upper column 78 are filled with mortar or concrete.

そして、接続部36は、定着ピース48、下側ピース50、中間ピース52及び上側ピース54の内周側並びに内側ピース28と床板30との間にコンクリートが充填されることで構成されている。また、図12に示されるように、上記のように構成された接続部36には、脚材24の高さ方向下側の部分、床板螺旋筋32、上側補強筋46、下側補強筋47及び柱体定着筋58の下側延出部58Bが埋め込まれた状態となっている。なお、図12には、床板30等の構成を理解し易くするため、接続部36を図示していない。 The connecting portion 36 is constructed by filling concrete on the inner peripheral sides of the fixing piece 48, the lower piece 50, the intermediate piece 52, and the upper piece 54, and between the inner piece 28 and the floor plate 30. Further, as shown in FIG. 12, the connecting portion 36 configured as described above includes the lower part of the leg member 24 in the height direction, the floor plate spiral reinforcement 32, the upper reinforcement reinforcement 46, and the lower reinforcement reinforcement 47. And the lower extending portion 58B of the column fixing reinforcement 58 is embedded. Note that the connecting portion 36 is not shown in FIG. 12 in order to make it easier to understand the structure of the floorboard 30 and the like.

(本実施形態の作用及び効果)
次に、本実施形態の作用並びに効果を説明する。
(Actions and effects of this embodiment)
Next, the operation and effects of this embodiment will be explained.

本実施形態では、図12に示されるように、床板30を備えており、この床板30は、鉄塔10の鉄骨脚部20の一部を構成する脚材24における高さ方向下側の部分を、その内周面で囲むように配置されており、接続部36を介して脚材24を保持している。 In this embodiment, as shown in FIG. 12, a floor plate 30 is provided, and this floor plate 30 covers the lower part in the height direction of the leg material 24 that constitutes a part of the steel frame leg part 20 of the steel tower 10. , are arranged so as to be surrounded by the inner peripheral surface thereof, and hold the leg member 24 via the connecting portion 36.

ところで、脚材24に作用する引き抜き荷重を支持するのにあたって、脚材24と一体的に設けられる柱体の重量は、大きい方が好ましい。また、施工時間の短縮の観点からは、柱体にプレキャストコンクリートを用いることが好ましい。一方で、鉄塔10を山岳地等に建設する場合、運搬可能な材料の重量に制限があるため、柱体に用いることができるプレキャストコンクリートの重量もまた制限されることとなる。 By the way, in order to support the pull-out load acting on the leg member 24, it is preferable that the weight of the column provided integrally with the leg member 24 is large. Furthermore, from the viewpoint of shortening construction time, it is preferable to use precast concrete for the columns. On the other hand, when constructing the steel tower 10 in a mountainous area or the like, there is a limit to the weight of materials that can be transported, so the weight of precast concrete that can be used for the column body is also limited.

ここで、本実施形態では、プレキャストコンクリート製の柱体定着部56と、プレキャストコンクリート製の下側柱体部60とを備えており、これらで柱体34の一部を構成することができる。 Here, this embodiment includes a column fixing section 56 made of precast concrete and a lower column section 60 made of precast concrete, which can constitute a part of the column 34.

詳しくは、柱体定着部56は、床板30上に配置されており、高さ方向から見て床板30の内周面30Aに沿う筒状とされている。この柱体定着部56には、複数の柱体定着筋58の一部が埋め込まれており、この柱体定着筋58は、柱体定着部56から高さ方向上側に延在方向に沿うように延出された上側延出部58Aと、柱体定着部56から高さ方向下側に延出されて高さ方向から見て床板30の内周面30Aの内側に配置された下側延出部58Bとを含んで構成されている。 Specifically, the column fixing section 56 is disposed on the floorboard 30 and has a cylindrical shape along the inner circumferential surface 30A of the floorboard 30 when viewed from the height direction. A portion of a plurality of column fixing bars 58 are embedded in the column fixing section 56, and the column fixing bars 58 extend upward in the height direction from the column fixing section 56. an upper extension part 58A extending downward from the column fixing part 56 in the height direction and a lower extension part extending downward in the height direction from the column fixing part 56 and disposed inside the inner circumferential surface 30A of the floorboard 30 when viewed from the height direction. It is configured to include an exit portion 58B.

また、柱体定着部56には、延在方向と直交するように上面56Bが設けられており、この上面56B上には、図1に示されるように、下側柱体部60が配置されている。 Further, the columnar fixing section 56 is provided with an upper surface 56B so as to be orthogonal to the extending direction, and a lower columnar section 60 is disposed on the upper surface 56B, as shown in FIG. ing.

