JP2014163143A - Curve part track structure and ballast reshaping material - Google Patents

Curve part track structure and ballast reshaping material Download PDF

Info

Publication number
JP2014163143A
JP2014163143A JP2013036046A JP2013036046A JP2014163143A JP 2014163143 A JP2014163143 A JP 2014163143A JP 2013036046 A JP2013036046 A JP 2013036046A JP 2013036046 A JP2013036046 A JP 2013036046A JP 2014163143 A JP2014163143 A JP 2014163143A
Authority
JP
Japan
Prior art keywords
ballast
shaping material
rail
line
track
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2013036046A
Other languages
Japanese (ja)
Other versions
JP5513643B1 (en
Inventor
Toshihito Tanaka
寿仁 田中
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
KEISEI KENSETSU KK
Original Assignee
KEISEI KENSETSU KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by KEISEI KENSETSU KK filed Critical KEISEI KENSETSU KK
Priority to JP2013036046A priority Critical patent/JP5513643B1/en
Application granted granted Critical
Publication of JP5513643B1 publication Critical patent/JP5513643B1/en
Publication of JP2014163143A publication Critical patent/JP2014163143A/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Railway Tracks (AREA)
  • Machines For Laying And Maintaining Railways (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a lightweight curve part track structure excellent in workability, drainability and processability.SOLUTION: A curve part track structure comprises ballast laid on a roadbed and first and second roadways mutually laid in parallel on the ballast, and the first and second roadways constitute a curve part with the second roadway side as the inside. The first roadway is composed of a first sleeper, a first outer-orbital rail and a first inner-orbital rail. The second roadway is composed of a second sleeper, a second outer-orbital rail and a second inner-orbital rail. A position of the first and second inner-orbital rails and the first and second outer-orbital rails is adjusted so that displacement is not caused in a height of the first and second inner-orbital rails and the first sand second roadways have a cant amount corresponding to a desired design speed. A first bulk increase part generated in the curve outside direction of the first roadway and a second bulk increase part generated between the first roadway and the second roadway, are reshaped by a ballast reshaping material formed in a net shape by positioning.

Description

本発明は鉄道の曲線部軌道構造、およびこれに用いられるバラスト整形材に関する。   The present invention relates to a curved track structure of a railway, and a ballast shaping material used therefor.

既存の鉄道路線の高速化を実現するためには、曲線通過速度の高速化が必要となる場合がある。曲線通過速度を高速化するためには、曲線部の軌道構造の改良が必要となる。曲線部の軌道構造の具体的な改良方法として、曲線半径の拡大、カント嵩上などがある。例えば曲線通過速度Vは、Rを曲線半径(m)、Cをカント(mm)、aを所定の係数として以下のように定義される。   In order to increase the speed of existing railway lines, it may be necessary to increase the curve passing speed. In order to increase the curve passing speed, it is necessary to improve the track structure of the curved portion. Specific methods for improving the trajectory structure of the curved portion include expansion of the curve radius and cant bulk. For example, the curve passing speed V is defined as follows, where R is a curve radius (m), C is a cant (mm), and a is a predetermined coefficient.

Figure 2014163143
Figure 2014163143

Cは通常、許容カント不足量C(mm)とカント設定量C(mm)の和で計算される。 C is normally calculated as the sum of the allowable cant deficiency C d (mm) and the cant set amount C m (mm).

曲線区間の軌道構造、当該軌道構造に用いる枕木やスラブマット等のレール支持体、曲線区間の軌道のカント設定方法の例として特許文献1が開示されている。   Patent Document 1 is disclosed as an example of a track structure of a curved section, a rail support such as a sleeper or a slab mat used for the track structure, and a method for setting a track of a curved section.

曲線通過速度を高速化するために曲線半径を拡大する方法を採用した場合、曲線半径の拡大により計画軌道が鉄道会社の用地外に張り出す場合には、新たな用地確保が必要となる。また、高架橋上に曲線が存在する場合、新たな計画軌道に合わせて既設高架橋の撤去、および計画された曲線半径を満足する新設高架橋の設置が必要となる。新たな用地確保は膨大なコストと手間がかかる。また、既設高架橋の撤去や新設高架橋の設置は、既存の鉄道路線の一部区間を長期間に渡り運休として行わなければならず、コストや手間が膨大となり、事実上不可能な場合が多い。そこで、曲線部の軌道構造の改良方法としてカント嵩上が実施される場合がある。以下、図1、図2を参照してカント嵩上の施工方法について説明する。図1は第1線路におけるカント嵩上の施工手順を示す横断面図である。図2は第1、第2線路におけるカント嵩上の施工手順を示す横断面図である。図1に示す曲線部軌道構造の例では、バラスト1が路盤に敷設され、バラスト1上に互いに平行に下り線(第1線路)、上り線(第2線路)が敷設されている。第1、および第2線路は、第2線路側を内側として曲線部を構成している。第1線路は、バラスト1上に敷設された第1枕木2と、第1枕木2上に曲線の外側方向に敷設された第1外軌レール3と、第1枕木2上に曲線の内側方向に敷設された第1内軌レール4とからなる。第2線路は、バラスト1上に敷設された第2枕木5と、第2枕木5上に曲線の外側方向に敷設された第2外軌レール6と、第2枕木5上に曲線の内側方向に敷設された第2内軌レール7とからなる。本明細書では第1線路が曲線外側に敷設され、第2線路が曲線内側に敷設された2本の線路からなる曲線部軌道構造を例に説明を進める。図1では、第1線路を下り線、第2線路を上り線とした複線と設定したが、上り、下りの別は本発明の本質とは無関係であるため、例えば第1線路を上り線、第2線路を下り線とした複線であってもよい。また、第1、第2線路を単線並列としてもよい。または、第1、第2線路を複々線の上り、下り何れかと設定してもよい。ここで、第1線路のカント嵩上後においてもパンタグラフと第1線路上に架空されるトロリー線(電車線)の接触を良好に保つため、カント嵩上後のトロリー線(電車線)と線路との離間距離がカント嵩上前と等しく保たれなければならない。このため、図1に示すように、カント嵩上前後において第1内軌レール4、および第2内軌レール7の高さに変位が生じないようにして、トロリー線(電車線)と線路との離間距離を等しく保つ。具体的には、図1の矢印Aに示すように、第1内軌レール4の下にあるバラスト1を予堀して、第1内軌レール4の高さを予め下げておき、その後、図1の矢印Bに示すように、第1外軌レール3の下にあるバラスト1を嵩増しして、第1外軌レール3の高さを高くすることでカント嵩上を行う。第2線路についても同様である。第2線路の場合は、図2の矢印Aに示すように、第2内軌レール7の下にあるバラスト1を予堀して、第2内軌レール7の高さを予め下げておき、その後、図2の矢印Bに示すように、第2外軌レール6の下にあるバラスト1を嵩増しして、第2外軌レール6の高さを高くすることでカント嵩上を行う。カント嵩上は、第1、および第2線路が所望の設計速度に対応するカント量を備えるように実施される。施工後のバラスト1には施工前のバラスト1と比較してその形状において変化がみられる。図2の長破線は施工前の軌道の横断面の線形を、実線は施工後の軌道の横断面の線形を示す。図2に示されるように、第1線路の曲線外側方向には、バラストが嵩増された領域である第1嵩増部1−1が生ずる。同様に、第1線路と第2線路の間には、第2嵩増部1−2が生ずる。これらの嵩増部1−1、1−2は、建築限界を超える高さ、幅になると車両通過時に巻き上げられるため問題となる。また、嵩増部1−1側を保守点検用通路として用いる場合、嵩増部1−1が作業員の歩行の妨げとなる。作業員が嵩増部1−1付近を通行する度にバラスト1を蹴り上げることでバラスト1が散乱し、保守管理上問題となる。これら以外にも、嵩増部1−1の下に例えば信号用トラフなどが埋設されている場合、この信号用トラフの保守点検に際し、嵩増部1−1は邪魔になる。   When the method of enlarging the curve radius is adopted in order to increase the curve passing speed, a new site needs to be secured when the planned track projects outside the site of the railway company due to the increase of the curve radius. In addition, when a curve exists on the viaduct, it is necessary to remove the existing viaduct along with the new planned trajectory and to install a new viaduct that satisfies the planned curve radius. Securing new land takes enormous costs and effort. Also, the removal of existing viaducts and the installation of new viaducts must be carried out for a long period of time on a part of the existing railway lines, which is extremely impossible in many cases due to enormous costs and labor. Thus, there is a case where canting is performed as a method for improving the track structure of the curved portion. In the following, the construction method with a cant bulk will be described with reference to FIGS. FIG. 1 is a cross-sectional view showing the construction procedure of the cant on the first track. FIG. 2 is a cross-sectional view showing the construction procedure of the first and second tracks with a high cant. In the example of the curved track structure shown in FIG. 1, the ballast 1 is laid on the roadbed, and the down line (first line) and the up line (second line) are laid in parallel on the ballast 1. The 1st and 2nd track | line has comprised the curved part by making the 2nd track | line side into an inner side. The first track has a first sleeper 2 laid on the ballast 1, a first outer rail rail 3 laid on the first sleeper 2 in an outward direction of the curve, and an inner direction of the curve on the first sleeper 2. And the first inner rail rail 4 laid on the surface. The second track is composed of a second sleeper 5 laid on the ballast 1, a second outer rail rail 6 laid on the second sleeper 5 in an outward direction of the curve, and an inner direction of the curve on the second sleeper 5. It consists of the 2nd inner track rail 7 laid in. In the present specification, description will be given by taking as an example a curved track structure including two lines in which the first line is laid on the curve outer side and the second line is laid on the curve inner side. In FIG. 1, the first line is set as a double line with the down line and the second line is set as the up line. However, the difference between the up line and the down line is irrelevant to the essence of the present invention. It may be a double track with the second line as a down line. Also, the first and second lines may be single-wire parallel. Or you may set a 1st, 2nd track | line as either the going up and down of a double line. Here, in order to maintain good contact between the pantograph and the trolley line (train line) suspended over the first line even after the first line cant rises, the trolley line (train line) and the line after the cant rise The separation distance between and must be kept the same as before the cant. Therefore, as shown in FIG. 1, the trolley line (train line) and the track are arranged so that no displacement occurs in the height of the first inner rail rail 4 and the second inner rail rail 7 before and after the cant rise. Keep the separation distance equal. Specifically, as shown by an arrow A in FIG. 1, the ballast 1 under the first inner rail rail 4 is pre-excavated, and the height of the first inner rail rail 4 is lowered in advance, As shown by an arrow B in FIG. 1, the ballast 1 under the first outer gauge rail 3 is increased in volume, and the height of the first outer gauge rail 3 is increased to increase the cant. The same applies to the second line. In the case of the second track, as shown by an arrow A in FIG. 2, the ballast 1 under the second inner rail rail 7 is pre-excavated, and the height of the second inner rail rail 7 is lowered in advance. Thereafter, as shown by an arrow B in FIG. 2, the ballast 1 under the second outer gauge rail 6 is increased, and the height of the second outer gauge rail 6 is increased, so that the cant is increased. Kant bulking is performed so that the first and second lines have a cant amount corresponding to a desired design speed. The ballast 1 after the construction shows a change in its shape as compared with the ballast 1 before the construction. The long broken line in FIG. 2 shows the alignment of the cross section of the track before construction, and the solid line shows the alignment of the cross section of the track after construction. As shown in FIG. 2, a first increased portion 1-1, which is a region where the ballast is increased, is generated in the curve outer direction of the first line. Similarly, the 2nd bulk increase part 1-2 arises between a 1st track | line and a 2nd track | line. Since these bulk increase parts 1-1 and 1-2 will be rolled up at the time of vehicle passing if it becomes the height and width exceeding a building limit, it will become a problem. Moreover, when using the bulking part 1-1 side as a passage for maintenance inspection, the bulking part 1-1 obstructs a worker's walk. The ballast 1 is scattered by kicking up the ballast 1 every time the worker passes near the bulking portion 1-1, which causes a problem in maintenance management. In addition to these, when a signal trough or the like is buried under the bulk increasing portion 1-1, the bulk increasing portion 1-1 becomes an obstacle in the maintenance and inspection of the signal trough.

