CN103243649B - The system and method for a kind of cable saddle Fast Installation, location - Google Patents

The system and method for a kind of cable saddle Fast Installation, location Download PDF

Info

Publication number
CN103243649B
CN103243649B CN201310190231.9A CN201310190231A CN103243649B CN 103243649 B CN103243649 B CN 103243649B CN 201310190231 A CN201310190231 A CN 201310190231A CN 103243649 B CN103243649 B CN 103243649B
Authority
CN
China
Prior art keywords
cable saddle
stiff skeleton
skeleton
flange
cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310190231.9A
Other languages
Chinese (zh)
Other versions
CN103243649A (en
Inventor
周拥军
吴浩
荣劲松
陈国良
吴文峰
刘宇峰
黎彦
詹文讯
陈鸣
黄国忠
王爱溪
蔡祺锋
周宇
赖学海
赵耀璞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Fourth Harbor Engineering Co Ltd
No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Original Assignee
CCCC Fourth Harbor Engineering Co Ltd
No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Fourth Harbor Engineering Co Ltd, No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd filed Critical CCCC Fourth Harbor Engineering Co Ltd
Priority to CN201310190231.9A priority Critical patent/CN103243649B/en
Publication of CN103243649A publication Critical patent/CN103243649A/en
Application granted granted Critical
Publication of CN103243649B publication Critical patent/CN103243649B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of cable saddle Fast Installation, navigation system, it comprises the prefabricated stiff skeleton of some joints, and described stiff skeleton comprises four vertical rods, the connection be laterally connected between vertical rod is supportted; And cable saddle installed base, be removably connected with described stiff skeleton, this joint stiff skeleton is installed fixing cable saddle by fixed mechanism, is regulated the three-dimensional coordinate of cable saddle by adjusting device; And the stiff skeleton being provided with cable saddle is worked the boom hoisting winching to mounted stiff skeleton in advance in king-post; And the flange that the stiff skeleton of adjacent segment is connected and fixed and bolt, nut.The invention also discloses the method utilizing said system to carry out cable saddle Fast Installation, location.The present invention changes engineering stiff skeleton in the past and is separated the construction technology of installation with cable saddle, and by integral prefabricated cable saddle and stiff skeleton, realize cable saddle and stiff skeleton once mounting puts in place, accurate positioning, adjust easy, handling safety, construction effect is remarkable.

