JP2008267030A - Method and device for supporting anchor bolt for building structure - Google Patents

Method and device for supporting anchor bolt for building structure Download PDF

Info

Publication number
JP2008267030A
JP2008267030A JP2007112783A JP2007112783A JP2008267030A JP 2008267030 A JP2008267030 A JP 2008267030A JP 2007112783 A JP2007112783 A JP 2007112783A JP 2007112783 A JP2007112783 A JP 2007112783A JP 2008267030 A JP2008267030 A JP 2008267030A
Authority
JP
Japan
Prior art keywords
anchor
anchor bolt
frame
fixing
template
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2007112783A
Other languages
Japanese (ja)
Inventor
Jun Okabe
純 岡部
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
AKITEC KK
OTSU TEKKO KK
TOKYO NEJI SEISAKUSHO KK
Unytite Corp
Original Assignee
AKITEC KK
OTSU TEKKO KK
TOKYO NEJI SEISAKUSHO KK
Unytite Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by AKITEC KK, OTSU TEKKO KK, TOKYO NEJI SEISAKUSHO KK, Unytite Corp filed Critical AKITEC KK
Priority to JP2007112783A priority Critical patent/JP2008267030A/en
Publication of JP2008267030A publication Critical patent/JP2008267030A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Foundations (AREA)
  • Joining Of Building Structures In Genera (AREA)
  • Reinforcement Elements For Buildings (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a method and a device for supporting an anchor bolt for a building structure by which the anchor bolt can be arranged without hindering installation work of foundation bar arrangement, and not only anchor bolt installation work but also bar arrangement work and concrete placing work thereafter are also facilitated. <P>SOLUTION: Installation intervals of the anchor bolts A are indicated on an installation position of a foundation Q in a marking process 100, and fixture plates 6 are fixed. A constructed anchor frame 1 is suspended on the installation position of the foundation Q in a suspending process 200. The installation position of the suspended anchor frame 1 is adjusted to the marking position in a centering process 300. The height of the anchor bolts A is adjusted by the length of leg parts 5 in a level adjusting process 400. The anchor frame 1 after the level adjustment is fixed on the fixing plates 6 in a frame fixing process 500. The position of each of the anchor bolts A is readjusted in a readjustment process 600 after the bar arrangement work. <P>COPYRIGHT: (C)2009,JPO&INPIT

Description

本発明は、建築構造物の基礎にアンカーボルトを施工する建築構造用アンカーボルトサポート工法及び装置に係り、基礎用配筋の設置作業を妨げず、極めて容易にアンカーボルトを設置することができる建築構造用アンカーボルトサポート工法及び装置に関するものである。   TECHNICAL FIELD The present invention relates to an anchor bolt support method and apparatus for building structures in which anchor bolts are installed on the foundation of a building structure, and it is possible to install an anchor bolt very easily without hindering the installation work of reinforcing bars for foundations. The present invention relates to a structural anchor bolt support method and apparatus.

建築構造用のアンカーボルトを基礎に固定するため、予め工場等で組み立てた支持フレーム等を基礎設置位置に設置し、この支持フレームにアンカーボルトを固定する工法が特許文献1及び特許文献3に記載されている。   In order to fix the anchor bolt for building structure to the foundation, Patent Document 1 and Patent Document 3 describe a construction method in which a support frame assembled in advance in a factory or the like is installed at a foundation installation position and the anchor bolt is fixed to the support frame. Has been.

特許文献1は、アンカーボルト据付治具及び据付方法に関するもので、基礎設置位置に伸縮自在な治具支柱を設置し、この治具支柱の上端部に設けた十字状のテンプレート受けにテンプレートを設置すると共に、該テンプレートにアンカーボルトを挿通するものである。   Patent Document 1 relates to an anchor bolt installation jig and installation method, in which an extendable jig post is installed at a base installation position, and a template is installed on a cross-shaped template holder provided at the upper end of the jig post. In addition, an anchor bolt is inserted through the template.

特許文献2は、アンカー用フレーム及びそれを用いた基礎の施工方法に係り、基礎設置位置にまず下部フレームを設置し、次に、この下部フレームの上端部にアンカーボルトを備えた上部フレームを連結する工法である。   Patent Document 2 relates to an anchor frame and a foundation construction method using the anchor frame. First, a lower frame is installed at a foundation installation position, and then an upper frame provided with anchor bolts is connected to an upper end portion of the lower frame. It is a construction method.

特許文献3は、アンカーボルト固定装置に関するもので、複数本のアンカーボルトを所定の間隔に保持するテンプレートと、アンカーボルトの下に配設した補助フレームを介してアンカーボルトを連結支持するアンカー保持部と、アンカー保持部の下端に連結する連結枠体と、更に連結枠体の下方に連結する調整用ボルトとからなるものである。
特開平7−207944号公報 特開平7−292683号公報 特開2002−167773号公報
Patent Document 3 relates to an anchor bolt fixing device, and a template for holding a plurality of anchor bolts at a predetermined interval, and an anchor holding portion for connecting and supporting the anchor bolts via an auxiliary frame disposed under the anchor bolts. And a connecting frame connected to the lower end of the anchor holding portion, and an adjusting bolt connected to the lower side of the connecting frame.
JP 7-207944 A JP 7-292683 A JP 2002-167773 A

基礎を構築するには、基礎用の配筋等の他に、地中梁用の配筋等も組み付けることになる。このため、これらの配筋等がアンカーボルトを固定する支持フレームと交錯するので、支持フレームを組み立てるスペースが限られるものである。ところが、特許文献1及び特許文献2の工法では、このような地中梁用の配筋等に干渉する位置に治具支柱や下部フレーム等が設置されるので、これらの工法の後に行われる配筋作業に極めて多くの不都合が生じることになる。   In order to construct the foundation, in addition to the reinforcement for the foundation, reinforcement for the underground beam is also assembled. For this reason, since these bar arrangements cross with the support frame which fixes an anchor bolt, the space which assembles a support frame is limited. However, in the methods disclosed in Patent Document 1 and Patent Document 2, jig posts and lower frames are installed at positions interfering with the reinforcement for the underground beam, so that the arrangement performed after these methods is performed. There will be a great deal of inconvenience in muscle work.

また、特許文献1及び特許文献2に示される工法によると、いずれも基礎設置位置に治具支柱や下部フレームを設置し、その後にアンカーボルトを連結する工法であるから、アンカーボルトを連結するまでの工程が多くなり、しかも、後付のアンカーボルトの位置を正確に調整する作業にも多くの手間が必要になる。   Moreover, according to the construction method shown in Patent Document 1 and Patent Document 2, both are the construction methods in which the jig support and the lower frame are installed at the foundation installation position and then the anchor bolt is connected. In addition, the number of steps is increased, and a lot of labor is required for the work of accurately adjusting the position of the anchor bolts attached later.