特開平11−280001号公報JP-A-11-280001

これに対し、例えば図3に示すようなL字ブロック900等を使って、嵩増部1−1の整形を行って、嵩増部1−1近傍に保守点検用通路を確保したり、嵩増部1−2を整形して、バラスト1が建築限界内に入らないようにし、通過車両が嵩増部1−2付近のバラスト1を巻き上げないようにすることが可能である。   On the other hand, for example, an L-shaped block 900 as shown in FIG. 3 is used to shape the bulking portion 1-1 to secure a maintenance inspection passage in the vicinity of the bulking portion 1-1. It is possible to shape the increasing part 1-2 so that the ballast 1 does not enter the building limit, and to prevent the passing vehicle from winding up the ballast 1 near the increasing part 1-2.

在来線の改修工事では、最終列車通過後、翌朝の始発列車通過前までに工程を消化しなければならない。また大規模地震が発生した場合、バラストの崩れ、軌道沈下が発生して列車走行に支障が生じる場合がある。この場合、できる限り短時間で軌道整備を行う必要がある。これらの理由により、バラスト整形材は施工性、取り扱いに優れることが要求されるが、図3に示したL字ブロック900は、重量、体積が大きいため施工性に優れているとはいえない。   In renovation work on conventional lines, the process must be completed after the last train passes and before the first train passes the next morning. In addition, when a large-scale earthquake occurs, the ballast collapses and the track subsidence occurs, which may hinder train travel. In this case, it is necessary to perform track maintenance in as short a time as possible. For these reasons, the ballast shaping material is required to be excellent in workability and handling, but the L-shaped block 900 shown in FIG. 3 is not excellent in workability because of its large weight and volume.

また、図3に示したL字ブロック900は体積が大きいため、資材として保管しておくために必要なスペースが大きくなるという欠点がある。   Further, since the L-shaped block 900 shown in FIG. 3 has a large volume, there is a disadvantage that a space necessary for storing it as a material becomes large.

また、路盤の軟弱化を防ぐため、バラストは十分な排水性能(水はけの良さ)を備えている必要があるが、図3に示したようなL字ブロック900をバラスト整形目的で多用すれば、軌道全体の排水性能は劣化する。軌道全体の排水性能が劣化すれば、路盤の軟弱化により軌道全体の歪み、緩みが発生し列車の運行に影響を来す。   Moreover, in order to prevent the softening of the roadbed, the ballast needs to have sufficient drainage performance (good drainage), but if the L-shaped block 900 as shown in FIG. The drainage performance of the entire track deteriorates. If the drainage performance of the entire track deteriorates, the softness of the roadbed will cause distortion and loosening of the entire track, affecting train operation.

また、図3に示したようなL字ブロック900は、一般にはコンクリート製であるため加工が容易でない。従って、現場の状況に則してその形状を変更することは難しい。   Moreover, since the L-shaped block 900 as shown in FIG. 3 is generally made of concrete, processing is not easy. Therefore, it is difficult to change the shape according to the situation at the site.

また、図3に示したようなL字ブロック900は重量が大きいため多用すれば盛土への上載重量が増大し、圧密沈下を誘引する。   Moreover, since the L-shaped block 900 as shown in FIG. 3 is heavy, if it is used frequently, the overlay weight on the embankment increases, and the consolidation settlement is induced.

そこで、本発明では、施工性、排水性、加工性に優れる軽量な曲線部軌道構造を提供することを目的とする。   Therefore, an object of the present invention is to provide a light-weight curved portion track structure that is excellent in workability, drainage, and workability.

本発明の曲線部軌道構造は、路盤に敷設されたバラストと、バラスト上に互いに平行に敷設された第1、および第2線路とを備える。第1、および第2線路が第2線路側を内側として曲線部を構成する。第1線路は、バラスト上に敷設された第1枕木と、第1枕木上に曲線の外側方向に敷設された第1外軌レールと、第1枕木上に曲線の内側方向に敷設された第1内軌レールとからなる。第2線路は、バラスト上に敷設された第2枕木と、第2枕木上に曲線の外側方向に敷設された第2外軌レールと、第2枕木上に曲線の内側方向に敷設された第2内軌レールとからなる。第1、第2内軌レールの高さに変位が生じず、かつ第1、および第2線路が所望の設計速度に対応するカント量を備えるように、第1、第2内軌レール、第1、第2外軌レールの位置が調整される。位置調整によって第1線路の曲線外側方向に生じるバラストの嵩増部である第1嵩増部と、第1線路と第2線路の間に生じるバラストの嵩増部である第2嵩増部とが、網状に形成されたバラスト整形材によって整形される。   The curved portion track structure of the present invention includes a ballast laid on a roadbed and first and second lines laid parallel to each other on the ballast. The first and second lines constitute the curved portion with the second line side as the inner side. The first track has a first sleeper laid on the ballast, a first outer rail rail laid on the first sleeper in an outward direction of the curve, and a first sleeper rail laid on the first sleeper in an inward direction of the curve. It consists of 1 inner rail. The second track is a second sleeper laid on the ballast, a second outer rail rail laid on the second sleeper in the curved outer direction, and a second sleeper rail laid on the second sleeper in the curved inner direction. It consists of two inner gauge rails. The first and second inner rail rails, the first and second inner rail rails, the first and second inner rail rails, so that no displacement occurs in the height and the first and second tracks have a cant amount corresponding to a desired design speed. 1. The position of the second outer rail rail is adjusted. A first increased portion that is an increased portion of the ballast generated in the direction of the curve of the first line by the position adjustment, and a second increased portion that is an increased portion of the ballast generated between the first line and the second line; Are shaped by a ballast shaping material formed in a net shape.

本発明の曲線部軌道構造は、施工性、排水性、加工性に優れ、軽量である。   The curved track structure of the present invention is excellent in workability, drainage, and workability, and is lightweight.