Description

The system and method for a kind of cable saddle Fast Installation, location
Technical field
The present invention relates to the system of a kind of cable saddle Fast Installation, location, particularly relate to the method being applied to cable-stayed bridge saddle and installing, locate.
Background technology
Suspension cable is the tie connecting king-tower and girder, and cable saddle is as the steering component of suspension cable, gentle transition when making suspension cable pass king-post, reduces flexural stress when suspension cable passes through king-post, and by through suspension cable dead load, mobile load is delivered on king-post, is one of key member of full-bridge.Cable saddle location will definitely not cause suspension cable and the cable saddle mouth of pipe friction occurs and damages suspension cable, affects the service life of workmanship and minimizing suspension cable.
The domestic Cable stayed Bridge Main Tower cable saddle construction stiff skeleton that adopts is separated mounting technique with cable saddle more: pre-buried shaped steel in king-post work progress, construct to during cable saddle region in king-post welding fabrication stiff skeleton; Measurement and positioning also welds cable saddle support; Lifting cable saddle is to stiff skeleton cable saddle Support Position; Measure and adjust and reinforce.Adopt stiff skeleton to be separated mounting technique with cable saddle, cable saddle and the one-time-reach-place of stiff skeleton mounting and adjusting can not be made, stiff skeleton Site Welding and cable saddle measurement and positioning spended time long, complicated operation and there is more security risk, affects site operation effect.
Summary of the invention
The object of the invention is to solve existing stiff skeleton and be separated mounting technique Problems existing with cable saddle, a kind of system being applicable to cable-stayed bridge saddle Fast Installation, location is provided.
To achieve these goals, present invention employs following technical scheme: a kind of cable saddle Fast Installation, navigation system, it is characterized in that: comprise the stiff skeleton that some joints are prefabricated, described stiff skeleton comprises four vertical rods, be laterally connected in connection support between four vertical rods; And cable saddle installed base, be removably connected with described stiff skeleton, this joint stiff skeleton is installed fixing cable saddle by fixed mechanism, is regulated the three-dimensional coordinate of cable saddle by adjusting device; And the stiff skeleton being provided with cable saddle is worked the boom hoisting winching to mounted stiff skeleton in advance in king-post; And the flange that the stiff skeleton of adjacent segment is connected and fixed and bolt, nut.
The stiff skeleton of adjacent segment is interconnected by a pair flange bolt, and bolt through described flange, and is fixed with lock nut and regulating nut respectively at the opposite side of flange and phase dorsal part.
Described fixed mechanism comprises " door " cabinet frame formed with shaped steel welding, described " door " cabinet frame partly encloses in cable saddle, and Open Side Down, " door " cabinet frame vertical direction and cable saddle closely connected, horizontal direction and cable saddle lateral surface leave and regulate gap, and horizontal direction is provided with adjusting bolt.
The described adjusting device for adjusting cable saddle three-dimensional coordinate comprises regulating nut between adjacent two joint stiff skeleton flange dishes and lock nut and cable saddle " door " cabinet frame place adjusting bolt.
A kind of cable saddle Fast Installation, localization method, it comprises the following steps:
(1) prefabricated stiff skeleton, stiff skeleton adopts shaped steel as its vertical rod, adopts channel-section steel (or being other shaped steel) as connecting support and diagonal brace, each making one joint between vertical rod, often restraining is done highly to determine according to king-post merogenesis height, and often joint is the guiding of next joint;
(2) the prefabricated stiff skeleton completed goes to cable saddle installed base, measure according to cable saddle and this joint stiff skeleton relative position, on stiff skeleton, saddle's position welding supports, cable saddle is installed, stiff skeleton fixes cable saddle with shaped steel welding " door " cabinet frame, " door " cabinet frame vertical direction and cable saddle closely connected, horizontal direction and cable saddle lateral surface leave and regulate gap, horizontal direction is provided with adjusting bolt, stiff skeleton internode and and cable saddle installed base between connecting portion welding flange, stiff skeleton internode is interconnected by flange bolt, bolt is arranged regulating nut and lock nut,