更に、特許文献1及び特許文献2の工法では、基礎設置位置が常に平坦である必要があり、基礎設置位置の一部が***しているような条件では使用できない不都合がある。すなわち、特許文献1では平板状の治具受けプレートを捨てコンクリート上に設置し、特許文献2では一対の据付板を捨てコンクリート上に設置するものである。したがって、基礎設置位置に杭頭が突出している場合など、基礎設置位置が平坦でない場合にはこれらの治具受けプレートや据付板の設置が不可能になるものである。   Furthermore, in the construction methods of Patent Document 1 and Patent Document 2, the foundation installation position needs to be always flat, and there is a disadvantage that it cannot be used under the condition that a part of the foundation installation position is raised. That is, in Patent Document 1, a flat jig receiving plate is disposed on the discarded concrete, and in Patent Document 2, a pair of installation plates are disposed on the discarded concrete. Therefore, when the foundation installation position is not flat, such as when the pile head protrudes at the foundation installation position, it is impossible to install these jig receiving plates and installation plates.

また、特許文献3のアンカーボルト固定装置によると、アンカーボルトを支持するために、テンプレートのほかに、補助フレームや連結枠体、調整用ボルトなど、数多くの部材を配しているので、これらの部材の連結作業に多くの手間を要していた。しかも、これらの連結枠体や調整用ボルト等の各部材が、その後の配筋作業や、コンクリート打設作業の妨げになる不都合が生じるものであった。   In addition, according to the anchor bolt fixing device of Patent Document 3, in order to support the anchor bolt, in addition to the template, a large number of members such as an auxiliary frame, a connecting frame, and an adjusting bolt are arranged. It took a lot of work to connect the members. Moreover, each member such as the connecting frame body and the adjusting bolts has a disadvantage that hinders subsequent bar arrangement work and concrete placing work.

更に、特許文献3では、固定装置設置後の配筋作業によって、アンカーボルトの設置位置に狂いが生じた場合に、改めて位置を調整する必要が生じる。ところが、連結枠体や補助フレームなどによってアンカーボルトが強固に支持されているので、配筋作業の後ではより強力な固定状態になり、アンカーボルトを再調整する作業が困難になっていた。   Furthermore, in patent document 3, when the installation position of an anchor bolt has changed by the reinforcement work after installation of a fixing device, the position needs to be adjusted again. However, since the anchor bolt is firmly supported by the connecting frame body, the auxiliary frame, and the like, it becomes a stronger fixed state after the bar arrangement work, and it is difficult to readjust the anchor bolt.

そこで、本発明は、上述の課題を解消すべく案出されたもので、基礎用配筋の設置作業を妨げずにアンカーボルトを配置でき、しかも、アンカーボルト設置作業のみならず、その後の配筋作業やコンクリート打設作業も容易にすることができる建築構造用アンカーボルトサポート工法及び装置の提供を目的とするものである。   Therefore, the present invention has been devised to solve the above-mentioned problems, and can fix the anchor bolt without hindering the installation work of the foundation reinforcing bar. It is an object of the present invention to provide an anchor bolt support method and apparatus for building structures that can facilitate the reinforcement work and the concrete placing work.

上述の目的を達成すべく本発明の第1の手段は、複数本のアンカーボルトAの上部を、予め所定の設置間隔でテンプレート2と補助フレーム3にて保持し、アンカーボルトAを所定の高さに調整支持する脚部5をアンカーボルトAのいずれか下端部に連結したアンカーフレーム1を建築構造物Pの基礎Q設置位置に支持固定するアンカーボルトサポート工法であって、基礎Q設置位置上に、アンカーボルトAの設置間隔を示すと共に、該設置間隔に固定用プレート6を固定する墨出し工程100と、構築されたアンカーフレーム1を基礎Q設置位置上に吊り込む吊り込み工程200と、吊り込んだアンカーフレーム1の設置位置を墨出し位置に調整する芯出し工程300と、アンカーフレーム1の高さを脚部5の長さで調整するレベル調整工程400と、レベル調整後のアンカーフレーム1を固定用プレート6上に固定するフレーム固定工程500と、配筋作業後に各アンカーボルトAの位置を再調整する再調整工程600と、からなる工法にある。   In order to achieve the above-mentioned object, the first means of the present invention is to hold the upper portions of the plurality of anchor bolts A with the template 2 and the auxiliary frame 3 at a predetermined installation interval in advance, and fix the anchor bolts A to a predetermined height. This is an anchor bolt support method for supporting and fixing the anchor frame 1 in which the leg portion 5 to be adjusted and supported is connected to one of the lower ends of the anchor bolt A to the foundation Q installation position of the building structure P. In addition to showing the installation interval of the anchor bolt A, the marking process 100 for fixing the fixing plate 6 to the installation interval, and the hanging process 200 for suspending the constructed anchor frame 1 on the foundation Q installation position, A centering process 300 for adjusting the installation position of the suspended anchor frame 1 to the marking position, and a level adjusting process for adjusting the height of the anchor frame 1 by the length of the leg 5 400, a frame fixing process 500 for fixing the anchor frame 1 after level adjustment onto the fixing plate 6, and a readjustment process 600 for readjusting the position of each anchor bolt A after the bar arrangement work. .

第2の手段は、前記フレーム固定工程500において、捨てコンクリートR上に施された前記墨出し工程100の墨出し位置に基づいてアンカーボルトAの設置位置に固定用プレート6をアンカーボルトAで固定し、該固定用プレート6にアンカーフレーム1の脚部5を溶接するものである。   The second means is that the fixing plate 6 is fixed to the installation position of the anchor bolt A with the anchor bolt A based on the marking position of the marking process 100 applied on the discarded concrete R in the frame fixing process 500. The legs 5 of the anchor frame 1 are welded to the fixing plate 6.

第3の手段は、前記レベル調整工程400において、前記アンカーフレーム1の脚部5とアンカーボルトAとの間にカプラー4を連結し、脚部5の長さを調整することでアンカーボルトAの高さを調整する。   The third means is that, in the level adjusting step 400, the coupler 4 is connected between the leg 5 of the anchor frame 1 and the anchor bolt A, and the length of the leg 5 is adjusted to adjust the length of the anchor bolt A. Adjust the height.

第4の手段は、前記再調整工程600において、アンカーフレーム1のテンプレート2周辺の配筋Sに固定具8をネジ止め固定し、該固定具8とテンプレート2とに溶接する調整部材9によりアンカーボルトAの位置を微調整するものである。   In the readjustment process 600, the fourth means is that the fixing member 8 is fixed to the reinforcing bar S around the template 2 of the anchor frame 1 by screwing, and the fixing member 8 and the template 2 are welded to the anchor 8 by the adjusting member 9 for anchoring. The position of the bolt A is finely adjusted.

第5の手段は、建築構造物Pの基礎Q設置位置にアンカーボルトAを支持固定するアンカーボルトサポート装置において、複数本のアンカーボルトAの上部を、予め所定の設置間隔でテンプレート2に連結すると共に、アンカーボルトAの下部をテンプレート2と同じ間隔で補助フレーム3にて保持し、アンカーボルトAを所定の高さに調整支持する脚部5をアンカーボルトAのいずれか下端部に連結することで、基礎Q設置位置上に吊り込まれるアンカーフレーム1を設け、脚部5とアンカーボルトAとの間に高さ調整用のカプラー4を連結し、脚部5の回転操作によりアンカーボルトAの高さを調整する装置を設けることにある。   In the anchor bolt support device for supporting and fixing the anchor bolt A to the foundation Q installation position of the building structure P, the fifth means connects the upper portions of the plurality of anchor bolts A to the template 2 at a predetermined installation interval in advance. At the same time, the lower part of the anchor bolt A is held at the auxiliary frame 3 at the same interval as the template 2, and the leg 5 that adjusts and supports the anchor bolt A to a predetermined height is connected to one of the lower ends of the anchor bolt A. Then, an anchor frame 1 suspended on the foundation Q installation position is provided, a height adjusting coupler 4 is connected between the leg 5 and the anchor bolt A, and the anchor bolt A is The object is to provide a device for adjusting the height.

第6の手段は、前記テンプレート2に溶接する調整部材9と、アンカーボルトAの周囲に配設された配筋Sにネジ止め固定する固定具8とを設け、該固定具8と調整部材9とを溶接して配筋後のアンカーボルトAの位置を再調整するように設けたことを課題解消のための手段とする。   The sixth means includes an adjusting member 9 to be welded to the template 2 and a fixing tool 8 to be screwed and fixed to the reinforcing bar S arranged around the anchor bolt A. The fixing tool 8 and the adjusting member 9 are provided. And a means for re-adjusting the position of the anchor bolt A after the bar arrangement is used as a means for solving the problem.

本発明の請求項1の工法によると、工場でセットされたアンカーフレーム1を現場で吊り込んで位置調整し、固定するものであるから、複数本のアンカーボルトAを基礎Q内に極めて容易に且つ正確に設置することができる。   According to the construction method of claim 1 of the present invention, the anchor frame 1 set in the factory is suspended at the site, and the position is adjusted and fixed. Therefore, a plurality of anchor bolts A can be very easily installed in the foundation Q. And it can install correctly.

しかも、芯出し工程300とレベル調整工程400によってアンカーフレーム1の位置を調整し、フレーム固定工程500でアンカーフレーム1を固定するので、アンカーフレーム1を現場で吊り込んでからから固定するまでの作業を極めて簡略化することができる。   In addition, the position of the anchor frame 1 is adjusted by the centering process 300 and the level adjusting process 400, and the anchor frame 1 is fixed by the frame fixing process 500. Can be greatly simplified.

また、アンカーフレーム1の脚部5は、アンカーボルトAの鉛直下方に連結されているので、基礎用配筋の設置作業を妨げずにアンカーボルトを配置することができる。更に、テンプレート2にセットしたアンカーボルトAのいずれかを選択して脚部5を連結できるので、基礎の下端部周辺に複雑に配置された配筋や床面に段差が生じている場合でも、これらの障害物を避けて設置することが可能になるものである。   Moreover, since the leg part 5 of the anchor frame 1 is connected to the vertically lower side of the anchor bolt A, the anchor bolt can be arranged without hindering the installation work of the foundation reinforcement. Furthermore, since any one of the anchor bolts A set on the template 2 can be selected and the leg portion 5 can be connected, even if there is a step in the bar arrangement or the floor that is arranged in a complicated manner around the lower end of the foundation, It will be possible to install avoiding these obstacles.

請求項2のフレーム固定工程500によると、捨てコンクリートR上に施された前記墨出し工程100の墨出し位置に基づいてアンカーボルトAの設置位置に固定用プレート6をアンカー6Aで固定し、該固定用プレート6にアンカーフレーム1の脚部5を溶接するので、アンカーフレーム1を基礎Qの所定位置に強固に固定することができる。   According to the frame fixing process 500 of claim 2, the fixing plate 6 is fixed to the installation position of the anchor bolt A by the anchor 6A based on the marking position of the marking process 100 applied on the discarded concrete R, Since the legs 5 of the anchor frame 1 are welded to the fixing plate 6, the anchor frame 1 can be firmly fixed to a predetermined position of the foundation Q.

請求項3のレベル調整工程400において、前記アンカーフレーム1の脚部5とアンカーボルトAとの間にカプラー4を連結し、脚部5の長さ調整でアンカーボルトAの高さを調整するので、作業員は、作業しやすい位置での高さ調整作業が可能になり、レベル調整工程400を容易に行うことができる。   In the level adjustment step 400 of claim 3, the coupler 4 is connected between the leg portion 5 of the anchor frame 1 and the anchor bolt A, and the height of the anchor bolt A is adjusted by adjusting the length of the leg portion 5. The worker can perform the height adjustment work at a position where the worker can easily work, and can easily perform the level adjustment process 400.

請求項4の再調整工程600によると、アンカーフレーム1のテンプレート2周辺の配筋Sに固定具8をネジ止め固定し、該固定具8とテンプレート2とに溶接する調整部材9によりアンカーボルトAの位置を調整するものであるから、配筋作業によって僅かな狂いが生じても、正確な位置に再調整することができる。   According to the readjustment process 600 of claim 4, the anchor bolt A is fixed by the adjusting member 9 that is fixed to the reinforcement S around the template 2 of the anchor frame 1 by screwing and welded to the fastener 8 and the template 2. Therefore, even if a slight deviation occurs due to the bar arrangement work, it can be readjusted to an accurate position.

請求項5に記載の装置によると、極めてシンプルな構成のアンカーフレーム1によってアンカーボルトAをサポートすることが可能になった。この結果、アンカーフレーム1設置後の配筋作業が容易になり、しかも、コンクリート打設時における各部への流入をスムーズに行うことができる。   According to the device of the fifth aspect, the anchor bolt A can be supported by the anchor frame 1 having a very simple configuration. As a result, the bar arrangement work after installation of the anchor frame 1 is facilitated, and the inflow to each part during the concrete placing can be smoothly performed.

また、カプラー4の装着により脚部5の長さを調整することでアンカーボルトAの高さを調整できるので、アンカーボルトAの高さ調整や水平調整を容易に行うことができる。また、カプラー4は脚部5の上部に位置しているので、脚部5の長さ調整作業が行い易い位置になっている。   Moreover, since the height of the anchor bolt A can be adjusted by adjusting the length of the leg portion 5 by mounting the coupler 4, the height adjustment and the horizontal adjustment of the anchor bolt A can be easily performed. Further, since the coupler 4 is located at the upper part of the leg part 5, the length of the leg part 5 can be easily adjusted.

請求項6によると、固定具8と調整部材9とにより、配筋作業後のアンカーボルトAを再調整することが可能になる。しかも、調整部材9は、テンプレート2に溶接していても、固定具8によって配筋に溶接しなくて済むので、配筋の劣化を招くおそれもない。したがって、アンカーボルトAを正確な位置に強固に固定すると共に、コンクリート打設の際に生じ易いアンカーボルトAの位置ずれなどの不具合を確実に防止する。このとき、アンカーボルトAは、シンプルな構造のアンカーフレーム1に支持されているので、配筋作業後の再調整を容易に行うことができるものである。   According to the sixth aspect, the anchor 8 after the bar arrangement work can be readjusted by the fixture 8 and the adjusting member 9. In addition, even if the adjustment member 9 is welded to the template 2, it is not necessary to weld the reinforcing member 9 to the reinforcing bar by the fixing tool 8, so that there is no possibility of causing deterioration of the reinforcing bar. Therefore, the anchor bolt A is firmly fixed at an accurate position, and problems such as misalignment of the anchor bolt A that are likely to occur during concrete placement are reliably prevented. At this time, since the anchor bolt A is supported by the anchor frame 1 having a simple structure, readjustment after the bar arrangement work can be easily performed.