第1線路におけるカント嵩上の施工手順を示す横断面図。The cross-sectional view which shows the construction procedure which cant bulk in the 1st track | line. 第1、第2線路におけるカント嵩上の施工手順を示す横断面図。The cross-sectional view which shows the construction procedure which cant bulk in the 1st, 2nd track | line. バラスト整形に用いるL字ブロックを例示する図。The figure which illustrates the L-shaped block used for ballast shaping. 実施例1の曲線部軌道構造のカント嵩上前後のバラスト形状の変化を示す横断面図。The cross-sectional view which shows the change of the ballast shape before and behind the cant bulky of the curve part track structure of Example 1. FIG. 実施例1の曲線部軌道構造のバラスト整形後のバラスト形状の変化を示す横断面図。The cross-sectional view which shows the change of the ballast shape after the ballast shaping of the curve part track structure of Example 1. FIG. 実施例1のI型バラスト整形材を示す図。The figure which shows the I type ballast shaping material of Example 1. FIG. 実施例1のL型バラスト整形材を示す図。The figure which shows the L-shaped ballast shaping material of Example 1. FIG. 実施例1のL型バラスト整形材のバリエーションを示す図。The figure which shows the variation of the L-shaped ballast shaping material of Example 1. FIG. 実施例1のL型バラスト整形材のバリエーションを示す図。The figure which shows the variation of the L-shaped ballast shaping material of Example 1. FIG. シミュレーションに用いるL字ブロックのサイズを例示する図。The figure which illustrates the size of the L-shaped block used for simulation. 実施例2の曲線部軌道構造のカント嵩上の施工手順1を示す横断面図。The cross-sectional view which shows the construction procedure 1 on the cant bulky of the curved part track structure of Example 2. FIG. 実施例2の曲線部軌道構造のカント嵩上の施工手順2を示す横断面図。The cross-sectional view which shows the construction procedure 2 which cant bulky the curve part track structure of Example 2. FIG. 実施例2の曲線部軌道構造のカント嵩上の施工手順3を示す横断面図。The cross-sectional view which shows the construction procedure 3 on the cant bulk of the curve part track structure of Example 2. FIG. 実施例2の曲線部軌道構造のカント嵩上の施工手順4を示す横断面図。The cross-sectional view which shows the construction procedure 4 on the cant bulky of the curve part track structure of Example 2. FIG. 実施例2の曲線部軌道構造のカント嵩上の施工手順5を示す横断面図。The cross-sectional view which shows the construction procedure 5 on the cant bulk of the curve part track structure of Example 2. FIG. 実施例2の曲線部軌道構造のカント嵩上の施工手順6を示す横断面図。The cross-sectional view which shows the construction procedure 6 on the cant bulky of the curved part track structure of Example 2. FIG.

以下、本発明の実施の形態について、詳細に説明する。なお、同じ機能を有する構成部には同じ番号を付し、重複説明を省略する。   Hereinafter, embodiments of the present invention will be described in detail. In addition, the same number is attached | subjected to the structure part which has the same function, and duplication description is abbreviate | omitted.

以下、図4、図5を参照して実施例1の曲線部軌道構造について説明する。図4は、本実施例の曲線部軌道構造のカント嵩上前後のバラスト形状の変化を示す横断面図である。図5は本実施例の曲線部軌道構造のバラスト整形後のバラスト形状の変化を示す横断面図である。   Hereinafter, the curved track structure according to the first embodiment will be described with reference to FIGS. 4 and 5. FIG. 4 is a cross-sectional view showing a change in the ballast shape before and after the cant bulk of the curved portion track structure of the present embodiment. FIG. 5 is a cross-sectional view showing a change in the ballast shape after the ballast shaping of the curved track structure according to the present embodiment.

本実施例では、一般部の曲線部軌道構造について述べる。図1と同様に、本実施例の曲線部軌道構造は、路盤に敷設されたバラスト1と、バラスト1上に互いに平行に敷設された第1、および第2線路とからなる。第1、および第2線路が第2線路側を内側として曲線部を構成する。第1線路は、バラスト1上に敷設された第1枕木2と、第1枕木2上に曲線の外側方向に敷設された第1外軌レール3と、第1枕木上に曲線の内側方向に敷設された第1内軌レール4とからなる。第2線路は、バラスト1上に敷設された第2枕木5と、第2枕木5上に曲線の外側方向に敷設された第2外軌レール6と、第2枕木5上に曲線の内側方向に敷設された第2内軌レール7とからなる。図2の場合と同様に、カント嵩上後、第1線路の曲線外側方向には第1嵩増部1−1が、第1線路と第2線路の間には、第2嵩増部1−2が生ずる。本実施例の曲線部軌道構造では、第1嵩増部1−1の下に信号用トラフ11が埋設されている。第1線路側にカント嵩上前の建築限界を長破線、カント嵩上後の建築限界10を実線で表示した。   In the present embodiment, the curved part track structure of the general part will be described. Similar to FIG. 1, the curved portion track structure of the present embodiment includes a ballast 1 laid on the roadbed, and first and second lines laid parallel to each other on the ballast 1. The first and second lines constitute the curved portion with the second line side as the inner side. The first track has a first sleeper 2 laid on the ballast 1, a first outer rail rail 3 laid on the first sleeper 2 in an outward direction of the curve, and an inner direction of the curve on the first sleeper. The first inner rail rail 4 is laid. The second track is composed of a second sleeper 5 laid on the ballast 1, a second outer rail rail 6 laid on the second sleeper 5 in an outward direction of the curve, and an inner direction of the curve on the second sleeper 5. It consists of the 2nd inner track rail 7 laid in. As in the case of FIG. 2, after the cant is raised, the first increased portion 1-1 is arranged in the direction of the curve outside the first line, and the second increased portion 1 is provided between the first line and the second line. -2 occurs. In the curved portion track structure of the present embodiment, a signal trough 11 is embedded under the first bulking portion 1-1. On the first track side, the building limit before the cant rise is indicated by a long broken line, and the building limit 10 after the cant rise is indicated by a solid line.

<測定、確認>
施工に先立ち、以下の(1)〜(4)の測定作業を行う。
(1)施工前の軌道状況曲線を測定し、設計曲線との相違点を見つける。
(2)これを踏まえ軌道横断方向線形(列車進行方向の左右の線形)の変位を検討する。(3)次に、整正作業を実施するか否か、必要の有無を検討する。
(4)併せて、軌道縦断方向線形(列車進行方向の前後の線形)の検討を行う。
<Measurement and confirmation>
Prior to construction, the following measurement operations (1) to (4) are performed.
(1) Measure the track condition curve before construction and find the difference from the design curve.
(2) Based on this, we will examine the displacement in the cross-track direction alignment (the left-right alignment in the train traveling direction). (3) Next, consider whether or not to perform the correction work and whether or not it is necessary.
(4) In addition, the track longitudinal direction alignment (alignment before and after the traveling direction of the train) is examined.

次に、以下の(A)〜(D)の確認作業を行う。
(A)施工区間内の基準器の位置で、トロリー線(電車線)と軌道との関連を調査する。(B)軌道横断面における軌道中心からの垂線とトロリー線(電車線)の左右変位量表とを参照して許容値の確認を実施し、一回作業あたりの嵩上量を検討する。
(C)併せて、トロリー線(電車線)の高さ(レール面−電車線間距離)量測定表を参照して許容値の確認を実施し、カント嵩上作業が可能か否かの検討を行う。
(D)軌道横断面、軌道縦断面の検討を行い、カント嵩上作業により、やむを得ずトロリー線(電車線)吊架許容値を超える恐れがある場合は、トロリー線(電車線)調整作業を実施する。
Next, the following confirmation operations (A) to (D) are performed.
(A) The relationship between the trolley line (train line) and the track is investigated at the position of the reference device in the construction section. (B) An allowable value is confirmed with reference to a perpendicular line from the track center in the track cross section and a lateral displacement amount table of the trolley wire (train line), and the amount of bulk per work is examined.
(C) At the same time, check the allowable value with reference to the height (rail surface-to-train distance) measurement table of the trolley line (train line), and examine whether the cant work is possible. I do.
(D) Examining the cross section of the track and the longitudinal section of the track, and if there is a risk that the trolley line (train line) suspension allowance will be exceeded due to the canting work, trolley line (train line) adjustment work To do.

<施工>
曲線内側の線路である第2線路側から先にカント嵩上を実施する。以下の〔手順1〕〜〔手順3〕の手順で施工を実施する。
〔手順1〕前述同様に、第2内軌レール7の下にあるバラスト1を予堀して、第2内軌レール7の高さを予め下げておき、第2外軌レール6の下にあるバラスト1を嵩増しして、第2外軌レール6の高さを高くする。
〔手順2〕同様に、第1内軌レール4の下にあるバラスト1を予堀して、第1内軌レール4の高さを予め下げておき、第1外軌レール3の下にあるバラスト1を嵩増しして、第1外軌レール3の高さを高くする。
〔手順3〕第1嵩増部1−1を網状に形成したI型バラスト整形材100により、第2嵩増部1−2を断面L字形状の網状に形成したL型バラスト整形材200により、図5に示す嵩増部1−1’、第2嵩増部1−2’の状態に整形する。
<Construction>
Kant bulking is performed first from the second line side which is the line inside the curve. Construction is performed according to the following [Procedure 1] to [Procedure 3].
[Procedure 1] As described above, the ballast 1 under the second inner rail rail 7 is pre-excavated, the height of the second inner rail rail 7 is lowered in advance, and A certain ballast 1 is increased, and the height of the second outer rail rail 6 is increased.
[Procedure 2] Similarly, the ballast 1 under the first inner rail rail 4 is pre-excavated, the height of the first inner rail rail 4 is lowered in advance, and it is under the first outer rail rail 3. The ballast 1 is increased in volume, and the height of the first outer rail 3 is increased.
[Procedure 3] By the I-type ballast shaping material 100 in which the first increased portion 1-1 is formed in a net shape, and by the L-type ballast shaping material 200 in which the second increased portion 1-2 is formed in a net shape having an L-shaped cross section. , The bulking portion 1-1 ′ and the second bulking portion 1-2 ′ shown in FIG. 5 are shaped.

