EP3556917A1 - Transport device for a spinning unit - Google Patents

Transport device for a spinning unit Download PDF

Info

Publication number
EP3556917A1
EP3556917A1 EP19169860.4A EP19169860A EP3556917A1 EP 3556917 A1 EP3556917 A1 EP 3556917A1 EP 19169860 A EP19169860 A EP 19169860A EP 3556917 A1 EP3556917 A1 EP 3556917A1
Authority
EP
European Patent Office
Prior art keywords
tracks
ring spinning
spinning machine
suspension
rows
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP19169860.4A
Other languages
German (de)
French (fr)
Other versions
EP3556917B1 (en
Inventor
Karl-Heinz Mack
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Saurer Spinning Solutions GmbH and Co KG
Original Assignee
Saurer Spinning Solutions GmbH and Co KG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Saurer Spinning Solutions GmbH and Co KG filed Critical Saurer Spinning Solutions GmbH and Co KG
Publication of EP3556917A1 publication Critical patent/EP3556917A1/en
Application granted granted Critical
Publication of EP3556917B1 publication Critical patent/EP3556917B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • DTEXTILES; PAPER
    • D01NATURAL OR MAN-MADE THREADS OR FIBRES; SPINNING
    • D01HSPINNING OR TWISTING
    • D01H9/00Arrangements for replacing or removing bobbins, cores, receptacles, or completed packages at paying-out or take-up stations ; Combination of spinning-winding machine
    • D01H9/005Arrangements for replacing or removing bobbins, cores, receptacles, or completed packages at paying-out or take-up stations ; Combination of spinning-winding machine for removing empty packages or cans and replacing by completed (full) packages or cans at paying-out stations; also combined with piecing of the roving
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H67/00Replacing or removing cores, receptacles, or completed packages at paying-out, winding, or depositing stations
    • B65H67/06Supplying cores, receptacles, or packages to, or transporting from, winding or depositing stations
    • DTEXTILES; PAPER
    • D01NATURAL OR MAN-MADE THREADS OR FIBRES; SPINNING
    • D01HSPINNING OR TWISTING
    • D01H1/00Spinning or twisting machines in which the product is wound-up continuously
    • D01H1/14Details
    • D01H1/18Supports for supply packages
    • DTEXTILES; PAPER
    • D01NATURAL OR MAN-MADE THREADS OR FIBRES; SPINNING
    • D01HSPINNING OR TWISTING
    • D01H9/00Arrangements for replacing or removing bobbins, cores, receptacles, or completed packages at paying-out or take-up stations ; Combination of spinning-winding machine
    • D01H9/18Arrangements for replacing or removing bobbins, cores, receptacles, or completed packages at paying-out or take-up stations ; Combination of spinning-winding machine for supplying bobbins, cores, receptacles, or completed packages to, or transporting from, paying-out or take-up stations ; Arrangements to prevent unwinding of roving from roving bobbins
    • DTEXTILES; PAPER
    • D01NATURAL OR MAN-MADE THREADS OR FIBRES; SPINNING
    • D01HSPINNING OR TWISTING
    • D01H9/00Arrangements for replacing or removing bobbins, cores, receptacles, or completed packages at paying-out or take-up stations ; Combination of spinning-winding machine
    • D01H9/18Arrangements for replacing or removing bobbins, cores, receptacles, or completed packages at paying-out or take-up stations ; Combination of spinning-winding machine for supplying bobbins, cores, receptacles, or completed packages to, or transporting from, paying-out or take-up stations ; Arrangements to prevent unwinding of roving from roving bobbins
    • D01H9/182Overhead conveying devices

Definitions

  • the invention relates to a transport device for a spinning machine for supplying ring spinning machines with supply spools and disposing the empty spooled sleeves with a suspension rail system, which is arranged between at least one roving frame and a ring spinning machine and equipped with a storage device that allows caching of suspension trolley trains, which either full Original bobbins or are equipped with empty-spun sleeves.
  • roving bobbins In connection with the operation of ring spinning machines, various embodiments of roving bobbins have long been known. It is known, for example, to install between roving machines and ring spinning machines a network of suspension rails on which suspension trolley trains are movably guided, which are equipped either with fresh roving or empty-spooled sleeves.
  • a transport device in which a block of roving, preferably so-called flyers, is connected via a suspension rail system to a block of ring spinning machines.
  • the suspension rail system has in the region of the gate of the ring spinning machines in each case a plurality of gate rows, which are connected at the end of the ring spinning machines in each case via a switch to an annularly arranged rail track of the suspension rail system.
  • a comparable transport device with a switched between roving and ring spinning machines suspension track system is also in the DE 195 08 399 C2 described.
  • the suspension rail system in Each area of the roving machines has a storage for suspended trolley trains and up to four rows of gates in the area of ring spinning machines.
  • the rows of gates are connected at the ends of the ring spinning machines in each case via switches to an annularly arranged rail track of the suspension rail system.
  • transport devices for roving bobbins are described, which, as usual, are arranged between at least one roving frame and a plurality of ring spinning machines and have a network of suspension rails on which suspension trolley trains are movably guided.
  • These known transport devices have at least one main hanger rail and a plurality of branch suspension rails, wherein a transfer device is arranged between the main suspension rail and the branch suspension railways.
  • a transfer device which is movable along the main hanger rail and has two slidably mounted carriages with hanging rail sections.
  • the carriages are displaceable in the transfer device transversely to their direction of travel such that their suspension rail sections can be brought into alignment with the main suspension rail track as well as with one of several branch suspension rail tracks.
  • suspension trolley trains that are positioned in the gate rows of a ring spinning machine, only individually and thus can be replaced successively.
  • the invention has the object, a transport device for a spinning, which serves the supply of ring spinning machines with supply bobbins and the disposal of empty-spooled sleeves and arranged between at least one roving frame and a ring spinning machine suspended track system having a memory device
  • a transport device for a spinning which serves the supply of ring spinning machines with supply bobbins and the disposal of empty-spooled sleeves and arranged between at least one roving frame and a ring spinning machine suspended track system having a memory device
  • This object is achieved in that in the field of ring spinning a gate with a plurality of gate rows is installed, which are connected via a switch configuration to the suspension rail system that, if necessary, a plurality of suspension trolley trains, the empty spooled sleeves, simultaneously from the gate rows the ring spinning machine are extendable and that subsequently the same number of suspension trolley trains that are equipped with full supply bobbins, again at the same time in the gate rows of the ring spinning machine is retracted.
  • the transport device has the particular advantage that by the simultaneous extension of a plurality of suspension trolley trains, which are equipped with empty-spun sleeves and the subsequent simultaneous retraction of the same number of suspension trolley trains, the fresh feed bobbins, the time that has been required to several in the rows of gates of a ring spinning machine positioned suspended trolley trains to be considerably shortened.
  • the storage device is designed so that all discharged from the rows of gates of the ring spinning machine suspended trolley trains retract simultaneously into the storage device and then can extend the same number of suspension trolley trains again simultaneously in the direction of the ring spinning machine from the storage device.
  • each case between four and ten rows of gates are arranged in the region of the gate of a ring spinning machine, wherein an arrangement with six rows of gates has proven in modern ring spinning machines to be particularly advantageous.
  • the memory device preferably has a prestorage arrangement which has a plurality of first tracks corresponding to the number of rows of gates of the at least one ring spinning machine and the same number of second tracks.
  • a first track is arranged adjacent to a second track and in each case a first turnout is arranged and formed at the end of the first and second tracks facing the at least one ring spinning machine such that in a first position of the first turnout a suspension carriage train into the first track can retract and in a second position of the first turnout a hanging vehicle train can extend out of the second track.
  • each have a second switch is arranged and designed so that in a first position of the second switch a suspension trolley train can extend from the first track and in a second position of the second switch a suspension trolley train in the second track can retract.
  • the second tracks can be advantageously filled again with suspension trolley trains with full roving bobbins and the suspension trolley trains with empty spun sleeves can be extended from the first tracks.
  • the suspended trolley trains with empty spooled sleeves can be moved to the roving machine or main storage.
  • the switch configuration has a number of straight connecting tracks and a number of crossing tracks intersection tracks and that for connecting the connecting tracks with the intersection tracks each a Vorweiche and in the intersection areas of connecting tracks and intersection tracks each have a bridge crossover is installed.
  • the number of connecting tracks and the number of crossing tracks are the same and preferably correspond to the number of gate rows installed in the gate of the ring spinning machine.
  • the connecting tracks lead to the storage device and the intersection tracks to the gate rows of the ring spinning machine.
  • the advance points each have a branch position and a straight-ahead position.
  • the crossing tracks are preferably connected to the connecting tracks and in the straight-ahead position the connecting tracks are preferably connected to the connecting tracks of a further switch configuration.
  • the bridge switches can preferably be arranged so that either the connecting tracks or the intersection tracks are continuous.
  • the bridge switches may, for example, have a rotatable track element.
  • the advance units are each equipped with their own drive, for example with an electromotive drive, while the numerous bridge switches are connected by a lever linkage and can be actuated by means of a common drive, preferably likewise an electromotive drive.
  • the Fig. 1 shows in side view, the gate of a ring spinning machine 1.
  • the arranged in a spinning ring spinning machine 1, however, is only shown very schematically, that is, of this ring spinning machine 1 is in Fig. 1 only one of the lower rollers of the drafting of the ring spinning machine 1 bearing, so-called punches 13 shown.
  • the gate 2 of the ring spinning machine 1 in the embodiment per spinning machine long side three rows of gates 3, so a total of six rows of gates 3, the are formed by rails 9 of a generally designated by the reference numeral 10 suspension rail system.
  • suspended trolley trains 11 either as in Fig. 1 indicated, with full roving bobbins 12, preferably flyers, are equipped, or have the empty-spun sleeves.
  • the hanging trolley trains 11 are movable in the suspension rail system 10 and are usually, as is known, of flexibly interconnected support members, so that they can also pass through curves.
  • the support members are guided in a conventional manner by means of rollers in the downwardly open, ⁇ -like rails 9 of the suspension rail system 10.
  • suspension trolley trains 11 The drive of such suspension trolley trains 11 is usually done either by hand, by "locomotives" or by friction roller drives.
  • the Fig. 2 shows in plan view arranged in a spinning, inventively designed transport device for supplying ring spinning machines 1 with roving 12 or to dispose of the spinning in the course of the spinning process by the ring spinning machines 1 spun sleeves.
  • the transport device has a suspension rail system 10 on which suspension trolley trains 11 are movably guided.
  • a ring spinning machine block consisting of three ring spinning machines 1, connected via a suspension rail system 10 with two roving 14.
  • the suspension rail system 10 is also equipped with a storage device 16.
  • the memory device 16 has a first one Pre-storage arrangement, at the ends of each of the switches 22 and 23 are arranged.
  • the memory device 16 comprises a second pre-storage arrangement 17.
  • the storage device 16 is also connected via a siding 4 with at least one roving 14, wherein in the embodiment, two roving 14 are shown.
  • the suspension trolley trains 11 are fitted with fresh roving bobbins 12. That is, incoming, equipped with empty-spun sleeves suspension trolley trains 11 are on the roving 14 as soon as possible retrofitted, that is, equipped with fresh roving 12 and then transported via the siding 4 to the storage device 16, where they are initially stored in the second Vor headinganowski 17 , which is conveyed technically connected to the first prestorage arrangement of the memory device 16.
  • the Fig. 3 shows on a larger scale a section of the in the Fig. 2 suspension rail system 10 shown in its entirety.
  • the gates 2 of the ring spinning machines 1 each have a total of six rows of gates 3, each having a switch configuration 15, which will be described below with reference to FIGS. 4 and 5 is explained in more detail, are connected to the suspension rail system 10 of the invention designed transport device.
  • the switch configuration 15 and thus the gate rows 3 are coupled to a memory device 16 which has pre-storage arrangements.
  • the first prestorage device has adjacent tracks 18 and 19, respectively. That means the two tracks 18 and 19 are right next to each other.
  • the number of pairs of tracks 18 and 19 corresponds to the number of rows of gates 3 of a ring spinning machine 1.
  • the first prestay device thus has six track pairs 18 and 19 and thus a total of twelve tracks.
  • the memory device furthermore has a second prestore device 17.
  • the prestore device 17 has the same number of tracks 20 as a ring spinning machine has rows of gates. In the present embodiment, therefore six tracks 20 are present.
  • FIGS. 4 and 5 show in each case different views of an advantageous embodiment of a switch configuration 15th
  • the Fig. 4 shows the turnout configuration 15 in plan view, while the Figure 5 represents a bottom view.
  • such a turnout configuration 15 has in the exemplary embodiment via six so-called connecting tracks 21, which pass through the turnout configuration 15 in a straight line and six so-called crossing tracks 25 which cross the connecting tracks 21 and which each form an extension of one of the rows of gates 3 of a ring spinning machine 1.
  • each of the total of six advance 5 arranged in the region of an incoming connecting track 21 and each controlled by a separate drive 24 can be controlled.
  • switch configurations 15 in the crossing regions connecting tracks 21 / crossing tracks 25 are each equipped with bridge switches 6.
  • the turnout configurations 15 each have a total of fifteen bridge turnouts 6.
  • up to six suspension trolley trains 11 can be discharged from the rows of gates 3 of a ring spinning machine 1 and then retracted up to six suspension trolley trains 11 simultaneously in the rows of gates 3, according to the switching position of the advance 5 and the bridge diverter 6.
  • suspension trolley trains 11, coming from the storage device 16 enter via the connecting tracks 21 in the switch configuration 15, by a corresponding to the switching position of the advance 5 or straight through the switch configuration 15 in the direction of the expiring connecting tracks 21 and thus to a subsequent switch configuration 15 will be forwarded.
  • the advance 5 each have a separate, electromotive drive 24, wherein the drives 24, as the drive 8 for the bridge switches, preferably via a central control device of the spinning, are defined controllable.
  • the numerous bridge switches 6 are also connected via a lever linkage 7 and connected via this lever linkage 7 also to their common drive 8.
  • the arrangement and design of a switch configuration 15 shown in the embodiment has in particular the great advantage that in case of need easily up to six suspension trolley trains 11 simultaneously from the gate rows 3 of a ring spinning machine 1 ausschleusbar and then easily the same number of suspension trolley trains 11 again simultaneously in the gate rows of the ring spinning machine 1 are infiltrated, resulting in a significant reduction in machine downtime, especially in batch changes.
  • the roving bobbins 12 of positioned in the rows of gates 3 of the gate 2 of the ring spinning machine 1 suspension trolley trains 11 are unwound, in order to continue the spinning process, a change of the hanging trolley trains 11 required the change process should take as little time as possible.
  • the selector configuration 15 arranged on the input side of the gate 2 of the middle ring spinning machine 1 is therefore initially switched correctly.
  • the advance 5 are switched by their drives 24 in their branching position and the bridge switches 6 are driven so that they stand with respect to the crossing tracks 25 conveyor technology on passage.
  • the first prestorage arrangement which has a total of 12 tracks 18, 19, is equipped in its end areas with switches 22 and 23, respectively.
  • a suspension trolley train 11 which is equipped with fresh roving bobbins 12, is temporarily stored on the tracks 19 of the first prestressing arrangement.
  • the incoming hanging trolley trains 11 loaded with empty spooled sleeves 11 are controlled by the switches 22 so as to run on the empty tracks 18 of the first pre-storage arrangement where they are temporarily stored.
  • the six suspension trolley trains 11 equipped with fresh roving bobbins then travel out of the first pre-storage arrangement and pass via the connecting tracks 21 to the switch configuration 15, which still identifies the switch position which had been set for the removal of the hanging trolley trains 11 equipped with empty-spun sleeves.
  • the hanging trolley trains 11 are then re-stocked with fresh roving bobbins 12.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Textile Engineering (AREA)
  • Spinning Or Twisting Of Yarns (AREA)