このように本発明によると、基礎用配筋の設置作業を妨げずにアンカーボルトを配置でき、しかも、アンカーボルト設置作業のみならず、その後の配筋作業やコンクリート打設作業も容易にすることができるなどといった産業上有益な種々の効果を奏するものである。   As described above, according to the present invention, the anchor bolt can be arranged without hindering the installation work of the foundation reinforcement, and not only the anchor bolt installation work but also the subsequent reinforcement work and concrete placing work are facilitated. It has various industrially beneficial effects such as being able to do so.

本発明の最良の形態は、墨出し工程100により、基礎Q設置位置上に、アンカーボルトAの設置間隔を示すと共に、該設置間隔に固定用プレート6を固定する。吊り込み工程200により、構築されたアンカーフレーム1を基礎Q設置位置上に吊り込む。芯出し工程300により、吊り込んだアンカーフレーム1の設置位置を墨出し位置に調整する。レベル調整工程400により、アンカーフレーム1の脚部5とアンカーボルトAとの間にカプラー4を連結し、脚部5の長さを調整してアンカーボルトAの高さを調整する。フレーム固定工程500により、捨てコンクリートR上に施された前記墨出し工程100の墨出し位置に基づいてアンカーボルトAの設置位置に固定用プレート6を固定し、該固定用プレート6にアンカーフレーム1の脚部5を溶接する。再調整工程600により、アンカーフレーム1のテンプレート2周辺の配筋Sに固定具8を固定し、該固定具8とテンプレート2とに連結する調整部材9によりアンカーボルトAの位置を微調整する工法によって、当初の目的を達成するものである。   In the best mode of the present invention, the marking process 100 indicates the installation interval of the anchor bolts A on the foundation Q installation position, and fixes the fixing plate 6 to the installation interval. The constructed anchor frame 1 is suspended on the foundation Q installation position by the suspension process 200. By the centering process 300, the installation position of the anchor frame 1 suspended is adjusted to the ink marking position. In the level adjustment process 400, the coupler 4 is connected between the leg portion 5 of the anchor frame 1 and the anchor bolt A, and the height of the anchor bolt A is adjusted by adjusting the length of the leg portion 5. The fixing plate 6 is fixed to the installation position of the anchor bolt A on the basis of the inking position of the inking process 100 applied on the discarded concrete R by the frame fixing process 500, and the anchor frame 1 is fixed to the fixing plate 6. The legs 5 are welded. In the readjustment process 600, the fixing tool 8 is fixed to the reinforcing bar S around the template 2 of the anchor frame 1, and the position of the anchor bolt A is finely adjusted by the adjusting member 9 connected to the fixing tool 8 and the template 2. To achieve the original purpose.

以下、本発明を図示例に基づいて説明する。本発明工法は、複数本のアンカーボルトAを所定の間隔に支持するアンカーフレーム1を用いる工法である。そこで、便宜上、このアンカーフレーム1からなる本発明装置から説明する。   Hereinafter, the present invention will be described based on illustrated examples. The construction method of the present invention is a construction method using an anchor frame 1 that supports a plurality of anchor bolts A at a predetermined interval. Therefore, for the sake of convenience, the apparatus of the present invention comprising this anchor frame 1 will be described.

アンカーフレーム1は、建築構造物Pの基礎Q設置位置にアンカーボルトAを固定するフレーム部材であり、主な構成は、テンプレート2、補助フレーム3、カプラー4、脚部5にて構成される。   The anchor frame 1 is a frame member that fixes the anchor bolt A to the position where the foundation Q of the building structure P is installed. The main structure includes a template 2, an auxiliary frame 3, a coupler 4, and legs 5.

テンプレート2は、複数本のアンカーボルトAの上部を、予め所定の設置間隔で連結する部材である。このテンプレート2には、アンカーボルトAの上部を設計に基づいた所定間隔に配置する挿通孔2Aを開穿してあり、この挿通孔2Aに挿通したアンカーボルトAを固定ナット2Bでテンプレート2に固定する(図2参照)。図示のテンプレート2は、挿通孔2Aを開穿した短冊状の基板2Cを4枚組み合わせて環状に連結したものを使用している(図3参照)。このようなテンプレート2により、挿通孔2Aの間隔設定が正確になり、テンプレート2の強度を高めることもできる。   The template 2 is a member that connects the upper portions of a plurality of anchor bolts A at a predetermined installation interval in advance. The template 2 has an insertion hole 2A in which the upper part of the anchor bolt A is arranged at a predetermined interval based on the design, and the anchor bolt A inserted through the insertion hole 2A is fixed to the template 2 with a fixing nut 2B. (See FIG. 2). The illustrated template 2 uses a combination of four strip-shaped substrates 2C each having an insertion hole 2A connected in an annular shape (see FIG. 3). With such a template 2, the interval between the insertion holes 2 </ b> A can be set accurately, and the strength of the template 2 can be increased.

補助フレーム3は、アンカーボルトAの下部をテンプレート2と同じ間隔で保持する部材である。この補助フレーム3はテンプレート2と同じ構成を成し、アンカーボルトAの下部に配設している(図2参照)。すなわち、テンプレート2と同様に、補助フレーム3に形成した挿通孔3AにアンカーボルトAを挿通し、固定ナット3Bで補助フレーム3に固定する。図示例では、補助フレーム3の挿通孔3A上面に定着板7を設け、アンカーボルトAの下部にネジ止めされた固定ナット3Bと該定着板7とを、補助フレーム3側に押圧固定するように設けている。   The auxiliary frame 3 is a member that holds the lower part of the anchor bolt A at the same interval as the template 2. The auxiliary frame 3 has the same configuration as the template 2 and is disposed below the anchor bolt A (see FIG. 2). That is, like the template 2, the anchor bolt A is inserted into the insertion hole 3A formed in the auxiliary frame 3, and is fixed to the auxiliary frame 3 with the fixing nut 3B. In the illustrated example, the fixing plate 7 is provided on the upper surface of the insertion hole 3A of the auxiliary frame 3, and the fixing nut 3B screwed to the lower part of the anchor bolt A and the fixing plate 7 are pressed and fixed to the auxiliary frame 3 side. Provided.

カプラー4は、脚部5とアンカーボルトAとの間に連結した部材であり、該カプラー4に連結した脚部5の長さを調整することでアンカーボルトAの高さを調整する(図4参照)。図示のカプラー4は、筒状体4Aの上下端部に一対の連結ナット4Bを固着すると共に、該筒状体4Aの側壁を貫通する貫通孔4Cを設けたものである。径の大きなカプラー4を使用する場合、この貫通孔4Cから筒状体4Aの内部にモルタル上の充填物を充填することで、筒状体4A内の空間をなくすことができる。さらに、小径の筒状体4Aを使用する場合は貫通孔4Cを設けなくても良い。   The coupler 4 is a member connected between the leg 5 and the anchor bolt A, and the height of the anchor bolt A is adjusted by adjusting the length of the leg 5 connected to the coupler 4 (FIG. 4). reference). The illustrated coupler 4 has a pair of connecting nuts 4B fixed to the upper and lower ends of the cylindrical body 4A and a through-hole 4C penetrating the side wall of the cylindrical body 4A. When the coupler 4 having a large diameter is used, the space in the cylindrical body 4A can be eliminated by filling the cylindrical body 4A with the filler on the mortar from the through hole 4C. Furthermore, when the small diameter cylindrical body 4A is used, the through hole 4C may not be provided.

このカプラー4において、上下の連結ナット4Bの径やピッチを変えて固着することも可能である(図4(イ)、(ロ)参照)。このようなカプラー4を用意することにより、径やピッチの異なるアンカーボルトAと脚部5とを連結することが可能になる。また、アンカーボルトAの径が比較的細い場合などでは、カプラー4として長ナットの使用も可能になる。   In this coupler 4, it is also possible to change the diameter and pitch of the upper and lower connecting nuts 4B and fix them (see FIGS. 4A and 4B). By preparing such a coupler 4, it is possible to connect the anchor bolt A and the leg portion 5 having different diameters and pitches. Further, when the diameter of the anchor bolt A is relatively thin, a long nut can be used as the coupler 4.

脚部5は、アンカーボルトAを所定の高さに調整支持する部材であり、この脚部5をアンカーボルトAのいずれか下端部に連結することで、基礎Q設置位置上に吊り込まれるアンカーフレーム1を設けている(図2参照)。このとき、脚部5やアンカーボルトAに丸鋼を使用することで、コンクリートの流入性を良好にすることができる。また、脚部5にボルト部材を用いることも可能である。さらに、脚部5の下端部を先鋭状にした場合、脚部5を回転させて長さ調整をする作業を容易になる(図10(ロ)参照)。また、脚部5の下端部を平坦にすると、固定用プレート6との接合性を高めることができる(図2参照)。   The leg portion 5 is a member that adjusts and supports the anchor bolt A to a predetermined height. By connecting the leg portion 5 to either lower end portion of the anchor bolt A, the anchor is hung on the foundation Q installation position. A frame 1 is provided (see FIG. 2). At this time, by using round steel for the leg 5 and the anchor bolt A, the inflow property of the concrete can be improved. It is also possible to use a bolt member for the leg 5. Further, when the lower end portion of the leg portion 5 is sharpened, the operation of adjusting the length by rotating the leg portion 5 is facilitated (see FIG. 10B). Moreover, if the lower end part of the leg part 5 is made flat, the bondability with the fixing plate 6 can be improved (see FIG. 2).

固定用プレート6は、例えば基礎Q設置位置に予め敷設された捨てコンクリートRの上に固定されるもので、図示例では、アンカー6Aで固定している(図2参照)。また、各脚部5の位置にそれぞれ固定用プレート6を配する他、複数の脚部5を固定する一対の帯状固定用プレート6や、1枚の固定用プレート6を使用するなど、固定用プレート6の設置数は任意に変更することができる(図示せず)。   The fixing plate 6 is fixed on, for example, abandoned concrete R laid in advance at the foundation Q installation position. In the illustrated example, the fixing plate 6 is fixed by an anchor 6A (see FIG. 2). Further, in addition to arranging the fixing plate 6 at the position of each leg 5, for example, a pair of belt-like fixing plates 6 for fixing the plurality of legs 5 or a single fixing plate 6 is used. The number of installed plates 6 can be arbitrarily changed (not shown).

そして、固定用プレート6上で、脚部5を回転させて脚部5の長さを調整することで、アンカーボルトAの高さを調整する。図2に示す脚部5には、回転操作後に固定する操作ナット5Aを装着している。アンカーボルトAの高さを調整した後は、脚部5の下端を固定用プレート6に溶接して固定する。   And the height of the anchor bolt A is adjusted by rotating the leg part 5 on the fixing plate 6 and adjusting the length of the leg part 5. An operation nut 5A that is fixed after the rotation operation is attached to the leg portion 5 shown in FIG. After adjusting the height of the anchor bolt A, the lower end of the leg portion 5 is welded to the fixing plate 6 and fixed.

固定具8は、アンカーボルトAの周囲に配設された配筋Sにネジ止め固定する金具である。また、調整部材9は、この固定具8と前述したテンプレート2とに溶接するもので、配筋後のアンカーボルトAの位置を再調整する(図12参照)。図示の固定具8は、配筋Sの側面に装着するU字金具8Aと、このU字金具8Aから配筋Sに圧着する圧着ボルト8Bからなる(図12(ロ)参照)。一方、調整部材9は棒状の部材で、再調整した位置でアンカーボルトAを固定するように溶接される(図12(イ)参照)。また、溶接手段の代わりに、固定具8やテンプレート2のいずれか又は両方に、調整部材9を連結する連結構造を設けてもよい。   The fixture 8 is a metal fitting that is fixed to the reinforcing bar S arranged around the anchor bolt A with screws. The adjusting member 9 is welded to the fixture 8 and the template 2 described above, and readjusts the position of the anchor bolt A after the bar arrangement (see FIG. 12). The illustrated fixture 8 includes a U-shaped metal fitting 8A to be mounted on the side surface of the reinforcing bar S, and a crimping bolt 8B for crimping the U-shaped metal fitting 8A to the reinforcing bar S (see FIG. 12B). On the other hand, the adjusting member 9 is a rod-like member and is welded so as to fix the anchor bolt A at the readjusted position (see FIG. 12 (A)). Moreover, you may provide the connection structure which connects the adjustment member 9 to either the fixture 8 or the template 2, or both instead of a welding means.

本発明工法は、次の工程からなる。すなわち、墨出し工程100、吊り込み工程200、芯出し工程300、レベル調整工程400、フレーム固定工程500、再調整工程600である。   The method of the present invention comprises the following steps. That is, the marking process 100, the hanging process 200, the centering process 300, the level adjusting process 400, the frame fixing process 500, and the readjustment process 600.

墨出し工程100は、基礎Q設置位置上に墨付けを行い、アンカーボルトAの設置間隔を示すと共に、この墨付け位置を基準として、固定用プレート6を設置間隔に固定する工程である(図6参照)。このとき、墨付けは、基礎Q設置位置上の捨てコンクリートRや耐圧板、あるいは杭頭U等に行われる(図6(イ)参照)。また、固定用プレート6を杭頭Uに設置しなければならない場合は、この杭頭Uの鉄板に固定用プレート6を直接溶接する。この場合、杭筋Tの位置を避ける必要がある(図6(ロ)参照)。   The marking process 100 is a process of marking the foundation Q installation position, indicating the installation interval of the anchor bolt A, and fixing the fixing plate 6 to the installation interval with reference to the marking position (see FIG. 6). At this time, marking is performed on the discarded concrete R, the pressure plate, the pile head U, or the like on the foundation Q installation position (see FIG. 6 (A)). When the fixing plate 6 must be installed on the pile head U, the fixing plate 6 is directly welded to the iron plate of the pile head U. In this case, it is necessary to avoid the position of the pile reinforcement T (see FIG. 6B).

