EP0999907B1 - Dispositif et procede pour le remplacement d'une piece interchangeable d'un agencement de lingotiere d'une installation de coulee continue - Google Patents

Dispositif et procede pour le remplacement d'une piece interchangeable d'un agencement de lingotiere d'une installation de coulee continue Download PDF

Info

Publication number
EP0999907B1
EP0999907B1 EP98941350A EP98941350A EP0999907B1 EP 0999907 B1 EP0999907 B1 EP 0999907B1 EP 98941350 A EP98941350 A EP 98941350A EP 98941350 A EP98941350 A EP 98941350A EP 0999907 B1 EP0999907 B1 EP 0999907B1
Authority
EP
European Patent Office
Prior art keywords
mold
mould
replaceable part
continuous casting
casting installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
EP98941350A
Other languages
German (de)
English (en)
Other versions
EP0999907A1 (fr
Inventor
Adalbert Roehrig
Adrian Stilli
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Concast Standard AG
Original Assignee
Concast Standard AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Concast Standard AG filed Critical Concast Standard AG
Publication of EP0999907A1 publication Critical patent/EP0999907A1/fr
Application granted granted Critical
Publication of EP0999907B1 publication Critical patent/EP0999907B1/fr
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D11/00Continuous casting of metals, i.e. casting in indefinite lengths
    • B22D11/04Continuous casting of metals, i.e. casting in indefinite lengths into open-ended moulds
    • B22D11/057Manufacturing or calibrating the moulds
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D11/00Continuous casting of metals, i.e. casting in indefinite lengths
    • B22D11/04Continuous casting of metals, i.e. casting in indefinite lengths into open-ended moulds
    • B22D11/053Means for oscillating the moulds
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D11/00Continuous casting of metals, i.e. casting in indefinite lengths
    • B22D11/07Lubricating the moulds
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D11/00Continuous casting of metals, i.e. casting in indefinite lengths
    • B22D11/12Accessories for subsequent treating or working cast stock in situ
    • B22D11/124Accessories for subsequent treating or working cast stock in situ for cooling