〔手順1〕〜〔手順3〕は、場合により複数回に分けて実施される。施工長は、2車長(40m)以上を最低長とする。   [Procedure 1] to [Procedure 3] are performed in multiple steps depending on the case. The construction length shall be at least 2 car lengths (40m) or more.

<バラスト整形材>
以下、図6、図7を参照して、I型バラスト整形材100、L型バラスト整形材200について詳細に説明する。図6は本実施例のI型バラスト整形材100を示す図である。図7は本実施例のL型バラスト整形材200を示す図である。図6に示すように、I型バラスト整形材100は、鉛直方向等間隔に配列された複数の第1鋼線120と、水平方向等間隔に配列された複数の第2鋼線130とを格子状に組み合わせて形成した網形状であることを特徴とする。I型バラスト整形材100の鉛直方向中心付近に、第1鋼線120と平行にL型鋼材110が溶接されていてもよい。L型鋼材110としては例えば幅20mmのL型鋼材を用いることができる。I型バラスト整形材100の水平方向端部に他のバラスト整形材との結合に用いるジョイント金具140をさらに備えることとしてもよい。ジョイント金具140は、任意の個数とすることができる。ジョイント金具140を備えることにより、I型バラスト整形材100同士を堅固に連結し延長することができる。また連結は、例えばボルト−ナットなどを用いて行うことができるため、施工が容易である。I型バラスト整形材100は、図5の嵩増部1−1’に用いるほか、高架橋上で使用することができる。施工に際しては、鉛直方向長さの約半分が、バラスト1に埋設される。これにより、力学的に自立が可能である。第1鋼線120、第2鋼線130は例えば直径6、8、10mmの芯材などを用いることができる。例えば第2鋼線130の長さを600mmとし、第1鋼線120を100mm間隔で7本配列して、高さ600mmのI型バラスト整形材100を形成してもよい。これらの材料が一般の鋼線であれば製作後亜鉛メッキを施して耐候性を向上させることが望ましい。また、材料にSUS304を使用する場合には、異種金属接触腐食を防ぐため同材料の連結使用が望ましい。第1鋼線120、第2鋼線130として、加工可能なFRP、炭素繊維束を用いてもよい。
<Ballast orthopedic material>
Hereinafter, the I-type ballast shaping material 100 and the L-type ballast shaping material 200 will be described in detail with reference to FIGS. 6 and 7. FIG. 6 is a view showing an I-type ballast shaping material 100 of the present embodiment. FIG. 7 is a view showing an L-type ballast shaping material 200 of the present embodiment. As shown in FIG. 6, the I-type ballast shaping material 100 lattices a plurality of first steel wires 120 arranged at equal intervals in the vertical direction and a plurality of second steel wires 130 arranged at equal intervals in the horizontal direction. It is characterized by having a net shape formed by combining in a shape. An L-shaped steel material 110 may be welded in the vicinity of the center in the vertical direction of the I-type ballast shaping material 100 in parallel with the first steel wire 120. As the L-shaped steel material 110, for example, an L-shaped steel material having a width of 20 mm can be used. It is good also as providing the joint metal fitting 140 used for a coupling | bonding with another ballast shaping material in the horizontal direction edge part of the I-type ballast shaping material 100. FIG. The number of joint fittings 140 can be any number. By providing the joint fitting 140, the I-type ballast shaping materials 100 can be firmly connected and extended. Moreover, since the connection can be performed using, for example, a bolt-nut or the like, the construction is easy. The I-type ballast shaping material 100 can be used on the high bridge in addition to the bulking portion 1-1 ′ of FIG. At the time of construction, about half of the vertical length is embedded in the ballast 1. Thereby, it is possible to stand on its own mechanically. For the first steel wire 120 and the second steel wire 130, for example, a core material having a diameter of 6, 8, or 10 mm can be used. For example, the length of the second steel wire 130 may be 600 mm, and the seven first steel wires 120 may be arranged at intervals of 100 mm to form the I-type ballast shaping material 100 having a height of 600 mm. If these materials are general steel wires, it is desirable to improve the weather resistance by galvanizing after production. When SUS304 is used as a material, it is desirable to use the same material in order to prevent contact corrosion of dissimilar metals. As the 1st steel wire 120 and the 2nd steel wire 130, FRP which can be processed, and a carbon fiber bundle may be used.

例えば、高さ600mmのI型バラスト整形材100を1メートル長さで製作する場合、第1鋼線120、第2鋼線130をφ6、φ8の鋼線をところどころ組み合わせて製作すると、その重量は13kg程度となる。   For example, when manufacturing the I-type ballast shaping material 100 with a height of 600 mm with a length of 1 meter, if the first steel wire 120 and the second steel wire 130 are manufactured by combining various steel wires of φ6 and φ8, the weight is as follows. It becomes about 13kg.

図7に示すように、L型バラスト整形材200は、I型バラスト整形材100と同じように、鉛直方向等間隔に配列された複数の第1鋼線120と、水平方向等間隔に配列された複数の第2鋼線230とを格子状に組み合わせて形成した網形状であって、第2鋼線230は第1鋼線130を所定の角度(例えば約90度)に折り曲げ、鉛直断面の形状をL字形状としたことを特徴とする。第2鋼線230は、所定の角度で折り曲げられていること以外は、前述した第1鋼線130と同じである。I型バラスト整形材100と同様、L型バラスト整形材200は、ジョイント金具140を備えてもよい。また、L型バラスト整形材200をバラスト1に固定するアンカー250を、L型バラスト整形材200の底面側に備えてもよい。また、第1鋼線120に引掛固定可能な鉤を両端に備える補強部材210を備えてもよい。補強部材210の両端の鉤は、L型バラスト整形材200の上方端部と、側方端部にそれぞれ引っ掛け固定される。補強部材210により、L型バラスト整形材200の物理的強度が増し、L型バラスト整形材200の変形を防ぐことができる。例えば第2鋼線230の先端から折り曲げ箇所までの長さを400mmとし、第1鋼線120を100mm間隔で鉛直方向に5本配列し、高さ400mmのL型バラスト整形材200を形成してもよい。補強部材210は、例えば250mm間隔で配列することができる。L型バラスト整形材としては、例えば図8、図9のようなサイズ違いのバリエーションを採用することもできる。図8においては、第2鋼線230の先端から折り曲げ箇所までの長さを500mmとし、第1鋼線120を100mmピッチで鉛直方向に6本配列して高さ500mmとしている。図9においては、第2鋼線230の先端から折り曲げ箇所までの長さを700mmとし、第1鋼線120を100mmピッチで鉛直方向に8本配列して高さ700mmとしている。   As shown in FIG. 7, the L-type ballast shaping material 200 is arranged at equal intervals in the horizontal direction with a plurality of first steel wires 120 arranged at equal intervals in the vertical direction, like the I-type ballast shaping material 100. The second steel wire 230 is formed by combining a plurality of second steel wires 230 in a lattice shape. The second steel wire 230 bends the first steel wire 130 at a predetermined angle (for example, about 90 degrees), and has a vertical cross section. The shape is L-shaped. The second steel wire 230 is the same as the first steel wire 130 described above except that the second steel wire 230 is bent at a predetermined angle. Similar to the I-type ballast shaping material 100, the L-type ballast shaping material 200 may include a joint fitting 140. Further, an anchor 250 for fixing the L-type ballast shaping material 200 to the ballast 1 may be provided on the bottom surface side of the L-type ballast shaping material 200. Moreover, you may provide the reinforcement member 210 which equips both ends with the hook which can be hooked and fixed to the 1st steel wire 120. The hooks at both ends of the reinforcing member 210 are hooked and fixed to the upper end portion and the side end portion of the L-shaped ballast shaping material 200, respectively. The reinforcing member 210 increases the physical strength of the L-type ballast shaping material 200 and prevents deformation of the L-type ballast shaping material 200. For example, the length from the tip of the second steel wire 230 to the bent portion is 400 mm, five first steel wires 120 are arranged in the vertical direction at intervals of 100 mm, and the L-shaped ballast shaping material 200 having a height of 400 mm is formed. Also good. The reinforcing members 210 can be arranged at intervals of 250 mm, for example. As the L-type ballast shaping material, for example, variations of different sizes as shown in FIGS. 8 and 9 can be adopted. In FIG. 8, the length from the tip of the second steel wire 230 to the bent portion is 500 mm, and six first steel wires 120 are arranged in a vertical direction at a pitch of 100 mm to a height of 500 mm. In FIG. 9, the length from the tip of the second steel wire 230 to the bent portion is 700 mm, and eight first steel wires 120 are arranged in a vertical direction at a pitch of 100 mm to a height of 700 mm.

例えば、高さ400mm、幅400mmのL型バラスト整形材200を1メートル長さで製作する場合、第1鋼線120、第2鋼線230をφ6、φ8の鋼線をところどころ組み合わせて製作すると、その重量は13kg程度となる。また、高さ500mm、幅500mmのL型バラスト整形材300を1メートル長さで製作する場合、第1鋼線120、第2鋼線230をφ6、φ8の鋼線をところどころ組み合わせて製作すると、その重量は14kg程度となる。また、高さ700mm、幅700mmのL型バラスト整形材400を1メートル長さで製作する場合、第1鋼線120、第2鋼線230をφ6、φ8の鋼線をところどころ組み合わせて製作すると、その重量は20kg程度となる。   For example, when the L-shaped ballast shaping material 200 having a height of 400 mm and a width of 400 mm is manufactured with a length of 1 meter, the first steel wire 120 and the second steel wire 230 are manufactured by combining various steel wires of φ6 and φ8. Its weight is about 13 kg. In addition, when manufacturing the L-shaped ballast shaping material 300 having a height of 500 mm and a width of 500 mm with a length of 1 meter, when the first steel wire 120 and the second steel wire 230 are manufactured by combining various steel wires of φ6 and φ8, Its weight is about 14kg. Moreover, when manufacturing the L-shaped ballast shaping material 400 having a height of 700 mm and a width of 700 mm with a length of 1 meter, the first steel wire 120 and the second steel wire 230 are manufactured by combining steel wires of φ6 and φ8 in some places. Its weight is about 20 kg.

I型バラスト整形材100、L型バラスト整形材200(300、400)は重ね置きして倉庫に保管することができるため、保管に必要な空間が少なくて済む。例えば、全長100m分のL型バラスト整形材200を資材として保管する際に必要となる空間は、わずか幅1m×長さ2m×高さ1m程度で済む。これは前述したL字ブロック900を全長100m保管する際に必要となる空間と比較すると劇的に小さい。   Since the I-type ballast shaping material 100 and the L-type ballast shaping material 200 (300, 400) can be stacked and stored in a warehouse, the space required for storage can be reduced. For example, the space required when storing the L-shaped ballast shaping material 200 for a total length of 100 m as a material only needs to be about 1 m wide × 2 m long × 1 m high. This is dramatically smaller than the space required for storing the L-shaped block 900 described above for a total length of 100 m.

<死加重の比較>
カント嵩上に際し、バラスト1の補充を行う必要があるが、この補充は、本来の設計に含まれる加重ではない。従って上述の圧密沈下を軽減するために、バラスト整形材は軽量であることが望ましい。ここで、バラスト整形材として用いるL字ブロック900のサイズを図10に示すように規定した場合の死加重の増加量と、前述したL型バラスト整形材200を用いた場合の死加重の増加量の比較シミュレーションを行った。以下にシミュレーション結果を示す。なおシミュレーションは標準的な形状を想定して行った。
<Comparison of death weight>
It is necessary to replenish the ballast 1 when the cant is bulky, but this replenishment is not a weight included in the original design. Therefore, in order to reduce the consolidation settlement described above, it is desirable that the ballast shaping material is lightweight. Here, an increase in death weight when the size of the L-shaped block 900 used as the ballast shaping material is defined as shown in FIG. 10 and an increase in death weight when the L-shaped ballast shaping material 200 described above is used. A comparative simulation was performed. The simulation results are shown below. The simulation was performed assuming a standard shape.

i)バラスト
L=(法0.3m+肩0.4m+PC2.4m+肩0.4m+法0.3m)=3.8m
C=145-80=65ミリ
V=(3.8m×(65/1000)÷2)×859.05m=106.09m3
G=106.09m3×1.6Kg/m3=169.74t…(11)
i) Ballast
L = (Method 0.3m + Shoulder 0.4m + PC2.4m + Shoulder 0.4m + Method 0.3m) = 3.8m
C = 145-80 = 65mm
V = (3.8m × (65/1000) ÷ 2) × 859.05m = 106.09m 3
G = 106.09m 3 × 1.6Kg / m 3 = 169.74t… (11)

ii)L字ブロック(300*250*600*50;66キロ/L=600mミリ・個)
G=(延長859.05m÷0.6m)×66kg=1432個×0.066=94.5t…(12)
ii) L-shaped block (300 * 250 * 600 * 50; 66kg / L = 600mmm / piece)
G = (extension 859.05m ÷ 0.6m) × 66kg = 1432pcs × 0.066 = 94.5t… (12)

iii)バラスト+L字ブロック
ΣG=(11)+(12)=169.74+94.5=264.24t/片線…(13)
iii) Ballast + L block ΣG = (11) + (12) = 169.74 + 94.5 = 264.24t / single line ... (13)

iv)L型バラスト整形材L300・I600F(L300=300*300*1000、9.9Kg/m)
上り線G=延長428.92m÷1m=429個×0.0099=4.25t…(14)
(I600F=600*1000、9.29.9Kg/m)
下り線G=延長430.13m÷1m=430個×0.0092t/片線=3.96t/片線F…(15)
iv) L-shaped ballast shaping material L300 / I600F (L300 = 300 * 300 * 1000, 9.9Kg / m)
Uplink G = Extension 428.92m ÷ 1m = 429 x 0.0099 = 4.25t… (14)
(I600F = 600 * 1000, 9.29.9Kg / m)
Down line G = extension 430.13m ÷ 1m = 430 pieces × 0.0092t / single line = 3.96t / single line F… (15)

v)バラスト+L型バラスト整形材L300・I600F
G=(11)×2+(14)+(15)=264.24×2+4.25t+3.96t=347.69t/片線…(16)
v) Ballast + L type ballast shaping material L300 / I600F
G = (11) × 2 + (14) + (15) = 264.24 × 2 + 4.25t + 3.96t = 347.69t / single line ... (16)

vi)比較
L字ブロック上下線当たり=(13)×2=528.48t…(17)
L型バラスト整形材L300・I600F上下線当たり347.69t…(18)
(17)-(18)=-180.79t(軽量化)
vi) Comparison L-shaped block top / bottom line = (13) x 2 = 528.48t ... (17)
L type ballast shaping material L300 / I600F 347.69t per vertical line ... (18)
(17)-(18) =-180.79t (weight reduction)

上記、シミュレーションにより、想定されたカント嵩上において、約180t軽量化できることが分かった。   From the above simulation, it was found that the weight can be reduced by about 180 t on the assumed cant bulk.

このように本実施例の曲線部軌道構造は、施工性、排水性、加工性に優れ軽量である。   As described above, the curved portion track structure of this example is excellent in workability, drainage, and workability, and is lightweight.

以下、図11から図16を参照して実施例2の曲線部軌道構造について説明する。図11〜16は、本実施例の曲線部軌道構造のカント嵩上の施工手順1〜6を示す横断面図である。   Hereinafter, the curved portion trajectory structure of the second embodiment will be described with reference to FIGS. 11 to 16. FIGS. 11-16 is a cross-sectional view which shows the construction procedures 1-6 which cant bulk the curve part track structure of a present Example.

本実施例では、駅構内の曲線部軌道構造について述べる。具体的には、駅構内の軌道の全部または一部が曲線部を構成している場合であって、当該駅が急行(特急)通過駅などであって、急行(特急)列車の高速化のために、駅構内の軌道においてカント嵩上が必要な場合について説明する。実施例1と同様に、本実施例の曲線部軌道構造は、路盤に敷設されたバラスト1と、バラスト1上に互いに平行に敷設された第1、および第2線路とからなり、第1、および第2線路が第2線路側を内側として曲線部を構成する。第1線路は、バラスト1上に敷設された第1枕木2と、第1枕木2上に曲線の外側方向に敷設された第1外軌レール3と、第1枕木上に曲線の内側方向に敷設された第1内軌レール4とからなる。第2線路は、バラスト1上に敷設された第2枕木5と、第2枕木5上に曲線の外側方向に敷設された第2外軌レール6と、第2枕木5上に曲線の内側方向に敷設された第2内軌レール7とからなる。第1線路11の曲線外側方向に信号用トラフ11が埋設されている。これらについては実施例1と全く同じ条件である。本実施例ではこれらに加え、第1線路の曲線外側方向に第1乗降台12が存在し、第2線路の曲線内側方向に第2乗降台13が存在する。第1乗降台12の先端を第1乗降台先端12−1と呼び、第2乗降台13の先端を第2乗降台先端13−1と呼ぶ。   In this embodiment, a curved track structure in a station will be described. Specifically, when all or part of the track in the station premises forms a curved section, the station is an express (express) passing station, etc., and the speed of the express (express) train is increased. Therefore, a case will be described in which a cant rise is necessary on the track in the station premises. Similar to the first embodiment, the curved portion track structure of the present embodiment includes a ballast 1 laid on the roadbed, and first and second lines laid parallel to each other on the ballast 1. The second line constitutes a curved portion with the second line side as the inner side. The first track has a first sleeper 2 laid on the ballast 1, a first outer rail rail 3 laid on the first sleeper 2 in an outward direction of the curve, and an inner direction of the curve on the first sleeper. The first inner rail rail 4 is laid. The second track is composed of a second sleeper 5 laid on the ballast 1, a second outer rail rail 6 laid on the second sleeper 5 in an outward direction of the curve, and an inner direction of the curve on the second sleeper 5. It consists of the 2nd inner track rail 7 laid in. A signal trough 11 is embedded in the curve outer direction of the first line 11. These are exactly the same conditions as in Example 1. In this embodiment, in addition to these, the first boarding / alighting platform 12 exists in the direction of the curve of the first line, and the second boarding / alighting platform 13 exists in the direction of the curve of the second line. The tip of the first boarding / alighting platform 12 is referred to as a first boarding / alighting platform tip 12-1, and the tip of the second boarding / alighting platform 13 is referred to as a second boarding / alighting platform tip 13-1.

