DE1684430B2 - Method for building high-rise buildings or the like. and device for carrying out the method - Google Patents

Method for building high-rise buildings or the like. and device for carrying out the method

Info

Publication number
DE1684430B2
DE1684430B2 DE1966S0105269 DES0105269A DE1684430B2 DE 1684430 B2 DE1684430 B2 DE 1684430B2 DE 1966S0105269 DE1966S0105269 DE 1966S0105269 DE S0105269 A DES0105269 A DE S0105269A DE 1684430 B2 DE1684430 B2 DE 1684430B2
Authority
DE
Germany
Prior art keywords
ceiling
formwork
wall
construction section
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
DE1966S0105269
Other languages
German (de)
Other versions
DE1684430C3 (en
DE1684430A1 (en
Inventor
Eduard Dipl.-Ing. 8011 Neukeferloh Balkheimer
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Walter Bau AG
Original Assignee
Dyckerhoff and Widmann AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dyckerhoff and Widmann AG filed Critical Dyckerhoff and Widmann AG
Priority to DE1966S0105269 priority Critical patent/DE1684430C3/en
Publication of DE1684430A1 publication Critical patent/DE1684430A1/en
Publication of DE1684430B2 publication Critical patent/DE1684430B2/en
Application granted granted Critical
Publication of DE1684430C3 publication Critical patent/DE1684430C3/en
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/38Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings for plane ceilings of concrete
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/35Extraordinary methods of construction, e.g. lift-slab, jack-block
    • E04B1/3505Extraordinary methods of construction, e.g. lift-slab, jack-block characterised by the in situ moulding of large parts of a structure
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/35Extraordinary methods of construction, e.g. lift-slab, jack-block
    • E04B1/3516Extraordinary methods of construction, e.g. lift-slab, jack-block characterised by erecting a vertical structure and then adding the floors from top to bottom
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/20Movable forms; Movable forms for moulding cylindrical, conical or hyperbolical structures; Templates serving as forms for positioning blocks or the like
    • E04G11/22Sliding forms raised continuously or step-by-step and being in contact with the poured concrete during raising and which are not anchored in the hardened concrete; Arrangements of lifting means therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Building Environments (AREA)

Description

4545

Die Erfindung bezieht sich auf ein Verfahren zum Errichten von Hochhäusern od. dgl., bei dem die senkrechten Betonwände mit einer von unten nach oben vorrückenden Wandschalung, wie Gleit- oder Kletterschalung, und die Decken in Bauabschnitten, die sich jeweils über mehrere Geschosse erstrecken, noch während der Herstellung des darüberliegenden Wandabschnittes auf Deckenschalungen hergestellt werden, wobei für jeden Bauabschnitt eine absenkbare Deckenschalung verwendet wird, die zunächst bis zur Höhe der obersten Decke des jeweiligen Bauabschnittes hochgezogen und dort festgelegt wird, worauf die Dekkcnherstellung jedes Bauabschnittes von oben nach im- le ti erfolgt, sowie auf eine Vorrichtung zur Durchführiii'.· des Verfahrens.The invention relates to a method for erecting high-rise buildings or the like, in which the vertical concrete walls are provided with wall formwork, such as sliding or climbing formwork, that moves from the bottom up, and the ceilings in construction sections that each extend over several floors, be prepared in a ceiling formwork or during the production of the overlying wall portion, being used for each stage of construction, a lowered ceiling formwork that is initially up to the height of the top blanket pulled of the respective phase of construction and fixed there, whereupon the Dekkcnherstellung each construction stage from top to im- le ti takes place, as well as a device for carrying out the process.

:>· kannte Verfahren dieser Art (FR-PS 1 358 253) erüHν1 hen ilas Fruchten von sehr hohen Bauwerken in "-clir kür/er Zeil, da Zwischendecken schon während 'lfs Vorrückens der Gleit- oder Kletterschalung eingeliracht werden, die zu einer Aussteifung führen. Bei den νιιπ'1'niinntcn Verfahren werden die Deckenschalungen für die einzelnen Bauabschnitte mittels an der Glfcit- oder Kletterschalung befestigter Hebemiael hochgezogen und in die für die oberste Decke des Bauabschnittes richtige Arbeitslage und anschließend mit auf den Decken befindlichen Hebemitteln in die für die darunterliegenden Decken entsprechenden Lagen gebracht. Wegen ihres erheblichen Gewichtes müssen die Deckenschalungen allerdings jeweils auf behelfsmäßigen, in die bereits erstellte Betonwand eingelassenen Wandkonsolen aufgelagert werden, was ihre Justierung erschwert. Außerdem müssen anschließend diese Wandkonsolen für das weitere Ablassen der Deckenschr.lungen wieder entfernt werden. Zum Schluß muß man dann noch die durch die Konsolen in den Zwischendecken oder der Wand entstandenen Ausnehmungen verputzen. :> · Known methods of this type (FR-PS 1 358 253) erüHν 1 hen the fruits of very high structures in a short period, since false ceilings are already introduced while the sliding or climbing formwork is advancing With the νιιπ'1'niinntcn method, the ceiling formwork for the individual construction sections are pulled up using lifting devices attached to the sliding or climbing formwork and in the correct working position for the top ceiling of the construction section and then with the lifting devices on the ceilings Due to their considerable weight, the ceiling formwork must be placed on makeshift wall brackets embedded in the concrete wall, which makes it difficult to adjust to be removed. Finally you have to di e plaster the recesses created by the consoles in the false ceilings or the wall.

Bei einem anderen Verfahren (OE-PS 167 316) treten zwar die letztgenannten Nachteile nicht auf br" ihm sind jedoch stockwerkshohe Rüstungen erforderlich. In another method (OE-PS 167 316) the last-mentioned disadvantages do not occur, but floor-high armor is required.

Der Erfindung liegt die Aufgabe zugrunde, einen möglichst stetigen und gleichmäßigen Arbeitsrhythmus für das Einziehen der Decken sicherzustellen und außerdem mit möglichst wenig Justierarbeit und ohne große Rüstungen auszukommen.The invention is based on the problem of a working rhythm that is as steady and uniform as possible to ensure that the ceilings are drawn in and, moreover, with as little adjustment work as possible and without big armor to get along.

Diese Aufgabe wird dadurch gelöst, daß die Decken schalung jedes Bauabschnittes so mit der Wandschalung verbunden wird, daß diese die gesamte Belastung beim Betonieren der jeweils obersten Decke jedes Bauabschnittes aufnimmt, daß das Vorrücken der Wand schalung vom Beginn der Herstellung dieser Decke bis zum Erreichen der erforderlichen Tragfähigkeit ausge setzt wird und daß die Deckenschalung nach dem Absenken zur Herstellung der jeweils darunterliegenden Decke an der darüber befindlichen, bereits ersteilten Decke angehängt wird.This object is achieved in that the ceiling formwork of each construction section so with the wall formwork is connected that this takes the entire load when concreting the topmost ceiling of each construction section takes up that the advance of the wall formwork from the beginning of the manufacture of this ceiling up to achieve the required load-bearing capacity is set and that the slab formwork after lowering for the production of the respective underlying ceiling on the one above it, which has already been created Ceiling is attached.

Hierdurch wird der Vorteil erzielt, daß auf ein Arbci ten unterhalb der jeweiligen Deckenschalungen verzichtet werden kann. Auf besondere Sk hcrheitsvorWeh rungen, die sonst bei hohen Gebäuden notwendig sind, kann weitgehend verzichtet werden. In weiterer Ausgestaltung der Erfindung kann jede einem Bauabschnitt zugeordnete Deckenschalung auf der Fundamentplatte bzw. der obersten Decke des darunter befindlichen Bauabschnittes zusammengesetzt und in etwa einem Stockwerksabstand an die Wandschalung angehängt werden. Dadurch wird der Vorteil erreicht, daß die Deckenschalung beim Vorrücken der Wandschalung bis zu deren Stillsetzen als Arbeitsbühne mitverwendbar ist.This has the advantage that an Arbci ten below the respective ceiling formwork can be dispensed with. To be especially awful The stanchions that are otherwise necessary in tall buildings can largely be dispensed with. In further development of the invention, any slab formwork assigned to a construction section can be placed on the foundation slab or the top ceiling of the construction section below and roughly one The floor spacing can be attached to the wall formwork. This has the advantage that the Slab formwork can also be used as a work platform when the wall formwork is advanced until it is shut down is.

Die Vorrichtung zur Durchführung des Verfahrens weist stetig in der Länge veränderbare Hängestangen auf, mittels der die Deckenschalung an der Wandschalung bzw. einer Decke befestigt ist. Zum Verändern ihrer Länge können die Hängestangen Schraubgewinde und Stellmuttern aufweisen. Durch die beschriebene Vorrichtung läßt sich die Deckenschalung in sehr einfacher Weise von oben her justieren.The device for carrying out the method has hanging rods which are continuously variable in length by means of which the ceiling formwork is attached to the wall formwork or a ceiling. To change her The hanging rods can have screw threads and locknuts in length. Through the described Device can be adjusted the ceiling formwork in a very simple manner from above.

Die Erfindung ist in der Zeichnung an Hand eines Ausführungsbeispiels näher erläutert. Es zeigtThe invention is explained in more detail in the drawing using an exemplary embodiment. It shows

F i g. 1 den ersten Bauabschnitt eines Hochhauses mit einer Wand- und Deckenschalung,F i g. 1 the first construction phase of a high-rise building with wall and ceiling formwork,

F i g. 2 dasselbe Hochhaus mit derselben Wand- und Deckenschalung, bei dem gerade die oberste Decke des ersten Bauabschnittes hergestellt ist,F i g. 2 the same high-rise building with the same wall and ceiling formwork in which the top ceiling of the first construction phase has just been produced,

F i g. 3 dasselbe Hochhaus mit der gleichen Wandschalung und einer weiteren Deckenschalung zur Herstellung der Decken des zweiten Bauabschnittes und Fig.4 das bereits erstellte Hochhaus mit zwanzigF i g. 3 the same high-rise building with the same wall formwork and another ceiling formwork for production the ceilings of the second construction phase and Fig. 4 the already built high-rise building with twenty

Stockwerken ohne Wandschalung, aber noch mit Dekkenschalungen in den oberen drei Bauabschnitten.Floors without wall formwork, but still with ceiling formwork in the upper three construction phases.

In F i g. 1 ist die Fundamentplatte 1 zu erkennen, auf der Seitenwände 3a ruhen, die mittels einer Gleitschalung 2 bis zur Höhe des dritten Geschosses 3.G hochgeführt sind. Von dieser Gleitschalung 2, die selbst an den Kletterstangen 4 mittels Doppelböcke 5 aufgehängt ist, werden eine obere Arbeitsbühne 6 und eine untere Arbeitsbühne 7 getragen. Außerdem sind außen Arbeitsgerüste 8 zum Nachreiben der aus der Gleitschalung heraustretenden, fertiggestellten frischen Betonflächen angehängt. Im Inneren des Gebäudes hängt eine frei tragende Deckenschalung Si, die mittels Hängestangen 10a an der Gleitschalung 2 befestigt ist. Über Spannschlösser 11a läßt sich die Deckenschalung 9a gegenüber der Gleitschalung 2 justieren. Die von Randbalken 12a getragene frei tragende Deckenschalung 9,7 läßt sich durch verschiebbare Querträger 13;i. 14j der Innenfläche des Gebäudes bei eventuellen kleinen Abstandsunterschieden der Seitenwändc 3;j so anpassen, daß sie immer dicht mit diesen abschließt. In den Seitenwänden 3a sind Ausnehmungen 15a zum Auflagern von Decken 16i bis 16s vorgesehen. Bei stillgesetzter Gleitschalung 2 braucht die Deckenschalung 9;j nur mittels der Spannschlösser 11a so justiert zu werden, daß sie genau mit dem unteren Rand der Ausnehmung 15a abschließt, um dann die Bewehrung und den Beton für die Decke einzubringen. Unmittelbar auf der Dekkenschalung 9a liegt schließlich noch eine in der Zeichnung nicht dargestellte Schalhaut auf. die den nahtlosen Übergang von der Deckenschalung 9;j in d;e Ausnehmungen 15a sicherzustellen hat.In Fig. 1 shows the foundation plate 1, on which the side walls 3a rest, which are raised by means of a sliding shuttering 2 up to the level of the third floor 3.G. An upper working platform 6 and a lower working platform 7 are supported by this sliding formwork 2, which is itself suspended from the climbing poles 4 by means of double brackets 5. In addition, work scaffolding 8 are attached to the outside for rubbing the finished, fresh concrete surfaces emerging from the sliding formwork. A self-supporting ceiling formwork Si, which is fastened to the sliding formwork 2 by means of hanging rods 10a, hangs in the interior of the building. The ceiling formwork 9a can be adjusted with respect to the sliding formwork 2 by means of turnbuckles 11a. The cantilevered ceiling formwork 9.7 carried by the edge beam 12a can be moved by means of displaceable cross members 13; i. 14j of the inner surface of the building in the event of any small differences in distance between the side walls 3; j so that it always ends tightly with these. Recesses 15a for supporting ceilings 16i to 16s are provided in the side walls 3a. When the sliding formwork 2 is shut down, the ceiling formwork 9; j only needs to be adjusted by means of the turnbuckles 11a so that it is flush with the lower edge of the recess 15a in order to then introduce the reinforcement and the concrete for the ceiling. Finally, a formwork skin (not shown in the drawing) rests directly on the ceiling formwork 9a. the seamless transition from the ceiling formwork 9; j in d ; e has to ensure recesses 15a.

F i g. 2 zeigt eine nach diesem Verfahren fertiggestellte Decke 16s für das fünfte Geschoß 5.C des ersten Bauabschnittes A. Die Gleitschalung 2 ist in entsprechender Höhe über der Decke 16s stillgesetzt worden. Anschließend wurden mittels der Spannschlösser lla die Deckenschalung 9a so justiert, daß ihre Oberfläche genau mit der Unterkante der zugehörigen, nun nicht mehr erkennbaren Ausnehmung 15a zusammentrifft und nun auf die Deckenschalung 9;i die nicht dargestellte Schalhaut aufgelegt, die auch in die Ausnehmungen 15a hineinragt Anschließend werden die ebenfalls nicht erkennbare Bewehrung ausgelegt und nun die Deckenschalung ya mit Beton ausgegossen und dieser du>'ch die Deckenschalung 9a so lange gestützt, bis er die erforderliche Festigkeit erreicht hat. Dann werden die Hängestangen 10a von der Gleitschalung 2 abgehängt. Allerdings ist hierzu die Deckenschalung 9a vorher mittels nicht weiter dargestellter Haltevorrichtungen an der obersten Decke 16s abzusichern. Nun kann die Gleitschalung 2 weiter vorrücken und mit ihr könnenF i g. 2 shows a ceiling 16s for the fifth floor 5.C of the first construction phase A completed using this method. The sliding formwork 2 has been shut down at a corresponding height above the ceiling 16s. The ceiling formwork 9a was then adjusted by means of the turnbuckles 11a so that its surface exactly meets the lower edge of the associated, now no longer recognizable recess 15a and the formwork skin (not shown) is now placed on the ceiling formwork 9; i, which also protrudes into the recesses 15a The reinforcement, which is also not recognizable, is then laid out and the ceiling formwork ya is now poured with concrete and this is supported by the ceiling formwork 9a until it has reached the required strength. Then the hanging rods 10a are suspended from the sliding formwork 2. However, for this purpose, the ceiling formwork 9a has to be secured beforehand on the uppermost ceiling 16s by means of holding devices (not shown). Now the sliding formwork 2 can move forward and can with it

ίο die Seitenwände 3b des zweiten Bauabschnittes B erstellt werden.ίο the side walls 3b of the second construction phase B are created.

Wie aus F i g. 3 ersichtlich, kann etwa gleichzeitig mittels der auf der Decke I65 befindlichen Ablaßvorrichtung 17a die Deckenschalung 9a stufenweise in die Arbeitslagen für das Erstellen der unter der Decke I65 liegenden Decken lfrs ... I61 abgesenkt, dann mit den Hängestangen 10a in den darüberliegenden Decken 16s ... 16: verankert und so nacheinander die einzelner. Decken 16-t ... I61 für das vierte bis erste Geschoß 4.C ... 1.C eingezogen werden.As shown in FIG. 3 can be seen at about the same time by means of the drainage device located on the ceiling I65 17a the slab formwork 9a gradually into the working positions for creating the under the slab I65 lying ceilings lfrs ... I61 lowered, then with the Hanging rods 10a in the overlying ceilings 16s ... 16: anchored and so the individual ones one after the other. Ceilings 16-t ... I61 for the fourth to first floor 4.C ... 1.C to be drawn in.

Ebenfalls etwa gleichzeitig wurde au· der Decke 16i eine zweite Deckenschalung 96 zusammengesetzt und, wenn die Gleitschalung 2 etwa eine Geschoßhöhe weiter voi gerückt ist, an diese angehängt, so daß sie nun wiederum als Arbeitsbühne für die Innenwandflächen des zweiten Bauabschnittes B mitverwendet werden kann.Also at about the same time, a second ceiling formwork 96 was put together on top of the ceiling 16i and, when the sliding formwork 2 has moved about one storey higher up, attached to it so that it can now be used as a working platform for the inner wall surfaces of the second construction section B.

In F i g. 4 ist schließlich in verkleinerter Darstellung das zwanzig Geschosse \.G ... 20.C aufweisende Hoch-In Fig. 4 is finally a reduced representation of the twenty storeys \ .G ... 20.C having high-

3c haus dargestellt, wobei die Decken I61 ... I65 des ersten Bauabschnittes A bereits alle erstallt sind, während in den nachfolgenden drei Bauabschnitten ß., C1 D mit den Geschossen 6.G" bis 20.G das gleichzeitige Fortschreiten der Herstellung der einzelnen Decken I620 bis 16b von oben nach unten mit den drei Deckenschalungen 9b, 9c. 9d gezeigt ist. Nachem der oberste Bauabschnitt D als letzter fertiggestellt wurde, wtrde hier erst eine Decke I619 nach der Decke I620 eingezogen, während in den unteren Bauabschnitten B, C bereits mehrere Decken erstellt sind. Weiterhin ist aus der F i g. 4 zu ersehen, daß natürlich die Decken I61 bis I620 jedes einzelnen Bauabschnittes A bis D von oben nach unten, und zwar nacheinander, hergestellt werden.3c house shown, the ceilings I61 ... I65 of the first construction phase A are already all, while in the following three construction phases ß., C 1 D with the floors 6.G "to 20.G the simultaneous progress of the production of the individual ceiling is shown I620 to 16b from top to bottom with the three-slabs 9b, 9c. 9d. Nachem de r uppermost construction phase D was completed last, wtrde here only a blanket I619 to the ceiling I620 fed, while in the lower phases B , C are already created several blankets. Furthermore, it can be seen from the F i g. 4, of course, that the blankets are I61 to I620 of each construction stage A to D from top to bottom, namely successively manufactured.

Hierzu 2 Blatt ZeichnungenFor this purpose 2 sheets of drawings

Claims (4)

I 684 Patentansprüche:I 684 claims: 1. Verfahren zum Errichten von Hochhäusern od. dgl, bei dem die senkrechten Betonwände mit s einer von unten nach oben vorrückenden Wandschalung, wie Gleit- oder Kletterschalung, und die Decken in Bauabschnitten, die sich jeweils über mehrere Geschosse erstrecken, noch während der Herstellung des darüberliegenden Wandabschnittes auf Deckenschalungen hergestellt werden, wobei für jeden Bauabschnitt eine absenkbare Deckenschalung verwendet wird, die zunächst bis zur Höhe der obersten Decke des jeweiligen Bauabschnittes hochgezogen und dort festgelegt wird, worauf die Deckenherstellung jedes Bauabschnittes von oben nach unten erfolgt, dadurch gekennzeichnet, daß die Deckenschalung jedes Bauabschnittes so mit der Wandschalung verbunden wird, daß diese die gesamte Belastung beim Betonieren der jeweils obersten Decke jedes Bauabschnittes aufnimmt, daß das Vorrücken der Wandschalung vom Beginn der Herstellung dieser Decke bis zum Erreichen der erforderlichen Tragfähigkeit ausgesetzt wird und daß die Deckenschalung nach dem Absenken zur Herstellung der jeweils darunterliegenden Decke an der darüber befindlichen, bereits erstellten Decke angehängt wird.1. A method for erecting high-rise buildings or the like, in which the vertical concrete walls are fitted with wall formwork moving from bottom to top, such as sliding or climbing formwork, and the ceilings in construction sections that each extend over several floors, even during manufacture of the overlying wall section are produced on ceiling formwork, whereby a lowerable ceiling formwork is used for each construction section, which is first pulled up to the height of the top ceiling of the respective construction section and fixed there, whereupon the ceiling production of each construction section takes place from top to bottom, characterized in that the ceiling formwork of each construction section is connected to the wall formwork so that it absorbs the entire load when concreting the topmost ceiling of each construction section, that the advance of the wall formwork is suspended from the beginning of the production of this ceiling until the required load-bearing capacity is reached and that the ceiling formwork is hung after lowering to produce the respective underlying ceiling on the above, already created ceiling. 2. Verfahren na.h Anspruch 1, dadurch gekennzeichnet, daß jede einem Bauabschnitt zugeordnete Deckenschalung auf der Fu.idamei .platte (1) bzw. der obersten Decke des darur.ler befindlichen Bauabschnittes zusammengesetzt und n; etwa einem Geschoßabstand an die Wandschalung angehängt wird.2. The method according to claim 1, characterized in that each is assigned to a construction section Slab formwork on the Fu.idamei .plate (1) or the uppermost ceiling of the building section located darur.ler assembled and n; about one Floor spacing is attached to the wall formwork. 3. Vorrichtung zur Durchführung des Verfahrens nach Anspruch 1 oder 2, dadurch gekennzeichnet, daß die Deckenschalung an der Wandschalung bzw. einer Decke über stetig in der Länge veränderbare Hängestangen befestigt ist.3. Device for performing the method according to claim 1 or 2, characterized in that that the ceiling formwork on the wall formwork or a ceiling is continuously variable in length Hanging rod is attached. 4. Vorrichtung nach Anspruch 3, dadurch gekennzeichnet, daß die Hängestangen Schraubgewinde und Stellmuttern aufweisen.4. Apparatus according to claim 3, characterized in that the hanging rods are screw threads and adjusting nuts.
DE1966S0105269 1966-08-09 1966-08-09 Method for building high-rise buildings or the like. and device for carrying out the method Expired DE1684430C3 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE1966S0105269 DE1684430C3 (en) 1966-08-09 1966-08-09 Method for building high-rise buildings or the like. and device for carrying out the method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE1966S0105269 DE1684430C3 (en) 1966-08-09 1966-08-09 Method for building high-rise buildings or the like. and device for carrying out the method

Publications (3)

Publication Number Publication Date
DE1684430A1 DE1684430A1 (en) 1969-12-04
DE1684430B2 true DE1684430B2 (en) 1974-09-26
DE1684430C3 DE1684430C3 (en) 1978-10-05

Family

ID=7526438

Family Applications (1)

Application Number Title Priority Date Filing Date
DE1966S0105269 Expired DE1684430C3 (en) 1966-08-09 1966-08-09 Method for building high-rise buildings or the like. and device for carrying out the method

Country Status (1)

Country Link
DE (1) DE1684430C3 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109403459A (en) * 2018-11-28 2019-03-01 东南大学 A kind of assembled column suspended structure system of achievable folding and expanding rapid construction

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1982003103A1 (en) * 1981-03-06 1982-09-16 John William Roach High rise system
US5460499A (en) * 1993-08-27 1995-10-24 Franklin; James W. Concrete building frame construction apparatus
IES20000239A2 (en) * 2000-03-30 2001-10-03 Terence Leahy Method of constructing a building
AU2003240022B2 (en) * 2002-02-01 2007-03-22 Yuanhe Li An erection unit for a building floor slab and the erection method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109403459A (en) * 2018-11-28 2019-03-01 东南大学 A kind of assembled column suspended structure system of achievable folding and expanding rapid construction

Also Published As

Publication number Publication date
DE1684430C3 (en) 1978-10-05
DE1684430A1 (en) 1969-12-04

Similar Documents

Publication Publication Date Title
DE102007026020A1 (en) Self-climbing system and method for concreting a beam and / or assembling a finished part by means of a self-climbing system
DE1283484B (en) Procedure for building high-rise buildings and formwork to carry out the procedure
DE1138208B (en) Method and device for setting up multi-storey buildings with a basement
DE1284076B (en) Method of erecting a building
DE1684430C3 (en) Method for building high-rise buildings or the like. and device for carrying out the method
DE3036539C2 (en) Device for the production of wall elements for the full assembly of houses
DE2125422C3 (en) Climbing formwork for erecting tower-like reinforced concrete structures
DE2213924A1 (en) Method and device for the production of multi-storey buildings with a reinforced concrete skeleton
DE1128114B (en) Process for erecting buildings with the help of assembly supports
DE1434466A1 (en) Method for erecting tall concrete structures, e.g. of high-rise residential buildings
DE2208911C3 (en) Device for distributing concrete in the course of erecting buildings
DE460542C (en) formwork
DE2404025A1 (en) Vertical wall concreting using adjacent formwork - for moulding horizontal slabs subsequently swung into vertical position
EP0148363A1 (en) Method to manufacture a building staircase or a staircase element, shuttering for carrying out this method
DE644586C (en) Process for the production of hollow stone ceilings
DE804245C (en) Method and apparatus for the manufacture of cast-in-place masonry
DE2520773A1 (en) Prefabricated reinforced brick walls with plaster surface - using a form for both operations
DE1182411B (en) Method and device for erecting multi-storey buildings with basements
DE828588C (en) Method and device for building walls for buildings or the like.
DE2651558A1 (en) METHOD AND DEVICE FOR PRODUCING SPACE ELEMENTS
DE810660C (en) Process for the production of floor slabs
DE1684381C (en) Formwork for the production of a wall base
DE803949C (en) Formwork for wall recesses, especially windows
AT337420B (en) WALL COVERING
AT334043B (en) HOLLOW WALL ELEMENT

Legal Events

Date Code Title Description
C3 Grant after two publication steps (3rd publication)
8339 Ceased/non-payment of the annual fee