Definitions

  • the invention relates to a continuous caster with a device for Changing a changing part of a mold arrangement of the continuous casting plant according to the preamble of claim 1 and a method for changing an interchangeable part of the continuous caster according to claim 1.
  • continuous casting plants in particular continuous steel casting plants, as a rule from time to time a mold or at least one component of the mold be replaced.
  • a mold or at least one component of the mold be replaced.
  • the action of one in the mold cavity a mold that solidifies onto the mold cavity Mold cavity wall in the long run to wear and tear and requires one Repair or replacement of the mold cavity wall.
  • Incidents that occur during casting operation such as breakthroughs in a strand shell or overflows of the molten metal through the pouring opening of the mold usually lead to an interruption of the casting operation on the affected Mold.
  • parts of the continuous caster, especially the mold or parts of the mold and strand guiding devices below the mold of solidified metal can be freed or even replaced before the casting operation can be resumed.
  • Molds are usually held in a continuous caster by a holding device worn, which is designed so that the molds in a casting position can be oscillated.
  • the holding device is usually used as an oscillating table, which is accessible from above for the installation and removal of a mold.
  • molds with vertical or sloping Mold cavities become intermediate vessels in the casting operation above the molds arranged, from which molten metal is poured into the mold cavity , usually several molds with melt from an intermediate vessel be supplied with several spouts.
  • a major accident involving the exchange a mold necessarily entails the closure of the foundry the mold affected by the accident and consequently a reduction in the casting performance the multiple-strand system, since the tundish gives access to the Molds blocked from above and the necessary mold replacement only in one Watering pause after removal of the intermediate vessel is possible.
  • a continuous casting installation is known from US Pat. No. 3,273,208, which is used for long sequence castings is suitable and which has a device for quickly changing one Mold is provided.
  • the mold can be moved horizontally on a straight line
  • the sliding table is arranged, with a mold transfer carriage that can be moved across it or cooperates with a turntable.
  • the movable sliding table requires open paths along the travel path in the Giessbühenêt Pits that are undesirable for safety reasons.
  • When using the Rotary tables in connection with multi-strand systems are large strand spacings and therefore large intermediate vessels are required.
  • An installation of this changing device in multi-strand systems not only leads to a high constructive Effort, but also too high operating costs, due to the maintenance the wear-prone intermediate vessels.
  • the holding device includes a platform on which the mold is attached in an operating position and their height with the help of two, provided with independent drives Lever systems is changeable.
  • a first lever system enables one Lowering and lifting the platform and serves as a transport device for Transport of the mold from the operating position to a second position in which the Chill captured by a second transport device below the casting platform, can be lifted off the platform and transported further.
  • a second Lever system allows the mold to oscillate around through the first lever system predetermined position by the die from the mold, the platform and the first lever system formed assembly as a whole with the help of the second lever system is set in motion.
  • This construction has the disadvantage that a relatively large total mass in the casting plant for oscillating the mold Movement must be kept and that the first lever system against the Vibrations transmitted by the second lever system are stabilized in a complex manner must be maintained in a controlled manner over a long period of time to be able to. Furthermore, in the initial phase of the mold change with the Transport device a relatively large mass in addition to the mold be moved.
  • a mold which is on an oscillating lifting table is releasably attached and a water tank, upper and lower flange plates, one Has water jacket and a mold tube.
  • LU 84 507 discloses a multi-strand casting plant with an arrangement of molds, where each mold including all its accessories, such as in particular the oscillation device for the mold is arranged on a frame, which is slidably mounted in the longitudinal direction on a lowerable ramp. After lowering the ramp, the mold together with the oscillation device, which consists of an oscillation mechanism and a drive motor, are moved along the ramp to a position below the working position, where they are separated from the oscillation device and then replaced can be. This arrangement also requires a relatively large one The mass must be moved before the mold can be replaced.
  • the invention has for its object the disadvantages of the known devices to avoid and a structurally simplified device and a method for changing an interchangeable part of a mold arrangement of a continuous caster to create, it being in a multi-line system while running Casting operation should be possible, the changing process with a single, selected Perform mold.
  • the mold in addition to a mold cavity wall, the one Form strand, comprises a support structure for the mold cavity wall.
  • the Support structure is a separable connection of the mold cavity wall with the oscillatable holding device producible.
  • the holding device determines the casting position of the mold.
  • a part of the mold arrangement becomes a stationary part viewed, which is connected to the change part in the casting operation and the spatial arrangement of the interchangeable part, in the following operating position of Exchange part called, defined and remains if the exchange part with the help the transport device is removed from the operating position.
  • the stationary part comprises at least the holding device.
