DE7132608U - Device that can be moved across the track for carrying heavy drills for track sales - Google Patents

Device that can be moved across the track for carrying heavy drills for track sales

Info

Publication number
DE7132608U
DE7132608U DE7132608U DE7132608DU DE7132608U DE 7132608 U DE7132608 U DE 7132608U DE 7132608 U DE7132608 U DE 7132608U DE 7132608D U DE7132608D U DE 7132608DU DE 7132608 U DE7132608 U DE 7132608U
Authority
DE
Germany
Prior art keywords
track
moved
drilling
trolleys
carrying heavy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DE7132608U
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
RAG AG
Original Assignee
Ruhrkohle AG
Publication date
Publication of DE7132608U publication Critical patent/DE7132608U/en
Expired legal-status Critical Current

Links

Landscapes

  • Machines For Laying And Maintaining Railways (AREA)
  • Processing Of Stones Or Stones Resemblance Materials (AREA)

Description

Ruhrltohle AG, 4j5 Essen, Rellinghauser Str. 1Ruhrltohle AG, 4j5 Essen, Rellinghauser Str. 1

Quer zur Strecke verfahrbare Vorrichtung zum Tragen schwerer Bohrmaschinen beim StreckenvortriebDevice that can be moved across the track to carry heavy drilling machines when driving the track

Die Neuerung betrifft eine Vorrichtung zum Tragen schwerer Bohrmaschinen, insbesondere der Gesteinsbohrmaschinen für den Streckenvortrieb, die an Einschienenhängebalinen verfahrbar aufgehängt sind.The innovation relates to a device for supporting heavy drilling machines, in particular rock drilling machines for the drifting, which are suspended on monorail balines so that they can be moved.

Die ständig steigenden Abbaugeschwindigkeiten im Untertagebetrieb fordern zwangsläufig auch eine größere Vortriebsgeschwindigkeit beim Auffahren der Strecken. Die Rationalisierung der Arbeitsvorgänge im Streckenvortrieb zum Zweck der Leistungserhöhung ist darum zu einer zwingenden Notwendigkeit geworden. Im Sinne der Rationalisierung muß unteranderem auch die Möglichkeit gegeben sein, mehrere Arbeitsvorgänge gleichzeitig und unabhängig voneinander durchzuführen. Diese Möglichkeit wird oft durch den Einsatz größerer Bohrmaschinen erschwert, da sie eine kräftigere Führung und Abstützung benötigen und auch mehr Zeit zu ihrem Versetzen von einer Stelle zur anderen brauchen.The constantly increasing mining speeds in underground operations inevitably require a higher advance speed when driving up the routes. The rationalization of the work processes in road tunneling for the purpose The increase in output has therefore become an imperative. In the sense of rationalization, among other things it is also possible to carry out several work processes simultaneously and independently of one another. This possibility is often made more difficult by the use of larger drills, as they have a stronger guide and Need support and also need more time to move them from one place to another.

Für den Einsatz solcher leistungsfähigeren Bohrmaschinen im Streckenvortrieb sind Vorrichtungen bekanntgeworden, die auf Einschienenhängebahnen in Streckenlängsrichtung verfahrbar eingerichtet sind. Der besondere Vorteil dieser Vorrichtungen besteht unter anderem darin, daß die gesamte zur Bohrmaschine gehörende maschinelle Einrichtung in einem Aggregat zusammengefaßt ist, das in der unmittelbaren Nähe der Firste an der Schiene aufgehängt ist. Die Streckensohle bleibt dadurch für den Einsatz anderer Einrichtungen frei. Die Lafette der Bohr-For the use of such more powerful drilling machines in road tunneling, devices have become known that on Monorails are set up to be movable in the longitudinal direction. The particular advantage of these devices consists, among other things, in the fact that the entire machine equipment belonging to the drilling machine is combined in one unit that is suspended from the rail in the immediate vicinity of the roof. The track sole remains for the use of other facilities. The carriage of the drilling

PRU 12/71 - 2 -PRU 12/71 - 2 -

Stk/BärPcs / bear

maschine wird bei dieser Einrichtung von einem Arm getragen, der oben am Rahmen des Aggregates angelenkt ist und hydraulisch in horizontaler und vertikaler Richtung verschwenkt werden kann. Um den Streckenquerschnitt an den Stoßen besser erfassen zu können und um die Einrichtung unabhängig von der Lademaschine bewegen zu können, werden stets zwei Hängebahnschienen jeweils in der Stoßnähe verlegt und mit je einer Bohrmaschine ausgerüstet.machine is carried by one arm in this device, which is hinged at the top of the frame of the unit and pivoted hydraulically in the horizontal and vertical direction can be. In order to be able to better grasp the cross-section of the route at the joints and to ensure that the facility is independent of To be able to move the loading machine, two overhead monorail rails are always laid in the vicinity of the joint and each with one Drill equipped.

Die großen Vorteile dieser bekannten Einrichtung, wie z.B. die Möglichkeit, Bohrungen in der Nähe der Firste, der Sohle und der Stöße etwa parallel zur Vortriebsrichtung herzustellen, das Freihalten der Sohle für andere gleichzeitig einzusetzende S Einrichtungen, leichte Handhabung und dgl., die sich auch imThe great advantages of this well-known device, such as the possibility of drilling near the roof, the sole and to produce the impacts roughly parallel to the direction of advance, to keep the sole free for others to use at the same time S facilities, easy handling and the like, which are also in the

praktischen Einsatz gut bewährt haben, werden zu einem be-have proven their worth in practical use will become a

trächtlichen Teil dadurch herabgesetzt, daß stets zwei komplette Bohreinrichtungen verwendet werden müssen. Doppelte Einrichtung bedingt nahezu doppelte Einrichtungskosten. Der Vorteil des freien Raumes an der Sohle kommt durch den Raumverlust für die zweite Bohrmaschine nicht voll zum Tragen. Die volle Ausnutzung der zweiten Bohrmaschine lot nur teil- ■ weise und meist nur dann möglich, wenn die Ortsbrust auf beiden Seiten frei ist, was wiederum eine gewisse Einschränkung des Einsatzes für andere Einrichtungen bedeutet.significant part is reduced by the fact that two complete drilling devices must always be used. Double Setup means almost double the setup costs. The advantage of the free space on the sole comes from the loss of space not fully usable for the second drill. The full utilization of the second drilling machine is only partially ■ wisely and usually only possible if the face is free on both sides, which in turn is a certain restriction of commitment to other institutions.

Diese Nachteile der sonst vorteilhaften Einrichtung werden gemäß der Neuerung dadurch beseitigt, daß an zwei in Streckenlängsrichtung parallel zueinander verlaufenden Hängebahnschienen ein in Streckenlängsrichtung verfahrbar eingerichtetes Zwischengestell angeordnet ist, an dem eine Bohrvorrichtung quer zur Strecke verfahrbar aufgehängt ist.These disadvantages become the otherwise advantageous device Eliminated according to the innovation that on two overhead monorail rails running parallel to one another in the longitudinal direction of the route an intermediate frame is arranged so as to be movable in the longitudinal direction of the route, on which a drilling device is suspended transversely to the track.

I)I I t I ' II) I I t I 'I

II.' > I It
I [ t [ I
II. '> I It
I [t [I

- 3 - ■- 3 - ■

Die neue Vorrichtung ermöglicht den Einsatz einer einzigen Bohrvorrichtung, deren Leistung auf die örtlichen Gegebenheiten des Streckenprofils genau abgestimmt werden kann. Die Bohreinrichtung kann jederzeit nach Bedarf von einer Streckenseite zur anderen leicht und in kürzester Zeit umgesetzt werden, ohne die übrigen Arbeitsvorgänge zu behindern. Der Streckenquerschnitt gewinnt mehr Bewegungsfreiheit, so daß parallel zu den anderen Arbeiten auch gebaut werden kann. Die Ausnutzung der Bohreinrichtung ist in vollem Umfang gegeben und die Einrichtungskosten werden beträchtlich herabgesetzt. The new device enables the use of a single drilling device , the performance of which can be precisely tailored to the local conditions of the route profile. The drilling device can be moved easily and quickly from one side of the route to the other at any time as required, without hindering the other work processes. The cross-section of the route gains more freedom of movement, so that construction can be carried out parallel to the other work. The drilling equipment can be used to its full extent and the equipment costs are considerably reduced.

In weiterer Ausgestaltung der Neuerung wird vorgeschlagen, daß das Zwischengestell aus zwei im Abstand parallel zueinander angeordneten, von Laufkatzen getragenen Laufschienen besteht, die durch Versteifungsgestänge miteinander verbunden sind und deren streckenstoßseitige Enden um einen geringen Betrag über die Hängebahnschienen hinaus herausragen.In a further embodiment of the innovation it is proposed that the intermediate frame consists of two spaced parallel to one another arranged running rails carried by trolleys, which are connected to one another by stiffening rods and their ends on the track joint side by a small amount the monorail rails protrude.

Durch die Ausbildung soll eine möglichst weit zu den Streckenstößen reichende Verfahrbarkeit der Bohreinrichtung erzielt werden.The aim of the training is to get as far as possible from the bumps in the route Reaching mobility of the drilling device can be achieved.

Weiterhin wird vorgeschlagen, die Vorrichtung so einzurichten, daß das Zwischengestell auf den Hängebahnschienen und die Bohrvorrichtung auf den Quer-Laufschienen fixierbar ist.It is also proposed to set up the device so that the intermediate frame can be fixed on the monorail rails and the drilling device on the transverse running rails.

Ein Ausführungsbeispiel der Neuerung ist in der Zeichnung dargestellt und wird im folgenden näher beschrieben. Es zeigen:An embodiment of the innovation is in the drawing and is described in more detail below. Show it:

Fig. 1 die Queransicht der EinrichtungFig. 1 shows the transverse view of the device

Fig. 2 die Längsansicht der Gesamteinrichtung.2 shows the longitudinal view of the entire device.

7H2Seiis.i.797H2Seiis.i.79

In Fig. 1 sind nahe dem Hangenden der Strecke 1 die Hängebahnschiöxioii 2 in Streokenlängsrichtung parallel zueinander angeordnet. Unmittelbar darunter ist das Zwischengestell 2 mittels Laufkatzen k auf den Schienen 2 in Stteckenlängsrichtung verfahrbar aufgehängt. Das Zwischengestell 5 besteht aus zwei quer zur Strecke angeordneten Laufschienen 5, die mittels Versteifungsgestänge 6 im Abstand und parallel zueinander gehalten werden. An den Laufschienen 5 ist das Antriebsaggregat 7 mittels Laufkatzen 8 aufgehängt und quer zur Strecke verfahrbar eingerichtet. Am Antriebsaggregat ist der die Lafette 9 tragende Arm 10 durch Bolzen am Antriebsaggregat 7 angelenkt. Mittels hydraulischer Zylinder 14 und 15 ist der Ann 10 in vertikaler Ebene schwenkbar eingerichtet.In Fig. 1, the hanging railroad tracks 2 are arranged parallel to one another in the longitudinal direction of the street near the hanging wall of the line 1. Immediately below this, the intermediate frame 2 is suspended by means of trolleys k on the rails 2 so as to be movable in the longitudinal direction of the section. The intermediate frame 5 consists of two running rails 5 arranged transversely to the track, which are held at a distance from and parallel to one another by means of stiffening rods 6. The drive unit 7 is suspended from the running rails 5 by means of trolleys 8 and is set up so that it can be moved transversely to the track. On the drive unit, the arm 10 carrying the mount 9 is articulated to the drive unit 7 by bolts. By means of hydraulic cylinders 14 and 15, the Ann 10 is arranged to be pivotable in the vertical plane.

Die Bohrmaschine 12 ist in der lafette 9 geführt und abgestützt. The drill 12 is guided and supported in the carriage 9.

Das Zwischengestell 3 ist denkbar einfach ausgebildet und ist sehr einfach und leicht auch an den bereits bestehenden Anlagen dieser Art anzubringen. Die Vorteile die es mit sich bringt, sind sehr groß, da eine mit dem Zwischengestell gemäß der Neuerung versehene Bohreinrichtung dieser Art zur Durchführung verschiedenster Arbeitsvorgänge im Streckenvortrieb schnell zur Seite gefahren werden kann, um beispielsweise Platz für die im Augenblick verrichteten Arbeiten zu schaffen. Selbst eine kurze Unterbrechung der Bohrarbeit würde die Gesamtleistung des Vortriebes kaum beeinträchtigen, da die Einrichtung sehr leicht abgezogen und wieder angesetzt werden kann.The intermediate frame 3 is very simple and is very simple and easy to attach to existing systems of this type. The advantages that come with it brings, are very large, as provided with the intermediate frame according to the innovation drilling device of this type for implementation various work processes in road tunneling can be quickly moved to the side, for example To create space for the work being done at the moment. Even a brief interruption in drilling would reduce overall performance hardly affect the advance, as the device can be removed and reattached very easily can.

Schutzansprüche;Protection claims;

71S280S1S.2.7S71S280S1S.2.7S

Claims (3)

A9/12/71 Stl/Bär SchutzansprücheA9 / 12/71 Stl / Bär protection claims 1. Vorrichtung zum Tragen schwerer Bohrmaschinen, insbesondere Gesteinebohrmaschinen für den Streckenvortrieb, die an Einschienenhängebahnen verfahrbar aufgehängt sind, gekennzeichnet durch ein an Laufkatzen (4) befestigtes Zwischengeetell (3) aus zwei im Abstand voneinander und parallel zueinander angeordneten Laufschienen (5), die üb^r Versteifungsgestänge (6) miteinander verbunden sind und auf denen Laufkatzen (8) verschieblich angebracht sind, die die Bohreinrichtung (7, 9, 10) tragen.1. Device for carrying heavy drills, in particular rock drills for driving, which are movably suspended on monorails, characterized by an intermediate frame (3) attached to trolleys (4) and made of two running rails (5) arranged at a distance from one another and parallel to one another, the above ^ r stiffening rods (6) are connected to each other and on which trolleys (8) are slidably attached, which carry the drilling device (7, 9, 10). 2. Vorrichtung nach Anspruch lf dadurch gekennzeichnet„ daß die Laufkatzen (4) an den Laufschienen (5) nahe deren Enden befestigt sind.2. Apparatus according to claim l f, characterized in "that the trolleys (4) are attached to the rails (5) near their ends. 3. Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, daß die Laufkatzen (4, 8) mit Feststellmitteln versehen sind.3. Apparatus according to claim 1, characterized in that the trolleys (4, 8) are provided with locking means.
DE7132608U Device that can be moved across the track for carrying heavy drills for track sales Expired DE7132608U (en)

Publications (1)

Publication Number Publication Date
DE7132608U true DE7132608U (en) 1973-02-15

Family

ID=1271498

Family Applications (1)

Application Number Title Priority Date Filing Date
DE7132608U Expired DE7132608U (en) Device that can be moved across the track for carrying heavy drills for track sales

Country Status (1)

Country Link
DE (1) DE7132608U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19524389C1 (en) * 1995-07-04 1996-10-02 Georg Koehler Self-propelled vertical and horizontal drilling equipment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19524389C1 (en) * 1995-07-04 1996-10-02 Georg Koehler Self-propelled vertical and horizontal drilling equipment

Similar Documents

Publication Publication Date Title
DE2619131A1 (en) METHOD AND DEVICE FOR REPLACING SECTIONS OF A TRACK
DE3108877C2 (en) Anchor drilling and anchor setting device assigned to a tunneling machine
DE2503197A1 (en) CONSTRUCTION TRAIN TO RENOVATE A RAILWAY TRACK
DE3428358C1 (en) Partial section tunnel boring machine with integrated anchor drilling and / or setting device
DE4112224A1 (en) TAMPING UNIT FOR TRACKING MACHINES TO PLUG THREE THRESHOLD
DE2558647A1 (en) ARRANGEMENT FOR DRIVING TRACKS AND FOR ADDING TRACK EXPANSION
DE2701380A1 (en) EXTENSION UNIT FOR THE SHIELD DRIVE FROM TUNNELS OR TALLS
EP3685016B1 (en) Conveying and transport system for tunnel constructions
DE2140901C3 (en) Maneuvering device
DE7132608U (en) Device that can be moved across the track for carrying heavy drills for track sales
DE2747975C3 (en) Device for building routes, especially in mining
DE2908452A1 (en) Mine gallery prefabricated support setting machine - is ring mounted on travelling bench on gantry on section cutting machine
DE3816621A1 (en) Apparatus for the local assembly of bulky machine parts, in particular support shields in mines
DE2646496A1 (en) DEVICE FOR CONTINUOUS EXTENSION OF A ROUTE
DE2606060C3 (en) Excavation and loading vehicle for mining operations
DE2623502C3 (en) System for handling and providing clamping plates and / or casting molds
DE3203939C2 (en) Transfer device to roadheaders
DE1904683A1 (en) ? for railroad tracks, especially those of the daytime fall
DE2817635C2 (en)
DE3744935C2 (en) Overhead travelling carriage for mine support erection
AT389337B (en) Track-travelling system and method for picking up, transporting and putting down or exchanging goods, in particular sleepers
DE3824395C1 (en) Device for shifting support sections, designed as I-shaped box sections and free of external straps, in mine and tunnel support free of bracing and props
AT331288B (en) MOBILE EQUIPMENT FOR LAYING AND OR. OR PICKING UP CROSS SLEEPERS OF A TRACK
DE2646800C3 (en) Device for the transport of striding support frames in mining and tunnel construction
DE1580914C3 (en) Movable reversing station for cable-operated railways, especially for underground monorails