<測定、確認>
施工に先立ち、以下の(1)〜(3)の測定作業を行う。
(1)施工前の軌道状況曲線を測定し、設計曲線との相違点を見つける。
(2)ホームと実際の軌道曲線のホーム限界測定を行う。
(3)軌道曲線に対するトロリー線(電車線)の諸元測定を行う。
<Measurement and confirmation>
Prior to construction, the following measurement operations (1) to (3) are performed.
(1) Measure the track condition curve before construction and find the difference from the design curve.
(2) Measure home limit of home and actual trajectory curve.
(3) The specifications of the trolley line (train line) with respect to the track curve are measured.

次に、以下の(A)〜(E)の確認作業を行う。
(A)施工区間内の基準器の位置で、ホームと軌道のホーム限界の確認を行う。
(B)基準器の位置で、トロリー線(電車線)と軌道との関連を調査する。
(C)軌道横断面における軌道中心からの垂線とトロリー線(電車線)の左右変位量表とを参照して許容値の確認を実施し、一回作業あたりの嵩上量を検討する。
(D)トロリー線(電車線)の高さ(レール面−電車線間距離)量測定表を参照して、許容値の確認を実施し、カント嵩上作業が可能か否かの検討を行う。
(E)軌道横断面、軌道縦断面の検討を行い、カント嵩上作業により、やむを得ずトロリー線(電車線)吊架許容値を超える恐れがある場合は、トロリー線(電車線)調整作業を実施する。
Next, the following confirmation operations (A) to (E) are performed.
(A) The home and track home limits are checked at the position of the reference device in the construction section.
(B) At the position of the reference device, the relationship between the trolley line (train line) and the track is investigated.
(C) The allowable value is confirmed with reference to the perpendicular line from the track center in the track cross section and the left-right displacement table of the trolley line (train line), and the amount of bulk per work is examined.
(D) Referring to the height (rail surface-to-train distance) measurement table for the trolley line (train line), the allowable value is confirmed, and it is examined whether the cant bulking work is possible. .
(E) Examining the cross section of the track and the longitudinal section of the track, and if there is a risk that the trolley line (train line) suspension allowance will be exceeded due to the canting work, the trolley line (train line) is adjusted. To do.

<施工>
実施例1と同様に、カント嵩上後においてもパンタグラフとトロリー線(電車線)の接触を良好に保つため、カント嵩上後のトロリー線(電車線)と線路との離間距離をカント嵩上前と等しく保つ必要がある。これに加えて駅部の曲線部軌道構造では、乗降台先端と車両の乗降口下端との位置関係が重要となる。すなわち、第1(第2)乗降台先端の高さと第1(第2)線路を走行する車両の乗降口の下端高さが所定の間隔H以下とならなければならない。所定の間隔Hは一般的には200mm程度とされる。乗降口先端の高さと車両乗降口の下端の高さが200mm以上離れてしまうと、乗降時に、乗客が躓くおそれがある。さらに、第1(第2)乗降台先端と第1(第2)線路を走行する車両の乗降口下端との水平方向間隔が所定の間隔W以下とならなければならない。この所定間隔Wも一般的には200mm程度とされる。乗降台先端と車両の乗降口下端との水平方向間隔が200mm以上離れてしまうと、乗客がホーム端で足を滑らせた場合に、ホームと車両の隙間に、足や身体を挟んでしまうおそれがある。本実施例の曲線部軌道構造の施工に際し、上述の条件を満足しながらカント嵩上を実行するために、図11〜図16に示す6つの施工手順に従って施工を進める。最初に第1線路(下り線)が施工される。
<Construction>
As in the first embodiment, the distance between the pantograph and the trolley line (train line) and the track after the cant is raised in order to keep good contact between the pantograph and the trolley line (train line). It needs to be kept equal to before. In addition to this, in the curved portion track structure of the station portion, the positional relationship between the front of the boarding platform and the lower end of the vehicle entrance is important. That is, the height of the front end of the first (second) boarding platform and the height of the lower end of the entrance of the vehicle traveling on the first (second) track must be equal to or less than the predetermined interval H. The predetermined interval H is generally about 200 mm. If the height of the front edge of the entrance / exit and the height of the lower end of the entrance / exit of the vehicle are separated by 200 mm or more, there is a possibility that the passengers may go when getting on / off. Furthermore, the horizontal interval between the front end of the first (second) boarding platform and the lower end of the entrance of the vehicle traveling on the first (second) track must be equal to or less than the predetermined interval W. This predetermined interval W is also generally about 200 mm. If the horizontal distance between the front edge of the boarding platform and the lower end of the vehicle entrance / exit is 200 mm or more, there is a risk that if the passenger slides his / her foot at the end of the home, the foot or body may be caught in the gap between the home and the vehicle There is. In the construction of the curved portion track structure of the present embodiment, construction is carried out according to the six construction procedures shown in FIGS. First, the first track (downline) is constructed.

〔手順1〕図11の矢印Dに示すように、道床厚調査後、下り線(第1線路)の軌道を全面的に嵩下する。これは、第1乗降台先端12−1の高さと第1線路を走行する車両の乗降口の下端高さを所定の間隔H以下に保つために必要な手順である。前述したように限度値であるHは200mm程度とされるが、鉄道会社によってその目標値は異なる。例えば100mm程度を目標値とし、この目標値に近づくように、第1線路の軌道を全面的に嵩下する。 [Procedure 1] As shown by arrow D in FIG. 11, after the roadbed thickness investigation, the track of the down line (the first line) is entirely lowered. This is a procedure necessary for maintaining the height of the first getting-on / off platform tip 12-1 and the lower end height of the entrance / exit of the vehicle traveling on the first track at a predetermined interval H or less. As described above, the limit value H is about 200 mm, but the target value varies depending on the railway company. For example, about 100 mm is set as a target value, and the track of the first line is entirely lowered so as to approach this target value.

〔手順2〕図12の矢印Eに示すように、第1線路の軌道を曲線外側方向に向かって所定の距離水平移動させる。第1乗降台先端12−1と第1線路を走行する車両の乗降口の下端との水平方向間隔を所定の間隔W以下に保つために必要な手順である。第1線路においてカント嵩上を行うと、第1線路を走行する車両は曲線内側方向に傾く。これにより、第1乗降台先端12−1と車両の乗降口との水平方向の間隔は大きくなる。従って、本手順における軌道の水平移動が必要となる。 [Procedure 2] As indicated by an arrow E in FIG. 12, the track of the first track is horizontally moved by a predetermined distance toward the curve outer side. This is a procedure necessary to keep the horizontal interval between the first boarding / alighting platform tip 12-1 and the lower end of the vehicle entrance / exit on the first track below a predetermined interval W. When the cant is raised on the first track, the vehicle traveling on the first track is tilted toward the inside of the curve. Thereby, the space | interval of the horizontal direction of the 1st boarding / alighting platform front-end | tip 12-1 and the entrance / exit of a vehicle becomes large. Therefore, the horizontal movement of the track in this procedure is required.

〔手順3〕図13の矢印Fに示すように、第1外軌レール3の下にあるバラスト1を嵩増しして、第1外軌レール3の高さを高くする。これにより第1線路は所望の曲線通過速度に対応するカント量を備える。このとき、手順1において予め軌道が嵩下されているため、外軌レール3が嵩上されても、第1乗降台先端12−1の高さと第1線路を走行する車両の乗降口の下端高さの差はH以下に抑えられる。 [Procedure 3] As shown by an arrow F in FIG. 13, the ballast 1 under the first outer gauge rail 3 is increased, and the height of the first outer gauge rail 3 is increased. Accordingly, the first line has a cant amount corresponding to a desired curve passing speed. At this time, since the track is previously raised in the procedure 1, even if the outer rail 3 is raised, the height of the first getting-on / off platform tip 12-1 and the lower end of the entrance / exit of the vehicle traveling on the first track. The difference in height is suppressed to H or less.

〔手順4〕次に、第2線路(上り線)が施工される。図14の矢印Gに示すように、第2線路の軌道を曲線外側方向に向かって所定の距離水平移動させる。第2乗降台先端13−1と第2線路を走行する車両の乗降口の下端との水平方向間隔を所定の間隔W以下に保つために必要な手順である。第2線路においてカント嵩上を行うと、第2線路を走行する車両は曲線内側方向に傾く。これにより、第2乗降台先端13−1と車両の乗降口との水平方向の間隔は狭められる。従って、第2乗降台先端13−1と車両とが近づきすぎないようにようにするため、本手順における軌道の水平移動が必要となる。 [Procedure 4] Next, the second track (upline) is constructed. As indicated by an arrow G in FIG. 14, the trajectory of the second line is horizontally moved by a predetermined distance toward the curve outward direction. This is a procedure necessary to keep the horizontal interval between the second getting-on / off platform tip 13-1 and the lower end of the entrance / exit of the vehicle traveling on the second track below a predetermined interval W. When the cant is raised on the second track, the vehicle traveling on the second track is inclined in the curve inner direction. Thereby, the space | interval of the horizontal direction of the 2nd boarding / alighting platform front-end | tip 13-1 and a vehicle entrance / exit is narrowed. Therefore, in order to prevent the second getting-on / off platform tip 13-1 and the vehicle from coming too close to each other, the horizontal movement of the track in this procedure is required.

〔手順5〕図15の矢印Hに示すように、第2外軌レール6の下にあるバラスト1を嵩増しして、第2外軌レール6の高さを高くする。これにより第2線路は所望の曲線通過速度に対応するカント量を備える。このとき、第2線路(上り線)においては、手順1のように予め軌道が嵩下していない。これはカント嵩上によっても、第2内軌レール7側の高さが変動しないため、第2乗降台先端13−1の高さと第2線路を走行する車両の乗降口の下端高さの差に変化が生じないためである。従って、手順5の施工後も第2乗降台先端13−1の高さと第2線路を走行する車両の乗降口の下端高さの差はH以下に抑えられる。なお、カント嵩上後においてもパンタグラフとトロリー線(電車線)の接触を良好に保つため、施工前と施工後とで比較して、第1内軌レール4、および第2内軌レール7の高さに変位が生じないようにする。 [Procedure 5] As shown by an arrow H in FIG. 15, the ballast 1 under the second outer gauge rail 6 is increased in volume, and the height of the second outer gauge rail 6 is increased. Accordingly, the second line has a cant amount corresponding to a desired curve passing speed. At this time, on the second line (upline), the track is not previously lowered as in the procedure 1. This is because the height on the second inner rail rail 7 side does not fluctuate even if the cant rises, so the difference between the height of the second boarding / alighting platform tip 13-1 and the height of the lower end of the boarding / exiting gate of the vehicle traveling on the second track. This is because no change occurs. Therefore, the difference between the height of the second boarding / alighting platform tip 13-1 and the height of the lower end of the boarding / alighting port of the vehicle traveling on the second track can be suppressed to H or less even after the execution of the procedure 5. In order to maintain good contact between the pantograph and the trolley line (train line) even after the cant rises, the first inner rail rail 4 and the second inner rail rail 7 are compared before and after the construction. Avoid displacement in height.

〔手順6〕最後に、第1嵩増部1−1をI型バラスト整形材100により、第2嵩増部1−2をL型バラスト整形材200により、図16に示す嵩増部1−1’、第2嵩増部1−2’の状態に整形する。 [Procedure 6] Finally, the first increased portion 1-1 is formed with the I-type ballast shaping material 100, the second increased portion 1-2 is formed with the L-type ballast shaping material 200, and the increased portion 1- shown in FIG. 1 ′ and the second bulking portion 1-2 ′ are shaped.

〔手順1〕〜〔手順6〕は、場合により複数回に分けて実施される。   [Procedure 1] to [Procedure 6] are carried out in a plurality of times depending on circumstances.

なお、実施例1、2においては第1嵩増部1−1に対して、I型バラスト整形材100を使用し、第2嵩増部1−2に対して、L型バラスト整形材200を用いたが、これに限られず、第1嵩増部1−1に対して、L型バラスト整形材200を使用し、第2嵩増部1−2に対して、I型バラスト整形材100を用いてもよいし、L型バラスト整形材200はより大型なL型バラスト整形材300、400等に代替してもよい。   In Examples 1 and 2, the I-type ballast shaping material 100 is used for the first bulking portion 1-1, and the L-type ballast shaping material 200 is used for the second bulking portion 1-2. Although it used, it is not restricted to this, The L-type ballast shaping material 200 is used with respect to the 1st bulking part 1-1, and the I-type ballast shaping material 100 is used with respect to the 2nd bulking part 1-2. The L-shaped ballast shaping material 200 may be replaced with larger L-shaped ballast shaping materials 300, 400, or the like.

このように本実施例の曲線部軌道構造は、施工性、排水性、加工性に優れ軽量である。   As described above, the curved portion track structure of this example is excellent in workability, drainage, and workability, and is lightweight.

Claims (12)

路盤に敷設されたバラストと、前記バラスト上に互いに平行に敷設された第1、および第2線路とを備え、前記第1、および第2線路が前記第2線路側を内側として曲線部を構成する曲線部軌道構造であって、
前記第1線路は、前記バラスト上に敷設された第1枕木と、前記第1枕木上に前記曲線の外側方向に敷設された第1外軌レールと、前記第1枕木上に前記曲線の内側方向に敷設された第1内軌レールとからなり、
前記第2線路は、前記バラスト上に敷設された第2枕木と、前記第2枕木上に前記曲線の外側方向に敷設された第2外軌レールと、前記第2枕木上に前記曲線の内側方向に敷設された第2内軌レールとからなり、
前記第1、第2内軌レールの高さに変位が生じず、かつ前記第1、および第2線路が所望の設計速度に対応するカント量を備えるように、前記第1、第2内軌レール、前記第1、第2外軌レールの位置が調整され、
前記位置調整によって前記第1線路の曲線外側方向に生じるバラストの嵩増部である第1嵩増部と、前記第1線路と前記第2線路の間に生じるバラストの嵩増部である第2嵩増部とが、網状に形成されたバラスト整形材によって整形された
曲線部軌道構造。
A ballast laid on the roadbed; and first and second lines laid parallel to each other on the ballast, wherein the first and second lines form a curved portion with the second line side inside. A curved part trajectory structure,
The first track includes a first sleeper laid on the ballast, a first outer rail rail laid on the first sleeper in an outer direction of the curve, and an inner side of the curve on the first sleeper. Consisting of a first inner rail rail laid in the direction,
The second track includes a second sleeper laid on the ballast, a second outer rail rail laid on the second sleeper in an outer direction of the curve, and an inner side of the curve on the second sleeper. Consisting of a second inner rail rail laid in the direction,
The first and second inner rails are arranged so that no displacement occurs in the height of the first and second inner rails, and the first and second tracks have a cant amount corresponding to a desired design speed. The positions of the rail and the first and second outer rails are adjusted,
A first increased portion that is an increased portion of the ballast generated in the curve outer direction of the first line by the position adjustment, and a second increased portion of the ballast that is generated between the first line and the second line. A curved portion track structure in which the bulking portion is shaped by a ballast shaping material formed in a net shape.
請求項1に記載の曲線部軌道構造であって、
前記第1線路の曲線外側方向に第1乗降台が存在し、前記第2線路の曲線内側方向に第2乗降台が存在する場合に、
前記第1乗降台先端高さと前記第1線路を走行する車両の乗降口の下端高さが所定の間隔以下となり、前記第1乗降台先端と前記第1線路を走行する車両の乗降口下端との水平方向距離が所定の間隔以下となるように、前記第1内軌レール、前記第1外軌レールの位置が調整され、
前記第2乗降台先端高さと前記第2線路を走行する車両の乗降口の下端高さが所定の間隔以下となり、前記第2乗降台先端と前記第2線路を走行する車両の乗降口下端との水平方向距離が所定の間隔以下となるように、前記第2内軌レール、前記第2外軌レールの位置が調整された
曲線部軌道構造。
The curved portion trajectory structure according to claim 1,
When there is a first boarding / alighting platform in the direction of the curve outside the first line and a second boarding / alighting platform in the direction of the curve inside the second line,
The height of the front edge of the first platform and the lower end of the entrance of the vehicle traveling on the first track is equal to or less than a predetermined interval, The positions of the first inner rail rail and the first outer rail rail are adjusted so that the horizontal distance is equal to or less than a predetermined interval,
The height of the tip of the second boarding / alighting platform and the height of the lower end of the entrance / exit of the vehicle traveling on the second track is equal to or less than a predetermined interval, A curved track structure in which the positions of the second inner rail rail and the second outer rail rail are adjusted such that the horizontal distance of the inner rail is equal to or less than a predetermined interval.
請求項1または2に記載の曲線部軌道構造であって、
前記バラスト整形材が、
鉛直方向等間隔に配列された複数の第1鋼線と、水平方向等間隔に配列された複数の第2鋼線とを格子状に組み合わせて形成した網形状である
曲線部軌道構造。
The curved portion trajectory structure according to claim 1 or 2,
The ballast shaping material is
A curved track structure in which a plurality of first steel wires arranged at equal intervals in the vertical direction and a plurality of second steel wires arranged at equal intervals in the horizontal direction are combined in a lattice shape.
請求項3に記載の曲線部軌道構造であって、
前記第2鋼線を所定の角度に折り曲げて、前記バラスト整形材の鉛直断面の形状をL字形状とした
曲線部軌道構造。
The curved portion trajectory structure according to claim 3,
A curved track structure in which the second steel wire is bent at a predetermined angle so that the shape of the vertical cross section of the ballast shaping material is an L shape.
請求項3または4に記載の曲線部軌道構造であって、
前記バラスト整形材の水平方向端部に他のバラスト整形材との結合に用いるジョイント金具をさらに備える
曲線部軌道構造。
The curved portion trajectory structure according to claim 3 or 4,
A curved portion track structure further comprising a joint fitting used for coupling with another ballast shaping material at an end portion in the horizontal direction of the ballast shaping material.
請求項4または5に記載の曲線部軌道構造であって、
前記バラスト整形材を前記バラストに固定するアンカーをさらに備える
曲線部軌道構造。
The curved portion trajectory structure according to claim 4 or 5,
A curved portion track structure further comprising an anchor for fixing the ballast shaping material to the ballast.
請求項4から6の何れかに記載の曲線部軌道構造であって、
前記第1鋼線に引掛固定可能な鉤を両端に備える補強部材をさらに備える
曲線部軌道構造。
The curved portion trajectory structure according to any one of claims 4 to 6,
A curved portion track structure further comprising a reinforcing member having hooks that can be hooked and fixed to the first steel wire at both ends.
路盤に敷設されたバラストと、前記バラスト上に互いに平行に敷設された第1、および第2線路とを備え、前記第1、および第2線路が前記第2線路側を内側として曲線部を構成する曲線部軌道構造において、前記曲線部軌道構造をカント嵩上した場合に前記第1線路の曲線外側方向に生じるバラストの嵩増部、および前記第1線路と前記第2線路の間に生じるバラストの嵩増部の整形に用いられ、
鉛直方向等間隔に配列された複数の第1鋼線と、水平方向等間隔に配列された複数の第2鋼線とを格子状に組み合わせて形成した網形状である
バラスト整形材。
A ballast laid on the roadbed; and first and second lines laid parallel to each other on the ballast, wherein the first and second lines form a curved portion with the second line side inside. In the curved portion track structure, the ballast increase portion generated in the curve outward direction of the first line when the curved portion track structure is raised, and the ballast generated between the first line and the second line Used to shape the bulk of the
A ballast shaping material having a net shape formed by combining a plurality of first steel wires arranged at equal intervals in the vertical direction and a plurality of second steel wires arranged at equal intervals in the horizontal direction in a lattice shape.
請求項8に記載のバラスト整形材であって、
前記第2鋼線を所定の角度に折り曲げて、前記バラスト整形材の鉛直断面の形状をL字形状とした
バラスト整形材。
The ballast shaping material according to claim 8,
The ballast shaping material which bent the said 2nd steel wire to the predetermined angle, and made the shape of the vertical cross section of the said ballast shaping material into L shape.
請求項8または9に記載のバラスト整形材であって、
前記バラスト整形材の水平方向端部に他のバラスト整形材との結合に用いるジョイント金具をさらに備える
バラスト整形材。
The ballast shaping material according to claim 8 or 9,
The ballast shaping material further provided with the joint metal fitting used for a coupling | bonding with another ballast shaping material in the horizontal direction edge part of the said ballast shaping material.
請求項9または10に記載のバラスト整形材であって、
前記バラスト整形材を前記バラストに固定するアンカーをさらに備える
バラスト整形材。
The ballast shaping material according to claim 9 or 10,
A ballast shaping material further comprising an anchor for fixing the ballast shaping material to the ballast.
請求項9から11の何れかに記載のバラスト整形材であって、
前記第1鋼線に引掛固定可能な鉤を両端に備える補強部材をさらに備える
バラスト整形材。
The ballast shaping material according to any one of claims 9 to 11,
The ballast shaping material further provided with the reinforcement member which equips both ends with the hook which can be hooked and fixed to the said 1st steel wire.
JP2013036046A 2013-02-26 2013-02-26 Curved track structure, ballast shaping material Active JP5513643B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2013036046A JP5513643B1 (en) 2013-02-26 2013-02-26 Curved track structure, ballast shaping material

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2013036046A JP5513643B1 (en) 2013-02-26 2013-02-26 Curved track structure, ballast shaping material

Publications (2)

Publication Number Publication Date
JP5513643B1 JP5513643B1 (en) 2014-06-04
JP2014163143A true JP2014163143A (en) 2014-09-08

Family

ID=51031171

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2013036046A Active JP5513643B1 (en) 2013-02-26 2013-02-26 Curved track structure, ballast shaping material

Country Status (1)

Country Link
JP (1) JP5513643B1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105672064A (en) * 2016-01-17 2016-06-15 中铁二院工程集团有限责任公司 Construction method for cable trough and protective shoulder of high-speed railway roadbed
CN105908583A (en) * 2016-04-22 2016-08-31 北京瑞威世纪岩土工程有限公司 System for replacing tunnel ballast track bed with ballastless track under non-interruption traveling condition
JP2019206835A (en) * 2018-05-29 2019-12-05 田中鉄筋工業株式会社 Ballast stop

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61141301U (en) * 1985-02-20 1986-09-01
JPH11280001A (en) * 1998-03-31 1999-10-12 Railway Technical Res Inst Rail support, track structure in curved section, and method for setting cant of track in curved section
JP3803100B2 (en) * 2004-01-13 2006-08-02 東海旅客鉄道株式会社 Curve section structure of road
JP4921236B2 (en) * 2007-04-27 2012-04-25 東海旅客鉄道株式会社 Ballast stopper, roadbed track
JP5379422B2 (en) * 2008-08-05 2013-12-25 東海旅客鉄道株式会社 Ballast stopper, roadbed track
JP4828616B2 (en) * 2009-03-18 2011-11-30 東日本旅客鉄道株式会社 Ballast screen

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105672064A (en) * 2016-01-17 2016-06-15 中铁二院工程集团有限责任公司 Construction method for cable trough and protective shoulder of high-speed railway roadbed
CN105908583A (en) * 2016-04-22 2016-08-31 北京瑞威世纪岩土工程有限公司 System for replacing tunnel ballast track bed with ballastless track under non-interruption traveling condition
CN105908583B (en) * 2016-04-22 2020-12-01 北京瑞威世纪岩土工程有限公司 System for replacing ballast track bed of tunnel with ballastless track under condition of uninterrupted driving
JP2019206835A (en) * 2018-05-29 2019-12-05 田中鉄筋工業株式会社 Ballast stop

Also Published As

Publication number Publication date
JP5513643B1 (en) 2014-06-04

Similar Documents

Publication Publication Date Title
CN104294767B (en) A kind of semi girder cast-in-place construction spreading Hanging Basket and construction method thereof
CN101781879B (en) Construction method of single-pylon cable-stayed bridge without dorsal cables
JP5513643B1 (en) Curved track structure, ballast shaping material
CN103243649B (en) The system and method for a kind of cable saddle Fast Installation, location
CN103243815A (en) End-anchored composite beam structure and corresponding reinforcing construction method
CN108729353A (en) A kind of General reinforced cage binding moulding bed
CN111597617A (en) Method for predicting fatigue life of shield tunnel
Oh et al. Experimental analysis of curling behavior of continuously reinforced concrete pavement
CN205295967U (en) Large -span continuous beam bridge strides existing station midspan closure section locking structure for rotation construction
CN210439081U (en) Magnetic suspension type platform
CN204139075U (en) A kind of semi girder cast-in-place construction spreading Hanging Basket
CN110374012A (en) A kind of prefabricated engineering method of T beam original position Support Method
CN106368089B (en) Tramcar track with small-radius curve is laid and the construction method of line type control
CN109518853A (en) A kind of built-in fitting and installation method for curtain wall installation
CN109024306A (en) Mountain terrain place Gao Dun rides pier formula door frame bridge lifting construction method
CN208844411U (en) A kind of steel reinforced concrete compound web plate structure of box beam beam-ends
CN108149965B (en) Joint structure at cable pit cross-track position and track industrial factory building
CN211074114U (en) Integral reinforcing bar of T type roof beam preparation standard frame
CN105648859A (en) Determining method and device for rail stress-free temperature of seamless track
CN205875741U (en) Cast -in -place floor is multi -functional, can have enough to meet need operation platform
CN110486074A (en) A kind of the stringing design method and construction method of major long tunnel construction ventilation
Mirkovic et al. Parametric Study of Additional Temperature Stresses in Continuously Welded Rails on Steel Truss Railway Bridges. Buildings 2023, 13, 2296
KR101906562B1 (en) Deck Plate For Warehouse And Construction Method Using Thereof
KR20130041458A (en) Wangja type tie for railroad
CN211738215U (en) Buried laying structure for pipeline crossing roadbed

Legal Events

Date Code Title Description
TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20140325

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20140327

R150 Certificate of patent or registration of utility model

Ref document number: 5513643

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250