  • the interchangeable part comprises at least one component of the Permanent mold, the holding device and the interchangeable part being designed in such a way that the change part after separation from the stationary part by means of Transport device from the operating position to a room below the Casting position is movable. Because at the beginning of a change process First the interchangeable part is separated from the stationary part decoupled from the oscillatable holding device. That way it is possible to change the changing part without moving the stationary part. So can keep the mass load of the transport device in operation to a minimum be reduced. Furthermore, the transport device can be designed so that it is separate from the holding device and the holding device in the casting operation together with the mold unaffected by the transport device can be oscillated.
  • the change part in multi-strand systems can also be replaced during the casting operation, even if intermediate vessels Block access to the replacement parts from above via the molds.
  • multi-strand systems with any strand spacing can realized and a device according to the invention, adapted to a predetermined Strand spacing, to be constructed. The strand spacing can be minimized if the transport device is designed, for example, that a mold in the strand guide direction in the space under the casting position can be moved. This will cause the mold to move in the direction avoided on a neighboring strand.
  • the Exchangeable part can be detected by the transport device.
  • the interchangeable part consists only of the mold cavity wall the mold. So it will be possible to use only part of a mold, which is subject to the greatest wear, to change without the rest Parts of the mold or the mold arrangement, which are usually a much larger one Mass than the mold cavity wall have to move.
  • the stationary Part of the mold arrangement can be equipped with guide elements in order to Automatic positioning of the change part when moving into its operating position to facilitate. Seals integrated into the management organs can be provided to automatically change the mold cavity wall when changing to seal against the leakage of coolant with which the mold cavity wall is acted upon.
  • This embodiment is particularly easy to implement in connection with a mold with spray cooling; in this case can a spray cooling device for cooling the mold cavity wall the stationary Part of the mold arrangement can be assigned. This embodiment is but also applicable to molds with water jacket cooling.
  • the interchangeable part is formed from the mold cavity wall with a coolant channel for cooling the mold cavity wall.
  • the coolant channel can be designed, for example, as a mold cavity wall surrounding water jacket cooling.
  • the stationary part of the mold arrangement with a supply connection to equip for the coolant such that the coolant channel automatically when the replacement part is inserted into the operating position Supply connection is connected.
  • the interchangeable part comprises the Chill mold in its entirety.
  • the support structure is the mold cavity wall separably connected to the holding device such that the mold detectable by the transport device and from the operating position into one Space below the casting position is movable.
  • the mold or mold arrangement can comprise devices that of influencing the casting and / or solidification processes and / or the Monitoring and / or controlling the function of the continuous casting system. Further embodiments according to the invention can be distinguished according to which of the devices mentioned optionally the stationary part of the Chill mold arrangement or the interchangeable part.
  • devices that are located directly at the outlet opening of the Mold cavity to act on an emerging strand, on the interchangeable part to arrange.
  • These devices include casters, for example and / or spray cooling devices and / or an electromagnetic stirrer for the strand.
  • Devices that need to be replaced less frequently can be used with Advantage formed as part of the stationary part of the mold arrangement and connected to the holding device in the periphery of the mold, for example or if the support structure for the mold cavity wall is the stationary one Part is attributable to be arranged on the support structure.
  • Such devices are, for example, devices for electromagnetic stirring and / or brakes for molten metal in the mold cavity and / or in the strand or a spray cooling device for the strand.
  • Such devices are, for example, devices for electromagnetic stirring and / or brakes for molten metal in the mold cavity and / or in the strand or a spray cooling device for the strand.
  • the transport device can be designed for lower loads can.
  • devices that are in connection with complex utilities are operated, advantageously the stationary part of the mold arrangement are not assigned to the connection to the supply facility excessively complex, for example in the form of detachable supply connections, to have to design.
  • Measuring devices for example, fall into this category to control the casting operation, in particular to measure a Pouring level and / or to control the temperature of parts of the mold.
  • an interchangeable part that includes one or more components that provide a supply need by means of stationary supply connections.
  • the stationary part has at least one supply connection has and the interchangeable part is designed such that the supply connection when changing the replacement part to a corresponding supply connection of the interchangeable part is coupled or decoupled to a supply connection to manufacture or to solve.
  • supply connections can be used to supply energy or coolants or lubricants or serve to exchange signals.
  • a controllable connected to the change part Device or a measuring probe for example a temperature probe Measuring the temperature in the mold cavity wall or other segments of the Exchange part, with control and / or measuring devices in the periphery of the Exchange part can be exchanged.
  • the transport device can be a Include lifting device with which the interchangeable part can be connected and which is designed that the changing part of the operating position in the room below the casting position is movable.
  • the transport device can be designed in this way be that the change part from the operating position along at least one Partial route essentially tangential to the strand guiding direction at the outlet opening is movable.
  • This embodiment of the transport device has the advantage that the changing part has a particularly small volume when changing sweeps. In this way it is possible to make the mold arrangement special compact to build.
  • the interchangeable part must have little freedom of movement when changing be removed from its operating position.
  • the Interchangeable part from the operating position on a piece-wise straight and / or piecewise arcuate path is movable. This results in the advantage usable possibility to change the change part from the operating position into any appropriate position to move, in the exchange part of another treatment can be subjected.
  • a continuous caster where the Strand immediately after exiting the mold through a secondary cooling chamber it is possible, for example, to construct the transport device in such a way that it can be positioned outside the secondary cooling chamber and the interchangeable part through a closable opening in the cooling chamber wall detectable and laterally after a movement tangential to the strand guide direction can be transported from the secondary cooling chamber.
  • the transport device As a mobile unit perform.
  • This construction offers the advantage in multi-strand systems that multiple molds can be served with the same transport device by the transport device suitably in the vicinity of the one to be replaced Exchange part is positioned.
  • the transport device it is also conceivable for the transport device to be arranged stationary with respect to the continuous caster. For example, everyone Mold can be assigned to a transport device. In this case there is no elaborate positioning of a once set on an interchangeable part Transport device. This makes automation of an inventive Device facilitated.
  • the mold arrangement 1 shows a mold arrangement 1 that passes through an opening in a base 6 a casting platform rises.
  • the mold arrangement 1 comprises a mold 2 with a Mold cavity 3 and a holding device 4 for the mold 2.
  • the mold 2 is provided as an interchangeable part of the mold arrangement 1 and can be used by the other components of the mold arrangement 1 forming a stationary part and can be moved by means of a transport device 23.
  • the following will be Reference numerals 2a, 2b etc. used to move the mold 2 in different positions to mark.
  • the mold cavity 3 is covered by a mold cavity wall 9 a pouring opening at the top and an outlet opening for one Strand 3 'formed at the lower end of the mold 2.
  • the strand 3 ' is as a solidified strand residue is shown, which is directly at the outlet opening of the mold 2 is cut off and has an upper end 3 "that corresponds to the casting level in casting operation.
  • the mold 2 has an outer jacket 20, which serves as a support structure for the mold cavity wall 9 and with the holding device 4 is connectable.
  • the space between the shell 20 and the mold cavity wall 9 is for the flow of a coolant, for example water, formed with a gap between the mold cavity wall 9 and the Mold cavity wall 9 surrounding tube 49 serves as a coolant channel through which the coolant is fed from a feed 15 'to a discharge 16' can.
  • the holding device 4 is designed as a mold table 4 'with an opening, through which the mold 2 can be brought into a casting position 2a from below, and with wedges 13 'displaceable along the mold table 4'. As in Fig. 1 is indicated by a double arrow in the strand guide direction, the holding device 4 can be oscillated by means of a drive, not shown.
  • the casting position 2a is defined by positioning members connected to the mold 2 13, by means of the wedges 13 'in a releasable connection with the mold table 4 'are to be brought.
  • the ends facing away from the shell 20 of the mold Inlets and outlets 15 'and 16' for the coolant are in each case as supply connections educated. These are shaped so that when inserted the mold 2 in the casting position 2a at coupling points 15 "and 16" with corresponding arranged on the stationary part of the mold arrangement 1 or discharges 15 and 16 for the coolant are separably connected.
  • the part of the mold 2a projecting from the mold table 4 ' is surrounded by a casing 11, which required different in the casting operation, accommodates devices to be attributed to the stationary part of the mold arrangement 1, for example one consisting of a radioactive emitter 12 and a detector 12 'formed measuring unit for checking the pouring level 3 "or one electromagnetic stirrer (not shown).
  • a temperature measuring device 70 is indicated in FIG.
  • the transport device 23 enables the mold 2 to be moved by two Degrees of freedom and is composed of several functional groups 23a, 23b, 23c, 23d.
  • a connection between the Transport device 23 and the mold 2a can be produced.
  • the coupling element 23d can be moved in the direction of arrow 23 'by means of the linear advance 23c, the Linear propulsion 23c in turn by means of the swivel arm 23b and a stationary one Swivel device 23a for the swivel arm 23b moved in the direction of arrow 23 " can be.
  • the coupling element 23d becomes more suitable Positioning of the transport device 23 connected to the mold 2a and by moving the wedge 13 'the connection of the mold 2a to the holding device 4th solved.
  • the mold is then activated by actuating the linear drive 23c along arrow 23 ', i.e. essentially tangential to the direction of the Strands 3 'at the outlet opening of the mold 2a, in a space 29 under the Casting position 2a moves, the supply connection of the inlets and outlets 15, 15 'or 16, 16' at the coupling points 15 "or 16" is released. Openings in the mold table 4 'and in the casing 11 serve as guide surfaces 4 "and 11 '.
  • the mold 2 can then be operated by pressing the Swivel device 23a into a suitable for further treatment of the mold 2 Position, for example in the position 2b indicated in Fig. 1 transported become. These processes are for inserting a new mold 2 into the Casting position 2a reversible.
  • FIG. 2 shows a casting vessel 30, which serves as an intermediate vessel for two strands 3 ', shown above two mold arrangements 1 '.
  • On the left Strand is an interruption in casting and a mold change and on the right A continuous casting is shown.
  • the mold arrangements 1 ' are each made of an interchangeable part consisting of one Chill mold 2 'with a mold cavity wall 9 and with a cooling water housing trained support structure 10 for the mold cavity wall 9, and from a stationary part built.
  • the stationary part comprises the mold table 4 ', Coupling devices 14 with inlets and outlets 15 and 16 for cooling water for connecting the support structure 10 to a cooling water circuit.
  • the coupling devices 14 also serve as holding devices for the Interchangeable part and are sliding plates that can be moved transversely to the direction of the strand (arrow 17) executed.
  • the drive is for the Movement according to arrow 17 omitted.
  • a lubricating oil distribution plate 18 provides for the pour-side half of the interchangeable part represents the upper part of a casing 11 of the mold 2 '.
  • a conical one Guide surface 19 also serves as the centering of the interchangeable part and as a coupling surface for lubricating oil, which is supplied via a line 21.
  • a lifting device in the secondary cooling chamber 7 22 shown as a telescopic lifting cylinder is a lifting device in the secondary cooling chamber 7 22 shown as a telescopic lifting cylinder.
  • a gripping device 24 is provided with a nitriding guide 25 and movable bolt 26 can, together with the lifting device 22, the interchangeable part in the vertical direction, i.e. essentially axially to the cavity wall 9, Pull out of its operating position or push it into it from below.
  • the lifting device 22 is arranged on a carriage 27 which is on an intermediate stage 28 can be inserted and fixed in the secondary cooling chamber 7 is.
  • a cast strand possibly clamped in the mold must underneath the mold can be separated and removed by cutting.
  • the spraying devices of the secondary cooling and, if available, guide rollers removed by swiveling or moving away are used for identical parts of the mold arrangement used.
  • Fig. 3 is in a mold arrangement 1 "in one Mold 2 "of severed strand part 31 shown.
  • the mold 2 is provided as an interchangeable part.
  • the support structure 10 for the mold cavity wall 9 of the mold 2 is with a Provide guide 32 for cooling water circulation along the mold cavity wall 9.
  • the mold cavity wall 9 is curved and can be round or rectangular etc. have cross-section.
  • the outer shape of the support structure 10 is cylindrical or prismatic, so that the interchangeable part is straight, vertical and substantially axially to the mold cavity wall 9 from the operating position can be pulled out in the direction of an arrow 33 or inserted into it.
  • the mold arrangement 1 "in Fig. 3 is with various additional devices Mistake.
  • Inside the casing 11 and the mold 2 ′′ is an electromagnetic one Stirring or braking device 51 arranged.
  • a stirrer 34 Immediately below the Mold cavity wall 9 are a stirrer 34, castors 35 and Spray devices 36 are provided.
  • the lifting device can replace the defective part in a vertical position set down on an exchange device or pick up the new one.
  • Becomes the gripping device 38 by e.g. 90 ° pivoted on the lifting device, see above the change parts can also be in a horizontal position from the change parts feeder mechanically lifted or discontinued.
  • the Interchangeable part by coupling devices 14 in the form of sliding plates, which are movable along guides 39 and through the conical guide surfaces 19 held or clamped to the casing 11.
  • a mold arrangement is shown with an interchangeable part, that of a segment of a mold 2 "', in particular a mold cavity wall 40 and a sealing flange 43, and has guide surfaces 42, 44.
  • the sealing flange 43 is with the mold cavity wall 40 against cooling water leakage sealingly connected.
  • the circular guide surface 44 also has the Function of a sealing surface and is based on a surface 45 of another annular flange 46 from.
  • the flange 46 belongs together with the one Guide and support flange 48 and a side wall 47 'formed support structure 47 for the mold cavity wall 40, a water jacket 49 and one Stirring device 50 to the stationary part of the mold 2 "'.
  • a partially illustrated lifting device 56 for Pulling out the mold cavity wall 40 visible.
  • hammer head bolts 57 can establish a connection between the sealing flange 43 and the lifting device 56 be created.
  • the mold arrangement 1 "" is a mold cavity wall according to FIGS. 6 and 7 60 of a mold 2 "" built into a support structure 61.
  • a spray water cooling system consisting of spray pipes 62 and spray nozzles 63, which are arranged via a cooling water supply 72 and a cooling water discharge line 73 are connected to a supply network.
  • the exchange part the mold arrangement 1 '' '' consists of the mold cavity wall 60, a upper sealing flange 65 with a lubricant supply 66 and a lower Sealing flange 67, which is located on a flange 68 of the support structure 61 supported.
  • a coupling part of a lifting device 69 is shown schematically. Between the upper sealing flange 65 and the support structure 61 is a another flange 70 arranged.
  • Process steps may be appropriate depending on the situation, for example stopping the inflow of the molten metal, stopping the oscillatory movement the mold, a separation of strand remnants stuck in the mold near the outlet opening the mold, a temporary removal of the secondary cooling devices under the mold.
  • the change part is for a transport device accessible and the necessary freedom of movement in the room below the casting position ensured.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Manufacturing & Machinery (AREA)
  • Continuous Casting (AREA)
  • Casting Devices For Molds (AREA)
  • Moulds For Moulding Plastics Or The Like (AREA)
  • Confectionery (AREA)