下側柱体部60は、図3にも示されるように、延在方向に沿うように配置されると共に、延在方向から見て脚材24を囲む円筒状とされている。また、下側柱体部60には、図4にも示されるように、柱体定着筋58の上側延出部58Aを挿通可能な複数の挿通孔部68が形成されており、下側柱体部60を設置するときに上側延出部58Aを挿通孔部68に挿通させることで、下側柱体部60の位置決めを行うことができる。そして、挿通孔部68にモルタルやコンクリートを充填することで、柱体定着部56と下側柱体部60とを接続することができる。 As shown in FIG. 3, the lower column body portion 60 is arranged along the extending direction and has a cylindrical shape surrounding the leg member 24 when viewed from the extending direction. Further, as shown in FIG. 4, the lower column body portion 60 is formed with a plurality of insertion holes 68 through which the upper extension portions 58A of the column body fixing bars 58 can be inserted. By inserting the upper extension portion 58A into the insertion hole portion 68 when installing the body portion 60, the lower column portion 60 can be positioned. Then, by filling the insertion hole portion 68 with mortar or concrete, the column fixing portion 56 and the lower column portion 60 can be connected.

また、図1及び図12に示されるように、床板30の内周面30A側、柱体定着部56の脚材24側及び下側柱体部60の脚材24側にコンクリートが充填されることで、柱体定着筋58の下側延出部58Bが埋め込まれた接続部36が構成されている。そして、接続部36によって、脚材24、柱体定着部56及び下側柱体部60が一体化されることで、柱体34の一部が構成される。 Further, as shown in FIGS. 1 and 12, concrete is filled on the inner circumferential surface 30A side of the floorboard 30, on the leg material 24 side of the column anchoring part 56, and on the leg material 24 side of the lower column body part 60. As a result, the connecting portion 36 in which the lower extending portion 58B of the columnar anchoring reinforcement 58 is embedded is configured. A part of the column 34 is formed by integrating the leg member 24, the column fixing section 56, and the lower column section 60 through the connection section 36.

このように、本実施形態では、柱体34を構成する部材を分割して運搬することができ、その結果、鉄塔10を山岳地等に建設する場合であっても、柱体34の重量を確保することができる。 In this way, in this embodiment, the members constituting the column 34 can be divided and transported, and as a result, even when the steel tower 10 is constructed in a mountainous area, the weight of the column 34 can be reduced. can be secured.

また、本実施形態では、図3~図5に示されるように、複数の接続筋62が、下側柱体部60から高さ方向上側に延在方向に沿うように延出されている。そして、これらの接続筋62は、延在方向から見て下側柱体部60に設けられた挿通孔部68よりも下側柱体部60の内周側に配置されている。 Further, in the present embodiment, as shown in FIGS. 3 to 5, the plurality of connecting bars 62 extend upward in the height direction from the lower column body portion 60 along the extending direction. These connecting bars 62 are arranged closer to the inner periphery of the lower columnar section 60 than the insertion holes 68 provided in the lower columnar section 60 when viewed from the extending direction.

一方、下側柱体部60の上面60A上には、プレキャストコンクリート製の中間柱体部70が配置されている。この中間柱体部70は、図7及び図8に示されるように、延在方向から見て脚材24を囲む円筒状とされており、延在方向に沿うように配置されている。そして、中間柱体部70には、接続筋62を挿通可能な複数の挿通孔部76が形成されている。 On the other hand, on the upper surface 60A of the lower column part 60, an intermediate column part 70 made of precast concrete is arranged. As shown in FIGS. 7 and 8, the intermediate column body portion 70 has a cylindrical shape surrounding the leg member 24 when viewed from the extending direction, and is arranged along the extending direction. A plurality of insertion holes 76 through which the connection bars 62 can be inserted are formed in the intermediate column body 70 .

これにより、中間柱体部70を下側柱体部60上に設置するときに接続筋62を挿通孔部76に挿通させることで、中間柱体部70の位置決めを行うことができる。そして、挿通孔部76にモルタルやコンクリートを充填することで、中間柱体部70と下側柱体部60とを接続することができる。 Thereby, when the intermediate column body part 70 is installed on the lower column body part 60, the intermediate column body part 70 can be positioned by inserting the connection bar 62 into the insertion hole part 76. Then, by filling the insertion hole portion 76 with mortar or concrete, the intermediate column portion 70 and the lower column portion 60 can be connected.

また、中間柱体部70からは、複数の接続筋72が、高さ方向上側に延在方向に沿うように延出されている。そして、これらの接続筋72は、延在方向から見て中間柱体部70に設けられた挿通孔部76よりも中間柱体部70の内周側に配置されている。 Furthermore, a plurality of connecting bars 72 extend upward in the height direction along the extending direction from the intermediate column body portion 70 . These connecting bars 72 are arranged closer to the inner periphery of the intermediate column 70 than the insertion holes 76 provided in the intermediate column 70 when viewed from the extending direction.

