GB2256881A - Load supporting structure - Google Patents

Load supporting structure Download PDF

Info

Publication number
GB2256881A
GB2256881A GB9211017A GB9211017A GB2256881A GB 2256881 A GB2256881 A GB 2256881A GB 9211017 A GB9211017 A GB 9211017A GB 9211017 A GB9211017 A GB 9211017A GB 2256881 A GB2256881 A GB 2256881A
Authority
GB
United Kingdom
Prior art keywords
deck
beams
load supporting
supporting structure
structure according
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
GB9211017A
Other versions
GB2256881B (en
GB9211017D0 (en
Inventor
Leslie Gordon Jaeger
Aftab Ahmed Mufti
Baidar Bakht
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MINISTRY OF TRANSPORTATION
Original Assignee
MINISTRY OF TRANSPORTATION
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MINISTRY OF TRANSPORTATION filed Critical MINISTRY OF TRANSPORTATION
Priority to US07/889,497 priority Critical patent/US5339475A/en
Priority to CA002069814A priority patent/CA2069814C/en
Priority to FR9206578A priority patent/FR2689532B1/en
Priority to JP4140803A priority patent/JPH06235207A/en
Publication of GB9211017D0 publication Critical patent/GB9211017D0/en
Publication of GB2256881A publication Critical patent/GB2256881A/en
Application granted granted Critical
Publication of GB2256881B publication Critical patent/GB2256881B/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/16Load-carrying floor structures wholly or partly cast or similarly formed in situ
    • E04B5/17Floor structures partly formed in situ
    • E04B5/23Floor structures partly formed in situ with stiffening ribs or other beam-like formations wholly or partly prefabricated
    • E04B5/29Floor structures partly formed in situ with stiffening ribs or other beam-like formations wholly or partly prefabricated the prefabricated parts of the beams consisting wholly of metal
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/12Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
    • E01D19/125Grating or flooring for bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2/00Bridges characterised by the cross-section of their bearing spanning structure
    • E01D2/02Bridges characterised by the cross-section of their bearing spanning structure of the I-girder type
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced
    • E01D2101/266Concrete reinforced with fibres other than steel or glass
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced
    • E01D2101/268Composite concrete-metal

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Bridges Or Land Bridges (AREA)
  • Rod-Shaped Construction Members (AREA)

Description

i Z-1 63^'11 1 LOAD SUPPORTING STRUCTURE The present invention relates to
load supporting structures.
Load supporting structures are used to span between spaced vertical supports and can typically be used in highway bridges and parking garages. A common construction utilizes beams or girders to support a concrete slab known as a deck. The beams can be made of either steel or concrete and are dimensioned such as to be able to transfer the loads from the deck into the vertical supports.
It is well known that concrete is relatively strong in compression but relatively weak in tension.
Because of this, the concrete slab is normally provided with steel reinforcements that usually take the form of steel bars. These bars are laid in a grid in both longitudinal and transverse directions and are located both at the bottom and at the top of the deck slab. 20 The placement of the reinforcing bars is done manually and is therefore relatively time consuming. Moreover, the bars have to be located within the formwork used to cast the slab in situ which further increases the expense and time taken to produce the slab. In a "slab-on-girder" type highway bridge commonly used in Ontario, Canada, each of the top and bottom reinforcements typically comprises about.3% by volume of longitudinally running steel bars and.3% by volume of transversely running steel bars. To provide the requisite strength to the slab, the bars must be located adjacent to the top and bottom of the deck. However, a commonly occurring problem with such deck slabs is that of-corrosion of the reinforcing steel bars. This corrosion may occur from reaction with the constituents of the concrete used to form the slab but also from reaction with the outside environment such as salt used to remove snow and ice from the support 1 2 structure or moisture within the air. In order to slow down the onset of corrosion the steel bars are frequently given a suitable protective coating and a minimum protective cover of concrete is provided on the bars.
While such action does retard the onset of corrosion, inevitably corrosion will occur resulting in a reduction in the life of the structure and expensive repair procedures requiring portions of the deck to be removed for inspection and repair.
Moreover, the need to cover the reinforcing steel with concrete leads to thickness of the deck that is greater than that needed to support the load. This not only increases the volume of and expense of the deck but leads to a corresponding increase in the strength and expense of the supporting structure.
It is therefore an object of the present invention to provide a load supporting structure in which the above disadvantages are obviated or mitigated.
According to the present invention there is provided a load supporting structure to span a pair of spaced vertical supports said structure comprising a pair of laterally spaced beams extending between the supports, tension members extending between said beams and being secured thereto to inhibit relative lateral movement between said beams. a deck supported by the beams. and fastening means extending between said deck and said beams to inhibit relative movement therebetween, said deck being formed from concrete impregnated with non- metallic fibres and dimensioned to transfer loads carried by the deck to the supports through the beam.
An embodiment of the invention will now be described by way of example only with reference to the accompanying drawings, in which.
Figure 1 is a side view of a load supporting structure; Figure 2 is a view of the line 2-2 of Figure 1; 1 1 3 Figure 3 is a plan view of Figure 1 with portions of the structure removed for clarity; Figure 4 is a perspective view of a portion of a supporting frame of the structure shown in Figure l; Figure 5 is a representation of a model used in the development of the structure of Figures 1-4; Figure 6 is a representation similar to Figure of a further test performed on the model; and Figure 7 is a sectional view, similar to Figure 2, of a-further embodiment of a load supporting structure.
Referring therefore to Figure 1, a load supporting structure indicated generally at 10 extends between a pair of vertical supports 12. The supports 12 are suitable columns or abutments capable of supporting the loads imposed on the load supporting structure.
A pair of laterally spaced beams 14,16 extend between the vertical supports 12 and, in the embodiment shown, I-section structural steel joists are used.
Alternatively, concrete beams or other configurations of steel beams such as rectangular or box beams could be used. It will be appreciated that an appropriate number of lateral spaced beams may be used to provide a deck of the required width. The beams 14,16 are supported on the supports 12 by pads 18. Each of the beams 14,16 has a central web 20 and upper and lower flanges 22.24. The beams 14,16 are maintained in spaced parallel relationship by structural members 25 located on the webs of the beams 14,16 near the supports 12.
Extending between the upper webs 22 is a series of steel straps 26 that act as tension members between the beams 14,16. The steel straps 26 are secured to the flanges 22 either by welding or other suitable forms of fastening such as bolts or rivets.
The beams 14,16 are connected at opposite ends by channels 29 that are secured to the flanges 22 in a manner similar to the straps 26. The channels 29 are 1 4 oriented with their webs in the horizontal plane to provide the maximum stiffness in that plane. A series of shear studs 32 are secured at spaced intervals along the upwardly directed surface of channels 29 and at regularly 5 spaced intervals along the flanges of each beam 14,16. The studs 32 are conventional fasteners used to secure a concrete structure to a steel structure such as those commercially available and known as "Nelson studs".
A deck 30 is supported on the upper surface of the flange 22. The deck 30 is attached to each of the flanges 22 and the channels 29 by the studs 32 to provide the necessary lateral stiffness. The deck 30 is formed from concrete impregnated with randomly distributed fibres. The fibres may be of any suitable material, preferably non-metallic, such as one or more of the group of carbon fibres, aramid fibres, polypropylene or suitable equivalent fibres. The fibres are mixed within the concrete prior to forming the slab which is cast in situ by utilizing appropriate form work (not shown). 20 The deck 30 preferably uses a fibre content of at least 5 parts in 1000 by volume. The concrete mixture would use a super plasticizer to improve the flow characteristics of the'wet concrete. The fibres are preferably not more than.05 mm 2 in diameter and not more than 40 mm in length when polypropylene is used. However, other lengths and diameters may be utilized depending on the particular circumstances in which the support structure is to be used.
In general terms, sufficient fibres should be included within the concrete to provide a tensile strength for the concrete slab that is at least 20% ofthe compressive Strength of the slab.
The depth of the deck 30 indicated at (d) in Figure 2 is such as to permits loads imposed on the upper surface of the deck 30 to be transferred to the beams 14,16 through an arching action. In general terms, a ratio of depth (d) to span (s) should be less than 1:14, that is the depth (d) should be at least 1/14 of the span (s).
With loads imposed on the deck being transferred to the beams 14, the straps 26 are utilized to inhibit any laterally outward movement of the flanges 22 of the beams 14. The spacing and cross-section of the straps 26 will again depend upon the nature of the loads imposed but typically the longitudinally spacing between the straps should be not more than 1/2 of the span (s). The cross- sectional area of the strapping should be not less than.4 of the cross- sectional area of the deck 30 supported by the strap. Thus if the deck is 225 mm thick with the straps 26 spaced 1 metre apart, the cross-sectional area of each strap should be in the order of goomm2. Suitable sections of structural steel can be utilized for the straps 26.
It will be noted that in the embodiment shown, the deck 30 is.formed without steel reinforcing structure embedded within the deck and therefore the inherent corrosive action between the concrete and the steel reinforcing rods is avoided. The straps 26 are spaced from the underside of-the deck to avoid any contact between the concrete and the straps and in the event that corrosion is induced by the environment, the straps 26 are readily available for inspection and/or replacement as necessary. This can be done without disturbing the deck 30.
Straps 26 should be located so as to ensure that the loads transferred from the deck to the flanges 22 through studs 32 do not induce laterally outward motion of the flanges. Where I-section beams 14 are utilized. then the strap 26 should be placed adjacent to the upper flange 22 as the web 14 is relatively flexible and would allow outward movement of the flanges 22. This would prevent the slab 30 taking the imposed loads through the arching action mentioned above.
6 However, if different section of beams 14 are used that exhibit increased lateral stiffness then alternative forms and locations tension members 26 could be utilized. For example, where box beams are utilized instead of the I-beams 14, the tension members 26 could be in the form of steel tubing extending across the neutral axis or slightly above the neutral axis of the beams. However, it is believed that the arrangement shown in Figure 2 is economical and facilitates fabrication.
The channel members 29 are provided at the ends of. the beams 14,16 to provide the necessary edge stiffness to sustain the compressive forces developed due to the arching action inherent in the deck. The disposition of the channel members 29 provides their major flexural rigidity in a horizontal plane with the studs 32 being effective to connect mechanically the deck 30 to the channel members 29.
The efficacy of the load supporting structure is illustrated by the following experimental test results.
First Model For the first text, a half-scale model of a two-girder bridge was constructed. Details of the model are shown in Figure 5 where reference numerals are used in the embodiment of Figures 1- 4 to identify like components. As shown in this figure, the 100 mm thick concrete deck slab 30 was supported by two steel girders 14,16 and the model had only three intermediate diaphragms 25, and none at the supports.
The deck slab concrete contained 38 mm long fibrillated polypropylene fibres (FORTA corporation). These fibres were added to the ready-mixed concrete just prior to placement in the amount of 0.34% by weight (or 0.88% by volume). Immediately prior to placement, the necessary degree of workability of concrete to cast the 7 slab was achieved by adding water rather than by the use of the customary superplasticizer. The concrete did not contain any steel reinforcement.
The deck slab was tested under a central rectangular patch load measuring 257 mm x 127 mm, with the latter dimension being in the longitudinal direction of the bridge. As shown in Figure 5, the load was applied thorugh a thick steel plate and a thin neoprene pad to represent the dual tires of a heavy commercial vehicle. The deck slab of the first model failed at a load of 173 Kn. The mode of failure was not that of punching shear. as is observed in deck slabs with conventional steel reinforcement.
Shortly before collapse, a vertical crack was observed at the free transverse edge of the deck slab, roughly midway between the girders. This crack indicated a lack of lateral restraint to the deck slab, especially at the ends of the bridge.
Second Model Realizing that the deck slab of the first model lacked lateral restraint at the bridge supports, the collapsed deck slab was carefully removed and end diaphragms added to the steel framework. With the addition of these end diaphragms, which consisted of two channels and a new deck slab, the second model resulted. The deck slab of the second model, having the same dimensions as that of the first, was cast in the same way except that superplasticizer was added instead of water to achieve workability. Both the compressive and tensile strengths of concrete were improved substantially by the user of the superplasticizer. This deck slab was also tested under a central rectangular patch load. once again, the deck slab of the second model did not fail in punching shear. At 222 Kn the failure load was somewhat higher but the mode of failure was practically the same as that of the deck slab of the first model.
8 Review of the results of the first two tests led to the realization that in conventionally-reinforced deck slabs, the transverse steel reinforcement participates in restraint of the lateral movement of the top flanges of the girders. This restraint permits the development of the arching system which is responsible for the enhanced strength of the slab and the punching shear mode of failure. The diaphragms of the first two models, having been lightly welded to the webs of the girders. could not restrain effectively the lateral movement of the girders above their points of connection at the webs. This lateral movement was obviously enough to keep the arching action from developing in the first two models.
Third Model A third model was constructed by using the steelwork of the second model with the straps 28 and lower channels 25 at the intermediate diaphragms being added.
These additional steel straps comprised bars of 64 mm x 10 mm crosssection spaced a 457 mm centres welded to the underside of the upper flanges of the girders. These straps represented about 1.4% of the area of concrete, which is considerably more than the minimum 0.6% transverse steel required as reinforcement in conventional deck slabs designed for punching shear in accordance with the standards set by the Ontario Highway Bridge Design Code (OHBDC, 1990). However, deck slabs designed for flexure often contain more transverse steel than 1.4% of the concrete area.
The concrete for the deck slab of the thirdmodel had the same mix as that used for the second model.
The deck slab of the third model failed under a central load of 418 Kn in a punching shear failure mode thus confirming the hypothedis that the necessary lateral restraint to the deck slab can ge provided by the steel 1 1 9 straps. Unlike that in the first two models, the deck slab failure in this model was highly localized with the rest of the slab remaining virtually undamaged.
Taking advantage of the localized failure under the central load (location 1), the deck slab was tested at two other locations. Locations 2 and 3 were a distance 0.86S and 0.43S from the closer transverse free edge, respectively, where S is the girder spacing.
Tests on locations 2 and 3 led to failure loads of 316 and 209 Kn, respectively; these failure loads are respectively 0.76 and 0.50 times the failure load at the centre. It was obvious that as the load moved towards the unstiffened transverse free edge of the deck slab 30, the longitudinal restraint declined and the failure mode degenerated towards a flexural one.
It is not difficult to conclude that the degree of restraint in the longitudinal directions falls away as the reference point moves towards the transverse free edge of the deck slab. This drop in restraint caused the slab to fail at location 2 in a hybrid failure mode rather than pure punching shear. Contrary to the requirements of the OHBDC (1990), the transverse edges of the deck slab of the third model were not stiffened.
Fourth Model Despite the encouraging results of the tests on the third model. there remained a crucial uncertainty about the ability of the fibre reinforced concrete (FRC) deck slab to sustain a pair of concentrated loads which straddle a girder and cause tensile stresses in the concrete above it. A fourth model was, therefore. constructed to study the behaviour of the slab under pairs of loads, 'One on either side of an internal girder. As shown in Figure 6, the fourth model was practically the same as the third model except for an additional girder and a larger overall width of the deck slab. The deck slab of the fourth model was cast by using a superplasticizer in the same way as the deck slab of the third model.
The deck slab of the fourth model was first tested under a pair of rectangular patch loads straddling the middle girder at the mid-span of the model. This test location is identified as location 1 in Figure 7. The test at this location resulted in simultaneous punching shear failure under the two loads, with each loading pad carrying a load of 418 Kn. Of particular note is the fact that the failure under the two loads occurred simultaneously and in identical patterns, with the punchout at the top surface being of the same shape and size as the patch loads. It is highly significant, although somewhat fortuitous, that this failure load per loading pad was exactly the same as the failure load for the deck slab of the third model at location 1. This observation confirmed that the FRC deck slab with restrained top flanges of the girders could develop the necessary internal arching system even when subjected to concentrated loads straddling transversely on either side of an internal girder.
The highly localized nature of the failure at location 1 permitted-the testing of the deck slab at other locations as well. Similarly to the tests on the third model, tests were also carried out-on the fourth model at two other locations; these locations, being Nos. 2 and 3 and each a distance 0.86S from the closer transverse free edge, are identified in Figure 4.
The test at location 2 led to simultaneous punching shear failure under the two loads at a load of 373 Kn per loading pad; this failure load is about 0.89 times the failure load at location 1. The failure atlocation 3,, which was a mirror image of location 2, occurred under only one loading pad and at 0.84 times the failure load at location 1, i.e. at 352 Kn. The mode of failure was again that of punching shear. It is noted that although the mode of failure at locations 2 and 3 11 was that of punching shear, the punched out area of the slab in these cases was slightly larger than at location 1 indicating somewhat reduced in-plane restraint.
Tests at locations 2 and 3 have confirmed that the proximity of the loads to the unstiffened transverse free edges of deck slabs tends to reduce its capacity to sustain concentrated loads.
It will be seen from the above test results that a load supporting structure can be formed by providing a supporting structure that exhibits the necessary lateral stiffness and longitudinal stiffness to permit the deck to sustain the internal arching action. The lateral stiffness is provided by the lateral straps 28 positioned adjacent to the underside of the deck and the longitudinal stiffness is provided by the channel members 29 at the ends of the beams 14,16.
The deck 30 is formed as described above by using conventional plywood sheathing that is removed after the deck has cured. However, the provision of the straps 28 may complicate the removal of the sheathing in some cases. A further embodiment of the load supporting structure is shown at Figure 7 in which this disadvantage is obviated or mitigated. Like components will be identified with like reference numerals with a suffix "all added for clarity.
In the embodiment of Figure 7, the sheathing of the form work is provided by thin stay-in-place carbon fibre reinforced concrete (CRFC) panels 36 that are supported on the flanges 22a of the beams 14a,16a. After the FRC has been poured, the panels 36 become integral with the deck 30a. The CFRC panels 36 are typically 25 mm to 50 mm, thick and are optionally supported between_ the beams 14a,16a during pouring of the deck 30a by temporary stringer 34. The technology for producing CFRC panels is well established. URC panels have been used as curtain walls in buildings. As such, the nature of 12 the panels is well known in the art and will not be described further.
After placement of the CRFC panels 36, the deck 30a may be poured and allowed to cure. The concrete used in the deck 30a conforms to the specifications described above. The CFRC panels 36 are left in place after the deck 30a has been poured and become an integral part of the deck 30a, thereby avoiding the need for subsequent removal.
It will be noted that the flanges 22a allow placement of the panels 36 without interfering with the connection between the deck 30a and the beams 14a,16a provided by the studs 32a.
It will be appreciated that the lack of reinforcement in the deck 30 limits the permissible overhang of the deck on the beams 14,16 so that the beams should be located adjacent the longitudinal edges of the deck.
In the embodiments described above, the straps 26 have been spaced from the underside of the deck 30. This is preferred to minimize corrosion. However, it is contemplated that the benefits of a reduced thickness for the deck could also-be obtained by forming the deck with the straps 26 embedded in the surface of the deck.
Although the effect of corrosion is not diminished, nevertheless the straps 26 remain accessible and may be replaced if necessary without disturbing the deck. The straps 26 are still effective to prevent lateral displacement of the beams 14,16 and allow the arching action in the deck to be obtained. In each case, however,, the beams and straps co-operate to provide a structure of sufficient stiffness to allow the arching action to develop within the deck and transfer loads to the beams, thereby avoiding the need for steel reinforcement as an integral part of the deck.
13

Claims (13)

We claim:
1. A load supporting structure to span a pair of spaced vertical supports said structure comprising a pair of laterally spaced_beams extending between the supports, tension members extending between said beams and being secured thereto to inhibit relative lateral movement between said beams, a deck supported by the beams, and fastening means extending between said deck and said beams to inhibit relative movement therebetween, said deck being formed from concrete impregnated with non-metallic fibres and dimensioned to transfer loads carried by the deck to the supports through the beam.
2. A load supporting structure according to claim 1 in which the deck is supported on the upper edge of each of said beams and said tension members extend between the upper edges.
3. A load supporting structure according to claim 1 wherein the tension members are straps attached to the beams at spaced intervals.
4. A load supporting structure according to claim 3 wherein the straps are disposed perpendicular to the beams.
5. A load supporting structure according to claim 1 wherein the non metallic fibres are distributed within the concrete with greater than 5 parts by volume of fibre to 1000 parts by volume of concrete.
6. A loadsupporting structure according to claim 1 wherein said tension members are spaced from said deck.
7. A load supporting'structure according to claim 5 wherein the fibres are polypropylene.
14
8. A load supporting structure according to claim 5, 6 or 7 wherein said deck has a tensile strength not less than 20% of its compressive strength.
9. A load supporting structure according to any preceding claim wherein the thickness of the deck is at least 1/14 of the span between said beams.
10. A load supporting structure according to any preceding claim wherein said fibres have a diameter not more than 0.05 mm and a length of not more than 40 mm.
11. A load supporting structure according to claim 1 wherein opposite ends of said beams are interconnected by a transverse structural member and fastening means extend between said structural member and said deck.
12. A load supporting structure according to claim 11 wherein said structural members are disposed to provide maximum stiffness in a horizontal plane.
13. A load supporting structure according to claim 12 wherein said structural members are channel members.
1 k
GB9211017A 1991-05-30 1992-05-22 Load supporting structure Expired - Fee Related GB2256881B (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
US07/889,497 US5339475A (en) 1991-05-30 1992-05-27 Load supporting structure
CA002069814A CA2069814C (en) 1991-05-30 1992-05-28 Load supporting structure
FR9206578A FR2689532B1 (en) 1991-05-30 1992-05-29 Load support structure.
JP4140803A JPH06235207A (en) 1991-05-30 1992-06-01 Load bearing structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
GB919111649A GB9111649D0 (en) 1991-05-30 1991-05-30 Load supporting structure

Publications (3)

Publication Number Publication Date
GB9211017D0 GB9211017D0 (en) 1992-07-08
GB2256881A true GB2256881A (en) 1992-12-23
GB2256881B GB2256881B (en) 1995-11-08

Family

ID=10695816

Family Applications (2)

Application Number Title Priority Date Filing Date
GB919111649A Pending GB9111649D0 (en) 1991-05-30 1991-05-30 Load supporting structure
GB9211017A Expired - Fee Related GB2256881B (en) 1991-05-30 1992-05-22 Load supporting structure

Family Applications Before (1)

Application Number Title Priority Date Filing Date
GB919111649A Pending GB9111649D0 (en) 1991-05-30 1991-05-30 Load supporting structure

Country Status (2)

Country Link
DE (1) DE4217783A1 (en)
GB (2) GB9111649D0 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2002012633A1 (en) * 2000-08-03 2002-02-14 Otkrytoe Aktsionernoe Obschestvo 'mostotrest' Structure of a precast cast-in-place span structure
GB2404390B (en) * 2003-07-31 2008-03-05 Ozgur Demir Thomas Keskin A method of forming a suspended floor slab in-situ
DE102011010672A1 (en) * 2011-02-08 2012-08-09 Ssf Ingenieure Ag Surface structure, particularly cover system, for industrial construction and for multi-storey construction, has two supports with composite plates, where intermediate space is provided between supports
RU2476636C1 (en) * 2011-09-21 2013-02-27 Открытое акционерное общество по проектированию строительства мостов "Институт Гипростроймост" Device to connect reinforced concrete roadway slab with main beams of railway bridge span

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BE1013231A3 (en) * 2000-01-13 2001-11-06 Tradecc Nv Improved sealing strip

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1064815A (en) * 1962-10-01 1967-04-12 Yawata Iron & Steel Co Steel girder bridges
GB1196403A (en) * 1966-09-03 1970-06-24 Geo Sands & Son Ltd Improvements in or relating to Building Structures
US3956788A (en) * 1974-10-23 1976-05-18 Nagin Harry S Bridge floor and method of constructing same
GB1452303A (en) * 1972-11-28 1976-10-13 Australian Wire Ind Pty Concrete reinforcing elements and reinforced composite incorporating same
EP0004346A1 (en) * 1978-03-27 1979-10-03 Eugene W. Sivachenko Box beam for use as a load carrying member and structures incorporating such box beams
US4282619A (en) * 1979-11-16 1981-08-11 Havens Steel Company Truss structure
US4309125A (en) * 1980-10-06 1982-01-05 Richardson George S Integrated bridge construction

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1064815A (en) * 1962-10-01 1967-04-12 Yawata Iron & Steel Co Steel girder bridges
GB1196403A (en) * 1966-09-03 1970-06-24 Geo Sands & Son Ltd Improvements in or relating to Building Structures
GB1452303A (en) * 1972-11-28 1976-10-13 Australian Wire Ind Pty Concrete reinforcing elements and reinforced composite incorporating same
US3956788A (en) * 1974-10-23 1976-05-18 Nagin Harry S Bridge floor and method of constructing same
EP0004346A1 (en) * 1978-03-27 1979-10-03 Eugene W. Sivachenko Box beam for use as a load carrying member and structures incorporating such box beams
US4282619A (en) * 1979-11-16 1981-08-11 Havens Steel Company Truss structure
US4309125A (en) * 1980-10-06 1982-01-05 Richardson George S Integrated bridge construction

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2002012633A1 (en) * 2000-08-03 2002-02-14 Otkrytoe Aktsionernoe Obschestvo 'mostotrest' Structure of a precast cast-in-place span structure
GB2404390B (en) * 2003-07-31 2008-03-05 Ozgur Demir Thomas Keskin A method of forming a suspended floor slab in-situ
DE102011010672A1 (en) * 2011-02-08 2012-08-09 Ssf Ingenieure Ag Surface structure, particularly cover system, for industrial construction and for multi-storey construction, has two supports with composite plates, where intermediate space is provided between supports
DE102011010672B4 (en) * 2011-02-08 2014-10-30 Ssf Ingenieure Ag Tensile structure with composite panels
RU2476636C1 (en) * 2011-09-21 2013-02-27 Открытое акционерное общество по проектированию строительства мостов "Институт Гипростроймост" Device to connect reinforced concrete roadway slab with main beams of railway bridge span

Also Published As

Publication number Publication date
GB9111649D0 (en) 1991-07-24
DE4217783A1 (en) 1993-01-21
GB2256881B (en) 1995-11-08
GB9211017D0 (en) 1992-07-08

Similar Documents

Publication Publication Date Title
US5339475A (en) Load supporting structure
KR100483083B1 (en) Composite Deck having Frame and Concrete
US5454128A (en) Prefabricated bridge deck form
KR100728106B1 (en) Cantilever construction structure of slab for bridge and the method thereof
CA2493141C (en) Improvement in load supporting structure
CA2280974C (en) Pre-cast concrete decking for load supporting structures
CN110392758B (en) Inverted T-shaped section mixed prestressed concrete beam and panel construction method using same
KR20160115602A (en) Method of replacing bridge deck slab and prestressed concrete girder assembly used therein
JP2009102826A (en) Girder bridge with reinforced concrete composite steel floor slab
JP3830767B2 (en) Continuous girder for bridge
JP2008088634A (en) Composite steel-concrete floor slab
GB2256881A (en) Load supporting structure
KR20130090709A (en) Construction method for corrugated steel plate web-psc composite beam
JP3885583B2 (en) Composite truss bridge and its construction method
KR100794444B1 (en) Construction Method of Composite Slab Bridge Using Composite Truss Girder
JP3579167B2 (en) Deck for road surface and its laying method
CN215252249U (en) Connecting structure of hogging moment area of steel-concrete combined continuous beam
JP2002275833A (en) Continuing method of simple beam of existing bridge and continuous beam structure
JP4293696B2 (en) Construction method of composite floor slab bridge
JPH0521522Y2 (en)
JP2003293323A (en) Reinforcement structure of continuous girder bridge
KR102440103B1 (en) End continuing connector for slab construction deck
JP2002173911A (en) Re-covering execution method for steel floorslab and concrete floorslab
CN215441448U (en) Light grid reinforced composite bridge floor
JPH0348285B2 (en)

Legal Events

Date Code Title Description
PCNP Patent ceased through non-payment of renewal fee

Effective date: 19990522