(3) the prefabricated stiff skeleton that completes and cable saddle by boom hoisting integral hoisting to king-post, be interconnected by flange bolt with the stiff skeleton of having constructed in king-post, survey crew measures the three-dimensional coordinate of cable saddle, adjusting the three-dimensional coordinate of cable saddle until meet design requirement by adjusting regulating nut between two joint stiff skeleton flange dishes, lock nut and cable saddle " door " cabinet frame place adjusting bolt, being finally welded and fixed cable saddle and skeleton.
Described stiff skeleton precast pedestal is made up of relatively two measure-alike fixed end moulds, and described fixed end mould is provided with the structure can fixing described stiff skeleton vertical rod, and stiff skeleton vertical rod cross binding is between described fixed end mould.
The feature that the present invention has changes engineering stiff skeleton to be in the past separated the construction technology of installation with cable saddle, by integral prefabricated cable saddle and stiff skeleton, realizes cable saddle and stiff skeleton once mounting puts in place, accurate positioning, adjust easy, handling safety, construction effect is remarkable.
Accompanying drawing explanation
Fig. 1 is prefabricated stiff skeleton schematic diagram on fixed end die station seat.
Fig. 2 is stiff skeleton internode connection diagram, and wherein Fig. 2 a is A enlarged drawing in Fig. 1; Fig. 2 b is the B direction view of Fig. 2 a; Fig. 2 c is the C direction view of Fig. 2 a.
Fig. 3 is the schematic diagram at cable saddle installed base cable saddle is arranged on stiff skeleton.
Fig. 4 is stiff skeleton contour structures schematic diagram, and wherein, Fig. 4 a is the front schematic view of stiff skeleton; The D direction view of Fig. 4 a that Fig. 4 b is; Fig. 4 c is the E direction view of Fig. 4 b.
Fig. 5 is cable saddle and stiff skeleton integral installation schematic diagram.
Wherein, fixed end mould 1 stiff skeleton 2 vertical rod 2.1 connects support 2.2 diagonal brace 2.3 flange 4 bolt 5 regulating nut 6 lock nut 7 cable saddle installed base 8 cable saddle 9 cable saddle support 10 " door " cabinet frame 11 horizontal direction adjusting bolt 12 king-post 13
Detailed description of the invention
A system for cable saddle Fast Installation, location, it linkage, cable saddle installed base 8 and boom hoisting of comprising the prefabricated stiff skeleton of some joints 2, the stiff skeleton of adjacent segment being connected and fixed.
Specifically, as shown in Fig. 4 respectively schemes, described stiff skeleton comprises four vertical rods 2.1, be laterally connected in connection support 2.2 between vertical rod and diagonal brace 2.3.This stiff skeleton is used for playing support and fixation to cable saddle.As shown in Figure 2, the stiff skeleton of adjacent segment adopts flange 4, bolt 5, regulating nut 6 to be connected with lock nut 7.
As shown in Figure 3, cable saddle installed base 8, is removably connected with described stiff skeleton, and cable saddle installed base has the structure for supporting stiff skeleton, and is connected with stiff skeleton bottom of upright rod with lock nut by bolt, adjusting nut.
Mounting method is as follows:
Prefabricated stiff skeleton.As shown in Figure 1, stiff skeleton precast pedestal is made up of relatively two measure-alike fixed end moulds 1, stiff skeleton adopts i iron (or being other shaped steel) as its vertical rod 2.1, adopt channel-section steel (or being other shaped steel) as connecting support 2.2 and diagonal brace 2.3, each making one saves, often restraining is done highly to determine according to king-post merogenesis height, and often joint is the guiding of next joint.Stiff skeleton internode connects as shown in Figure 2, often bottom joint stiff skeleton and top and upper and lower joint stiff skeleton connecting portion welding flange 4, and stiff skeleton internode is interconnected by flange bolt 5, bolt is arranged regulating nut 6 and lock nut 7.
The prefabricated stiff skeleton completed goes to cable saddle installed base 8, as Fig. 3, measure according to cable saddle 9 and this joint stiff skeleton relative position, saddle's position welding support 10 on stiff skeleton, cable saddle is installed, on stiff skeleton with shaped steel welding " door " cabinet frame 11 fix cable saddle, " door " cabinet frame vertical direction and cable saddle closely connected, horizontal direction then with outside cable saddle leaves adjust the play.Horizontal direction installs adjusting bolt 12, and stiff skeleton contour structures schematic diagram is as shown in Fig. 4 (shadow region is cable saddle).
The prefabricated stiff skeleton that completes and cable saddle by boom hoisting integral hoisting to king-post 13, be interconnected by flange 4 bolt 5 with the stiff skeleton of having constructed in king-post, as shown in Figure 5, survey crew measures the three-dimensional coordinate of cable saddle, adjusts the three-dimensional coordinate of cable saddle until meet design requirement by adjusting regulating nut 6 between two joint stiff skeleton flange dishes with lock nut 7 and cable saddle " door " cabinet frame place adjusting bolt 12; Finally be welded and fixed cable saddle and skeleton.