Abstract

Die Erfindung betrifft eine Transportvorrichtung für eine Spinnerei zum Versorgen von Ringspinnmaschinen (1) mit Vorgarnspule (12) und Entsorgen der leergesponnenen Hülsen mit einem Hängeschienensystem (10), das zwischen mindestens einer Vorspinnmaschine (14) und einer Ringspinnmaschine (1) angeordnet und mit einer Speichereinrichtung (16) ausgestattet ist, die ein Zwischenspeichern von Hängewagenzügen (11) ermöglicht, welche entweder mit vollen Vorgarnspule (12) oder mit leergesponnenen Hülsen bestückt sind.Erfindungsgemäß ist vorgesehen, dass im Bereich der Ringspinnmaschine (1) ein Gatter (2) mit einer Vielzahl von Gatterreihen (3) installiert ist, die über eine Weichenkonfiguration (15) so an das Hängeschienensystem (10) angeschlossen sind, dass im Bedarfsfall eine Mehrzahl von Hängewagenzügen (11), die leergesponnene Hülsen aufweisen, gleichzeitig aus den Gatterreihen (3) der Ringspinnmaschine (1) ausfahrbar sind und dass anschließend gleichzeitig die gleiche Anzahl von Hängewagenzügen (11), die mit vollen Vorgarnspule (12) bestückt sind, wieder in die Gatterreihen (3) der Ringspinnmaschine (1) einfahrbar ist.The invention relates to a transport device for a spinning mill for supplying ring spinning machines (1) with roving bobbin (12) and disposing the empty spooled sleeves with a suspension rail system (10) arranged between at least one roving machine (14) and a ring spinning machine (1) and with a Memory device (16) is provided, which allows a buffering of suspension trolley trains (11) which are equipped either with full roving bobbin (12) or with empty-spun sleeves. According to the invention, in the area of the ring spinning machine (1) with a gate (2) a plurality of rows of gates (3) is installed, which are connected via a switch configuration (15) to the suspension rail system (10), that, if necessary, a plurality of suspension trolley trains (11), the empty spooled sleeves, simultaneously from the gate rows (3) the ring spinning machine (1) are extendable and then at the same time the same Anzah l of suspension trolley trains (11), which are equipped with full roving bobbin (12), again in the gate rows (3) of the ring spinning machine (1) is retractable.

Description

Die Erfindung betrifft eine Transportvorrichtung für eine Spinnerei zum Versorgen von Ringspinnmaschinen mit Vorlagespulen und Entsorgen der leergesponnenen Hülsen mit einem Hängeschienensystem, das zwischen mindestens einer Vorspinnmaschine und einer Ringspinnmaschine angeordnet und mit einer Speichereinrichtung ausgestattet ist, die ein Zwischenspeichern von Hängewagenzügen ermöglicht, welche entweder mit vollen Vorlagespulen oder mit leergesponnenen Hülsen bestückt sind.The invention relates to a transport device for a spinning machine for supplying ring spinning machines with supply spools and disposing the empty spooled sleeves with a suspension rail system, which is arranged between at least one roving frame and a ring spinning machine and equipped with a storage device that allows caching of suspension trolley trains, which either full Original bobbins or are equipped with empty-spun sleeves.

Im Zusammenhang mit dem Betrieb von Ringspinnmaschinen sind seit längerem verschiedene Ausführungsformen für Transportvorrichtungen für Vorgarnspulen bekannt. Es ist beispielweise bekannt, zwischen Vorspinnmaschinen und Ringspinnmaschinen ein Netz von Hängeschienen zu installieren, an denen Hängewagenzüge verfahrbar geführt sind, die entweder mit frischen Vorgarnspulen oder mit leergesponnenen Hülsen bestückt sind.In connection with the operation of ring spinning machines, various embodiments of roving bobbins have long been known. It is known, for example, to install between roving machines and ring spinning machines a network of suspension rails on which suspension trolley trains are movably guided, which are equipped either with fresh roving or empty-spooled sleeves.

Derartige Transportvorrichtungen für Vorgarnspulen sind auch in der Patentliteratur in zahlreichen Patentanmeldungen zum Teil recht ausführlich beschrieben.Such roving bobbins are also described in some detail in the patent literature in numerous patent applications.

Durch die DE 42 13 122 A1 ist beispielsweise eine Transportvorrichtung bekannt, bei der ein Block von Vorspinnmaschinen, vorzugsweise so genannte Flyer, über ein Hängeschienensystem an einen Block von Ringspinnmaschinen angeschlossen ist.By the DE 42 13 122 A1 For example, a transport device is known in which a block of roving, preferably so-called flyers, is connected via a suspension rail system to a block of ring spinning machines.

In das Hängeschienensystem, an dem Hängewagenzüge umlaufen, die entweder von Hand, durch "Lokomotiven" oder durch Reibradantriebe bewegt werden und die entweder mit vollen Flyerspulen oder mit leergesponnenen Hülsen bestückt sind, ist eine Reinigungseinrichtung für die leergesponnenen Flyerspulenhülsen sowie ein Zentralpuffer zum Zwischenspeichern von Hängewagenzügen eingeschaltet.In the suspension track system, on the hanging trolley trains that are moved either by hand, by "locomotives" or by Reibradantriebe and equipped with either full flyers or with empty-spooled sleeves, is a cleaning device for the empty-spool roving bobbins and a central buffer for caching suspension trolley trains switched on.

Das Hängeschienensystem weist im Bereich des Gatters der Ringspinnmaschinen jeweils mehrere Gatterreihen auf, die endseitig der Ringspinnmaschinen jeweils über eine Weiche an eine ringförmig angeordnete Schienenbahn des Hängeschienensystems angeschlossen sind.The suspension rail system has in the region of the gate of the ring spinning machines in each case a plurality of gate rows, which are connected at the end of the ring spinning machines in each case via a switch to an annularly arranged rail track of the suspension rail system.