図3に戻り、中間柱体部70の上面70A上には、プレキャストコンクリート製の上側柱体部78が配置されている。この上側柱体部78は、図10及び図11にも示されるように、延在方向から見て脚材24を囲む円筒状とされており、延在方向に沿うように配置されている。そして、上側柱体部78には、接続筋72を挿通可能な複数の挿通孔部82が形成されている。 Returning to FIG. 3, an upper column 78 made of precast concrete is arranged on the upper surface 70A of the intermediate column 70. As shown in FIGS. 10 and 11, the upper column body portion 78 has a cylindrical shape surrounding the leg member 24 when viewed from the extending direction, and is arranged along the extending direction. A plurality of insertion holes 82 through which the connection bars 72 can be inserted are formed in the upper column body 78.

これにより、上側柱体部78を中間柱体部70上に設置するときに接続筋72を挿通孔部82に挿通させることで、上側柱体部78の位置決めを行うことができる。そして、挿通孔部82にモルタルやコンクリートを充填することで、上側柱体部78と中間柱体部70とを接続することができる。 Thereby, when installing the upper column body part 78 on the intermediate column body part 70, the upper column body part 78 can be positioned by inserting the connecting reinforcement 72 into the insertion hole part 82. Then, by filling the insertion hole portion 82 with mortar or concrete, the upper column portion 78 and the intermediate column portion 70 can be connected.

このように、本実施形態では、下側柱体部60上に、上側柱体部78及び中間柱体部70が設置されることで柱体34が構成される。このため、本実施形態では、柱体34の大きさに応じて柱体34を構成する部材の分割数を設定し、当該部材の重量が大きくなることを抑制することができる。 As described above, in this embodiment, the columnar body 34 is configured by installing the upper columnar body portion 78 and the intermediate columnar body portion 70 on the lower columnar body portion 60. Therefore, in this embodiment, the number of divisions of the member constituting the column 34 is set according to the size of the column 34, and it is possible to suppress the weight of the member from increasing.

また、本実施形態では、図3に示されるように、下側柱体部60に設けられた挿通孔部68が、延在方向から見て中間柱体部70の外周に沿うように配置されると共に、挿通孔部68の一部が中間柱体部70で覆われている。このため、挿通孔部68へのモルタルやコンクリートの充填が中間柱体部70で阻害されることを抑制しつつ、中間柱体部70の外径を確保することができる。 In addition, in this embodiment, as shown in FIG. 3, the insertion hole 68 provided in the lower column body 60 is arranged along the outer periphery of the intermediate column body 70 when viewed from the extending direction. At the same time, a portion of the insertion hole portion 68 is covered by the intermediate column portion 70. Therefore, the outer diameter of the intermediate column part 70 can be ensured while suppressing the filling of mortar or concrete into the insertion hole part 68 from being obstructed by the intermediate column part 70.

また、本実施形態では、中間柱体部70に設けられた挿通孔部76が、延在方向から見て上側柱体部78の外周に沿うように配置されると共に、挿通孔部76の一部が上側柱体部78で覆われている。このため、挿通孔部76へのモルタルやコンクリートの充填が上側柱体部78で阻害されることを抑制しつつ、上側柱体部78の外径を確保することができる。 Further, in the present embodiment, the insertion hole 76 provided in the intermediate column 70 is arranged along the outer periphery of the upper column 78 when viewed from the extending direction, and one part of the insertion hole 76 is arranged along the outer periphery of the upper column 78 when viewed from the extending direction. portion is covered with an upper column portion 78. Therefore, the outer diameter of the upper column part 78 can be ensured while suppressing the filling of mortar or concrete into the insertion hole part 76 from being obstructed by the upper column part 78.

また、本実施形態では、図6に示されるように、下側柱体部60の外周側に螺旋筋64が埋め込まれており、この螺旋筋64は、延在方向から見て下側柱体部60に設けられた複数の挿通孔部68を囲むようにかつ軸方向を延在方向とされた状態で配置されている。このため、下側柱体部60に発生する曲げモーメントに対する下側柱体部60の剛性を確保することができる。 Further, in this embodiment, as shown in FIG. 6, a spiral muscle 64 is embedded in the outer circumferential side of the lower column body part 60, and this spiral muscle 64 is visible in the lower column body when viewed from the extending direction. It is arranged so as to surround the plurality of insertion holes 68 provided in the section 60 and with the axial direction as the extending direction. Therefore, the rigidity of the lower column body 60 against the bending moment generated in the lower column body 60 can be ensured.

また、本実施形態では、図9に示されるように、中間柱体部70の外周側に螺旋筋74が埋め込まれており、この螺旋筋74は、延在方向から見て中間柱体部70に設けられた複数の挿通孔部76を囲むようにかつ軸方向を延在方向とされた状態で配置されている。このため、中間柱体部70に発生する曲げモーメントに対する中間柱体部70の剛性を確保することができる。 Further, in this embodiment, as shown in FIG. 9, a spiral muscle 74 is embedded in the outer peripheral side of the intermediate column body 70, and this spiral muscle 74 is visible in the intermediate column body 70 when viewed from the extending direction. It is arranged so as to surround a plurality of insertion holes 76 provided in the axial direction and extend in the axial direction. Therefore, the rigidity of the intermediate column 70 against the bending moment generated in the intermediate column 70 can be ensured.