Claims (6)

1. cable saddle Fast Installation, a navigation system, is characterized in that: comprise
The stiff skeleton that some joints are prefabricated, described stiff skeleton comprises four vertical rods, the connection be laterally connected between vertical rod is supportted; And
Cable saddle installed base, is removably connected with described stiff skeleton, and that connection with cable saddle installed base is saved stiff skeleton and installed fixing cable saddle by fixed mechanism, regulated the three-dimensional coordinate of cable saddle by adjusting device; And
The stiff skeleton being provided with cable saddle is worked the boom hoisting winching to mounted stiff skeleton in advance in king-post; And
The flange that the stiff skeleton of adjacent segment is connected and fixed and bolt, nut.
2. cable saddle Fast Installation according to claim 1, navigation system, it is characterized in that: the stiff skeleton of adjacent segment is interconnected by a pair flange bolt, bolt through described flange, and is fixed with lock nut and regulating nut respectively at the opposite side of flange and phase dorsal part.
3. cable saddle Fast Installation according to claim 1, navigation system, it is characterized in that: described fixed mechanism comprises " door " cabinet frame formed with shaped steel welding, described " door " cabinet frame partly encloses in cable saddle, Open Side Down, " door " cabinet frame vertical direction and cable saddle closely connected, horizontal direction and cable saddle lateral surface leave and regulate gap, and horizontal direction is provided with adjusting bolt.
4. cable saddle Fast Installation according to claim 3, navigation system, is characterized in that: comprise regulating nut between adjacent two joint stiff skeleton flange dishes and lock nut and cable saddle " door " cabinet frame place adjusting bolt for regulating the described adjusting device of cable saddle three-dimensional coordinate.
5. cable saddle Fast Installation, a localization method, it is characterized in that adopt as arbitrary in Claims 1 to 4 as described in system and realized by following steps:
(1) prefabricated stiff skeleton, stiff skeleton adopts shaped steel as its vertical rod, adopts channel-section steel as connection support and diagonal brace, make a joint at every turn between vertical rod, and often restraining is done highly to determine according to king-post merogenesis height, and often joint is the guiding of next joint;
(2) the prefabricated stiff skeleton completed goes to cable saddle installed base, measure according to cable saddle and this joint stiff skeleton relative position, on stiff skeleton, saddle's position welding supports, cable saddle is installed, stiff skeleton fixes cable saddle with shaped steel welding " door " cabinet frame, " door " cabinet frame vertical direction and cable saddle closely connected, horizontal direction and cable saddle lateral surface leave and regulate gap, horizontal direction is provided with adjusting bolt, stiff skeleton internode and and cable saddle installed base between connecting portion welding flange, stiff skeleton internode is interconnected by flange bolt, bolt is arranged regulating nut and lock nut,
(3) the prefabricated stiff skeleton that completes and cable saddle by boom hoisting integral hoisting to king-post, be interconnected by flange bolt with the stiff skeleton of having constructed in king-post, survey crew measures the three-dimensional coordinate of cable saddle, adjusting the three-dimensional coordinate of cable saddle until meet design requirement by adjusting regulating nut between two joint stiff skeleton flange dishes, lock nut and cable saddle " door " cabinet frame place adjusting bolt, being finally welded and fixed cable saddle and stiff skeleton.
6. method according to claim 5, it is characterized in that: described stiff skeleton precast pedestal is made up of relatively two measure-alike fixed end moulds, described fixed end mould is provided with the structure can fixing described stiff skeleton vertical rod, and stiff skeleton vertical rod cross binding is between described fixed end mould.
CN201310190231.9A 2013-05-21 2013-05-21 The system and method for a kind of cable saddle Fast Installation, location Active CN103243649B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310190231.9A CN103243649B (en) 2013-05-21 2013-05-21 The system and method for a kind of cable saddle Fast Installation, location

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310190231.9A CN103243649B (en) 2013-05-21 2013-05-21 The system and method for a kind of cable saddle Fast Installation, location

Publications (2)

Publication Number Publication Date
CN103243649A CN103243649A (en) 2013-08-14
CN103243649B true CN103243649B (en) 2015-07-29

Family

ID=48923501

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310190231.9A Active CN103243649B (en) 2013-05-21 2013-05-21 The system and method for a kind of cable saddle Fast Installation, location

Country Status (1)