吊り込み工程200は、クレーンなどの重機を使用してアンカーフレーム1を基礎Q設置位置上に吊り込む工程である(図7参照)。このとき、基礎Q設置位置に段差がある場合は、予め脚部5の長さを調整しておき、設置後、脚部5の操作でアンカーボルトAの微調整を行うようにする(図7(ロ)参照)。また、杭筋T等が露出している場合は、この杭筋Tが妨げにならないように曲げてアンカーフレーム1を設置する(図7(ハ)参照)。更に、脚部5の連結位置は任意に変えることができるので、障害物が妨げにならいない位置に連結する(図8参照)。   The hanging process 200 is a process of hanging the anchor frame 1 on the foundation Q installation position using a heavy machine such as a crane (see FIG. 7). At this time, if there is a step in the foundation Q installation position, the length of the leg 5 is adjusted in advance, and after installation, the anchor bolt A is finely adjusted by operating the leg 5 (FIG. 7). (See (b)). Further, when the pile reinforcement T or the like is exposed, the anchor frame 1 is installed by bending so that the pile reinforcement T does not interfere (see FIG. 7C). Furthermore, since the connection position of the leg part 5 can be changed arbitrarily, it connects with the position where an obstruction does not become obstructive (refer FIG. 8).

芯出し工程300は、吊り込んだアンカーフレーム1の設置位置を墨出し位置に調整する工程である(図9参照)。この工程では、テンプレート2の位置出し用の基準位置に下げ振り10をセットし、基礎Q設置位置の墨付け位置を利用してアンカーフレーム1の前後、左右の位置を調整する。   The centering step 300 is a step of adjusting the installation position of the suspended anchor frame 1 to the inking position (see FIG. 9). In this step, the downward swing 10 is set at the reference position for positioning the template 2, and the front and rear and left and right positions of the anchor frame 1 are adjusted using the marking position of the foundation Q installation position.

レベル調整工程400は、アンカーボルトAの高さを脚部5の長さで調整する工程である(図10参照)。この工程において、アンカーフレーム1のカプラー4に連結した脚部5の回転操作によりアンカーボルトAの高さおよび水平を調整する(図10(ロ)参照)。   The level adjustment step 400 is a step of adjusting the height of the anchor bolt A by the length of the leg portion 5 (see FIG. 10). In this step, the height and level of the anchor bolt A are adjusted by rotating the leg 5 connected to the coupler 4 of the anchor frame 1 (see FIG. 10B).

フレーム固定工程500は、レベル調整後のアンカーフレーム1を基礎Q設置位置上に固定する工程である。この工程の前に、捨てコンクリートR上に施された前記墨出し工程の墨出し位置に基づいて固定用プレート6がアンカー6Aで予め固定されている。フレーム固定工程500は、この固定用プレート6にアンカーフレーム1の脚部5を溶接する工程である。   The frame fixing step 500 is a step of fixing the anchor frame 1 after level adjustment on the foundation Q installation position. Prior to this step, the fixing plate 6 is fixed in advance with an anchor 6A based on the marking position of the marking process performed on the discarded concrete R. The frame fixing step 500 is a step of welding the leg portion 5 of the anchor frame 1 to the fixing plate 6.

図11は、配筋作業が終了した状態を示している。これらの配筋Sは、設計段階からアンカーボルトAや脚部5に干渉しない位置に設置されるものであるから、アンカーフレーム1が配筋作業の妨げにならずに済む(図11(ハ)参照)。但し、配筋作業時に、これらの配筋SがアンカーボルトAに接触するなどの理由から、アンカーボルトAの位置が僅かにずれる場合がある。このため、後述する再調整工程600により、アンカーボルトAの位置を正確な位置に戻すものである。   FIG. 11 shows a state where the bar arrangement work is finished. Since these reinforcing bars S are installed at positions where they do not interfere with the anchor bolts A and the legs 5 from the design stage, the anchor frame 1 does not interfere with the reinforcing work (FIG. 11C). reference). However, there is a case where the position of the anchor bolt A is slightly shifted due to the reason that these reinforcing bars S come into contact with the anchor bolt A during the bar arrangement work. For this reason, the position of the anchor bolt A is returned to an accurate position by the readjustment process 600 described later.

したがって、再調整工程600は、配筋作業後に各アンカーボルトAの位置を再調整する工程である(図12参照)。この工程では、テンプレート2周辺に配された配筋Sに固定具8を固定し、該固定具8とテンプレート2とに溶接する調整部材9によりアンカーボルトAの位置を微調整するものである(図12(イ)参照)。このとき、固定具8を配筋Sに溶接することは、配筋Sの強度が劣化するので好ましくない。そこで、固定具8は、配筋Sにネジ止めできる構造のものを使用する(図12(ロ)参照)。また、コンクリート打設後は、アンカーフレーム1からテンプレート2と調整部材9が外され、代わりに鉄骨を連結するベースプレートTが装着される(図1参照)。   Therefore, the readjustment process 600 is a process of readjusting the position of each anchor bolt A after the bar arrangement work (see FIG. 12). In this step, the fixing tool 8 is fixed to the reinforcing bar S arranged around the template 2 and the position of the anchor bolt A is finely adjusted by the adjusting member 9 welded to the fixing tool 8 and the template 2 ( Refer to FIG. At this time, welding the fixture 8 to the reinforcing bar S is not preferable because the strength of the reinforcing bar S deteriorates. Therefore, the fixture 8 has a structure that can be screwed to the reinforcing bar S (see FIG. 12B). Moreover, after concrete placement, the template 2 and the adjustment member 9 are removed from the anchor frame 1, and a base plate T for connecting steel frames is attached instead (see FIG. 1).

尚、本発明は図示例に限定されるものではなく、本発明の要旨を変更しない範囲で任意に変更することができるものである。   In addition, this invention is not limited to the example of illustration, It can change arbitrarily in the range which does not change the summary of this invention.

本発明の使用状態を示す正断面図である。It is a front sectional view showing a use state of the present invention. 本発明の使用状態を示す正面図である。It is a front view which shows the use condition of this invention. 本発明のテンプレートを示す平面図である。It is a top view which shows the template of this invention. 本発明のカプラーの他の実施例を示す正面図である。It is a front view which shows the other Example of the coupler of this invention. 本発明の作業手順を示す工程図である。It is process drawing which shows the operation | work procedure of this invention. 本発明の墨出し工程を示し、(イ)は側面図、(ロ)は平面図である。FIG. 3 shows a marking process according to the present invention, where (A) is a side view and (B) is a plan view. 本発明の吊り込み工程を示す側面図である。It is a side view which shows the suspension process of this invention. 本発明の脚部と固定用プレートとの変更例を示し、(イ)は側面図(ロ)は平面図である。The modification of the leg part of this invention and a fixing plate is shown, (a) is a side view (b) is a top view. 本発明の芯出し工程を示す側面図である。It is a side view which shows the centering process of this invention. 本発明のレベル調整工程を示す側面図である。It is a side view which shows the level adjustment process of this invention. 本発明における配筋作業後を示し、(イ)、 (ロ)は側面図、(ハ)は平面図である。FIG. 2 shows a state after the bar arrangement work in the present invention, wherein (a) and (b) are side views and (c) are plan views. 本発明の再調整工程を示し、(イ)は側面図、(ロ)は固定具の説明図である。The readjustment process of this invention is shown, (A) is a side view, (B) is explanatory drawing of a fixing tool.

符号の説明Explanation of symbols

A アンカーボルト
P 建築構造物
Q 基礎
R 捨てコンクリート
S 配筋
T 杭筋
U 杭頭
1 アンカーフレーム
2 テンプレート
2A 挿通孔
2B 固定ナット
2C 基板
3 補助フレーム
3A 挿通孔
3B 固定ナット
4 カプラー
4A 筒状体
4B 連結ナット
4C 貫通孔
5 脚部
5A 操作ナット
6 固定用プレート
6A アンカー
7 定着板
8 固定具
8A U字金具
8B 圧着ボルト
9 調整部材
10 下げ振り
A Anchor bolt P Building structure Q Foundation R Discarded concrete S Reinforcement T Pile bar U Pile head 1 Anchor frame 2 Template 2A Insertion hole 2B Fixing nut 2C Substrate 3 Auxiliary frame
3A Insertion hole 3B Fixing nut 4 Coupler 4A Cylindrical body 4B Connection nut 4C Through hole 5 Leg 5A Operation nut 6 Fixing plate 6A Anchor 7 Fixing plate 8 Fixing tool 8A U-shaped fitting 8B Crimping bolt 9 Adjustment member 10 Down swing

Claims (6)

複数本のアンカーボルトの上部を、予め所定の設置間隔でテンプレートと補助フレームにて保持し、アンカーボルトを所定の高さに調整支持する脚部をアンカーボルトのいずれか下端部に連結したアンカーフレームを建築構造物の基礎設置位置に支持固定するアンカーボルトサポート工法であって、基礎設置位置上に、アンカーボルトの設置間隔を示すと共に、該設置間隔に固定用プレートを固定する墨出し工程と、構築されたアンカーフレームを基礎設置位置上に吊り込む吊り込み工程と、吊り込んだアンカーフレームの設置位置を墨出し位置に調整する芯出し工程と、アンカーフレームの高さを脚部の長さで調整するレベル調整工程と、レベル調整後のアンカーフレームを固定用プレート上に固定するフレーム固定工程と、配筋作業後に各アンカーボルトの位置を再調整する再調整工程と、からなることを特徴とする建築構造用アンカーボルトサポート工法。   An anchor frame in which upper portions of a plurality of anchor bolts are held in advance by a template and an auxiliary frame at a predetermined installation interval, and a leg portion that adjusts and supports the anchor bolt to a predetermined height is connected to either lower end portion of the anchor bolt. An anchor bolt support method for supporting and fixing a building structure at a foundation installation position, showing an installation interval of anchor bolts on the foundation installation position, and an ink marking step of fixing a fixing plate to the installation interval; The suspension process of suspending the constructed anchor frame on the foundation installation position, the centering process of adjusting the installation position of the suspended anchor frame to the marking position, and the height of the anchor frame by the length of the leg Level adjustment process to adjust, frame fixing process to fix anchor frame after level adjustment on fixing plate, and after bar arrangement work Readjustment process and anchor bolt support method for building structures, characterized in that it consists of re-adjusting the position of the anchor bolt. 前記フレーム固定工程において、捨てコンクリート上に施された前記墨出し工程の墨出し位置に基づいてアンカーボルトの設置位置に固定用プレートをアンカーで固定し、該固定用プレートにアンカーフレームの脚部を溶接する請求項1記載の建築構造用アンカーボルトサポート工法。   In the frame fixing step, the fixing plate is fixed to the anchor bolt installation position with the anchor based on the marking position of the marking step applied on the discarded concrete, and the anchor frame leg is attached to the fixing plate. The anchor bolt support method for building structures according to claim 1 to be welded. 前記レベル調整工程において、前記アンカーフレームの脚部とアンカーボルトとの間にカプラーを連結し、脚部の長さを調整することでアンカーボルトの高さを調整する請求項1記載の建築構造用アンカーボルトサポート工法。   2. The building structure according to claim 1, wherein in the level adjustment step, a coupler is connected between the leg portion of the anchor frame and the anchor bolt, and the height of the anchor bolt is adjusted by adjusting the length of the leg portion. Anchor bolt support method. 前記再調整工程において、アンカーフレームのテンプレート周辺の配筋に固定具をネジ止め固定し、該固定具とテンプレートとに溶接する調整部材によりアンカーボルトの位置を微調整する請求項1記載の建築構造用アンカーボルトサポート工法。   The building structure according to claim 1, wherein, in the readjustment step, a fixing tool is screwed and fixed to a bar arrangement around the template of the anchor frame, and the position of the anchor bolt is finely adjusted by an adjustment member welded to the fixing tool and the template. Anchor bolt support construction method. 建築構造物の基礎設置位置にアンカーボルトを支持固定するアンカーボルトサポート装置において、複数本のアンカーボルトの上部を、予め所定の設置間隔でテンプレートに連結すると共に、アンカーボルトの下部をテンプレートと同じ間隔で補助フレームにて保持し、アンカーボルトを所定の高さに調整支持する脚部をアンカーボルトのいずれか下端部に連結することで、基礎設置位置上に吊り込まれるアンカーフレームを設け、脚部とアンカーボルトとの間に高さ調整用のカプラーを連結し、該脚部の回転操作によりアンカーボルトの高さを調整するように設けたことを特徴とする建築構造用アンカーボルトサポート装置。   In an anchor bolt support device for supporting and fixing anchor bolts at the foundation installation position of a building structure, the upper portions of a plurality of anchor bolts are connected in advance to a template at a predetermined installation interval, and the lower portions of the anchor bolts are spaced at the same interval as the template. An anchor frame that is suspended on the foundation installation position is provided by connecting a leg portion that is held by an auxiliary frame and that adjusts and supports the anchor bolt to a predetermined height to either lower end portion of the anchor bolt. An anchor bolt support device for a building structure, wherein a height adjusting coupler is connected between the anchor bolt and the anchor bolt, and the height of the anchor bolt is adjusted by rotating the leg. 前記テンプレートに溶接する調整部材と、アンカーボルトの周囲に配設された配筋にネジ止め固定する固定具とを設け、該固定具と調整部材とを溶接して配筋後のアンカーボルトの位置を再調整するように設けた請求項5記載の建築構造用アンカーボルトサポート装置。   An adjustment member to be welded to the template, and a fixture to be screwed and fixed to the reinforcement arranged around the anchor bolt, and the position of the anchor bolt after the reinforcement by welding the fixture and the adjustment member The anchor bolt support device for a building structure according to claim 5, wherein the anchor bolt support device is provided so as to readjust.
JP2007112783A 2007-04-23 2007-04-23 Method and device for supporting anchor bolt for building structure Pending JP2008267030A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2007112783A JP2008267030A (en) 2007-04-23 2007-04-23 Method and device for supporting anchor bolt for building structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2007112783A JP2008267030A (en) 2007-04-23 2007-04-23 Method and device for supporting anchor bolt for building structure

Publications (1)

Publication Number Publication Date
JP2008267030A true JP2008267030A (en) 2008-11-06

Family

ID=40046876

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2007112783A Pending JP2008267030A (en) 2007-04-23 2007-04-23 Method and device for supporting anchor bolt for building structure

Country Status (1)

Country Link
JP (1) JP2008267030A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010044179A1 (en) 2008-10-16 2010-04-22 住友ベークライト株式会社 Method for manufacturing semiconductor device and semiconductor device
CN110410398A (en) * 2019-08-21 2019-11-05 中冶天工集团天津有限公司 A kind of foundation bolt securing device and its application method
CN112547801A (en) * 2020-11-17 2021-03-26 十四冶建设集团云南安装工程有限公司 High-precision ultrathin aluminum foil mill unit mounting method
CN114033191A (en) * 2021-12-13 2022-02-11 中国化学工程第十一建设有限公司 Anchor plate type foundation bolt positioning method
CN114777705A (en) * 2022-05-10 2022-07-22 中国核工业华兴建设有限公司 Nuclear power safety injection water tank foundation bolt installation measurement inspection method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02132241A (en) * 1988-11-14 1990-05-21 Hitachi Metals Ltd Column base structure
JPH0754349A (en) * 1993-08-13 1995-02-28 Sekisui House Ltd Anchor bolt top end fixing tool
JPH07207944A (en) * 1994-01-24 1995-08-08 Daiwa House Ind Co Ltd Anchor bolt installing jig and setting method
JPH07292683A (en) * 1994-04-25 1995-11-07 Maeda Corp Anchor frame and foundation construction method using the frame
JPH093912A (en) * 1995-06-22 1997-01-07 Okabe Co Ltd Plate anchor construction method
JP2002167773A (en) * 2000-11-29 2002-06-11 Taito Kogyo:Kk Anchor bolt fixing device
JP2004036103A (en) * 2002-06-28 2004-02-05 Asahi Sangyo Kk Anchor frame and method for fixing the same

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02132241A (en) * 1988-11-14 1990-05-21 Hitachi Metals Ltd Column base structure
JPH0754349A (en) * 1993-08-13 1995-02-28 Sekisui House Ltd Anchor bolt top end fixing tool
JPH07207944A (en) * 1994-01-24 1995-08-08 Daiwa House Ind Co Ltd Anchor bolt installing jig and setting method
JPH07292683A (en) * 1994-04-25 1995-11-07 Maeda Corp Anchor frame and foundation construction method using the frame
JPH093912A (en) * 1995-06-22 1997-01-07 Okabe Co Ltd Plate anchor construction method
JP2002167773A (en) * 2000-11-29 2002-06-11 Taito Kogyo:Kk Anchor bolt fixing device
JP2004036103A (en) * 2002-06-28 2004-02-05 Asahi Sangyo Kk Anchor frame and method for fixing the same

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010044179A1 (en) 2008-10-16 2010-04-22 住友ベークライト株式会社 Method for manufacturing semiconductor device and semiconductor device
CN110410398A (en) * 2019-08-21 2019-11-05 中冶天工集团天津有限公司 A kind of foundation bolt securing device and its application method
CN112547801A (en) * 2020-11-17 2021-03-26 十四冶建设集团云南安装工程有限公司 High-precision ultrathin aluminum foil mill unit mounting method
CN112547801B (en) * 2020-11-17 2023-07-14 十四冶建设集团云南安装工程有限公司 High-precision ultrathin aluminum foil rolling mill set installation construction method
CN114033191A (en) * 2021-12-13 2022-02-11 中国化学工程第十一建设有限公司 Anchor plate type foundation bolt positioning method
CN114033191B (en) * 2021-12-13 2023-05-23 中国化学工程第十一建设有限公司 Anchor plate type anchor bolt positioning method
CN114777705A (en) * 2022-05-10 2022-07-22 中国核工业华兴建设有限公司 Nuclear power safety injection water tank foundation bolt installation measurement inspection method
CN114777705B (en) * 2022-05-10 2023-09-05 中国核工业华兴建设有限公司 Nuclear power plant water injection tank foundation bolt installation, measurement and inspection method

Similar Documents

Publication Publication Date Title
KR101409418B1 (en) Steel socket and apparatus connecting steel pile steel column using the same
JP2019112811A (en) Main leg installation method and anchor frame installation jig
JP7262277B2 (en) Installation method of jig using anchor member
JP2008267030A (en) Method and device for supporting anchor bolt for building structure
CN111173297A (en) Reinforcing steel bar mounting and positioning device and construction method thereof
JP4020406B2 (en) Formwork support mechanism and placement method
JP4380429B2 (en) Anchor bolt installation method and anchor bolt installation device for steel pipe foundation pile
KR20110010248A (en) Multi u-head bracket apparatus for bridge construction
JP2006291550A (en) Method and apparatus for installing column fixing member in steel pipe foundation pile
JP3673108B2 (en) Hollow slab void member installation method
JP2012162882A (en) Anchor frame, and construction method for foundation structure using anchor frame
KR102361789B1 (en) Supporter for installating horizontal member of supporting system
JP5968667B2 (en) Construction method of lightweight building foundation
CN114197894A (en) Construction method of large concrete funnel
JP6181000B2 (en) Foundation structure of building with steel frame and its construction method
JP3131447U (en) Anchor bolt fixing device
JP2015055079A (en) Anchor frame, and method for constructing anchor structure using the anchor frame
JP5305941B2 (en) Floor frame height adjustment nut embedding method and floor frame height adjustment nut holder
JPH10311045A (en) Surface table construction method and device for erecting post
JP5766828B2 (en) Method for installing solar cell module installation stand and solar cell module installation stand
JP7438821B2 (en) Anchor bolt fixing jig
CN216920426U (en) Positioning tool for steam turbine foundation embedded part
CN215393483U (en) Steel sheet is roof beam installation positioner even
JP2012225053A (en) Perpendicularity adjustment jig and perpendicularity adjustment method
JPH10299004A (en) Positioning method and equipment for steel pipe column in erecting insertion type steel pipe column

Legal Events

Date Code Title Description
A977 Report on retrieval

Effective date: 20091102

Free format text: JAPANESE INTERMEDIATE CODE: A971007

A131 Notification of reasons for refusal

Effective date: 20091208

Free format text: JAPANESE INTERMEDIATE CODE: A131

A02 Decision of refusal

Effective date: 20100406

Free format text: JAPANESE INTERMEDIATE CODE: A02