さらに、本実施形態では、図11に示されるように、上側柱体部78の外周側に螺旋筋80が埋め込まれており、この螺旋筋80は、延在方向から見て上側柱体部78に設けられた複数の挿通孔部82を囲むようにかつ軸方向を延在方向とされた状態で配置されている。このため、上側柱体部78に発生する曲げモーメントに対する上側柱体部78の剛性を確保することができる。 Furthermore, in this embodiment, as shown in FIG. 11, a spiral muscle 80 is embedded in the outer circumferential side of the upper column body part 78, and this spiral muscle 80 is visible in the upper column body part 78 when viewed from the extending direction. It is arranged so as to surround a plurality of insertion holes 82 provided in the axial direction and extend in the axial direction. Therefore, the rigidity of the upper column body 78 against the bending moment generated in the upper column body 78 can be ensured.

また、本実施形態では、図6に示されるように、下側柱体部60における螺旋筋64の外周側に、延在方向から見て円環状とされた補強筋66が埋め込まれており、この補強筋66によって、下側柱体部60に発生する曲げモーメントに対する下側柱体部60の剛性をより高めることができる。 Further, in this embodiment, as shown in FIG. 6, a reinforcing bar 66 having an annular shape when viewed from the extending direction is embedded in the outer peripheral side of the spiral bar 64 in the lower column body part 60, The reinforcing bars 66 can further increase the rigidity of the lower column body 60 against the bending moment generated in the lower column body 60.

以上、説明したように、本実施形態に係る鉄塔基礎構造によれば、鉄塔10の基礎部22の一部を構成する柱体34の重量を確保しつつ、柱体34の構築に必要な施工時間を短縮し、さらに柱体34を構成する材料の運搬を容易なものとすることができる。 As described above, according to the steel tower foundation structure according to the present embodiment, the weight of the column 34 that constitutes a part of the foundation 22 of the steel tower 10 is ensured, and the construction necessary for constructing the column 34 is carried out. The time can be shortened, and the material constituting the column 34 can be easily transported.

<変形例>
以下、図14及び図15を用いて、本実施形態の変形例に係る鉄塔基礎構造について説明する。なお、上述した実施形態と同一構成部分については同一番号を付してその説明を省略する。
<Modified example>
Hereinafter, a steel tower foundation structure according to a modification of this embodiment will be described using FIGS. 14 and 15. Note that the same components as those in the embodiment described above are given the same numbers and the explanation thereof will be omitted.

本変形例に係る基礎部22では、柱体34が定着ピース48を備えておらず、下側ピース50が床板30に柱体定着筋58を介して取り付けられている。 In the foundation 22 according to this modification, the column 34 does not include the fixing piece 48, and the lower piece 50 is attached to the floorboard 30 via column fixing bars 58.

詳しくは、本変形例において、柱体定着筋58の下側延出部58Bは、床板30の上側床板ブロック42に埋め込まれており、柱体定着筋58の上側延出部58Aは、床板30の高さ方向上側に延在方向に沿うように延出されている。 Specifically, in this modification, the lower extending portion 58B of the column anchoring reinforcement 58 is embedded in the upper floor plate block 42 of the floor plate 30, and the upper extending portion 58A of the column anchoring reinforcement 58 is embedded in the upper floor plate block 42 of the floor plate 30. It extends upward in the height direction along the extension direction.

また、下側柱体部60は、床板30上に延在方向に沿うように配置されており、高さ方向から見て、その内周が円形とされると共に延在方向から見て外径がD1の筒状又はリング状に形成されている。そして、下側柱体部60の下面60Bは、上側床板ブロック42の上面42Aに当接された水平面とされており、下側柱体部60の上面60Aは、延在方向に対して直交している。 Further, the lower column body portion 60 is arranged on the floor plate 30 along the extending direction, and its inner circumference is circular when viewed from the height direction, and the outer diameter when viewed from the extending direction. is formed into a cylindrical or ring shape D1. The lower surface 60B of the lower column body 60 is a horizontal surface that is in contact with the upper surface 42A of the upper floor plate block 42, and the upper surface 60A of the lower column body 60 is perpendicular to the extending direction. ing.

上記変形例では、柱体定着筋58の上側延出部58Aが、床板30から高さ方向上側に延在方向に沿うように延出されており、下側延出部58Bは、上側延出部58Aから高さ方向下側に延出されると共に、床板30に埋め込まれている。 In the above modification, the upper extending portion 58A of the columnar fixing bars 58 extends upward in the height direction from the floor plate 30 along the extending direction, and the lower extending portion 58B extends upwardly from the floor plate 30 in the upper extending direction. It extends downward in the height direction from the portion 58A and is embedded in the floorboard 30.