Eine vergleichbare Transportvorrichtung mit einem zwischen Vorspinnmaschinen und Ringspinnmaschinen eingeschalteten Hängeschienensystem ist auch in der DE 195 08 399 C2 beschrieben. Bei dieser bekannten Transportvorrichtung weist das Hängeschienensystem im Bereich der Vorspinnmaschinen jeweils einen Speicher für Hängewagenzüge und im Bereich der Ringspinnmaschinen bis zu vier Gatterreihen auf.A comparable transport device with a switched between roving and ring spinning machines suspension track system is also in the DE 195 08 399 C2 described. In this known transport device, the suspension rail system in Each area of the roving machines has a storage for suspended trolley trains and up to four rows of gates in the area of ring spinning machines.

Auch hier sind die Gatterreihen endseitig der Ringspinnmaschinen jeweils über Weichen an eine ringförmig angeordnete Schienenbahn des Hängeschienensystems angeschlossen.Again, the rows of gates are connected at the ends of the ring spinning machines in each case via switches to an annularly arranged rail track of the suspension rail system.

Des Weiteren sind im Zusammenhang mit Transportvorrichtungen für Vorgarnspulen so genannte Überleitvorrichtungen bekannt. Durch solche Überleitvorrichtungen soll der Aufwand an Weichen, die in den Hängeschienensystemen benötigt werden, vermindert werden.Furthermore, so-called transfer devices are known in connection with transport devices for roving bobbins. By such Überleitvorrichtungen the cost of points that are needed in the suspension rail systems should be reduced.

In der DE 10 2007 014 596 A1 und der DE 10 2007 029 288 A1 sind beispielsweise Transportvorrichtungen für Vorgarnspulen beschrieben, die, wie üblich, zwischen mindestens einer Vorspinnmaschine und mehreren Ringspinnmaschinen angeordnet sind und ein Netz von Hängeschienen aufweisen, an denen Hängewagenzüge verfahrbar geführt sind.In the DE 10 2007 014 596 A1 and the DE 10 2007 029 288 A1 For example, transport devices for roving bobbins are described, which, as usual, are arranged between at least one roving frame and a plurality of ring spinning machines and have a network of suspension rails on which suspension trolley trains are movably guided.

Diese bekannten Transportvorrichtungen weisen mindestens eine Haupt-Hängeschienenbahn sowie mehrere Zweig-Hängeschienenbahnen auf, wobei zwischen der Haupt-Hängeschienenbahn und den Zweig-Hängeschienenbahnen eine Überleitvorrichtung angeordnet ist.These known transport devices have at least one main hanger rail and a plurality of branch suspension rails, wherein a transfer device is arranged between the main suspension rail and the branch suspension railways.

Das heißt, in einem Bereich zwischen einer Haupt-Hängeschienenbahn und einer den Zweig-Hängeschienenbahnen ist eine Überleitvorrichtung installiert, die entlang der Haupt-Hängeschienenbahn verfahrbar ist und zwei verschiebbar gelagerte Schlitten mit Hängeschienen-Abschnitten aufweist.That is, in a region between a main hanger rail and the branch hanger railways, there is installed a transfer device which is movable along the main hanger rail and has two slidably mounted carriages with hanging rail sections.

Die Schlitten sind in der Überleitvorrichtung quer zu ihrer Fahrtrichtung derart verschiebbar, dass ihre Hängeschienen-Abschnitte mit der Haupt-Hängeschienenbahn sowie mit einer von mehreren Zweig-Hängeschienenbahnen in Flucht gebracht werden können.The carriages are displaceable in the transfer device transversely to their direction of travel such that their suspension rail sections can be brought into alignment with the main suspension rail track as well as with one of several branch suspension rail tracks.

Über diese Hängeschienenbahn-Verbindung können dann Hängewagenzüge in beiden Richtungen übergeleitet werden. Das bedeutet, mittels derartiger Überleitvorrichtungen können sowohl Hängewagenzüge, die mit vollen Vorgarnspulen bestückt sind, von einer Haupt-Hängeschienenbahn in eine Zweig-Hängeschienenbahn im Gatter einer Ringspinnmaschine eingefahren, als auch nach dem Abarbeiten der Vorgarnspulen wieder aus den Zweig-Hängeschienenbahnen auf die Haupt-Hängeschienenbahn zurückgeführt werden, die mit einer Vorspinnmaschine oder einem Zwischenspeicher verbunden ist.Hanging trolley trains can then be transferred in both directions via this hanger rail connection. This means that by means of such Überleitvorrichtungen both suspension trolley trains, which are equipped with full roving bobbins, retracted from a main hanger rail in a branch-hanger rail in the gate of a ring spinning machine, as well as after working off the roving bobbins from the branch-hanger railways on the main Hängeschienenbahn be returned, which is connected to a roving or a buffer.

Nachteilig bei den vorstehend beschriebenen, bekannten Transportvorrichtungen ist allerdings, dass Hängewagenzüge, die in den Gatterreihen einer Ringspinnmaschine positioniert sind, lediglich einzeln und damit nacheinander ausgetauscht werden können.A disadvantage of the transport devices described above, however, is that suspension trolley trains that are positioned in the gate rows of a ring spinning machine, only individually and thus can be replaced successively.

Das heißt, wenn im Bereich der Gatterreihen einer Ringspinnmaschine mehrere Hängewagenzüge positioniert sind, die alle ausgetauscht werden sollen, gestaltet sich der Wechselvorgang relativ zeitaufwendig, da, bevor ein Hängewagenzug, der mit neuen, vollen Flyerspulen bestückt ist, in eine der Gatterreihen des Gatters einer Ringspinnmaschine einfahren kann, stets zunächst ein Hängewagenzug, der leergesponnene Hülsen aufweist, aus der Gatterreihe herausgefahren werden muss.That is, if several hanging trolley trains are positioned in the gate rows of a ring spinning machine, all to be replaced, the change process is relatively time-consuming, because before a suspension truck train, which is equipped with new, full flyer spool, in one of the gate rows of the gate Retracting ring spinning machine, always first a suspension trolley train, the empty spooled sleeves must be moved out of the gate row.

Bei modernen Ringspinnmaschinen, die eine Vielzahl von Gatterreihen, zum Beispiel vier bis zehn Gatterreihen, aufweisen, gestaltet sich der Wechselvorgang entsprechend relativ langwierig und führt zu nicht unerheblichen Produktionsverlusten.In modern ring spinning machines, which have a plurality of rows of gates, for example, four to ten rows of gates, the change process is correspondingly relatively lengthy and leads to not inconsiderable production losses.

Insbesondere bei Partiewechseln, bei denen stets alle in den Gatterreihen positionierten Hängewagenzüge getauscht werden müssen, kommt es bislang in der Regel zu erheblichen Produktionseinbußen, da die Ringspinnmaschine während des gesamten Wechselvorganges abgeschaltet ist.In particular, when lot changes in which always positioned in the gate rows suspended trolley trains must always be replaced, it usually comes to a significant loss of production so far, since the ring spinning machine is switched off during the entire change process.

Ausgehend vom vorstehend beschriebenen Stand der Technik, liegt der Erfindung die Aufgabe zugrunde, eine Transportvorrichtung für eine Spinnerei, die der Versorgung von Ringspinnmaschinen mit Vorlagespulen und der Entsorgung von leergesponnenen Hülsen dient und ein zwischen mindestens einer Vorspinnmaschine und einer Ringspinnmaschine angeordnetes Hängeschienensystem mit einer Speichereinrichtung aufweist, zu entwickeln, mit dem Hängewagenzüge, insbesondere auch bei Partiewechseln, extrem schnell und damit sehr effektiv ausgetauscht werden können.Starting from the above-described prior art, the invention has the object, a transport device for a spinning, which serves the supply of ring spinning machines with supply bobbins and the disposal of empty-spooled sleeves and arranged between at least one roving frame and a ring spinning machine suspended track system having a memory device To develop, with the suspension trolley trains, especially in lot changes, extremely fast and thus can be exchanged very effectively.

Diese Aufgabe wird erfindungsgemäß dadurch gelöst, dass im Bereich der Ringspinnmaschine ein Gatter mit einer Vielzahl von Gatterreihen installiert ist, die über eine Weichenkonfiguration so an das Hängeschienensystem angeschlossen sind, dass im Bedarfsfall eine Mehrzahl von Hängewagenzügen, die leergesponnene Hülsen aufweisen, gleichzeitig aus den Gatterreihen der Ringspinnmaschine ausfahrbar sind und dass anschließend die gleiche Anzahl von Hängewagenzügen, die mit vollen Vorlagespulen bestückt sind, wieder gleichzeitig in die Gatterreihen der Ringspinnmaschine einfahrbar ist.This object is achieved in that in the field of ring spinning a gate with a plurality of gate rows is installed, which are connected via a switch configuration to the suspension rail system that, if necessary, a plurality of suspension trolley trains, the empty spooled sleeves, simultaneously from the gate rows the ring spinning machine are extendable and that subsequently the same number of suspension trolley trains that are equipped with full supply bobbins, again at the same time in the gate rows of the ring spinning machine is retracted.

Vorteilhafte Ausführungsformen der Erfindung sind Gegenstand der Unteransprüche.Advantageous embodiments of the invention are the subject of the dependent claims.

Die erfindungsgemäße Transportvorrichtung hat insbesondere den Vorteil, dass durch das gleichzeitige Ausfahren einer Mehrzahl von Hängewagenzügen, die mit leergesponnenen Hülsen bestückt sind und das anschließend gleichzeitige Einfahren der gleichen Anzahl von Hängewagenzügen, die frische Vorlagespulen aufweisen, die Zeitspanne, die bislang benötigt wurde, um mehrere in den Gatterreihen einer Ringspinnmaschine positionierte Hängewagenzüge auszutauschen, erheblich verkürzt wird.The transport device according to the invention has the particular advantage that by the simultaneous extension of a plurality of suspension trolley trains, which are equipped with empty-spun sleeves and the subsequent simultaneous retraction of the same number of suspension trolley trains, the fresh feed bobbins, the time that has been required to several in the rows of gates of a ring spinning machine positioned suspended trolley trains to be considerably shortened.

Da somit auch die Zeitspanne, während der die Ringspinnmaschine abgeschaltet ist, verkürzt wird, wird mit der erfindungsgemäßen Transportvorrichtung folglich auch die Produktivität der Ringspinnmaschinen, insbesondere auch, wenn öfters Partiewechsel anstehen, deutlich verbessert.Thus, since the time span during which the ring spinning machine is switched off, is shortened, with the transport device according to the invention consequently also the productivity of the ring spinning machines, especially if there are often batch changes, significantly improved.

In vorteilhafter Ausführungsform ist vorgesehen, dass die Speichereinrichtung so gestaltet ist, dass alle aus den Gatterreihen der Ringspinnmaschine ausgeschleusten Hängewagenzüge gleichzeitig in die Speichereinrichtung einfahren und anschließend die gleiche Anzahl von Hängewagenzügen wieder gleichzeitig in Richtung der Ringspinnmaschine aus der Speichereinrichtung ausfahren können.In an advantageous embodiment, it is provided that the storage device is designed so that all discharged from the rows of gates of the ring spinning machine suspended trolley trains retract simultaneously into the storage device and then can extend the same number of suspension trolley trains again simultaneously in the direction of the ring spinning machine from the storage device.

Das bedeutet, bei einem Austausch von Hängewagenzügen werden, obwohl eine Vielzahl von Hängewagenzügen gleichzeitig ausgewechselt werden, sowohl im Bereich der Ringspinnmaschinen, als auch im Bereich der Speichereinrichtung Verzögerungen jedweder Art vermieden.This means that when replacing suspension trolley trains, although a large number of suspension trolley trains are replaced at the same time, delays of any kind are avoided both in the area of the ring spinning machines and in the area of the storage device.

Vorzugsweise sind im Bereich des Gatters einer Ringspinnmaschine jeweils zwischen vier und zehn Gatterreihen angeordnet, wobei sich eine Anordnung mit sechs Gatterreihen bei modernen Ringspinnmaschinen als besonders vorteilhaft erwiesen hat.Preferably, in each case between four and ten rows of gates are arranged in the region of the gate of a ring spinning machine, wherein an arrangement with six rows of gates has proven in modern ring spinning machines to be particularly advantageous.

Durch die Anordnung von sechs Gatterreihen, das heißt, von je drei Gatterreihen pro Spinnmaschinenlängsseite, ist nicht nur auf einfache Weise eine ordnungsgemäße Versorgung der zahlreichen Spinnstellen der Ringspinnmaschine mit Vorgarn gewährleistet, sondern es ist auch sichergestellt, dass im Bedarfsfall problemlos und schnell Hängewagenzüge, die leergesponnene Hülsen aufweisen, gegen Hängewagen, die mit frischen Vorgarnspulen bestückt sind, getauscht werden können.Due to the arrangement of six rows of gates, that is, of three rows of gates per spinning machine longitudinal side, not only a simple way a proper supply of the numerous spinning stations of the ring spinning machine with roving is ensured, but it is also ensured that in case of need easily and quickly hanging trolley trains, the have spun sleeves, can be exchanged for hanging trolleys that are equipped with fresh roving bobbins.

Die Speichereinrichtung weist vorzugsweise eine Vorspeicheranordnung auf, die eine Mehrzahl von ersten Gleisen entsprechend der Anzahl von Gatterreihen der mindestens einen Ringspinnmaschine und die gleiche Anzahl von zweiten Gleisen aufweist. Vorzugsweise ist jeweils ein erstes Gleis benachbart zu einem zweiten Gleis angeordnet und jeweils eine erste Weiche ist an dem der mindestens einen Ringspinnmaschine zugewandten Ende der ersten und zweiten Gleise so angeordnet und ausgebildet, dass in einer ersten Stellung der ersten Weiche ein Hängewagenzug in das erste Gleis einfahren kann und in einer zweiten Stellung der ersten Weiche ein Hängewagenzug aus dem zweiten Gleis ausfahren kann. So können unmittelbar nach Einfahren von Hängewagenzügen mit leergesponnen Hülsen in die ersten Gleise, in den zweiten Gleisen zwischengespeicherte Hängewagenzüge mit vollen Vorgarnspulen in Richtung der Ringspinnmaschinen ausgefahren werden. So kann ein Partiewechsel an einer Ringspinnmaschine schnell durchgeführt werden.The memory device preferably has a prestorage arrangement which has a plurality of first tracks corresponding to the number of rows of gates of the at least one ring spinning machine and the same number of second tracks. Preferably, in each case a first track is arranged adjacent to a second track and in each case a first turnout is arranged and formed at the end of the first and second tracks facing the at least one ring spinning machine such that in a first position of the first turnout a suspension carriage train into the first track can retract and in a second position of the first turnout a hanging vehicle train can extend out of the second track. Thus, immediately after retracting suspension trolley trains with empty spun sleeves in the first tracks, suspended in the second track suspension trolley trains can be extended with full roving in the direction of the ring spinning machines. So a lot change on a ring spinning machine can be done quickly.

Vorzugsweise ist an dem anderen Ende der ersten und zweiten Gleise jeweils eine zweite Weiche so angeordnet und ausgebildet, dass in einer ersten Stellung der zweiten Weiche ein Hängewagenzug aus dem ersten Gleis ausfahren kann und in einer zweiten Stellung der zweiten Weiche ein Hängewagenzug in das zweite Gleis einfahren kann. Auf diese Weise können die zweiten Gleise vorteilhaft wieder mit Hängewagenzügen mit vollen Vorgarnspulen aufgefüllt werden und die Hängewagenzüge mit leergesponnenen Hülsen können aus den ersten Gleisen ausgefahren werden. Die Hängewagenzüge mit den leergesponnenen Hülsen können zu der Vorspinnmaschine oder einem Hauptspeicher gefahren werden.Preferably, at the other end of the first and second tracks each have a second switch is arranged and designed so that in a first position of the second switch a suspension trolley train can extend from the first track and in a second position of the second switch a suspension trolley train in the second track can retract. In this way, the second tracks can be advantageously filled again with suspension trolley trains with full roving bobbins and the suspension trolley trains with empty spun sleeves can be extended from the first tracks. The suspended trolley trains with empty spooled sleeves can be moved to the roving machine or main storage.

Es ist jedoch besonders, wenn die die Speichereinrichtung zwischen der Vorspeicheranordnung und der mindestens einen Vorspinnmaschine eine weitere Vorspeicheranordnung umfasst, die über die gleiche Anzahl an Gleisen verfügt wie die mindestens eine Ringspinnmaschine Gatterreihen aufweist. So können zwei Partiewechsel unmittelbar hintereinander durchgeführt werden.However, it is particularly when the storage device between the Vorspeicheranordnung and at least one roving frame comprises a further Vorspeicheranordnung having the same number of tracks as the at least one ring spinning machine has rows of gates. So two game changes can be carried out immediately after each other.

In weiterer vorteilhafter Ausführungsform ist vorgesehen, dass die Weichenkonfiguration eine Anzahl von geradlinigen Verbindungsgleisen sowie eine Anzahl die Verbindungsgleise querende Kreuzungsgleise aufweist und dass zur Verbindung der Verbindungsgleise mit den Kreuzungsgleisen jeweils eine Vorweiche und in den Kreuzungsbereichen von Verbindungsgleisen und Kreuzungsgleisen jeweils eine Brückenweiche installiert ist.In a further advantageous embodiment, it is provided that the switch configuration has a number of straight connecting tracks and a number of crossing tracks intersection tracks and that for connecting the connecting tracks with the intersection tracks each a Vorweiche and in the intersection areas of connecting tracks and intersection tracks each have a bridge crossover is installed.

Die Anzahl der Verbindungsgleise und die Anzahl der Kreuzungsgleise sind dabei gleich und entsprechen vorzugsweise der Anzahl der im Gatter der Ringspinnmaschine installierten Gatterreihen.The number of connecting tracks and the number of crossing tracks are the same and preferably correspond to the number of gate rows installed in the gate of the ring spinning machine.

Gemäß einer Weiterbildung der Erfindung führen die Verbindungsgleise zu der Speichereinrichtung und die Kreuzungsgleise zu den Gatterreihen der Ringspinnmaschine.According to one embodiment of the invention, the connecting tracks lead to the storage device and the intersection tracks to the gate rows of the ring spinning machine.

Vorzugsweise weisen die Vorweichen jeweils eine Abzweigstellung sowie eine Geradeausstellung auf. In der Abzweigstellung sind die Kreuzungsgleise vorzugsweise mit den Verbindungsgleisen verbunden und in der Geradeausstellung sind die Verbindungsgleise vorzugsweise mit den Verbindungsgleisen einer weiteren Weichenkonfiguration verbunden sind.Preferably, the advance points each have a branch position and a straight-ahead position. In the branch position, the crossing tracks are preferably connected to the connecting tracks and in the straight-ahead position the connecting tracks are preferably connected to the connecting tracks of a further switch configuration.

Die Brückenweichen können vorzugsweise so angeordnet werden, dass entweder die Verbindungsgleise oder die Kreuzungsgleise durchgängig sind. Dazu können die Brückenweichen zum Beispiel ein drehbares Gleiselement aufweisen.The bridge switches can preferably be arranged so that either the connecting tracks or the intersection tracks are continuous. For this purpose, the bridge switches may, for example, have a rotatable track element.

Des Weiteren sind die Vorweichen jeweils mit einem eigenen Antrieb, beispielsweise mit einem elektromotorischen Antrieb, ausgestattet, während die zahlreichen Brückenweichen durch ein Hebelgestänge verbunden und mittels eines gemeinsamen Antriebes, vorzugsweise ebenfalls eines elektromotorischen Antriebes, betätigbar sind.Furthermore, the advance units are each equipped with their own drive, for example with an electromotive drive, while the numerous bridge switches are connected by a lever linkage and can be actuated by means of a common drive, preferably likewise an electromotive drive.

Da sowohl die Antriebe der Vorweichen, als auch der Antrieb der Brückenweichen an eine Zentralsteuereinheit der Spinnerei angeschlossen sind, ist im Bedarfsfall jederzeit eine definierte Ansteuerung der Weichenkonfiguration gewährleistet.Since both the drives of the advance, and the drive of the bridge turnouts are connected to a central control unit of the spinning, if necessary, a defined control of the switch configuration is ensured at any time.

Das bedeutet, derartig ausgebildete Weichenkonfigurationen ermöglichen auf relativ einfache Weise eine gleichzeitige definierte Führung einer Vielzahl von Hängewagenzügen, so dass bei Bedarf gleichzeitig und sicher sowohl eine Mehrzahl von Hängewagenzügen aus den Gatterreihen einer Ringspinnmaschine ausgeschleust, als auch anschließend gleichzeitig eine gleiche Anzahl von Hängewagenzügen wieder in die Gatterreihen einer Ringspinnmaschine eingeschleust werden können.This means that such trained turnouts allow in a relatively simple manner, a simultaneous defined leadership of a variety of suspension trolley trains, so if necessary simultaneously and safely ejected both a plurality of suspension trolley trains from the gate rows of a ring spinning machine, and then at the same time an equal number of suspension trolley trains back in the gate rows of a ring spinning machine can be introduced.

Die Erfindung wird nachfolgend anhand von in den Zeichnungen dargestellten Ausführungsbeispielen näher erläutert.The invention will be explained in more detail with reference to embodiments shown in the drawings.

Es zeigt:

Fig. 1
in Seitenansicht das Gatter einer Ringspinnmaschine, wobei das Gatter pro Spinnmaschinenlängsseite drei, also insgesamt sechs Gatterreihen aufweist, und bezüglich der Ringspinnmaschine lediglich eine, der die Unterwalzen der Streckwerke tragenden, so genannten Stanzen dargestellt ist,
Fig. 2
in Draufsicht eine in einer Spinnerei angeordnete, erfindungsgemäß ausgebildete Transportvorrichtung, mit drei Ringspinnmaschinen, die jeweils mit einem Gatter ausgerüstet sind, das eine Vielzahl von Gatterreihen aufweist, wobei die Gatterreihen jeweils über eine Weichenkonfiguration an ein Hängeschienensystem angeschlossen sind, das mit einer Speichereinrichtung ausgestattet ist,
Fig. 3
in einem größeren Maßstab einen Ausschnitt, der in Fig. 2 dargestellten Transportvorrichtung,
Fig. 4
eine Draufsicht auf eine eingangsseitig der Gatterreihen einer Ringspinnmaschine installierten Weichenkonfiguration,
Fig. 5
die in Fig. 4 dargestellte Weichenkonfiguration in Unteransicht, wobei die Weichenkonfiguration so gestaltet ist, dass aus den Gatterreihen der Ringspinnmaschinen gleichzeitig bis zu sechs Hängewagenzüge ausfahren und in Richtung der Speichereinrichtung geleitet werden können sowie anschließend gleichzeitig die gleiche Anzahl Hängewagenzüge, die von der Speichereinrichtung kommen, in Richtung der Gatterreihen der Ringspinnmaschinen gefahren werden können.
It shows:
Fig. 1
in side view, the gate of a ring spinning machine, the gate per Spinnmaschinenlängsseite three, that is a total of six rows of gates, and with respect to the ring spinning machine only one of the lower rollers of the drafting systems bearing, so-called punching is shown
Fig. 2
in plan view arranged in a spinning, inventively constructed transport device, with three ring spinning machines, each equipped with a gate having a plurality of rows of gates, the rows of gates are each connected via a switch configuration to a suspension rail system, which is equipped with a storage device .
Fig. 3
on a larger scale a section that in Fig. 2 illustrated transport device,
Fig. 4
a plan view of an input side of the gate rows of a ring spinning machine installed turnout configuration,
Fig. 5
in the Fig. 4 illustrated turnout configuration in a bottom view, wherein the turnout configuration is designed so that from the rows of gates of the ring spinning machines simultaneously extend up to six suspension trolley trains and can be directed towards the storage device and then simultaneously the same number of hanging trolley trains that come from the storage device in the direction of the gate rows the ring spinning machines can be driven.

Die Fig. 1 zeigt in Seitenansicht, das Gatter einer Ringspinnmaschine 1. Die in einer Spinnerei angeordnete Ringspinnmaschine 1 ist allerdings lediglich stark schematisch dargestellt, das heißt, von dieser Ringspinnmaschine 1 ist in Fig. 1 nur eine der die Unterwalzen der Streckwerke der Ringspinnmaschine 1 tragenden, so genannten Stanzen 13 dargestellt.The Fig. 1 shows in side view, the gate of a ring spinning machine 1. The arranged in a spinning ring spinning machine 1, however, is only shown very schematically, that is, of this ring spinning machine 1 is in Fig. 1 only one of the lower rollers of the drafting of the ring spinning machine 1 bearing, so-called punches 13 shown.

Wie ersichtlich, weist das Gatter 2 der Ringspinnmaschine 1 im Ausführungsbeispiel je Spinnmaschinenlängsseite drei Gatterreihen 3, also insgesamt sechs Gatterreihen 3 auf, die durch Schienen 9 eines insgesamt mit dem Bezugszeichen 10 gekennzeichneten Hängeschienensystems gebildet werden.As can be seen, the gate 2 of the ring spinning machine 1 in the embodiment per spinning machine long side three rows of gates 3, so a total of six rows of gates 3, the are formed by rails 9 of a generally designated by the reference numeral 10 suspension rail system.

In diesen Schienen 9 des Hängeschienensystems 10 laufen Hängewagenzüge 11, die entweder, wie in Fig. 1 angedeutet, mit vollen Vorgarnspulen 12, vorzugsweise Flyerspulen, bestückt sind, oder die leergesponnenen Hülsen aufweisen.In these rails 9 of the suspension rail system 10 are suspended trolley trains 11, either as in Fig. 1 indicated, with full roving bobbins 12, preferably flyers, are equipped, or have the empty-spun sleeves.

Die Hängewagenzüge 11 sind im Hängeschienensystem 10 verfahrbar und bestehen in der Regel, wie an sich bekannt, aus flexibel miteinander verbundenen Traggliedern, so dass sie auch Kurven durchfahren können.The hanging trolley trains 11 are movable in the suspension rail system 10 and are usually, as is known, of flexibly interconnected support members, so that they can also pass through curves.

Die Tragglieder sind dabei in an sich bekannter Weise mittels Rollen in den nach unten offenen, Ω-ähnlichen Schienen 9 des Hängeschienensystems 10 geführt.The support members are guided in a conventional manner by means of rollers in the downwardly open, Ω-like rails 9 of the suspension rail system 10.

Der Antrieb solcher Hängewagenzüge 11 erfolgt üblicherweise entweder per Hand, durch "Lokomotiven" oder durch Reibrollenantriebe.The drive of such suspension trolley trains 11 is usually done either by hand, by "locomotives" or by friction roller drives.

Die Fig. 2 zeigt in Draufsicht eine in einer Spinnerei angeordnete, erfindungsgemäß ausgebildete Transportvorrichtung zum Versorgen von Ringspinnmaschinen 1 mit Vorgarnspulen 12 bzw. zum Entsorgen der im Zuge des Spinnvorganges durch die Ringspinnmaschinen 1 leergesponnenen Hülsen.The Fig. 2 shows in plan view arranged in a spinning, inventively designed transport device for supplying ring spinning machines 1 with roving 12 or to dispose of the spinning in the course of the spinning process by the ring spinning machines 1 spun sleeves.

Wie vorstehend bereits erläutert, verfügt die Transportvorrichtung über ein Hängeschienensystem 10, an dem Hängewagenzüge 11 verfahrbar geführt sind.As already explained above, the transport device has a suspension rail system 10 on which suspension trolley trains 11 are movably guided.

Wie des Weiteren ersichtlich, ist beim Ausführungsbeispiel ein Ringspinnmaschinenblock, bestehend aus drei Ringspinnmaschinen 1, über ein Hängeschienensystem 10 mit zwei Vorspinnmaschinen 14 verbunden.As further shown, in the embodiment, a ring spinning machine block consisting of three ring spinning machines 1, connected via a suspension rail system 10 with two roving 14.

Im Bereich der Gatter 2 der drei Ringspinnmaschinen 1 sind jeweils insgesamt sechs Gatterreihen 3 installiert, die jeweils über eine Weichenkonfiguration 15 mit dem Hängeschienensystem 10 verbunden sind.In the area of the gates 2 of the three ring spinning machines 1 a total of six rows of gates 3 are installed, which are each connected via a switch configuration 15 with the suspension rail system 10.

Wie in Fig. 2 weiter angedeutet, ist das Hängeschienensystem 10 außerdem mit einer Speichereinrichtung 16 ausgestattet. Die Speichereinrichtung 16 weist eine erste Vorspeicheranordnung auf, an deren Enden jeweils die Weichen 22 und 23 angeordnet sind. Außerdem umfasst die Speichereinrichtung 16 eine zweite Vorspeicheranordnung 17.As in Fig. 2 further indicated, the suspension rail system 10 is also equipped with a storage device 16. The memory device 16 has a first one Pre-storage arrangement, at the ends of each of the switches 22 and 23 are arranged. In addition, the memory device 16 comprises a second pre-storage arrangement 17.

Die Speichereinrichtung 16 ist außerdem über ein Anschlussgleis 4 mit wenigstens einer Vorspinnmaschine 14 verbunden, wobei im Ausführungsbeispiel zwei Vorspinnmaschinen 14 dargestellt sind.The storage device 16 is also connected via a siding 4 with at least one roving 14, wherein in the embodiment, two roving 14 are shown.

In der Vorspinnmaschine 14 werden die Hängewagenzüge 11 mit frischen Vorgarnspulen 12 bestückt. Das heißt, einlaufende, mit leergesponnenen Hülsen bestückte Hängewagenzüge 11 werden an der Vorspinnmaschine 14 sobald wie möglich umgerüstet, das heißt, mit frischen Vorgarnspulen 12 ausgestattet und anschließend über das Anschlussgleis 4 zur Speichereinrichtung 16 transportiert, wo sie zunächst in der zweiten Vorspeicheranordnung 17 zwischengespeichert werden, die fördertechnisch mit der ersten Vorspeicheranordnung der Speichereinrichtung 16 verbunden ist.In the roving 14, the suspension trolley trains 11 are fitted with fresh roving bobbins 12. That is, incoming, equipped with empty-spun sleeves suspension trolley trains 11 are on the roving 14 as soon as possible retrofitted, that is, equipped with fresh roving 12 and then transported via the siding 4 to the storage device 16, where they are initially stored in the second Vorspeicheranordnung 17 , which is conveyed technically connected to the first prestorage arrangement of the memory device 16.

Die Fig. 3 zeigt in einem größeren Maßstab einen Ausschnitt des in der Fig. 2 in seiner Gesamtheit dargestellten Hängeschienensystems 10.The Fig. 3 shows on a larger scale a section of the in the Fig. 2 suspension rail system 10 shown in its entirety.

Wie ersichtlich, weisen die Gatter 2 der Ringspinnmaschinen 1 jeweils insgesamt sechs Gatterreihen 3 auf, die jeweils über eine Weichenkonfiguration 15, die nachfolgend anhand der Figuren 4 und 5 näher erläutert wird, an das Hängeschienensystem 10 der erfindungsgemäß ausgebildeten Transportvorrichtung angeschlossen sind.As can be seen, the gates 2 of the ring spinning machines 1 each have a total of six rows of gates 3, each having a switch configuration 15, which will be described below with reference to FIG FIGS. 4 and 5 is explained in more detail, are connected to the suspension rail system 10 of the invention designed transport device.

Die Weichenkonfiguration 15 und damit die Gatterreihen 3 sind an eine Speichereinrichtung 16 gekoppelt, die über Vorspeicheranordnungen verfügt.
Die erste Vorspeichereinrichtung weist jeweils benachbarte Gleise 18 und 19 auf. Das heißt die beiden Gleise 18 und 19 liegen direkt nebeneinander. Die Anzahl der Gleispaare 18 und 19 entspricht der Anzahl der Gatterreihen 3 einer Ringspinnmaschine 1. Im vorliegenden Ausführungsbeispiel weist die erste Vorspeichereinrichtung also sechs Gleispaare 18 und 19 auf und damit insgesamt zwölf Gleise.
Die Speichereinrichtung verfügt des Weiteren über eine zweite Vorspeichereinrichtung 17. Die Vorspeichereinrichtung 17 verfügt über die gleiche Anzahl an Gleisen 20 wie eine Ringspinnmaschine Gatterreihen aufweist. Im vorliegenden Ausführungsbeispiel sind also sechs Gleise 20 vorhanden.
The switch configuration 15 and thus the gate rows 3 are coupled to a memory device 16 which has pre-storage arrangements.
The first prestorage device has adjacent tracks 18 and 19, respectively. That means the two tracks 18 and 19 are right next to each other. The number of pairs of tracks 18 and 19 corresponds to the number of rows of gates 3 of a ring spinning machine 1. In the present embodiment, the first prestay device thus has six track pairs 18 and 19 and thus a total of twelve tracks.
The memory device furthermore has a second prestore device 17. The prestore device 17 has the same number of tracks 20 as a ring spinning machine has rows of gates. In the present embodiment, therefore six tracks 20 are present.

Die Figuren 4 und 5 zeigen dabei jeweils unterschiedliche Ansichten einer vorteilhaften Ausführungsform einer Weichenkonfiguration 15.The FIGS. 4 and 5 show in each case different views of an advantageous embodiment of a switch configuration 15th

Die Fig. 4 zeigt dabei die Weichenkonfiguration 15 in Draufsicht, während die Fig.5 eine Unteransicht darstellt.The Fig. 4 shows the turnout configuration 15 in plan view, while the Figure 5 represents a bottom view.

Wie insbesondere aus Fig. 5 ersichtlich, verfügt eine solche Weichenkonfiguration 15 im Ausführungsbeispiel über sechs so genannte Verbindungsgleise 21, die die Weichenkonfiguration 15 geradlinig durchlaufen sowie über sechs so genannte Kreuzungsgleise 25, die die Verbindungsgleise 21 queren und die jeweils eine Verlängerung einer der Gatterreihen 3 einer Ringspinnmaschine 1 bilden.As in particular from Fig. 5 can be seen such a turnout configuration 15 has in the exemplary embodiment via six so-called connecting tracks 21, which pass through the turnout configuration 15 in a straight line and six so-called crossing tracks 25 which cross the connecting tracks 21 and which each form an extension of one of the rows of gates 3 of a ring spinning machine 1.

In Förderrichtung F sind eingangsseitig der Weichenkonfigurationen 15 jeweils Vorweichen 5 installiert, wobei jede der insgesamt sechs Vorweichen 5 im Bereich eines einlaufenden Verbindungsgleises 21 angeordnet und jeweils durch einen separaten Antriebes 24 definiert ansteuerbar ist.In the conveying direction F are on the input side of the switch configurations 15 each pre-5 installed, each of the total of six advance 5 arranged in the region of an incoming connecting track 21 and each controlled by a separate drive 24 can be controlled.

Des Weiteren sind derartige Weichenkonfigurationen 15 in den Kreuzungsbereichen Verbindungsgleise 21/ Kreuzungsgleise 25 jeweils mit Brückenweichen 6 ausgestattet.Furthermore, such switch configurations 15 in the crossing regions connecting tracks 21 / crossing tracks 25 are each equipped with bridge switches 6.

Beim vorliegenden Ausführungsbeispiel weisen die Weichenkonfigurationen 15 jeweils insgesamt fünfzehn Brückenweichen 6 auf.In the present embodiment, the turnout configurations 15 each have a total of fifteen bridge turnouts 6.

Wie dargestellt, können bei Bedarf, entsprechend der Schaltstellung der Vorweichen 5 und der Brückenweichen 6, gleichzeitig bis zu sechs Hängewagenzüge 11 aus den Gatterreihen 3 einer Ringspinnmaschine 1 ausgeschleust und anschließend bis zu sechs Hängewagenzüge 11 wieder gleichzeitig in die Gatterreihen 3 eingefahren werden.As shown, at the same time up to six suspension trolley trains 11 can be discharged from the rows of gates 3 of a ring spinning machine 1 and then retracted up to six suspension trolley trains 11 simultaneously in the rows of gates 3, according to the switching position of the advance 5 and the bridge diverter 6.

Allerdings können Hängewagenzüge 11, die von der Speichereinrichtung 16 kommend, über die Verbindungsgleise 21 in die Weichenkonfiguration 15 einlaufen, durch eine entsprechend der Schaltstellung der Vorweichen 5 auch oder geradeaus durch die Weichenkonfiguration 15 hindurch in Richtung der auslaufenden Verbindungsgleise 21 und damit zu einer nachfolgenden Weichenkonfiguration 15 weitergeleitet werden.However, suspension trolley trains 11, coming from the storage device 16, enter via the connecting tracks 21 in the switch configuration 15, by a corresponding to the switching position of the advance 5 or straight through the switch configuration 15 in the direction of the expiring connecting tracks 21 and thus to a subsequent switch configuration 15 will be forwarded.

Wie aus Fig. 4 ersichtlich, weisen die Vorweichen 5 jeweils einen separaten, elektromotorischen Antrieb 24 auf, wobei die Antriebe 24, wie der Antrieb 8 für die Brückenweichen, vorzugsweise über eine Zentralsteuereinrichtung der Spinnerei, definiert ansteuerbar sind.How out Fig. 4 can be seen, the advance 5 each have a separate, electromotive drive 24, wherein the drives 24, as the drive 8 for the bridge switches, preferably via a central control device of the spinning, are defined controllable.

Die zahlreichen Brückenweichen 6 sind außerdem über ein Hebelgestänge 7 verbunden und über dieses Hebelgestänge 7 auch an ihren gemeinsamen Antrieb 8 angeschlossen.The numerous bridge switches 6 are also connected via a lever linkage 7 and connected via this lever linkage 7 also to their common drive 8.

Die im Ausführungsbeispiel dargestellte Anordnung und Ausbildung einer Weichenkonfiguration 15 hat insbesondere den großen Vorteil, dass im Bedarfsfall problemlos bis zu sechs Hängewagenzüge 11 gleichzeitig aus den Gatterreihen 3 einer Ringspinnmaschine 1 ausschleusbar und anschließend problemlos die gleiche Anzahl von Hängewagenzüge 11 wieder gleichzeitig in die Gatterreihen der Ringspinnmaschine 1 einschleusbar sind, was speziell bei Partiewechseln zu einer starken Verkürzung der Maschinenausfallzeiten führt.The arrangement and design of a switch configuration 15 shown in the embodiment has in particular the great advantage that in case of need easily up to six suspension trolley trains 11 simultaneously from the gate rows 3 of a ring spinning machine 1 ausschleusbar and then easily the same number of suspension trolley trains 11 again simultaneously in the gate rows of the ring spinning machine 1 are infiltrated, resulting in a significant reduction in machine downtime, especially in batch changes.

Funktion der erfindungsgemäßen Transportvorrichtung:Function of the transport device according to the invention:

Wenn an einer der Ringspinnmaschinen 1, beispielsweise an der mittleren Ringspinnmaschine, die Vorgarnspulen 12 der in den Gatterreihen 3 des Gatters 2 der Ringspinnmaschine 1 positionierten Hängewagenzüge 11 abgewickelt sind, ist, um den Spinnprozess fortsetzen zu können, ein Wechsel der Hängewagenzüge 11 erforderlich, wobei der Wechselvorgang möglichst wenig Zeit beanspruchen sollte.If at one of the ring spinning machines 1, for example, at the middle ring spinning machine, the roving bobbins 12 of positioned in the rows of gates 3 of the gate 2 of the ring spinning machine 1 suspension trolley trains 11 are unwound, in order to continue the spinning process, a change of the hanging trolley trains 11 required the change process should take as little time as possible.

Das bedeutet, die sechs in den Gatterreihen 3 der mittleren Ringspinnmaschine 1 positionierten, jetzt leergesponnene Hülsen aufweisende Hängewagenzüge 11 müssen schnellstmöglich gegen sechs Hängewagenzüge 11 getauscht werden, die mit frischen Vorgarnspulen 12 bestückt sind.This means that the six positioned in the gate rows 3 of the middle ring spinning machine 1, now empty spun sleeves hanger trolley trains 11 must be swapped as quickly as possible against six suspension trolley trains 11, which are equipped with fresh roving 12.

Um die sechs mit leergesponnenen Hülsen bestückten Hängewagenzüge 11 gleichzeitig aus den Gatterreihen 3 der Ringspinnmaschine 1 ausschleusen zu können, wird deshalb zunächst die eingangsseitig des Gatters 2 der mittleren Ringspinnmaschine 1 angeordnete Weichenkonfiguration 15 ordnungsgemäß geschaltet.In order to be able to simultaneously eject the six hanging trolley trains 11 equipped with empty-spun sleeves from the rows of gates 3 of the ring spinning machine 1, the selector configuration 15 arranged on the input side of the gate 2 of the middle ring spinning machine 1 is therefore initially switched correctly.

Das heißt, die Vorweichen 5 und die Brückenweichen 6 der betreffenden Weichenkonfiguration 15 werden so geschaltet, dass jede der Gatterreihen 3 fördertechnisch durchgängig an eines der Verbindungsgleise 21 des Hängeschienensystems 10 angeschlossen ist, die die Weichenkonfiguration 15 geradlinig durchlaufen.That is, the advances 5 and the bridge switches 6 of the relevant switch configuration 15 are switched so that each of the rows of gates 3 conveyor technology is continuously connected to one of the connecting tracks 21 of the suspension rail system 10, which pass through the turnout configuration 15 in a straight line.

Zu diesem Zweck werden die Vorweichen 5 durch ihre Antriebe 24 in ihre Abzweigstellung geschaltet und die Brückenweichen 6 so angesteuert, dass sie bezüglich der Kreuzungsgleise 25 fördertechnisch auf Durchgang stehen.For this purpose, the advance 5 are switched by their drives 24 in their branching position and the bridge switches 6 are driven so that they stand with respect to the crossing tracks 25 conveyor technology on passage.

Das bedeutet, die über ein Hebelgestänge 7 an einen gemeinsamen Antrieb 8 angeschlossenen Brückenweichen 6 werden, zum Beispiel durch die Zentralsteuereinrichtung der Spinnerei, so geschaltet, dass alle Hängewagenzüge 11 die jeweils zwischenliegenden Verbindungsgleise 21 queren und schließlich über die zugehörige Vorweiche 5 in das angeschlossene Verbindungsgleis 21 einlaufen können.This means that connected via a lever linkage 7 to a common drive 8 bridge diverter 6, for example, by the central control device of the spinning, switched so that all suspension trolley trains 11 cross the respective intermediate connecting tracks 21 and finally on the associated sub-feeder 5 in the connected connecting track 21 can enter.

Über die angeschlossenen Verbindungsgleise 21 laufen dann alle Hängewagenzüge 11 in Richtung der Speichereinrichtung 16 weiter, wobei, wie ersichtlich, die Verbindungsgleise 21 jeweils an die Weichen 22 der ersten Vorspeichereinrichtung angeschlossen sind.Via the connected connecting tracks 21 then all suspension trolley trains 11 continue in the direction of the memory device 16, wherein, as can be seen, the connecting tracks 21 are respectively connected to the switches 22 of the first prestorage device.

Die erste Vorspeicheranordnung die insgesamt über 12 Gleise 18, 19 verfügt, ist in ihren Endbereichen mit Weichen 22 bzw. 23 ausgestattet.The first prestorage arrangement, which has a total of 12 tracks 18, 19, is equipped in its end areas with switches 22 and 23, respectively.

In der Praxis ist auf den Gleisen 19 der ersten Vorspeicheranordnung jeweils ein Hängewagenzug 11 zwischengespeichert, der mit frischen Vorgarnspulen 12 bestückt ist.In practice, a suspension trolley train 11, which is equipped with fresh roving bobbins 12, is temporarily stored on the tracks 19 of the first prestressing arrangement.

Das bedeutet, die einlaufenden, mit leergesponnenen Hülsen bestückten Hängewagenzüge 11 werden durch die Weichen 22 so gesteuert, dass sie auf die leeren Gleise 18 der ersten Vorspeicheranordnung laufen, wo sie zwischengespeichert werden.That is, the incoming hanging trolley trains 11 loaded with empty spooled sleeves 11 are controlled by the switches 22 so as to run on the empty tracks 18 of the first pre-storage arrangement where they are temporarily stored.

Anschließend fahren die sechs mit frischen Vorgarnspulen bestückten Hängewagenzüge 11 aus der ersten Vorspeicheranordnung aus und gelangen über die Verbindungsgleise 21 zur Weichenkonfiguration 15, die nach wie vor die Schaltstellung ausweist, die zum Ausschleusen der mit leergesponnenen Hülsen bestückten Hängewagenzüge 11 eingestellt worden war.The six suspension trolley trains 11 equipped with fresh roving bobbins then travel out of the first pre-storage arrangement and pass via the connecting tracks 21 to the switch configuration 15, which still identifies the switch position which had been set for the removal of the hanging trolley trains 11 equipped with empty-spun sleeves.

Das bedeutet, die sechs mit frischen Vorgarnspulen bestückten Hängewagenzüge 11 werden in Richtung der Gatterreihen 3 abgelenkt und können gleichzeitig in die Gatterreihen 3 der Ringspinnmaschine 1 einlaufen.This means that the six suspension trolley trains 11 equipped with fresh roving bobbins are deflected in the direction of the rows of gates 3 and can simultaneously run into the rows of gates 3 of the ring spinning machine 1.

Nach dem ordnungsgemäßen Positionieren der Hängewagenzüge 11 kann an der Ringspinnmaschine 1 sofort wieder mit dem Anspinnprozess gestartet werden.After the proper positioning of the suspension trolley trains 11 can be started again on the ring spinning machine 1 with the piecing process.

Im Anschluss werden aus der zweiten Vorspeicheranordnung 17 Hängewagenzüge 11, die an der Vorspinnmaschine 14 mit frischen Vorgarnspulen 12 bestückt worden sind, in die erste Vorspeicheranordnung überführt. Dazu werden die Weichen 23 so eingestellt, dass die Hängewagenzüge 11 mit frischen Vorgarnspulen von den Gleisen 20 in die freien Gleise 19 der ersten Vorspeichereinrichtung fahren. Außerdem werden die bislang auf den Gleisen 18 der ersten Vorspeicheranordnungen zwischengespeicherten, mit leergesponnenen Hülsen bestückten Hängewagenzüge 11 durch entsprechende Verstellung der Weichen 23 auf die Gleise 20 der zweiten Vorspeicheranordnung 17 überführt, von wo aus die Hängewagenzüge 11 später, das heißt, sobald dies möglich ist, über das Verbindungsgleis 4 zur Vorspinnmaschine 14 geschickt werden.Following are from the second Vorspeicheranordnung 17 suspension trolley trains 11, which have been fitted to the roving 14 with fresh roving bobbin 12, transferred to the first Vorspeicheranordnung. For this purpose, the switches 23 are adjusted so that the suspension trolley trains 11 drive with fresh roving from the tracks 20 in the free tracks 19 of the first pre-storage device. In addition, the previously cached on the tracks 18 of the first Vorspeicheranordnungen, equipped with empty-spun sleeves hanging trolley trains 11 are transferred by appropriate adjustment of the switches 23 on the tracks 20 of the second Vorspeicheranordnung 17, from where the suspension trolley trains 11 later, that is, as soon as possible are sent over the connecting track 4 to the roving 14.

An der Vorspinnmaschine 14 werden die Hängewagenzüge 11 dann erneut mit frischen Vorgarnspulen 12 bestückt.At the roving 14 the hanging trolley trains 11 are then re-stocked with fresh roving bobbins 12.

Es wird ausdrücklich darauf hingewiesen, dass alle in den Anmeldungsunterlagen offenbarten Angaben und Merkmale, insbesondere die in den Zeichnungen dargestellte räumliche Ausbildung, soweit sie einzeln oder in Kombination gegenüber dem Stand der Technik neu sind, als erfindungswesentlich beansprucht werden.It is expressly pointed out that all information and features disclosed in the application documents, in particular the spatial training shown in the drawings, insofar as they are novel individually or in combination with respect to the prior art, are claimed to be essential to the invention.

BezugszeichenlisteLIST OF REFERENCE NUMBERS

11
RingspinnmaschineRing spinning machine
22
Gattergate
33
Gatterreihegate row
44
Anschlussgleissiding
55
Vorweichepre-soak
66
Brückenweichebridge Soft
77
Hebelgestängelever linkage
88th
Antriebdrive
99
Schienerail
1010
HängeschienensystemHanging rail system
1111
Hängewagenzugsuspended-trolley train
1212
Vorgarnspuleroving
1313
Stanzepunch
1414
Vorspinnmaschineroving
1515
Weichenkonfigurationsoft configuration
1616
Speichereinrichtungmemory device
1717
Zweite VorspeicheranordnungSecond Vorspeicheranordnung
1818
Gleis der ersten VorspeicheranordnungTrack of the first prestorage arrangement
1919
Gleis der ersten VorspeicheranordnungTrack of the first prestorage arrangement
2020
Gleis der zweiten VorspeicheranordnungTrack of the second Vorspeicheranordnung
2121
VerbindungsgleisVerbindungsgleis
2222
Weicheswitch
2323
Weicheswitch
2424
Antriebdrive
2525
Kreuzungsgleisintersection track
FF
Förderrichtungconveying direction

Claims (10)

Transportvorrichtung für eine Spinnerei zum Versorgen von Ringspinnmaschinen (1) mit Vorgarnspule (12) und Entsorgen der leergesponnenen Hülsen mit einem Hängeschienensystem (10), das zwischen mindestens einer Vorspinnmaschine (14) und einer Ringspinnmaschine (1) angeordnet und mit einer Speichereinrichtung (16) ausgestattet ist, die ein Zwischenspeichern von Hängewagenzügen (11) ermöglicht, welche entweder mit vollen Vorgarnspule (12) oder mit leergesponnenen Hülsen bestückt sind,
dadurch gekennzeichnet,
dass im Bereich der Ringspinnmaschine (1) ein Gatter (2) mit einer Vielzahl von Gatterreihen (3) installiert ist, die über eine Weichenkonfiguration (15) so an das Hängeschienensystem (10) angeschlossen sind, dass im Bedarfsfall eine Mehrzahl von Hängewagenzügen (11), die leergesponnene Hülsen aufweisen, gleichzeitig aus den Gatterreihen (3) der Ringspinnmaschine (1) ausfahrbar sind und
dass anschließend gleichzeitig die gleiche Anzahl von Hängewagenzügen (11), die mit vollen Vorgarnspule (12) bestückt sind, wieder in die Gatterreihen (3) der Ringspinnmaschine (1) einfahrbar ist.
Transport device for a spinning mill for supplying ring spinning machines (1) with a roving bobbin (12) and disposing the empty-wound tubes with a suspension rail system (10) arranged between at least one roving machine (14) and a ring spinning machine (1) and having a storage device (16). equipped, which allows a caching of suspension trolley trains (11), which are equipped either with full roving bobbin (12) or with empty-spun sleeves,
characterized,
that in the area of the ring spinning machine (1), a gate (2) is installed with a plurality of gate lines (3) connected via a switch configuration (15) as to the suspension rail system (10) are connected, that a plurality of (in case of need of suspension trolley trains 11 ), the empty spun sleeves have, at the same time from the gate rows (3) of the ring spinning machine (1) are extendable and
that then at the same time the same number of suspension trolley trains (11), which are equipped with full roving bobbin (12), again in the gate rows (3) of the ring spinning machine (1) is retractable.
Transportvorrichtung nach Anspruch 1, dadurch gekennzeichnet, dass die Speichereinrichtung (16) so gestaltet ist, dass alle aus den Gatterreihen (3) der Ringspinnmaschine (1) ausgeschleusten Hängewagenzüge (11) gleichzeitig in die Speichereinrichtung (16) einfahren und anschließend die gleiche Anzahl von Hängewagenzüge (11) wieder gleichzeitig in Richtung der Ringspinnmaschine (1) aus der Speichereinrichtung (16) ausfahren können.Transport device according to claim 1, characterized in that the storage device (16) is designed so that all of the gate rows (3) of the ring spinning machine (1) discharged hauling trains (11) retract simultaneously into the storage device (16) and then the same number of Suspension trolley trains (11) again at the same time in the direction of the ring spinning machine (1) from the storage device (16) can extend. Transportvorrichtung nach einem der vorherigen Ansprüche, dadurch gekennzeichnet, dass die Speichereinrichtung (16) eine Vorspeicheranordnung aufweist, die eine Mehrzahl von ersten Gleisen (18) entsprechend der Anzahl von Gatterreihen (3) der mindestens einen Ringspinnmaschine (1) und die gleiche Anzahl von zweiten Gleisen (19) aufweist, dass jeweils ein erstes Gleis (18) benachbart zu einem zweiten Gleis (19) angeordnet ist und jeweils eine erste Weiche (22) an dem der mindestens einen Ringspinnmaschine (1) zugewandten Ende der ersten und zweiten Gleise so angeordnet und ausgebildet ist, dass in einer ersten Stellung der ersten Weiche (22) ein Hängewagenzug (11) in das erste Gleis (18) einfahren kann und in einer zweiten Stellung der ersten Weiche (22) ein Hängewagenzug (11) aus dem zweiten Gleis (19) ausfahren kann.Transport device according to one of the preceding claims, characterized in that the storage device (16) has a prestorage arrangement which has a plurality of first tracks (18) corresponding to the number of rows of gates (3) of the at least one ring spinning machine (1) and the same number of second ones Track (19), that in each case a first track (18) adjacent to a second track (19) is arranged and in each case a first switch (22) arranged at the at least one ring spinning machine (1) facing the end of the first and second tracks and is configured such that in a first position of the first switch (22) a suspension trolley train (11) can enter into the first track (18) and in a second position Position of the first switch (22) can extend a suspension trolley train (11) from the second track (19). Transporteinrichtung nach Anspruch 3, dadurch gekennzeichnet, dass an dem anderen Ende der ersten und zweiten Gleise jeweils eine zweite Weiche (23) so angeordnet und ausgebildet ist, dass in einer ersten Stellung der zweiten Weiche (23) ein Hängewagenzug (11) aus dem ersten Gleis (18) ausfahren kann und in einer zweiten Stellung der zweiten Weiche (23) ein Hängewagenzug in das zweite Gleis (19) einfahren kann.Transport device according to claim 3, characterized in that at the other end of the first and second tracks each have a second switch (23) is arranged and designed such that in a first position of the second switch (23) a suspension trolley train (11) from the first Track (18) can extend and in a second position of the second switch (23) can bring a suspension trolley train in the second track (19). Transporteinrichtung nach einem der Ansprüche 3 oder 4, dadurch gekennzeichnet, dass die Speichereinrichtung (16) zwischen der Vorspeicheranordnung und der mindestens einen Vorspinnmaschine (14) eine weitere Vorspeicheranordnung (17) umfasst, die über die gleiche Anzahl an Gleisen (20) verfügt wie die mindestens eine Ringspinnmaschine (1) Gatterreihen (3) aufweist.Transport device according to one of claims 3 or 4, characterized in that the storage device (16) between the Vorspeicheranordnung and the at least one roving frame (14) comprises a further Vorspeicheranordnung (17) having the same number of tracks (20) as the at least one ring spinning machine (1) has gate rows (3). Transportvorrichtung nach einem der vorherigen Ansprüche, dadurch gekennzeichnet, dass die Weichenkonfiguration (15) eine Anzahl von geradlinigen Verbindungsgleisen (21) sowie eine gleiche Anzahl die Verbindungsgleise (21) querende Kreuzungsgleise (25) aufweist und
dass zur Verbindung der Verbindungsgleise (21) mit den Kreuzungsgleisen (25) jeweils eine Vorweiche (5) und in den Kreuzungsbereichen von Verbindungsgleisen (21) und Kreuzungsgleisen (25) jeweils eine Brückenweiche (6) installiert ist.
Transport device according to one of the preceding claims, characterized in that the switch configuration (15) has a number of straight connecting tracks (21) and an equal number of crossing tracks (25) crossing the connecting tracks (21) and
in that in each case a pre-switch (5) is installed for connecting the connecting tracks (21) to the intersection tracks (25), and in each case a bridge switch (6) is installed in the intersection areas of connecting tracks (21) and intersection tracks (25).
Transportvorrichtung nach Anspruch 6, dadurch gekennzeichnet, dass die Verbindungsgleise (21) zu der Speichereinrichtung (16) führen und die Kreuzungsgleise (25) zu den Gatterreihen (3) der Ringspinnmaschine (1).Transport device according to claim 6, characterized in that the connecting tracks (21) lead to the storage device (16) and the crossing tracks (25) to the gate rows (3) of the ring spinning machine (1). Transportvorrichtung nach einem der Ansprüche 6 bis 7, dadurch gekennzeichnet, dass die Vorweichen (5) jeweils eine Abzweigstellung, in der die Kreuzungsgleise (25) mit den Verbindungsgleisen (21) verbunden sind, und eine Geradeausstellung, in der die Verbindungsgleise (21) mit den Verbindungsgleisen (21) einer weiteren Weichenkonfiguration (15) verbunden sind, aufweisenTransport device according to one of claims 6 to 7, characterized in that the Vorweich (5) each have a branch position in which the intersection tracks (25) with the connecting tracks (21) are connected, and a straight-ahead position in which the connecting tracks (21) the connecting tracks (21) of a further switch configuration (15) are connected Transportvorrichtung nach einem der Ansprüche 6 bis 8, dadurch gekennzeichnet, dass die Brückenweichen (6) so angeordnet werden können, dass entweder die Verbindungsgleise (21) oder die Kreuzungsgleise (25) durchgängig sind.Transport device according to one of claims 6 to 8, characterized in that the bridging points (6) can be arranged so that either the connecting tracks (21) or the crossing tracks (25) are continuous. Transportvorrichtung nach einem der Ansprüche 6 bis 9, dadurch gekennzeichnet, dass die zahlreichen Brückenweichen (6) über ein Hebelgestänge (7) an einen gemeinsamen Antrieb (8) angeschlossen sind, der definiert ansteuerbar ist.Transport device according to one of claims 6 to 9, characterized in that the numerous bridge turnouts (6) via a lever linkage (7) to a common drive (8) are connected, which is controllable defined.
EP19169860.4A 2018-04-18 2019-04-17 Transport device for a spinning unit Active EP3556917B1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE102018109232.6A DE102018109232A1 (en) 2018-04-18 2018-04-18 Transport device for a spinning mill

Publications (2)

Publication Number Publication Date
EP3556917A1 true EP3556917A1 (en) 2019-10-23
EP3556917B1 EP3556917B1 (en) 2022-09-28

Family

ID=66217951

Family Applications (1)

Application Number Title Priority Date Filing Date
EP19169860.4A Active EP3556917B1 (en) 2018-04-18 2019-04-17 Transport device for a spinning unit

Country Status (4)

Country Link
EP (1) EP3556917B1 (en)
CN (1) CN110387607B (en)
DE (1) DE102018109232A1 (en)
ES (1) ES2929795T3 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112301477B (en) * 2020-11-03 2022-08-23 江苏大生集团有限公司 Sliver barrel arrangement and operation method for automatic conveying of sliver barrels of roving frame

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4213122A1 (en) * 1992-04-21 1993-10-28 Zinser Textilmaschinen Gmbh Suspended trolley rail conveyor - has rail sections to form a central buffer to park trolleys
DE19508399A1 (en) * 1995-03-09 1996-09-12 Zinser Textilmaschinen Gmbh Spinning mill conveyor system flexibly controlling the bobbin traffic

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3734506A1 (en) * 1987-10-12 1989-04-27 Veit Gmbh & Co SWITCH ARRANGEMENT
DE4000227A1 (en) * 1989-04-05 1990-08-23 Rieter Ag Maschf Textile ring spinning frame - has overhead rail system for automatic delivery of roving bobbins with removal of empties
DE8911853U1 (en) * 1989-10-04 1991-02-07 Veit Transpo GmbH, 8910 Landsberg Spinning mill with a hanging conveyor system
JPH07157200A (en) * 1993-12-06 1995-06-20 Howa Mach Ltd Coarse thread bobbin transporting device
DE19601286C1 (en) * 1996-01-16 1996-11-14 Zinser Textilmaschinen Gmbh An easily re-configured conveyor system. for textile spools and tubes
DE10251631B4 (en) * 2002-11-06 2005-09-29 Saurer Gmbh & Co. Kg Transport system for roving bobbins
DE102007029288A1 (en) 2007-03-23 2008-12-24 Oerlikon Textile Gmbh & Co. Kg Transport device in a spin line
DE102007014596A1 (en) 2007-03-23 2008-09-25 Oerlikon Textile Gmbh & Co. Kg Overhead transport system especially for reels in a spinning system has a transfer module to move sets of reels between a main track and side tracks
CN103074709B (en) * 2013-02-06 2015-08-26 晋中经纬泓鑫机械有限公司 Thickness coupling device in fine spining machine
JP2015158029A (en) * 2014-02-25 2015-09-03 株式会社豊田自動織機 Weighing device of roving package

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4213122A1 (en) * 1992-04-21 1993-10-28 Zinser Textilmaschinen Gmbh Suspended trolley rail conveyor - has rail sections to form a central buffer to park trolleys
DE19508399A1 (en) * 1995-03-09 1996-09-12 Zinser Textilmaschinen Gmbh Spinning mill conveyor system flexibly controlling the bobbin traffic

Also Published As

Publication number Publication date
EP3556917B1 (en) 2022-09-28
DE102018109232A1 (en) 2019-10-24
CN110387607B (en) 2022-05-31
CN110387607A (en) 2019-10-29
ES2929795T3 (en) 2022-12-01

Similar Documents

Publication Publication Date Title
EP0709501B1 (en) Method for exchanging cans between a transport carriage for flat cans and an open-end spinning machine; and a transport carriage for carrying out this method
DE3928648A1 (en) SYSTEM WITH ONE OR MORE SPINNING MACHINES AND WITH AT LEAST ONE CHANGING CARRIAGE TO CHANGE CAN
EP3584207B1 (en) Container changer for a spinning works preparation device and container changing method
EP3556917B1 (en) Transport device for a spinning unit
EP0311958B1 (en) Switching arrangement
EP0384360A2 (en) Transporting system for cans between two drawing frames
DE10130467B4 (en) Arrangement of service positions for maintenance equipment on a textile machine
DE3429153C2 (en) Creel
EP0869206B1 (en) Transport and storage system for spinning cans
EP0855456B1 (en) Method and apparatus for transporting full roving bobbins respectively empty roving cores
DE19508399C2 (en) Spinning system consisting of a number of pre-spinning machines and ring spinning machines
WO2017001297A1 (en) Device for receiving and transporting away wound coils
CH691490A5 (en) Transport and Umsetzanlage between at least one roving frame and a downstream storage or processing area.
EP0916613B1 (en) Tube supplying apparatus for textile machines for making cross-wound bobbins
DE3734505A1 (en) HANGING TRANSPORT SYSTEM
EP0534184B1 (en) Transporting system for transporting individual carriers
WO2007036335A1 (en) Supplying spool feeding method and device
EP0311069B1 (en) Transport system for roving bobbins between spinning machines
EP1568805A2 (en) Bobbin diverting device for selectively accessing a train of bobbins in a bobbin conveying system at a spinning plant
CH690781A5 (en) Transport and Umsetzanlage to a roving.
DE102013018985A1 (en) Method for carrying out a cross-bobbin change at a workstation of a textile machine producing cross-wound bobbins as well as textile machines producing cross-wound bobbins.
EP0909844B1 (en) Sliver can stand
DE4445263C2 (en) Transport and transfer system for roving bobbins and empty tubes
EP2140050A2 (en) Transport device in a spinning mill
DE19611398A1 (en) Simple flexible transport routing system for textile reels and cores on suspended trains

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION HAS BEEN PUBLISHED

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20200423

RBV Designated contracting states (corrected)

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

RIC1 Information provided on ipc code assigned before grant

Ipc: B65H 67/06 20060101ALI20220520BHEP

Ipc: D01H 9/18 20060101ALI20220520BHEP

Ipc: D01H 1/18 20060101ALI20220520BHEP

Ipc: D01H 9/00 20060101AFI20220520BHEP

INTG Intention to grant announced

Effective date: 20220615

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

Free format text: NOT ENGLISH

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 1521291

Country of ref document: AT

Kind code of ref document: T

Effective date: 20221015

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 502019005741

Country of ref document: DE

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

Free format text: LANGUAGE OF EP DOCUMENT: GERMAN

REG Reference to a national code

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2929795

Country of ref document: ES

Kind code of ref document: T3

Effective date: 20221201

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG9D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220928

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220928

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20221228

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220928

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220928

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220928

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20220928

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220928

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20221229

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220928

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220928

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230130

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220928

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220928

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220928

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230128

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220928

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 502019005741

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220928

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220928

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220928

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: IT

Payment date: 20230428

Year of fee payment: 5

Ref country code: ES

Payment date: 20230503

Year of fee payment: 5

Ref country code: DE

Payment date: 20230426

Year of fee payment: 5

Ref country code: CH

Payment date: 20230502

Year of fee payment: 5

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20230629

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220928

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20230417

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230417

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20230430

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220928

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230417

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220928

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230417

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230430

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230430

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230417

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230417