Claims (15)

  1. Installation de coulée continue, comprenant :
    a) un agencement de lingotière (1, 1', 1", 1"', 1"") qui inclut une lingotière (2a, 2', 2", 2'", 2"") et un dispositif de maintien oscillant (4) pour faire osciller la lingotière dans une position de coulée, et une partie stationnaire, ce dispositif étant formé d'une partie stationnaire (11, 47, 47', 48, 61, 70) et d'une partie interchangeable (2a, 2', 2", 2"', 2""), ladite partie interchangeable étant reliée de façon séparable à la partie stationnaire, et la partie interchangeable incluant au moins une composante de la lingotière ;
    b) un dispositif pour changer la partie interchangeable, qui inclut un dispositif de transport (22, 23, 38, 56, 69) pour le transport de la partie interchangeable entre une position de fonctionnement (2a) et une deuxième position (2b) dans un espace (29) au-dessous de la position de coulée ;
    caractérisée en ce que :
    c) la partie stationnaire inclut le dispositif de maintien (4), et
    d) le dispositif de maintien et la partie interchangeable sont ainsi réalisés que la partie interchangeable est déplaçable, après séparation vis-à-vis de la partie stationnaire (4), hors de la position de fonctionnement (2a) jusque dans la deuxième position (2b), au moyen du dispositif de transport.
  2. Installation de coulée continue selon la revendication 1, caractérisée en ce que la partie interchangeable comprend une paroi (40, 60) de cavité de moulage, qui forme une cavité de moulage (3) de la lingotière (2"', 2"") avec une ouverture d'entrée et une ouverture de sortie pour une barre (3').
  3. Installation de coulée continue selon la revendication 2, caractérisée en ce que la partie interchangeable inclut un canal à réfrigérant (32, 49) qui entoure la paroi (9) de la cavité de moulage, pour le refroidissement de celle-ci.
  4. Installation de coulée continue selon l'une des revendications 1 à 3, caractérisée en ce que la partie interchangeable inclut la lingotière (2a, 2', 2").
  5. Installation de coulée continue selon l'une ou l'autre des revendications 2 et 3, caractérisée en ce que la partie interchangeable (2") comprend au niveau de l'ouverture de sortie, des roulettes (35) et/ou des moyens de refroidissement par pulvérisation (36) et/ou un agitateur électromagnétique (34) pour la barre (31).
  6. Installation de coulée continue selon l'une des revendications 1 à 5, caractérisée en ce que la partie stationnaire (11) inclut un dispositif (50, 51) pour l'agitation électromagnétique et/ou le freinage du métal en fusion dans la cavité de moulage (3) et/ou dans la barre (31) et/ou un dispositif de refroidissement par pulvérisation pour la barre (31) et/ou des dispositifs de mesure pour le contrôle du processus de coulée, en particulier pour la mesure de la hauteur du niveau de coulée (12, 12') et/pour le contrôle de la température (71) des parties de la lingotière.
  7. Installation de coulée continue selon l'une des revendications 2, 5 et 6, caractérisée en ce que la partie stationnaire inclut un dispositif de refroidissement par pulvérisation (62, 63) pour le refroidissement de la paroi (60) de la cavité de moulage.
  8. Installation de coulée continue selon l'une des revendications 1 à 7, caractérisée en ce que la partie stationnaire comprend au moins un raccord d'alimentation (15, 16, 71), et en ce que la partie interchangeable est ainsi réalisée que le raccord d'alimentation est accouplé ou respectivement découplé lors du changement de la partie interchangeable avec un raccord d'alimentation correspondant (15', 16', 70) de la partie interchangeable, afin d'établir ou d'interrompre une liaison d'alimentation.
  9. Installation de coulée continue selon la revendication 8, caractérisée en ce que la liaison d'alimentation est réalisée en vue de l'alimentation en énergie (70, 71), en produit réfrigérant (15", 16"), en lubrifiant (21, 66), ou en signaux (70, 71).
  10. Installation de coulée continue selon l'une des revendications 1 à 9, caractérisée en ce que le dispositif de transport inclut un dispositif de levage (22, 23, 38, 56, 69) auquel la partie interchangeable est susceptible d'être reliée, et réalisé de telle façon que la partie interchangeable est déplaçable hors de la position de fonctionnement jusque dans l'espace (29) au-dessous de la position de coulée (2a).
  11. Installation de coulée continue selon l'une des revendications 1 à 10, caractérisé en ce que le dispositif de transport est ainsi réalisé que la partie interchangeable est déplaçable hors de la position de fonctionnement au moins le long d'un trajet partiel tangentiellement (23') à la direction de guidage de la barre au niveau de l'ouverture de sortie et/ou sur un trajet partiellement rectiligne (23') et/ou partiellement de forme arquée (23").
  12. Installation de coulée continue selon l'une des revendications 1 à 11, caractérisé en ce que le dispositif de transport (23) est agencé stationnaire par rapport à l'agencement de lingotière (1).
  13. Installation de coulée continue selon l'une des revendications 1 à 12, caractérisé en ce que l'installation de coulée continue comprend une pluralité d'agencements de lingotière (1'), en ce que le dispositif de transport (22, 27) est réalisé mobile, et en ce que la partie interchangeable (2') de chaque agencement de lingotière est déplaçable avec le dispositif de transport.
  14. Procédé pour échanger une partie interchangeable d'un agencement de lingotière dans une installation de coulée continue selon l'une des revendications 1 à 13, dans lequel l'agencement de lingotière comprend une lingotière et un dispositif de maintien oscillant (4) pour faire osciller la lingotière dans une position de coulée et la partie interchangeable comprend au moins une composante de la lingotière, et dans lequel la partie interchangeable est susceptible d'être reliée de manière séparable à une partie stationnaire de l'agencement de lingotière qui inclut le dispositif de maintien (4), et dans lequel est prévu un dispositif de transport (23) pour le transport de la partie interchangeable entre une position de fonctionnement (2a) et une deuxième position (2b) dans un espace (29) au-dessous de la position de coulée (2a), caractérisé en ce que la partie interchangeable (2a, 2', 2", 40, 60) est séparée de la partie stationnaire (4, 11, 47, 47', 48, 61, 70) de l'agencement de lingotière (1, 1', 1", 1"', 1"") et en ce qu'elle est ensuite déplacée jusqu'à la deuxième position (2b) au moyen du dispositif de transport (22, 23, 38, 56, 69).
  15. Procédé selon la revendication 14, caractérisé en ce que la partie interchangeable est déplacée hors de la position de coulée au moins sur un trajet partiel tangentiellement (23') à la direction de guidage de la barre et/ou hors de la position de fonctionnement sur un trajet partiellement rectiligne (23') et/ou partiellement de forme arquée (23").
EP98941350A 1997-08-08 1998-07-16 Dispositif et procede pour le remplacement d'une piece interchangeable d'un agencement de lingotiere d'une installation de coulee continue Expired - Lifetime EP0999907B1 (fr)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CH187197 1997-08-08
CH187197 1997-08-08
PCT/EP1998/004447 WO1999007498A1 (fr) 1997-08-08 1998-07-16 Dispositif et procede pour le remplacement d'une piece interchangeable d'un agencement de lingotiere d'une installation de coulee continue

Publications (2)

Publication Number Publication Date
EP0999907A1 EP0999907A1 (fr) 2000-05-17
EP0999907B1 true EP0999907B1 (fr) 2002-08-21

Family

ID=4220551

Family Applications (1)

Application Number Title Priority Date Filing Date
EP98941350A Expired - Lifetime EP0999907B1 (fr) 1997-08-08 1998-07-16 Dispositif et procede pour le remplacement d'une piece interchangeable d'un agencement de lingotiere d'une installation de coulee continue

Country Status (16)

Country Link
US (1) US6289973B1 (fr)
EP (1) EP0999907B1 (fr)
JP (1) JP2001513444A (fr)
KR (1) KR100529588B1 (fr)
CN (1) CN1096899C (fr)
AT (1) ATE222519T1 (fr)
AU (1) AU728547B2 (fr)
BR (1) BR9811138A (fr)
CA (1) CA2300388A1 (fr)
CZ (1) CZ302003B6 (fr)
DE (1) DE59805256D1 (fr)
ES (1) ES2183408T3 (fr)
PL (1) PL338470A1 (fr)
TR (1) TR200000367T2 (fr)
WO (1) WO1999007498A1 (fr)
ZA (1) ZA987015B (fr)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100829941B1 (ko) * 2002-05-29 2008-05-16 주식회사 포스코 연주기의 시그먼트 결합용 가이드
CN100387375C (zh) * 2006-04-28 2008-05-14 重庆钢铁(集团)有限责任公司 方坯连铸机电磁搅拌结晶器快速更换装置
CN1986111B (zh) * 2006-12-22 2010-04-14 江苏沙钢集团有限公司 一种快速连铸工艺
AT516300B1 (de) * 2014-09-23 2016-09-15 Primetals Technologies Austria GmbH Verfahren zum raschen Umbau einer einsträngigen Brammen-Stranggießanlage in eine mehrsträngige Knüppel-Stranggießanlage und vice versa
CN108127095B (zh) * 2017-12-05 2019-05-28 燕山大学 一种铜管水平连铸过滤器的自动化更换装置
CN113894259B (zh) * 2021-08-27 2022-11-04 上海二十冶建设有限公司 一种板坯连铸结晶器在线对中调整方法
CN113953459B (zh) * 2021-10-26 2023-10-13 马鞍山迪川机械设备有限公司 一种新能源设备精密零件批量铸造模具

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3273208A (en) * 1963-09-19 1966-09-20 United Eng Foundry Co Interchangeable continuous casting apparatus
AT347057B (de) * 1976-07-08 1978-12-11 Voest Ag Stranggiessanlage
ES236575Y (es) * 1978-06-08 1979-05-01 Mejoras introducidas en los tubos sumergidos, aplicable a distribuidores en colada continua de fundicion.
FR2442092A1 (fr) * 1978-11-22 1980-06-20 Rotelec Sa Lingotiere de coulee continue equipee interieurement d'un organe electrique
DE3207149C1 (de) * 1982-02-27 1983-07-07 Mannesmann AG, 4000 Düsseldorf Stranggiesskokille fuer fluessige Metalle
LU84507A1 (de) 1982-12-06 1984-10-22 Mecanarbed Anordnung der kokillen in einer mehrstranggiessanlage
JPH0638973B2 (ja) * 1985-07-08 1994-05-25 住友金属工業株式会社 連続鋳造設備の鋳型交換装置

Also Published As

Publication number Publication date
JP2001513444A (ja) 2001-09-04
KR100529588B1 (ko) 2005-11-17
AU8976398A (en) 1999-03-01
AU728547B2 (en) 2001-01-11
CZ2000466A3 (cs) 2000-06-14
US6289973B1 (en) 2001-09-18
CN1265615A (zh) 2000-09-06
EP0999907A1 (fr) 2000-05-17
PL338470A1 (en) 2000-11-06
CZ302003B6 (cs) 2010-09-01
TR200000367T2 (tr) 2000-07-21
KR20010022184A (ko) 2001-03-15
DE59805256D1 (de) 2002-09-26
ATE222519T1 (de) 2002-09-15
CN1096899C (zh) 2002-12-25
CA2300388A1 (fr) 1999-02-18
ZA987015B (en) 1999-02-08
WO1999007498A1 (fr) 1999-02-18
ES2183408T3 (es) 2003-03-16
BR9811138A (pt) 2000-07-18

Similar Documents

Publication Publication Date Title
EP1893368B1 (fr) Installation de coulee continue comprenant au moins deux robots multifonctionnel
EP0999907B1 (fr) Dispositif et procede pour le remplacement d'une piece interchangeable d'un agencement de lingotiere d'une installation de coulee continue
DE19637402A1 (de) Bandgießen
WO2001026847A1 (fr) Machine de coulee en bande pour produire une bande de metal et procede de commande de ladite machine
EP0107068A1 (fr) Procédé pour la coulée continue horizontale de métaux, en particulier de l'acier
WO1999000205A1 (fr) Procede et dispositif pour la commande du deplacement d'une poche de coulee a faible hauteur de coulee dans une installation de coulee
DE2738587A1 (de) Abschirmvorrichtung fuer einen giessstrahl aus fluessigem metall
EP0379042B1 (fr) Dispositif dans une installation de coulée continue pour agiter un coeur liquide d'une ligne à la sortie d'une lingotière
DE2330053A1 (de) Vorrichtung an einer stranggiessanlage
EP0268143A2 (fr) Procédé et lingotière pour la coulée continue de lingots métalliques, en particulier de lingots d'acier
DE3733933A1 (de) Stranggiesseinrichtung
DE69027771T2 (de) Induktionsschmelz- und -giessofen
DE3111057C2 (de) Ringförmige, sich horizontal erstreckende Stranggießkokille
CH689447A5 (de) Einrichtung zum Zufuehren einer Stahlschmelze in eine Stranggiesskokille.
DE3786071T2 (de) Giesspfanne zum Giessen von flüssigem Metall.
EP0577232B1 (fr) Dispositif et procédé de coulée continue avec une installation de coulée à plusieurs ligues
EP0294451B1 (fr) Procede de coulage continu de barres metalliques
LU82416A1 (de) Vorrichtung und verfahren zum chargenweisen giessen in einer stahlstranggiesserei
DE60303386T2 (de) Vorrichtung zum entleeren von metallschmelze aus einem behälter
DE2839870A1 (de) Verfahren und vorrichtung zum metallguss
DE1508816C (de) Gießanlage für das bei der Elektroschlackenraffination anfallende Metall
EP4104949A1 (fr) Dispositif d'appui pour une lingotière d'une installation de coulée continue
EP0074545A1 (fr) Procédé et installation de coulée continue horizontale de métaux liquides, notamment d'acier
CH692105A5 (de) Einrichtung zum Zuführen von Stahl in eine Stranggiesskokille.
EP0092539A1 (fr) Installation de coulée continue horizontale pour la coulée continue d'une barre ayant le format d'une brame en coupe transversale

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20000131

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT CH DE DK ES FI FR GB GR IT LI PT SE

17Q First examination report despatched

Effective date: 20000830

GRAG Despatch of communication of intention to grant

Free format text: ORIGINAL CODE: EPIDOS AGRA

GRAG Despatch of communication of intention to grant

Free format text: ORIGINAL CODE: EPIDOS AGRA

GRAH Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOS IGRA

GRAH Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOS IGRA

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT CH DE DK ES FI FR GB GR IT LI PT SE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT;WARNING: LAPSES OF ITALIAN PATENTS WITH EFFECTIVE DATE BEFORE 2007 MAY HAVE OCCURRED AT ANY TIME BEFORE 2007. THE CORRECT EFFECTIVE DATE MAY BE DIFFERENT FROM THE ONE RECORDED.

Effective date: 20020821

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20020821

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20020821

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20020821

REF Corresponds to:

Ref document number: 222519

Country of ref document: AT

Date of ref document: 20020915

Kind code of ref document: T

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

Free format text: NOT ENGLISH

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

GBT Gb: translation of ep patent filed (gb section 77(6)(a)/1977)

Effective date: 20020821

REF Corresponds to:

Ref document number: 59805256

Country of ref document: DE

Date of ref document: 20020926

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20021121

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20021121

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20021205

REG Reference to a national code

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2183408

Country of ref document: ES

Kind code of ref document: T3

EN Fr: translation not filed
PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20030716

26N No opposition filed

Effective date: 20030522

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20050615

Year of fee payment: 8

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20050617

Year of fee payment: 8

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20060716

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20070201

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20060716

REG Reference to a national code

Ref country code: CH

Ref legal event code: PFA

Owner name: CONCAST AG

Free format text: CONCAST STANDARD AG#TOEDISTRASSE 9#8027 ZUERICH (CH) -TRANSFER TO- CONCAST AG#TOEDISTRASSE 9#8027 ZUERICH (CH)

Ref country code: CH

Ref legal event code: NV

Representative=s name: LUCHS & PARTNER PATENTANWAELTE

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: ES

Payment date: 20100727

Year of fee payment: 13

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: CH

Payment date: 20110720

Year of fee payment: 14

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20120731

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20120731

REG Reference to a national code

Ref country code: ES

Ref legal event code: FD2A

Effective date: 20130606

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20110717