また、下側柱体部60を設置するときには、上述した実施形態と同様に、上側延出部58Aを挿通孔部68に挿通させることで、下側柱体部60の位置決めを行うことができる。そして、挿通孔部68にモルタルやコンクリートを充填することで、床板30と下側柱体部60とを接続することができる。 Further, when installing the lower column body part 60, the lower column body part 60 can be positioned by inserting the upper extension part 58A into the insertion hole part 68, similarly to the embodiment described above. . Then, by filling the insertion hole portion 68 with mortar or concrete, the floor plate 30 and the lower column body portion 60 can be connected.

また、床板30側及び下側柱体部60の脚材24側にコンクリートが充填されることで、接続部36が構成されている。そして、接続部36によって、脚材24及び下側柱体部60が一体化されることで、柱体34の一部が構成される。 Further, the connection portion 36 is formed by filling the floor plate 30 side and the leg material 24 side of the lower column body portion 60 with concrete. A part of the column 34 is configured by integrating the leg member 24 and the lower column body 60 through the connecting portion 36 .

このように、本変形例では、基本的に上述した実施形態と同様の作用並びに効果を奏する。また、鉄塔10の仕様等に応じて柱体34の構成を簡略化することができる。 In this way, this modification example basically provides the same functions and effects as those of the above-described embodiment. Furthermore, the configuration of the column 34 can be simplified depending on the specifications of the steel tower 10 and the like.

<上記実施形態の補足説明>
(1) 上述した実施形態では、柱体34の主な部分が、4つのプレキャストコンクリート製の部材すなわち柱体定着部56、下側柱体部60、中間柱体部70及び上側柱体部78で構成されていたが、これに限らない。すなわち、柱体34の大きさに応じて、柱体34を構成するプレキャストコンクリート製の部材の個数を適宜変更することが可能である。
<Supplementary explanation of the above embodiment>
(1) In the embodiment described above, the main parts of the column 34 are made of four precast concrete members, namely the column anchoring part 56, the lower column part 60, the intermediate column part 70, and the upper column part 78. It consisted of, but is not limited to. That is, depending on the size of the column 34, the number of precast concrete members forming the column 34 can be changed as appropriate.

(2) また、上述した実施形態では、下側柱体部60、中間柱体部70及び上側柱体部78のそれぞれに螺旋筋が埋め込まれていたが、これらの螺旋筋の代わりに複数のフープ筋を設けるような構成を採用してもよい。また、柱体34に発生する曲げモーメントの大きさ等に応じて、柱体34の一部を構成するプレキャストコンクリート製の部材に埋め込まれる配筋の太さや本数等を適宜変更してもよい。 (2) Furthermore, in the embodiment described above, spiral muscles were embedded in each of the lower column body part 60, the intermediate column body part 70, and the upper column body part 78, but instead of these spiral muscles, a plurality of spiral muscles are embedded. A configuration in which hoop lines are provided may also be adopted. Further, depending on the magnitude of the bending moment generated in the column 34, etc., the thickness, number, etc. of the reinforcing bars embedded in the precast concrete member forming a part of the column 34 may be changed as appropriate.

(3) また、上述した実施形態では、下側の柱体部に設けられた挿通孔部の一部が、上側の柱体部で覆われていたが、これに限らない。すなわち、柱体34を構築する工程や柱体34に必要な剛性等に応じて、下側に柱体部に設けられた挿通孔部の全部が、上側の柱体部で覆われるような構成を採用することも可能である。 (3) Furthermore, in the embodiments described above, a part of the insertion hole provided in the lower columnar body was covered by the upper columnar body, but the present invention is not limited to this. That is, depending on the process of constructing the column 34, the required rigidity of the column 34, etc., the structure is such that the entire insertion hole provided in the column on the lower side is covered by the column on the upper side. It is also possible to adopt

(4) 加えて、上述した実施形態では、脚材24の延在方向が高さ方向に対して傾いていたが、鉄塔10の仕様等に応じて脚材24の延在方向が高さ方向と同一方向となるような構成、すなわち柱体34の延在方向が高さ方向となるような構成も採り得る。 (4) In addition, in the embodiment described above, the extending direction of the leg members 24 is inclined with respect to the height direction, but depending on the specifications of the steel tower 10, etc., the extending direction of the leg members 24 is inclined in the height direction. It is also possible to adopt a configuration in which the direction is the same as that, that is, a configuration in which the extending direction of the columnar body 34 is the height direction.

10 鉄塔
20 鉄骨脚部
24 脚材
30 床板
30A 内周面
36 接続部
56 柱体定着部
56B 上面
58 柱体定着筋
58A 上側延出部
58B 下側延出部
60 下側柱体部
60A 上面
62 接続筋(第1接続筋)
64 螺旋筋(第1螺旋筋)
66 補強筋
68 挿通孔部(定着筋挿通孔部)
70 中間柱体部
70A 上面
72 接続筋(第2接続筋)
74 螺旋筋(第2螺旋筋)
76 挿通孔部(第1接続筋挿通孔部)
78 上側柱体部
82 挿通孔部82(第2接続筋挿通孔部)
10 Steel tower 20 Steel frame leg 24 Leg material 30 Floor board 30A Inner circumferential surface 36 Connection portion 56 Column fixing section 56B Top surface 58 Column fixing bar 58A Upper extension 58B Lower extension 60 Lower column 60A Top surface 62 Connecting muscle (first connecting muscle)
64 Spiral muscle (1st spiral muscle)
66 Reinforcement bar 68 Insertion hole part (fixer bar insertion hole part)
70 Intermediate column body part 70A Upper surface 72 Connecting bar (second connecting bar)
74 Spiral muscle (second spiral muscle)
76 Insertion hole part (first connection bar insertion hole part)
78 Upper column part 82 Insertion hole part 82 (second connection bar insertion hole part)

Claims (7)

鉄塔の鉄骨脚部の一部を構成する脚材における当該鉄塔の高さ方向下側の部分を当該高さ方向から見て内周面で囲むように配置されて当該脚材を保持する床板と、
前記床板上に配置され、当該高さ方向から見て前記内周面に沿う筒状とされると共に前記脚材の延在方向と直交するように設けられた支持面を備えたプレキャストコンクリート製の柱体定着部と、
一部が前記柱体定着部に埋め込まれると共に、当該柱体定着部から前記高さ方向上側に前記延在方向に沿うように延出された上側延出部と、当該柱体定着部から当該高さ方向下側に延出されて当該高さ方向から見て前記内周面の内側に配置された下側延出部と、を含む複数の柱体定着筋と、
前記支持面上に前記延在方向に沿うように配置され、当該延在方向から見て当該脚材を囲む円筒状とされると共に、前記上側延出部を挿通可能な複数の定着筋挿通孔部が形成されたプレキャストコンクリート製の下側柱体部と、
前記床板の前記内周面側、前記柱体定着部の前記脚材側及び前記下側柱体部の当該脚材側にコンクリートが充填されることで構成され、前記下側延出部が埋め込まれた接続部と、
を有する鉄塔基礎構造。
A floor plate that is arranged to surround the lower part of the steel tower in the height direction of the steel tower with an inner circumferential surface when viewed from the height direction of the leg material that constitutes a part of the steel frame leg of the steel tower, and that holds the leg material; ,
A precast concrete member disposed on the floor plate, having a cylindrical shape along the inner circumferential surface when viewed from the height direction, and having a support surface provided perpendicular to the extending direction of the leg. A column fixing part;
an upper extension part that is partially embedded in the columnar fixing section and extends from the columnar fixing section upward in the height direction along the extension direction; a plurality of columnar fixing bars, including a lower extending portion extending downward in the height direction and disposed inside the inner circumferential surface when viewed from the height direction;
A plurality of fixing rod insertion holes arranged on the support surface along the extending direction, having a cylindrical shape surrounding the leg material when viewed from the extending direction, and through which the upper extension part can be inserted. a lower column made of precast concrete with a section formed therein;
The inner peripheral surface side of the floor plate, the leg side of the column fixing part, and the leg side of the lower column body part are filled with concrete, and the lower extension part is embedded. a connected part,
A steel tower foundation structure with
鉄塔の鉄骨脚部の一部を構成する脚材における当該鉄塔の高さ方向下側の部分を当該高さ方向から見て囲むように配置されて当該脚材を保持する床板と、
前記床板から前記高さ方向上側に前記脚材の延在方向に沿うように延出された上側延出部と、当該上側延出部から当該高さ方向下側に延出されて当該床板に埋め込まれた下側延出部と、を含む複数の柱体定着筋と、
前記床板上に前記延在方向に沿うように配置され、当該延在方向から見て当該脚材を囲む筒状とされると共に、前記上側延出部を挿通可能な複数の定着筋挿通孔部が形成されたプレキャストコンクリート製の下側柱体部と、
前記床板側及び前記下側柱体部の前記脚材側にコンクリートが充填されることで構成された接続部と、
を有する鉄塔基礎構造。
A floor plate that is arranged to surround the lower part of the steel tower in the height direction when viewed from the height direction of the leg material constituting a part of the steel frame leg of the steel tower, and holds the leg material;
an upper extending portion extending upward in the height direction from the floor plate along the extending direction of the leg; and an upper extending portion extending downward in the height direction from the upper extending portion to the floor plate. a plurality of column anchorage bars including an embedded lower extension;
A plurality of fixing bar insertion holes arranged on the floor plate along the extending direction, having a cylindrical shape surrounding the leg material when viewed from the extending direction, and into which the upper extension part can be inserted. A precast concrete lower column part formed with
a connecting portion configured by filling the floor plate side and the leg side of the lower column body with concrete;
A steel tower foundation structure with
前記下側柱体部から前記高さ方向上側に前記延在方向に沿うように延出されると共に、当該延在方向から見て前記定着筋挿通孔部よりも当該下側柱体部の内周側に配置された複数の第1接続筋と、
前記下側柱体部の上面上に前記延在方向に沿うように配置され、前記延在方向から見て前記脚材を囲む円筒状とされると共に、前記第1接続筋を挿通可能な複数の第1接続筋挿通孔部が形成されたプレキャストコンクリート製の中間柱体部と、
前記中間柱体部から前記高さ方向上側に前記延在方向に沿うように延出されると共に、当該延在方向から見て前記第1接続筋挿通孔部よりも当該中間柱体部の内周側に配置された複数の第2接続筋と、
前記中間柱体部の上面上に前記延在方向に沿うように配置され、前記延在方向から見て前記脚材を囲む円筒状とされると共に、前記第2接続筋を挿通可能な複数の第2接続筋挿通孔部が形成されたプレキャストコンクリート製の上側柱体部と、
をさらに有する、
請求項2に記載の鉄塔基礎構造。
The inner periphery of the lower column extends upward in the height direction along the extension direction from the lower column, and is further inner than the fixing bar insertion hole when viewed from the extension direction. a plurality of first connection bars arranged on the side;
A plurality of rods arranged along the extending direction on the upper surface of the lower column body portion, each having a cylindrical shape surrounding the leg member when viewed from the extending direction, and through which the first connecting rod can be inserted. an intermediate column body made of precast concrete in which a first connecting reinforcement insertion hole is formed;
Extending upward in the height direction from the intermediate column body along the extension direction, the inner periphery of the intermediate column body is further inner than the first connecting bar insertion hole when viewed from the extension direction. a plurality of second connection bars arranged on the side;
A plurality of rods are disposed on the upper surface of the intermediate column body part along the extending direction, have a cylindrical shape surrounding the leg material when viewed from the extending direction, and into which the second connecting bars can be inserted. an upper column body made of precast concrete in which a second connecting reinforcement insertion hole is formed;
further having,
The steel tower foundation structure according to claim 2.
前記定着筋挿通孔部は、前記延在方向から見て前記中間柱体部の外周に沿うように配置されると共に、一部が当該中間柱体部で覆われている、
請求項3に記載の鉄塔基礎構造。
The fixing bar insertion hole portion is arranged along the outer periphery of the intermediate columnar portion when viewed from the extending direction, and is partially covered by the intermediate columnar portion.
The steel tower foundation structure according to claim 3.
前記第1接続筋挿通孔部は、前記延在方向から見て前記上側柱体部の外周に沿うように配置されると共に、一部が当該上側柱体部で覆われている、
請求項4に記載の鉄塔基礎構造。
The first connecting rod insertion hole is arranged along the outer periphery of the upper column body when viewed from the extending direction, and is partially covered by the upper column body.
The steel tower foundation structure according to claim 4.
前記下側柱体部の外周側に埋め込まれると共に前記延在方向から見て前記複数の定着筋挿通孔部を囲むようにかつ軸方向を当該延在方向とされた状態で配置された第1螺旋筋と、
前記中間柱体部の外周側に埋め込まれると共に前記延在方向から見て前記複数の第1接続筋挿通孔部を囲むようにかつ軸方向を当該延在方向とされた状態で配置された第2螺旋筋と、
前記上側柱体部の外周側に埋め込まれると共に前記延在方向から見て前記複数の第2接続筋挿通孔部を囲むようにかつ軸方向を当該延在方向とされた状態で配置された第3螺旋筋と、
をさらに有する、
請求項3~請求項5の何れか1項に記載の鉄塔基礎構造。
A first member embedded in the outer circumferential side of the lower columnar body portion and disposed so as to surround the plurality of anchoring bar insertion holes when viewed from the extending direction and with the axial direction as the extending direction. spiral muscles,
A first connecting rod embedded in the outer circumferential side of the intermediate column body part and arranged so as to surround the plurality of first connecting reinforcement insertion holes when viewed from the extending direction and with the axial direction as the extending direction. 2 spiral muscles,
A second connecting rod is embedded in the outer circumferential side of the upper columnar body part, and is arranged so as to surround the plurality of second connecting reinforcement insertion holes when viewed from the extending direction, and with the axial direction being the extending direction. 3 spiral muscles,
further having,
The steel tower foundation structure according to any one of claims 3 to 5.
前記下側柱体部における前記第1螺旋筋の外周側に埋め込まれると共に前記延在方向から見て円環状とされた補強筋をさらに有する、
請求項6に記載の鉄塔基礎構造。
further comprising a reinforcing bar embedded in the outer circumferential side of the first spiral bar in the lower column body part and having an annular shape when viewed from the extending direction;
A steel tower foundation structure according to claim 6.
JP2022065406A 2022-04-11 2022-04-11 Tower foundation structure Active JP7314352B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2022065406A JP7314352B1 (en) 2022-04-11 2022-04-11 Tower foundation structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2022065406A JP7314352B1 (en) 2022-04-11 2022-04-11 Tower foundation structure

Publications (2)

Publication Number Publication Date
JP7314352B1 JP7314352B1 (en) 2023-07-25
JP2023155824A true JP2023155824A (en) 2023-10-23

Family

ID=87428119

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2022065406A Active JP7314352B1 (en) 2022-04-11 2022-04-11 Tower foundation structure

Country Status (1)

Country Link
JP (1) JP7314352B1 (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06316942A (en) * 1993-05-07 1994-11-15 Nippon Hume Pipe Co Ltd Precast product for foundation of steel tower, and construction of steel tower therewith
JP2011106147A (en) * 2009-11-17 2011-06-02 Tokyo Electric Power Co Inc:The Structure and method for reinforcing steel tower foundation
JP2012246621A (en) * 2011-05-25 2012-12-13 Takenaka Komuten Co Ltd Tower-like structure
WO2016171444A1 (en) * 2015-04-22 2016-10-27 장수호 Structure for supporting square bars of tower structure and construction method therefor
JP2019112811A (en) * 2017-12-22 2019-07-11 東京電力ホールディングス株式会社 Main leg installation method and anchor frame installation jig
JP2020094457A (en) * 2018-12-14 2020-06-18 東電設計株式会社 Steel tower foundation structure and its construction method
JP2022018840A (en) * 2020-07-16 2022-01-27 東電設計株式会社 Steel tower foundation structure and construction method of the same

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06316942A (en) * 1993-05-07 1994-11-15 Nippon Hume Pipe Co Ltd Precast product for foundation of steel tower, and construction of steel tower therewith
JP2011106147A (en) * 2009-11-17 2011-06-02 Tokyo Electric Power Co Inc:The Structure and method for reinforcing steel tower foundation
JP2012246621A (en) * 2011-05-25 2012-12-13 Takenaka Komuten Co Ltd Tower-like structure
WO2016171444A1 (en) * 2015-04-22 2016-10-27 장수호 Structure for supporting square bars of tower structure and construction method therefor
JP2019112811A (en) * 2017-12-22 2019-07-11 東京電力ホールディングス株式会社 Main leg installation method and anchor frame installation jig
JP2020094457A (en) * 2018-12-14 2020-06-18 東電設計株式会社 Steel tower foundation structure and its construction method
JP2022018840A (en) * 2020-07-16 2022-01-27 東電設計株式会社 Steel tower foundation structure and construction method of the same

Also Published As

Publication number Publication date
JP7314352B1 (en) 2023-07-25

Similar Documents

Publication Publication Date Title
KR100864953B1 (en) Frp-concrete composite structure using precast fiber reinforced polymer pipe of double(inner and outer) hollow type and the construction method using the same
KR101684771B1 (en) Method for connection structure for internally confined hollow rc column-foundation connection reinforced with external tube
JP2008111256A (en) Joint structure and construction method for pile head part
JP2020094457A (en) Steel tower foundation structure and its construction method
JP2022018840A (en) Steel tower foundation structure and construction method of the same
JP5250096B2 (en) Building structure
JP5640768B2 (en) Pile construction method, pile construction method, and member for positioning and fixing reinforcing bars
JP2017150248A (en) Foundation structure for solar panel
JP2009280985A (en) Structure for connecting pile and column together
JP2023155824A (en) Steel tower foundation structure
JP2000064305A (en) Foundation structure of steel tower and construction thereof
JP4413064B2 (en) Side wall structure of precast PC tank
JP2012057431A (en) Structure for connecting pile and steel column
JP2020026634A (en) Seismic isolation upper foundation structure and method for manufacturing the same, footing structure, and method for constructing seismic isolation foundation
JP2004027727A (en) Foundation pile and construction method for foundation pile
JP7324348B1 (en) Tower foundation structure
JP3841209B2 (en) Joint structure of structural steel
JP4909445B1 (en) Ground tank construction method and ground tank
KR101886273B1 (en) Method and apparatus for forming basic support for fence installed in wall
JP2020200620A (en) Pile foundation structure
JP2020133198A (en) Structure and construction method thereof
JP7149772B2 (en) Seismic isolation upper foundation structure and footing structure
JP2024015910A (en) Steel tower foundation structure
CN217679681U (en) Ring beam steel bar structure for anchoring ring beam component
JP2012149439A (en) Reinforcement anchoring structure

Legal Events

Date Code Title Description
A80 Written request to apply exceptions to lack of novelty of invention

Free format text: JAPANESE INTERMEDIATE CODE: A80

Effective date: 20220502

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20230214

A871 Explanation of circumstances concerning accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A871

Effective date: 20230214

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20230404

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20230525

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20230627

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20230712

R150 Certificate of patent or registration of utility model

Ref document number: 7314352

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150