Country Link
CN (1) CN103243649B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106544959B (en) * 2016-12-12 2018-05-29 中铁大桥局集团有限公司 The construction method of king-tower lifting segment and bridge main tower saddle containing saddle
CN107881914B (en) * 2017-12-15 2023-09-12 中交第二航务工程局有限公司 Wire-dividing tube type cable saddle back field assembly type positioning device and assembly method
CN108487064B (en) * 2018-03-09 2019-06-25 济南城建集团有限公司 Separate installment main cable saddle of suspension bridge seat construction method
CN110184919B (en) * 2019-04-26 2020-09-15 安徽省公路桥梁工程有限公司 Construction method of low leaning tower cable saddle positioning system
CN110863432A (en) * 2019-11-26 2020-03-06 上海市基础工程集团有限公司 Rapid and accurate positioning method for steel structure tower column installation construction
CN112064514A (en) * 2020-09-14 2020-12-11 浙江交工金筑交通建设有限公司 Cable saddle rigid structure and integral positioning and mounting method thereof
CN113443554B (en) * 2021-07-07 2023-11-07 上海振华重工(集团)股份有限公司 Correction method for flatness of upper opening flange of upright post of container crane

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3356417B2 (en) * 1999-11-09 2002-12-16 株式会社エスイー Construction method and construction structure at the saddle part of the cable, and bridge
CN201183933Y (en) * 2008-03-14 2009-01-21 上海市政工程设计研究总院 Cable saddle for rope-suspension bridge tower top
CN101412489A (en) * 2008-11-20 2009-04-22 中铁二局股份有限公司 Method for traversing cable saddle of large tonnage cable crane
CN201458588U (en) * 2009-06-10 2010-05-12 中铁十三局集团第一工程有限公司 Combination-type movable cable saddle of cable crane
KR20110111907A (en) * 2010-04-06 2011-10-12 케이블텍 주식회사 Saddle assembly
CN202730650U (en) * 2012-07-18 2013-02-13 成都市新筑路桥机械股份有限公司 Main cable saddle used for bridge
CN102808380B (en) * 2012-08-21 2014-12-10 广西壮族自治区公路桥梁工程总公司 Cable saddle transverse moving system and cable saddle transverse moving construction method
CN203429556U (en) * 2013-05-21 2014-02-12 中交四航局第一工程有限公司 System for quickly installing and positioning cable saddle

Also Published As

Publication number Publication date
CN103243649A (en) 2013-08-14

Similar Documents

Publication Publication Date Title
CN103243649B (en) The system and method for a kind of cable saddle Fast Installation, location
CN102561712B (en) Precise positioning frame for large steel columns and equipment foundation fixing bolts and construction method of precise positioning frame
CN103243654B (en) Mounting method for steel anchor beam of cable-stayed bridge and assembly jig and cable bent tower mounting platform used in method
CN103215894B (en) Portable interim prestressed stretch-draw anchor block
CN204278223U (en) Prefabricated case beam steel bar binding clamping fixture
CN103437279B (en) Overhead cast-in-place box compression struts and construction technology thereof
CN107336346A (en) A kind of beam making bench
CN105672655A (en) Side wall self-propelled type triangular truss and construction method thereof
CN104674665A (en) Installation method for corridor bridge of large space steel structure
CN102518300B (en) Embedded conical bearing joint type steel structural support and construction method thereof
CN105317052B (en) Tower crane foundation bolt fixing method
CN102828469A (en) Positioning mounting construction method for triangular steel constructed pillar of inclined-leg steel box
CN106759457A (en) The installation method of cantilever design high-accuracy built-in fitting
CN103485539A (en) Construction control method for large direct-buried steel anchor fluke embedded part
CN204626411U (en) A kind of pile foundation steel bar cage erecting device
CN104831632A (en) Upper transverse beam and lower transverse beam construction method for bridge cable bent tower
CN201962608U (en) Adjustable viaduct concrete anti-collision guardrail template supporting device
CN203429556U (en) System for quickly installing and positioning cable saddle
CN105088961B (en) The construction method that a kind of end bay closure segment is merged with Cast-in-Situ Segment
CN205257790U (en) Fixed high -low leg handle portal crane
CN109629449A (en) A kind of steel case arch bridge arch springing toughened internal stress installation locating support and alignment method
CN106906750B (en) Multi-functional across the railway line swing bridge girder closing construction mould bases of one kind and its construction method
CN209194354U (en) High-altitude long-span binder base-supporting shellfish thunder support construction
CN102644379A (en) Temporary supporting system of steel column base and construction method of temporary supporting system
CN202577158U (en) Hyperbolic cable tower cross beam adjusting bracket

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant