CN208831156U - A kind of cable wind rope anchoring device for locating of fans installation - Google Patents
A kind of cable wind rope anchoring device for locating of fans installation Download PDFInfo
- Publication number
- CN208831156U CN208831156U CN201821475109.0U CN201821475109U CN208831156U CN 208831156 U CN208831156 U CN 208831156U CN 201821475109 U CN201821475109 U CN 201821475109U CN 208831156 U CN208831156 U CN 208831156U
- Authority
- CN
- China
- Prior art keywords
- steel plate
- cable wind
- wind rope
- locating
- anchoring device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/72—Wind turbines with rotation axis in wind direction
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/728—Onshore wind turbines
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
A kind of cable wind rope anchoring device for locating of fans installation, includes support frame;Support frame as described above has included the steel plate for supporting fixed function, and steel plate includes in the bottom steel plate being laterally arranged and being installed on side steel plate vertically arranged at left and right sides of the steel plate of bottom;Reinforcing rib is fixed between the rear and front end of side steel plate, the bottom of reinforcing rib is fixed on the steel plate of bottom;The middle part of the side steel plate is equipped with reinforcing ring, is equipped with swivel mount between reinforcing ring, stop tab is inlaid between swivel mount and reinforcing ring.The present apparatus can the stress to cable wind rope accurately adjusted and controlled, so that tower is in best stress, guarantee that subsequent construction makes smooth advances.120 degree of anchor interval is uniformly distributed.Anchor swivel mount is free to rotate, is influenced by landform, the gradient smaller.Cable wind rope stress is controllable, adjustable, and stress is good.The present apparatus is influenced smaller by landform, the gradient, and cable wind rope stress is simple, reliable.It is wider that the present apparatus adapts to boundary of works area.
Description
Technical field
The utility model relates to blower construction field, especially a kind of cable wind rope for locating of fans installation anchors dress
It sets.
Background technique
Distant view energy 120m tower is after having lifted the 5th section of tower, by oneself height and high-altitude air speed influence, tower vibration
Dynamic amplitude is larger, and to ensure that safety and the tower of equipment are gone on smoothly with what cabin abutting joint worked, integrating prevents from vibrating
Validity and field conduct convenient and efficient property, generally use cable wind rope as optimal embodiment, pass through the cable being tightened up
Wind rope limits the amplitude (generally using 3 cable wind ropes, 120 ° of adjacent angle) of tower, in order to keep the tension of cable wind rope,
It needs to anchor cable wind rope.
Since blower construction place is complicated, site operation platform is not of uniform size, in order to guarantee that cable wind rope can sufficiently inhibit
Tower is vibrated in radial direction, and the angle of tower and cable wind rope is no less than 30 °, and usually construction is advisable with 45 °.Usual blower cable
Wind rope anchoring construction is by pounding bar reinforcement into underground certain depth as anchor point, and this method is unable to accurately control three
The state of tension of cable wind rope guarantees that the resultant radial force that tower is subject to is zero.Once cable wind rope anchoring after, it is subsequent be finely adjusted it is tired
Difficult and dynamics is not easily controlled, and during distant view energy 120m tower cable wind rope anchoring construction, develops a kind of novel guy
Restrict anchor, structure is simple, it is easy to operate, can the stress to cable wind rope accurately adjusted and controlled, make tower
Cylinder is in best stress, guarantees that subsequent construction makes smooth advances.
Utility model content
The technical problem underlying of solution: a kind of cable wind rope anchoring device for locating of fans installation, structure is simple, behaviour
Make it is convenient, can the stress to cable wind rope accurately adjusted and controlled, so that tower is in best stress, after guarantee
Continuous construction makes smooth advances.
The technical scheme adopted by the utility model to solve the technical problem is as follows: a kind of guy for locating of fans installation
Rope anchor, includes support frame;Support frame as described above has included the steel plate for supporting fixed function, and steel plate includes setting in lateral
The bottom steel plate set and it is installed on side steel plate vertically arranged at left and right sides of the steel plate of bottom;It is fixed between the rear and front end of side steel plate
There is reinforcing rib, the bottom of reinforcing rib is fixed on the steel plate of bottom;The middle part of the side steel plate is equipped with reinforcing ring, is equipped between reinforcing ring
Swivel mount is inlaid with stop tab between swivel mount and reinforcing ring.
The utility model compared to the prior art, the advantage is that:
(1) present apparatus structure is simple, fixed, easy to connect, and easy to manufacture, manufacturing cost is low.Anchor structure
Simply, it is convenient to mount and dismount.Backstop chip architecture is simple, rotates, will not fall off with axis.
(2) present apparatus can the stress to cable wind rope accurately adjusted and controlled, so that tower is in best stress shape
State guarantees that subsequent construction makes smooth advances.
(3) 120 degree of anchor interval, be uniformly distributed.Anchor swivel mount is free to rotate, by landform, gradient shadow
Sound is smaller.Cable wind rope stress is controllable, adjustable, and stress is good.The present apparatus is influenced smaller, cable wind rope stress by landform, the gradient
Simply, reliably.It is wider that the present apparatus adapts to boundary of works area.
The additional aspect and advantage of the utility model will be set forth in part in the description, partially will be from following description
In become obvious, or recognized by the practice of the utility model.
Detailed description of the invention
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment
Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only
It is some embodiments of the utility model, for those of ordinary skill in the art, in the premise not made the creative labor
Under, it is also possible to obtain other drawings based on these drawings.
Fig. 1 is the utility model cable wind rope anchoring device composition schematic diagram;
Fig. 2 is the utility model support frame composition schematic diagram;
Fig. 3 is the utility model swivel mount composition schematic diagram;
Fig. 4 is the utility model stop tab schematic diagram.
Specific embodiment
Exemplary embodiments of the present disclosure are described in more detail below with reference to accompanying drawings.Although showing the disclosure in attached drawing
Exemplary embodiment, it being understood, however, that may be realized in various forms the disclosure without should be by embodiments set forth here
It is limited.On the contrary, these embodiments are provided to facilitate a more thoroughly understanding of the present invention, and can be by the scope of the present disclosure
It is fully disclosed to those skilled in the art.
In the description of the present invention, it should be understood that term " longitudinal direction ", " transverse direction ", "upper", "lower", " preceding ",
The orientation or positional relationship of the instructions such as " rear ", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outside" be based on
Orientation or positional relationship shown in the drawings is merely for convenience of description the utility model, rather than the dress of indication or suggestion meaning
It sets or element must have a particular orientation, be constructed and operated in a specific orientation, therefore should not be understood as to the utility model
Limitation.
A kind of cable wind rope anchoring device for locating of fans installation, includes support frame 4;Support frame as described above 4 includes
The steel plate 7 of support fixed function is played, steel plate 7 includes in the bottom steel plate 72 being laterally arranged and being installed on bottom steel plate 72 or so two
The vertically arranged side steel plate 71 in side;Reinforcing rib 6 is fixed between the rear and front end of side steel plate 71, the bottom of reinforcing rib 6 is fixed on
On bottom steel plate 72;The middle part of the side steel plate 71 is equipped with reinforcing ring 8, and swivel mount 2, swivel mount 2 and reinforcement are equipped between reinforcing ring 8
Stop tab 3 is inlaid between ring 8.
The swivel mount 2 includes lateral steel pipe and vertical steel pipe, and lateral steel pipe and vertical steel pipe are welded into T-shaped steel
Pipe 10;The both ends of lateral steel pipe are equipped with the stop tab card slot 11 for inlaying stop tab 3;Vertical steel pipe is in hollow form, tail portion weldering
It is connected to hex nut 9, threaded engagement is equipped with ball handle 1 in hex nut 9, and ball handle 1 connects cable wind rope.
Optimization, the outside of the bottom steel plate 72 is additionally provided with four reinforcing rings 8, and reinforcing ring 8 is equipped with anchor bolt 5, passes through four
Root anchor bolt 5 fixes support frame 4 on the ground, and slope can also construct, and it is wider to adapt to boundary of works area.
Optimization, the whole stop tab 3 is in " Jiong " character form structure, and bottom spacing is equal to the outer diameter of lateral steel pipe, backstop
Chip architecture is simple, rotates, will not fall off with axis.
Optimization, the whole reinforcing rib 6 is in "U" shaped structure, and top spacing is greater than the outer diameter of vertical steel pipe.
The principle of cable wind rope anchoring device for locating of fans installation: cable wind rope anchoring device is mainly by connection cable wind rope
Ball handle, swivel mount, stop tab, support frame, anchor bolt composition, are fixed on the ground support frame by four anchor bolts, slope
Also it can construct, the axial freedom of swivel mount is then limited by the stop tab of two sides, swivel mount is made only to retain rotary freedom.
After cable wind rope is connected to ball handle and fastens, rotating ballhead handle by bolt precession and exits and reaches tension, loosens guy
The purpose of rope, at the same also can control cable wind rope stress size and state, since swivel mount can rotate freely, cable wind rope by
Power is in good condition, is influenced by ground surface or terrain smaller.
The specific implementation method of cable wind rope anchoring device for locating of fans installation are as follows:
1) before the lifting of top section tower, be prepared in advance 3 cable wind ropes, and rope length guarantees 200m length.It is advised simultaneously on ground
The specific location of three anchor points is marked, anchor points are selected cannot influence subsequent lifting construction as principle, by cable
Wind rope is distributed in 120 ° and ties up on the flange of tower top with reference to anchor points, it is reliable to guarantee connection, while rope is in tower
What be can be convenient remove.
2) 3 anchors are anchored on the ground respectively by anchor bolt, while rotation is blocked by the stop tab of two sides
Frame, will be in ball handle precession swivel mount.Swivel mount is made of two steel-pipe weldings, is welded with ball handle joint steel pipe end
One hex nut forms bolt connection pair with ball handle.
3) top section tower bolt is all pre- next, and master hangs decoupling device, by cable wind rope by being fastened on bulb hand after manually tensing
On handle, then by the way that reinforcing bar is inserted into ball handle, rotating ballhead handle achievees the purpose that tense cable wind rope, when cable wind rope tenses
Simultaneously operating is needed, bolt should be consistent into silk number, guarantees three cable wind rope uniform forces.
4) cabin is lifted by crane, two positioning pins are installed below cabin, are docked in cabin with tower, positioning and guiding pin has passed through
When tower drum flange hole, cabin and tower also use one section of gap, ball handle is screwed out into swivel mount, removes tower cable wind rope.It completes
Cabin is docked with tower, and the method is equally applicable to the abutting joint of wind wheel and cabin.
Although the various embodiments described above are described, once a person skilled in the art knows basic wounds
The property made concept, then additional changes and modifications can be made to these embodiments, so the foregoing is merely the realities of the utility model
Example is applied, the scope of patent protection of the utility model is not intended to limit, it is all to utilize the utility model specification and accompanying drawing content
Made equivalent structure or equivalent flow shift, is applied directly or indirectly in other relevant technical fields, and similarly includes
Within the scope of patent protection of the utility model.
Claims (5)
1. a kind of cable wind rope anchoring device for locating of fans installation, includes support frame (4);It is characterized in that, the branch
Support (4) has included the steel plate (7) for supporting fixed function, and steel plate (7) includes in bottom steel plate (72), the Yi Jian being laterally arranged
Loaded on side steel plate (71) vertically arranged at left and right sides of bottom steel plate (72);Reinforcement is fixed between the rear and front end of side steel plate (71)
Muscle (6), the bottom of reinforcing rib (6) are fixed on bottom steel plate (72);The middle part of the side steel plate (71) is equipped with reinforcing ring (8), adds
Swivel mount (2) are equipped between Qiang Huan (8), stop tab (3) are inlaid between swivel mount (2) and reinforcing ring (8).
2. the cable wind rope anchoring device according to claim 1 for locating of fans installation, which is characterized in that the rotation
Frame (2) includes lateral steel pipe and vertical steel pipe, and lateral steel pipe and vertical steel pipe are welded into T-shaped steel pipe (10);Lateral steel
The both ends of pipe are equipped with the stop tab card slot (11) for inlaying stop tab (3);Vertical steel pipe is in hollow form, and tail portion is welded with hexagonal
Nut (9), threaded engagement is equipped with ball handle (1) in hex nut (9), and ball handle (1) connects cable wind rope.
3. the cable wind rope anchoring device according to claim 1 for locating of fans installation, which is characterized in that the bottom steel
Four reinforcing rings (8) are additionally provided on the outside of plate (72), reinforcing ring (8) is equipped with anchor bolt (5).
4. the cable wind rope anchoring device according to claim 2 for locating of fans installation, which is characterized in that the backstop
Piece (3) is integrally in " Jiong " character form structure, and bottom spacing is equal to the outer diameter of lateral steel pipe.
5. the cable wind rope anchoring device according to claim 1 for locating of fans installation, which is characterized in that the reinforcement
Muscle (6) is integrally in "U" shaped structure, and top spacing is greater than the outer diameter of vertical steel pipe.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821475109.0U CN208831156U (en) | 2018-09-10 | 2018-09-10 | A kind of cable wind rope anchoring device for locating of fans installation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821475109.0U CN208831156U (en) | 2018-09-10 | 2018-09-10 | A kind of cable wind rope anchoring device for locating of fans installation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208831156U true CN208831156U (en) | 2019-05-07 |
Family
ID=66312684
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821475109.0U Active CN208831156U (en) | 2018-09-10 | 2018-09-10 | A kind of cable wind rope anchoring device for locating of fans installation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208831156U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112664032A (en) * | 2019-10-16 | 2021-04-16 | 北京金风科创风电设备有限公司 | Stay cable anchoring device, stay cable type tower and wind generating set |
-
2018
- 2018-09-10 CN CN201821475109.0U patent/CN208831156U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112664032A (en) * | 2019-10-16 | 2021-04-16 | 北京金风科创风电设备有限公司 | Stay cable anchoring device, stay cable type tower and wind generating set |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101418542B (en) | Cable system construction method of spatial self-anchored rope-suspension bridge | |
CN104532843B (en) | A kind of steel column location straightening method of stand column pile | |
US4079556A (en) | Wall support device | |
CN104695752B (en) | Rapid rush-repair Tower System and its erection method | |
CN105780995B (en) | A kind of curved space tube truss structure and its installation method | |
CN205955358U (en) | Group's tower device of interior floated armful of pole of acting as go -between | |
CN110374008A (en) | A method of the erection of cable-stayed bridge steel truss is carried out in marine environment | |
CN208831156U (en) | A kind of cable wind rope anchoring device for locating of fans installation | |
CN109339458A (en) | A kind of multi-functional trolley of Cast-in-situ Beam steel reinforcement cage binding installation | |
CN108221694B (en) | The method for installing long-span arch bridge tie-rod | |
CN106703835A (en) | Welding-free quick assembly supporting structure with grid steel frames for tunnel primary supporting construction | |
CN105401527B (en) | Construction method for anchoring catwalk and catwalk anchoring device | |
CN107675624A (en) | The general telescopic sustaining wall of assembly of disk button cat ladder | |
CN107816209B (en) | The large-scale Roof Truss construction technology of installation is lifted across outer two sides | |
CN105905815A (en) | Work method of seating-type self-balance holding pole | |
CN206768628U (en) | A kind of bridge rotating hauling rope positioner | |
CN108661334A (en) | A kind of steel column hoop support device preventing the outer unstability of cast-in-situ reinforced concrete oblique circular cylinder plane | |
CN205474862U (en) | Wet seam template operation platform of portable case roof beam | |
CN208456648U (en) | A kind of soft-rock tunnel full length fastening supporting construction | |
CN209308433U (en) | A kind of multi-functional trolley of Cast-in-situ Beam steel reinforcement cage binding installation | |
CN215419516U (en) | Pipeline protection structure | |
CN206693031U (en) | A kind of large-span suspension bridge cable crane load bearing system of head-rope parallel structure | |
CN206346755U (en) | A kind of grid steel frame for tunnel just branch construction exempts to weld quick assembling supporting construction | |
CN101942835B (en) | Heavy-load composite function anchoring device for scaffold | |
CN206173966U (en) | Stake end reinforcing apparatus |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |